COURSE OUTCOMES (COMPETENCY UNIT WORK ACTIVITIES)
At the end of the course, students should be able to:-
1. Identify electrical appliances maintenance requirement specificat
2. Prepare single phase electrical appliances maintenance tools, eq
3. Carry out electrical appliances inspection.
4. Carry out electrical appliances maintenance.
COURSE DESCRIPTION (COMPETENCY UNIT DESCRIPTOR)
Single Phase electrical appliances maintenance is a set of competency
by referring to appliances service manual and standard operating proce
1994 and other related rules and regulations body and statutory requir
maintenance must be able to identify appliances specification and manu
resistance and earthing resistance testing in accordance with manufactu
ETE 2022
KSKV SVM 2017
tions and manuals.
quipment and materials.
to carry out repair work and maintenance on electrical appliances faulty
edures and in compliances with Electrical Act 1990, Electrical Regulation
rements. The personnel who are competent in the electrical appliances
uals, carry out maintenance activities and to conduct polarity, insulation,
urer’s specification requirements.
Document Page 2/14
CONTENT AND LEAR
PROGRAMME : ELECTRICAL TECHNOLOGY
COURSE NAME : SINGLE PHASE ELECTRICAL APPLIANCES
CODE NAME : ETE 2022
CONTACT HOURS CONTENT STANDARD LE
(RELATED K
(TRAINING DURATION) (WORK ACTIVITIES) / ATTITUDE
30 HOURS 1. IDENTIFY RELATED KNO
(5 WEEKS)
ELECTRICAL
THEORY :
6 HOURS APPLIANCES 1.1 Types of h
PRACTICAL : MAINTENANCE Microwave
24 HOURS
REQUIREMENT Air Condit
SPECIFICATIONS AND and Single
MANUALS.
1.2 Types of e
circuit, Op
Board fau
1.3 Types of s
1.4 Electrical
Energy Co
Supply Ac
Regulation
ETE 2022
KSKV SVM 2017
RNING STANDARDS
S MAINTENANCE
EARNING STANDARD PERFORMANCE CRITERIA /
KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ SAFETY / ENVIRONMENTAL)
OWLEDGE ASSESSMENT CRITERIA
home appliances, such as: 1.1 List out single phase wiring fault
e, Oven, Iron, Lamp, Single Phase according Electrical Act &
tioning, Water Heater, Refrigerator Regulation and Standard,
e phase motor. Occupational Safety & Health Act
514 (OSHA) 1994, Standard &
electrical appliances fault: Short Industrial Research Institute of
pen circuit, Loose contact and Malaysia (SIRIM).
ulty.
1.2 Determine schematic diagram
schematic diagram. according Electrical Act &
Regulation and Standard,
Act & Regulation and Standard: Occupational Safety & Health Act
ommission Act 2001, Electricity 514 (OSHA) 1994, Standard &
ct 1990 (Act 447), Electrical Industrial Research Institute of
n 1994, Malaysia (SIRIM).
Document Page 3/14
MS 1936:
(COP), El
Code of p
instruction
1.5 Occupatio
(OSHA) 1
1.6 Authorisat
such as: G
1.7 Standard
Malaysia (
RELATED SKI
1.1 Determine
1.2 Interpret s
1.3 Determine
1.4 Adhere st
ATTITUDE / SA
Attitude
1.1 Proactive
specificati
ETE 2022
KSKV SVM 2017
: 2006 / IEC 60364, MS 1979: 2007 1.3 Check visual on the board
lectrical Installation of Buildings – according Electrical Act &
practice (COP) and Based on latest Regulation and Standard,
n by regulatory body. Occupational Safety & Health Act
514 (OSHA) 1994, Standard &
onal Safety & Health Act 514 Industrial Research Institute of
1994. Malaysia (SIRIM).
tion requirement to access site
Green card and Safety passport.
& Industrial Research Institute of
(SIRIM).
ILLS
e types of home appliances fault.
schematic diagram.
e electrical appliances fault.
tandard of SIRIM.
AFETY / ENVIRONMENTAL
in obtaining manufacturer’s
ion and operation manual.
Document Page 4/14
CONTENT AND LEAR
PROGRAMME : ELECTRICAL TECHNOLOGY
COURSE NAME : SINGLE PHASE ELECTRICAL APPLIANCES
CODE NAME : ETE 2022
CONTACT HOURS CONTENT STANDARD LE
(RELATED K
(TRAINING DURATION) (WORK ACTIVITIES) / ATTITUDE
24 HOURS 2. PREPARE SINGLE RELATED KNO
(4 WEEKS) PHASE ELECTRICAL
APPLIANCES 2.1 Wiring too
THEORY : MAINTENANCE
4 HOURS TOOLS, EQUIPMENT 2.2 Types of e
AND MATERIALS
PRACTICAL : 2.3 Types of e
20 HOURS accessorie
2.4 Electrical
2.5 Calibration
instrumen
2.6 Electrical
specificati
ETE 2022
KSKV SVM 2017
RNING STANDARDS
S MAINTENANCE
EARNING STANDARD PERFORMANCE CRITERIA /
KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ SAFETY / ENVIRONMENTAL)
OWLEDGE ASSESSMENT CRITERIA
ols, equipment and materials. 2.1 Select tools, equipment and
electrical cable for single phase. material according standard
operating procedure.
electrical equipment and 2.2 Fix electrical appliances faulty part
es. according requirements
testing instrument.
n requirement for electrical testing
ntation.
appliances manufacturer’s
ion and operation manual.
Document Page 5/14
RELATED SKI
2.1 Acquire m
materials.
2.2 Determine
phase ele
2.3 Determine
instrumen
2.4 Determine
electrical t
2.5 Obtain ele
specificati
ATTITUDE / SA
Attitude
2.1 Handle eq
2.2 Peruse th
operation
Safety
2.1 Meticulou
certificate
2.2 Handle wi
tools with
2.3 Ensure to
condition.
ETE 2022
ILLS KSKV SVM 2017
maintenance tools, equipment and Document Page 6/14
.
e types of electrical cable for single
ectrical appliance.
e types of electrical testing
nt.
e calibration requirement for
testing instrumentation.
ectrical appliances manufacturer’s
ion and operation manual.
AFETY / ENVIRONMENTAL
quipment with care.
he manufacturer’s specification and
manual.
us in interpreting calibration
e.
iring tools, equipment and testing
care.
ools and equipment in good working
.
CONTENT AND LEAR
PROGRAMME : ELECTRICAL TECHNOLOGY
COURSE NAME : SINGLE PHASE ELECTRICAL APPLIANCES
CODE NAME : ETE 2022
CONTACT HOURS CONTENT STANDARD LE
(RELATED K
(TRAINING DURATION) (WORK ACTIVITIES) / ATTITUDE
36 HOURS 3. CARRY OUT RELATED KNO
(6 WEEKS) ELECTRICAL 3.1 Schematic
APPLIANCES 3.2 Procedure
THEORY : INSPECTION
12 HOURS appliance
PRACTICAL : RELATED SKI
24 HOURS 3.1 Interpret s
3.2 Utilise too
3.3 Inspect el
3.4 Confirm e
ETE 2022
KSKV SVM 2017
RNING STANDARDS
S MAINTENANCE
EARNING STANDARD PERFORMANCE CRITERIA /
KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ SAFETY / ENVIRONMENTAL)
OWLEDGE ASSESSMENT CRITERIA
c diagram. 3.1 Inspect electrical appliances
e to inspect single phase electrical according standard operating
es condition. procedure.
ILLS 3.2 Record electrical appliances fault
according specification standard
operating procedure.
schematic diagram. 3.3 Determine electrical appliances
ols, equipment and material. fault according standard operating
procedure.
lectrical appliance condition. 3.4 Test performance verification
electrical appliances fault. according standard operating
procedure.
Document Page 7/14
3.5 Interpret s
manufactu
3.6 Carry out
ATTITUDE / SA
Attitude
3.1 Thorough
Safety
3.1 Used app
3.2 Comply w
3.3 Use tools,
ETE 2022
KSKV SVM 2017
single phase electrical appliances
urer’s manual.
housekeeping activities.
AFETY / ENVIRONMENTAL
hly in inspecting faulty.
propriate PPE.
with rules and regulation.
, equipment and material properly.
Document Page 8/14
CONTENT AND LEAR
PROGRAMME : ELECTRICAL TECHNOLOGY
COURSE NAME : SINGLE PHASE ELECTRICAL APPLIANCES
CODE NAME : ETE 2022
CONTACT HOURS CONTENT STANDARD LE
(RELATED K
(TRAINING DURATION) (WORK ACTIVITIES) / ATTITUDE
30 HOURS 4. CARRY OUT RELATED KNO
(5 WEEKS) ELECTRICAL
APPLIANCES 4.1 Procedure
THEORY : MAINTENANCE fault.
6 HOURS
4.2 Electrical
PRACTICAL :
24 HOURS 4.3 Select too
maintenan
4.4 Schematic
4.5 Procedure
electrical a
4.6 Various te
ETE 2022
KSKV SVM 2017
RNING STANDARDS
S MAINTENANCE
EARNING STANDARD PERFORMANCE CRITERIA /
KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ SAFETY / ENVIRONMENTAL)
OWLEDGE ASSESSMENT CRITERIA
es to rectify electrical appliances 4.1 Replace electrical appliance faulty
part according standard operating
appliances faulty part. procedure.
ols, equipment and material for
nce work. 4.2 Utilise tools and equipment
according standard operating
procedure.
c drawing. 4.3 Test for resting and commissioning
according standard operating
e to acquire spare parts for procedure.
appliance.
4.4 Test for continuity, polarity,
esting and measuring instruments. insulation resistance and earthing
resistance according standard
operating procedure.
Document Page 9/14
4.7 Types and
devices.
4.8 Types of t
Polarity an
4.9 Specificat
4.10 Operation
appliance
RELATED SKI
4.1 Select too
for mainte
4.2 Interpret s
4.3 Troublesh
4.4 Obtain ele
4.5 Rectify an
4.6 Execute fu
4.7 Interpret t
4.8 Select tes
4.9 Check pro
4.10 Conduct in
ETE 2022
KSKV SVM 2017
d application and protection 4.5 Submit a checklist, logbook and
schedule maintenance report
testing: Insulation, Continuity, according standard operating
nd Earthing. procedure.
tion technical data.
n manual for single phase electrical
es.
ILLS
ols, equipment and material used
enance activities.
schematic drawing.
hoot electrical appliances faulty.
ectrical appliances spare parts.
nd replace faulty part.
unctionality testing.
test result.
sting and measuring instruments.
otection devices.
nsulation testing.
Document Page 10/14
4.11 Conduct c
4.12 Conduct p
4.13 Conduct e
4.14 Collect an
single pha
ATTITUDE / SA
Attitude
4.1 Proactive
Safety
4.1 Used app
4.2 Comply w
4.3 Used tools
4.4 Display sa
4.5 Lock main
4.6 Ensure ‘O
4.7 Handle ca
ETE 2022
KSKV SVM 2017
continuity testing.
polarity testing.
earthing testing.
nd record maintenance result for
ase electrical appliances.
AFETY / ENVIRONMENTAL
in maintenance work
propriate PPE.
with rules and regulation.
s, equipment and material properly.
afety sign board.
n switch.
OFF live supply.
are spare part and install correctly.
Document Page 11/14
CORE ABILITY
CORE ABILITY
SILA RUJUK LAMPIRAN A : JADUAL PEMETAAN NO
SILA RUJUK LAMPIRAN B : JADUAL PEMETAAN NO
ETE 2022
KSKV SVM 2017
OSS DAN KSKV
OSS DAN CORE ABILITY
Document Page 12/14
TOOLS, EQUIPMENT AND MATERIALS (TEM)
ITEMS
1. Schematic diagram
2. Block Diagram
3. Measuring and Test Instruments
4. Components/Parts Specification
5. Distribution Boards
6. Trunking Tools
7. Equipment Data Book
8. Electrical Equipment
9. Electrical Mechanical tools
10. Electrical hand tools
11. Electrical power tools
12. Electrical Accessories
13. Electrical Fittings
14. Electrical Testing Instrument
15. Double Insulated cable
16. Wiring materials
17. Cables
18. PVC Tape
ETE 2022
KSKV SVM 2017
RATIO (TEM : TRAINEES)
1:1
1:1
1:1
1:1
1:2
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
Document Page 13/14
REFERENCES
1. Undang-Undang Malaysia. 2005. Akta Bekalan Elektrik
Pindaan sehingga 2005. MDC Publisher Sdn Bhd Mala
2. Suruhanjaya Tenaga Malaysia. Standard Pendawaian
IEC 60364) Jabatan Standard Malaysia
3. The Institution of Electrical Engineers, 1998, Peraturan
Golden Books Centre Sdn Bhd
4. BS 7671: 2001 Requirements for Electrical Installation
Institution of Electrical Engineers
5. R.Boylestad and L.Nashelsky. (1996). Electronic Devic
6. Albert Paul Malvino and Donald P. Leach. (1994). Digit
0028018214)
7. Joseph A. Risse. (1968). Understanding electronic test
ETE 2022
KSKV SVM 2017
k 1990 dan Peraturan-Peraturan Elektrik 1994,
aysia.
Malaysia (Electrical Installations Of Buildings - MS
n-Peraturan bagi Pemasangan Elektrik, Edisi 16.
ns (IEE Wiring Regulations, Sixteenth Edition)
ces and Circuit Theory. Prentice Hall- Gale
tal Principles and Application. McGraw-Hill. (ISBN:
t equipment. H. W
Document Page 14/14
MINISTRY OF EDUC
VOCATIONAL COLLEGE S
COURSE INF
PROGRAMME : ELECTRICAL
COURSE NAME : THREE PHASE
CODE NAME : ETE 3042
LEVEL / SEMESTER : 3 SEMESTER
CREDIT UNIT : 2.0
CONTACT HOUR : FACE TO FAC
NON FACE TO
COURSE TYPE : VOCATIONAL
PREREQUISITE :-
CORE REQUISITE :-
ETE 3042
KSKV SVM 2017
CATION, MALAYSIA
STANDARD CURRICULUM
FORMATION
TECHNOLOGY
E MOTOR & MOTOR CONTROL INSTALLATION
3
CE : 4.0 HOURS/WEEK
O FACE :
Document Page 1/16
COURSE OUTCOMES (COMPETENCY UNIT WORK ACTIVITIES)
At the end of the course, students should be able to:-
1. Identify three phase motor installation specifications and procedu
2. Prepare three phase motor and motor control installation mainten
3. Carry out three phase motor installation.
4. Carry out three phase motor control termination.
5. Inspect three phase motor and motor control functionality.
6. Record three phase motor and motor control installation.
COURSE DESCRIPTION (COMPETENCY UNIT DESCRIPTOR)
Three phase motor and motor control installation is an activity that co
motor and motor control based on installation specification and procedu
and other related rules and regulations body and statutory requirements
control must be able to interpret installation manuals and procedures, c
phase motor and motor control functionality and to conduct continuity, p
ETE 3042
KSKV SVM 2017
ures.
nance tools, equipment and materials.
overs the competency requirements for the installation of Three phase
ures in accordance with Electrical Act 1990, Electrical Regulation 1994
s. The personnel who are competent in the three phase motor and motor
carry out three phase motor and motor control installation, inspect three
polarity, insulation resistance and earthing resistance testing.
Document Page 2/16
CONTENT AND LEAR
PROGRAMME : ELECTRICAL TECHNOLOGY
COURSE NAME : THREE PHASE MOTOR & MOTOR CONTRO
CODE NAME : ETE 3042
CONTACT HOURS CONTENT STANDARD LE
(RELATED K
(TRAINING DURATION) (WORK ACTIVITIES) / ATTITUDE
12 HOURS 1. IDENTIFY THREE RELATED KNO
(3 WEEKS)
PHASE MOTOR AND
THEORY :
3 HOURS MOTOR CONTROL 1.1 Types of t
PRACTICAL : INSTALLATION induction
9 HOURS
SPECIFICATIONS AND run, Repu
PROCEDURES Universal
1.2 Types of t
Reverse,
(SD), Auto
Rotor Res
1.3 Three pha
and acces
1.4 Three pha
accessorie
ETE 3042
KSKV SVM 2017
RNING STANDARDS
OL INSTALLATION
EARNING STANDARD PERFORMANCE CRITERIA /
KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ SAFETY / ENVIRONMENTAL)
OWLEDGE ASSESSMENT CRITERIA
three phase motor: Squirrel cage 1.1 Installation three phase motor &
motor, Capacitor start, Capacitor motor control according to
ulsion motor, Shaded poles, requirements.
motor and Synchronous motor.
1.2 All specification and requirements
three phase motor control: Forward follow manufacturing manual/
Direct Online (DOL), Star Delta handbook.
o Transformer (AT), Slip Ring –
sistor Starter and Other Stater
ase motor main control components
ssories.
ase control circuit components and
es.
Document Page 3/16
1.5 Magnetic
1.6 Electrical
Energy Co
Supply Ac
Regulation
60364, MS
Installation
(COP) and
regulatory
1.7 Occupatio
(OSHA) 1
1.8 Authorisat
such as: G
RELATED SKI
1.1 Determine
1.2 Determine
1.3 Determine
componen
1.4 Determine
componen
1.5 Determine
relay as re
ATTITUDE / SA
Attitude
1.1 Adhere th
according
ETE 3042
contactor and overload relay. KSKV SVM 2017
Act & Regulation and Standard: Document Page 4/16
ommission Act 2001, Electricity
ct 1990 (Act 447), Electrical
n 1994, MS 1936: 2006 / IEC
S 1979: 2007 (COP), Electrical
n of Buildings – Code of practice
d Based on latest instruction by
y body.
onal Safety & Health Act 514
1994.
tion requirement to access site
Green card and Safety passport.
ILLS
e three phase motor.
e three phase motor control.
e three phase motor main
nts and accessories.
e three phase control circuit
nts and accessories.
e magnetic contactor and overload
equired.
AFETY / ENVIRONMENTAL
he procedure and instruction
g operational manual.
CONTENT AND LEAR
PROGRAMME : ELECTRICAL TECHNOLOGY
COURSE NAME : THREE PHASE MOTOR & MOTOR CONTRO
CODE NAME : ETE 3042
CONTACT HOURS CONTENT STANDARD LE
(RELATED K
(TRAINING DURATION) (WORK ACTIVITIES) / ATTITUDE
16 HOURS 2. PREPARE THREE RELATED KNO
(4 WEEKS) PHASE MOTOR AND
MOTOR CONTROL 2.1 Three line
THEORY : INSTALLATION circuit and
4 HOURS MAINTENANCE
TOOLS, EQUIPMENT 2.2 Location o
PRACTICAL : AND MATERIALS devices in
12 HOURS Underwat
Protection
Timer, The
relay.
2.3 Three pha
maintenan
maintenan
ETE 3042
KSKV SVM 2017
RNING STANDARDS
OL INSTALLATION
EARNING STANDARD PERFORMANCE CRITERIA /
KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ SAFETY / ENVIRONMENTAL)
OWLEDGE ASSESSMENT CRITERIA
e drawing: Main circuit, Control 2.1 Allocate motor & motor control
d Protection devices. installation including devices
according manufacturer’s
of motor & motor control installation specification.
ncluding: Platform structure,
ter, Surface, Weather proof, 2.2 Use the election of sensing
n devices and Sensing devices: devices at corrected installation
ermal, Limit, Flow and latching according to requirement and
specification.
ase motor & motor control
nce: Periodically check, Preventive
nce and Corrective maintenance.
Document Page 5/16
2.4 Three pha
installation
2.5 Three pha
equipmen
Multimete
RELATED SKI
2.1 Select thre
2.2 Select loc
installation
2.3 Determine
control ma
2.4 Select thre
tools.
2.5 Select thre
testing eq
ATTITUDE / SA
Attitude
2.1 Housekee
Safety
2.1 Comply w
ETE 3042
ase motor & motor control KSKV SVM 2017
n tools, equipment and materials.
Document Page 6/16
ase motor & motor control testing
nt: LCR meter, Rotation meter,
er and Insulation tester meter
ILLS
ee line drawing.
cation of motor & motor control
n devices.
e three phase motor & motor
aintenance.
ee phase motor & motor control
ee phase motor & motor control
quipment.
AFETY / ENVIRONMENTAL
eping.
with rules and regulation.
CONTENT AND LEAR
PROGRAMME : ELECTRICAL TECHNOLOGY
COURSE NAME : THREE PHASE MOTOR & MOTOR CONTRO
CODE NAME : ETE 3042
CONTACT HOURS CONTENT STANDARD LE
(RELATED K
(TRAINING DURATION) (WORK ACTIVITIES) / ATTITUDE
20 HOURS 3. CARRY OUT THREE RELATED KNO
(5 WEEKS) PHASE MOTOR 3.1 Schematic
INSTALLATION 3.2 Three pha
THEORY : 3.3 Main & co
5 HOURS 3.4 Motor sizi
3.5 Installation
PRACTICAL : 3.6 Control pa
15 HOURS 3.7 Functiona
ETE 3042
KSKV SVM 2017
RNING STANDARDS
OL INSTALLATION
EARNING STANDARD PERFORMANCE CRITERIA /
KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ SAFETY / ENVIRONMENTAL)
OWLEDGE ASSESSMENT CRITERIA
c diagram.
ase motor symbol. 3.1 Selection drawing suitable with the
ontrol circuit. requirements and location.
ing & rating.
n procedure. 3.2 Rectify and repair the fault
anel accessories. according to specification.
ality of circuit
3.3 Test the circuit according to
standard format.
Document Page 7/16
RELATED SKI
3.1 Read and
3.2 Identify m
3.3 Identify ty
accessorie
3.4 Install thre
3.5 Testing th
3.6 Repair the
ATTITUDE / SA
Attitude
3.1 Meticulou
Safety
3.1 Use PPE
3.2 Adhere to
ETE 3042
KSKV SVM 2017
ILLS
d interpret schematic drawing.
motor size and rating.
ypes of motor components and
es.
ee phase motor and motor control.
he circuit.
e three phase motor fault.
AFETY / ENVIRONMENTAL
us in read and interpreter diagram.
properly.
o electrical Act & regulation.
Document Page 8/16
CONTENT AND LEAR
PROGRAMME : ELECTRICAL TECHNOLOGY
COURSE NAME : THREE PHASE MOTOR & MOTOR CONTRO
CODE NAME : ETE 3042
CONTACT HOURS CONTENT STANDARD LE
(RELATED K
(TRAINING DURATION) (WORK ACTIVITIES) / ATTITUDE
12 HOURS 4. CARRY OUT THREE RELATED KNO
(3 WEEKS) PHASE MOTOR 4.1 Installation
CONTROL 4.2 Types of c
THEORY : TERMINATION 4.3 Type of lo
3 HOURS 4.4 Accessori
PRACTICAL : of tools.
9 HOURS 4.5 Operation
4.6 Cable colo
ETE 3042
KSKV SVM 2017
RNING STANDARDS
OL INSTALLATION
EARNING STANDARD PERFORMANCE CRITERIA /
KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ SAFETY / ENVIRONMENTAL)
OWLEDGE ASSESSMENT CRITERIA
n termination & connection. 4.1 Ensure fix the installation,
termination and circuit connection
circuit/connection. according to requirement and
specification.
oad/connection.
4.2 Platform in good stability and fixed
ies connection, fittings and function firm according to standard format.
n of hand tools and equipment. 4.3 Follow checklist and instruction
or code/marking manual according to standard
format.
4.4 Mark cable according to code at
cable end according to
specification.
Document Page 9/16
RELATED SKI
4.1 Connect c
4.2 Fix compo
4.3 Identify ty
4.4 Calculate
4.5 Identify co
4.6 Identify ac
4.7 Identify co
4.8 Identify ty
4.9 Identify ca
4.10 Inspect ca
4.11 Apply test
ATTITUDE / SA
Attitude
4.1 Housekee
4.2 Meticulou
Safety
4.1 Use PPE
4.2 Comply el
4.3 Comply A
4.4 Used a pr
ETE 3042
KSKV SVM 2017
ILLS
control circuit.
onents and accessories.
ype of circuit/controls.
electrical load/circuit.
orrect location.
ccessories and fitting.
onnection terminal.
ype of hand tools and equipment.
able color code/marking.
able termination and installation.
t procedures technique.
AFETY / ENVIRONMENTAL
eping.
us in read and interpreter diagram
properly.
lectrical Act & regulation.
Act 514 (OSHA).
roper hand tools
Document Page 10/16
CONTENT AND LEAR
PROGRAMME : ELECTRICAL TECHNOLOGY
COURSE NAME : THREE PHASE MOTOR & MOTOR CONTRO
CODE NAME : ETE 3042
CONTACT HOURS CONTENT STANDARD LE
(RELATED K
(TRAINING DURATION) (WORK ACTIVITIES) / ATTITUDE
12 HOURS 5. INSPECT THREE RELATED KNO
(3 WEEKS) PHASE MOTOR AND
MOTOR CONTROL 5.1 Types and
THEORY : FUNCTIONALITY
3 HOURS 5.2 Types of t
Polarity an
PRACTICAL :
9 HOURS 5.3 Specificat
5.4 Operation
RELATED SKI
5.1 Determine
instrumen
ETE 3042
KSKV SVM 2017
RNING STANDARDS
OL INSTALLATION
EARNING STANDARD PERFORMANCE CRITERIA /
KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ SAFETY / ENVIRONMENTAL)
OWLEDGE
d application of protection devices.
testing: Insulation, Continuity,
nd Earthing.
tion technical data.
n manual
ILLS ASSESSMENT CRITERIA
e testing and measurement 5.1 Continuity, polarity, insulation
nts. resistance and earthing resistance
tested.
Document Page 11/16
5.2 Check Pro
5.3 Conduct in
5.4 Conduct c
5.5 Conduct p
5.6 Conduct e
5.7 Conduct m
load).
5.8 Collect an
5.9 Carry out
ATTITUDE / SA
Attitude
5.1 Meticulou
Safety
5.1 Use PPE
5.2 Comply el
5.3 Comply A
5.4 Used a pr
5.5 Adhere m
5.6 Code of E
ETE 3042
otection devices. KSKV SVM 2017
nsulation test.
continuity test. Document Page 12/16
polarity test.
earthing test.
motor test run (on load and off
nd record the data.
housekeeping activities
AFETY / ENVIRONMENTAL
us in read and record data.
properly.
lectrical Act & regulation.
Act 514 (OSHA).
roper hand tools.
maintenance procedure.
Ethics.