05
43
Main contractor PEMBINAAN SPK SDN. BHD.
Procurement Design & Build, Open Tender
Construction Industrialised Building System
Date Completed 31 May 2018
Project cost RM 284.9 million
Kuala Krai Hospital, Kota Bharu 44
Architect A.Mukif Architect
Engineers
1. Azman, Lim & Associates
Quantity 2. KVA Konsult
Surveyor 3. Meridian Project
Medical
Consultant Management Sdn Bhd
Landscape 4. EAG Consulting Sdn Bhd
ZUL-QS Consult
AMA Norma Medical Planner Sdn Bhd
Master Health Planning
Verdant Space Sdn Bhd
45 Kuala Krai Hospital, Kota Bharu
05
46
Kuala Krai Hospital, Kota Bharu
47
Layout plan
● One-Off Design
● 268 beds
● 40 hectares site area
● 49,074 m2 floor area
1. Haemodialysis
2. Peritoneal Dialysis
3. Diagnostic & Autopsy
4. Physiotherapy
5. General Surgery /
Orthopaedics /
Anaesthesia
6. Obstetrics & Gynae
7. ENT /Ophthalmology /
Dental (Oral Surgery &
Paediatrics)
8. Paediatrics
9. Laboratory (Haemato /
Biochemistry /
Chemical Pathology /
Microbiology /
Parasitology /
Mycology / Histo. /
Cyto. /Serology /
Immunology)
10. 8 Operation Theatre
48
Negeri Sembilan
Project06 Rembau Hospital
hospital design Hospital Rembau is a new District Hospital that sits on a
32.4 acres of land. The 76 bedded hospital with gross
floor area of 21,654 square metres was designed to
connect the community as well as the environment. The
planning concept was focused around the Central
Courtyard and respective functional zones. Thus, a clear
identification of space and access was clearly
highlighted for each zone of the hospital.
The spread out of 3 storey blocks are able to bring in
natural lighting and to provide external views. A modern
approach in design with pitched roofs and deep
overhangs provides comfort to the visitors and patients.
The interior spaces were enhanced with various colours
and motifs to heighten the different departments and
also to brighten the surroundings. Good planning and
proper use of materials create a relaxing environment
for rehabilitation and healing process.
The facility consists of General Medical, Obstetrics &
Gynaecology, Paediatric, Radiology, Pathology,
Pharmacy and Central Sterilising Services Unit (CSSU).
The hospital is also equipped with two Operation
Theatres.
4129
50
Rembau Hospital, Negeri Sembilan
06
51
Main contractor SEIE ENGINEERING SDN BHD
Procurement Conventional Consultant,
Open Tender
Construction Industrialised Building System
Date Completed 10 October 2019
Project cost RM 115.5 million
Rembau Hospital 52
Architect A MIRZA Architect
Engineers
1. Perunding KMN Sdn Bhd.
Quantity 2. Jurutera Perunding Kuasa
Surveyor
Tenaga Sdn Bhd
Pakatan International
Medical TA Architect
Consultant Advance Pact Sdn Bhd
53 Rembau Hospital
06
54
Rembau Hospital
55
Layout plan
● One-Off Design
● 76 beds
● 19,9217 m2 site area
● 21,654 m2 floor area
1. General Medical
2. Obstetrics &
Gynaecology
3. Paediatrics
4. Radiology
5. Pathology
6. Pharmacy
7. Central Sterile Supply
Unit (CSSU)
8. Operation Theatre
56
Project07 Negeri Sembilan
hospital designICU & CCU, Tuanku Jaafar Hospital,
Seremban
This project was for refurbishment works to renovate
the facilities of ICU and CCU at Level 4 and Level 5 of
Tuanku Jaafar Hospital, Seremban.
The facility consists of 12 beds; 6 beds of ICU and 6 beds
of CCU.
57
58
ICU & CCU, Tuanku Jaafar Hospital, Seremban
07
59
Main contractor BINA CONSO SDN. BHD.
Procurement Conventional In-House,
Open Tender
Construction Conventional
Date Completed 30 August 2018
Project cost RM 6.8 million
ICU & CCU, Tuanku Jaafar Hospital, Seremban 60
F“ orm follows function - that has been
misunderstood. Form and function should be
one, joined in a spiritual union.”
Frank Lloyd Wright
61 ICU & CCU, Tuanku Jaafar Hospital, Seremban
07
62
ICU & CCU, Tuanku Jaafar Hospital, Seremban
63
Layout plan
● One-Off Design
● ICU : 1300m2
● CCU : 650 m2
● 12 BEDS
1. Upgrading works level
4 and 5 to fit in ICU
and CCU facilities
2. 6 beds of ICU
3. 6 beds of CCU
64
Project Completed
65
01 project in
66
Project08 Kuala Lumpur
pecialised designNational Blood Centre - Additional
Block & Internal Renovation Work
The project was part of works on upgrading 22 blood
collection centres to support national vaccination
projects in Malaysia. The work was focused on the
construction of additional 4-storey buildings. The
function is to provide space and facilities for storage and
processing of high quality blood plasma, before it is used
for medical consumption. The building with gross floor
area of 1,258 square metres consists of a Fractionation
Laboratory, a Receiving Room and Storage Room.
The scope of work is to provide work space, storage
space, Blood Bank Information System requirements,
engineering requirements, medical and non-medical
equipment placement that meet the relevant standards
and guidelines for implementing the blood plasma
fractionation process. Thus, additional work space in
laboratories, office space, and product storage are
essential in line with the increase in plasma quality, and
the products yielded from the processed plasma.
6172
68
National Blood Centre - Additional Block & Internal Renovation Work
National Blood Centre - Additional Block & Internal Renovation Work Main ZAFA BINA SDN.
contractor BHD.
Procurement Design & Build,
Selective Tender
Construction Conventional
Date 27 December 2018
Completed
Project cost RM 6 million
Architect RRA ARCHITECT
Engineers PERUNDING RZA
PERUNDING JZA
Quantity
Surveyor ZUL QS CONSULT
SDN. BHD.
69
Layout plan
● One-Off Design
● 1,258.40 m2
1. Additional block for
National Blood Centre
2. Facilities for blood
plasma fractionation
process
70
Project Completed
71
09 projects in
72
Project09 Selangor
health clinic designPuchong Health Clinic, Petaling Jaya -
Type 3
Puchong Health Clinic is located at Batu 14, Puchong,
Selangor, nearby the old clinic. It sits on a 5.43 acres of
land. The clinic was fully operational in June 2019,
providing medical facilities to local Kinrara residents and
surrounding areas. The facility can accommodate
between 300 to 500 visitors per day. The clinic was
designed using JKR Pre-Approved Plan Health Clinic
Type 3 (Teja).
The gross floor area of the two storey building is 2,790
square metres and consists of 5 beds (3 recovery beds
and 2 asthma bays), Accident and Emergency Unit,
Outpatient Clinic, Dental Clinic, Mother and Children
Clinic, Pharmacy, Imaging and Diagnostics and
Pathology Laboratory.
7123
74
Puchong Health Clinic, Petaling Jaya
09
75
Main contractor ATLANTAS CONSTRUCTION SDN BHD
Procurement Conventional In-House,
Open Tender
Construction Conventional
Date Completed 26 April 2019
Project cost RM 19.9 million
Puchong Health Clinic, Petaling Jaya 76
O“ rganic architecture seeks superior sense of
use and a finer sense of comfort, expressed in
organic simplicity.”
Frank Lloyd Wright
77 Puchong Health Clinic, Petaling Jaya
09
78
Puchong Health Clinic, Petaling Jaya
79
Layout plan
● Standard Design Type
3 (Teja CR)
● 2790 m2 floor area
● 5.4311 acres site area
1. Accident and
Emergency
2. Outpatient Clinic
3. Mother and Children
Clinic
4. Dental Clinic
5. Pharmacy
6. Pathology Laboratory
7. Imaging (X-Ray)
80
Project 10 Selangor
health clinic design 81 Gombak Setia Health Clinic - Type 3
Gombak Setia Health Clinic sits on a very small site of
0.786 acre of land. The clinic was designed using JKR
Pre-Approved Plan Health Clinic Type 3 (Teja). It was
initiated to replace the old existing clinic as well as to
cater to the growing needs of the surrounding
population. The facilities can accommodate between 300
to 500 visitors per day.
Due to the compact site area, the clinic was designed with
the concept of “Less is More” which is demonstrated in
the simple and modern usage of horizontal and vertical
elements. Utilisation of metal roofing, perforated panels,
aluminium composite cladding and louvres as facade
elements helps to emphasise its design concept. It was
designed with solid form, and was balanced by a
protruded and recessed wall, round columns, and
louvres. The clinic also applied unique textures and
vibrant colours on its facade that become a new
landmark in its surrounding area.
The gross floor area of the three storey high building is
3,713 square metres. It consists of 5 beds (3 recovery
beds and 2 asthma bays), Accident and Emergency Unit,
Outpatient Clinic, Mother and Children Clinic, Pharmacy,
Imaging and Diagnostics and Pathology Laboratory.
82
Gombak Setia Health Clinic, Gombak
10
83
Main contractor KAYANGAN JITU TEGUH SDN. BHD.
Procurement Conventional In-House,
Open Tender
Construction Industrialised Building System
Date Completed 16 April 2019
Project cost RM 17.6 million
Gombak Setia Health Clinic, Gombak 84
T“' hink in simples' as my old master used to say
- meaning to reduce the whole to its parts in
simplest terms, getting back to first principles.”
Frank Lloyd Wright
85 Gombak Setia Health Clinic, Gombak
10
86
Gombak Setia Health Clinic, Gombak
87
Layout plan
● One Off Type 3
● 3712.88m2 floor area
● 0.786 acre site area
● 5 beds
1. 3 recovery beds
2. 2 asthma bay
3. Accident and
Emergency
4. Outpatient Clinic
5. Mother and Children
Clinic
6. Pharmacy
7. Pathology Laboratory
8. Imaging (X-Ray)
88
Project11 Selangor
health clinic designBandar Tun Hussein Onn Health Clinic,
Cheras - Type 3
Bandar Tun Hussein Onn Health Clinic is located at Jalan
Suadamai, Bandar Tun Hussein Onn, Cheras, Selangor.
It sits on a 3.0 acres of land. The clinic was fully
operational in April 2018 providing medical facilities to
approximately 50,000 residents in the areas
surrounding Balakong and Cheras. The facility can
accommodate between 300 to 500 visitors per day. The
clinic was designed using JKR Pre-Approved Plan Health
Clinic Type 3 (Teja-CR).
The gross floor area of the double storey building is
2,790 square metres. It consists of 5 beds (3 recovery
beds and 2 asthma bays), Accident and Emergency Unit,
Outpatient Clinic, Mother and Children Clinic, Pharmacy,
Imaging and Diagnostics and Pathology Laboratory.