12 34 5 678
A Socket A
B
AC POWER SUPPLY 14 AC POWER SUPPLY
-X101
Cubicle Lighting Cubicle Heating L
N
=E01/D1.7 1L1 -X230 1 3/N/PE 50Hz 380/220V PE -X230 2 1L1 =E04/D1.2
/Z6.4 4 1L2 =E04/D1.2
=E01/D1.7 1L2 3 6 1L3 =E04/D1.2
2.5 GN/YE
=E01/D1.7 1L3 5 10
B 17
2.5 BK
-F1 21
/Z6.4
10A
I>
C 150kV Bay No.1 (Transformer 1) 150kV Bay No.4 (Bus Coupler) C
Control Protection Panel Control Protection Panel
(=E01+WR1) -X230 12 13 (=E04+WR1)
-S101 22 21 -B101 21
/Z6.6 V
/Z6.4
D 1 D
-E101 21 -R101
/Z6.5 /Z6.5
2
PE
E =E01/D1.7 1N -X230 7 -X230 8 9 11 1N =E04/D1.2 E
18 1PE =E04/D1.2
=E01/D1.7 1PE 15 16
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA AC Supply System CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /D1 of 2
56 78
12 34 56 78
A Power Supply Power Supply Power Supply DC POWER SUPPLY A
DC POWER SUPPLY Control Protection Circuit Control Protection Circuit Signalling Circuit/BCU B
21L+ =E04/D2.1
(Main 1) (Main 2) 21L- =E04/D2.1
=E01/D2.7 21L+ -X110 1 110 VDC (Control Supply Main 1) -X110 2 22L+ =E04/D2.1
=E01/D2.7 21L- 3 4 22L- =E04/D2.1
150kV Bay No.1 (Transformer 1) =E01/D2.7 22L+ -X210 1 110 VDC (Control Supply Main 2) -X210 2 150kV Bay No.4 (Bus Coupler)
Control Protection Panel =E01/D2.7 22L- 3 4 Control Protection Panel
(=E01+WR1) (=E04+WR1)
B
2.5 BK 2.5 BK 2.5 BK 2.5 BK
C C
-F2 21 -F3 21 -F4 21 -F5 21
/Z6.4 43 /Z6.4 43 /Z6.4 43 /Z6.4 43
6A 6A 6A 6A
I> I> I> I> I> I> I> I>
-KPSA2 A1 D
D /Z6.6 14 13 22 21
44 43 32 31
-KPS
/Z6.6
E
C1 21L+ C2 22L+ S 31L+ E
/M1.1 /M5.1 /R1.1
C1 21L- C2 22L- S 31L-
/M1.1 /M5.1 /R1.1
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA BNR/150/EL/ED/ 0902 CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /D2 of 2
56 78
1 2 3 4 56 7 8
A
GIS Local Control Cubicle -XC21 9 A
=+ DWG. NO. HTD12-249-170-0102 10
11 -X
S1 -X301 -XC21 1 -A300 TMU220 14 12
/Z1.1 16 13 -X
S2 2 A1 A2 14
S1 3 13 5A 15 B
15 1A 16
P2 P1 4 -X
T5.21 P2 P1 5 9 B1 B2 10
150-200/1A P2 P1 12 -X
CL.0,2, 15VA TARIFF METER PANEL/DFR6
=+7 C
8 11 5A
1A
B S2 5 C1 C2 6
8
S1 7 5A
1A
S2 1 N1 N2 2
4
3 5A
1A C264
C
-XV11 1 -A300 TMU220 22
2 /Z1.1
3 LINE VT
21 U1 U2
D4
23 V1 V2 24
5
6 D
7
8 25 W1 W2 26
27 N1 N2 28
E BVTM 2VA BUS VT E
-XV14 1 19 X1 X2 20
/G7.2 2
BVTM 2VN 3
/G7.2 4
C264
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CT and VT Connection CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 BCU (C264) APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /G1 of 7
4 5678
12 3 4 5678
GIS Local Control Cubicle
DWG. NO. HTD12-249-170-0102
A S1 -X302 -XC22 1 -S87TA 22 -F87T IA (1) A
P2 P1 /Z6.1 /Z2.1 IB (1)
P2 P1 2 IC (1)
P2 P1 3 21 C24
C23 P643
T5.22
C26
150-300/1A C25
CL.X, 15VA S2 C28
C27
S1 23 24
S2 4 25 26
5
S1 B
6
B 7
8
S2
S1 -X -XC1 1 27 28 -F87T IA (2)
MMLG01 22 /Z2.1 IB (2)
C 2 IC (2)
3 -S87TB E24
S2 /Z6.1 E23 P643
P2 P1 4 21
P2 P1 5 E26
P2 P1 E25 C
6
S1 7 23 24 E28
S2 8 E27
C1
1000-2000/1A
CL.X, 15VA (20kV CT)
S1 25 26
D S2 D
27 28
MMLG01
P2 P1 P2 P1 S1 -X -XC51 1 -S87TA -F87T
2 /Z6.1 /Z2.1
2 C16 IY (HV)
-X -XC52 1 1
2
T51
E 150-300/1A S2 34 C15 E
CL.X, 15VA 56 C14 IY (LV)
T52 S1 7 8 C13
1000-2000/1A S2 MMLG01 C12 IY (TV)
CL.X, 15VA C11
P643
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI CT and VT Connection
C INTERNAL REVISION 05.09.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA MICOM P643 & P142 CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 CIRCUIT DIAGRAM APPR. RS SCALE NTS
1
2 4 56 DWG. NO. BNR/150/EL/ED/ 0903 /G2 of 7
78
12 3 4 5 678
GIS Local Control Cubicle -XC23 1
DWG. NO. HTD12-249-170-0102 2
A 3 -S50/51 -F50/51 A
-X303 4 /Z6.2 /Z3.1 B
P2 P1 S1 5 22 IA C
P2 P1 6 21 C1 5A IB D
P2 P1S2 7 C3 1A IC E
T5.23 S1 8 C2 IN
150-300/1A
CL.5P20+CL.0,5, 30VA C4 5A
C6 1A
23 24 C5
S2 25 26 C7 5A
C9 1A
B C8
S1
C10 5A
S2 C11 1A
C12
27 28
MMLG01
P142
C
S1 -X304 25-L1A =E00/G2.3 -XC23 9 L1 =E00/G1.3 Disturbance Fault Recorder
P2 P1 25-L1B =E00/G2.3 L2 =E00/G1.3 (=E00+EX381)
D T5.24 P2 P1 25-L2A =E00/G2.3 10 L3 =E00/G1.3
2000-4000/1A P2 P1 25-L2B =E00/G2.3 11 N =E00/G1.3
25-L3A =E00/G2.3
CL.X, 15VA S2 25-L3B =E00/G2.3 12
13
S1 150kV Busbar Protection Panel
S2 (=E00+R1) 14
15
16
17
E S1
S2
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CT Connection CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 MICOM P142 APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /G3 of 7
4 5678
12 345678
GIS Local Control Cubicle
DWG. NO. HTD12-249-170-0102
A A
C5.25 P2 P1S1 -X305
2000-4000/1A P2 P1S2
P2 P1
CL.X, 15VA
S1
S2 B
B S1
S2
C -S51N -F51N C
/Z6.2 /Z4.1 D
D -X -XC14 1 22 IA E
20kV CT 2 21 24 C1 5A IB
3 26 C3 1A IC
-X 4 23 28 C2 IN
5
6 25 C4 5A
7 C6 1A
8 27 C5
-XC53 1 C7 5A
2 C9 1A
C8
C10 5A
C11 1A
C12
E
C13 5A IN (SEN)
C15 1A
T53 P2 P1 S1 9 10
1000/1A S2 12 C14
CL.5P20, 30VA 11
MMLG01
P142
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C INTERNAL REVISION 05.09.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CT Connection to Busbar Protection Relay P746 CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 and MICOM P142 APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /G4 of 7
4 5678
1 2 3456 7 8
A A
-F90
B B
C /Z5.2 MEASUREMENT I C
-XC20 1 MI : 06 5A
2
3 MI : 09 1A
4
FROM 20kV CT MI : 10 0.2A
MI : 05 0
FROM 20kV VT -XV20 1 MEASUREMENT U
2 MI : 01
MI : 02
TAPCON-260
DD
EE
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CT & VT Connection CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 TAPCON-260 APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /G5 of 7
4 5678
1 2 34 56 78
A
BUS 1 BUS 2 BUS 1 BUS 2
VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER
150kV Bay No.1 (Transformer 1) A
Control Protection Panel
(=E01+WR1)
1VBP-L1 =E01/G6.5
1VBP-L2 =E01/G6.5
1VBP-L3 =E01/G6.6
1VBP-N =E01/G6.6
2VBP-L1 =E01/G6.7
2VBP-L2 =E01/G6.7
2VBP-L3 =E01/G6.8
2VBP-N =E01/G6.8
150kV Bay No.4 (Bus Coupler)
Control Protection Panel
(=E04+WR1)
1VBP-L1 =E04/G4.4
1VBP-L2 =E04/G4.4
1VBP-L3 =E04/G4.4
1VBP-N =E04/G4.5
2VBP-L1 =E04/G5.4
2VBP-L2 =E04/G5.4
2VBP-L3 =E04/G5.4
2VBP-N =E04/G5.5
B B
C
-XVBP1 1 2 34 56 78 -XVBP2 1 2 34 56 78
C
DD
EE
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Bus VT Selection CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 Protection APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /G6 of 7
4 5678
1 2 34 56 78
A
BUS 1 BUS 2 BUS 1 BUS 2
VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER
150kV Bay No.1 (Transformer 1) A
Control Protection Panel
(=E01+WR1)
1VBM-L1 =E01/G7.5
1VBM-L2 =E01/G7.5
1VBM-L3 =E01/G7.6
1VBM-N =E01/G7.6
2VBM-L1 =E01/G7.7
2VBM-L2 =E01/G7.7
2VBM-L3 =E01/G7.8
2VBM-N =E01/G7.8
150kV Bay No.4 (Bus Coupler)
Control Protection Panel
(=E04+WR1)
1VBM-L1 =E04/G4.5
1VBM-L2 =E04/G4.5
1VBM-L3 =E04/G4.6
1VBM-N =E04/G4.6
2VBM-L1 =E04/G5.5
2VBM-L2 =E04/G5.5
2VBM-L3 =E04/G5.6
2VBM-N =E04/G5.6
B B
C
-XVBM1 1 2 34 56 7 8 -XVBM2 1 2 34 56 78 D
E
C
-KQ1 7 -KQ2
/Z6.4 11 3 /Z6.4
D 8
12 4
BVTM 2VA
/G1.4 7
BVTM 2VN 11 3
/G1.4
8
12 4
E
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Bus VT Selection CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 Metering APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /G7 of 7
4 5678
12 345678
A A
-F87L Relay Reset Manual Close Spare Spare Spare Spare Spare Spare Spare
Power Supply
C1 21L+ -X201 1 23 21L+ C1
/D2.3 /M2.1
B B
-S87TA 14 13 -KRST 1 -KMCL
/Z6.1 /Z6.4 95 /Z6.4
MMLG01
1
95
C C
D
J2 -X201 21 22 23 24 25 26 27
-F87T L+ RS1 RESET
/Z2.1 L- /M2.3
P64315 16 J1
14mm²
GROUND STRAP
D
-S87TA -F87T OPTO14 F12 OPTO13 F10 OPTO3 D6 OPTO4 D8 OPTO5 D10 OPTO12 F8 OPTO9 F2 OPTO10 F4 OPTO11 F6
/Z6.1 /Z2.1
MMLG01 P643
E F11 F9 D5 D7 D9 F7 F1 F3 F5 E
C1 21L- -X201 15 21L- C1
/D2.3 /M2.1
-X201 11 12 13 14
F -X201 17 18 19 20
A ISSUED FOR APPROVAL F
B FOR CONSTRUCTION
C AS MANUFACTURED 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
REV. REMARKS 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Line Differential Protection Input CHECK RS DATE 31.05.2012
1
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /M1 of 9
45678
12 345 6 78
A Intertrip from A
20kV Side B
87T/64 Intertrip from Transf. Electromechanical 87BB/50BF 1st stage 50BF 2nd stage
General Trip 20kV Side Trip Trip Trip -X201 6
-X
C1 21L+ -X201 4 5 21L+ C1
/M1.7 -X /M3.1
-X201 30
-F87T 17 18 H2 H1-K94A -K94T
15 13
/Z2.1 R1 15 13/Z7.3 K1/Z7.4 K1
B P643
150kV Busbar Protection PanelMVAJ101MVAJ101
(=E00+R1)
-F87B -F87B
B1 =E00/P2.2 87b/50BF 1st stage =E00/P2.1 CO1
-S87TA B2 =E00/P2.4 50BF 2nd stage C
/Z6.1
20kV Protection Panel
MMLG01 =+
C
-X201 28 29
D RESET RS1 D
/M1.3
-F86A 28 27 -F86A -K94A
/Z7.1 Trip 24 /Z7.1 /Z7.3 Trip
22
21t
23
E
Reset
26 25
MVAJ105
28 27
24
22
E MVAJ101
MVAJ105
C1 21L- 21L- C1
/M1.7 /M3.1
F Lock-Out Relay 1
Reset
A ISSUED FOR APPROVAL
B FOR CONSTRUCTION F
C AS MANUFACTURED
REV. REMARKS 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
1 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Lock-Out Relay 1 Initiation CHECK RS DATE 31.05.2012
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /M2 of 9
56 78
12 345678
A Spare Spare Spare Spare Spare Spare Spare Spare Motor Protective Tap Changer A
B
-F90 Switch In Operation
Power Supply
C1 21L+ -X201 7 -X201 8 -X201 9 21L+ C1
/M2.7 /M4.1
B -X1 10 -X1 12
MOTOR DRIVE UNIT
=+
C -X1 11 -X1 13 C
D
X1:01 E
-X201 31 32 33 34 -X201 35 36 37 38 -X201 39 40
-F90 L+
/Z5.2
L-X1:02
TAPCON-260
14mm²
GROUND STRAP
D
X1:32 X1:34 X1:16 X1:17 X1:14 X1:13 X1:11 X1:12 X1:29 X1:28
-F90 IO IO IO IO IO
/Z5.2
TAPCON-260
E X1:31 X1:33 X1:27 X1:15 X1:30
C1 21L- -X201 16 21L- C1
/M2.7 /M4.1
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Tapcon-260 CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /M3 of 9
56 78
12 34 567 8
A
A
B
BCD- BCD+ BCD 20 BCD 10 BCD 8 BCD 4 BCD 2 BCD 1 Relay Reset Manual Close C
C1 21L+ -X201 10
/M3.8
-X1 54 -A300 E2 E1
/Z1.1 E4 E3
B
MOTOR DRIVE UNIT DO1 DO2
=+
C264
C -X1 60 -X1 59 -X1 58 -X1 57 -X1 56 -X1 55
-X201 41 42 43 44 -X201 45 46 47 48
D X1:14 X1:15 X1:16 X1:17 X1:30 X1:31 X1:32 X1:33 D
E
-F90 UC UC -KRST 13 14 -KMCL
/Z5.2 /Z6.4 13 14/Z6.4
E TAPCON-260 X1:29 X1:34
C1 21L-
/M3.8
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Tapcon-260 CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /M4 of 9
56 78
12 345678
A A
RS900 -F50/51 Relay Reset Manual Close Spare Spare Spare Spare Spare
Power Supply Power Supply 3 4
C2 22L+ -X202 1 2 22L+ C2
/D2.4 /M6.2
B B
-S50/51 14 13 -KRST 6 -KMCL
/Z6.2 /Z6.4 10 2 /Z6.4
MMLG01 6
10 2
C C
D
-+ F2
ESW L+ -F50/51 L+ -X202 20 21 22 23 24
L- /Z3.1 L-
RS2 RESET MC2 MCL
/M6.3 /M6.5
P14215 16 F1
14mm²
GROUND STRAP
D
-S50/51 -F50/51 OPTO1 D2 OPTO2 D4 OPTO3 D6 OPTO4 D8 OPTO5 D10 OPTO6 D12 OPTO7 D14
/Z6.2 /Z3.1
MMLG01 D1 D3 D5 D7 D9 D11 D13 E
P142
E
C2 22L- -X202 13 14 22L- C
/D2.4 /M6.2
-X202 9 10 11 12
-X202 16 17 18 19
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Overcurrent Protection Input CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /M5 of 9
56 78
12 34567 8
A
A Relay Reset Manual Close Spare Spare Spare Spare Spare B
C
-F51N D
Power Supply E
C2 22L+ -X202 5 6 22L+ C2
/M5.7 /M7.1
B 14 13
-S51N
/Z6.2
MMLG01
C
F2
-F51N L+ RESET RS2 RS2 RESET -X202 25 26 27 28 29
/Z4.1 L- /M5.4 /M7.3 MCL MC2
/M5.4
P14215 16 F1
14mm²
GROUND STRAP
D
-S51N -F51N OPTO1 D2 OPTO2 D4 OPTO3 D6 OPTO4 D8 OPTO5 D10 OPTO6 D12 OPTO7 D14
/Z6.2 /Z4.1
MMLG01 D1 D3 D5 D7 D9 D11 D13
P142
E
C2 22L- -X202 15 22L- C
/M5.7 /M7.1
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Earth Fault Protection Input CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /M6 of 9
56 78
12 3456 78
A A
-F50/51A -F51N Intertrip from Transf. Electromechanical 87BB/50BF 1st stage 50BF 2nd stage
Trip Trip 20kV Side Trip Trip Trip
C2 22L+ -X202 7 8 22L+ C2
/M6.7
-F50/51 E2 E1 -F51N E2 E1 -K94A 75 -K94T 16 14
150kV Busbar Protection Panel
/Z3.1 R1 /Z4.1 R1 /Z7.3 K1 /Z7.4 K1 B
B P142 (=E00+R1)
P142 MVAJ101 MVAJ101 B3 =E00/P2.5 87b/50BF 1st stage =E00/P2.4 CO2
B4 =E00/P2.7 50BF 2nd stage
17 18 17 18 -F87B -F87B
-S50/51 -S51N
/Z6.2 /Z6.2
C MMLG01 MMLG01 C
-X202 30 31
D RESET RS2 D
/M6.4
-F86B 28 27 -F86B
/Z7.2 Trip 24 /Z7.2
22
21t
23
Reset
26 25
MVAJ105
E E
MVAJ105
C2 22L- 22L- C2
/M6.7
Lock-Out Relay 2
Reset
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Lock-Out Relay 2 Initiation CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /M7 of 9
56 78
1 2 345678
A A
B B
C
-DS21 -DS22 -ES21 -ES22 D
Disconnector Switch Disconnector Switch Earthing Switch Earthing Switch E
Open Close Open Close Open Close Open Close
Command Command Command Command Command Command Command Command
C Local Control Cubicle
DWG. NO. HTD12-249-170-0102
-A300 DO3 DO4 DO5 DO6 DO7 DO8 DO9 DO10
D5 D6/Z1.1
D7 D8
D9 D10C264
D11 D12
D -X100 1 D13 D14-X100 23-X100 45-X100 67-X100 8 9
D15 D16
-X222 1 -X222 2 -X222 3 -X222 5 -X222 6 -X222 8 -X222 9 -X222 11 -X222 12
D20
E D21 D19
D23
D24 D22
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Disconnector Switch & Earthing Switch Control CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /M8 of 9
56 78
1 2 345678
A A
B
C -F86A K13 13 1 -CB2 13 13 B
D /Z7.1 Circuit Breaker D4 D3 5 9 5 9 C
E Close Command D
MVAJ105 E
-F74A
-F86B K1 /Z7.6 M1
/Z7.2
7PA30
MVAJ105
-F74B
/Z7.6 M1
7PA30
-X100 10 -A300 -X100 12
-X221 1 /Z1.1
DO2
C264
-X100 11
Local Control Cubicle -X221 2 -X221 3
DWG. NO. HTD12-249-170-0102
-X100 13 14 15
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Circuit Breaker Closing cmd. CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /M9 of 9
56 78
1 2 34 567 8
A A
Circuit Breaker Lock-Out Relay 1 Trip Circuit Supervision 1 Lock-Out Relay 2 Trip Circuit Supervision 2
B Open Command Operated Operated B
C
-A300 D2 D1 -F86A K1 -F74A K1 K2 -F86B K1 -F74B K1 K2
/Z1.1 DO1 75/Z7.1/Z7.6 /Z7.2 /Z7.6
2-
C C264 12 17PA30 7PA30
84
75
2-
12 1
84
MVAJ105 MVAJ105
D D
E
-X200 1 -X200 2 34 -X200 5 -X200 6 7 -X300 1 2 -X300 3 -X300 4 5
Local Control Cubicle -X223 5 6 -X223 1 7 -X223 2 -X223 3 4 -X224 1 7 -X224 2 -X224 3 4
DWG. NO. HTD12-249-170-0102
E
-X200 8 9 10 -X300 6 7 8 9 10
F 150kV Bay No.2 (Transformer 2) (=E02+WR1) F
Tripping Circuit
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO CB Coil 1 & Coil 2 DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CIRCUIT DIAGRAM CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 56 APPR. RS SCALE NTS
1
2 4 DWG. NO. BNR/150/EL/ED/ 0903 /N1 of 1
78
1 2 34567 8
A A
B -F87T -F50/51 Start 50BF Intertrip from Transformer Electromechanical B
C Trip Trip 20kV Side Trip C
D -F51N D
Trip
H5 E3 E3 86 86
-F87T R3 -F50/51 R2 -F51N R2 -K94A K1 -K94T K1
/Z2.1 /Z3.1 /Z4.1 /Z7.3 /Z7.4
P643 P142 P142 MVAJ101 MVAJ101
4 H6 4 E4 4 E4
-S87TB -S50/51 -S51N
/Z6.1 /Z6.2 /Z6.2
MMLG01 MMLG01 MMLG01
3 3 3
-X400 1 2
E 150kV Busbar Protection Panel E
(=E00+R1)
=E00/M4.5 COM1
=E00/M4.5 SBF
-X400 3 4 5
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA 50BF Initiation CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /P1 of 3
56 78
1 2 345678
A A
-CB2 Circuit Breaker -DS21 -DS22
Disconnector Switch Disconnector Switch
Open Close Open Close Open Close
B B
C
-X224 6 8 -X224 1 D
-W1 71 -W1 16 -W2 39 -W2 19 -W3 39 -W3 19
Local Control Cubicle-X01.1 Z4A Z2A X02.1 X2 X1 X03.1 X2 X1
DWG. NO. HTD12-249-170-0102
C
10 9
16 15
16 17
18 19
16 17
18 19
Z2A X1 X1
-W1 70 -W1 17 -W2 38 -W2 18 -W3 38 -W3 18
-X224 7 9 -X224 3 2 -X224 5 4
D
150kV Busbar Protection Panel
(=E00+R1)
=E00/M4.3 COM2
=E00/M4.3 CB2-OP
=E00/M4.3 CB2-CL
=E00/M4.3 DS21-OP
=E00/M4.4 DS21-CL
=E00/M4.4 DS22-OP
=E00/M4.5 DS22-CL
EE
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CB/DS Status CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 to Busbar Protection APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /P2 of 3
4 5678
1 23 4567 8
A A
B 20kV Incoming Intertrip to 20kV Side B
C Circuit Breaker C
D D
E Open Close -F87L -F50/51 -F50/51 Transformer Electromechanical 50BF 2nd stage
Command Command Trip Trip Trip Trip Trip
10
H7 E5 E5 11 9
150kV Busbar Protection Panel
-F87T R4 -F50/51 R3 -F51N R3 -K94T K1
/Z2.1 /Z3.1 /Z4.1 /Z7.4 (=E00+R1)
B5 =E00/P2.8 50BF 2nd stage =E00/P2.7 CO3
E9 E10 P643 P142 P142 MVAJ101
E11 E12
-A300 DO5 DO6 6 H8 6 E6 6 E6
/Z1.1
C264 -F87B
-S87TB -S50/51 -S51N
/Z6.1 /Z6.2 /Z6.2
MMLG01 MMLG01 MMLG01
5 5 5
12
-X400 6 -X400 7 8 -X400 9 11
-X -X -X
20kV Protection Panel -X -X
E
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Intertrip to 20kV Side CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /P3 of 3
56 78
12 345 678
C264 -CB2 -DS21 -DS22 -ES21 -ES22 A
Circuit Breaker Diconnector Switch Diconnector Switch Earthing Switch Earthing Switch B
A Power Supply
Open Close Open Close Open Close Open Close Open Close
S 31L+ -X500 1
/D2.5 -X500 2 -X500 3 31L+ S
/R2.1
B
-X243 1 SCOM2 /R2.1
-W1 69 -W1 15 -W2 37 -W2 17 -W3 37 -W3 17 -W4 34 -W4 14 -W5 34 -W5 14
-X01.1 Z4Local Control CubicleZ1 -X02.1 X2 X1 -X03.1 X2 X1 -X04.1 X2 X1 -X05.1 X2 X1
DWG. NO. HTD12-249-170-0102
21
16 15
14 15
16 17
14 15
16 17
13 14
16 17
13 14
16 17
Z1 X1 X1 X1 X1
-W4 33 -W4 13 -W5 33 -W5 13
-W1 68 -W1 14 -W2 36 -W2 16 -W3 36 -W3 16
C C
D
-X243 3 2 -X243 5 4 -X243 7 6 -X243 9 8 -X243 11 10
-X500 19 20 -X500 21 22 -X500 23 24 -X500 25 26 -X500 27 28
D
-A300 A24 A23 L+ -A300 DI1 P1 DI3 P4 DI5 P7 -A300 DI7 P10 DI9 P13
/Z1.1 A22 /Z1.1 P2 P5 P8 /Z1.1 P11 P14
E L- -KQ1 13 14 -KQ2 13 14 C264 E
/Z6.4 /Z6.4
C264 C264
14mm² P3 P6 P9 P12 P15
GROUND STRAP
S 31L- -X500 14 31L- S
/D2.5 /R2.1
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Alarm Signalling to BCU (C264) CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /R1 of 7
56 78
12 3456 78
A Local/Remote CB Spring Charging Bus A&B, ES, CB Zone SF6 Pressure Bus A&B, ES, CB/DS/ES CB Motor A
Selector switch Time Exceeded CH Zone SF6 Pressure CH Zone SF6 Pressure Motor Overload Circuit
S 31L+
/R1.8 Local Off Remote 1st Threshold 1st 2nd 2nd Threshold
Threshold Threshold
-X500 4 -X500 5 31L+ S
/R3.1
-X242 1
/R1.8 SCOM2 SCOM1 /R3.2
B B
Local Control Cubicle
DWG. NO. HTD12-249-170-0102 LOCAL 25 26 6 10
OFF 6 10
REMOTE 6 10
16 6 10
43LR 12 6 10
6 10
6 10
6 10
6 10
6 10
6 10
6 10
6 10
6 10
26
-KMT -K63GB1 -K63GD1 -K63GC1 -K63GA1 -K63GA2 -K63GB2 -K63GD2 -K63GC2 -K49-52 -K49-189 -K49-289 -K49-157 -K49-257 -K36D5
15
C C
D
-X243 12 13 14 -X242 2 3 -X242 4 5 6 -X242 7 -X242 8
-X500 29 30 31 32 33 -X500 34 35 36 -X500 37 -X500 38
D
DI11 P16 P17 DI13 P19 P20 DI15 P22 P23 DI1 O1 O2 DI3 O4 O5
-A300 E
/Z1.1
E
C264
P18 P21 P24 O3 O6
S 31L- 31L- S
/R1.8 /R3.1
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Alarm Signalling to BCU (C264) CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /R2 of 7
56 78
12 345678
A CB Control Signal & 110VDC 110VDC DS/ES Heater/ ANN. Faulty Lock-Out Relay Trip Circuit 1 Trip Circuit 2 AC Power Supply A
Operated Failure Failure MCB Trip
Circuit Indication Trip 1 Trip 2 Motor Lighting
Circuit Circuit Circuit Circuit AC Supply
S 31L+ -X500 6 Faulty -X500 7 31L+ S
/R2.8 /R4.1
/R2.7 SCOM1 B
C
B D
Local Control Cubicle H1 -F86A -F86B -F74A -F74B -F1
DWG. NO. HTD12-249-170-0102 /Z7.1 /Z7.2 /Z7.6 /Z7.6 /Z6.4
K1 K1
26 M1 M1
26
26 MVAJ105 MVAJ105 7PA30 7PA30
26
26
26
26
I3 C3
86
86
14
6 10
14
6 10
12 11
-K36D1 -K36D2 -K36D3 -K36D4 -K36D6 -K36A1 -K36A2
C
-X242 9 -X242 10
-X500 39 -X500 40
D
DI5 O7 O8 DI7 O10 O11 DI9 O13 O14
-A300 E
/Z1.1
O9 O12 O15
E
31L- S
C264 /R4.1
S 31L-
/R2.8
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Alarm Signalling to BCU (C264) CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /R3 of 7
56 78
12 345678
A -F87T Relay -F50/51 Relay -F51N Relay -F87T -F87T -F87T F50/51 -F51N Intertrip from A
Failure Failure Failure 87T 64 (150kV Side) 64 (20kV Side) 50/51 51N 20kV Side B
DC Power Supply Operated Operated Operated
MCB Trip Operated Operated 31L+ S
/R5.1
S 31L+
/R3.8
B 12 11
12 11
-F2 12 11-F3-F4-F5-F87T -F50/51 -F51N -S87TB -F50/51 -F51N -K94A K1
/Z6.4 12 11/Z6.4/Z6.4/Z6.4/Z2.1 WC1/Z3.1 WC1 /Z4.1 WC1 /Z6.1 /Z3.1 R4 /Z4.1 R4 /Z7.3
J12 J11
F12 F11P643P142P142MMLG01 P142 P142 MVAJ101
F12 F11
H4 H3 7 8
G6 G5
G8 G7
E7
1 2 E9 E8
E7
1 2 E9 E8
12 10
C C-F87T
-F87T -F87T -S50/51 -S51N
/Z2.1 R2 /Z2.1 R11 /Z2.1 R12 /Z6.2 /Z6.2
P643 P643 P643 MMLG01 MMLG01
D D
DI11 O16 O17 DI13 O19 O20 DI15 O22 O23 DI1 N1 N2 N6
N5
-A300 E
/Z1.1
O18 O21 O24 N3
E C264
31L- S
S 31L- /R5.1
/R3.8
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Alarm Signalling to BCU (C264) CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /R4 of 7
56 78
12 345678
Buchholz Relay Oil Temperature Winding Temperature Winding Temperature Oil Level Indicator Oil Level Indicator Pressure Relief Pressure Relief RS2001 Relay
A Indicator A
Indicator HV Indicator LV for Main Consenvator for OLTC Consenvator Device Device for OLTC B
Alarm Trip Alarm Trip Alarm Trip Alarm Trip Alarm Alarm Alarm Alarm Trip Trip Trip
(Min Level) (Max Level) (Min Level) (Max Level)
S 31L+ -X500 8 -X500 9 -X500 10 31L+ S
/R4.8 /R6.1
*) TRF /R6.2
B -X -X -X -X -X -X -X -X -X -X -X -X -X -X -X
60MVA 150/20kV TRANSFORMER 2 P41 P41
MARSHALLING KIOSK
43
21
32
31 34
42
41 44
32
31 34
42
41 44
32
31 34
42
41 44
3
12
6
45
3
12
6
45
3
12
14 13
21
P10 P10 P20 P20 P30 P30 P31 P31 P40 P40 P50 P51 P80
C -X -X -X -X -X -X -X -X -X -X -X -X -X -X -X C
D
-X500 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
P10 /R6.6 P20 /R6.6 P30 /R6.6 P31 /R6.6 P50 /R6.6 P51 /R6.6 P80 /R6.6
D
DI5 N7 N8 DI7 N10 N11 DI9 N13 N14 DI11 N16 N17 DI13 N19 N20 DI15 N22 N23 M3 M1 M2 M6 M5
-A300 DI2 /R6.2 E
/Z1.1 31L- S
N9 N12 N15 N18 N21 N24 /R6.1
E C264
S 31L-
/R4.8
F *) : Internally connection at Transformer Marshalling Kiosk F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI Alarm Signalling to BCU (C264)
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
REV. REMARKS CIRCUIT DIAGRAM
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1 456
2 DWG. NO. BNR/150/EL/ED/ 0903 /R5 of 7
78
12 345 678
A Cooling Fans Fault Fan On Fans Supply Transformer Electromechanical A
Indicator Failure Trip
S 31L+ Alarm Alarm
/R5.8
31L+ S
/R7.1
/R5.7 TRF *) -X -X B
-X
-X
B
60MVA 150/20kV TRANSFORMER 2
MARSHALLING KIOSK
97 98
97 98
97 98
97 98
97 98
97 98
97 98
97 98
21
12
11 14
F01 F02 F03 F04 F05 F06 F07 F08 K11 K40
C -X -X -X -X C
D
-X500 56 57 -X500 58 59 /R5.2 P10 -D1
/R5.3 P20 -D2
D /R5.4 P30 -D3
/R5.4 P31 -D4
/R5.6 P50 -D5
/R5.7 P51 -D6
/R5.7 P80 -D7
-A300 M4 -K94T 28 27
/Z1.1 M9 M7 /Z7.4 Trip 24
22
E C264/R5.7 DI2 M8 MVAJ101 E
31L- S
S 31L- /R7.1
/R5.8
F *) : Internally connection at Transformer Marshalling Kiosk F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI Alarm Signalling to BCU (C264)
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
REV. REMARKS CIRCUIT DIAGRAM
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1 456
2 DWG. NO. BNR/150/EL/ED/ 0903 /R6 of 7
78
12 3456 78
20kV Incoming A
A CB Open CB Close
Rack-In Rack-Out Spare Spare Spare Spare Spare Spare Spare Spare
S 31L+ -X500 11 -X500 12 -X500 13 31L+ S
/R6.7
-X B
C
B
20kV Protection Panel 20kV 20kV Rack Rack
CB CB In Out
C -X -X -X -X
-X500 62 63 64 65 66 67 68 69 70 71
D D
-A300 M12 M10 E
/Z1.1 M11
E C264 M15 M13
M14
M18 M16
M17
M21 M19
M20
M24 M22
M23
S 31L- 31L- S
/R6.7
-X500 15 16 17 18
F
F
A ISSUED FOR APPROVAL
B FOR CONSTRUCTION 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
C AS MANUFACTURED 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Alarm Signalling to BCU (C264) CHECK RS DATE
1 DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /R7 of 7
56 78
1 2 345678
A A
-F87T -F87T -F87T -F50/51 Relay -F51N Relay Intertrip from Transformer Electromechanical Lock-Out Relay -CB1 Open
87T Operated 64 (150kV Side) 64 (20kV Side) Operated Operated 20kV Side Trip Operated Circuit Breaker
-X600 2
Operated Operated
-X
B -X03 11 B
X01.1 C
-S87TB H9 17 18 -S50/51 E10 -S51N E10 -K94A K1 11 9 -K94T K1 12 10 -F86A K1 11 9 -F86B K1 D
/Z6.1 /Z6.2 E11 7 8 /Z6.2 E11 7 8 /Z7.3 /Z7.4 /Z7.1 11 9/Z7.2 -X03 12
Local Control Cubicle
MMLG01 MMLG01 MMLG01 MVAJ101 MVAJ101 MVAJ105 DWG. NO. HTD12-249-170-0101MVAJ105 -X600 11
C G2 G1 G4 G3
-F87T R5 -F87T R9 -F87T -F50/51 -F51N
/Z2.1 /Z2.1 /Z2.1 R10 /Z3.1 R5 /Z4.1 R5
P643 P643 P643 P142 P142
H10 E12 E12
-X600 1 3 4 5 6 7 8 9 10
D
Disturbance Fault Recorder
(=E00+EX381)
=E00/M3.1 COM2
=E00/M3.1 B10
=E00/M3.2 B11
=E00/M3.2 B12
=E00/M3.3 B13
=E00/M3.3 B14
=E00/M3.4 B15
=E00/M3.4 B16
=E00/M3.4 B17
=E00/M3.5 B18
E E
-X600 12 13 14 15
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C INTERNAL REVISION 05.09.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Signalling to DFR CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /S1 of 2
56 78
1 2 345678
A A
B B
C
Lower Raise Emergency Off Manual Remote Oil Temperature Winding Temperature Winding Temperature D
Switch Indicator Indicator HV Indicator LV E
TAPCON-260X1:06X1:04
-F90 4-20mA INPUT
C
E6 E5 _+ _+ _+
-F90 -F90 -A300 E8 E7-A300
/Z5.2 IO /Z5.2 IO /Z1.1 DO3 /Z1.1 DO4
AD8-X1 : 01
TAPCON-260 TAPCON-260 C264 AD8-X1 : 02C264
AD8-X1 : 03
X1:07 X1:05 AD8-X1 : 04
AD8-X1 : 05
AD8-X1 : 06
-X201 49 50 51 -X201 52 53 -X201 54 55 -X201 56 57 -X201 58 59 -X201 60 61
D
MOTOR DRIVE UNIT -X1 12 -X1 11 -X1 10 -X1 12 -X1 11 -X2 39 -X2 40 -X2 103 104 -X2 106 107 -X2 109 110
=+
E
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Transformer Motor Drive Unit Control CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /S2 of 2
56 78
1 2 3 4 5 6 78
-A300 -A300 DI1 -A300 -A300 -A300 -A300 POWER AUXILIARY SUPPLY
DI2 /R4.6 /M4.6 DO1 AND LEGACY PORT - BIU241 - SLOT A
P1 + DI1 O1 + N1 + E1 DO2 A1 O2
/R2.4 /M4.6 E2 DO3 A2
A O2 + N2 + DI1 /S2.4 E3 DO4 A3 O1 A
DI2 O3 _ N3 _ DI2 /S2.5 E4 DO5 A5 B
/R1.2 P2 + O4 + N4 + DI3 /P3.3 E5 DO6 A4 WATCHDOG
DI3 DI4 /P3.3 E6 DO7 A6
P3 _ /R2.6 O5 + N5 + DI5 E7 DO8
P4 + O6 _ N6 _ DI6 E8 A7 +
DI4 O7 + N7 + DI7 E9 DO9
DI3 DI8 E10 DI1
DI5 O8 + N8 + DI9 E11 DO10
/R1.3 P5 + /R3.2 O9 _ N9 _ DI10 E12 A9 +
O10 + N10 + DI11 E13
DI6 DI4 DI12 E14 A8 _ DI2
O11 + N11 + DI13 E15
P6 _ DI7 O12 _ N12 _ DI14 E16
/R3.5 O13 + N13 + DI15 E17
B P7 + DI16 E18
DI8 O14 + N14 +
O15 _ DI5 N15 _ E20 A12 RXD/TB RS232/
DI9 O16 + N16 + E19
/R3.7 /R5.2 E21 A13 GND RS485 SERIAL LINK 1
O17 + DI6 N17 + E23
/R1.4 P8 + DI10 O18 _ N18 _ E22 A14 TXD/TA #
O19 + N19 + E24
P9 _ DI11 A15 GND RS232/
P10 + /R4.1 O20 + N20 + A16 CTS RS422
O21 _ N21 _
DI12 O22 + DI7 N22 + A17 RXD/TB RS485
DI13 O23 + /R5.2 N23 + A18 TXD/TA SERIAL LINK 2
/R4.3 O24 _ DI8 N24 _ A19 RTS/RB
/R1.6 P11 +
P12 _ DI14 A20 RA C
C P13 + D
DI15 C264 (Part) A21 DCB # E
/R1.7 P14 + /R4.5 Digital Output Unit F
P15 _ DI9 DOU200 - Slot E A22 Vaux POWER
D P16 + DI16 /R5.3 A23 +
/R2.2 D1 A24 - SUPPLY
P17 + DI10 D2 DO1
P18 _ /N1.2 D3 F1 DO1 1
P19 + DI11 /M9.5 D4 DO2 F2 DO2 /R1.2 5A 2 N1
/M8.3 D5 F3 DO3 /G1.5 N2
/R5.4 /M8.3 D6 DO3 F4 DO4 3
DI12 /M8.4 D7 F5 DO5 1A 4 C1
/M8.4 D8 DO4 F6 DO6 C2
/R2.2 P20 + DI13 /M8.5 D9 F7 DO7 5
/M8.5 D10 DO5 F8 DO8 5A 6 B1
P21 _ /R5.5 D11 F9 B2 TMU220
DI14 /M8.6 D12 DO6 F10 DO9 7
E P22 + D13 F11 1A 8 A1
DI15 /M8.6 D14 DO7 F12 DO10 A2
D15 F13 9 X1
/R5.5 D16 DO8 F14 5A 10 X2
DI16 D17 F15
D18 F16 11
F17 1A 12
D20 F18
D19 13
D21 DO9 F20 5A 14
D23 F19
D22 F21 15
D24 DO10 F23 1A 16
F22
F24 19
20
/R2.3 P23 + 21 U1
P24 _ 22 U2
23 V1
C264 (PART) C264 (PART) C264 (PART) C264 (Part) C264 (Part) 24 V2
DIGITAL INPUT UNIT DIGITAL INPUT UNIT DIGITAL INPUT UNIT Digital Output Unit Digital Output Unit 25 W1
DOU200 - Slot D DOU200 - Slot F 26 W2
F DIU200 - SLOT P DIU200 - SLOT O DIU200 - SLOT N 27 N1
28 N2
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI C264
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
REV. REMARKS CIRCUIT DIAGRAM
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1 56
2 4 DWG. NO. BNR/150/EL/ED/ 0903 /Z1 of 7
78
12 345678
A -F87T -F87T -F87T A
/M1.4 /R4.3 B
-F87T C24 D1 _ /M1.5 J11 WATCHDOG F1 _ C
D2 + /M1.5 /M2.2 J12 F2 + D
/G2.6 C23 IA (1) OPTO 1 _ /R4.5 J13 CONTACT OPTO 9 F3 _ /M1.6 E
C26 IB (1) + /M1.2 /P1.4 WATCHDOG F4 + /M1.6
B IC (1) _ /P3.5 J14 CONTACT F5 _ /M1.6
C25 D3 + /S1.2 F6 +
C C28 IA (2) D4 _ H1 F7 _
IB (2) + /S1.2
/G2.6 C27 IC (2) OPTO 2 _ /S1.3 H2 RELAY 1 OPTO 10
NOTE 2 + /R4.5
D IA (3) D5 _ /R4.6 H3
C18 IB (3) D6 + H4 RELAY 2
/G2.6 IC (3) _
C17 OPTO 3 + H5 OPTO 11
E C20 _
+ H6 RELAY 3
F C19 _
C22 D7 + H7
A ISSUED FOR APPROVAL D8 H8 RELAY 4
B FOR CONSTRUCTION C21
C AS MANUFACTURED OPTO 4 H9 OPTO 12 F8 + /M1.5
REV. REMARKS E24 H10 RELAY 5
1 E23 OPTO 5 D9 H11 F9 _ /M1.4
E26 D10 H12 RELAY 6 F10 +
H13 OPTO 13 F11 _
E25 D11
E28 D12 H14
H15 RELAY 7
E27
OPTO 6 H16 OPTO 14 F12 + /M1.3
C12 F13 _
D13 H17 F14 +
C11 D14 H18 RELAY 8 F15 _
C14 F16 +
OPTO 7 G1 RELAY 9 OPTO 15
C13 G2
C16
OPTO 8 D15 G3
C15 D16 G4 RELAY 10
G5 OPTO 16
G6 RELAY 11
D17 G7 COMMON CONNECTION F17 _
COMMON CONNECTION D18 G8 RELAY 12 F18 +
G9
G10 RELAY 13
IY (TV) Vx, AC/DC AUX. SUPPLY J1 _ G11
J2 + G12 RELAY 14
IY (LV) G13
IY (HV) J7 +
J8 + G14
J9 _ G15 RELAY 15
J10 _
G16
48V DC FIELD G17
VOLTAGE OUT G18 RELAY 16
CASE EARTH
MICOM P643 (PART) MICOM P643 (PART)
NOTE 2
SEE TABLE 1 FOR BIAS ASSIGNMENT TO ACTUAL WINDINGS, BIAS INPUT 1 IS ALWAYS AN HV WINDING CONNECTION
P643 BIAS INPUT BIAS 1 BIAS 2 BIAS 3
HV + LV HV LV
HV + LV (x2) HV LV LV
HV (x2) + LV HV HV LV
HV + TV + LV HV TV LV
F
15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI MICOM P643
03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /Z2 of 7
4 5 6 78
12 34 5678
A -F50/51 -F50/51 -F50/51 A
/R4.3 B
-F50/51 C
/M7.2 D
C1 5A D1 _ /P1.4 F11 WATCHDOG SK2 1 E
C2 D2 + /P3.5 F12 CONTACT (DATA READY)
D3 _ /R4.6
C3 1A IA OPTO 1 /M5.4 /S1.4 F13 (DATA
C4 5A NOTE 1 F14 ACKNOWLEDGE)
WATCHDOG 10
CONTACT
E1 (EXTERNAL 16
C5 OPTO 2 D4 + /M5.4 E2 RELAY 1 RESET)
C6 1A IB
E3 (DOWNLOAD COMMAND) 17
C7 5A D5 _ E4 RELAY 2 (D0-D7) 2-9
E5
B /G3.6 C8 OPTO 3 /M5.5
IC D6 + E6 RELAY 3 (T0-T7) 11,12,15,13,
E7 20,21,23,24
C9 1A
D7 _ E8 (OV) 19,18,22,25
E9 RELAY 4
C10 5A OPTO 4 D8 + /M5.5
C11 IN D9 _
E10 (NOT CONNECTED) 14
C12 1A
E11
OPTO 5 /M5.6 E12 RELAY 5
IN
C13 5A D10 + E13 SK1 1
C14 2
E14
C C15 1A SENSITIVE D11 _ E15 RELAY 6
OPTO 6 D12 +
D13 _ /M5.6 E16 3
E17 4
E18 RELAY 7 5
VA C19 OPTO 7 D14 + /M5.7 6
D15 _ 7
D16 +
VB C20 8
OPTO 8 9
VC C21 D17 _
COMMON CONNECTION D18 +
D VN C22 F1 _ /M5.3
Vx, AC/DC AUX. SUPPLY F2 + FIBER OPTIC TX1
COMMUNICATION RX1
F7 +
(OPTIONAL).
48V DC FIELD F8 +
IRIG-B INPUT
F17 VOLTAGE OUT F9 _ (OPTIONAL).
F10 _
EIA485 MICOM P142 (PART)
KBUS
F18 PORT
CASE EARTH
E MICOM P142 (PART)
NOTE 1
OPTO INPUT 1 & 2 MUST BE USED FOR SETTING GROUP CHANGES
IF THIS OPTION IS SELECTED IN THE RELAY MENU
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA MICOM P142 CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /Z3 of 7
56 78
12 34 567 8
A
A -F51N -F51N -F51N B
/R4.4 C
-F51N D
/M7.3 E
C1 5A D1 _ /P1.5 F11 WATCHDOG SK2 1
C2 D2 + /P3.6 F12 CONTACT (DATA READY)
D3 _ /R4.7
C3 1A IA OPTO 1 /M6.3 /S1.4 F13 (DATA
C4 5A NOTE 1 F14 ACKNOWLEDGE)
WATCHDOG 10
CONTACT
E1 (EXTERNAL 16
C5 OPTO 2 D4 + /M6.5 E2 RELAY 1 RESET)
C6 1A IB
E3 (DOWNLOAD COMMAND) 17
C7 5A D5 _ E4 RELAY 2 (D0-D7) 2-9
E5
B /G4.6 C8 OPTO 3 /M6.5
IC D6 + E6 RELAY 3 (T0-T7) 11,12,15,13,
E7 20,21,23,24
C9 1A
D7 _ E8 (OV) 19,18,22,25
E9 RELAY 4
C10 5A OPTO 4 D8 + /M6.5
C11 IN D9 _
E10 (NOT CONNECTED) 14
C12 1A
E11
OPTO 5 /M6.6 E12 RELAY 5
IN
C13 5A D10 + E13 SK1 1
C14 2
E14
C C15 1A SENSITIVE D11 _ E15 RELAY 6
OPTO 6 D12 +
D13 _ /M6.6 E16 3
E17 4
E18 RELAY 7 5
VA C19 OPTO 7 D14 + /M6.7 6
D15 _ 7
D16 +
VB C20 8
OPTO 8 9
VC C21 D17 _
COMMON CONNECTION D18 +
D VN C22 F1 _ /M6.2
Vx, AC/DC AUX. SUPPLY F2 + FIBER OPTIC TX1
COMMUNICATION RX1
F7 +
(OPTIONAL).
48V DC FIELD F8 +
IRIG-B INPUT
F17 VOLTAGE OUT F9 _ (OPTIONAL).
F10 _
EIA485 MICOM P142 (PART)
KBUS
F18 PORT
CASE EARTH
E MICOM P142 (PART)
NOTE 1
OPTO INPUT 1 & 2 MUST BE USED FOR SETTING GROUP CHANGES
IF THIS OPTION IS SELECTED IN THE RELAY MENU
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA MICOM P142 CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /Z4 of 7
56 78
12 345678
A A
B
-F90 IO SLOT -F90 UC SLOT -F90 C
MEASUREMENT I Status Parallel Failure D
MI : 06 5A X1:02 X1:01 E
X1:03 X1:02
MI : 09 1A X1:01
X1:03
MI : 10 0.2A X1:21 Parallel On X1:04
MI : 05 0 X1:22
Function Monitoring Tap Position X1:05
BCD 1 X1:06
/G5.5 Free Parametrable X1:25
Tap Position X1:07
MEASUREMENT U Preselection Desired Voltage Lev.2 X1:26 BCD 2 X1:08
B MI : 01 Free Parametrable X1:23 Tap Position X1:09
BCD 4 X1:10
Preselection Desired Voltage Lev.3 X1:24
Tap Position X1:18
MI : 02 X1:19 BCD 8 X1:19
U< U> I> X1:20 Tap Position X1:20
X1:18 BCD 10 X1:21
SID-CARD Free Parametrable X1:31 /M3.3 Tap Position X1:22
X1:32 BCD 20 X1:23
RJ45 IEC 61850
ETHERNET Tap Position X1:24
BCD + X1:25
X1:33
Tap Position X1:26
C CPU-X9 : 03 Desired Voltage Lev.1 X1:34 /M3.4 BCD - X1:27
CPU-X9 : 02 CPU-BUS CAN-L
X1:16
CPU-X9 : 01 CAN-GND Desired Voltage Lev.2 X1:17 /M3.4
CPU-X9 : 04 CAN-H Desired Voltage Lev.3 X1:27
NOTE 1 X1:14
Lower X1:13
X1:11
Raise X1:13 X1:12
Manual X1:11 /M3.5 Parallel Group 1 X1:14
Parallel Group 2 X1:15
D Auto X1:12 X1:16
X1:15 BCD - X1:17
BCD + X1:29
Motor Protective Switch Off X1:29 /M3.6 BCD 20 /M4.2
Motor Drive Unit in Operation X1:28 BCD 10 X1:30 /M4.4
X1:30 X1:31
SU SLOT BCD 8 X1:32
BCD 4 X1:33
/M3.2 AC/DC Aux. Supply Lower X1:06 /S2.2 BCD 2 X1:34
_ X1:02 Raise X1:07 /S2.3 BCD 1
+ X1:01 X1:04
X1:05
E Manual X1:09
Auto X1:10
X1:08
CASE EARTH
TAPCON 260 (PART) TAPCON 260 (PART)
NOTE 1
PLEASE BEAR IN MIND THAT THE CAN BUS MUST BE CONNECTED WITH A RESISTOR OF 120OHM AR BOTH END
AT THE FIRST AND LAST REGULATOR
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Voltage Regulator CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 TAPCON-260 APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /Z5 of 7
4 5678
12 3 45678
A 21 A
11 12
23 24
-S87TA -S87TB -S50/51 -S51N MMLG01 AC MCB I>
-F1 /D1.3
/G2.5 /R4.6 /R4.7 12 /R3.7
/G2.5 /P1.4 /P1.4 /P1.5 34
/G2.5 /P3.5 /P3.5 /P3.6 56 21
43
B I> B
11 12
23 24
/G2.5 /R4.5 /S1.4 /S1.4 78 I>
/G4.5 9 10 MCB /D2.3 /D2.3 /R4.1
/D2.4 /D2.4 /R4.2
/G4.5 11 12 -F2 /D2.5 /D2.5 /R4.2
-F3 /D2.6 /D2.6 /R4.2
-F4
-F5
/M1.2 /M5.3 /M6.2 13 14
C /M1.2 /M5.3 /M6.2 15 16 C
/M2.2 /S1.2 /M7.2 /M7.3 17 18 13 14
1
95
2
10 6
3
11 7
4
12 8
A2 A1
14 13
22 21
44 43
32 31
19 20 IDEC/EQ. 10A/12A MG/EQ.
-KPS
-KQ1 /R1.5 /G7.2 /G7.3 /D2.4 /D2.5 /D2.6 /D2.5 /D2.6
/G7.4 /G7.4
/G2.5 /G2.5 /G3.5 /G4.5 21 22 -KQ2 /R1.6
-KRST /M4.6 /M1.3 /M5.4
/M1.3 /M5.4
23 24 -KMCL /M4.6
/G2.5 /G2.5 /G3.5 /G4.5
D /G2.5 /G2.5 /G3.5 /G4.5 25 26 D
/G2.5 /G2.5 /G3.5 /G4.5 27 28
NOTE 1 L 21
TERMINAL 13 & 14 ARE SHORTED TOGETHER N PE
BY THE COVER CONTACT WHEN THE COVER IS IN PLACE PE
-X101 /D1.5 HEATING /D1.4
220V AC
-R101
E E
. 21 21 22 21
V 14 13
CUBICLE LIGHTING
220V AC
-B101 /D1.4 -E101 /D1.3 -S101 /D1.3
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI Test Block - MMLG, MCB, Aux. Components
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
REV. REMARKS CIRCUIT DIAGRAM
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1 56
2 4 DWG. NO. BNR/150/EL/ED/ 0903 /Z6 of 7
78
12 345 67 8
A
A
B
-F86A -F86B -K94A -K94T -F74A -F74B II C
/M9.4 /M9.4 8
1 1 4
3 3 1 I
12
2 2 /N1.4 /N1.7
4 4 -2
/N1.3 /N1.6 5 /M7.3 5 14
7 /P1.5 7 10
B /R3.5 /S1.5 13
/R3.6 6 /R4.8 /P1.6 6 9
8 /M2.3 /P3.7 8
/S1.6 7PA30
9 /M2.3 9 /R3.6 /R3.7 6
11 /M7.4 11 5
/S1.6 /S1.7
10
10 12 /M9.5 /M9.5
12
13
13 15
15
14
14 16
C 16 17
19
17
18
19 20
18
20
23
21
/M2.2 /M7.2 22 t 22
D 24 24 D
/M2.6 /R6.7
27 28 27 28
Trip Trip
/M2.3 /M7.3 Reset 26
25
MVAJ105 - LOCKOUT RELAY MVAJ101
E NOTE 1 NOTE 1 E
LINK IN FOR HIGH BURDEN AS SUPPLIED LINK IN FOR HIGH BURDEN AS SUPPLIED
LINK OUT FOR LOW BURDEN LINK OUT FOR LOW BURDEN
NOTE 2
LINK TO ENABLE RESET INHIBITOR/ECONOMISING COIL
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Lock-Out Relay, TCS Relay, Tripping Relay CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0903 /Z7 of 7
56 78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14 -X222
-X222
15 -X100 -X222
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X222
-X222
-A300 :D6 1 /M8.2 -X222 :1
-X222
-A300 :D5 2 /M8.3 -X222 :2
-X222
-A300 :D7 3 /M8.3 -X221 :3
-X221
-A300 :D9 4 /M8.4 :5
-A300 :D11 5 /M8.4 :6
-A300 :D13 6 /M8.5 :8
C -A300 :D15 7 /M8.5 :9 C
-A300 :D21 8 /M8.6 :11
-A300 :D24 9 /M8.6 :12
-F86B :3 10 /M9.4 :1
-A300 :D4 11 /M9.5 :2
13 /M9.2
14 /M9.2
15 /M9.2
D D
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E02+WR1-X100 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. (3)G73011 /TD1 of 29 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK6N - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X110
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-F2 :1 1 /D2.2
-F2 :3 2 /D2.7
3 /D2.2
4 /D2.7
C
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E02+WR1-X110 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. (3)G73011 /TD2 of 29 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :5
Item designation No Item designation :6
13 :1
14 -X223 :7
-X223 :2
15 -X200 -X223 :3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X223
-X223 :4 C
-A300 :D1 1 /N1.1 -X223
-X223
-A300 :D2 2 /N1.2
-F86A :5 3 /N1.2
-F74A :2 4 /N1.2
-F86A :7 5 /N1.3
-F74A :4 6 /N1.4
C -F74A :8 7 /N1.4
8 /N1.2
9 /N1.2
10 /N1.2
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E02+WR1-X200 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. (3)G73011 /TD3 of 29 Sh.
2
78
1 2345 6 7 8
7
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X201
-S87TA :14 1 /M1.2 -F2 :2
2 /M1.4 :H1
:15 3 /M1.5 -F87T
C :X1:02 4 /M2.4 :X1:01 C
5 /M2.5 -X :10
:D5 6 /M2.6 -F90 :12
:D7 7 /M3.2 -X1 :54
:D9 8 /M3.6 -X1
:F7 9 /M3.7 -X1
:F1 10 /M4.2
-S87TA :F3 11 /M1.2 -F2 :4
-F90 :F5 12 /M1.2
D 13 /M1.2 D
-F87T :27 14 /M1.2
E -F87T :X1:31 15 /M1.2 -X
-F87T :X1:33 16 /M3.2
F -F87T :X1:16 17 /M1.2 E
-F87T :X1:16 18 /M1.2
A ISSUED FOR APPROVAL -F87T :X1:15 19 /M1.2 -X1 :11
B FOR CONSTRUCTION -F87T 20 /M1.2 -X1 :13
C AS MANUFACTURED :X1:30 21 /M1.4
Rev. Remarks -K94A 22 /M1.5
-F90 23 /M1.5
1 -F90 24 /M1.5
-F90 25 /M1.6
-F90 26 /M1.6
-F90 27 /M1.6
-F 28 /M2.4
-F 29 /M2.5
-F 30 /M2.6
-F90 31 /M3.3
-F 32 /M3.4
A 33 /M3.4
B Screen bus 34 /M3.4
C 35 /M3.5
D 36 /M3.5
E 37 /M3.5
38 /M3.6
39 /M3.6
40 /M3.7
Screen bus F
N-bus
PE-PEN-bus
Used cores total
Continued on sheet
15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI =E02+WR1-X201 31.05.2012
03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE NTS
6 /TD4 of 29 Sh.
Date Name PROJECT 3 APPR. RS SCALE
2 DWG. NO. (3)G73011
45 8
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X201
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-F90 :X1:29 41 /M4.2
-F 42 /M4.2
-F 43 /M4.3 -X1 :60
-F 44 /M4.3 -X1 :59
-F90 :X1:34 45 /M4.4 -X1 :58
-F 46 /M4.4 -X1 :57
C -F 47 /M4.4 -X1 :56 C
-F 48 /M4.4 -X1 :55
-F90 :X1:06 49 /S2.1 -X1 :12
-F90 :X1:07 50 /S2.2 -X1 :11
-F90 :X1:05 51 /S2.3 -X1 :10
-A300 :E5 52 /S2.3 -X1 :12
-A300 :E6 53 /S2.4 -X1 :11
-A300 :E7 54 /S2.4 -X2 :39
-A300 :E8 55 /S2.5 -X2 :40
-F90 56 /S2.6 -X2 :103
-F90 57 /S2.6 -X2 :104
-F90 58 /S2.6 -X2 :106
-F90 59 /S2.7 -X2 :107
D -F90 60 /S2.7 -X2 :109 D
-F90 61 /S2.7 -X2 :110
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E02+WR1-X201 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. (3)G73011 /TD5 of 29 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
B
4 C
D
5 E
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X202
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-ESW :+ 1 /M5.2
-S50/51 :14 2 /M5.3
3 /M5.5
4 /M5.6
-S51N :14 5 /M6.2
6 /M6.5
C 7 /M7.5
8 /M7.5
9 /M5.2
10 /M5.2
11 /M5.2
12 /M5.2
-ESW :- 13 /M5.2
-S50/51 :15 14 /M5.3
-S51N :15 15 /M6.2
16 /M5.2
17 /M5.2
18 /M5.2
19 /M5.2
D -F50/51 :D5 20 /M5.5
-F50/51 :D7 21 /M5.5
-F50/51 :D9 22 /M5.6
-F50/51 :D11 23 /M5.6
-F50/51 :D13 24 /M5.7
-F51N :D5 25 /M6.5
-F51N :D7 26 /M6.5
-F51N :D9 27 /M6.6
-F51N :D11 28 /M6.6
-F51N :D13 29 /M6.7
30 /M7.5
31 /M7.5
E
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E02+WR1-X202 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. (3)G73011 /TD6 of 29 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK6N - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X210
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-F4 :1 1 /D2.2
-F4 :3 2 /D2.7
3 /D2.2
4 /D2.7
C
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.2 (Transformer 2) (=E02+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E02+WR1-X210 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. (3)G73011 /TD7 of 29 Sh.
2
78