b. Concrete work

c. Brick work

d. Reinforcement work

6.2 Calculate the construction price rate by using build-up
rate method.

6.2.1 Distinguish the build-up rate culculation for;

a. Excavation works using hands and machine

b. Concrete work

8 c. Brick work
25/04/2022 - d. Reinforcement work
01/05/2022

7.0 The Quantity Measurement

7.1 Explain the quantity measurement using billing
method and drawing and specification method.

7.1.1 State the uses and importance of Bills of
Quantities

02/05/2022 - CUTI PERTE

08/05/2022

7.1 Explain the quantity measurement using billing

9 method and drawing and specification method.

09/05/2022 -

15/05/2022

3

4 H - Theory

Interactive
Lecture

CLO 2C PLO 2
Cooperative

CLO 4A PLO Learning
11
SYN

ASYN

1 H - Theory

2 H - Tutorial

PROJECT 1

CLO 2C
PLO 2
1 H - Theory

ENGAHAN SEMESTER

CLO 2C PLO 2 Interactive
Lecture

SYN

7

7.1.1 State the uses and importance of Bills of
Quantities

7.2 Explain the method of taking off quantity
measurement.

7.2.1 Describe the uses of dimension form, unit
measurement, items measurement, taking off list and
description of works

7.2.2 Interpret the structural drawing

7.2 Explain the method of taking off quantity
measurement.

7.2.1 Describe the uses of dimension form, unit
measurement, items measurement, taking off list and
description of works

7.2.2 Interpret the structural drawing

10
16/05/2022 -
22/05/2022

7.3 Estimate the quantity of work by using taking off
method

7.3.1 Calculate the quantity of earthwork for;

a. Site Clearance

3

ASYN
1 H - Theory
1 H - Tutorial

CLO 2C PLO 2 2 H - Theory

CLO 2C PLO 2 Interactive
Lecture
CLO 4A PLO
11 SYN

ASYN

2 H - Theory

1 H - Tutorial

1 H - Theory

8

b. Cut and fill

7.3 Estimate the quantity of work by using taking off
method

11 7.3.1 Calculate the quantity of earthwork for;
23/05/2022 - a. Site Clearance
29/05/2022 b. Cut and fill

7.3.2 Calculate the quantity of piling work for concrete
pile

7.3.3 Calculate the quantity of sub structure work for;

a. Pad Foundation

12 b. Column Stump
30/05/2022 - c. Ground Beam
05/06/2022 d. Ground Floor Slab

7.3.4 Calculate the quantity of super structure work for;

13 a. Column
06/06/2022 - b. Upper Floor
12/06/2022 c. Roof Beam

3

CLO 2C PLO 2 Interactive
Lecture
CLO 4A PLO
11 SYN

ASYN

3 H - Theory

1 H - Tutorial

CLO 2C PLO 2 Interactive
Lecture
PLO 4A PLO
11 SYN

ASYN

1 H - Theory

3 H - Tutorial

Interactive TEST 2 (1 H)
Lecture
CLO 2C PLO 2
SYN
CLO 4A PLO
11 ASYN

2 H - Theory

9

7.3.5 Calculate the quantity of finishing work for;

14 a. Floor
13/06/2022 - b. Internal and external walls
19/06/2022 c. Ceiling

4

1 H - Tutorial

CLO 2C PLO 2 Interactive
Lecture
CLO 4A PLO
11 SYN

ASYN

3 H - Theory

1 H - Tutorial

0

NAMA PENSYARAH : MUHAMAD HUSAINI BIN MOHAMA
JABATAN : JABATAN KEJURUTERAAN AWAM
KOD & NAMA KURSUS : DCC10032 – CIVIL ENGINEERING

WEEK/ TOPIC AND SUB TOPIC CL
DATE CLO

INTRODUCTION

• CIO distribution and briefing for
course DCC10032 - CIVIL ENGINEERING
MATERIALS.

• Elaborate Continous Assesment marks and
activities for whole semester.

1 1.0 CONCRETE MATERIALS AND MIXTURE
07/03/2022

- 1.1 Identify the different components of concrete
13/03/2022 materials.

1.1.1 Describe the materials in concrete mixture; cement,
fine aggregate, coarse aggregate and water.

1.1.2 List the advantages and disadvantages of concrete
in the construction industry

1.1.3 List the types of cement

4

AD KAMILAN SESI : 11 2021/2022
G MATERIALS SEKSYEN : S1
KELAS : DKA1A

TEACHING

LO PLO & ASSESSMENT DATE OF
LEARNING IMPLEMENTATION

ACTIVITIES 11/03/2022
[2 Hour]
2 H-Theory

O1C PLO1 Interactive
learning

SYN
ASYN

1

1.1.4 State the properties of cement in concrete mixture;
the chemical composition in cement, process of hydration
in concrete and the storage method of cement.

1.1.5 Describe the properties of aggregates in concrete;
classification and sources of the aggregates, criteria of
aggregates and function of the aggregates and its relation
to the strength of concrete.

1.1.6 Discuss the behavior of water in concrete mixture;
role of water in concrete mixture and the suitable water
quality for concrete mixture.

1.2 Explain the basic knowledge of concrete mixture.

1.2.1 Describe difference types of concrete mixture;
prescribed mix, designed mix and nominal mix.

1.2.2 Classify the ratio of proportions in concrete mixture

CONTINUE:

1.2 Explain the basic knowledge of concrete mixture. CLO

1.2.3 Distinguish the purposes of the following admixture CLO

in concrete mixture ; catalyzing substances, retarding
2 substances, water decreasing substance, plasticizing
14/03/2022
- substances, air trapping additive and easy mixing
additive. admixture in concrete mixture;
20/03/2022

1.3 Make use of basic knowledge of concrete mixture to
classify fresh concrete and hardened concrete.

4

2 H-Theory
O1C PLO1 Interactive

learning
O3CPLO 12

SYN
ASYN

2

1.3.1 Show the relationship between fresh concrete and
the workability of concrete

1.3.2 List the factors influencing workability on fresh
concrete; water-cement ratio, aggregate-cement ration,
shape and surface texture of aggregate and admixture
substance.

CONTINUE:

1.3 Make use of basic knowledge of concrete mixture to CLO
classify fresh concrete and hardened concrete. CLO
CLO
1.3.3 Explain the test on workability and strength of
concrete; slump test, compacting factor test and cube
test.

1.3.4 Explain the criteria of hard concrete

3 2.0 CONCRETE WORKS AT THE CONSTRUCTION
21/03/2022 SITE

-
27/03/2022

2.1 Determine the cause and effects of segregation and
bleeding on concrete.

2.1.1 Define; segregation and bleeding.

2.1.2 State the factors that influence segregation and
bleeding in concrete mixture

2.1.3 Describe the effects of segregation and bleeding on
quality of concrete

4

2 H-Theory
O1C PLO1 Interactive

learning,
O2A PLO10

Discussion
O3C PLO12

SYN
ASYN

3

CONTINUE:

2.2 Apply the basic concepts of concrete works at the CLO
construction site.

CLO

2.2.1 Describe the following works of concrete preparation
at site;batching method of concrete (volume method and
weighing method) and mixing method of concrete
(manually and using machinery.

2.2.2 Recognize the following elements of concrete
transportation;methods of concrete transportation on site
and batching plant.

2.2.3 Explain the procedures of casting and placing of
concrete

4 2.2.4 Discuss the following elements of compacting
28/03/2022 concrete;

-
03/04/2022 a. Purpose of compacting concrete

b. Method of compacting concrete
c. Advantages and disadvantages of compacting

concrete using vibrator and steel rod

2.2.5 Describe the method of concrete curing

3.0 REINFORCED CONCRETE
3.1 Explain about Reinforced concrete.
3.1.1 Describe reinforced concrete
3.1.2 Explain the types of steel reinforcement

4

2 H-Theory
O1C PLO1 Interactive

learning,
O2A PLO10

Discussion
SYN
ASYN

4

CONTINUE: CLO
CLO
3.1 Explain about Reinforced concrete.

3.1.3 Illustrate the position and distribution of
reinforcement bar

3.1.4 Discuss the cutting and bending method of
reinforcement bar

3.1.5 Identify the relationship between formwork and
reinforced concrete

5
04/04/20224.0 PRE-STRESSED CONCRETE

-

10/04/20224.1 Interpret pre-stressed concrete.

4.1.1 Describe pre-stressed concrete

4.1.2 Give the usage of pre-stressed concrete in
construction industry

4.1.3 Discuss the methods of pre-stressed concrete;

a. Pre-tension
b. Post-tension

4.1.4 Illustrate the types of bar or tendon for pre-stressed
concrete

6 5.0 TIMBER CLO
11/04/2022

- 5.1 Explain the local timber.
17/04/2022

4

2 H-Theory
O1C PLO1 Interactive

learning,
O2A PLO10

Discussion

SYN
ASYN

1.5 H- Assessment :
Theory QUIZ 1

O1C PLO1

5

5.1.1 Describe characteristics of local timber (density, CLO
moisture content, strength, durability, shrinkage, tendency
to warp)

5.1.2 Classify timber based on density, strength and types
of timber

5.1.3 Distinguish procedures of timber drying using
natural drying and tenor methods

5.1.4 Illustrate defects in timber or wood based on the
aspect of nature and external factors

5.1.5 Explain procedures in preserving timber treatment;
coal tar creosote, tar oil, petroleum oil, water-borne
preservative and boric acid or borax.

5.1.6 Explain method of treating timber; brushing and
spraying method, deluging, deeping and steeping method,
open tank application and pressure application.

5.1.7 Discuss wood based panel products; plywood, glue
laminated timber, fiber board and particle board.

5.1.8 Identify finishes of timber and its suitable liquid
solvents

5.2 Discuss the use of local timber.

5.2.1 Explain the use of local timber to as construction
materials

7 6.0 BRICK
18/04/2022

-
24/04/2022

4

O2A PLO10 Interactive (0.17 Hour)
learning,

Discussion
PRESENTATION 1

(0.33 Hour)

SYN

ASYN

1.17 H- Assessment :
Theory

6

6.1 Explain about the bricks and concrete block. CLO

6.1.1 Define bricks and concrete block; clay bricks
(common facing and engineering brick), calcium silicate
brick, sand-cement bricks and concrete block.

6.1.2 State the properties of bricks and concrete block;
clay brick, calcium-silicate bricks, sand-cement bricks and
concrete block.

6.1.3 List the usage of bricks and concrete block

6.2 Explain the basic knowledge of brick bonding in
brickwork.

6.2.1 Describe parts and dimensions of bricks

CONTINUE:

6.2 Explain the basic knowledge of brick bonding in CLO
brickwork. CLO

6.2.2 Explain the uses of different types of cut brick

8 6.2.3 Illustrate the following terminologies in brick
25/04/2022bonding; lateral or horizontal joints, vertical joints, lapped,

- quoin, stop end, tooting or gagged and racking or step.
01/05/2022

6.2.4 Discuss the principle of brick bonding in brickwork.

6.3 Apply the fundamental principles of brick bonding in
brick arrangement.

4

O1C PLO1 Interactive PRESENTATION (Cont..)
learning,

(0.83 Hour)

Discussion

SYN
ASYN

2 H-Theory

O1C PLO1 Interactive
learning

O3C PLO12

SYN

ASYN

7

6.3.1 Show the types of bonds in brickwork; stretcher
bond, header bond, English bond and Flemish bond.

02/05/2022 CUTI PERTE
-

08/05/2022
CONTINUE:

6.3 Apply the fundamental principles of brick bonding in CLO
brick arrangement. CLO

6.3.2 Illustrate the mortar pointing and jointing

7.0 STEEL AND NON-STEEL MATERIALS
9

09/05/2022
- 7.1 Explain about steel and non steel materials.

15/05/2022
7.1.1 Describe the properties and usage of steel iron; pig

iron, cast iron and wrought iron.

7.1.2 Explain the properties and usage of non-steel iron;
copper, zinc, aluminum and bronze and bronze.

7.1.3 Define non steel materials; glass, plastic and
polymer, bitumen and asphalt, paint and composite
materials.

CONTINUE: CLO

10 7.1 Explain about steel and non steel materials.
16/05/2022

-
22/05/2022

4

ENGAHAN SEMESTER

2 H-Theory
O1C PLO1 Interactive

learning,
O3C PLO12

Discussion

SYN
ASYN

2 H-Theory Assessment :
ASSIGNMENT 1
O1C PLO1 Interactive
learning

8

7.1.3 Define non steel materials; glass, plastic and
polymer, bitumen and asphalt, paint and composite
materials.

7.2 Explain the basic concepts of steel and non-steel
material

7.2.1 Illustrate the connection use for joining steel; bolt
and nut, welding and rivet.

7.2.2 Describe the corrosion of steel; types of protective
coating and protection of steel

7.2.3 Describe the fundamental knowledge of non-steel
materials.

CONTINUE:

7.2 Explain the basic concepts of steel and non-steel CLO
material CLO

7.2.3 Describe the fundamental knowledge of non-steel
11 materials.
23/05/2022
-
29/05/2022

7.3 Explain the uses of steel and non-steel materials in
building element.

7.3.1 Describe the advantages and disadvantages of steel
structural

4

SYN
ASYN

2 H-Theory
O1C PLO1 Interactive

learning,
O3C PLO12

Discussion
SYN
ASYN

9

7.3.2 Discuss the uses of non-steel materials; glass,
plastic and polymer and bitumen and asphalt.

8.0 BUILDING ELEMENTS
8.1 Explain about building elements.
8.1.1 Define building elements

8.2 Determine the fundamental knowledge of building
elements.

8.2.1 Describe the types of window; pivoted window,
hinged window, sliding window, compound window and
framed side-hung window.

8.0 BUILDING ELEMENTS

8.2 Determine the fundamental knowledge of building CLO
elements. CLO

8.2.2 Describe the types of door; flush door, panel door

and timber door.
12

30/05/2022 8.2.3 Described the types of staircase; straight run and
- staircase, quarter-twist staircase, half-run staircase
geometry staircase.
05/06/2022

8.2.4 Describe the types of roof; flat roof, gable roof,
hipped roof and lean-to roof.

5

1.33 H- Assessment :
Theory TEST 1

O1C PLO1 (0.67 Hour)
Interactive

O3C PLO12 learning

SYN
ASYN

0

CONTINUE: CLO
CLO
8.3 Explain the concept of building elements.

8.3.1 Discuss the installation of building elements
according to the building concept

9.0 FINISHES

13 9.1 Explain about building finishes.
06/06/2022

- 9.1.1 Define building finishes
12/06/2022

9.1.2 List the criteria in selection of building finishes

9.2 Interpret the fundamental knowledge of building
finishes.

9.2.1 Describe the types and properties of floor finishes;
mosaic, clay tiles, concrete tiles, marble, terrazzo, granite
tiles and wood strip and parquet.

CONTINUE:

9.2 Interpret the fundamental knowledge of building CLO

finishes.

14 CLO
13/06/20229.2.2 Describe the types and properties of ceiling finishes;

- lime plaster, cement plaster, tyrolean plaster, gypsum
19/06/2022plaster, wood strips, soft board and plywood.

5

2 H-Theory
O1C PLO1 Interactive

learning,
O3C PLO12

Discussion

SYN
ASYN

2 H-Theory
O1C PLO1 Interactive

learning,
O3C PLO12

Discussion

SYN
1

9.2.3 Describe the types and properties of roof finishes;
concrete and clay roof tiles, aluminum sheets, zinc and
asbestos.
9.3 Apply the building finishes according the building
concept.
9.3.1 Choose the suitable finishes to enhance the building
concept.

5

ASYN
2

NAMA PENSYARAH : MUHAMAD HUSAINI BIN MOHAMA
JABATAN : JABATAN KEJURUTERAAN AWAM
KOD & NAMA KURSUS : DCC10022 – BRICKWORK AND CO

WEEK/ TOPIC AND SUB TOPIC
DATE

Course Ouline distribution and briefing for Bri
course DCC10022 - BRICKWORK AND CONCRETE
LABORATORY

Elaborate Continous Assesment marks and activities for
whole semester

1 C
07/03/2022 1.0 Introduction to Civil Engineering Laboratory Wo
La
-
13/03/2022

1.1 Identify the elements to be considered in the
brickwork and concrete laboratory;
1.1.1 Layout of workshop.
1.1.2 Workshop safety procedures.
1.1.3 Handling of tools.

1.0 Introduction to Civil Engineering Laboratory

2 1.2 Recognize the workshop work principles.
14/03/2022
Bri
-

20/03/2022

5

AD KAMILAN SESI : 11 2021/2022
ONCRETE LABORATORY SEKSYEN : S1
KELAS : DKA1A

CLO PLO TEACHING ASSESSMENT DATE OF
PLO5 & IMPLEMENTATION
2.0
ickworks LEARNING 9/3/2022
CLO2 ACTIVITIES (3 hours)
Interactive
briefing and 9/3/2022
discussion (3 hours)

3 H-Practical 9/3/2022
[3 hours]
SYN
09/03/2022
ASYN [3 hours]

3.0
Concrete

orks And
aboratory

CLO1

2.0 PLO5 Interactive
ickworks briefing and
discussion
CLO2
3 H-Practical

3

1.2.1 Procedures to accomplish the given task.
1.2.2 Handling of materials and machines according to
procedure.

C
Wo
La

2.0 Brickworks

2.1 Conduct various types of arrangement for brick wall

and finishing work; Bri

2.1.1 Identify the concept of brick and finishing work.

2.1.2 Carry out the brickwork arrangement and finishing
work;

a. Stretcher Bond. C
Wo
3 b. English Bond. La
21/03/2022

-
27/03/2022 c. Flemish Bond.

d. Wall plastering.

2.1.3 Use the right tools and equipment to produce
cement mortar and construct various types of brick wall.

2.1.4 Use the right tools to gain the correct measurement
for brickwork arrangement.

2.1.5 Carry out brickwork correctly according to safety
and health procedure.

5

3.0 SYN
Concrete ASYN

orks And
aboratory

CLO1

Project Project practical
activities

2.0 PLO5
ickworks

PLO9
CLO2

CLO3

3.0 Workshop
Concrete activities Workshop practical

orks And SYN
aboratory
ASYN
CLO1

CLO3

4

2.1.6 Accomplish the brickwork within a given time frame.

2.2 Work within a group and show ability to work in team
to complete assigned tasks during practical work
sessions.

2.2.1 Show active participation and cooperation within a
group.

2.2.2 Distribute specific task to each member in group to
complete laboratory work in a given time.

2.2.3 Perform actively in a group to complete the task.

3.0 Concrete Works And Laboratory

3.1 Conduct standard testing for concrete material, fresh
concrete and hardened concrete.

3.1.1 Carry out standard test for quality of cement
(Softening Point Test).

3.1.2 Carry out standard test for quality and properties of
sand (Sand Segregation Test (Fine Aggregate)).

3.1.3 Carry out standard test for properties of course
aggregate a. Sieve Analysis Test (Coarse Aggregate).

3.1.4 Carry out standard test on workability of fresh
concrete (Slump Test).

3.1.5 Carry out standard testing to determine the strength
of hardened concrete (Compressive Strength Test
Cubes).

5

5

3.1.6 Use the right tools and equipment to obtain yield
result.

3.1.7 Carry out test correctly according to safety and
health procedure.

3.1.8 Accomplish the test within a given time frame.

3.2 Demonstrate active participation and cooperation
within a group.

3.2.1 Complete specific task within a group to complete
laboratory work in a given time.

3.2.2 Perform actively to complete the task and result.

2.0 Brickworks

2.1 Conduct various types of arrangement for brick wall

and finishing work; Bri

2.1.1 Identify the concept of brick and finishing work.

2.1.2 Carry out the brickwork arrangement and finishing C
work; Wo
4 La
28/03/2022 a. Stretcher Bond.
-
03/04/2022
b. English Bond.

c. Flemish Bond.

d. Wall plastering.

2.1.3 Use the right tools and equipment to produce
cement mortar and construct various types of brick wall.

5

Project Project practical
activities

2.0 PLO5
ickworks

PLO9
CLO2

CLO3

3.0 Workshop practical
Concrete Workshop
activities
orks And
aboratory SYN

CLO1 ASYN

CLO3

6

2.1.4 Use the right tools to gain the correct measurement
for brickwork arrangement.

2.1.5 Carry out brickwork correctly according to safety
and health procedure.

2.1.6 Accomplish the brickwork within a given time frame.

2.2 Work within a group and show ability to work in team
to complete assigned tasks during practical work
sessions.

2.2.1 Show active participation and cooperation within a
group.

2.2.2 Distribute specific task to each member in group to
complete laboratory work in a given time.

2.2.3 Perform actively in a group to complete the task.

3.0 Concrete Works And Laboratory

3.1 Conduct standard testing for concrete material, fresh
concrete and hardened concrete.

3.1.1 Carry out standard test for quality of cement
(Softening Point Test).

3.1.2 Carry out standard test for quality and properties of
sand (Sand Segregation Test (Fine Aggregate)).

3.1.3 Carry out standard test for properties of course
aggregate a. Sieve Analysis Test (Coarse Aggregate).

5

7

3.1.4 Carry out standard test on workability of fresh
concrete (Slump Test).

3.1.5 Carry out standard testing to determine the strength
of hardened concrete (Compressive Strength Test
Cubes).

3.1.6 Use the right tools and equipment to obtain yield
result.

3.1.7 Carry out test correctly according to safety and
health procedure.

3.1.8 Accomplish the test within a given time frame.

3.2 Demonstrate active participation and cooperation
within a group.

3.2.1 Complete specific task within a group to complete
laboratory work in a given time.

3.2.2 Perform actively to complete the task and result.

2.0 Brickworks

2.1 Conduct various types of arrangement for brick wall

and finishing work; Bri

5 2.1.1 Identify the concept of brick and finishing work.
04/04/2022

- 2.1.2 Carry out the brickwork arrangement and finishing
10/04/2022 work;

a. Stretcher Bond.

b. English Bond. C

5

Project Project practical
activities

2.0 PLO5
ickworks

PLO9
CLO2

CLO3

3.0 Workshop practical
Concrete Workshop
activities

8

c. Flemish Bond. Wo
d. Wall plastering. La

2.1.3 Use the right tools and equipment to produce
cement mortar and construct various types of brick wall.

2.1.4 Use the right tools to gain the correct measurement
for brickwork arrangement.

2.1.5 Carry out brickwork correctly according to safety
and health procedure.

2.1.6 Accomplish the brickwork within a given time frame.

2.2 Work within a group and show ability to work in team
to complete assigned tasks during practical work
sessions.

2.2.1 Show active participation and cooperation within a
group.

2.2.2 Distribute specific task to each member in group to
complete laboratory work in a given time.

2.2.3 Perform actively in a group to complete the task.

3.0 Concrete Works And Laboratory
3.1 Conduct standard testing for concrete material, fresh
concrete and hardened concrete.
3.1.1 Carry out standard test for quality of cement
(Softening Point Test).

5

orks And SYN
aboratory ASYN

CLO1

CLO3

9

3.1.2 Carry out standard test for quality and properties of
sand (Sand Segregation Test (Fine Aggregate)).

3.1.3 Carry out standard test for properties of course
aggregate a. Sieve Analysis Test (Coarse Aggregate).

3.1.4 Carry out standard test on workability of fresh
concrete (Slump Test).

3.1.5 Carry out standard testing to determine the strength
of hardened concrete (Compressive Strength Test
Cubes).

3.1.6 Use the right tools and equipment to obtain yield
result.

3.1.7 Carry out test correctly according to safety and
health procedure.

3.1.8 Accomplish the test within a given time frame.

3.2 Demonstrate active participation and cooperation
within a group.

3.2.1 Complete specific task within a group to complete
laboratory work in a given time.

3.2.2 Perform actively to complete the task and result.

2.0 Brickworks Bri

6
11/04/2022 2.1 Conduct various types of arrangement for brick wall

- and finishing work;
17/04/2022

6

Project Project practical
activities

2.0 PLO5
ickworks

PLO9

0

2.1.1 Identify the concept of brick and finishing work.

2.1.2 Carry out the brickwork arrangement and finishing
work;

a. Stretcher Bond.

b. English Bond. C
c. Flemish Bond. Wo
La

d. Wall plastering.

2.1.3 Use the right tools and equipment to produce
cement mortar and construct various types of brick wall.

2.1.4 Use the right tools to gain the correct measurement
for brickwork arrangement.

2.1.5 Carry out brickwork correctly according to safety
and health procedure.

2.1.6 Accomplish the brickwork within a given time frame.

2.2 Work within a group and show ability to work in team
to complete assigned tasks during practical work
sessions.

2.2.1 Show active participation and cooperation within a
group.

2.2.2 Distribute specific task to each member in group to
complete laboratory work in a given time.

2.2.3 Perform actively in a group to complete the task.

6

CLO2 Workshop practical
CLO3
Workshop
3.0 activities
Concrete
SYN
orks And
aboratory ASYN

CLO1
CLO3

1


Click to View FlipBook Version