APPENDIX
Milestone Activity Buildin
Start Project
Start Precise Grading Base Design
Start Caissons 2/1/201
Start Structural Frame 2/4/201
Start Roofing
Start MEP & Elevator 3/11/201
7/25/201
SL Start T.I.* 10/18/201
11/18/201
Start Curtainwall
Move-In 11/18/201
12/3/201
Total # of Months 7/7/202
17
Total Cost of Structure
$ 12,843,84
* Other GC's can start T.I. upo
ng "B"
Conxtech Frame Concrete Frame
19 2/1/2019 2/1/2019
19 2/4/2019 2/4/2019
19 3/11/2019 3/11/2019
19 6/25/2019 3/25/2019
19 8/29/2019 11/15/2019
19 9/27/2019 10/31/2019
19 9/27/2019 10/31/2019
19 12/3/2019 12/3/2019
20 7/7/2020 7/7/2020
7.2 17.2 17.2
47 $ 13,913,291 $ 13,108,004
on approval from City of Irvine
Cost Comparative Analysis of S
for
ELS - Buildin
257,870 SSF Conventional Steel Frame
Description Quantity UT UP Total
FOUNDATIONS 14,980 LF $ 47.00 704,06
Piles 704,06
APGD Piles (premium for concrete frame)
3,582 CY $ 400.00 3,971,75
STRUCTURE 88,211 SF $ 8.00 1,432,61
Concrete
Pile Caps - increase by 15% for Flat Plate LF 705,68
SOG - Same -
Concrete Columns 257,870 SF $ 7.11 -
Concrete Shear Walls -
Concrete Deck w/ PT Beams
Concrete Deck/Joist Fill & Finish, 0.0126CY/SF 1,833,45
Fill TS columns with concrete
Structural Steel 2,063 TN $ 3,400.00 7,014,06
ConXTech System complete -
Steel Framing Installed - columns, beams
Metal Decking 7,014,06
Metal Decking
Fireproofing 257,870 SF $ 3.95 1,018,58
257,870 SF $ 2.00 515,74
OTHER SYSTEMS
Exterior Wall Differential 386,80
MEP Trades - (Acoustical, Penetrations, etc.)
257,870 SF $ 1.50 386,80
SOFT COSTS
General Conditons DY -
Critical Path Time Differential 257,870 SF $ -
-
TOTALS (NOT including mark-ups):
49.81 $ 12,843,84
Variance from Base Assumption:
- Structure erects quickly, prefab.
NOTES/COMMENTS: - Lightweight and seismically friendly.
Structural Systems 5-Oct-2018
ng B
ConXTech Steel Framed Concrete Flat Plate
Quantity UT UP Total Quantity UT UP Total
60 47.00 704,060 17,976 LF $ 47.00 844,872
60 14,980 SF $ 704,060 844,872
55 4,061,293 $ 49.56 12,778,872
1,432,611 4,119 CY $ 400.00 1,647,503
11 3,582 CY $ 400.00 88,211 SF $ 705,688
705,688 6,715 LF $ 8.00 1,678,841
88 88,211 SF $ 8.00 - 9,000 SF $ 250.00 495,000
- 257,870 SF $ 8,251,840
- 55.00 -
32.00 -
1,833,456 -
56 257,870 SF $ 7.11 89,538 -
6,715 LF $ 13.33 -
7,993,970 -
64 31.00 7,993,970
257,870 SF $
-
64
87 257,870 SF $ 3.95 1,018,587 -
40 257,870 SF $ 2.00 515,740
05 386,805 (515,740)
(773,610)
05 257,870 SF $ 1.50 386,805 257,870 SF $ (3.00) 257,870
257,870 SF $ 1.00
- DY - - DY -
47 257,870 SF $ - 257,870 SF $ -
- -
53.95 $ 13,913,291 50.83 $ 13,108,004
1,069,444 264,157
- Structure erects fastest. - Structure begins immediately upon building
- Sole source fabricator. permit, no lag.
- Non-standard practice. - Structure erects slowly.
-Easily converts from office space to lab space.
- Standard practice.
- Best acoustical performance.
conxtech schedule
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
Edwards ELS Expansion (10/05/18 proposal w/ConXtech) 471 09/10/18 07/23/20 Start Con
431 11/05/18 07/23/20
SUMMARY & MILESTONES Phase 0 S
OVERALL 431 11/05/18 07/22/20
S1000 Start Construction 0 11/05/18* 07/22/20
431 11/05/18 07/22/20
S1010 Overall Construction (SUMMARY) 07/22/20
0 07/22/20
S1090 Substantial Completion 60 04/28/20 07/23/20
01/28/19
S1100 Punchlist & Closeout (SUMMARY) 0
431 11/05/18 01/28/19
S1110 Final Completion 01/28/19
54 11/05/18 07/08/20
DETAIL 0 11/05/18 04/05/19
PHASE 0 54 11/05/18 07/07/20
0 07/17/19
S2000 Phase 0 Start Construction
384 01/03/19 07/07/20
S2010 Phase 0 Construction Duration (SUMMARY) 67 01/03/19
0 02/01/19* 07/07/20
S2050 Phase 0 Complete Construction 07/07/20*
363 02/01/19 05/29/20
PHASE 1 (BUILDING B) 0
0 09/27/19 05/28/20
S2190 Utility Relocations (SUMMARY) 0 09/26/19
0 07/08/20
S2200 Phase 1 Start Construction (Building B) 05/28/20
22 06/05/20
S2210 Phase 1 Construction Duration (Building B) (SUMMARY) 0 05/28/20
05/28/20
S2215 Phase 1 Steel Erection Complete (Building B) 290 04/08/19 07/23/20
0 04/08/19
S2220 Ready for Tenant Improvements (Building B) (by SL) 07/22/20
290 04/08/19 10/10/19
S2250 Phase 1 Substantial Completion (Building B) 0
0 12/03/19 07/22/20
S2255 Ready for Tenant Improvements (Building B) (by Others) 0
0 05/29/20 07/22/20
S2260 Phase 1 Punchlist & Corrections (Building B) (SUMMARY) 07/22/20
22 04/28/20 02/06/20
S2270 Phase 1 Final Completion (Building B) 0
02/06/20
PHASE 1 (BUILDING A) 273 06/25/19 02/06/20
0 06/25/19*
S2100 Phase 1 Start Construction (Building A)
273 06/25/19
S2110 Phase 1 Construction Duration (Building A) (SUMMARY) 0
0 12/13/19
S2115 Phase 1 Steel Erection Complete (Building A) 0
0 07/23/20
S2120 Ready for Tenant Improvements (Building A) (by SL)
22 06/22/20
S2150 Phase 1 Substantial Completion (Building A) 0
S2155 Ready for Tenant Improvements (Building A) (by Others) 218 03/28/19
0 03/28/19
S2160 Phase 1 Punchlist & Corrections (Building A) (SUMMARY)
218 03/28/19
S2170 Phase 1 Final Completion (Building A) 0
PHASE 1 (BUILDING C)
S2300 Phase 1 Start Construction (Building C)
S2310 Phase 1 Construction Duration (Building C) (SUMMARY)
S2315 Phase 1 Steel Erection Complete (Building C)
S2320 Ready for Tenant Improvements (Building C) (by SL)
S2350 Phase 1 Substantial Completion (Building C)
S2355 Ready for Tenant Improvements (Building C) (by Others)
S2360 Phase 1 Punchilst & Corrections (Building C) (SUMMARY)
S2370 Phase 1 Final Completion (Building C)
PHASE 1 (OFFSITE - ALTON PKWY & REDHILL AVE)
S2400 Phase 1 Start Construction (Offsite)
S2410 Phase 1 Construction Duration (Offsite) (SUMMARY)
S2420 Phase 1 Complete Construction (Offsite)
Project Start 09/10/18 Page 1 of 18 Edwards Lifescience
Project Finish 07/23/20 TASK filter: All Activities Proposal Schedule with C
Data Date 09/01/18
Run Date 10/05/18 Snyder L
2019 Aug Sep Oct Nov Dec 2020 Jul Aug Sep Oct Nov
c Jan Feb Mar Apr May Jun Jul Jan Feb Mar Apr May Jun Edwards ELS Expansion (10/05/18 proposal w/ConX
SUMMARY & MILESTONES
OVERALL
nstruction
Overall Construction (SUMMARY)
Substantial Completion
Punchlist & Closeout (SUMMARY)
Final Completion
DETAIL
PHASE 0
Start Construction
Phase 0 Construction Duration (SUMMARY)
Phase 0 Complete Construction
PHASE 1 (BUILDING B)
Utility Relocations (SUMMARY)
Phase 1 Start Construction (Building B)
Phase 1 Construction Duration (Building B) (SUMMARY
Phase 1 Steel Erection Complete (Building B)
Ready for Tenant Improvements (Building B) (by SL)
Phase 1 Substantial Completion (Building B)
Ready for Tenant Improvements (Building B) (by Others)
Phase 1 Punchlist & Corrections (Building B) (SUMMAR
Phase 1 Final Completion (Building B)
PHASE 1 (BUILDING A)
Phase 1 Start Construction (Building A)
Phase 1 Construction Duration (Building A) (SUMMARY)
Phase 1 Steel Erection Complete (Building A)
Ready for Tenant Improvements (Building A) (by SL)
Phase 1 Substantial Completion (Building A)
Ready for Tenant Improvements (Building A) (by Others)
Phase 1 Punchlist & Corrections (Building A) (SUMMARY)
Phase 1 Final Completion (Building A)
PHASE 1 (BUILDING C)
Phase 1 Start Construction (Building C)
Phase 1 Construction Duration (Building C) (SUMMA
Phase 1 Steel Erection Complete (Building C)
Ready for Tenant Improvements (Building C) (by SL)
Phase 1 Substantial Completion (Building C)
Ready for Tenant Improvements (Building C) (by Oth
Phase 1 Punchilst & Corrections (Building C) (SUMM
Phase 1 Final Completion (Building C)
PHASE 1 (OFFSITE - ALTON PKWY & REDHILL AVE)
Phase 1 Start Construction (Offsite)
Phase 1 Construction Duration (Offsite) (SUMMARY)
Phase 1 Complete Construction (Offsite)
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
CONTRACT AWARD 30 09/10/18 10/19/18 CONTRACT
D1000 Prepare Proposal 20 09/10/18* 10/05/18 Prepare Proposa
0 10/05/18 Submit Proposal
D1010 Submit Proposal 5 10/08/18 10/12/18
0 10/12/18 Owner Review
D1020 Owner Review Proposal / Interview 5 10/15/18 10/19/18 Owner Award C
06/24/19
D1030 Owner Award Contract 162 10/29/18 Execute Cont
Phase 0 Bu
D1040 Execute Contract
Bid & Aw
CRITICAL PERMIT MILESTONES Prep
T
. 113 10/29/18 04/15/19
Bid & A
D2000 Phase 0 Building Permit 0 10/29/18*
0 12/17/18*
D2005 Precise Grading Permit for Building A, B & C 0 01/15/19*
0 02/15/19*
D2010 1st Plan Check Comments from City for Building A & B 0 02/15/19*
0 03/15/19*
D2020 1st Plan Check Comments from City for Building C 0 04/15/19*
0 01/02/19 01/02/19
D2030 Foundation Only Permit (if not bldg) for Building A, B & C
0 01/02/19*
D2040 Full Building Permit for Building A & B 0 01/02/19*
0 01/02/19*
D2050 Full Building Permit for Building C 0 01/02/19*
0 01/02/19*
ONSITE/OFFSITE PERMITS 0 01/02/19*
0 01/02/19*
D2100 Site Electrical Permit 144 11/28/18 06/24/19
D2110 SCE Permit 30 11/28/18 01/14/19
30 05/13/19 06/24/19
D2120 OCFA Permit 298 10/22/18 12/31/19
D2130 Yard Permit
D2140 Civil Permit
D2150 MCE Offsite Encroachment Permit
D2160 IRWD Permit
FAA PERMITS
D2200 Obtain FAA Crane Permit (Generator Relocation)
D2210 Obtain FAA Crane Permit (Steel Erection)
CRITICAL SUBMITTALS & PROCUREMENT
DIVISION 02 - SITE 45 10/22/18 12/28/18
P023000.10 Bid & Award Piles 15 10/22/18 11/09/18
10 11/13/18 11/28/18
P023000.20 Prepare Shop Drawings for Piles 20 11/29/18 12/28/18
10 11/29/18 12/12/18
P023000.21 City Review Shop Drawings for Piles 12/19/18
5 12/13/18 12/28/18
P023000.30 Test Piles 5 12/20/18 09/27/19
180 01/16/19
P023000.31 Document Test Piles 02/12/19
20 01/16/19 05/07/19
P023000.32 City Review Test Piles 60 02/13/19 06/05/19
20 05/08/19 09/27/19
DIVISION 03 - CONCRETE 80 06/06/19 08/28/19
206 11/01/18
P034000.10 Bid & Award Precast 06/24/19
160 11/01/18 11/15/18
P034000.20 Prepare Shop Drawings Precast 10 11/01/18* 12/17/18
20 11/16/18 01/18/19
P034000.21 Review/Approve Shop Drawings Precast 20 12/18/18
P034000.29 Fabricate Precast Panels
DIVISION 05 - METALS
CONXTECH STEEL - BLDG B
P051001.05 Bid & Award Structural Steel (ConXtech Bldg B)
P051001.10 Design Structural Steel (ConXtech Bldg B)
P051001.15 LPA/Structural Approval Structural Steel (ConXtech Bldg B)
Project Start 09/10/18 Page 2 of 18 Edwards Lifescience
Project Finish 07/23/20 TASK filter: All Activities Proposal Schedule with C
Data Date 09/01/18
Run Date 10/05/18 Snyder L
2019 2020
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
T AWARD
al
al
Proposal / Interview
Contract
tract
CRITICAL PERMIT MILESTONES
.
uilding Permit
Precise Grading Permit for Building A, B & C
1st Plan Check Comments from City for Building A & B
1st Plan Check Comments from City for Building C
Foundation Only Permit (if not bldg) for Building A, B & C
Full Building Permit for Building A & B
Full Building Permit for Building C
ONSITE/OFFSITE PERMITS
Site Electrical Permit
SCE Permit
OCFA Permit
Yard Permit
Civil Permit
MCE Offsite Encroachment Permit
IRWD Permit
FAA PERMITS
Obtain FAA Crane Permit (Generator Relocation)
Obtain FAA Crane Permit (Steel Erection)
CRITICAL SUBMITTALS & PROCUREMENT
DIVISION 02 - SITE
ward Piles
pare Shop Drawings for Piles
City Review Shop Drawings for Piles
Test Piles
Document Test Piles
City Review Test Piles
DIVISION 03 - CONCRETE
Bid & Award Precast
Prepare Shop Drawings Precast
Review/Approve Shop Drawings Precast
Fabricate Precast Panels
DIVISION 05 - METALS
CONXTECH STEEL - BLDG B
Award Structural Steel (ConXtech Bldg B)
Design Structural Steel (ConXtech Bldg B)
LPA/Structural Approval Structural Steel (ConXtech Bldg B)
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
P051001.16 Deferred Submittal Approval Structural Steel (ConXtech Bldg B) 30 01/21/19 03/01/19
80 03/04/19 06/24/19 Bid
P051001.20 Fabrication Structural Steel (ConXtech Bldg B) 169 01/02/19 08/28/19
23 01/02/19* 02/01/19 Start Con
CONVENTIONAL STEEL - BLDG A & C 10 02/04/19 02/15/19 Mobilizat
02/18/19
P051000.05 Bid Structural Steel 1 02/18/19 08/14/19 Notify U
125 02/19/19 08/28/19 Dec
P051000.06 Steel Bidders Review 1st Plan Check & Update Bids (Bldg A & B) 125 03/05/19 09/06/19 Con
165 01/16/19 Acc
P051000.10 Award Structural Steel 02/12/19 C
20 01/16/19 08/08/19 E
P051000.30 Submittal/Review/Fabricate Steel (Bldg A) 125 02/13/19 08/22/19 S
125 02/27/19 09/06/19 L
P051000.40 Submittal/Review/Fabricate Steel (Bldg C) 125 03/13/19 12/31/19
290 11/01/18
DIVISION 07 - THERMAL & MOISTURE PROTECTION 12/03/18
20 11/01/18* 12/02/19
P074243.10 Bid & Award Aluminum Panels 250 12/04/18 12/16/19
250 12/18/18 12/31/19
P074243.20 Submittal/Review/Procure Material to Shop Aluminum Panels (Bldg B) 250 01/07/19 11/25/19
220 01/16/19
P074243.21 Submittal/Review/Procure Material to Shop Aluminum Panels (Bldg A) 02/12/19
20 01/16/19 05/07/19
P074243.29 Submittal/Review/Procure Material to Shop Aluminum Panels (Bldg C) 60 02/13/19 06/05/19
20 05/08/19 11/25/19
DIVISION 08 - OPENINGS 120 06/06/19 01/28/19
54 11/05/18
P084000.10 Bid & Award Glass/Glazing
P084000.20 Submittal/Review/Fabricate Curtainwall/Glazing (Bldg B)
P084000.30 Submittal/Review/Fabricate Curtainwall/Glazing (Bldg A)
P084000.40 Submittal/Review/Fabricate Curtainwall/Glazing (Bldg C)
DIVISION 14 - ELEVATORS
P142000.10 Bid & Award Elevators
P142000.20 Prepare Shop Drawings Elevators
P142000.21 Review/Approve Shop Drawings Elevators
P142000.29 Fabricate Elevators
CONSTRUCTION - PHASE 0 - ELECTRICAL IMPROVEMENTS
ELECTRICAL / GENERATOR WORK 54 11/05/18 01/28/19
0-10000 Start Construction 0 11/05/18 11/09/18
5 11/05/18 11/14/18
0-10010 Mobilization 2 11/13/18 11/30/18
10 11/15/18 11/30/18
0-10020 Notify Underground Dig Alert 10 11/15/18 11/30/18
0 12/07/18
0-10030 Decorative Fence at Redhill Ave & Alton Pkwy 5 12/03/18 01/03/19
15 12/10/18 01/03/19
0-10035 Construct Access Road from Alton 15 12/10/18 01/10/19
5 01/04/19 12/11/18
0-10036 Access Road from Alton Available 2 12/10/18 12/13/18
2 12/12/18 12/18/18
0-10040 Coordination Meeting 3 12/14/18 12/10/18
1 12/10/18 12/26/18
0-10050 Relocate (E) Motorized Gate at MLE 10 12/11/18 12/26/18
10 12/11/18 12/28/18
0-10060 (N) Motorized Gate at Access Road 2 12/27/18 01/02/19
1 01/02/19 12/27/18
0-10070 Phase 0 Construction Fencing 1 12/27/18 01/03/19
3 12/28/18
0-10100 Electrical Safe-off
0-10300 Sawcut/Demo Asphalt
0-10310 Demo Electrical Conduit/Infrastructure
0-11000 Layout New Service Yard
0-11010 Underground Electrical Ductbank to New Service Yard
0-11020 Pull Box & Underground Electrical Ductbank to Future Lab Bldg
0-11030 Slurry & Backfill Electrical Trench
0-11040 Repair A/C Paving & Remove Trench Plates
0-11100 Fine Grade 2500KV Generator Pad
0-11110 Form/Rebar 2500KV Generator Pad
Project Start 09/10/18 Page 3 of 18 Edwards Lifescience
Project Finish 07/23/20 TASK filter: All Activities Proposal Schedule with C
Data Date 09/01/18
Run Date 10/05/18 Snyder L
2019 2020
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Deferred Submittal Approval Structural Steel (ConXtech Bldg B)
Fabrication Structural Steel (ConXtech Bldg B)
CONVENTIONAL STEEL - BLDG A & C
Bid Structural Steel
Steel Bidders Review 1st Plan Check & Update Bids (Bldg A & B)
Award Structural Steel
Submittal/Review/Fabricate Steel (Bldg A)
Submittal/Review/Fabricate Steel (Bldg C)
DIVISION 07 - THERMAL & MOISTURE PROTECTION
Bid & Award Aluminum Panels
Submittal/Review/Procure Material to Shop Aluminum Panels (Bldg B)
Submittal/Review/Procure Material to Shop Aluminum Panels (Bldg A)
Submittal/Review/Procure Material to Shop Aluminum Panels (Bldg C)
DIVISION 08 - OPENINGS
d & Award Glass/Glazing
Submittal/Review/Fabricate Curtainwall/Glazing (Bldg B)
Submittal/Review/Fabricate Curtainwall/Glazing (Bldg A)
Submittal/Review/Fabricate Curtainwall/Glazing (Bldg C)
DIVISION 14 - ELEVATORS
Bid & Award Elevators
Prepare Shop Drawings Elevators
Review/Approve Shop Drawings Elevators
Fabricate Elevators
CONSTRUCTION - PHASE 0 - ELECTRICAL IMPROVEMENTS
ELECTRICAL / GENERATOR WORK
nstruction
ation
Underground Dig Alert
corative Fence at Redhill Ave & Alton Pkwy
nstruct Access Road from Alton
cess Road from Alton Available
Coordination Meeting
Relocate (E) Motorized Gate at MLE
(N) Motorized Gate at Access Road
Phase 0 Construction Fencing
Electrical Safe-off
Sawcut/Demo Asphalt
Demo Electrical Conduit/Infrastructure
Layout New Service Yard
Underground Electrical Ductbank to New Service Yard
Pull Box & Underground Electrical Ductbank to Future Lab Bldg
Slurry & Backfill Electrical Trench
Repair A/C Paving & Remove Trench Plates
Fine Grade 2500KV Generator Pad
Form/Rebar 2500KV Generator Pad
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
0-11120 Inspect 2500KV Generator Pad 1 01/04/19 01/04/19
1 01/07/19 01/07/19
0-11130 Pour 2500KV Generator Pad 1 01/07/19 01/07/19
5 01/08/19 01/14/19
0-11135 Pour 1250KV Generator Pad 2 01/15/19 01/16/19
2 01/15/19 01/16/19
0-11140 Cure 2500KV Generator Pad 3 01/17/19 01/21/19
5 01/22/19 01/28/19
0-11200 Relocate & Set 2500KV Generator 0 01/28/19
67 01/03/19 04/05/19
0-11205 Relocate 1250KV Generator to Temp Pad
0-11210 Electrical Connections at 2500KV Generator
0-11220 Fuel, Start-up & Test 2500KV Generator
0-11510 2500KV Generator Online
CONSTRUCTION - PHASE 1 - UTILITY RELOCATIONS
UNDERGROUND UTILITY RELOCATIONS 67 01/03/19 04/05/19
1A-09100 Relocate MLE Electrical 40 01/03/19 02/27/19
5 02/28/19 03/06/19
1A-09110 Patch Existing Areas of Temporary Construction Access 0 03/06/19
04/05/19
1A-09120 Access Road from Redhill Available 22 03/07/19 04/05/19
22 03/07/19 07/07/20
1A-09130 Reroute Storm Drain 363 02/01/19
1A-09140 Reroute Fire Water & Other Utilities between HVC & Museum Deck
CONSTRUCTION - PHASE 1 - BLDG B (OFFICE/LAB/SITE)
EARTHWORK 26 02/01/19 03/08/19
1B-10000 Start Construction 0 02/01/19 02/01/19
1 02/01/19 03/01/19
1B-10010 Survey 20 02/04/19 03/08/19
5 03/04/19 10/17/19
1B-10020 Earthwork 156 03/11/19 05/24/19
06/10/19
1B-10030 Certify Pad 55 03/11/19 06/10/19
30 04/29/19 06/24/19
FOUNDATIONS / STRUCTURE 30 04/29/19 07/17/19
30 05/13/19 07/24/19
1B-15000 Drill/Rebar/Pour Piles (522) 16 06/25/19 07/31/19
16 07/02/19 08/14/19
1B-15100 Form/Rebar/Pour Pilecaps 15 07/11/19 08/28/19
15 07/25/19 08/21/19
1B-15200 Excavate/Form/Pour Elevator Pits 10 08/15/19 08/21/19
15 08/01/19 08/28/19
1B-15300 Form/Rebar/Pour Gradebeams 15 08/01/19 09/05/19
10 08/15/19 09/19/19
1B-17000 Erect Structural Steel (ConXtech) 10 08/22/19 08/28/19
15 08/29/19 09/19/19
1B-17010 Weld Structural Steel (ConXtech) 15 08/08/19 09/26/19
15 08/29/19 10/10/19
1B-17100 Metal Deck/Edge Metal/Shear Studs (2nd Floor) 10 09/13/19 10/17/19
10 09/27/19 09/12/19
1B-17110 Metal Deck/Edge Metal/Shear Studs (3rd Floor/Low Roofs) 05/13/20
5 10/11/19
1B-17120 Metal Deck (Main Roofs) 20 08/15/19
164 09/20/19
1B-18000 Underslab Plumbing Rough-in
1B-18050 Complete Rebar/Pour Gradebeams at Moment Frames
1B-18100 Fine Grade for SOG
1B-18110 Sand/Vapor Barrier for SOG
1B-18120 Form/Rebar/Pour SOG
1B-18200 MEP/Rebar/Pour Concrete on Metal Deck (2nd Floor)
1B-18300 MEP/Rebar/Pour Concrete on Metal Deck (3rd Floor)
1B-18400 Fireproofing 1st Floor
1B-18410 Fireproofing 2nd Floor
1B-18420 Fireproofing 3rd Floor
1B-19000 Precast Stairs
EXTERIOR SKIN
Project Start 09/10/18 Page 4 of 18 Edwards Lifescience
Project Finish 07/23/20 TASK filter: All Activities Proposal Schedule with C
Data Date 09/01/18
Run Date 10/05/18 Snyder L
2019 2020
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Inspect 2500KV Generator Pad
Pour 2500KV Generator Pad
Pour 1250KV Generator Pad
Cure 2500KV Generator Pad
Relocate & Set 2500KV Generator
Relocate 1250KV Generator to Temp Pad
Electrical Connections at 2500KV Generator
Fuel, Start-up & Test 2500KV Generator
2500KV Generator Online
CONSTRUCTION - PHASE 1 - UTILITY RELOCATIONS
UNDERGROUND UTILITY RELOCATIONS
Relocate MLE Electrical
Patch Existing Areas of Temporary Construction Access
Access Road from Redhill Available
Reroute Storm Drain
Reroute Fire Water & Other Utilities between HVC & Museum Deck
CONSTRUCTION - PHASE 1 - BLDG B (OFFICE/LAB
EARTHWORK
Start Construction
Survey
Earthwork
Certify Pad
FOUNDATIONS / STRUCTURE
Drill/Rebar/Pour Piles (522)
Form/Rebar/Pour Pilecaps
Excavate/Form/Pour Elevator Pits
Form/Rebar/Pour Gradebeams
Erect Structural Steel (ConXtech)
Weld Structural Steel (ConXtech)
Metal Deck/Edge Metal/Shear Studs (2nd Floor)
Metal Deck/Edge Metal/Shear Studs (3rd Floor/Low Roofs)
Metal Deck (Main Roofs)
Underslab Plumbing Rough-in
Complete Rebar/Pour Gradebeams at Moment Frames
Fine Grade for SOG
Sand/Vapor Barrier for SOG
Form/Rebar/Pour SOG
MEP/Rebar/Pour Concrete on Metal Deck (2nd Floor)
MEP/Rebar/Pour Concrete on Metal Deck (3rd Floor)
Fireproofing 1st Floor
Fireproofing 2nd Floor
Fireproofing 3rd Floor
Precast Stairs
EXTERIOR SKIN
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
1B-30000 Exterior Framing 30 09/20/19 10/31/19
30 09/20/19 10/31/19
1B-30010 Exterior MEP Rough-in 30 10/04/19 11/15/19
30 10/04/19 11/15/19
1B-30020 Exterior Sheathing 30 10/11/19 11/22/19
80 12/03/19 03/25/20
1B-30100 Precast Panels 30 01/30/20 03/11/20
30 02/27/20 04/08/20
1B-30150 GFRC Panels 10 04/09/20 04/22/20
40 11/18/19 01/16/20
1B-30300 Curtainwall 15 10/18/19 11/07/19
40 10/25/19 12/24/19
1B-30350 Storefront Framing 60 11/25/19 02/20/20
10 04/23/20 05/06/20
1B-30360 Storefront Glazing 05/13/20
5 05/07/20 05/13/20
1B-30370 Storefront Doors 189 08/15/19
1B-30400 Steel & Glass Guardrails
1B-30500 Weatherproofing for Aluminum Panels
1B-30510 Field Measure & Fab Aluminum Panels
1B-30520 Install Aluminum Panels
1B-30600 MEP Trim
1B-30900 Cleanup & Prepunch
ROOF
ROOF DECKS 179 08/29/19 05/13/20
10 08/29/19 09/12/19
1B-40000 MEP Penetrations & Roof Drains 10 09/13/19 09/26/19
10 03/19/20 04/01/20
1B-40030 Sheetmetal Flashing 10 03/26/20 04/08/20
20 04/09/20 05/06/20
1B-40100 Waterproofing 5 05/07/20 05/13/20
95 08/15/19 01/02/20
1B-40110 Topping Slabs 20 08/15/19 09/12/19
20 08/15/19 09/12/19
1B-40300 Roof Deck Pavers & Finishes 20 08/22/19 09/19/19
30 08/29/19 10/10/19
1B-40900 Cleanup & Prepunch Roof Decks 10 10/04/19 10/17/19
30 10/11/19 11/22/19
MAIN ROOFS 20 10/11/19 11/07/19
20 11/25/19 12/24/19
1B-41000 MEP Penetrations & Roof Drains 5 12/26/19 01/02/20
02/28/20
1B-41010 Mechanical Curbs 106 09/27/19
1B-41030 Sheetmetal Flashing
1B-41100 Roofing
1B-41200 Set Mechanical Equipment
1B-41210 Hookup Mechanical Equipment
1B-41300 Roof Screen Panels
1B-41400 Sheetmetal Trim & Finish
1B-41900 Cleanup & Prepunch Roof
INTERIOR
1ST FLOOR CORE 86 09/27/19 01/31/20
15 09/27/19 10/17/19
1B-50000 Overhead Mechanical Rough-in 15 10/04/19 10/24/19
15 10/04/19 10/24/19
1B-50010 Overhead Plumbing Rough-in 15 10/04/19 10/24/19
15 10/04/19 10/24/19
1B-50020 Overhead Fire Sprinkler Rough-in 15 10/11/19 10/31/19
15 10/11/19 10/31/19
1B-50030 Overhead Electrical Rough-in 15 10/11/19 10/31/19
11/04/19
1B-50100 Wall Framing & Furring 5 10/29/19 11/06/19
5 10/31/19
1B-50110 Wall Plumbing Rough-in
1B-50120 Wall Electrical Rough-in
1B-50130 Wall Low Voltage Rough-in
1B-50140 Wall MEP & Framing Inspections
1B-50150 Wall Insulation (dry-in)
Project Start 09/10/18 Page 5 of 18 Edwards Lifescience
Project Finish 07/23/20 TASK filter: All Activities Proposal Schedule with C
Data Date 09/01/18
Run Date 10/05/18 Snyder L
2019 2020
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Exterior Framing
Exterior MEP Rough-in
Exterior Sheathing
Precast Panels
GFRC Panels
Curtainwall
Storefront Framing
Storefront Glazing
Storefront Doors
Steel & Glass Guardrails
Weatherproofing for Aluminum Panels
Field Measure & Fab Aluminum Panels
Install Aluminum Panels
MEP Trim
Cleanup & Prepunch
ROOF
ROOF DECKS
MEP Penetrations & Roof Drains
Sheetmetal Flashing
Waterproofing
Topping Slabs
Roof Deck Pavers & Finishes
Cleanup & Prepunch Roof Decks
MAIN ROOFS
MEP Penetrations & Roof Drains
Mechanical Curbs
Sheetmetal Flashing
Roofing
Set Mechanical Equipment
Hookup Mechanical Equipment
Roof Screen Panels
Sheetmetal Trim & Finish
Cleanup & Prepunch Roof
INTERIOR
1ST FLOOR CORE
Overhead Mechanical Rough-in
Overhead Plumbing Rough-in
Overhead Fire Sprinkler Rough-in
Overhead Electrical Rough-in
Wall Framing & Furring
Wall Plumbing Rough-in
Wall Electrical Rough-in
Wall Low Voltage Rough-in
Wall MEP & Framing Inspections
Wall Insulation (dry-in)
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
1B-50160 Drywall Walls 10 11/04/19 11/18/19
10 10/18/19 10/31/19
1B-50200 Hard Ceiling Framing 10 10/25/19 11/07/19
10 10/25/19 11/07/19
1B-50210 Hard Ceiling Mechanical Rough-in 10 10/25/19 11/07/19
11/12/19
1B-50220 Hard Ceiling Fire Sprinkler Rough-in 5 11/05/19 11/25/19
10 11/12/19 12/11/19
1B-50230 Hard Ceiling Electrical Rough-in 10 11/26/19 12/18/19
10 12/05/19 01/10/20
1B-50240 Hard Ceiling MEP Inspections 20 12/12/19 12/18/19
12/26/19
1B-50250 Drywall Ceilings 5 12/12/19 01/03/20
10 12/12/19 01/07/20
1B-50260 Tape Drywall Walls & Ceilings 10 12/19/19 01/10/20
01/17/20
1B-50300 Prime & Paint 2 01/06/20 01/24/20
5 01/06/20 01/24/20
1B-50310 Electrical Panels & Pull Wire 5 01/13/20 01/24/20
5 01/20/20 01/24/20
1B-50320 Door Frames 5 01/20/20 01/24/20
5 01/20/20 01/10/20
1B-50460 Suspended & Surface Mounted Fixtures 5 01/20/20 01/17/20
5 01/20/20 01/24/20
1B-50600 Flooring 20 12/12/19 01/31/20
10 01/06/20 02/14/20
1B-50610 Base 10 01/13/20 10/31/19
5 01/27/20 11/07/19
1B-50620 Hang Doors 86 10/11/19 11/07/19
15 10/11/19 11/07/19
1B-50630 Finish Paint 15 10/18/19 11/07/19
15 10/18/19 11/15/19
1B-50640 Door Hardware 15 10/18/19 11/15/19
15 10/18/19 11/15/19
1B-50650 Mechanical Trim 15 10/25/19 11/19/19
15 10/25/19 11/21/19
1B-50660 Fire Sprinkler Trim 15 10/25/19 12/04/19
5 11/13/19 11/15/19
1B-50670 Electrical Trim 5 11/15/19 11/22/19
10 11/19/19 11/22/19
1B-50680 Low Voltage Trim 10 11/01/19 11/22/19
10 11/08/19 11/26/19
1B-50800 Tile (Restrooms) 10 11/08/19 12/11/19
10 11/08/19 12/26/19
1B-50820 Plumbing Fixtures (Restrooms) 5 11/20/19 01/03/20
10 11/26/19 01/24/20
1B-50840 Toilet Accessories (Restrooms) 10 12/12/19
10 12/19/19
1B-50900 Cleanup & Prepunch Interior 20 12/27/19
2ND FLOOR CORE
1B-55000 Overhead Mechanical Rough-in
1B-55010 Overhead Plumbing Rough-in
1B-55020 Overhead Fire Sprinkler Rough-in
1B-55030 Overhead Electrical Rough-in
1B-55100 Wall Framing & Furring
1B-55110 Wall Plumbing Rough-in
1B-55120 Wall Electrical Rough-in
1B-55130 Wall Low Voltage Rough-in
1B-55140 Wall MEP & Framing Inspections
1B-55150 Wall Insulation (dry-in)
1B-55160 Drywall Walls
1B-55200 Hard Ceiling Framing
1B-55210 Hard Ceiling Mechanical Rough-in
1B-55220 Hard Ceiling Fire Sprinkler Rough-in
1B-55230 Hard Ceiling Electrical Rough-in
1B-55240 Hard Ceiling MEP Inspections
1B-55250 Drywall Ceilings
1B-55260 Tape Drywall Walls & Ceilings
1B-55300 Prime & Paint
1B-55310 Electrical Panels & Pull Wire
Project Start 09/10/18 Page 6 of 18 Edwards Lifescience
Project Finish 07/23/20 TASK filter: All Activities Proposal Schedule with C
Data Date 09/01/18
Run Date 10/05/18 Snyder L
2019 2020
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Drywall Walls
Hard Ceiling Framing
Hard Ceiling Mechanical Rough-in
Hard Ceiling Fire Sprinkler Rough-in
Hard Ceiling Electrical Rough-in
Hard Ceiling MEP Inspections
Drywall Ceilings
Tape Drywall Walls & Ceilings
Prime & Paint
Electrical Panels & Pull Wire
Door Frames
Suspended & Surface Mounted Fixtures
Flooring
Base
Hang Doors
Finish Paint
Door Hardware
Mechanical Trim
Fire Sprinkler Trim
Electrical Trim
Low Voltage Trim
Tile (Restrooms)
Plumbing Fixtures (Restrooms)
Toilet Accessories (Restrooms)
Cleanup & Prepunch Interior
2ND FLOOR CORE
Overhead Mechanical Rough-in
Overhead Plumbing Rough-in
Overhead Fire Sprinkler Rough-in
Overhead Electrical Rough-in
Wall Framing & Furring
Wall Plumbing Rough-in
Wall Electrical Rough-in
Wall Low Voltage Rough-in
Wall MEP & Framing Inspections
Wall Insulation (dry-in)
Drywall Walls
Hard Ceiling Framing
Hard Ceiling Mechanical Rough-in
Hard Ceiling Fire Sprinkler Rough-in
Hard Ceiling Electrical Rough-in
Hard Ceiling MEP Inspections
Drywall Ceilings
Tape Drywall Walls & Ceilings
Prime & Paint
Electrical Panels & Pull Wire
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
1B-55320 Door Frames 5 12/27/19 01/03/20
10 12/27/19 01/10/20
1B-55460 Suspended & Surface Mounted Fixtures 10 01/06/20 01/17/20
01/21/20
1B-55600 Flooring 2 01/20/20 01/24/20
5 01/20/20 01/31/20
1B-55610 Base 5 01/27/20 02/07/20
5 02/03/20 02/07/20
1B-55620 Hang Doors 5 02/03/20 02/07/20
5 02/03/20 02/07/20
1B-55630 Finish Paint 5 02/03/20 02/07/20
5 02/03/20 01/24/20
1B-55640 Door Hardware 20 12/27/19 01/31/20
10 01/20/20 02/07/20
1B-55650 Mechanical Trim 10 01/27/20 02/14/20
5 02/10/20 02/28/20
1B-55660 Fire Sprinkler Trim 86 10/25/19 11/15/19
15 10/25/19 11/22/19
1B-55670 Electrical Trim 15 11/01/19 11/22/19
15 11/01/19 11/22/19
1B-55680 Low Voltage Trim 15 11/01/19 11/22/19
15 11/01/19 12/03/19
1B-55800 Tile (Restrooms) 15 11/08/19 12/03/19
15 11/08/19 12/03/19
1B-55820 Plumbing Fixtures (Restrooms) 15 11/08/19 12/05/19
5 11/27/19 12/09/19
1B-55840 Toilet Accessories (Restrooms) 5 12/03/19 12/18/19
10 12/05/19 12/03/19
1B-55900 Cleanup & Prepunch Interior 10 11/18/19 12/10/19
10 11/25/19 12/10/19
3RD FLOOR CORE 10 11/25/19 12/10/19
10 11/25/19 12/12/19
1B-60000 Overhead Mechanical Rough-in 5 12/06/19 12/26/19
10 12/12/19 01/10/20
1B-60010 Overhead Plumbing Rough-in 10 12/27/19 01/17/20
10 01/06/20 02/07/20
1B-60020 Overhead Fire Sprinkler Rough-in 20 01/13/20 01/17/20
5 01/13/20 01/24/20
1B-60030 Overhead Electrical Rough-in 10 01/13/20 01/31/20
10 01/20/20 02/04/20
1B-60100 Wall Framing & Furring 2 02/03/20 02/07/20
5 02/03/20 02/14/20
1B-60110 Wall Plumbing Rough-in 5 02/10/20 02/21/20
5 02/17/20 02/21/20
1B-60120 Wall Electrical Rough-in 5 02/17/20 02/21/20
5 02/17/20 02/21/20
1B-60130 Wall Low Voltage Rough-in 5 02/17/20
1B-60140 Wall MEP & Framing Inspections
1B-60150 Wall Insulation (dry-in)
1B-60160 Drywall Walls
1B-60200 Hard Ceiling Framing
1B-60210 Hard Ceiling Mechanical Rough-in
1B-60220 Hard Ceiling Fire Sprinkler Rough-in
1B-60230 Hard Ceiling Electrical Rough-in
1B-60240 Hard Ceiling MEP Inspections
1B-60250 Drywall Ceilings
1B-60260 Tape Drywall Walls & Ceilings
1B-60300 Prime & Paint
1B-60310 Electrical Panels & Pull Wire
1B-60320 Door Frames
1B-60460 Suspended & Surface Mounted Fixtures
1B-60600 Flooring
1B-60610 Base
1B-60620 Hang Doors
1B-60630 Finish Paint
1B-60640 Door Hardware
1B-60650 Mechanical Trim
1B-60660 Fire Sprinkler Trim
1B-60670 Electrical Trim
Project Start 09/10/18 Page 7 of 18 Edwards Lifescience
Project Finish 07/23/20 TASK filter: All Activities Proposal Schedule with C
Data Date 09/01/18
Run Date 10/05/18 Snyder L
2019 2020
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Door Frames
Suspended & Surface Mounted Fixtures
Flooring
Base
Hang Doors
Finish Paint
Door Hardware
Mechanical Trim
Fire Sprinkler Trim
Electrical Trim
Low Voltage Trim
Tile (Restrooms)
Plumbing Fixtures (Restrooms)
Toilet Accessories (Restrooms)
Cleanup & Prepunch Interior
3RD FLOOR CORE
Overhead Mechanical Rough-in
Overhead Plumbing Rough-in
Overhead Fire Sprinkler Rough-in
Overhead Electrical Rough-in
Wall Framing & Furring
Wall Plumbing Rough-in
Wall Electrical Rough-in
Wall Low Voltage Rough-in
Wall MEP & Framing Inspections
Wall Insulation (dry-in)
Drywall Walls
Hard Ceiling Framing
Hard Ceiling Mechanical Rough-in
Hard Ceiling Fire Sprinkler Rough-in
Hard Ceiling Electrical Rough-in
Hard Ceiling MEP Inspections
Drywall Ceilings
Tape Drywall Walls & Ceilings
Prime & Paint
Electrical Panels & Pull Wire
Door Frames
Suspended & Surface Mounted Fixtures
Flooring
Base
Hang Doors
Finish Paint
Door Hardware
Mechanical Trim
Fire Sprinkler Trim
Electrical Trim
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
1B-60680 Low Voltage Trim 5 02/17/20 02/21/20
20 01/13/20 02/07/20
1B-60800 Tile (Restrooms) 10 02/03/20 02/14/20
10 02/10/20 02/21/20
1B-60820 Plumbing Fixtures (Restrooms) 02/28/20
5 02/24/20 02/28/20
1B-60840 Toilet Accessories (Restrooms) 50 12/19/19
1B-60900 Cleanup & Prepunch Interior
INTERIOR STAIRS
1B-70000 Drywall & Tape Stairs 30 12/19/19 01/31/20
20 01/13/20 02/07/20
1B-70010 Handrails 20 01/20/20 02/14/20
20 01/27/20 02/21/20
1B-70020 Prime & Paint 20 02/03/20 02/28/20
56 01/13/20 03/30/20
1B-70030 Flooring
1B-70040 MEP Trim
ELEVATORS
1B-71000 Elevator Pre-Check List & Corrections 10 01/13/20 01/24/20
5 01/27/20 01/31/20
1B-71010 Elevator Rails (#1) 5 02/03/20 02/07/20
3 02/10/20 02/12/20
1B-71020 Elevator Equipment (#1) 3 02/13/20 02/17/20
5 02/18/20 02/24/20
1B-71030 Elevator Temp Platform (#1) 5 03/09/20 03/13/20
5 02/10/20 02/14/20
1B-71040 Elevator Door Frames (#1) 5 02/17/20 02/21/20
3 02/24/20 02/26/20
1B-71050 Elevator Cab & Finishes (#1) 3 02/27/20 03/02/20
5 03/03/20 03/09/20
1B-71060 Elevator Test & Adjust (#1) 5 03/16/20 03/20/20
5 02/24/20 02/28/20
1B-72010 Elevator Rails (#2) 5 03/02/20 03/06/20
3 03/09/20 03/11/20
1B-72020 Elevator Equipment (#2) 3 03/12/20 03/16/20
5 03/17/20 03/23/20
1B-72030 Elevator Temp Platform (#2) 5 03/24/20 03/30/20
06/08/20
1B-72040 Elevator Door Frames (#2) 322 03/04/19
1B-72050 Elevator Cab & Finishes (#2)
1B-72060 Elevator Test & Adjust (#2)
1B-73010 Elevator Rails (#3)
1B-73020 Elevator Equipment (#3)
1B-73030 Elevator Temp Platform (#3)
1B-73040 Elevator Door Frames (#3)
1B-73050 Elevator Cab & Finishes (#3)
1B-73060 Elevator Test & Adjust (#3)
SITEWORK
1B-80000 Site Wet Utilities 20 03/04/19 03/29/19
20 04/01/19 04/26/19
1B-80100 Site Dry Utilities 20 09/20/19 10/17/19
20 10/18/19 11/15/19
1B-80200 Hardscape (Parking Aisle) 120 11/15/19 05/06/20
40 04/13/20 06/08/20
1B-80210 Landscape/Irrigation (Parking Aisle) 105 02/10/20 07/07/20
1B-80400 Hardscape (Main Courtyard)
1B-80410 Landscape (Main Courtyard)
INSPECTIONS / PUNCHLIST
1B-89000 Permanent Power 20 02/10/20 03/06/20
20 05/26/20 06/22/20
1B-90000 Final Inspections 40 04/27/20 06/22/20
10 06/23/20 07/07/20
1B-90005 Commissioning/LEED Approval 07/07/20
0 06/08/20
1B-90010 Inclement Weather Allowance 2 06/05/20
1B-90020 Substantial Completion
1B-90100 Prepare Punchlist
Project Start 09/10/18 Page 8 of 18 Edwards Lifescience
Project Finish 07/23/20 TASK filter: All Activities Proposal Schedule with C
Data Date 09/01/18
Run Date 10/05/18 Snyder L
2019 2020
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Low Voltage Trim
Tile (Restrooms)
Plumbing Fixtures (Restrooms)
Toilet Accessories (Restrooms)
Cleanup & Prepunch Interior
INTERIOR STAIRS
Drywall & Tape Stairs
Handrails
Prime & Paint
Flooring
MEP Trim
ELEVATORS
Elevator Pre-Check List & Corrections
Elevator Rails (#1)
Elevator Equipment (#1)
Elevator Temp Platform (#1)
Elevator Door Frames (#1)
Elevator Cab & Finishes (#1)
Elevator Test & Adjust (#1)
Elevator Rails (#2)
Elevator Equipment (#2)
Elevator Temp Platform (#2)
Elevator Door Frames (#2)
Elevator Cab & Finishes (#2)
Elevator Test & Adjust (#2)
Elevator Rails (#3)
Elevator Equipment (#3)
Elevator Temp Platform (#3)
Elevator Door Frames (#3)
Elevator Cab & Finishes (#3)
Elevator Test & Adjust (#3)
SITEWORK
Site Wet Utilities
Site Dry Utilities
Hardscape (Parking Aisle)
Landscape/Irrigation (Parking Aisle)
Hardscape (Main Courtyard)
Landscape (Main Courtyard)
INSPECTIONS / PUNCHLIST
Permanent Power
Final Inspections
Commissioning/LEED Approval
Inclement Weather Allowance
Substantial Completion
Prepare Punchlist
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
1B-90110 Punchlist Corrections 20 06/09/20 07/07/20
0 07/07/20
1B-90120 Final Completion 05/28/20
295 04/01/19
CONSTRUCTION - PHASE 1 - BLDG A (PAVILION/MUSEUM)
EARTHWORK 16 04/08/19 04/29/19
1A-10000 Start Construction 0 04/08/19 04/08/19
1 04/08/19 04/15/19
1A-10010 Survey 5 04/09/19 04/09/19
1 04/09/19 04/22/19
1A-10020 Demo 5 04/16/19 04/29/19
5 04/23/19 12/09/19
1A-10050 Pre-Grade Meeting with City 154 04/30/19
05/20/19
1A-10100 Earthwork 15 04/30/19 06/04/19
10 05/21/19 06/04/19
1A-10110 Certify Pad 10 05/21/19 06/18/19
10 06/05/19 07/17/19
FOUNDATIONS / STRUCTURE 20 06/19/19 08/14/19
20 07/18/19 09/12/19
1A-15000 Drill/Rebar/Pour Piles (144) 20 08/15/19 09/26/19
10 09/13/19 10/17/19
1A-15100 Form/Rebar/Pour Pilecaps 15 09/27/19 10/24/19
10/31/19
1A-15200 Excavate/Form/Pour Elevator Pit 5 10/18/19 11/07/19
5 10/25/19 11/07/19
1A-15300 Form/Rebar/Pour Gradebeams 5 11/01/19 11/12/19
5 11/01/19 11/14/19
1A-16000 Form/Rebar/Pour/Strip CIP Walls (Pour 1) 2 11/08/19 11/21/19
2 11/13/19 11/07/19
1A-16100 Form/Rebar/Pour/Strip CIP Walls (Pour 2) 5 11/15/19 11/15/19
5 11/01/19 12/02/19
1A-16110 Form/Rebar/Pour/Strip CIP Walls (Pour 3) 5 11/08/19 12/09/19
5 11/22/19 11/22/19
1A-17000 Erect Structural Steel 5 12/03/19 04/15/20
20 10/25/19
1A-17010 Weld Structural Steel 90 12/10/19 12/31/19
12/31/19
1A-17100 Metal Deck/Edge Metal/Shear Studs (2nd Floor) 15 12/10/19 01/15/20
5 12/24/19 12/31/19
1A-17110 Metal Deck/Edge Metal/Shear Studs (Low Roof) 01/22/20
10 01/02/20 02/19/20
1A-17120 Metal Deck (High Roof) 15 12/10/19 02/26/20
02/12/20
1A-18000 Underslab Plumbing Rough-in 5 01/16/20 03/11/20
20 01/23/20 03/18/20
1A-18100 Fine Grade for SOG 40 01/02/20 02/12/20
10 01/30/20 01/22/20
1A-18110 Sand/Vapor Barrier for SOG 10 02/27/20
1A-18120 Form/Rebar/Pour SOG 5 03/12/20
20 01/16/20
1A-18200 MEP/Rebar/Pour Concrete on Metal Deck (2nd Floor)
5 01/16/20
1A-18300 MEP/Rebar/Pour Concrete on Metal Deck (Low Roof)
1A-18400 Fireproofing 1st Floor
1A-18410 Fireproofing 2nd Floor
1A-19000 Prep/Pour Ramp & Precast Stairs
EXTERIOR SKIN
1A-30000 Exterior Framing
1A-30010 Exterior MEP Rough-in
1A-30020 Exterior Sheathing
1A-30050 Intumescent & High Performance Paint at Exposed Steel
1A-30200 Waterproofing for Wood Panel System
1A-30210 Wood Panel System
1A-30300 Curtainwall
1A-30350 Storefront Framing
1A-30360 Storefront Glazing
1A-30370 Storefront Doors
1A-30400 Steel & Glass Guardrails
1A-30500 Weatherproofing for Aluminum Panels
Project Start 09/10/18 Page 9 of 18 Edwards Lifescience
Project Finish 07/23/20 TASK filter: All Activities Proposal Schedule with C
Data Date 09/01/18
Run Date 10/05/18 Snyder L
2019 2020
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Punchlist Corrections
Final Completion
CONSTRUCTION - PHASE 1 - BLDG A (PAVILION/MUSEUM)
EARTHWORK
Start Construction
Survey
Demo
Pre-Grade Meeting with City
Earthwork
Certify Pad
FOUNDATIONS / STRUCTURE
Drill/Rebar/Pour Piles (144)
Form/Rebar/Pour Pilecaps
Excavate/Form/Pour Elevator Pit
Form/Rebar/Pour Gradebeams
Form/Rebar/Pour/Strip CIP Walls (Pour 1)
Form/Rebar/Pour/Strip CIP Walls (Pour 2)
Form/Rebar/Pour/Strip CIP Walls (Pour 3)
Erect Structural Steel
Weld Structural Steel
Metal Deck/Edge Metal/Shear Studs (2nd Floor)
Metal Deck/Edge Metal/Shear Studs (Low Roof)
Metal Deck (High Roof)
Underslab Plumbing Rough-in
Fine Grade for SOG
Sand/Vapor Barrier for SOG
Form/Rebar/Pour SOG
MEP/Rebar/Pour Concrete on Metal Deck (2nd Floor)
MEP/Rebar/Pour Concrete on Metal Deck (Low Roof)
Fireproofing 1st Floor
Fireproofing 2nd Floor
Prep/Pour Ramp & Precast Stairs
EXTERIOR SKIN
Exterior Framing
Exterior MEP Rough-in
Exterior Sheathing
Intumescent & High Performance Paint at Exposed Steel
Waterproofing for Wood Panel System
Wood Panel System
Curtainwall
Storefront Framing
Storefront Glazing
Storefront Doors
Steel & Glass Guardrails
Weatherproofing for Aluminum Panels
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
1A-30510 Field Measure & Fab Aluminum Panels 20 01/23/20 02/19/20
1A-30520 Install Aluminum Panels 30 02/20/20 04/01/20
1A-30550 Composite LED Screen 10 03/19/20 04/01/20
1A-30600 MEP Trim 04/08/20
1A-30900 Cleanup & Prepunch 5 04/02/20 04/15/20
5 04/09/20 01/03/20
ROOF MEP Penetrations & Roof Drains 41 11/01/19
Mechanical Curbs
LOW ROOF Roof Hatch 41 11/01/19 01/03/20
1A-40000 Sheetmetal Flashing 3 11/01/19 11/05/19
1A-40010 Roofing 3 11/01/19 11/05/19
1A-40020 Set Mechanical Equipment 3 11/01/19 11/05/19
1A-40030 Hookup Mechanical Equipment 3 11/06/19 11/08/19
1A-40100 Operable Skylight 5 11/12/19 11/18/19
1A-40200 Sheetmetal Trim & Finish 2 11/19/19 11/20/19
1A-40210 Cleanup & Prepunch Roof 12/06/19
1A-40300 10 11/21/19 12/18/19
1A-40400 Overhead Mechanical Rough-in 20 11/19/19 12/26/19
1A-40900 Overhead Plumbing Rough-in 01/03/20
Overhead Fire Sprinkler Rough-in 5 12/19/19 04/29/20
INTERIOR Overhead Electrical Rough-in 5 12/27/19
Wall Framing & Furring 105 12/03/19
1ST FLOOR Wall Plumbing Rough-in
1A-50000 Wall Electrical Rough-in 100 12/03/19 04/22/20
1A-50010 Wall Low Voltage Rough-in 5 12/03/19 12/09/19
1A-50020 Wall MEP & Framing Inspections 5 12/10/19 12/16/19
1A-50030 Wall Insulation (dry-in) 5 12/10/19 12/16/19
1A-50100 Drywall Walls 5 12/10/19 12/16/19
1A-50110 Hard Ceiling Framing 5 12/10/19 12/16/19
1A-50120 Hard Ceiling Mechanical Rough-in 5 12/17/19 12/23/19
1A-50130 Hard Ceiling Fire Sprinkler Rough-in 5 12/17/19 12/23/19
1A-50140 Hard Ceiling Electrical Rough-in 5 12/17/19 12/23/19
1A-50150 Hard Ceiling MEP Inspections 2 12/24/19 12/26/19
1A-50160 Drywall Ceilings 2 01/16/20 01/17/20
1A-50200 Tape Drywall Walls & Ceilings 5 01/20/20 01/24/20
1A-50210 Prime & Paint 3 12/17/19 12/19/19
1A-50220 Electrical Panels & Pull Wire 3 12/20/19 12/24/19
1A-50230 Door Frames 3 12/20/19 12/24/19
1A-50240 Ceiling Grid 3 12/20/19 12/24/19
1A-50250 Mechanical Fixtures in Grid 2 12/26/19 12/27/19
1A-50260 Fire Sprinkler Drops in Grid 3 01/27/20 01/29/20
1A-50300 Electrical Fixtures in Grid 02/12/20
1A-50310 Ceiling Grid & MEP Inspections 10 01/30/20 02/19/20
1A-50320 5 02/13/20 03/04/20
1A-50400 02/24/20
1A-50410 10 02/20/20 02/26/20
1A-50420 3 02/20/20 03/04/20
1A-50430 5 02/20/20 03/04/20
1A-50440 5 02/27/20 03/04/20
5 02/27/20 03/06/20
5 02/27/20
2 03/05/20
Project Start 09/10/18 Page 10 of 18 Edwards Lifescience
Project Finish 07/23/20 TASK filter: All Activities Proposal Schedule with C
Data Date 09/01/18
Run Date 10/05/18 Snyder L
2019 2020
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Field Measure & Fab Aluminum Panels
Install Aluminum Panels
Composite LED Screen
MEP Trim
Cleanup & Prepunch
ROOF
LOW ROOF
MEP Penetrations & Roof Drains
Mechanical Curbs
Roof Hatch
Sheetmetal Flashing
Roofing
Set Mechanical Equipment
Hookup Mechanical Equipment
Operable Skylight
Sheetmetal Trim & Finish
Cleanup & Prepunch Roof
INTERIOR
1ST FLOOR
Overhead Mechanical Rough-in
Overhead Plumbing Rough-in
Overhead Fire Sprinkler Rough-in
Overhead Electrical Rough-in
Wall Framing & Furring
Wall Plumbing Rough-in
Wall Electrical Rough-in
Wall Low Voltage Rough-in
Wall MEP & Framing Inspections
Wall Insulation (dry-in)
Drywall Walls
Hard Ceiling Framing
Hard Ceiling Mechanical Rough-in
Hard Ceiling Fire Sprinkler Rough-in
Hard Ceiling Electrical Rough-in
Hard Ceiling MEP Inspections
Drywall Ceilings
Tape Drywall Walls & Ceilings
Prime & Paint
Electrical Panels & Pull Wire
Door Frames
Ceiling Grid
Mechanical Fixtures in Grid
Fire Sprinkler Drops in Grid
Electrical Fixtures in Grid
Ceiling Grid & MEP Inspections
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
1A-50450 Ceiling Tile 5 03/09/20 03/13/20
1A-50460 Suspended & Surface Mounted Fixtures 5 03/16/20 03/20/20
1A-50500 Millwork/Cabinetry/Wall Finishes 10 02/27/20 03/11/20
1A-50510 Countertops 3 03/12/20 03/16/20
1A-50600 Flooring 5 03/23/20 03/27/20
1A-50610 Base 2 03/30/20 03/31/20
1A-50620 Hang Doors 3 03/30/20 04/01/20
1A-50630 Finish Paint 5 04/02/20 04/08/20
1A-50640 Door Hardware 3 04/09/20 04/13/20
1A-50650 Mechanical Trim 5 04/09/20 04/15/20
1A-50660 Fire Sprinkler Trim 5 04/09/20 04/15/20
1A-50670 Electrical Trim 5 04/09/20 04/15/20
1A-50680 Low Voltage Trim 5 04/09/20 04/15/20
1A-50800 Tile (Restrooms) 5 02/20/20 02/26/20
1A-50820 Plumbing Fixtures (Restrooms) 3 02/27/20 03/02/20
1A-50840 Toilet Accessories (Restrooms) 3 03/03/20 03/05/20
1A-50900 Cleanup & Prepunch Interior 5 04/16/20 04/22/20
2ND FLOOR 100 12/10/19 04/29/20
1A-55000 Overhead Mechanical Rough-in 5 12/10/19 12/16/19
1A-55010 Overhead Plumbing Rough-in 5 12/17/19 12/23/19
1A-55020 Overhead Fire Sprinkler Rough-in 5 12/17/19 12/23/19
1A-55030 Overhead Electrical Rough-in 5 12/17/19 12/23/19
1A-55100 Wall Framing & Furring 5 12/17/19 12/23/19
1A-55110 Wall Plumbing Rough-in 5 12/24/19 12/31/19
1A-55120 Wall Electrical Rough-in 5 12/24/19 12/31/19
1A-55130 Wall Low Voltage Rough-in 5 12/24/19 12/31/19
1A-55140 Wall MEP & Framing Inspections 2 01/02/20 01/03/20
1A-55150 Wall Insulation 2 01/20/20 01/21/20
1A-55160 Drywall Walls 5 01/27/20 01/31/20
1A-55200 Hard Ceiling Framing 3 12/24/19 12/27/19
1A-55210 Hard Ceiling Mechanical Rough-in 3 12/30/19 01/02/20
1A-55220 Hard Ceiling Fire Sprinkler Rough-in 3 12/30/19 01/02/20
1A-55230 Hard Ceiling Electrical Rough-in 3 12/30/19 01/02/20
1A-55240 Hard Ceiling MEP Inspections 2 01/03/20 01/06/20
1A-55250 Drywall Ceilings 3 02/03/20 02/05/20
1A-55260 Tape Drywall Walls & Ceilings 10 02/06/20 02/19/20
1A-55300 Prime & Paint 5 02/20/20 02/26/20
1A-55310 Electrical Panels & Pull Wire 10 02/27/20 03/11/20
1A-55320 Door Frames 3 02/27/20 03/02/20
1A-55400 Ceiling Grid 5 02/27/20 03/04/20
1A-55410 Mechanical Fixtures in Grid 5 03/05/20 03/11/20
1A-55420 Fire Sprinkler Drops in Grid 5 03/05/20 03/11/20
1A-55430 Electrical Fixtures in Grid 5 03/05/20 03/11/20
1A-55440 Ceiling Grid & MEP Inspections 2 03/12/20 03/13/20
1A-55450 Ceiling Tile 5 03/16/20 03/20/20
1A-55460 Suspended & Surface Mounted Fixtures 5 03/23/20 03/27/20
Project Start 09/10/18 Page 11 of 18 Edwards Lifescience
TASK filter: All Activities Proposal Schedule with C
Project Finish 07/23/20
Snyder L
Data Date 09/01/18
Run Date 10/05/18
2019 2020
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Ceiling Tile
Suspended & Surface Mounted Fixtures
Millwork/Cabinetry/Wall Finishes
Countertops
Flooring
Base
Hang Doors
Finish Paint
Door Hardware
Mechanical Trim
Fire Sprinkler Trim
Electrical Trim
Low Voltage Trim
Tile (Restrooms)
Plumbing Fixtures (Restrooms)
Toilet Accessories (Restrooms)
Cleanup & Prepunch Interior
2ND FLOOR
Overhead Mechanical Rough-in
Overhead Plumbing Rough-in
Overhead Fire Sprinkler Rough-in
Overhead Electrical Rough-in
Wall Framing & Furring
Wall Plumbing Rough-in
Wall Electrical Rough-in
Wall Low Voltage Rough-in
Wall MEP & Framing Inspections
Wall Insulation
Drywall Walls
Hard Ceiling Framing
Hard Ceiling Mechanical Rough-in
Hard Ceiling Fire Sprinkler Rough-in
Hard Ceiling Electrical Rough-in
Hard Ceiling MEP Inspections
Drywall Ceilings
Tape Drywall Walls & Ceilings
Prime & Paint
Electrical Panels & Pull Wire
Door Frames
Ceiling Grid
Mechanical Fixtures in Grid
Fire Sprinkler Drops in Grid
Electrical Fixtures in Grid
Ceiling Grid & MEP Inspections
Ceiling Tile
Suspended & Surface Mounted Fixtures
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work
Activity ID Activity Name Dur Current Start Current
Finish
Aug Sep Oct Nov Dec
1A-55500 Millwork/Cabinetry/Wall Finishes 10 03/05/20 03/18/20
3 03/19/20 03/23/20
1A-55510 Countertops 5 03/30/20 04/03/20
03/11/20
1A-55600 Flooring 10 02/27/20 04/07/20
2 04/06/20 04/08/20
1A-55605 Walkway Pedestal Pavers 3 04/06/20 04/15/20
5 04/09/20 04/20/20
1A-55610 Base 3 04/16/20 04/22/20
5 04/16/20 04/22/20
1A-55620 Hang Doors 5 04/16/20 04/22/20
5 04/16/20 04/22/20
1A-55630 Finish Paint 5 04/16/20 04/29/20
5 04/23/20 03/20/20
1A-55640 Door Hardware
35 02/03/20 02/14/20
1A-55650 Mechanical Trim 02/28/20
10 02/03/20 03/06/20
1A-55660 Fire Sprinkler Trim 10 02/17/20 03/13/20
03/20/20
1A-55670 Electrical Trim 5 03/02/20 04/09/20
5 03/09/20
1A-55680 Low Voltage Trim 5 03/16/20 03/04/20
36 02/20/20 03/11/20
1A-55900 Cleanup & Prepunch Interior 03/18/20
10 02/20/20 03/23/20
INTERIOR STAIRS 5 03/05/20 03/26/20
5 03/12/20 04/02/20
1A-70000 Drywall & Tape Stairs 3 03/19/20 04/09/20
3 03/24/20 05/06/20
1A-70010 Handrails 5 03/27/20
5 04/03/20 04/26/19
1A-70020 Prime & Paint 05/24/19
280 04/01/19 04/08/20
1A-70030 Flooring 05/06/20
20 04/01/19 05/28/20
1A-70040 MEP Trim 20 04/29/19
60 01/16/20 04/01/20
ELEVATOR 20 04/09/20 05/13/20
55 03/12/20 05/13/20
1A-71000 Elevator Pre-Check List & Corrections 05/28/20
15 03/12/20 05/28/20
1A-71010 Elevator Rails 10 04/30/20 04/29/20
40 03/19/20 05/28/20
1A-71020 Elevator Equipment 10 05/14/20 05/28/20
07/22/20
1A-71030 Elevator Temp Platform 0
2 04/28/20
1A-71040 Elevator Door Frames 20 04/30/20
0
1A-71050 Elevator Cab & Finishes 313 04/29/19
1A-71060 Elevator Test & Adjust
SITEWORK
1A-80000 Site Wet Utilities
1A-80100 Site Dry Utilities
1A-80400 Hardscape (Entry/Museum)
1A-80410 Landscape (Entry/Museum)
INSPECTIONS / PUNCHLIST
1A-89000 Permanent Power
1A-90000 Final Inspections
1A-90005 Commissioning/LEED Approval
1A-90010 Inclement Weather Allowance
1A-90020 Substantial Completion
1A-90100 Prepare Punchlist
1A-90110 Punchlist Corrections
1A-90120 Final Completion
CONSTRUCTION - PHASE 1 - BLDG C (CAFE/CONFERENCE)
EARTHWORK 21 06/25/19 07/24/19
0 06/25/19 06/25/19
1C-10000 Start Construction 1 06/25/19
1C-10010 Survey
Project Start 09/10/18 Page 12 of 18 Edwards Lifescience
Project Finish 07/23/20 TASK filter: All Activities Proposal Schedule with C
Data Date 09/01/18
Run Date 10/05/18 Snyder L
2019 2020
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Millwork/Cabinetry/Wall Finishes
Countertops
Flooring
Walkway Pedestal Pavers
Base
Hang Doors
Finish Paint
Door Hardware
Mechanical Trim
Fire Sprinkler Trim
Electrical Trim
Low Voltage Trim
Cleanup & Prepunch Interior
INTERIOR STAIRS
Drywall & Tape Stairs
Handrails
Prime & Paint
Flooring
MEP Trim
ELEVATOR
Elevator Pre-Check List & Corrections
Elevator Rails
Elevator Equipment
Elevator Temp Platform
Elevator Door Frames
Elevator Cab & Finishes
Elevator Test & Adjust
SITEWORK
Site Wet Utilities
Site Dry Utilities
Hardscape (Entry/Museum)
Landscape (Entry/Museum)
INSPECTIONS / PUNCHLIST
Permanent Power
Final Inspections
Commissioning/LEED Approval
Inclement Weather Allowance
Substantial Completion
Prepare Punchlist
Punchlist Corrections
Final Completion
CONSTRUCTION - PHASE 1 - BLDG C (CAFE/CO
EARTHWORK
Start Construction
Survey
es Campus Expansion Remaining Level of Effort
ConXtech Steel - 10/05/2018 Actual Level of Effort
Langston Remaining Work
Critical Remaining Work