Kualiti Element Kekuda Bumbung
CONTOH KUALITI KERJA BATA YANG RENDAH
TIADA PENGAWALAN
KUALITI KERJA
MELEPA
PENGGUNAAN
KAPUR YANG
BERLEBIHAN
CONTOH KUALITI KERJA KEMASAN
CAT YANG RENDAH
Permukaan cat yang
mengelupas
Sambungan dinding
bata / lepaan simen
yang retak
Cat yang telah
terkopek
Rujuk Detil A
Kemasan cat yang
mengelupas
Detil A
CONTOH KUALITI ‘TILING’ YANG RENDAH
Saiz sambungan
jubin lantai yang
tidak sekata
Bucu sambungan
jubin yang tidak
tepat
CONTOH KUALITI
KERJA KONKRIT
‘COLD
JOINT’
HONEY COMB TO WALL
HONEY COMB
TO DROP
SLAB/BEAM
HONEY COMB
TO ROOF BEAM
STARTER BAR MIS-ALIGNMENT
BESI DIPOTONG TAMPA DIGANTI
CONTOH KUALITI KERJA TETULANG
CONTOH KUALITI KERJA
PAPAN ACUAN
Placing ‘Formworks’ inside
‘swimming pool’
Special ‘Plumb’ ordered from Indonesia
KESAN KUALITI LAPISAN KALIS AIR
SOKET Kesan Lapisan Kalis
ELEKTRIK Lembab Rendah Kualiti
CAT DINDING MENGELUPAS Kayu kambi (Skirting) reput &
terkopak/lekang
KAYU KAMBI Tahap kritikal – berlaku litar
KEMASAN LANTAI pintas
Cat dinding mengelupas
Lantai kemasan kayu reput &
terkopak/lekang
KEBAKARAN ‘RISER’ DI SEBELAH TANDAS
SOKET
ELEKTRIK
Kesan lapisan kalis
air rendah kualiti
menyebabkan litar
pintas
KAYU KAMBI
CONTOH KUALITI KERJA LUARAN
Kegagalan Kerja Tanah
n Kaedah pemadatan yang tidak
mengikut spesifkasi
n Tidak menjalankan ujian
kepadatan
n Kaedah penjagaan cerun yang
tidak betul
n Kaedah pengorekan
berhampiran yang tidak betul
n Pengaliran di tapak tidak
sempurna
n Sistem pengaliran bawah tanah
tidak disediakan atau dibina
tidak mengikut spesifikasi
Rumusan . . . . . . . . . .
Penyeliaan kualiti bahan dan kerja merangkumi
penyediaan sistem kualiti atau QA / QC Manual di
mana ia menentukan :
i. Personel tapak yang berkelayakan
ii. Penyediaan Dokumen Kaedah Kerja
iii. Penyemakan & pengawalan bahan
iv. Tahap kelulusan setiap aktiviti / kerja.
Kesan
Pengabaian
Kualiti
UTUSAN MALAYSIA
29/08/05
LAPORAN
PRESTASI
PROJEK
Dikeluarkan oleh
pihak wakil klien
(PP - Jurutera/Akitek)
Nota
Penyelarasan Kerja
Antara Disiplin
Oleh :
Wan Noor Azman Wan Suffian
Certified Construction Project Manager (CCPM)
Corporate Member, Malaysian Concrete Society (MCSM)
Member, Malaysian Institute of Value Management (MMIVM)
Ijazah Kejuruteraan Awam & Struktur Univ Bradford, UK
KANDUNGAN
q PROJEK BERMASALAH
q DISIPLIN YANG TERLIBAT DAN STRUKTUR
ORGANISASI PROJEK
q KOMPONEN KERJA PEMBINAAN
q KEPERLUAN PENYELARASAN ANTARA DISIPLIN
q BAGAIMANA KERJA PENYELARASAN DIBUAT
q CIRI PENGURUSAN/ PENYELIA PROJEK
q KEGAGALAN PROJEK
PROJEK BERMASALAH
DI PERINGKAT PEMBINAAN
Antara penemuan audit oleh JKR:
Projek pembinaan yang bermasalah adalah disebabkan oleh:
Ø Komunikasi yang kurang berkesan antara disiplin yang
terlibat, kontraktor dan pelanggan
Ø Bila ada isu-isu, ‘role and responsibility’ tidak jelas
Menyebabkan kelewatan membuat keputusan
(teknikal atau bukan teknikal)
Disiplin yang terlibat dengan
pembinaan (projek bangunan)
Senibina
Awam
Struktur
Mekanikal
Elektrikal
Ukurbahan
Komponen kerja pembinaan
untuk bangunan
Penyeliaan kerja-kerja struktur bangunan adalah
untuk:
Builder’s work
Building services:
v Mechanical
v Electrical
External works (Civil works)
Builder’s work
Kerja struktur (sub and super)
Kerja senibina
Mechanical services
Sistem Penyaman Udara
Sistem Pencegah Kebakaran
Sistem Peralatan Dapur
Sistem Pam-Pam Penggalak (Booster Pump)
Sistem Lif dan Pengangkutan Tegak
Sistem Pam Najis
Sistem Dobi
Sistem Kebuk Wasap (Fume Cupboard)
Sistem-Sistem Mekanikal di hospital seperti dandang
stim, alat-alat pensteril, gas-gas perubatan dan bilik
sejuk
Electrical services
Sistem elektrik kuasa; voltan rendah dan voltan tinggi
Sistem kabel bawah tanah
Sistem talian atas
Pemasangan elektrik dalam bangunan
Sistem lampu luar: lampu kawasan, lampu
keselamatan, lampu jeti, lampu jalan, lampu sukan,
lampu stadium & lampu lapangan terbang.
Sistem penjanakuasa
Sistem komputer
Sistem telekomunikasi dan peralatan telefoni, PABX
Sistem telemetri
Electrical services (samb)
Sistem perlindungan dan bekalan kuasa untuk
peralatan komputer
Sistem antenna TV pusat
Sistem pembunyian dan peralatan pandang dengar
Sistem lampu studio, lampu pentas dan peralatan
pentas yang bermotor
Sistem Keselamatan
Sistem panggilan ‘call system’
Peralatan ‘Uninterruptible Power Supply’, UPS
Peralatan kepakaran hospital seperti lampu bilik bedah,
alat X-ray dan sebagainya.
External works
Kerja tanah
Jalan/ dataran kejat
Perparitan
Paip luaran/ komunikasi
Landskap
Dan lain-lain
Keperluan penyelarasan antara
disiplin?
i. Pemantauan dan kawalan berjalan lancar ke atas:
Kos
Masa
Skop
Kualiti
ii. Projek dapat disiapkan seperti yang dikehendaki
Decision making:
Technical or non technical
Some people (project managers) have a habit of:
Never making a decision promptly
Passing the decision making on to the others
Making a decision too fast
Fearing an error and its results, or
Fearing responsibility
Professionalism
Exercise full engineering and professionalism in all
levels
Right attitude and willingness to assure responsibilities
Prompt decision is vital (engineering decision)
Making no decision, make no mistake refer to the
‘expert’ in HQ
Site staff should not carry out ‘supervising’ part alone
but work with all discipline & contractor to ensure
better quality construction right from the start.
Bagaimana penyelarasan dibuat
Mesyuarat
v Mesyuarat pertama ‘kick off’: semua disiplin,
kontraktor dan pelanggan
v Mesyuarat tapak
v Mesyuarat teknikal
Communication network
Laporan-laporan projek
Types of meetings
Scope Definition
Start-up
Risk Analysis
Client- initiated
Unplanned – urgent
Progress/ Periodic
Informal/ Motivational
Close-out/ Finalisation
Communications
Design faults Root cause is poor
Construction faults communication in
Tasks and issues writing, in
documentation or in oral
Letter : untuk makluman & tindakan tuan’ what is the
action required?
Roles and Responsibility must be clear. Action and
tasks must have dates of completion
Communication must be clear and precise to
minimise misunderstanding and possible delays.
Communication Devices
• Network Diagram of who the stakeholders are …..
and who communicates with whom
• Contact list of key players
• Contact media
• Communications Matrix of Reports and Meetings
• Roles and Responsibilities for the project team
members and management staff
Reports
Reporting to:
• Project Sponsor/ Client
• Manager
• Project Team
• Steering Committee/ Specialist groups and/ or
• Individuals
The type of report will depend on …
The type of level of information you need to
receive/ pass
Intended audience
Who will deal with the information
What information “systems” are in place
Types of response and response time
Media – need and availability
Types of Project Reports
Weekly
Monthly
Progress
Milestone
Phase
Status
Exception
Other
Ciri-ciri pengurus projek/penyelia yang
cemerlang
1. Mempunyai keyakinan diri yang tinggi
2. Fokus kepada penghasilan kerja
3. Berkebolehan dalam komunikasi
4. Berkebolehan dalam menyelesaikan masaalah
5. Bertenaga serta mempunyai inisiatif
6. Berkebolehan dalam perundingan
7. Berkebolehan dalam penyelarasan serta
penyatupaduan.
8. Mempunyai perspektif ‘helikopter’.
Kegagalan projek: antara sebab- sebab
termasuklah
1. Tiada perancangan projek
2. Lambat membuat keputusan
3. Komitmen S.O.;- kepimpinan lemah
4. Tidak mahir berkomunikasi
5. Pengurusan maklumat tidak efektif
6. Tidak mahir dalam interpersonal
7. Tidak sensitive keperluan pelanggan
8. Pasukan projek lemah
9. Tiada pembangunan personel dalam aspek
pengurusan projek
10. Tidak mahir business
SEKIAN
“TERIMA KASIH”
41
PENGENALAN
Peringkat Kerja Tanah
Kajian Tapak
Pembersihan Tapak
Pemotongan & Penambakan
Pengorekan Asas/Longkang
SKOP KERJA SECARA AM
Pembersihan tapak & ‘stock pile top soil’
Penyediaan jalan, longkang sementara, silt trap & kolam takungan
Kelulusan “Pre-com Drawing” dan bahan tanah tambak serta ‘borrow pit’
Pemotongan, penambakan & pembentukan cerun
Pengeluaran tanah lebihan (tidak diperlukan) & tidak boleh digunakan
(unsuitable soil)
Pengorekkan longkang sementara kawasan potongan/penambakan &
pengorekan asas tebok penahan.
Penimbusan semula dengan tanah (granular) dibenarkan.
‘Pest Control’ (Sekiranya ada struktur bangunan)
Kajian Tapak
Untuk mendapatkan maklumat berkaitan tapak iaitu:
1. Persekitaran :- 2. Keadaan Tanah:-
• Mackintosh Probe
Peta geologi • Korekan terbuka
Rekod perlombongan • Borehole
Sesalur kemudahan
Laporan kajicuaca
Pelan pembangunan yang lalu.
AWAS ! – Dapat maklumat “status” Tapak Projek sebelum
‘site possession’. Elakan pertelingkahan
Pertelingkahan Memasuki Tapak Untuk Kerja
Tanah
Jangan konfrantasi dengan pemilik tanah.
Beritahu jurutera yang bertanggungjawab.
Jangan benarkan kontraktor masuki tapak.
Kemungkinan pemilik tanah belum
mendapat pampasan.
Pembersihan tapak dan kerja tanah
Sebelum pembersihan tapak :
Persediaan kerja ukur – dirikan pancang di batu tanda sempadan & Bench
Mark/TBM dan garis tengah
Mendirikan kemudahan sementara
Pejabat Tapak
Kuarters
Jalan keluar/masuk
Lencongan jalan
Alatan keselamatan
Peralatan/mesin kerja tanah
“Wash trap”
Silt Trap & Kolam Takungan dll…….di tempat yang stratigik & dapatkan
‘Layout Plan for Temporary Works’ daripada kotraktor