Hasliza binti Yusof
1.0 The Construction Industry In General
2.0 The Tender Procedure
3.0 The Contract Procedure
4.0 Standard Form of Contract P.W.D FORM 203/ 203A
5.0 The Preliminary Estimating Method
6.0 The Build-up Rate Method
7.0 The Quantity Measurement
With the name of Allah SWT
A special thanks to all member of Civil Engineering Department (DKA) for
their support in completing this E-book. This E-book was originally written to
cater for diploma students in polytechnic and other institutions of higher
learning. Hopefully this E-book will bring much benefit and helping students to
gain better understanding of the course needed.
CHAPTER 1:
THE CONSTRUCTION
INDUSTRY IN GENERAL
The Construction Industry In General
i. Introduction
ii. Construction activities/stage involved
iii. The roles of :
- Design Team Members
- Construction Team Members
iv. The roles of PKK & CIDB
Introduction
The definition of Construction Industries is industry that
comprises construction and civil works.(preparation of
land, repair of building, structure and others)
Areas of works
i. Building work
ii. Civil engineering
iii. Mechanical
iv. Water supply
v. Electrical
vi. Quarries
vii. Telecommunication and others.
Types of work (refer CIDB)
i. Civil Engineering Civil engineering construction
ii. Building CIDB-code CE
CIDB-code B
iii. Mechanical & electrical CIDB-code ME
Field Code/ specialization
Code Category CE Code Category ME
CE 01 Road construction M01
CE02 Bridge construction M02 Aircond E01 Sound system
CE03 System E02
CE04 Marin structure M03 supervision and
CE05 Dam …M21 fire safety/ security
……CE43 Tunnel prevention
Code Category B system
B 01 IBS- prefabricated concrete system
B 02 Lift & E03
B 03 IBS- steel frame system escalator …..E14
B 04
B 05 General building work
…B 28 Pile work
i. Civil Engineering
Example of works:
. Road and highway .
construction
. Bridge and jetty
. Tunnel
. others
. Hydroelectric
. dams
. Airport
. Railway tracks
ii. Building
Construction works
relating to:
Houses, Office,Hotel and resort and
others.
- Ibs system
- interior design
- Tile installation
- Painting
- Pile and others
The Construction Activities/ stage involved
i. Feasibility study
ii. design
iii. tender
iv. contract
v. construction
vi. Hand over
vii. Maintenance
i. Feasibility Study
The research has to implement before starting any
construction. The research consists of:
- Social research to determine the loss account, and to fulfill
the costumer needed or to solve the social problems.
- Soil investigation research to determine types of soil and
bearing capacity.
Write a report.
ii. Design
Scheme design including estimation cost
Detail design
Bill of Quantities
Final cost estimation
Scheme design - First phase in the design of a project where an architect/engineer prepares schematic diagrams
giving a general view of the components and the scale of the project after detailed discussions with the client
(owner).
Bill of quantity
Rate Total
amount
No. Description of item Unit Quantity RM Sen
RM Sen
1 Element 1: work below lowest floor finish
Generally
All excavation are measured from
formation level unless otherwise stated
Surface excavation
Excavate oversite to reduce level;
maximum depth not exceeding 1.00m
depth, get out and cart away from site
including level and grading to surface
of excavation M3 200
hardcore M2 350
200mm under raft foundation
Lean concrete
50mm thick under raft foundation M3 18
iii. Tender
Choosing the suitable contractor to build and finish
the construction project.
iv. Contract
Contract is an agreement between two or more
responsibilities parties and the agreement effective by
law
v. Construction
The contractor that has been appointed and has sign
the contract must build and finish the construction
due to the time given and cost that been agreed and
also due to the specified qualities.
vi. Handover
The construction project will be deliver by contractor
to the developer or owner when the construction is
fully finish.
vii. Use and maintenance
When the construction project is ready to use or
occupied by consumer, the employer or owner will
always do the maintenance when needed.
Parties/ authorities involved in construction
parties Description
Consultant Professional firm- architect, civil& structural engineer,
mechanical engineer, electrical engineer, and quantity surveyor.
Financial Institutions Malayan banking, cimb bank, public bank, affin bank and others.
superintending officer / Government project, example JKR: Head of director, deputy of
project director director, state director, district engineer)
Swasta: Representative of client (architect)
local authority JKR, JPS, TNB, IWK, District Council, city council and other2
Insurance company Kurnia insurances, RHB insurance, Takaful Malaysia, takaful
ikhlas Malaysia and others.
Suppliers Supply all types of material such as brick, cement, sand, tiles and
others.
Machinery rental: Machine, lorry, crane and others
licensing agencies Three agencies:
Ministry of Finance, Construction Industry Development Board
Malaysia (CIDB), Contractor service centre (PKK)/bahagian pem
kontraktor
Team in construction:
i. Design Team Members
ii. Cconstruction Team Members
Design Team Members
Project Developer
Architects
Civil & Structural, Electrical & Mechanical Engineers
Quantity Surveyor
Design Team Members
Project Developer - Is the owner of the project / client
Architects - To prepare a preliminary design and
detailed design
Civil & Structural, Electrical & Mechanical Engineers –
as advisor
Quantity Surveyor - cost advisor (Calculates a
preliminary estimation)
Construction Team Members
i. Contractor
ii. Architects
iii. Civil & Structural, Electrical & Mechanical
Engineers
iv. Quantity Surveyor
Construction Team Members
i. Contractor
ii. Architects
iii. Civil & Structural, Electrical & Mechanical
Engineers
iv. Quantity Surveyor
Construction Team Members
Contractor
Must build and complete the project to specification
based on the contract documents.
Must bear the cost of all the works on site during
construction and after completion.
Must work efficiently to complete the project by the
due date.
Must provide insurance coverage for the project and
workers.
Architects
To control and supervise constructions project
according to the original design
Team leader among the consultants.
To communicate with contractor.
Civil & Structural, Electrical & Mechanical
Engineers
To supervise during constructions
As an advisor on site for their designated fields.
Quantity Surveyor
Will evaluate the work at site according to schedule to
prepare progress payment.
Will evaluate corrected defect work.
Will make sure that all the defects have been repaired
during the defect liability period.
Will prepare the final account.
Contractor registration
1. Contractor Service Center (PKK)/ bahagian
pembangunan kontraktor dan usahawan
- Scope of Work
2. Construction Industry Development Board
Malaysia (CIDB) JKR
- Scope of Work
LLP
KKR
PKK
CIDB
Scope of Work
i. Contractor service centere(PKK)
❑ Supervise and manage the Bumiputera status
❑ Certificate of bumiputera status/ Sijil perakuan taraf bumiputera
ii. Construction Industry Development Board Malaysia (CIDB).
❑ Registration centre for all contractors
❑ Certificate of contractor registration / Sijil perakuan pendaftaran
kontraktor
❑ Certificates of government procurement/ Sijil perolehan kerja kerajaan
❑ Accreditation
❑ Technical courses to contractor company
❑ Training to labor
Kuatkuasa : 15/10/2012, laksanakan SSPK (SISTEM SATU PENDAFTARAN
KONTRAKTOR)
Grade, Limit of tender, Value of tender, category, specialization
More than
RM 10 000 000.00
Contractor registration criteria
More than
RM 10 000 000.00
Application Procedure
Only the owner or director of the company can
make an application. Applicants are only allowed
to register for one company.
Submit applications:
a) Online via smb.cidb.gov.my or;
b) Over the CIDB counter, or by post
Online application
Counter Application Flowchart
PERAKUAN PENDAFTARAN OLEH CIDB
Dapatkan
kerja kerajaan
Pendaftaran
kod bidang
SIJIL TARAF BUMIPUTERA – Pusat khidmat kontraktor
- 51% daripada pemilikan saham syarikat
dimiliki oleh Bumiputera
- 51% daripada Ahli Lembaga Pengarah
dipegang oleh Bumiputera(Ketua Pegawai
Eksekutif, Pengarah urusan, Pengurus,
Akauntan/ Pengurus Kewangan)
Procurement/perolehan
work - Civil, Mechanical, Electrical
Government supply
procurement
-Food, Goods
service 1. Consultancy – Engineering,
Survey, Environment
2. Non consultancy- Training,
Cleaning,
Government procurement
1. Direct purchase /Pembelian terus/runcit
(Pembelian bagi sesuatu item yang tidak melebihi RM 50 000.00 setahun-
contoh:bekalan)
2. Direct appointment /Lantikan terus
(-Bekalan yang diperlukan untuk elak kelewatan
- perkhidmatan yang memerlukan kepakaran)
3. Quotation /Sebut harga
Mempelawa Kontraktor Kelas G1 atau G2
4. Tender/tawaran
Grade G3 to G7
Supply/ Perolehan Bekalan
➢ Procurement of supplIes: supply of
goods to carry out a programme,
activity or government project.
➢ Contractors who want to participate in
the procurement must has a Ministry of
Finance (KK) license (registration
through e-procurement)
perolehan bekalan perlu menggunakan lesen Kementerian Kewangan
SENARAI KOD BIDANG PENDAFTARAN BEKALAN DAN PERKHIDMATAN
DI KEMENTERIAN KEWANGAN BERKUATKUASA MEI 2012
BIDANG, SUB BIDANG DAN PECAHAN SUB BIDANG
bekalan perkhidmatan
Service/perkhidmatan
Non-consulting
services
❑ Use of human energy services or
expertise to implement and
complete a particular project
❑ Contractors who want to
participate in the procurement
must has a Ministry of Finance (KK)
license (registration through e-
procurement)
Consulting services
Architect
Engineer
Surveyor
Quantities Surveyor
supply service
Work/ Perolehan Kerja
Civil works such as buildings,
airports, ports, roads, construction
site, dams and drainage works. It
also includes mechanical and
electrical works.
Procurement: Work
PENGKHUSUSAN
Pendaftaran Kontraktor
Sistem sekarang dikenali Sistem Pendaftaran Satu
Kontraktor (SSPK)
Diuruskan oleh CIDB
Diputuskan dalam keputusan Mesyuarat Jemaah Menteri
14 September 2012
Pertukaran berlaku pada 15 Oktober 2012
Sebab pertukaran
➢ PKK dan CIDB di bawah satu kementerian iaitu
Kementerian Kerja Raya (KKR)
➢ Untuk mengelakkan pertindihan fungsi
➢ PKK untuk urusan taraf bumiputra
Tender
Tender is a statement from the client
that provides information to the
contractor about the proposed project.
The tender can be awarded either by
competition or by negotiation
Price > RM 500 000.00
Grade G3 to G7
Price of document tender (min RM 50.00)
Quotation
A formal statement of promise by
potential supplier to supply the goods
or services.
Renovation, painting and others
A quotation may also contain terms of
sale and payment, and warranties.
Price < RM 500 000.00
G1 to G2
Prosedur penyediaan tender
Adakah ada keperluan?
Contoh :Sekolah,hospital,dsbgnya
Cadangan dikemukakan kepada pihak
JKR Daerah( proses awalan)
Proses penyediaan dokumen meja tender
-Terima plan drpd jabatan arkitek/arkitek yang
dilantik
-Penyediaan kos projek
Anggaran kos dihantar ke Ibu Pejabat JKR Kuala
Lumpur
- Untuk menentukan jenis tender (segera or tidak,
saiz projek,keadaan , lokasi, kesesuaian dengan masa,
kos, pengalaman)