The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.

NAMA: AININ SABRINA BINTI MOHAMMAD AZRA'I
NO MATRIK: CB190042
LAPORAN LATIHAN MENGAJAR LM1-LM2 SESI MAC-JULAI2023 (PART 1)

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by Ainin Sabrina, 2023-07-29 11:33:10

E-PORTFOLIO AININ SABRINA BINTI MOHAMMAD AZRAI 1-320

NAMA: AININ SABRINA BINTI MOHAMMAD AZRA'I
NO MATRIK: CB190042
LAPORAN LATIHAN MENGAJAR LM1-LM2 SESI MAC-JULAI2023 (PART 1)

RNING STANDARDS STANDARD ASSESSMENT CRITERIA pouring area. f concrete pouring such as: hed level: ASSESMENT CRITERIA i. Concrete casting done within time period as per specification. ii. Concrete pouring work properly done according to specification and construction quality. iii. Concrete leveled according to specification and construction quality.


RELATED SKILLS: i. Identify location of concr ii. Monitor concrete casting iii. Carry out concrete pourin iv. Perform concrete leveling ATTITUDE/SAFETY/ENVIR Attitude: - Patient in concrete pouri Safety - Adhere to safety require - Wear proper PPE


rete pouring area. . ng work. g by using suitable tools. ROMENTAL: ing work ment


CONTACT HOUR CONTENT STANDARD LEARNING ST 2. CARRY OUT CONCRETE CURING PROCESS RELATED KNOWLEDGE : i. Method of concrete curing ii. Types of curing • Curing compound • Gunny sack • Spray water • Plastic iii. Concrete setting monitori • Duration • Weather • Structure element iv. Housekeeping and 3R ac • Concrete mixing • Concrete pouring • Concrete curing RELATED SKILLS: i. Determine method of con ii. Execute curing process iii. Carry out housekeeping a and Recycle) activities ATTITUDE/SAFETY/ENVIR Attitude: - Ensure timely completion


TANDARD ASSESSMENT CRITERIA g ng process such as ctivities ncrete curing and 3R (Reduce, Reuse OMENTAL: n of work ASSESSMENT CRITERIA i. Curing process applied according to specification. ii. Concrete setting process monitored. iii. Housekeeping and 3R activities properly done according to safety procedure.


3. COORDINATE CONCRETE WORK INSPECTION - Patient in performing con Safety - Adhere to safety requirem - Wear proper PPE RELATED KNOWLEDGE : i. Authorize personnel such • Local authority • Registered architect/e ii. Concrete work inspection • Size/Dimension • Alignment • Verticality • Strength • Durability • Cleanliness • Workability • Colour • Surface • Permeability iii. Types of inspection form before, during and after in iv. Inspection form format v. Method of filling in inspec vi. Concrete work inspection vii. Regulatory body requirem building concrete work su • Safety and health • Quality control


ncrete curing process ment h as: engineer n criteria (RIN, RFI, etc) used nspection ction form n arrangement ment on residential uch as ASSESSMENT CRITERIA i. Authorise personnel listed and confirmed ii. Concrete work inspection executed in accordance with planning schedule iii. Size, dimension and alignment checked according to inspection criteria iv. Concrete non-compliance rectification works done and quality checked according to inspection result v. Regulatory body requirement complied related to concrete work vi. Safety rules and regulation applied related to concrete work


RELATED SKILLS: i. Determine authorized per and consultant ii. Confirm size, alignment, v durability, cleanliness, co (honeycomb / Bulging / C permeability iii. Arrange concrete work in iv. Rectify any non-complian v. Comply to regulatory bod vi. Adhere to safety rules an ATTITUDE / SAFETY / ENV Attitude - Ability to collaborate and department - Ensure timely completion


rsonnel from authorities verticality, strength, lour, surface Cracking) and spection nce concrete work y requirement d regulation VIRONMENTAL : cooperate with other n of work


EMPLOYABILITY SKILLS Tools, Equipment and Materials (TEM) Core Abilities SILA RUJUK LAMPIRAN A : JADUAL PEMETAAN NOSS DAN KSK SILA RUJUK LAMPIRAN B : JADUAL PEMETAAN NOSS DAN COR ITEMS 1. Sand 2. Coarse aggregate 3. Cement 4. Additive 5. Water 6. PPE 7. Scoop 8. Vibrator 9. Bucket 10. Wheelbarrow 11. Trowel 12. Leveling equipment 13. Concrete mixer 14. Concrete pump 15. Water Pump


KV RE ABILITY TAHAP 1, 2, 3 RATIO (TEM : Trainees) 1:5 1:5 as required 1:5 1:5 1:1 1:5 1:5 1:5 1:5 1:5 1:5 1:5 1:5 1:5


16. Curing compound/Gunny sack/Plastic/ Spray water 17. Sample for inspection form 18. Sample for construction drawing 19. Sample for authorities documents(Planning approval documents Building plan approval documents) REFERENCES 1. Edward Allen, Joseph Iano, (2009) Fundamentals of Buildin New Hersey, ISBN 978-0-470-07468-8 2. Francis D.K. Ching, (2010), Building Construction Illustrated 378-0-470-08781-7


s, 1:5 1:1 1:1 1:1 ng Construction: Material and Method, John Wiley And Son Inc, d Fourth Edition, John Wiley And Son Inc, New Jersey, ISBN:


3. Edward Allen, Rob Thallon, Fundamentals of Residential Co 470-5-4085-4 4. Tan Boon Tong, (2000) Teknologi Binaan Bangunan, Dewa 5. Whitney C Clark Huntington (2001), Building Construction M 6. N. Jackson (1984), Civil Engineering Materials, English Lan 7. Uzairi Haji Saidin(1988), Aturcara Kontrak dan Tafsiran, Pet 8. William Irvine (2005), Surveying for Construction, McGraw-H 9. WG Mc Lean (2004), Theory & Problems of Engineering Me 10.A.M.NevelleJ.J.Brooke(1990), Concrete Technology, Longm 11.Case, J Chilver, A.H (1987),Kekuatan Bahan dan Struktur, D 12.Nunally, S.W (1998), Construction Methods and Manageme 13.Wang, B.T.H (1987), Construction and Development - With 14.Peter Domone, John Hilston(1994), Construction Materials.


onstruction, John Wiley And Son Inc, New Jersey, ISBN 978-0- an Bahasa, Kuala Lumpur. Materials and Types Of Construction, Robert E. Mickadeit. guage Book Society Macmillan (Elbs). taling Jaya IBS Buku. Hill Education. echanics Static and Dynamics, Sahaums. man, New Jersey. Dewan Bahasa. ent, Prentice Hall. Reference to Malaysian Practice', Pelanduk Publication.


MINISTRY OF EDUC VOCATIONAL COLLEGE S COURSE INF PROGRAMME : CONS COURSE NAME : FORM COURSE CODE : WTP 1 YEAR / SEMESTER : 1 / SEM CREDIT UNIT : 3.0 cre CONTACT HOUR : FACE NON F COURSE TYPE : VOCA PREREQUISITE : - CORE REQUISITE : -


CATION, MALAYSIA STANDARD CURRICULUM FORMATION TRUCTION TECHNOLOGY MWORK 1033 MESTER 1 edit/hrs TO FACE : 7.0 HOURS/WEEK FACE TO FACE : ATIONAL


COURSE OUTCOMES: At the end of the module, students should be able to:- 1. Identify residential building formwork requirement. 2. Fabricate formwork members. 3. Set out formwork alignment. 4. Carry out formwork installation. 5. Coordinate formwork inspection. 6. Dismantle formwork member (after concreting has matured). COURSE DESCRIPTION Residential building formwork is the addition of base materials and conc homes, businesses, and other buildings. The importance of the formwor The person who is competent in residential building formwork shall b formwork members, set out formwork alignment, carry out formwork insta (after concreting has matured). The outcome of this competency is to install a stable formwork to be able accordance with the approved construction drawing specification.


crete contained within retaining walls to use as a slab for construction of rk specification for concrete is based on strength and durability. e able to identify residential building formwork requirement, fabricate allation, coordinate formwork Inspection and dismantle formwork member e to hold the wet concrete in the correct position in


CONTENT AND LEAR PROGRAM : CONSTRUCTION TECHNOLOGY COURSE NAME : FORMWORK COURSE CODE : WTP 1033 CONTACT HOURS CONTENT STANDARD LEARNING ST 140 HOURS (20 WEEKS) 1. IDENTIFY RESIDENTIAL BUILDING FORMWORK REQUIREMENT RELATED KNOWLEDGE i. Contract documents. ii. Content of contract docu • Drawing • Specification • Bill of quantities • Cost • Duration iii. Approved construction d • Mechanical and Elec • Building plan o Structure plan o Architecture plan o Internal plumbing iv. Types and purpose of fo • Timber • Metal • Plastic • Aluminium v. Types of formwork elem • Foundation


RNING STANDARDS TANDARD PERFORMANCE CRITERIA uments drawing ctrical plan n g ormwork such as: ment ASSESSMENT CRITERIA i. Type of formwork listed and explained according to approved construction drawing. ii. Approved construction drawing details listed and explained based on design, dimension and type of residential building formworks. iii. Types of formwork element listed and explained according to construction drawing.


• Stump • Beam o Ground o Upper o Roof • Column/stiffener • Slab • Wall • Staircase APPLIED SKILL: i. Obtain approved constr ii. Interpret approved cons iii. Finalise approved cons details. iv. Determine information formwork works. ATTITUDE / SAFETY / ENV ATTITUDE - Meticulous and details contract document. - Honesty in the privacy the contract documents RELATED KNOWLEDGE


ruction drawing. struction drawing. struction drawing regarding building VIRONMENTAL: in interpreting and confidenciality of s. ASSESSMENT CRITERIA


2. FABRICATE FORMWORK MEMBERS i. Types of formwork such • Plywood / metal • Timber • Plastic • Aluminium ii. Types of formwork acce • Mould Oil • Nails • Strut iii. Types of formwork fabric equipment such as: • Scaffolding • Plumb bob • Hammer • Cutter • Saw • Measurement tape • Marking ink • Brush • Tie rod/tie form iv. Method of formwork pre • Measure • Mark • Cut • Fabricate v. Method and technique o vi. Formwork members ass as: • Platform/base levellin • Formwork members • Strut and prop • Formwork tie


as: sories such as: cation tools and paration such as: of formwork cutting. sembly procedure such ng i. Formwork materials condition checked and arranged according to drawing specification. ii. Formwork fabrication tools and equipment condition checked and arranged according to fabrication requirement. iii. Formwork material accurately cut and quality checked according to construction drawing specification. iv. Formwork members assembled and quality checked according to drawing specification drawing.


APPLIED SKILL: i. Prepare formwork mater ii. Prepare formwork fabric equipment. iii. Cut formwork material. iv. Assemble formwork mem ATTITUDE / SAFETY / ENV ATTITUDE: - Careful and meticulous assemble formwork mem SAFETY: - Adhere to safety rules a - Wear proper PPE. 3. SET OUT FORMWORK ALIGNMENT RELATED KNOWLEDGE i. Formwork members loca ii. Formwork members dim iii. Marking techniques • Visual/observation • Marking string • Laser • Measure tape iv. Formwork members alig • Horizontalness • Verticality • Slanting


rials. cation tools and mbers. VIRONMENTAL: in cutting and mbers. nd regulations. ation. mension. gn ASSESSMENT CRITERIA i. Formwork members dimension checked according to appoved drawing. ii. Level marking for formwork members confirmed according to appoved drawing. iii. Formwork alignment work properly done according to construction practices quality.


APPLIED SKILL: i. Confirm formwork memb ii. Confirm formwork memb iii. Mark formwork members iv. Align formwork member verticality and slanting. ATTITUDE / SAFETY / ENV ATTITUDE: - Diligent, patient and met formwork alignment. SAFETY: - Adhere to safety rules a - Wear proper PPE. 4. CARRY OUT FORMWORK INSTALLATION RELATED KNOWLEDGE i. Formwork members to d ii. Method and technique fo such as: • Strut


bers location. bers dimension. s level. rs horizontalness, VIRONMENTAL: ticulous in carrying out nd regulations. designated area. ormwork installation ASSESSMENT CRITERIA i. Formwork members placed to designated area according construction drawing.


• Tie rod • Prop • Scaffolding iii. Purpose of using mould internal surface. iv. Formwork installation pr APPLIED SKILL: i. Place formwork member ii. Install formwork at desig iii. Apply mould oil to formw ATTITUDE / SAFETY / ENV ATTITUDE: - Diligent, patient and met formwork alignment. SAFETY: - Adhere to safety rules a - Wear proper PPE. 5. COORDINATE FORMWORK INSPECTION RELATED KNOWLEDGE i. Authorize personnel suc • Local authority • Registered architect/ ii. Formwork inspection crit • Size • Alignment


oil to formwork ractice. rs to designated area. gnated area. work internal surface. VIRONMENTAL: ticulous in carrying out nd regulations. ii. Formwork installed according to construction drawing specification and installation quality. ch as: /engineer teria ASSESSMENT CRITERIA i. Authorise personnel listed and confirmed. ii. Formworks inspection excuted in accordance with planning schedule.


• Verticality • Strength • Durability • Cleanliness • Permeability iii. Types of inspection form before, during and after iv. Inspection form format. v. Method of filling in inspe vi. Formwork Inspection arr vii. Regulatory body require building formwork such a • Safety and health • Quality control APPLIED SKILL: i. Confirm authorized pers and consultant. ii. Determine size, alignme strength, durability, clea permeability. iii. Arrange inspection form iv. Rectify any non complia Installation. ATTITUDE / SAFETY / ENV ATTITUDE: - Ability to collaborate and department


m (RIN, RFI, etc) used inspection. ection form. rangement. ement on residential as: sonnel from authorities ent, verticality, nliness and mwork. nce formwork VIRONMENTAL: d cooperate with other iii. Size, dimension and alignment checked according to inspection criteria. iv. Formworks non compliance rectification works done and quality checked according to inspection result.


6. DISMANTLE FORMWORK MEMBER (AFTER CONCRETING HAS MATURED) RELATED KNOWLEDGE i. Method and technique fo as: • Strut • Tie rod • Prop • Scaffolding ii. Materials formwork safe dispose. iii. Housekeeping and 3R a iv. Safety procedure comply dismantling formwork. APPLIED SKILL: i. Remove strut, tie rod, pr ii. Keep/cart away/ dispose safely. iii. Carry out housekeeping iv. Comply to regulatory bo v. Adhere to safety rules a ATTITUDE / SAFETY / ENV ATTITUDE: - Diligent in following pro - Ensure timely completi SAFETY:


ormwork remove such ly kept/cart away/ activities. y when installing and rop and scaffolding. e materials formwork and 3R activities. dy requirement. nd regulation. VIRONMENTAL: ocedure. ion of work. ASSESSMENT CRITERIA i. Strut, tie rod, prop and scaffolding removed according to standard procedure. ii. Materials formwork kept for recycle. iii. Housekeeping and 3R activities properly done according to safety procedure. iv. Regulatory body requirement complied related to formworks activities. v. Safety rules and regulation applied related to formworks activities.


- Adhere to safety requir EMPLOYABILITY SKILLS Core Abilities SILA RUJUK LAMPIRAN A : JADUAL PEMETAAN NOSS DAN KSK SILA RUJUK LAMPIRAN B : JADUAL PEMETAAN NOSS DAN COR


rement. KV RE ABILITY TAHAP 1, 2, 3


TOOLS, EQUIPMENT AND MATERIALS (TEM) ITEMS 20. Mould Oil 21. Nail 22. Plywood/metal 23. Timber 24. Strut 25. Scaffolding 26. PPE 27. Plumbub 28. Hammer 29. Cutter 30. Saw 31. Measurement tape 32. Marking ink 33. Brush 34. Tie rod/tie form 35. Sample for inspection form 36. Sample for construction drawing 37. Sample for authorities documents(Planning approval documen Building plan approval documents)


RATIO (TEM : Trainees) nts, 1:5 1:5 1:5 1:5 1:5 1:5 1:1 1:5 1:1 1:5 1:1 1:1 1:1 1:1 1:5 1:1 1:1 1:1


REFERENCES 1. Edward Allen, Joseph Iano, (2009) Fundamentals of Building Hersey, ISBN 978-0-470-07468-8 2. Francis D.K. Ching, (2010), Building Construction Illustrated F 08781-7 3. Edward Allen, Rob Thallon, Fundamentals of Residential Con 4085-4 4. Tan Boon Tong, (2000) Teknologi Binaan Bangunan, Dewan B 5. Whitney C Clark Huntington (2001), Building Construction, Ma 6. N. Jackson (1984), Civil Engineering Materials, English Langu 7. Uzairi Haji Saidin(1988), Aturcara Kontrak dan Tafsiran,Petali 8. William Irvine (2005), Surveying for Construction, McGraw-Hil 9. WG Mc Lean (2004), Theory & Problems of Engineering Mech 10. A.M.NevelleJ.J.Brooke(1990), Concrete Technology, Longma 11. Case, J Chilver, A.H (1987),Kekuatan Bahan dan Struktur,Dew 12. Nunally, S.W (1998), Construction Methods and Management 13. Wang, B.T.H (1987), Construction and Development - With Re 14. Peter Domone, John Hilston(1994), Construction Materials.


g Construction: Material and Method, John Wiley And Son Inc, New ourth Edition, John Wiley And Son Inc, New Jersey, ISBN: 378-0-470- nstruction, John Wiley And Son Inc, New Jersey, ISBN 978-0-470-5- Bahasa, Kuala Lumpur. aterials and Types Of Construction, Robert E. Mickadeit. uage Book Society Macmillan (Elbs). ng Jaya IBS Buku. l Education. hanics Static and Dynamics, Sahaums. n, New Jersey. wanBahasa. t, Prentice Hall. eference to Malaysian Practice', Pelanduk Publication.


MINISTRY OF EDUC VOCATIONAL COLLEGE S COURSE INF PROGRAMME : CONSTR COURSE NAME : INTROD COURSE CODE : WTP 101 YEAR/SEMESTER : 1 / SEME CREDIT UNIT : 2.0 CONTACT HOUR : FACE TO NON FA COURSE TYPE : VOCATI PREREQUISITE : - CORE REQUISITE :


CATION, MALAYSIA STANDARD CURRICULUM FORMATION RUCTION TECHNOLOGY DUCTION OF SITE PREPARATION 12 ESTER 1 O FACE : 4.0 HOURS / WEEK ACE TO FACE : ONAL


COURSE OUTCOMES At the end of the course, the students should be able to:- 1. Identify land/site preparation requirement 2. Prepare land/site preparation tools, equipment and materials 3. Carry out pegging and setting out work 4. Carry out hoarding installation COURSE DESCRIPTION Land/Site Preparation consists of clearing away the trees, debris, rubbish site, doing whatever rough grading that is necessary, and staking the ho The person who is competent in land/site preparation should be able to tools, equipment and materials, carry out pegging and setting out work land/site preparation inspection and perform foundation activities. The outcome of this competency is to ensure the land/site is prepared and drawing


h, etc, relocating obstructions and levelling the platform area from building use location in preparation for installation of the footings and foundation. identify land/site preparation requirement, prepare land/site preparation k, carry out hoarding installation, perform site clearing work, coordinate d qualified for any and all construction works in accordance to the construction


CONTENT AND LEAR PROGRAMME : CONSTRUCTION TECHNOLOGY COURSE NAME : INTRODUCTION OF SITE PREPARATION CODE NAME : WTP 1012 CONTACT HOURS CONTENT STANDARD LEARNI 80 HOURS (20 WEEKS) 1. IDENTIFY LAND / SITE PREPARATION REQUIREMENT RELATED KNOW i. Contract docum ii. Content of cont ● Drawing ● Specificatio ● Bill of Qua ● Cost ● Duration iii. Land / site pre ● Land owne o Types of g o Land Statu o Caveat ● Local auth ● Temporary


RNING STANDARDS ING STANDARD ASSESSMENT CRITERIA WLEDGE : ments tract documents on ntities paration documents ership title rant us ority requirement y site requirement ASSESSMENT CRITERIA i. Types and functions of land / site document listed and explained ii. information regarding land/site listed and explained iii. Safety requirements on land / site preparation listed and explained


● Approved c o Infrastructu o Mechanica o Building pl iv. Purpose of land v. Land / site prep ● Machinery ● Manpower ● Material ● Money vi. Types of buildin ● Piling ● Pad footing ● Raft Found ● Strip Footi vii. Land / site pre requirements APPLIED SKILLS i. Interpret buildin ii. Finalize approv details iii. Identify types foundation


construction drawing ure plan al and Electrical plan an d / site preparation paration resources such as r ng foundation such as g dation ng paration safety S: ng construction documents ved construction drawing of land / site preparation


2. PREPARE LAND / SITE PREPARATION TOOLS, EQUIPMENT AND MATERIALS iv. Determine info preparation req v. Determine safe ATTITUDE/ SAFE Attitude: ● Meticulous interpreting preparation ● Honesty in confidentia documents RELATED KNOW i. Purpose of met ii. Types and funct preparation too ● Hand tools ● Power tool ● Cha ● Dril iii. Types and func preparation eq ● Back Hoe ● Excavator ● Back Push ● Lorry


Click to View FlipBook Version