12 34 5 678
A Socket A
B
AC POWER SUPPLY 14 AC POWER SUPPLY
-X101
Cubicle Lighting Cubicle Heating L
N
7 1L1 -X230 1 3/N/PE 50Hz 380/220V PE -X230 2 1L1
/Z3.2 4 1L2
7 1L2 3 6 1L3
2.5 GN/YE
7 1L3 5 10
B 17
2.5 BK
-F1 21
/Z3.2
10A
I>
C Disturbance Fault Recorder (=E00+EX381) C
-X230 12 13 Telcom Pax Panel
-S101 22 21 -B101 21
/Z3.4 V
/Z3.2
D 1 D
-E101 21 -R101
/Z3.3 /Z3.3
2
PE
E 7 1N -X230 7 -X230 8 9 11 1N E
18 1PE
7 1PE 15 16
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI AC Supply System
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE
REV. REMARKS CIRCUIT DIAGRAM
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1 56
2 4 DWG. NO. BNR/150/EL/ED/0909 /D1 of 2
78
12 3 45 67 8
A
A Power Supply -X110 2 B
DC POWER SUPPLY ION Meter 4 C
D
Disturbance Fault Recorder (=E00+EX381) /D3.7 21L+ -X110 1 110 VDC (Control Supply Main 1)
/D3.7 21L- 3
B
2.5 BK
C
-F4 21
/Z3.2 43
10A
I> I>
D
EE C 21L+
/M1.1
C 21L-
/M1.1
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI DC Supply System
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE
REV. REMARKS CIRCUIT DIAGRAM
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1 56
2 4 DWG. NO. BNR/150/EL/ED/0909 /D2 of 2
78
1 2 34 5 67 8
A A
FROM 20kV CT -XC11 1 -P401 B
B /Z1.3 C
2 D
C 3 I11 I12
IA
D 4
5 I21 I22
E IB
6
F 7 I31 I32
8 IC
A ISSUED FOR APPROVAL
B FOR CONSTRUCTION I41 I42
C AS MANUFACTURED IC
REV. REMARKS ION8650
1 -XA1 1
/Z3.5
01
ENTRELEC 2
02
3
03
4
04
-XV11 1 -P401 VA
2 /Z1.3
3 V1
4
FROM 20kV VT V2 VB
5
6
7
8
-XV1 1 V3 VC E
/Z3.5 01 VN VN
2
ENTRELEC 02 ION8650
3
03 F
4
15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 04 Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI CT & VT Connection ION8650
03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA 5 CHECK RS DATE
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/0909 /G1 of 2
4 6 78
1 2 34 5 67 8
A A
FROM 20kV CT -XC12 1 -P402 B
B /Z2.3 C
2 D
C 3 I11 I12
IA
D 4
5 I21 I22
E IB
6
F 7 I31 I32
8 IC
A ISSUED FOR APPROVAL
B FOR CONSTRUCTION I41 I42
C AS MANUFACTURED IC
REV. REMARKS ION8650
1 -XA2 1
/Z3.6
01
ENTRELEC 2
02
3
03
4
04
-XV12 1 -P402 VA
2 /Z2.3
3 V1
4
FROM 20kV VT V2 VB
5
6
7
8
-XV2 1 V3 VC E
/Z3.6 01 VN VN
2
ENTRELEC 02 ION8650
3
03 F
4
15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 04 Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI CT & VT Connection ION8650
03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA 5 CHECK RS DATE
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/0909 /G2 of 2
4 6 78
12 34 5678
ION8650 A
A Power Supply
C 21L+ -X301 1 2 21L+ C
/D2.5
B B
C C
-P401 N/- L1/+L+ -P402 L+
/Z1.3 N/- L1/+/Z2.3
L- L-
ION8650 ION8650
D 14mm² D
GROUND STRAP
E E
C 21L- -X301 7 8 21L- C
/D2.5
-X301 3 4 5 6
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CIRCUIT DIAGRAM CHECK RS DATE
REV. REMARKS
DATE NAME P.O.NO. 3 56 APPR. RS SCALE NTS
1
2 4 DWG. NO. BNR/150/EL/ED/0909 /M1 of 1
78
1 2 34 5678
A A
B B
AC Power Supply DC Power Supply
MCB Trip MCB Trip
C -F1 12 11-F4 C
/Z3.2 12 11/Z3.2
-X400 1 2 3
D D
E E
-X400 4 5 6 7
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI Alarm Signalling
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE
REV. REMARKS CIRCUIT DIAGRAM
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1 56
2 4 DWG. NO. BNR/150/EL/ED/0909 /S1 of 1
78
1 2 345678
A A
B
C -P401 -P401
D /G1.6
E I11 IA RS-232 RS-485 B
/G1.6 I12 C
I21 TxD TA(-) 1 D
I22 RxD RA(-) E
I31 IB 2
I32 3
I41 RTS TB(+)
I42 CTS RB(+) 4
VA1 9 IC SHLD 5
VB1 10 SIG GND 6
VC1 11
VN1 12 IN
AUX. SUPPLY L1/+ + /M1.2
N/- _
PROTECTIOVE GND.2
(EARTH)
ION8650(PART)
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI ION8650
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE
REV. REMARKS CIRCUIT DIAGRAM
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1 56
2 4 DWG. NO. BNR/150/EL/ED/0909 /Z1 of 3
78
1 2 345678
A A
B
C -P402 -P402
D /G2.6
E I11 IA RS-232 RS-485 B
/G2.6 I12 C
I21 TxD TA(-) 1 D
I22 RxD RA(-) E
I31 IB 2
I32 3
I41 RTS TB(+)
I42 CTS RB(+) 4
VA1 9 IC SHLD 5
VB1 10 SIG GND 6
VC1 11
VN1 12 IN
AUX. SUPPLY L1/+ + /M1.2
N/- _
PROTECTIOVE GND.2
(EARTH)
ION8650(PART)
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI ION8650
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE
REV. REMARKS CIRCUIT DIAGRAM
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1 56
2 4 DWG. NO. BNR/150/EL/ED/0909 /Z2 of 3
78
1 2 34567 8
A A
B 21 -XA1 -XA2 B
C 11 12 C
D 23 24 D
E AC MCB I> 1 E
-F1 /D1.3 /S1.2
01
2 /G1.5 /G2.5
21 02
43 3
11 12 03
23 24 4
I> I>
/D2.5 04
MCB /D2.5 /S1.2
-F4 ENTRELEC
-XV1 -XV2
L 21 1 /G1.5 /G2.5
N PE
PE 01
2
-X101 /D1.5 HEATING /D1.4
220V AC 02
3
-R101
03
4
04
ENTRELEC
. 21 21 22 21
V 14 13
CUBICLE LIGHTING
220V AC
-B101 /D1.4 -E101 /D1.3 -S101 /D1.3
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI Test Block - MMLG, MCB, Aux. Components
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CHECK RS DATE
REV. REMARKS CIRCUIT DIAGRAM
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1 56
2 4 DWG. NO. BNR/150/EL/ED/0909 /Z3 of 3
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK6N - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X110
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-F4 :1 1 /D2.2
-F4 :3 2 /D2.7
3 /D2.2
4 /D2.7
C
DD
E E
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E00+EX2-X110 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/0909 /TD1 of 8 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK6N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X230
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-F1 :1 1 /D1.2
2 /D1.7
3 /D1.2
4 /D1.7
5 /D1.2
6 /D1.7
C -E101 :2 7 /D1.2 C
8 /D1.3
:21
-R101 :2 9 /D1.4 :1
:L
-X101 :N 10 /D1.5
11 /D1.7
-F1 :2 12 /D1.3 -S101
-B101
13 /D1.4 -X101
14 /D1.5
15 /D1.2
-R101 :PE 16 /D1.4
-X101 :PE 17 /D1.5
18 /D1.7
D D
E E
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E00+EX2-X230 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/0909 /TD2 of 8 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X301
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-F4 :2 1 /M1.2
2 /M1.2 -P401 :L1/+
3 /M1.2
4 /M1.2
5 /M1.2
6 /M1.2
C -P401 :N/- 7 /M1.2 C
8 /M1.2
DD
E E
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E00+EX2-X301 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/0909 /TD3 of 8 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X400
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-F1 :11 1 /S1.2
-F1 :12 2 /S1.2
-F4 :12 3 /S1.2
4 /S1.2
5 /S1.2
6 /S1.2
C 7 /S1.2
DD
E E
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E00+EX2-X400 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/0909 /TD4 of 8 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -XC11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-XA1 :1 1 /G1.4
2 /G1.4
-XA1 :2 3 /G1.4
4 /G1.4
-XA1 :3 5 /G1.4
6 /G1.4
C -XA1 :4 7 /G1.4
1 8 /G1.4
DD
E E
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E00+EX2-XC11 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/0909 /TD5 of 8 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -XC12
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-XA2 :1 1 /G2.4
2 /G2.4
-XA2 :2 3 /G2.4
4 /G2.4
-XA2 :3 5 /G2.4
6 /G2.4
C -XA2 :4 7 /G2.4
8 /G2.4
DD
E E
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E00+EX2-XC12 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/0909 /TD6 of 8 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -XV11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-XV1 :1 1 /G1.4
2 /G1.4
-XV1 :2 3 /G1.4
4 /G1.4
-XV1 :3 5 /G1.4
6 /G1.4
C -XV1 :4 7 /G1.4
8 /G1.4
DD
E E
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E00+EX2-XV11 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/0909 /TD7 of 8 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -XV12
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-XV2 :1 1 /G2.4
2 /G2.4
-XV2 :2 3 /G2.4
4 /G2.4
-XV2 :3 5 /G2.4
6 /G2.4
C -XV2 :4 7 /G2.4
8 /G2.4
DD
E E
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C Energy Meter Panel (=E00+EX2) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E00+EX2-XV12 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/0909 /TD8 of 8 Sh.
2
78
ALSTOM A B Identification Data DE F G
Qty Description and application Item Item Designation Manufacture Remark
ION8650 (Power logic M8650C4C0H5E1B1A)
2 ENERGY METER 1 -P401, -P402 SCHNEIDER
CCEVA
2 CURRENT TEST BLOCK -XA1, -XA2 ENTRELEC
TCEVA.
2 VOLTAGE TEST BLOCK -XV1, -XV2 ENTRELEC
C60N-C10
1 MINIATUR CIRCUIT BREAKER C60H-DC 2 -F1 MERLIN-GERIN
1 MINIATUR CIRCUIT BREAKER (6A) CNTD (CLS-101) 3 -F4 MERLIN-GERIN
1 LIMITS SWITCH NTR-10A 4 -S101
1 THERMOSTAT DMK-047050 5 -B101 ALSTOM
1 HEATHER MSCSEP 6 -R101 ELEXPERT
1 OUTLET SOCKET 7 -X101, -X102, -X103, -X104 ELEXPERT
GE
C AS MANUFACTURED 03.10.12 RIAN PT. PLN PERSERO Energy Meter Panel LC1
Rev Remarks Date Name Norm 150kV GIS BANDARA NGURAH RAI (=E00+EX2) Sheet C1+
PT. INDOKOMAS BUANA PERKASA
List of Components 1
12 34 5 678
A Socket A
B
AC POWER SUPPLY 14 AC POWER SUPPLY
-X101
Cubicle Lighting Cubicle Heating L
N
-X -X230 1 3/N/PE 50Hz 380/220V PE -X230 2 1L1 =E01/D1.2
/Z4.5 4 1L2 =E01/D1.2
-X 3 6 1L3 =E01/D1.2
2.5 GN/YE
-X 5 10
B 17
2.5 BK
-F1 21
/Z4.5
10A
I>
C AC DISTRIBUTION BOARD 150kV Bay No.1 (Transformer 1) C
Control Protection Panel
-X230 12 13 (=E01+WR1)
-S101 22 21 -B101 21
/Z4.7 V
/Z4.5
D 1 D
-E101 21 -R101
/Z4.6 /Z4.6
2
PE
E -X -X230 7 -X230 8 9 11 1N =E01/D1.2 E
18 1PE =E01/D1.2
-X 15 16
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI AC Supply System
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR CIRCUIT DIAGRAM
1 3 APPR. RS SCALE NTS
DATE NAME P.O.NO. 56
DWG. NO. BNR/150/EL/ED/ /D1 of 2
2
4 78
12 3 456 78
A Power Supply DC POWER SUPPLY A
DC POWER SUPPLY Busbar Protection Relays B
21L+ =E01/D2.1
-X -X110 1 110 VDC (Control Supply Main 1)DC DISTRIBUTION BOARD -X110 2 21L- =E01/D2.1 150kV Bay No.1 (Transformer 1)
-X 3 4 Control Protection Panel
22L+ =E01/D2.1 (=E01+WR1)
-X -X210 1 110 VDC (Control Supply Main 2) -X210 2 22L- =E01/D2.1
-X 3 4
B
2.5 BK 2.5 BK
C C
-F4 21 -F5 21
/Z4.5 43 /Z4.5 43
6A 6A
I> I> I> I>
D -KPSA2 A1 D
/Z4.5
14 13 22 21
-KPS 34 33 42 41
/Z4.5
E C 31L+ E
/M1.1
C 31L-
/M1.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI DC Supply System
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR CIRCUIT DIAGRAM
1 3 APPR. RS SCALE NTS
DATE NAME P.O.NO. 56
DWG. NO. BNR/150/EL/ED/ /D2 of 2
2
4 78
1 2 34567 8
A A
B =E01/G3.4 15-L1A -XC15 1 -S87B1 22 -F87B1 1A1 B
C =E01/G3.4 15-L1B 2 /Z4.1 24 /Z1.1 P746 C
D 3 21 D23 D
=E01/G3.4 15-L2A 1A1
=E01/G3.4 15-L2B 4 23 D24 P746
5
150kV Bay No.1 (Transformer 1) =E01/G3.4 15-L3A 6 25 26 -F87B2 1A1
Control Protection Panel =E01/G3.4 15-L3B 27 28 /Z2.1 P746
(=E01+WR1) 7 D23
8
9 1 2 D24
3 4
-F87B3
MMLG01 /Z3.1
D23
D24
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CT Connection to MICOM P746 CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.1 (Transformer 1) (=E01+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /G1 of 5
2
4 5678
1 2 34567 8
A A
B =E02/G3.4 25-L1A -XC25 1 -S87B2 22 -F87B1 1B1 B
C =E02/G3.4 25-L1B 2 /Z4.2 24 /Z1.1 P746 C
D 3 21 D25 D
=E02/G3.4 25-L2A 1B1
=E02/G3.4 25-L2B 4 23 D26 P746
5
150kV Bay No.2 (Transformer 2) =E02/G3.4 25-L3A 6 25 26 -F87B2 1B1
Control Protection Panel =E02/G3.4 25-L3B 27 28 /Z2.1 P746
(=E02+WR1) 7 D25
8
9 1 2 D26
3 4
-F87B3
MMLG01 /Z3.1
D25
D26
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CT Connection to MICOM P746 CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.2 (Transformer 2) (=E02+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /G2 of 5
2
4 5678
1 2 34 5 6 7 8
A A
=E04/G1.4 32-L1A -XC32 1 -S87B3 22 -F87B1 1C1
B =E04/G1.4 32-L1B 2 /Z4.2 24 /Z1.1 P746 B
C 3 21 D27 C
=E04/G1.4 32-L2A 1C1
=E04/G1.4 32-L2B 4 23 D28 P746
5
=E04/G1.4 32-L3A 6 25 26 -F87B2 1C1
=E04/G1.4 32-L3B 27 28 /Z2.1 P746
7 D27
8 1 2
9 3 4 D28
MMLG01 -F87B3
/Z3.1
D27
D28
150kV Bay No.4 (Bus Coupler) -S87B4 -F87B1
Control Protection Panel /Z4.3 /Z1.1
(=E04+WR1) 21
23 22 D17 1A2
=E04/G2.4 33-L1A -XC33 1
D =E04/G2.4 33-L1B 2 25 24 D18 D
3 27
E =E04/G2.4 33-L2A P746
=E04/G2.4 33-L2B 4 1
F 5 3 -F87B2
=E04/G2.4 33-L3A 6 /Z2.1
A ISSUED FOR APPROVAL =E04/G2.4 33-L3B MMLG01
B FOR CONSTRUCTION 7 26 D17 1A2
REV. REMARKS 8 5
9 28 D18 E
1
P746
-F87B3
/Z3.1
2 D17 1A2
4 D18
P746
F
CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
150kV GIS BANDARA NGURAH RAI CT Connection to MICOM P746
15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA from 150kV Bay No.4 (Bus Coupler) (=E04+WR1) CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
3 CIRCUIT DIAGRAM APPR. RS SCALE NTS
DATE NAME P.O.NO.
6 DWG. NO. BNR/150/EL/ED/ /G3 of 5
2
4 78
1 2 34567 8
A A
B =E05/G3.4 45-L1A -XC45 1 -S87B5 22 -F87B1 1B2 B
C =E05/G3.4 45-L1B 2 /Z4.3 24 /Z1.1 P746 C
D 3 21 D19 D
=E05/G3.4 45-L2A 1B2
=E05/G3.4 45-L2B 4 23 D20 P746
5
150kV Bay No.5 (to UGC NUSA DUA) =E05/G3.4 45-L3A 6 25 26 -F87B2 1B2
Control Protection Panel =E05/G3.4 45-L3B 27 28 /Z2.1 P746
(=E05+WR1) 7 D19
8
9 1 2 D20
3 4
-F87B3
MMLG01 /Z3.1
D19
D20
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CT Connection to MICOM P746 CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /G4 of 5
2
4 5678
1 2 34567 8
A A
B =E06/G3.4 55-L1A -XC55 1 -S87B6 22 -F87B1 1C2 B
C =E06/G3.4 55-L1B 2 /Z4.3 24 /Z1.1 P746 C
D 3 21 D21 D
=E06/G3.4 55-L2A 1C2
=E06/G3.4 55-L2B 4 23 D22 P746
5
150kV Bay No.6 (to PAMACUTAN) =E06/G3.4 55-L3A 6 25 26 -F87B2 1C2
Control Protection Panel =E06/G3.4 55-L3B 27 28 /Z2.1 P746
(=E06+WR1) 7 D21
8
9 1 2 D22
3 4
-F87B3
MMLG01 /Z3.1
D21
D22
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CT Connection to MICOM P746 CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /G5 of 5
2
4 5678
12 3 4567 8
RS900 -F87B1 -F87B1 -F87B1 -CB1 -DS11 -DS12 Start 50BF A
Power Supply Power Supply Power Supply Circuit Breaker Disconnector Switch Disconnector Switch
A Power Supply
2 3 4 Open Close Open Close Open Close
C 31L+ -X301 1
/D2.5 -X301 5 -X301 6 31L+ C
/M2.1
=E01/P2.2 COM2 =E01/P1.3 COM1
BB
150kV Bay No.1 (Transformer 1)
14 13 14 13 14 13 Control Protection Panel CB1 DS11 DS12 -F87T -F50/51 -F51N -K94A -K94T
(=E01+WR1)
-S87B1 -S87B2 -S87B3 Trip Trip Trip
/Z4.1 /Z4.2 /Z4.2
MMLG01 MMLG01 MMLG01
CB1-OP =E01/P2.3 CB1-CL =E01/P2.3 DS11-OP =E01/P2.4 DS12-OP =E01/P2.4 SBF =E01/P1.4
DS11-CL =E01/P2.4 DS12-CL =E01/P2.5
CC
-+ M2 M2 M2
ESW L+ -F87B1 L+ -F87B2 L+ -F87B3 L+ -X301 27 28 29 30 31 32 33
/Z1.1 /Z2.1 /Z3.1
CB1-OP /M2.2
L- L- L- L- CB1-CL /M2.2
P746 P746 P746M1M1 M1 DS11-OP /M2.2 D
DS11-CL /M2.2 E
D DS12-OP /M2.2
14mm²
GROUND STRAP
DS12-CL /M2.2
SBF1 /M2.2
-S87B1 15 16 -S87B2 15 16 -S87B3 15 16 -F87B1 OPTO1 E2 OPTO2 E4 OPTO3 E6 OPTO4 E8 OPTO5 E10 OPTO6 E12 OPTO7 E14
/Z4.1 /Z4.2 /Z4.2 /Z1.1
E MMLG01 MMLG01 MMLG01
P746
E1 E3 E5 E7 E9 E11 E13
C 31L- -X301 19 20 21 22 31L- C
/D2.5 -X301 15 16 17 18 /M2.1
-X301 23 24 25 26
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.1 (Transformer 1) (=E01+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M1 of 15
2
4 5678
12 345678
A -CB1 -DS11 -DS12 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M1.8 Open Close Open Close Open Close
31L+ C
/M3.1
BB
C C
D
/M1.7 CB1-OP CB1-OP /M3.2
/M1.7 CB1-CL CB1-CL /M3.2
/M1.7 DS11-OP DS11-OP /M3.2
DS11-CL /M3.2
D /M1.7 DS11-CL DS12-OP /M3.2
/M1.7 DS12-OP DS12-CL /M3.2
/M1.7 DS12-CL
/M1.7 SBF1 SBF1 /M3.2
-F87B2 OPTO1 E2 OPTO2 E4 OPTO3 E6 OPTO4 E8 OPTO5 E10 OPTO6 E12 OPTO7 E14 E
/Z2.1
E
P746
E1 E3 E5 E7 E9 E11 E13
C 31L- 31L- C
/M1.8 /M3.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.1 (Transformer 1) (=E01+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M2 of 15
2
4 5678
12 345678
A -CB1 -DS11 -DS12 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M2.7 Open Close Open Close Open Close
31L+ C
/M4.1
BB
C C
/M2.5 CB1-OP D
/M2.5 CB1-CL
/M2.5 DS11-OP OPTO1 E2 OPTO2 E4 OPTO3 E6 OPTO4 E8 OPTO5 E10 OPTO6 E12 OPTO7 E14 E
D /M2.5 DS11-CL
/M2.5 DS12-OP
/M2.5 DS12-CL
/M2.5 SBF1
-F87B3
/Z3.1
E
P746
E1 E3 E5 E7 E9 E11 E13
C 31L- 31L- C
/M2.7 /M4.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.1 (Transformer 1) (=E01+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M3 of 15
2
4 5678
1 2 345 6 78
A -CB2 -DS21 -DS22 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M3.7 Open Close Open Close Open Close
-X301 7 -X301 8 31L+ C
/M5.1
B 150kV Bay No.2 (Transformer 2) =E02/P2.2 COM2 =E02/P1.3 COM1 B
Control Protection Panel
(=E02+WR1) CB2 DS21 DS22 -F87T -F50/51 -F51N -K94A -K94T
Trip Trip Trip
CB2-OP =E02/P2.3 CB2-CL =E02/P2.3 DS21-OP =E02/P2.4 DS22-OP =E02/P2.4 SBF =E02/P1.4
DS21-CL =E02/P2.4 DS22-CL =E02/P2.5
CC
-X301 34 35 36 37 38 39 40
CB2-OP /M5.2 D
CB2-CL /M5.2 E
DS21-OP /M5.2
D DS21-CL /M5.2
DS22-OP /M5.2
DS22-CL /M5.2
SBF2 /M5.2
-F87B1 OPTO8 E16 OPTO9 G2 OPTO10 G4 OPTO11 G6 OPTO12 G8 OPTO13 G10 OPTO14 G12
/Z1.1
E
P746
E15 G1 G3 G5 G7 G9 G11
C 31L- 31L- C
/M3.7 /M5.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.2 (Transformer 2) (=E02+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M4 of 15
2
4 5678
12 345678
A -CB2 -DS21 -DS22 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M4.8 Open Close Open Close Open Close
31L+ C
/M6.1
BB
C C
D
/M4.5 CB2-OP CB2-OP /M6.2
/M4.5 CB2-CL CB2-CL /M6.2
/M4.5 DS21-OP DS21-OP /M6.2
DS21-CL /M6.2
D /M4.5 DS21-CL DS22-OP /M6.2
/M4.5 DS22-OP DS22-CL /M6.2
/M4.5 DS22-CL
/M4.5 SBF2 SBF2 /M6.2
-F87B2 OPTO8 E16 OPTO9 G2 OPTO10 G4 OPTO11 G6 OPTO12 G8 OPTO13 G10 OPTO14 G12 E
/Z2.1
E
P746
E15 G1 G3 G5 G7 G9 G11
C 31L- 31L- C
/M4.8 /M6.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.2 (Transformer 2) (=E02+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M5 of 15
2
4 5678
12 345678
A -CB2 -DS21 -DS22 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M5.7 Open Close Open Close Open Close
31L+ C
/M7.1
BB
C C
/M5.5 CB2-OP D
/M5.5 CB2-CL
/M5.5 DS21-OP OPTO8 E16 OPTO9 G2 OPTO10 G4 OPTO11 G6 OPTO12 G8 OPTO13 G10 OPTO14 G12 E
D /M5.5 DS21-CL
/M5.5 DS22-OP
/M5.5 DS22-CL
/M5.5 SBF2
-F87B3
/Z3.1
E
P746
E15 G1 G3 G5 G7 G9 G11
C 31L- 31L- C
/M5.7 /M7.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.2 (Transformer 2) (=E02+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M6 of 15
2
4 5678
12 345678
A -CB3 -DS31 -DS32 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch -X301 10
C 31L+
/M6.7 Open Close Open Close Open Close
-X301 9 31L+ C
/M8.1
B 150kV Bay No.4 (Bus Coupler) =E04/P2.4 COM2 =E04/P2.2 COM1 B
Control Protection Panel
(=E04+WR1) CB3 DS31 DS32 -F50/51
Trip
CB3-OP =E04/P2.4 CB3-CL =E04/P2.5 DS31-OP =E04/P2.5 DS32-OP =E04/P2.6 SBF =E04/P2.3
DS31-CL =E04/P2.6 DS32-CL =E04/P2.7
CC
-X301 41 42 43 44 45 46 47
CB3-OP /M8.2 D
CB3-CL /M8.2 E
DS31-OP /M8.2
D DS31-CL /M8.2
DS32-OP /M8.2
DS32-CL /M8.2
SBF2 /M8.2
-F87B1 OPTO15 G14 OPTO16 G16 OPTO17 H2 OPTO18 H4 OPTO19 H6 OPTO20 H8 OPTO21 H10
/Z1.1
E
P746
G13 G15 H1 H3 H5 H7 H9
C 31L- 31L- C
/M6.7 /M8.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Bay No.1 (Transformer 1) (=E01+WR1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.4 (Bus Coupler) (=E04+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M7 of 15
2
4 5678
12 345678
A -CB3 -DS31 -DS32 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M7.8 Open Close Open Close Open Close
31L+ C
/M9.1
BB
C C
D
/M7.5 CB3-OP CB3-OP /M9.2
/M7.5 CB3-CL CB3-CL /M9.2
/M7.5 DS31-OP DS31-OP /M9.2
DS31-CL /M9.2
D /M7.5 DS31-CL DS32-OP /M9.2
/M7.5 DS32-OP DS32-CL /M9.2
/M7.5 DS32-CL
/M7.5 SBF3 SBF3 /M9.2
-F87B2 OPTO15 G14 OPTO16 G16 OPTO17 H2 OPTO18 H4 OPTO19 H6 OPTO20 H8 OPTO21 H10 E
/Z2.1
E
P746
G13 G15 H1 H3 H5 H7 H9
C 31L- 31L- C
/M7.8 /M9.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.4 (Bus Coupler) (=E04+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M8 of 15
2
4 5678
12 345678
A -CB3 -DS31 -DS32 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M8.7 Open Close Open Close Open Close
31L+ C
/M10.1
BB
C C
/M8.5 CB3-OP D
/M8.5 CB3-CL
/M8.5 DS31-OP OPTO15 G14 OPTO16 G16 OPTO17 H2 OPTO18 H4 OPTO19 H6 OPTO20 H8 OPTO21 H10 E
D /M8.5 DS31-CL
/M8.5 DS32-OP
/M8.5 DS32-CL
/M8.5 SBF3
-F87B3
/Z3.1
E
P746
G13 G15 H1 H3 H5 H7 H9
C 31L- 31L- C
/M8.7 /M10.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.4 (Bus Coupler) (=E04+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M9 of 15
2
4 5678
1 2 34 56 78
A -CB4 -DS41 -DS42 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch -X301 12
C 31L+
/M9.7 Open Close Open Close Open Close Open Close Open Close
-X301 11
31L+ C
/M11.1
B 150kV Bay No.5 (to UGC NUSA DUA) =E05/P2.2 COM2 =E05/P1.4 COM1 B
Control Protection Panel
(=E05+WR1) CB4 CB4 CB4 DS41 DS42 -F87L -F50/51 -K94A
Pole A Pole B Pole C Trip Trip Trip
CB4A-OP =E05/P2.3 CB4A-CL =E05/P2.3 CB4B-OP =E05/P2.3 CB4C-OP =E05/P2.4 DS41-OP =E05/P2.5
CB4B-CL =E05/P2.4 CB4C-CL =E05/P2.5 DS41-CL =E05/P2.6
DS42-OP =E05/P2.6
DS42-CL =E05/P2.7
SBF =E05/P1.5
CC
-X301 48 49 50 51 52 53 54 55 56 57 58
D CB4B-OP /M11.2 DS41-OP /M11.2 D
CB4B-CL /M11.2 DS41-CL /M11.2 E
-F87B1 CB4C-OP /M12.2 DS42-OP /M11.2
/Z1.1 CB4C-CL /M12.2 DS42-CL /M11.2
E SBF4 /M11.2
P746 OPTO22 H12 OPTO23 H14 OPTO24 H16 OPTO25 C2 OPTO26 C4 OPTO27 C6 OPTO28 C8
H11 H13 H15 C1 C3 C5 C7
C 31L- 31L- C
/M9.7 /M11.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M10 of 15
2
4 5678
12 345678
A -CB4 -DS41 -DS42 Start 50BF A
Disconnector Switch Disconnector Switch
C 31L+ Circuit Breaker
/M10.8
Pole B
Open Close Open Close Open Close
31L+ C
/M12.1
BB
C C
/M10.4 CB4B-OP DS41-OP /M12.2 D
/M10.4 CB4B-CL DS41-CL /M12.2
/M10.7 DS41-OP DS42-OP /M12.2
DS42-CL /M12.2
D /M10.7 DS41-CL
/M10.7 DS42-OP SBF4 /M12.2
/M10.7 DS42-CL
/M10.7 SBF4 OPTO22 H12 OPTO23 H14 OPTO24 H16 OPTO25 C2 OPTO26 C4 OPTO27 C6 OPTO28 C8 E
-F87B2
/Z2.1
E
P746
H11 H13 H15 C1 C3 C5 C7
C 31L- 31L- C
/M10.8 /M12.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M11 of 15
2
4 5678
12 345678
A -CB4 -DS41 -DS42 Start 50BF A
Disconnector Switch Disconnector Switch
C 31L+ Circuit Breaker
/M11.7
Pole C
Open Close Open Close Open Close
31L+ C
/M13.1
BB
C C
/M10.4 CB4C-OP D
/M10.4 CB4C-CL
/M11.5 DS41-OP OPTO22 H12 OPTO23 H14 OPTO24 H16 OPTO25 C2 OPTO26 C4 OPTO27 C6 OPTO28 C8 E
D /M11.5 DS41-CL
/M11.5 DS42-OP
/M11.5 DS42-CL
/M11.5 SBF4
-F87B3
/Z3.1
E
P746
H11 H13 H15 C1 C3 C5 C7
C 31L- 31L- C
/M11.7 /M13.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M12 of 15
2
4 5678
1 2 34 56 78
A -CB5 -DS51 -DS52 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch -X301 14
C 31L+
/M12.7 Open Close Open Close Open Close Open Close Open Close
-X301 13
31L+ C
/M14.1
B 150kV Bay No.6 (to PAMACUTAN) =E06/P2.2 COM2 =E06/P1.4 COM1 B
Control Protection Panel
(=E06+WR1) CB5 CB5 CB5 DS51 DS52 -F87L -F50/51 -K94A
Pole A Pole B Pole C Trip Trip Trip
CB5A-OP =E06/P2.3 CB5A-CL =E06/P2.3 CB5B-OP =E06/P2.3 CB5C-OP =E06/P2.4 DS51-OP =E06/P2.5
CB5B-CL =E06/P2.4 CB5C-CL =E06/P2.5 DS51-CL =E06/P2.6
DS52-OP =E06/P2.6
DS52-CL =E06/P2.7
SBF =E06/P1.5
CC
-X301 59 60 -X301 61 62 -X301 63 64 65 66 67 68 69
D CB5B-OP /M14.2 DS51-OP /M14.2 D
CB5B-CL /M14.2 DS51-CL /M14.2 E
-F87B1 CB5C-OP /M15.2 DS52-OP /M14.2
/Z1.1 CB5C-CL /M15.2 DS52-CL /M14.2
E SBF5 /M14.2
P746 OPTO29 C10 OPTO30 C12 OPTO31 C14 OPTO32 C16 OPTO33 B2 OPTO34 B4 OPTO35 B6
C9 C11 C13 C15 B1 B3 B5
C 31L- 31L- C
/M12.7 /M14.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M13 of 15
2
4 5678
12 345678
A -CB5 -DS51 -DS52 Start 50BF A
Disconnector Switch Disconnector Switch
C 31L+ Circuit Breaker
/M13.8
Pole B
Open Close Open Close Open Close
31L+ C
/M15.1
BB
C C
/M13.4 CB5B-OP DS51-OP /M15.2 D
/M13.4 CB5B-CL DS51-CL /M15.2
/M13.7 DS51-OP DS52-OP /M15.2
DS52-CL /M15.2
D /M13.7 DS51-CL
/M13.7 DS52-OP SBF5 /M15.2
/M13.7 DS52-CL
/M13.7 SBF5 OPTO29 C10 OPTO30 C12 OPTO31 C14 OPTO32 C16 OPTO33 B2 OPTO34 B4 OPTO35 B6 E
-F87B2
/Z2.1
E
P746
C9 C11 C13 C15 B1 B3 B5
C 31L- 31L- C
/M13.8 /M15.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M14 of 15
2
4 5678
1 2 345 67 8
A -CB5 -DS51 -DS52 Start 50BF 50BF 2nd stage 31L+ C A
Disconnector Switch Disconnector Switch Multiplication
C 31L+ Circuit Breaker
/M14.7
Pole C
Open Close Open Close Open Close
L16
L18 L17
L16
L18 L17
L16
L18 L17
B B-F87B1
-F87B2 -F87B3
/Z1.1 R8 /Z2.1 R8 /Z3.1 R8
P746 P746 P746
C C
/M13.4 CB5C-OP D
/M13.4 CB5C-CL
/M14.5 DS51-OP OPTO29 C10 OPTO30 C12 OPTO31 C14 OPTO32 C16 OPTO33 B2 OPTO34 B4 OPTO35 B6 -K50BF 28 27
/Z5.3 Trip 24
D /M14.5 DS51-CL 22
/M14.5 DS52-OP E
/M14.5 DS52-CL
/M14.5 SBF5 MVAJ101
-F87B3
/Z3.1
E
P746
C9 C11 C13 C15 B1 B3 B5
C 31L- 31L- C
/M14.7
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M15 of 15
2
4 5678
1 2 345678
A A
To To To 20kV Protection Panel
Lock-Out 1 Relay Lock-Out 2 Relay
87BB/50BF 1st stage 50BF 2nd stage 87BB/50BF 1st stage 50BF 2nd stage 50BF 2nd stage
BB
-F87B1 R1 L2 L1 -F87B2 R1 -F87B3 R1 -K50BF K1 75 -F87B1 R2 -F87B2 R2 -F87B3 R2 K50BF K1 86 -K50BF K1
/Z1.1 L2 L1/Z2.1 /Z3.1 /Z5.3 L4 L3/Z1.1 /Z2.1 /Z3.1 /Z5.3 11 9/Z5.3
L2 L1 L4 L3
P746 P746 P746 MVAJ101 L4 L3P746P746P746MVAJ101 MVAJ101
C C
-X400 1 2 3 -X400 4 5 6 -X400 7 8
150kV Bay No.1 (Transformer 1) =E01/M2.5 A2 =E01/M7.5 A4
Control Protection Panel =E01/M7.5 CO2 =E01/P3.7 CO3
(=E01+WR1) =E01/M7.5 A3 =E01/P3.7 A5
=E01/M2.4 CO1
=E01/M2.4 A1
DD
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.1 (Transformer 1) (=E01+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P1 of 6
2
4 5678
1 2 345678
A A
To To To 20kV Protection Panel
Lock-Out 1 Relay Lock-Out 2 Relay
87BB/50BF 1st stage 50BF 2nd stage 87BB/50BF 1st stage 50BF 2nd stage 50BF 2nd stage
BB
-F87B1 R3 L6 L5 -F87B2 R3 -F87B3 R3 -K50BF K1 12 10 -F87B1 R4 -F87B2 R4 -F87B3 R4 K50BF K1 15 13 -K50BF K1
/Z1.1 L6 L5/Z2.1 /Z3.1 /Z5.3 L8 L7/Z1.1 /Z2.1 /Z3.1 /Z5.3 16 14/Z5.3
L6 L5 L8 L7
P746 P746 P746 MVAJ101 L8 L7P746P746P746MVAJ101 MVAJ101
C C
-X400 9 10 11 -X400 12 13 14 -X400 15 16
150kV Bay No.2 (Transformer 2) =E02/M2.5 B2 =E02/M7.5 B4
Control Protection Panel =E02/M7.5 CO2 =E02/P3.7 CO3
(=E02+WR1) =E02/M7.5 B3 =E02/P3.7 B5
=E02/M2.4 CO1
=E02/M2.4 B1
DD
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.2 (Transformer 2) (=E02+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P2 of 6
2
4 5678
1 2 34567 8
A A
B
To To C
Lock-Out 1 Relay Lock-Out 2 Relay D
B 87BB/50BF 1st stage 50BF 2nd stage 87BB/50BF 1st stage 50BF 2nd stage
-F87B1 R5 L10 L9 -F87B2 R5 -F87B3 R5 -K50BF K1 19 17 -F87B1 R6 -F87B2 R6 -F87B3 R6 K50BF K1 20 18
/Z1.1 L10 L9/Z2.1/Z3.1 /Z5.3 L12 L11/Z1.1 /Z2.1 /Z3.1 /Z5.3
L10 L9 L12 L11
P746 P746 P746 MVAJ101 L12 L11P746P746P746MVAJ101
C
-X400 17 18 19 -X400 20 21 22
D 150kV Bay No.4 (Bus Coupler) =E04/M2.4 C2 =E04/M3.4 C4
Control Protection Panel =E04/M3.3 CO2
(=E04+WR1) =E04/M3.3 C3
=E04/M2.3 CO1
=E04/M2.3 C1
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.4 (Bus Coupler) (=E04+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P3 of 6
2
4 5678
1 23 4 5 67 8
A A
To 50BF 2nd stage DTT to Remote End
Lock-Out 1 Relay 50BF 2nd stage B
87BB/50BF 1st stage
-F87B1 R9 K2 K1 -F87B2 R9 K2 K1 -F87B3 R9 K2 K1 -F87B1 K4 K3 -F87B2 -F87B3 -F87B1 K6 K5 -F87B2 -F87B3 K6 K5
/Z1.1 /Z2.1 /Z3.1 /Z1.1 R10 K4 K3/Z2.1 R10 /Z3.1 R10 /Z1.1 R11 K6 K5/Z2.1 R11/Z3.1 R11
K4 K3
P746 P746 P746 P746 P746 P746 P746 P746 P746
B -X400 23 24 25 -X400 26 27
150kV Bay No.5 (to UGC NUSA DUA) =E05/M2.4 D2 =E05/M2.5 CO2
Control Protection Panel =E05/M2.5 D3
(=E05+WR1)
C =E05/M2.3 CO1 C
=E05/M2.3 D1 D
E
To
Lock-Out 2 Relay
87BB/50BF 1st stage 50BF 2nd stage
D -F87B1 K8 K7 -F87B2 K8 K7 -F87B3 K8 K7 -F87B1 K10 K9 -F87B2 -F87B3
K10 K9
/Z1.1 R12 /Z2.1 R12 /Z3.1 R12 /Z1.1 R13 K10 K9/Z2.1 R13/Z3.1 R13
P746 P746 P746 P746 P746 P746
-X400 28 29 30
E 150kV Bay No.5 (to UGC NUSA DUA) =E05/M4.4 D5
Control Protection Panel
(=E05+WR1)
=E05/M4.4 CO3
=E05/M4.4 D4
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P4 of 6
2
4 5678
1 23 4 5 67 8
A A
To 50BF 2nd stage DTT to Remote End
Lock-Out 1 Relay 50BF 2nd stage B
87BB/50BF 1st stage
-F87B1 K12 K11 -F87B2 K12 K11 -F87B3 K12 K11-F87B1 -F87B2 -F87B3 -F87B1 K13 -F87B2 -F87B3
/Z1.1 R14 /Z2.1 R14 /Z3.1 R14 K13/Z1.1 R15 /Z2.1 R15 /Z3.1 R15 /Z1.1 R16 K15 K14 /Z2.1 R16 /Z3.1 R16
P746 P746 P746 K15 K14P746 P746 P746 P746 K13P746P746
K13 K15 K14
K15 K14 K13
K13 K15 K14
K15 K14
B -X400 31 32 33 -X400 34 35
150kV Bay No.6 (to PAMACUTAN) =E06/M2.4 E2 =E06/M2.5 CO2
Control Protection Panel =E06/M2.5 E3
(=E06+WR1)
C =E06/M2.3 CO1 C
=E06/M2.3 E1 D
E
To
Lock-Out 2 Relay
87BB/50BF 1st stage 50BF 2nd stage
D -F87B1 J2 J1 -F87B2 -F87B3 J2 J1 -F87B1 J4 J3 -F87B2 -F87B3
J2 J1 J4 J3
/Z2.1 R17 /Z3.1 R17 J4 J3
/Z1.1 R17 /Z1.1 R18 /Z2.1 R18 /Z3.1 R18
P746 P746 P746 P746 P746 P746
-X400 36 37 38
E 150kV Bay No.6 (to PAMACUTAN) =E06/M4.4 E5
Control Protection Panel
(=E06+WR1)
=E06/M4.4 CO3
=E06/M4.4 E4
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P5 of 6
2
4 5678
12 345678
To
Lock-Out 1 Relay
87BB/50BF 1st stage 50BF 2nd stage
AA
-F87B1 J6 J5-F87B2 -F87B3 -F87B1 -F87B2 -F87B3
/Z1.1 R19 J6 J5/Z2.1 R19/Z3.1 R19/Z1.1 R20 /Z2.1 R20 /Z3.1 R20
J6 J5
P746 J8 J7P746P746P746P746P746
J8 J7
J8 J7
B -X400 39 40 41 B
C C
D
To To 20kV Protection Panel E
Lock-Out 2 Relay 50BF 2nd stage
87BB/50BF 1st stage 50BF 2nd stage
D -F87B1 J10 J9-F87B2 -F87B3 -F87B1 -F87B2 -F87B3 -F87B1 -F87B2 -F87B3
J10 J9
/Z1.1 R21 J10 J9/Z2.1 R21/Z3.1 R21/Z1.1 R22/Z2.1 R22/Z3.1 R22 /Z1.1 R23 /Z2.1 R23 /Z3.1 R23
J12 J11
J12 J11
J12 J11
J13
J15 J14
J13
J15 J14
J13
J15 J14
P746 P746 P746 P746 P746 P746 P746 P746 P746
-X400 42 43 44 -X400 45 46
E
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P6 of 6
2
4 5678