Jabatan Warisan Negara Masjid Sultan Alaeddin

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by designergroup.asi, 2023-03-31 00:34:39

Jabatan Warisan Negara Masjid Sultan Alaeddin

Jabatan Warisan Negara Masjid Sultan Alaeddin

100 MASJID SULTAN ALA’EDDIN SEMASA CTB-Jugra_10"x10"_page deleted_3jan2020.indd 100 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 101 SEMASA Pemasangan panel siling ‘gypsum’ kepada kerangka ‘galvanised C channel’ untuk siling baru kawasan Ruang Limpah. Installation of new gypsum ceiling panels on galvanised ‘C’channel at Courtyard Ceiling Area. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 101 06/01/2020 7:58 PM


102 MASJID SULTAN ALA’EDDIN Kerja Mengecat Siling Baru di kawasan Ruang Limpah. Painting works for new ceiling finish at Courtyard Area. SEMASA CTB-Jugra_10"x10"_page deleted_3jan2020.indd 102 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 103 SEMASA Kerja Mengecat Siling Baru di kawasan Ruang Limpah. Painting works for new ceiling finish at Courtyard Area. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 103 06/01/2020 7:58 PM


104 MASJID SULTAN ALA’EDDIN SELEPAS Keadaan siap kerja siling di Kubah Sisi. Completed ceiling works at Side Dome. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 104 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 105 SELEPAS Keadaan siap kerja dikawasan Ruang Limpah. Completed ceiling works at Courtyard Area. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 105 06/01/2020 7:58 PM


106 MASJID SULTAN ALA’EDDIN CTB-Jugra_10"x10"_page deleted_3jan2020.indd 106 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 107 Kajian Struktur Bangunan Kajian struktur telah dilakukan untuk mengenalpasti jenis reka bentuk asas bangunan dan kaitan keretakan kepada dinding bata di atas permukaan tanah. 2 lokasi eskavasi telah dilakukan dan hasil kajian direkodkan. Building Structural Studies Structural studies was done to identify the foundation design of the load bearing walls and related damages to the brickwalls above ground level. 2 pits was excavated and all finding recorded. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 107 06/01/2020 7:58 PM


108 MASJID SULTAN ALA’EDDIN SEBELUM CTB-Jugra_10"x10"_page deleted_3jan2020.indd 108 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 109 SEBELUM Lokasi yang dicadangkan untuk kerja penggalian secara terkawal telah dilakukan pada 2 lokasi yang dipilih berdasarkan kepada kesan keretakan pada dinding bata yang berdekatan. Penandaan dilakukan di tapak untuk mengawal dan menentukan saiz lubang untuk kerja penggalian. Location of excavation pits was identified in relation to the nearest brickwall cracks. Markings on site are done to control excavation pit sizes. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 109 06/01/2020 7:58 PM


110 MASJID SULTAN ALA’EDDIN SEMASA CTB-Jugra_10"x10"_page deleted_3jan2020.indd 110 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 111 SEMASA Proses kerja penggalian kajian struktur bangunan di lokasi bersebelahan struktur Kubah Sudut dalam kawasan Ruang Limpah. Tahap penggalian dilakukan sehingga aras asas struktur tanggung beban bangunan untuk melihat dan menilai keadaannya. Excavation works at the Corner Dome of the Courtyard Area and ‘Buttress Wall’ area. Analysis was done on the condition of the load bearing wall footing structure. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 111 06/01/2020 7:58 PM


112 MASJID SULTAN ALA’EDDIN CTB-Jugra_10"x10"_page deleted_3jan2020.indd 112 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 113 Kerja Konservasi Lantai Skop kerja konservasi lantai melibatkan Dewan Utama dan Ruang Limpah. Lantai Dewan Utama daripada jubin ‘terrazzo’ merupakan kemasan asal. Ruang Limpah merupakan kawasan yang asalnya tidak berbumbung dan ditutup untuk menampung pertambahan jamaah dan dipasang kemasan lantai baru. Floor Conservation Works The floor conservation workscope includes the Main Hall and the Courtyard Area. ‘Terrazzo’ tiles is the original floor finish at the Main Hall. The Courtyard Area is originally an enclosed open air space and was tiled and roofed to accommodate the increasing congregation. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 113 06/01/2020 7:58 PM


114 MASJID SULTAN ALA’EDDIN LANTAI RUANG DEWAN UTAMA FLOOR AREA OF MAIN HALL CTB-Jugra_10"x10"_page deleted_3jan2020.indd 114 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 115 PELAN LANTAI FLOOR PLAN CTB-Jugra_10"x10"_page deleted_3jan2020.indd 115 06/01/2020 7:58 PM


116 MASJID SULTAN ALA’EDDIN SEBELUM Kemasan lantai karpet di kawasan Dewan Utama dan kawasan ‘Buttress’. Existing carpeted areas of the Main Hall and ‘Buttress’ area. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 116 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 117 SEBELUM Kemasan lantai karpet di kawasan Dewan Utama dan kawasan ‘Buttress’. Existing carpeted areas of the Main Hall and ‘Buttress’ area. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 117 06/01/2020 7:58 PM


118 MASJID SULTAN ALA’EDDIN SEMASA Perlindungan Kepada Lantai Asal ‘Terrazzo’. Protection to existing ‘Terrazzo’ floor. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 118 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 119 SEMASA Pemasangan papan lapis sebagai lapisan pelindung lantai ‘terrazzo’. Plywood layer as protection to existing ‘terrazzo‘ floor. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 119 06/01/2020 7:58 PM


120 MASJID SULTAN ALA’EDDIN SEMASA Membaikpulih kemasan lantai asal jubin ‘Terrazzo’. Restoration of the ‘Terrazzo’ floor finish. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 120 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 121 Menutup lubang kesan tebukan lantai selepas kerja rawatan anai-anai. Closing up bored points after termite treatment works. SEMASA CTB-Jugra_10"x10"_page deleted_3jan2020.indd 121 06/01/2020 7:58 PM


122 MASJID SULTAN ALA’EDDIN SELEPAS CTB-Jugra_10"x10"_page deleted_3jan2020.indd 122 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 123 SELEPAS CTB-Jugra_10"x10"_page deleted_3jan2020.indd 123 06/01/2020 7:58 PM


124 MASJID SULTAN ALA’EDDIN LANTAI KAWASAN RUANG LIMPAH FLOOR AT COURTYARD AREA CTB-Jugra_10"x10"_page deleted_3jan2020.indd 124 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 125 Kerja menanggalkan jubin lantai sedia ada. Removal of existing floor tiles finish. SEMASA CTB-Jugra_10"x10"_page deleted_3jan2020.indd 125 06/01/2020 7:58 PM


126 MASJID SULTAN ALA’EDDIN SEMASA Kerja memecah slab lantai konkrit sedia ada. Demolition of existing concrete floor. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 126 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 127 SEMASA Menyediakan slab konkrit baru untuk lantai ruang limpah. Preparing new concrete slab for courtyard area. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 127 06/01/2020 7:58 PM


128 MASJID SULTAN ALA’EDDIN SEMASA Kerja Kemasan Lantai Baru. Jenis ‘Terrazzo In Situ‘. New ‘Terracotta In Situ’ Floor Finish. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 128 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 129 SEMASA Memberi perlindungan dengan lapisan ‘sealer’ dan mengilap lantai ‘Terrazzo’. Applying ‘sealer’ and polishing of ‘terrazo’ floor finish. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 129 06/01/2020 7:58 PM


130 MASJID SULTAN ALA’EDDIN SELEPAS CTB-Jugra_10"x10"_page deleted_3jan2020.indd 130 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 131 SELEPAS CTB-Jugra_10"x10"_page deleted_3jan2020.indd 131 06/01/2020 7:58 PM


132 MASJID SULTAN ALA’EDDIN CTB-Jugra_10"x10"_page deleted_3jan2020.indd 132 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 133 Kerja Konservasi Dinding Skop kerja konservasi dinding tanggung beban di Masjid ini melibatkan dinding kawasan berikut :- a. Dinding Dalam (Dewan Utama) b. Dinding Luar (Dinding Kawasan Ruang Limpah) Wall Conservation Works The workscope of the load bearing walls of the Masjid covers the following :- a. Internal Walls (Main Hall) b. External Walls (Courtyard Walls) CTB-Jugra_10"x10"_page deleted_3jan2020.indd 133 06/01/2020 7:58 PM


134 MASJID SULTAN ALA’EDDIN KERJA DINDING DALAM INTERNAL WALL WORKS CTB-Jugra_10"x10"_page deleted_3jan2020.indd 134 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 135 PELAN LANTAI FLOOR PLAN CTB-Jugra_10"x10"_page deleted_3jan2020.indd 135 06/01/2020 7:58 PM


136 MASJID SULTAN ALA’EDDIN SEBELUM Kesemua dinding sedia ada dalam kawasan Dewan Utama ini telah ditutup dengan kemasan panel kayu. Skop kerja konservasi memerlukan semua lapisan panel kayu ini dibuka dan dikembalikan semula kepada keadaan asal dinding. All walls at the Main Hall are cladded with timber panels. The conservation work scope requires the removal of these panels and restore the original plastered walls. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 136 06/01/2020 7:58 PM


MASJID SULTAN ALA’EDDIN 137 SEBELUM CTB-Jugra_10"x10"_page deleted_3jan2020.indd 137 06/01/2020 7:59 PM


138 MASJID SULTAN ALA’EDDIN Kerja membuka panel kayu untuk mengenalpasti kerosakan pada dinding dan kerja membaikpulih plaster dan batu bata dinding. Removing timber wall panels to identify damaged plaster and brick walls to be made good SEMASA CTB-Jugra_10"x10"_page deleted_3jan2020.indd 138 06/01/2020 7:59 PM


MASJID SULTAN ALA’EDDIN 139 SEMASA Kajian dijalankan untuk mengenalpasti tahap kelembapan pada dinding dan melaksanakan kerja ‘chemical fluid injection’ untuk mengatasinya. Sampel-sampel plaster kapur juga disediakan untuk mengenalpasti campuran nisbah kapur dengan pasir yang terbaik untuk perlaksanaan kerja plaster pada dinding. Site test to determine moisture level and using chemical fluid injection remedy. Plaster samples were done to determine most suitable mix for plastering works. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 139 06/01/2020 7:59 PM


140 MASJID SULTAN ALA’EDDIN SELEPAS Keadaan dinding dalam Dewan Utama setelah selesai kerja baikpulih. Completed works to the internal walls of the Main Hall. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 140 06/01/2020 7:59 PM


MASJID SULTAN ALA’EDDIN 141 SELEPAS CTB-Jugra_10"x10"_page deleted_3jan2020.indd 141 06/01/2020 7:59 PM


142 MASJID SULTAN ALA’EDDIN KERJA DINDING LUAR EXTERNAL WALL WORKS CTB-Jugra_10"x10"_page deleted_3jan2020.indd 142 06/01/2020 7:59 PM


MASJID SULTAN ALA’EDDIN 143 Skop kerja konservasi untuk dinding adalah untuk membaikpulih semua kerosakan dinding bata dan plaster serta memberi kemasan cat baru. The conservation workscope for the walls are to made good all brick wall and plaster damages with apply new paint finishes. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 143 06/01/2020 7:59 PM


144 MASJID SULTAN ALA’EDDIN SEMASA CTB-Jugra_10"x10"_page deleted_3jan2020.indd 144 06/01/2020 7:59 PM


MASJID SULTAN ALA’EDDIN 145 SEMASA Kerja mengikis lapisan plaster dinding yang rapuh serta membaikpulih kesan-kesan keretakan yang terdapat pada bata dinding. Scrapping damaged plaster works and making good damaged brick walls. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 145 06/01/2020 7:59 PM


146 MASJID SULTAN ALA’EDDIN Kerja memasang elemen dekoratif GRC. Installing decorative GRC panels. SEMASA CTB-Jugra_10"x10"_page deleted_3jan2020.indd 146 06/01/2020 7:59 PM


MASJID SULTAN ALA’EDDIN 147 SEMASA CTB-Jugra_10"x10"_page deleted_3jan2020.indd 147 06/01/2020 7:59 PM


148 MASJID SULTAN ALA’EDDIN SELEPAS Keadaan dinding selepas selesai kerja-kerja baikpulih dan diberi kemasan cat baru. Competed works of the restored walls with new paint finish. CTB-Jugra_10"x10"_page deleted_3jan2020.indd 148 06/01/2020 7:59 PM


MASJID SULTAN ALA’EDDIN 149 SELEPAS CTB-Jugra_10"x10"_page deleted_3jan2020.indd 149 06/01/2020 7:59 PM