The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.

LAPORAN AKHIR LM 2_MUHAMAD HUSAINI (DB180163)

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by muhdhusaini007, 2022-07-13 05:46:01

LAPORAN AKHIR LM 2_MUHAMAD HUSAINI (DB180163)

LAPORAN AKHIR LM 2_MUHAMAD HUSAINI (DB180163)

UNIVERSITI TUN HUSSEIN ONN MALAYSIA

FAKULTI PENDIDIKAN TEKNIKAL & VOKASIONAL
http://www.uthm.edu.my

LAPORAN AKHIR LATIHAN MENGAJAR 2

PROGRAM SARJANA MUDA PENDIDIKAN
VOKASIONAL (BINAAN BANGUNAN)

KOD SUBJEK: BBP 40408

Nama guru pelatih : Muhamad Husaini bin Mohamad Kamilan
No. matrik : DB180163
No. tel dan email : 013-6786020 / [email protected]

Nama Institusi : Politeknik Sultan Idris Shah
Alamat Institusi : Sungai Lang, 45100 Sungai Air Tawar, Selangor
Nombor Telefon : 03-3280 6200
Email Institusi : [email protected]

Nama Pembimbing : Puan Suzielahyati binti Yahya
Nombor Telefon : 019-9107071

Nama Penyelia : Ts. Dr. Yusmarwati Binti Yusof
Nombor Telefon : 019-735 7574

husaini

MUHAMAD HUSAINI BIN
MOHAMAD KAMILAN

01 JULAI 2022

JADUAL WAKTU
KELAS

JADUAL

TIMET

Nama Pelatih: MUHAMAD HUSAINI BIN MOHAMAD KAMILAN
Trainee’s Name:

8.00 am - 9.00 am - 10.00 am 10.15 am 1
9.00 am 10.00 - 10.15 - 11.15
Hari/Masa am am am

Isnin DCC20073 DCC20073 D
Selasa (DKA 2B) (DKA 2B) (D
Rabu
Khamis DCC10022 DCC10022 DCC10022 D
Jumaat (DKA 1A) (DKA 1A) (DKA 1A) (D

DCC20073 DCC20073
(DKA 2B) (DKA 2B)

Bil Mata Pelajaran
1 DCC 20073 - CONTRACT AND ESTIMATING

WAKTU

TABLE

N

11.15 am 12.15 pm 13.15 14.15 15.15 pm 16.15 pm
- 12.15 - 13.15 pm - pm - - 16.15 - 17.15
pm pm 14.15 15.15 pm pm
pm pm

DCC10032 DCC10032 REHAT
DKA 1A) (DKA 1A)

REHAT

DCC10022 REHAT DCC10022 DCC10022
DKA 1A) (DKA 1A) (DKA 1A)

REHAT

REHAT

Kelas Masa Bil Kelas Mulai Hingga
1/7/2022
DKA 2B 4 32 Orang 21/3/2022

Bil Mata Pelajaran

2 DCC 10032 - CIVIL ENGINEERING MATERIALS
3 DCC 10022 - BRICKWORKS AND CONCRETE LABORATORY
4 MPU 24011 - SCRABBLES

Kelas Masa Bil Kelas Mulai Hingga

DKA 1A 2 23 Orang 21/3/2022 1/7/2022
DKA 1A 3 23 Orang 21/3/2022 1/7/2022
DKA 1A 2 20 Orang 21/3/2022 1/7/2022

SILIBUS KURSUS

SILABUS KURSUS/ SUKA

COURSE’S SYLLABUS/

KOD & NAMA KURSUS : DCC20073 – CONTRACT AND ESTIM
KELAS : DKA2B

WEEK/ TOPIC AND SUB TOPIC
DATE INTRODUCTION

Course Information Outline distribution and briefing for course
DCC20073 - Contract & Estimating
Elaborate Continous Assesment marks and activities for whole
semester

1.0 The Construction Industry in General

1.1 Explain the basic concept of construction industry.

1 1.1.1 Describe the types of construction industry in general
07/03/2022 - 1.1.2 Identify stages involved in construction industry
13/03/2022

1.1.3 Explain the roles of the design team members and
builders team members

1.1.4 Explain the roles of Pusat Khidmat Kontraktor (PKK)
and the Construction Industry Development Board of Malaysia
(CIDB) in construction industry in Malaysia

2.0 The Tender Procedure

ATAN MATA PELAJARAN

/ SUBJECT’S OUTLINE

MATING

CLO TEACHING & DATE OF
PLO LEARNING ASSESSMENT IMPLEMENTATION

ACTIVITIES 07/03/2022
[2 Hour]
Interactive
Lecture 11/03/2022
[2 Hour]

CLO1C PLO1 SYN
ASYN

3 H - Theory

1 H - Theory
CLO1C PLO1

2.1 Describe the tender procedure.

2.1.1 Define tender and quotation
2.1.1 Define tender and quotation

2.2 Explain the tender procedure.

2.2.1 Describe the types, characteristics, advantages and
disadvantages of tender;

a. Open Tender

b. Limited Tender (Bumiputera only)

c. Selective Tender

d. Pre-Qualification/Two Stage Tender

2 e. Negotiable Tender
14/03/2022 -

20/03/2022

2.2.2 Explain tender document, table tender document,

tender notice, closing of tender, opening of tender box, tender

opening committee, tender report, tender validation period and

extension of tender validation period, tender board and its

authorities, tender award, tender rejection and re-tendering.

3.0 The Contract Procedure
3.1 Describe the contract procedure.

3.1.1 Describe contract and subcontract
3.1.2 Explain principles of contract

Interactive
Lecture
SYN
ASYN

CLO1C PLO1
3 H - Theory

1 H - Theory
CLO1C PLO1

3.2 Explain the contract procedure

3.2.1 Identify the features, requirements, advantages and
disadvantages of contracts for;

a. Lump Sum Contract

b. Turnkey Contract

c. Cost Reimbursement Contract (Cost plus Contract)

d. Measure and Value Contract

3.2.2 Explain main/prime contractor, domestic sub-
contractors, nominated sub-contractor and nominated supplier
3
21/03/2022 -
27/03/2022
4.0 Standard Form of Contract (P.W.D Form 203 / 203A)

4.1 Describe the clauses in Standard Form of Contract
(P.W.D Form 203/203A with the latest version).

4.1.1 Explain the following terms in Standard Form of
Contract (P.W.D Form 203/203A with the latest version);

a. The S.O. And S.O.’S Representatives

b. S.O.’S Right to Take Action

c. S.O.’S Instructions

4 4.0 Standard Form of Contract (P.W.D Form 203 / 203A)
28/03/2022 -
03/04/2022

Interactive TEST 1 (1 H)
Lecture
CLO1C PLO1
Cooperative
Learning

SYN

ASYN

2 H - Theory

CLO1C PLO1
CLO3A PLO8 1 H - Theory

ASSIGNMENT 1

4.1 Describe the clauses in Standard Form of Contract
(P.W.D Form 203/203A with the latest version).

4.1.1 Explain the following terms in Standard Form of
Contract (P.W.D Form 203/203A with the latest version);

d. Obligations of the Contractor

e. Indemnity in Respect of Personal Injuries and
Damage to Property

f. Insurance against Personal Injuries and Damage
to Property

g. Indemnities to Government in Respect of Claims
by Workmen

h. Compliance with the Law

i. Employment of Workmen

j. Payment to Contractor and Interim Certificates

k. Materials, Goods and Workmanship

l. Damages For Non-Completion

m. Claims For Loss and Expense

n. Events and Consequences of Default by the
Contractor

o. Termination on Corruption

p. General Duties and Performance Standard

Interactive
Lecture

CLO 1C PLO1 SYN

CLO 3A PLO8 ASYN

4 H - Theory

4.1.2 Demonstrate knowledge of ethical standard to complete a
given task regarding the usage of Standard Form of Contract
(P.W.D Form 203/203A with the latest version).

5.0 The Preliminary Estimating Method

5.1 Explain the preliminary estimating methods.

5.1.1 Describe definition and importance of preliminary

estimating methods

5

04/04/2022 - 5.1.2 Identify types of the preliminary estimating

10/04/2022 methods;

a. Unit Valuation Method

b. Floor Area Method

c. Cubic Content Method

5.1.3 Explain advantages and disadvantages of the
preliminary estimating methods as in 5.1.2.

5.2 Estimate the construction cost by using preliminary
estimating method.

CLO1C PLO2 Interactive
Lecture

SYN

ASYN

1 H - Theory

CLO2C PLO2
2 H - Theory

CLO2C PLO2
1 H - Theory

5.2 Estimate the construction cost by using preliminary
estimating method.

6
11/04/2022 -
17/04/2022

6.0 The Build-up Rate Method

6.1 Explain the build-up rate methods.

6.1.1 Describe requirement and uses of the price rates
and schedule of rates

6.1.2 Explain the basic criteria of price
calculation,materials, labour, plants, overheads and profits.
6.2 Calculate the construction price rate by using build-up rate
method.

7 6.2.1 Distinguish the build-up rate culculation for;
18/04/2022 - a. Excavation works using hands and machine
24/04/2022 b. Concrete work

c. Brick work

d. Reinforcement work

Interactive QUIZ 1 (0.25 H)
Lecture
CLO2C PLO2
SYN

ASYN

1 H - Theory

1.75 H -
Tutorial

CLO2C PLO2 1 H - Theory

CLO 2C PLO 2 Interactive
CLO 4A PLO 11 Lecture

SYN

ASYN

4 H - Theory

6.2 Calculate the construction price rate by using build-up rate
method.

6.2.1 Distinguish the build-up rate culculation for;

a. Excavation works using hands and machine

b. Concrete work

8 c. Brick work
25/04/2022 - d. Reinforcement work
01/05/2022

7.0 The Quantity Measurement

7.1 Explain the quantity measurement using billing method
and drawing and specification method.

7.1.1 State the uses and importance of Bills of
Quantities

02/05/2022 - CUTI PERT

08/05/2022

7.1 Explain the quantity measurement using billing method

and drawing and specification method.

9 7.1.1 State the uses and importance of Bills of
09/05/2022 - Quantities
15/05/2022

CLO 2C PLO 2 Interactive
CLO 4A PLO 11 Lecture

Cooperative
Learning

SYN

ASYN

1 H - Theory

2 H - Tutorial

PROJECT 1

CLO 2C PLO 2
1 H - Theory

TENGAHAN SEMESTER

CLO 2C PLO 2 Interactive
Lecture

SYN

ASYN

1 H - Theory

7.2 Explain the method of taking off quantity measurement.

7.2.1 Describe the uses of dimension form, unit
measurement, items measurement, taking off list and
description of works

7.2.2 Interpret the structural drawing
7.2 Explain the method of taking off quantity measurement.

7.2.1 Describe the uses of dimension form, unit
measurement, items measurement, taking off list and
description of works

7.2.2 Interpret the structural drawing

10
16/05/2022 -
22/05/2022

7.3 Estimate the quantity of work by using taking off method

7.3.1 Calculate the quantity of earthwork for;

a. Site Clearance

b. Cut and fill
7.3 Estimate the quantity of work by using taking off method

11 7.3.1 Calculate the quantity of earthwork for;
23/05/2022 - a. Site Clearance
29/05/2022

1 H - Tutorial
CLO 2C PLO 2 2 H - Theory

CLO 2C PLO 2 Interactive
CLO 4A PLO 11 Lecture

SYN

ASYN

2 H - Theory

1 H - Tutorial

1 H - Theory

CLO 2C PLO 2 Interactive
CLO 4A PLO 11 Lecture

SYN

ASYN

b. Cut and fill
7.3.2 Calculate the quantity of piling work for concrete pile

7.3.3 Calculate the quantity of sub structure work for;

a. Pad Foundation

12 b. Column Stump
30/05/2022 - c. Ground Beam
05/06/2022 d. Ground Floor Slab

7.3.4 Calculate the quantity of super structure work for;

a. Column

13 b. Upper Floor
06/06/2022 - c. Roof Beam
12/06/2022

7.3.5 Calculate the quantity of finishing work for;

14 a. Floor
13/06/2022 - b. Internal and external walls
19/06/2022

3 H - Theory
1 H - Tutorial

CLO 2C PLO 2 Interactive
PLO 4A PLO 11 Lecture

SYN

ASYN

1 H - Theory

3 H - Tutorial

Interactive TEST 2 (1 H)
Lecture
CLO 2C PLO 2
CLO 4A PLO 11 SYN

ASYN

2 H - Theory

1 H - Tutorial

CLO 2C PLO 2 Interactive
CLO 4A PLO 11 Lecture

SYN

c. Ceiling

ASYN
3 H - Theory
1 H - Tutorial

KOD & NAMA KURSUS : DCC10032 – CIVIL ENGINEERING MA
KELAS : DKA1A

WEEK/ TOPIC AND SUB TOPIC CL
DATE

INTRODUCTION

• CIO distribution and briefing for course DCC10032 - CLO
CIVIL ENGINEERING MATERIALS.

• Elaborate Continous Assesment marks and activities
for whole semester.

1.0 CONCRETE MATERIALS AND MIXTURE

1 1.1 Identify the different components of concrete materials.
07/03/2022

- 1.1.1 Describe the materials in concrete mixture; cement, fine
13/03/2022 aggregate, coarse aggregate and water.

1.1.2 List the advantages and disadvantages of concrete in
the construction industry

1.1.3 List the types of cement

1.1.4 State the properties of cement in concrete mixture; the
chemical composition in cement, process of hydration in
concrete and the storage method of cement.

1.1.5 Describe the properties of aggregates in concrete;
classification and sources of the aggregates, criteria of

ATERIALS

TEACHING

LO PLO & ASSESSMENT DATE OF
LEARNING IMPLEMENTATION

ACTIVITIES 11/03/2022
[2 Hour]
2 H-Theory

O1C PLO1 Interactive
learning

SYN
ASYN

aggregates and function of the aggregates and its relation to
the strength of concrete.

1.1.6 Discuss the behavior of water in concrete mixture; role of
water in concrete mixture and the suitable water quality for
concrete mixture.

1.2 Explain the basic knowledge of concrete mixture.

1.2.1 Describe difference types of concrete mixture;
prescribed mix, designed mix and nominal mix.

1.2.2 Classify the ratio of proportions in concrete mixture
CONTINUE:

1.2 Explain the basic knowledge of concrete mixture. CLO

1.2.3 Distinguish the purposes of the following admixture in CLO
concrete mixture ; catalyzing substances, retarding
substances, water decreasing substance, plasticizing
substances, air trapping additive and easy mixing additive.
admixture in concrete mixture;
2
14/03/2022
-
20/03/2022
1.3 Make use of basic knowledge of concrete mixture to
classify fresh concrete and hardened concrete.

1.3.1 Show the relationship between fresh concrete and the
workability of concrete

1.3.2 List the factors influencing workability on fresh concrete;
water-cement ratio, aggregate-cement ration, shape and
surface texture of aggregate and admixture substance.

2 H-Theory

O1C PLO1 Interactive
learning

O3C PLO 12

SYN

ASYN

CONTINUE:

1.3 Make use of basic knowledge of concrete mixture to CLO
classify fresh concrete and hardened concrete. CLO
CLO
1.3.3 Explain the test on workability and strength of concrete;
slump test, compacting factor test and cube test.

1.3.4 Explain the criteria of hard concrete

3
21/03/2022 2.0 CONCRETE WORKS AT THE CONSTRUCTION SITE

-
27/03/2022 2.1 Determine the cause and effects of segregation and

bleeding on concrete.

2.1.1 Define; segregation and bleeding.

2.1.2 State the factors that influence segregation and bleeding
in concrete mixture

2.1.3 Describe the effects of segregation and bleeding on
quality of concrete

CONTINUE:

2.2 Apply the basic concepts of concrete works at the CLO
4 construction site. CLO
28/03/2022
- 2.2.1 Describe the following works of concrete preparation at
03/04/2022 site;batching method of concrete (volume method and

weighing method) and mixing method of concrete (manually
and using machinery.

2 H-Theory

O1C PLO1 Interactive
O2A PLO10 learning,
O3C PLO12
Discussion

SYN
ASYN

2 H-Theory

O1C PLO1 Interactive
O2A PLO10 learning,

Discussion

2.2.2 Recognize the following elements of concrete
transportation;methods of concrete transportation on site and
batching plant.

2.2.3 Explain the procedures of casting and placing of
concrete

2.2.4 Discuss the following elements of compacting concrete;

a. Purpose of compacting concrete
b. Method of compacting concrete
c. Advantages and disadvantages of compacting

concrete using vibrator and steel rod

2.2.5 Describe the method of concrete curing

3.0 REINFORCED CONCRETE

3.1 Explain about Reinforced concrete.

3.1.1 Describe reinforced concrete

3.1.2 Explain the types of steel reinforcement
CONTINUE:

3.1 Explain about Reinforced concrete. CLO
CLO
5 3.1.3 Illustrate the position and distribution of reinforcement
04/04/2022 bar

-
10/04/2022

3.1.4 Discuss the cutting and bending method of
reinforcement bar

SYN
ASYN

2 H-Theory

O1C PLO1 Interactive
O2A PLO10 learning,

Discussion

SYN

3.1.5 Identify the relationship between formwork and
reinforced concrete

4.0 PRE-STRESSED CONCRETE

4.1 Interpret pre-stressed concrete.

4.1.1 Describe pre-stressed concrete

4.1.2 Give the usage of pre-stressed concrete in construction
industry

4.1.3 Discuss the methods of pre-stressed concrete;

a. Pre-tension
b. Post-tension

4.1.4 Illustrate the types of bar or tendon for pre-stressed
concrete
5.0 TIMBER

5.1 Explain the local timber. CLO

5.1.1 Describe characteristics of local timber (density, CLO

6 moisture content, strength, durability, shrinkage, tendency to
11/04/2022 warp)

-
17/04/2022 5.1.2 Classify timber based on density, strength and types of

timber

5.1.3 Distinguish procedures of timber drying using natural
drying and tenor methods

ASYN

1.5 H-Theory Assessment :
QUIZ 1
O1C PLO1 Interactive
O2A PLO10 learning, (0.17 Hour)

Discussion

SYN PRESENTATION 1
ASYN (0.33 Hour)

5.1.4 Illustrate defects in timber or wood based on the aspect
of nature and external factors

5.1.5 Explain procedures in preserving timber treatment; coal
tar creosote, tar oil, petroleum oil, water-borne preservative
and boric acid or borax.

5.1.6 Explain method of treating timber; brushing and spraying
method, deluging, deeping and steeping method, open tank
application and pressure application.

5.1.7 Discuss wood based panel products; plywood, glue
laminated timber, fiber board and particle board.

5.1.8 Identify finishes of timber and its suitable liquid solvents

5.2 Discuss the use of local timber.

5.2.1 Explain the use of local timber to as construction
materials
6.0 BRICK

6.1 Explain about the bricks and concrete block. CLO

6.1.1 Define bricks and concrete block; clay bricks (common
7 facing and engineering brick), calcium silicate brick, sand-
18/04/2022 cement bricks and concrete block.
-
24/04/2022 6.1.2 State the properties of bricks and concrete block; clay

brick, calcium-silicate bricks, sand-cement bricks and concrete
block.

6.1.3 List the usage of bricks and concrete block

O1C PLO1 1.17 H- Assessment :
Theory PRESENTATION (Cont..)

Interactive (0.83 Hour)
learning,

Discussion

SYN
ASYN

6.2 Explain the basic knowledge of brick bonding in brickwork.

6.2.1 Describe parts and dimensions of bricks
CONTINUE:

6.2 Explain the basic knowledge of brick bonding in brickwork. CLO

6.2.2 Explain the uses of different types of cut brick CLO

6.2.3 Illustrate the following terminologies in brick bonding;
lateral or horizontal joints, vertical joints, lapped, quoin, stop
8 end, tooting or gagged and racking or step.
25/04/2022
-
01/05/2022 6.2.4 Discuss the principle of brick bonding in brickwork.

6.3 Apply the fundamental principles of brick bonding in brick
arrangement.

6.3.1 Show the types of bonds in brickwork; stretcher bond,
header bond, English bond and Flemish bond.

02/05/2022 CUTI PERTE
-

08/05/2022

CONTINUE:

9 6.3 Apply the fundamental principles of brick bonding in brick CLO
09/05/2022 arrangement. CLO

-
15/05/2022

6.3.2 Illustrate the mortar pointing and jointing

2 H-Theory

O1C PLO1 Interactive
learning

O3C PLO12

SYN

ASYN

ENGAHAN SEMESTER

2 H-Theory

O1C PLO1 Interactive
O3C PLO12 learning,

Discussion

7.0 STEEL AND NON-STEEL MATERIALS

7.1 Explain about steel and non steel materials.

7.1.1 Describe the properties and usage of steel iron; pig iron,
cast iron and wrought iron.

7.1.2 Explain the properties and usage of non-steel iron;
copper, zinc, aluminum and bronze and bronze.

7.1.3 Define non steel materials; glass, plastic and polymer,
bitumen and asphalt, paint and composite materials.
CONTINUE:

7.1 Explain about steel and non steel materials. CLO

7.1.3 Define non steel materials; glass, plastic and polymer,
bitumen and asphalt, paint and composite materials.

10 7.2 Explain the basic concepts of steel and non-steel material
16/05/2022

-
22/05/2022 7.2.1 Illustrate the connection use for joining steel; bolt and

nut, welding and rivet.

7.2.2 Describe the corrosion of steel; types of protective
coating and protection of steel

7.2.3 Describe the fundamental knowledge of non-steel
materials.

SYN
ASYN

2 H-Theory Assessment :
ASSIGNMENT 1
O1C PLO1 Interactive
learning

SYN
ASYN

CONTINUE:

7.2 Explain the basic concepts of steel and non-steel material CLO

7.2.3 Describe the fundamental knowledge of non-steel CLO
materials.

7.3 Explain the uses of steel and non-steel materials in
building element.

7.3.1 Describe the advantages and disadvantages of steel
structural

11 7.3.2 Discuss the uses of non-steel materials; glass, plastic
23/05/2022 and polymer and bitumen and asphalt.

-
29/05/2022

8.0 BUILDING ELEMENTS

8.1 Explain about building elements.

8.1.1 Define building elements

8.2 Determine the fundamental knowledge of building
elements.

8.2.1 Describe the types of window; pivoted window, hinged
window, sliding window, compound window and framed side-
hung window.

2 H-Theory

O1C PLO1 Interactive
O3C PLO12 learning,

Discussion

SYN
ASYN

8.0 BUILDING ELEMENTS

8.2 Determine the fundamental knowledge of building CLO
elements. CLO

8.2.2 Describe the types of door; flush door, panel door and
12 timber door.
30/05/2022
- 8.2.3 Described the types of staircase; straight run staircase,
05/06/2022 quarter-twist staircase, half-run staircase and geometry

staircase.

8.2.4 Describe the types of roof; flat roof, gable roof, hipped
roof and lean-to roof.

CONTINUE:

8.3 Explain the concept of building elements. CLO

8.3.1 Discuss the installation of building elements according to CLO
the building concept

13
06/06/2022 9.0 FINISHES

-
12/06/2022

9.1 Explain about building finishes.

9.1.1 Define building finishes

9.1.2 List the criteria in selection of building finishes

O1C PLO1 1.33 H- Assessment :
O3C PLO12 Theory TEST 1

Interactive (0.67 Hour)
learning

SYN
ASYN

2 H-Theory

O1C PLO1 Interactive
O3C PLO12 learning,

Discussion

SYN
ASYN

9.2 Interpret the fundamental knowledge of building finishes.

9.2.1 Describe the types and properties of floor finishes;
mosaic, clay tiles, concrete tiles, marble, terrazzo, granite tiles
and wood strip and parquet.
CONTINUE:

9.2 Interpret the fundamental knowledge of building finishes. CLO

9.2.2 Describe the types and properties of ceiling finishes; lime CLO
plaster, cement plaster, tyrolean plaster, gypsum plaster,
wood strips, soft board and plywood.
14
13/06/2022 9.2.3 Describe the types and properties of roof finishes;
- concrete and clay roof tiles, aluminum sheets, zinc and
19/06/2022 asbestos.

9.3 Apply the building finishes according the building concept.

9.3.1 Choose the suitable finishes to enhance the building
concept.

2 H-Theory

O1C PLO1 Interactive
O3C PLO12 learning,

Discussion

SYN
ASYN


Click to View FlipBook Version