Warranty Manual (Complete)

Warranty Manual (Complete)

n Wenger Warranty

Wenger Corporation warrants that the Strata Decks (pit filler) purchased by Berglund
Construction, and delivered to Francis W. Parker School, located in Chicago, IL, under normal
use and service, be free from defects for five(5) years from date of substantial completion, which
is February 24, 2009.

Wenger's duty under this warranty is limited to repair or replacement, without
charge to the purchaser during the period of this warranty, of such parts as
shall be acknowledged by Wenger to be defective.

This warranty shall apply only if the product has been operated in accordance with
procedures recommended by Wenger. It shall not apply ifthe product has been subject to
misuse, negligence, accident, or vandalism, nor if it has been altered or repaired outside
Wenger's place of business in a manner that, in the determination of Wenger, shall
have affected its performance, stability or reliability.

Any implied warranty of merchantability or fitness is limited to the duration of this express
warranty.

Wenger shall not be liable for any direct, indirect, incidental or consequential damages arising
out of failure of a Wenger product or any of its parts, except for personal injuries and/or
property damage resulting directly from such failure. Wenger shall never be liable for breach
of warranty, whether express or implied, including any implied warranty of merchantability or
fitness, in an amount greater than the purchase price of the product described by this warranty.

Before Wenger will repair or replace any product claimed to be defective, the purchaser must
notify Wenger at the address below and permit examination by Wenger, which must establish
satisfactory proof of defect in material or workmanship. Ifthe examination establishes defects,
Wenger will repair or replace the defective parts.

The terms ofthis warranty constitute the purchaser's sole and exclusive remedy.

1v1Ul« tkJ

Traci Ehric;h
Project Coordinator
Wenger Corporation
555 Park Drive, Box 448
Owatonna, MN 55060

June 3, 2009

WENGER CORPORATION

I I I555 Park Drive P.O . Box 448 Owatonna, MN 55060-0448 telephone 507.455.4100 iacsimile 507.455.4258 internet wengercorp.com

Wenger Warranty

Wenger Corporation warrants that the Strata Decks (pit filler) purchased by Berglund
Construction, and delivered to Francis W. Parker School, located in Chicago, IL, under normal
use and service, be free from defects for five(5) years from date of substantial completion, which
is February 24, 2009.

Wenger's duty under this warranty is limited to repair or replacement, without
charge to the purchaser during the period ofthis warranty, of such parts as
shall be acknowledged by Wenger to be defective.

This warranty shall apply only if the product has been operated in accordance with
procedures recommended by Wenger. It shall not apply ifthe product has been subject to
misuse, negligence, accident, or vandalism, nor if it has been altered or repaired outside
Wenger's place of business in a manner that, in the determination of Wenger, shall
have affected its performance, stability or reliability.

Any implied warranty of merchantability or fitness is limited to the duration of this express
warranty.

Wenger shall not be liable for any direct, indirect, incidental or consequential damages arising
out of failure of a Wenger product or any of its parts, except for personal injuries and/or
property damage resulting directly from such failure. Wenger shall never be liable for breach
of warranty, whether express or implied, including any implied warranty of merchantability or
fitness, in an amount greater than the purchase price of the product described by this warranty.

Before Wenger will repair or replace any product claimed to be defective, the purchaser must
notify Wenger at the address below and permit examination by Wenger, which must establish
satisfactory proof of defect in material or workmanship. Ifthe examination establishes defects,
Wenger will repair or replace the defective parts.

The terms ofthis warranty constitute the purchaser's sole and exclusive remedy.

Project Coordinator
Wenger Corporation
555 Park Drive, Box 448
Owatonna, MN 55060

( J June 3, 2009

WENGER CORPORATION

I I I555 Park Drive P.O. Box 448 Owatonna, MN 55060-0448 telephone 507.455.4100 facsimile 507.455.4258 internet wengercorp.com

555 PARK.DR I
OWATONNA, MN 55060
Date: June 3, 2009
n Ph: (800) 326-8373 Ext. 147
[email protected] Wenger 1461760
Order#
I LETTER OF TRANSMITTAL

To: Berglund Construction
Attn: Merrell Jones
111 E Wacker Drive Suite 2450
Chicago, IL 60601

Subject: Closeouts-Francis W Parker School

Cooies Document Tvoe Descriotion
3 Wenger Warranties Strata Pit Filler
Owner Manuals
3 Orchestra Pit Filler

Hi Merrell,
Please let me know if you need anything else in terms of closeout documents.

1;~- ~

Traci Ehrjch
Project Coordinator

WENGER CORPORATION

I I I555 Park Drive P.O. Box 448 Owatonna, MN 55060-0448 telephone 507.455.4100 facsimile 507.455.4258 internet wengercorp.com

BERGLUND Transmittal
F CONSTRUCTION
Project: 506043-FWPS North Wing Ren. & Add.
Establish•d 1911
Architect's 200 5.18.00
Berglund Construction Company Project No.:
111 E. Wacker Drive, Suite 2450
Chicago, IL 60601 Transmittal No.: 269
Phone: 312.726. 6624
Fax: 312.726 .6629 Date Sent: 03/ 26/10

From: Merrell Jones
Berglund Construction Company
Phone: (312) 726-6624, Ext. 3359
Fax: (312) 726-6629
E-mail: mjones@berg lundco.com

To: Damian Jones Items listed are being sent

Francis W. Parker School 0 Enclosed
330 West Webster Avenue D Under Separate Cover
Chicag o, IL 60614

Phone: (773) 797-5103 Via: Messenger Service to Francis Parker

Fax: (773) 549-4669

E-mail: [email protected] FedEx Ground to Nagle Hartray

cc: Dirk Danker - Nagle Hartray Danker Kagan (Tracking No. 871896410020772)

McKay Penney Architects Ltd. - Phone: (312)

425-1000 - Fax: (312) 425-1001,

Chad Matesi - Project Management Advisors,

Inc. (TRANSMITTAL ONLY)

BCC File

!subject: Closeout Documents: Warranties

We are transmitting the following to you:

D Architectural Drawings D 0 & M Manuals D Addenda 0 Other: Closeout
D Engineering Drawings 0 MSDS/Reports D Change Orders
D Shop Drawings D Product Data D Contract Warranties
D Plans D Samples D Letters
D Prints D Specifications D Payment Application

Specification Architect's Comments (7/13/09) Comments Number of
Copies
07141: 2 year installer warranty specified. 1- All Sealants' REVISED warranty 2
year submitted enclosed. Please insert behind tab 12
(Waterproofing) of the Warranty Manual. 2
07142: 2 year installer warranty specified. 1- (The All Sealants' one-year warranty 2
07550 : year submitted currently inserted may be discarded.)
No warranty documentation submitted Same as Above 2
2
07811: 2 year manufacturer's warranty Jones & Cleary warranty enclosed, along
08211: specified, to be signed by the installer. with manufacturer's 20 year warranty.
1-year submitted Please insert behind tab 14 (Membrane
Life of Installation warranty specified. Roofing) of the Warranty Manual.
Spray Insulations' warranty enclosed.
Please insert behind tab 15 (Sprayed
Fireproofing) of the Warranty Manual.
Eggers manufacturer warranty from

Transmittal - (Page 2 of 3)

Project: 506043-FWPS North Wing Ren. & Add .

Establish•d 1911 Architect's 2005.18.00
Project No.:

Transmittal No.: 269

Date Sent: 03/26/10

NOTE 08411: 1-year submitted Palatine Builders' Sunnly. Please insert 0
08520: No warranty documentation submitted behind tab 18 of Warranty Manual. 0
08911 : No warranty documentation submitted To Be Submitted at a Later Date 0
10101: No warranty documentation submitted 2
11000: 50 year warranty specified. 1-year [ o Be Submitted at a Later Date 2
11132: submitted 2
[ o Be Submitted at a Later Date
12660: Incorrect date noted for start of warranty 2
Previously submitted. Refer to Claridge
14240: No warranty documentation submitted warranty under Section 29 in Warranty 2
Manual. (Copy has been attachedfor your
15000: 10 year warranty specified. 1-year reference.) 2
submitted Gala Systems REVISED warranty
15975: enclosed. Please insert behind tab 31 of 2
16000: No warranty documentation submitted Warranty Manual. 2
Carney & Co. warranty enclosed for
1-year guarantee specified to commence Projection Screens. There was no tab
from the date of acceptance of work. originally created for this category in the
Submitted guarantee commences from Warranty Manual. Therefore, please insert
the subcontractor's presumed date of this warranty behind tab 39, which will not
completion for the various equipment be used. For your convenience, I have
and systems. attached two (2) labels in order to re-label
No warranty documentation submitted tab 42 to read "42 ) Projection Screens".
Jezet Seating REVISED warranty
No warranty documentation submitted enclosed. Please insert behind tab 3~of
Warranty Manual. (The Jezet Seating one-
year warranty currently inserted may be
discarded.)
Previously submitted. Refer to
ThyssenKrupp warranty under Section 38
in Warranty Manual. Note: Warranty
date reflects date offinal acceptance and
will not be revised. (Copy has been
attached for your reference.)
See attached letter from Berglund Project
Executive, Larry Wiley, along with
manufacturer warranties submitted by
Westside Mechanical. Please insert
behind tab 45 of Warranty Manual.

Previously submitted. Refer to Johnson
Controls' warranty under Section 46 in
Warranty Manual. (Copy has been
attached/or your reference.)
Block Electric warranties enclosed.
Please insert behind tab 47 of Warranty
Manual.

Transmittal - (Page 3 of 3)

Project: 506043-FWPS North Wing Ren. & Add.

E•tabli•hed 1911 Architect's 2005.18.00
Project No.:

Transmittal No.: 269

Date Sent: 03/26/10

Notes: Mr. Jones,

For your use, please find enclosed subcontractor and manufacturer warranties (in duplicate) that were not
previously included in the Warranty Manuals for the North Wing project. For your convenience, I have also
enclosed two (2) copies of a revised Table of Contents for each of your manuals, along with a quantity of
sheet protectors.

A copy of each warranty will also be submitted to Mr. Dirk Danker at Nagle Hartray for reference.

If you have any questions or concerns, please feel free to contact me at the number as listed on page 1 of
this transmittal.

Thank you.

_...,,,,..215~ ~--- Merrell Jones - Administrative Assistant 03/26/10
----.-~-------- ~----- Printed Name - Title Date
From Signatw

II II

NagleHartrayDankerKaganMcKayPenney

312.425.1000
312. 425.1001
w.w1.nhdkmp.com

' 30 West Monroe Street
Chicago, Illinois 60603
~, Ntemorc:tndum / / ,/ ~ - , , ~

Date: 13 July 2009

Re: Francis W. Parker School - North Wing Renovations & Additions
Project Close-out documentation: Warranties
NHDKMP No. 2005.18.00

To:
Damian Jones, Bob Haugh, Chad Matesi, Roger McCarron, Larry Wiley

Via: email

From: CC:
Andrew Gale Dirk Danker

Comments:

NHDKMP has reviewed the warranties submitted by Berglund Construction Company in partial fulfillment of the close out
procedures for the above listed project. We note the following deviations from the contract documents:

07141: 2 year installer warranty specified. 1-year submitted
07142: 2 year installer warranty specified. 1-year submitted
07811: 2 year manufacturer's warranty specified, to be signed by the installer. 1-year submitted
07550: No warranty documentation submitted
08211: Life of Installation warranty specified. 1-year submitted
08411: No warranty documentation submitted
08520: No warranty documentation submitted
08911: No warranty documentation submitted 10101: 50 year warranty specified. 1-year submitted
11000: Incorrect date noted for start of warranty
11132: No warranty documentation submitted
12660: 10 year warranty specified. 1-year submitted
14240: No warranty documentation submitted
15000: 1-year guarantee specified to commence from the date of acceptance of work. Submitted guarantee commences from the
subcontractor's presumed date of completion for the various equipment and systems.
15975: No warranty documentation submitted
16000: No warranty documentation submitted

Thank you,
Andrew Gale

Merrell Jones Merrell Jones
Monday, March 29, 2010 5:51 PM
From: 'Chad Matesi (PMA)'
Sent: Dirk Danker (Nagle Hartray); [email protected]; Larry Wiley
To: Francis Parker North Wing Warranties Submitted to Owner
Cc: Warranties Submitted per Architect's Comments.pdf
Subject:
Attachments:

Chad,

Per NHDKMP's memo dated 7/13/09, we have submitted to the Owner all of the outstanding warranties with the
exception of 08411, 08520, 08911, which will be submitted at a later date. We have also sent a copy of those warranties
to Mr. Dirk Danker at Nagle Hartray for record.

Please feel free to contact me if you have any questions or concerns.

Thank
you.

BERGLUND CONSTRUCTION

Tracking:

1

Recipient Delivery
'Chad Matesi (PMA)' Delivered: 3/29/2010 5:51 PM
Dirk Danker (Nagle Hartray)
[email protected]
Larry Wiley

2

Merrell Jones Bergemann, Todd J. [[email protected]]
Wednesday, August 26, 2009 7:25 AM
(/~-\rom: Merrell Jones
Jent: Larry Wiley; Sepe, Sarah
To: RE: Revised Warranty Date Required for Francis Parker Closeout Documentation
Cc: Francis Parker School- EX3801 (1yrFS)T.pdf; FPS proposal.pdf
Subject:
Attachments: Closeout (5-06043)

Categories:

Merrell I Larry,

The elevator was accepted for public use on 2/5/09 thus begins the 1 year warranty. (see attached}

Should the Owner want the 1 year warranty to begin on 2/24/09 then additional costs will be required to compensate
for the "temporary use" of the elevator between 2/5/09 and 2/24/09.

Pursuant to our proposal, the monthly costs for temporary use are $800 per month therefore added costs for this
instance would be approximately $600 dollars. (see attached, page 2)

PLEASE NOTE ..... In speaking with our service department concerning the warranty, they indicated the possibility that
should a maintenance agreement be signed with ThyssenKrupp Elevator that our service department would be willing to
cover the additional warranty at no charge within the signed agreement. If this option is desired, please have the
Owner contact Sarah Sepe at 708-932-9283 to discuss maintenance options.

an ks and let me know of any questions.

Regards,
Todd Bergemann
New Installation Sales
ThyssenKrupp Elevator
2305 Enterprise Drive
Westchester, IL 60154
PH: 708-236-7502
FX: 708-236-7535
www.seewhatwebuilt.com

From: Merrell Jones [mailto:[email protected]]

Sent: Tuesday, August 25, 2009 5:12 PM

To: Bergemann, Todd J.
Cc: Larry Wiley

Subject: Revised Warranty Date Required for Francis Parker Closeout Documentation

Good Afternoon Todd,

The Architect on the Francis Parker North Wing project has reviewed Thyssen's submitted warranty and noted that the
Final Acceptance Date needs to be revised to February 24. 2009.

( ·;indly resubmit your warranty (in triplicate) to my attention by the end of the week.

"'~-~"

If you have any questions or concerns, please don't hesitate to call.

1

Thank you.
BERGLUND CONSTRUCTION

2

FINAL ACCEPTANCE.

DATE cJ./Cz'/4 :/

TO: THYSSENKRUPP ELEVATOR STREET ADDRESS 3 3 '2 tA/. W lii:t<3,£:r4 t2

re10 .sµ.·1e. v 1.::. tc c J"'/G £.

I .Jo ei ~~ d-.3&-. ?S.3 l:J

BUILDING THYSSENKRUPP ELEVATOR THYSSENKRUPP #OF KEV(S) RECEIVED
ELEVATOR ID NO. CONSTRUCTION CONTRACT NO. FACTORY SERIAL NO. KEYS KEY AND KEY NUMBER

bllf~Pc~ndent H ~ 3 L<'f

'-F'a"t"'r ·f1 v';J .:1 ri<

A Fire Service 0 i../~ .3 (1 S

· c.H1o4i/sttw_,a.. ypDRoto.r .~M1...#oce,,l1<<~.aJGr
/$m l&-1(. P 1./ /::>IlfJ L..S -J-d S'c /I/,,U IO Lt.:.t( 1£"11£...;(_ S ttE •/if!..f/ I
Gentlemen:
s' .
ti~ 0 _ Other:
.. I! q /iJ

We have examined the above listed elevator(s} furnished and completed by you in the above building under the terms of a

contract between us dated . The equipment as installed appears to be

satisfactory and in accordance with th~ contract and we hereby·accept it under the terms and guarantees of said contract, and

acknowledge receipt of all keys as shown above.

ACCEPTED BY:

L;o .Owner I Arch.PE ?bl ..U I'\..)D P u r c h a s e r - -T-ype-orP-lfn-t - - - - - - - - -
Aay'--,1 _.\'(.l~~~ Type or Print

I

TY!l"°tor Print

~ , Signature of Authoiaed Official Signature of Authoraed Offlclal
loTDaittlee__/~'--_7~..~Q+i..~_hf_'..-u.-..¥',___.,,-,,_r;._.Ty_pe_o,r P.rin__t -_-.._--_--_--_-
Title _ _ _ _ _ _ _-=----::~------

Type or Print

Date _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

. ThyssenKrupp Representative _ _ _ _ _ _ _ _ __

DO NOT WRITE BELOW THIS LINE.

ThyssenKrupp Elevator •

l!IU I l&I"" ~"'Pl.\.I

.·J ThyssenKrupp Elevator

r'~~ate: ~I '"I I a> 5 ELEVATOR COMPLETION CHECKLIST (page 1/2)

'r ."!Jlldlng Name: flf/MJ41"J ,&>Mkl.l..< .:µ::.#.ea L Speed: A@

sBuilding Address: >'a rd. w11u9:1rgee . maCapacity:

City: a,;;1e44ea State:_r.......,<._.. _ _ _ _ _ _ _ __

Elevator Serial Number: £2(..?@d ( Bulldlng ID Number:__.(_ _

1
2

3
4
5
6
7
8
9

10

11 allon can for twin ost.
12
13
14
15
16
17
18
19

min both directions. Ad ustments P17 P18

ressure, sealed and ta ed

1
2
3
4
5
6
7
8
9
10
11
12 ermits.
13
14
15

revent overheatin a-brake coil.

ThyssenKrupp Elevator

ELEVATOR COMPLETION CHECKLIST (page 2f2)

1
2
3
4
5
6
7
8
9
10
11
12
13
14

15
16
17

18
19
20

1
2.
3
4
5
6 for office file
7

ThyssenKrupp Elevator

HYDRAULIC INSPECTION & TEST

ANNUAL TEST (FILL OUT SEPARATE REPORT FOR EACH ELEVATOR)

DATE ~/'f/&Cf

ACCEPTANCE TEST OFFICE& f·C,,.wtt.:S'T41-llf/.:d"TeP(

NAME OF BUILDING lieA.41<-;6~/l ,..q,,~ LOCATION :J,,:ia W• wtlt1S-·a?:~
ELEVATOR SERIAL NO. ~-1.f!!g[l_ CITY & STATE t:UhcA·40 .:CL .

(IF NONE, USE MOTOR OR CONTROL SERIAL NO.) THYSSENKRUPP SERVICE CONTRACT N O . - - - - - . - - -
JOB NO. a'/d::"4¥.)>~<1" (
BUILDING ELEVATOR NO. CUSTOMER P.O. NO.
MAKE OF ELEVATOR ttCe. RATED CAR SPEED tr.La F.P.M. RATED CAPACITY l.f.S'()D LBS.
TYPE OF ELEVATOR A4.S..:$

RATED CAPACITY TEST

TO COMPLY WITH AMERICAN NATIONAL SAFETY CODE ANSI A17.1RULE303 AND RULES 1005 &1006. FLEX HOSE REPLACEMENT

REQUIRED NOT MORE THAN 6 YEAR INTERVAL.

Flex Hose and Fittings Tested at Relief Pressure For 30 Sec. Hose Replacement Date _ _ __

HPhoysseicTaalgDgiemdeWnsitiohnRoefpRlaecseemrveonirt D_ate_&_SAE_Ty_pe _ _ _ _C_on_ditio_n o_f Re_ser_voir_O_ _i l_- -_-_-_-_-_- -_-_

Make (3) Round Trips Before Setting Relief Valve ..L

Test the relief valve setting by first inching the empty car up to engage the plunger stop ring, and then by applying additional pump

pressure as required to check the setting. The maximum setting must be no greater than 125% of working pressure to comply with the

American National Safety Code ANSI Al7.1 Rule 1005 & 303.
Relief Valve Setting '9~0 P.S.I. (Should be 125% of Heavy Load Up Working Pressure)

Corrected Relief Valve etting P.S.I. (If Required)

No Load Working Pressure: Up I 4?0 P.S.I.

No Load Car Speed: Up F.P.M. Down F.P.M.
Relief Valve Sealed: >'JI/? S
NOTE: Code Requires Relief Valve Setting Be Sealed.

See Rule 1005 and locate car at any convenient level. Open the disconnect switch and locate the elevation of the platform with respect to a
convenient reference. Do not shut off any valves in the line. Provide adequate timbers or pipe as well as safety slings to support car and
load if entering the pit.

Tank Oil Level At Start of Standing Test Tank Oil Temperature At Start of Standing Test - - - - -

After a minimum of 15 minutes, note the position of the platform with respect to the chosen reference.

Length of Time Car Standing-Empty Amount Car Settled During Standing Period - - - - - -
Oil Temperature At End of Standing Period Tank Oil Level At end of Standing Period _ _ _ __

Amount of Leakage At Packing During Test Condition of Piston P a c k i n g - - - - - - - - -

NOTE: A CHANGE IN CAR POSITION WHICH CANNOT BE ACCOUNTED FOR BY VISIBLE OIL LEAKAGE OR TEMPERATURE CHANGE OF THE
OIL INDICATES A LEAK IN THE CYLINDER OR IN THE UNDERGROUND PIPING, AND NEED FOR FURTHER INSPECTION TESTS OR REPAIRS.

Pres. Switch RWuolerk3in0g6.P1r4esTsuersete:dUp&/ ~~j_iii P.S.I.
*Heavy Load Up ~-...,..._--~,.,,.--..,---F.P.M.

*Heavy Load Car Speed: Down F.P.M.
NStoarnmdablya(nEdmFeinrgael nTceyrmBiantatel rSytoLpopwinegrinDge) vPicoewseTr eOpserat.e..,d.tid'i~~n~.T!;'"-1eset-.e""!'d>-..;i-v...,-,""'e:,..,,..5,_;- _ _ _ __

Power Door System Tested: Torque .l:e' # KinetiCC Ft.#

C!::.JEmergency Terminal Speed~ing Device Tested
Was the Test Satisfactory: No If not, explain._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Representative of the Insurance Company, City or State Inspector or Owner, Present at test:

(Indicate Name and Title)

MECHANIC'S SIGNATURE _ _ _ _ _ _ _ _ _ __ SUPT. SIGNATURE - - - - - - - - - - -
Copy of this Report Given to Customer: Yes No CUSTOMER'S SIGNATURE _ _ _ _ _ _ _ _ __

*Acceptance Test Only WHITE-BRANCH COPY YELLOW-CUSTOMER COPY PINK-ZONE COPY

MAHl&T0301

ThyssenKrupp Elevator

March 5, 2006

Attn: Larry Wiley
Berglund Construction

Re: Francis Parker School Addition (Revision #3)
Chicago, IL

We are pleased to submit the bid price of $114,750.00 (One Hundred Fourteen Thousand Seven Hundred
Fifty Dollars, excluding taxes) to furnish and install one (1) pre-engineered Continental 45 (plan II) HOLED
hydraulic passenger elevator. This quotation is based upon our standard proposal and includes all
permits and one inspection fee.

CHARACTERISTICS OF PROPSED EQUIPMENT:

Capacity: 4,500 lb. Machine room: Adjacent @ LL
Free Service:
Speed: 150 fpm Min. Hoistway Size: 12 months
Required Overhead:
Stops: 3 (3 front I 1 rear ) Required Pit: 7'-4" x 10'-9 1/2"

Travel: 21'-10" 13'-11"
4'- O"
Doors: Two-speed 4'-0" X 7'-0"

Car Enclosure: We are providing our standard ThyssenKrupp design (TKAP) raised plastic laminate wall panels with
stainless steel #4 reveals. Our standard suspended fluorescent lighting with baked enamel frame. Stainless steel
#4 cab doors with stainless steel #4 fronts. Aluminum door sills. Exhaust fan and two (2) stainless steel #4
handrails.
Hoistway Entrances: We are providing our standard, bolted stainless steel #4 frames and doors. Aluminum door
sills at all floors.
Cab Fixtures: We are providing our standard "Aurora" design car fixtures. With this design, we are providing
illuminated car and hall pushbuttons with stainless steel #4 faceplate finish. Position indicator (in-car) with car
direction lantern.
Hall Fixtures: We are providing our standard "Aurora" design hall fixtures with hall position indicator at ground floor.
Additional Features: Elevator pads and hooks. Viscosity Control. 9'7" tall cab (9'0" inside clear). Keyswitches.

INSTALLATION & DESIGN CRITERIA:

• Proposal price does NOT include stage lifts. ThyssenKrupp Elevator does not manufacture or install stage lifts.

• Electrical information of building has not been reviewed. Elevator will utilize a 50 H.P. motor with solid state

starting. Proper power supply and circuit protection to be provided by others.

• Proposal price is based upon utilizing a indoor drill rig. Adequate space and floor support (if required) must be
provided by others. A 10,000 lb. capacity hoistbeam must be provided. Street parking is to be provided by
others within 75' of hoistway access. Any permits are to be paid by others. Spoils shall remain on-site just
outside of building. Spoils are to be removed by others.

• Proposal price does NOT include hall lanterns. See ALTERNATES, if equipment is desired.

• Adequate storage must be provided adjacent to the hoistway at ground level. If storage is not available, a
storage container is required to be provided by others. If a storage container is utilized, double handing costs
will apply and additional charges will follow.

• If a drywall shaft is to be utilized, adequate rail bracket support (tube steel) is to be provided by others, in
locations determined by ThyssenKrupp Elevator.

• Proposal does not include any MBE I WBE I Chicago Residenty or similar requirements. We will not be held
responsible for any associated damages by not meeting any specified requirements.

• OSHA approved barricades are to be provided by others surrounding the work area at each floor.

2305 Enterprise Drive
Westchester, IL 60154
Phone: (708) 236-7502
Fax: (708) 236-7535
E-Mail: [email protected]
Internet: www.ThyssenKruppElevator.com

ThyssenKrupp Elevator

QUALIFICATIONS & DIVISION 14 EXCEPTIONS:
1. Pricing is based upon architectural plans dated 10/02/06 and elevator specifications. Final

pricing is contingent upon review of complete project plans, project manual and contract
documents.
2. Pricing is based upon building completion prior to December 31, 2008. Should installation exceed completion
date, ThyssenKrupp Elevator shall be entitled to recover associated costs with the IUEC local 2 labor wage
increase.
3. Finished floor and grouting by others.
4. One set of our standard manuals will be provided
5. Specification 14240-1 1.1 B- Equipment in "related sections" are to be provided and installed by others, with
the exception of inserts (if CMU shaft) for guide rails. These will be supplied by TKE and installed by others. If a
drywall shaft is utilized, rail bracket support (tube steel) is to be provided and installed by others.
6. Specification 14240-1&2 1.3 B & E-We are providing our standard shop drawings. These do not indicate
variations from specified equipment. Variations are listed in this proposal. We are providing our OST (on-board
service tool) for diagnostic purposes. We are not providing any additional diagnostic or monitoring equipment
which may be available to our installers or maintenance personnel.
7. Specification 14240-4 2.4 B- We are providing our standard car control station. This is not "semi-recessed".
8. Specification 14240-5 2.4 D- We are not providing a fireman's phone jack. This equipment is outdated.
9. Specification 14240-5 2.4 G - See alternates, if desired.
10. Specification 14240-6 2.6 A 6 -We are providing our standard suspended ceiling as later specified. We are
not providing a polished metal ceiling.
11. Specification 14240-6 2.7 B-We are providing our standard bolted stainless steel #4 frames & doors. These
do not contain welded corners.
12. Specification 14240-7 2.8 A 5 c - We are providing a battery powered lowering system as "standby powered
lowering". Additional dry contacts are to be provided by electrical is elevator disconnect.
13. Specification 14240-8 3.2 A 1-We are providing a steel casing to retain well hole. This is not waterproof.
14. Specification 14240-9 3.5 - Temporary use can be provided for additional costs and by signing ThyssenKrupp
Elevators temporary acceptance form. Protective coverings are to be provided and installed by others.
ThyssenKrupp Elevator will not be responsible for damages caused by others trades. Refurbishment can be
provided for additional costs on a T& M basis. Our standard billing rates shall apply.
15. Specification 14420 -We are not providing our installing this equipment. This equipment is to be by others.

ALTERNATES:
);:> ADD $2A50 dollars to proposed price if hall lanterns are to be utilized in lieu of our standard car riding
lantern.
);:> ADD $800 dollars (PER MONTH) for temporary construction use of the elevator. Price does NOT include
operator time, refurbishment or temp communication system.
);:> ADD $109 dollars (PER HOUR) for an operator to run the elevator during temporary use.

CLARIFICATIONS:

• Installation of elevators will commence upon turnover of enclosed hoistway for our uninterrupted use, and a

code compliant machine room equipped with 3-phase power of 208/480 volts.

• We have provided a 200-pound flooring weight allowance. Should actual floor weight or additional cab weight

exceed 200 pounds, additional costs may follow. Finished floor by others.

• Hoistway entrance wall thickness can not exceed 12". If entrance wall thickness exceeds 12", additional costs

will follow due to frame modification.

• Our hoistway entrances do not require steel angle supports for the door sills. ThyssenKrupp Elevator utilizes an

entrance arrangement that eliminates the need for this angle and the associated material I labor costs. Our sills

do not require grouting under the sill, but may require grouting between the face of the sill and the finished floor

(grouting by others). ,

• We have not reviewed the construction schedule. Should special measures need to be taken, additional cost

may follow.

• On site storage, approximately 25' X 25' per elevator adjacent to the hoistway at grade level is required.

• If off-site storage is necessary, you will be charged additional costs to cover additional material handling,

transportation and storage.

2305 Enterprise Drive
Westchester, IL 60154
Phone: (708) 236-7502
Fax: (708}236-7535
E-Mail: [email protected]
Internet: www.ThyssenKruppElevator.com

ThyssenKrupp Elevator

• There will be additional charges for labor incurred for extra loading and unloading (double-
handling) plus monthly charges for storage if contractor is not ready for us on requested ship
date.

• There will be a remobilization charge if we have to pull off the job and return.
• This proposal is based upon 1998 ASME, Al 7.1 code. Should 2000 ASME, Al 7.1 code be required, additional

costs will follow.

This quotation is subject to the following conditions:
1. Our price will remain effective for thirty (30) days.
2. Pricing is based upon elevator installation completed by December 31, 2008. If elevator installation shall

exceed completion date, we shall have the right to adjust our labor rates according to Local 2 union wage
increase.
3. We have not included any special equipment to meet any seismic zone (code) requirements.
4. It is expressly understood that we are not obligated to accept a contract at the quoted price, unless a mutually
satisfactory schedule can be established prior to the execution of a contract.
5. A hoist beam is required in each elevator overhead for hydraulic elevators and each elevator machine room for
traction elevators. It must be designed for an 8,000-pound center point load for hoisting. This beam is not
included in our proposal.
6. ThyssenKrupp Elevator, Central Region, will perform work per the approved contract. The unit/units shall not be
released for use until all code requirements are satisfied, and the approval of and necessary permits from the
responsible inspection authority have been obtained.
7. Proposal includes union labor only. No MBE, LBE, WBE, DBE, Residency or similar requirements.
ThyssenKrupp Elevator will not be held accountable for any associated costs or damages.
8. This proposal is contingent upon ThyssenKrupp Corporation's legal department reviewing and approving
general and special conditions for the project, as well as the final contract document.
9. In the event ThyssenKrupp Corporation is required to afford additional insurance coverage pursuant to the
terms and conditions of the subcontract - contract of any other contractual documents, the additional insurance
coverage shall not include for the acts, actions, omissions, or neglects of the additional insured.
10. We must have a change order signed by an authorized representative of your company in order to proceed with
any additional work beyond the contract scope.
11. ThyssenKrupp Elevator will perf.orm its own cleaning on the job-site. We will not accept any additional cleaning
· cost. If our cleaning is not adequate, we must be notified in writing so we may take corrective action.
12. Terms of payment: Payment be shall due th~ first day of each month for 90% of material and labor incorporated
in the work including material suitably stored at the site or other agreed upon location. Upon completion of 50%
of our work, the retention shall be reduced to 5%. Before the "Final Acceptance" of the elevator(s),
ThyssenKrupp must have received 95% of all payments due (including any change orders). ThyssenKrupp
must be provided final payment (retention) within (30) days of the "Final Acceptance".
13. ThyssenKrupp Elevator shall not be held responsible for delays caused by other trades.
14. We shall not be required to attend weekly project meetings. We will attend on an as needed basis only.
15. This proposal and our "work not included" sheet will be amended to all subcontracts.

Lead Times: (subject to change according to factory volume)
);>- Three (3) to Four (4) weeks for elevator submittals after a letter of intent or contract is reviewed.
);>- Twelve (12) to Fourteen (14) weeks for fabrication after all approvals and executed contract are returned.
);>- One (1) week for the elevator to ship to the jobsite.

»- Approximately Six (6) weeks (per elevator) for installation. We must have a completed hoistway, completed .

machine room, and permanent power to begin installation.

Should you have any questions, please do not hesitate to contact me at 708-236-7502.

TSoindcd~erBeleyf,rgle~_J,..'~~

New Installation Sales

2305 Enterprise Drive
Westchester, IL 60154
Phone: (708) 236-7502
Fax: (708) 236-7535
E-Mail: [email protected]
Internet: www.ThyssenKruppElevator.com

ThyssenKrupp Elevator

NEW INSTALLATION & EXISTING BUILDING
WORK NOT INCLUDED

A legal hoistway, properly framed and enclosed, and including a pit of proper depth provided with ladder, sump pump,
lights, access doors and waterproofing, as required. Dewatering of pit(s). Legal machine room, adequate for the elevator equipment, including
floors, trap doors, gratings, foundations, lighting, ventilation and heat to maintain the room at an ambient temperature of 50 degrees. Fahrenheit
minimum 90 degrees Fahrenheit maximum, non-condensing. Adequate supports and foundations to carry the loads of all equipment, including
support for guide rail brackets. Adequate bracing of entrance frames to prevent distortion during wall construction. When required, divider
beams at suitable points shall be provided for guide rail bracket support.

It is agreed that in the event asbestos material is knowingly or unknowingly removed or disturbed in any manner at the jobsite, you will monitor
our work place and prior to and during our manning of the job, you will certify that asbestos in the environment does not exceed .01 fibers per cc
as tested by NIOSH 7400. In the event our employees or those of our subcontractors are exposed to an asbestos hazard, PCP's, lead or other
hazardous substances, you agree to indemnify, defend, and hold us harmless from all damages, claims, suits, expenses, and payments resulting
from such exposure. Identification, notification, removal and disposal of asbestos containing material, PCP's lead or other hazardous substances
is the responsibility of the contractor.

All sill supports, including steel angles where required, and sill recesses (if sill angles not supplied by Elevator Contractor) and the grouting of
door sills. Provide O.S.H.A. compliant removable temporary enclosures or other protection (barricades and kickboards) from open hoistways
during the time the elevator is being installed (protection must allow clearance for installation of entrance frames). The Contractor agrees to
indemnify, defend and hold us harmless from any OSHA citations we may receive as a result of contractor's non-compliance with OSHA
standards. Proper trenching and backfilling for any underground piping and/or conduit. Cutting and patching of walls, floors, etc., and removal of
such obstructions as may be necessary for proper installation of the elevator. Setting anchors and sleeves. Pockets or blockouts for signal
fixtures. Structural steel door frames with extensions to beam above if required on hoistway sides and sills for freight elevators, including finish
painting of these items.

Suitable connections from the power main to each controller and. signal equipment feeders as required, including necessary circuit breakers and
fused mainline disconnect switches per NEC. Wiring to controller for car lighting. (Per N.E.C. Articles 620-22 and 620-51). Electric power
without charge, for construction, testing and adjusting of the same characteristics as the permanent supply. A means to automatically disconnect
the main line and the emergency power supply to the elevator prior to the application of water in the elevator machine room will be furnished by
the electrical contractor. This means shall not be self-resetting. Wiring and conduit from life safety panel or any other monitor station to elevator
machine room or suitable connection point in hoistway. The contractor will provide a temporary 220 FAC - 30 amps single phase terminal with
disconnect for each traction elevator in the machine room(s) and within 50 feet of the machine room(s) for hydraulic elevators at the start of the
job for temporary operation of work platform.

Heat and smoke sensing devices at elevator lobbies on each floor, machine room, and hoistways (where applicable), with normally open dry
contracts terminating at a properly marked terminal in the elevator controller. Telephone connection to elevator controller (must be a dedicated
line and monitored 24 hours - instrument in cab by others). One additional telephone line per group of elevators for diagnostic capability wired to
designated controller.

Emergency power supply with automatic time delay transfer switch and auxiliary contacts with wiring to the designated elevator controller.
Electrical cross connections between elevator machine room for emergency power purposes is to be provided by others. Any governmentally
required safety provisions not directly involved for elevator installation. All painting, except as otherwise specified. Temporary elevator service
prior to completion and acceptance of complete installation. Furnishing, installing and maintaining the required fire rating of elevator hoistway
walls, including the penetration of fire wall by elevator fixture boxes, is not the responsibility of the elevator contractor. Flooring and/or installation
of flooring by others.

Owner/General Contractor to provide a bonded ground wire, properly sized, from the elevator controller(s) to the primary building ground.

Remote wiring to outside alarm bell as requested by the Safety Code for Elevators and Escalators (ASME 17.1) (where applicable).

Costs for additional inspections of the elevator equipment by code authorities after the initial one fails due to items that are the responsibility of
the contractor, or for assisting others inspecting equipment installed by others.

The contractor agrees to provide a dry and secure area adjacent to the hoistway(s) at ground level for storage of the elevator equipment at the
time of delivery. Adequate ingress and egress to this area will also be provided. Any relocation of the equipment as directed by the contractor
after its initial delivery will be at contractor's expense.

The contractor agrees to provide at no cost a crane to hoist elevator equipment as needed.

Composite clean up crews will not be provided. Elevator contractor will be responsible for own housekeeping.

All existing equipment removed by company shall become the exclusive property of company.

HYDRAULICS ONLY

A 30" X 30" blackout, or as otherwise indicated on shop drawings, in pit floor for jack hole properly located from building lines (if pit not installed)
with adequate ingress and egress for mobile well drilling equipment. Access to pressurized water supply within 100 feet of hole (To be field
coordinated). Removal of all dirt and debris accumulated during excavation of the jack hole to be by the General Contractor. Grouting and water
proofing of blackout after jack is installed.

Owner/General Contractor agrees to provide a 4' X 4' opening in the elevator hoistway overhead, at the request of the local field office.
Should unusual conditions be encountered during excavation of jack hole, contractor will be notified immediately and written authorization to
proceed shall be obtained by Subcontractor. the contract price shall be increased by the amount of additional labor at Subcontractor's usual
billing rates, and the actual co~ of any additional material plus 15%.

ThyssenKrupp Elevator •

WARRANTY and MAINTENANCE SERVICE

PURCHASER ffaf1Cj5 fa~w :clwol
BUILDING LOCATION C.ltiic.ft~ 1.L
A

E,)(CONTRACT NO. Ql{6 :JjO l

EQUIPMENT SERIAL NO. ~C-~.:....·-....-3_...<f>~QI~_ _ _ _ _ __

el>nx:nifFINAL ACCEPTANCE DATE 5 1J,/liJq

We warrant the equipment installed by us for a period of ONE YEAR from the final acceptance date, in accordance with

the terms of the contract. ThyssenKrupp Elevator trained and supervised maintenance techtcrarzlwill provide
5... oqmainteranz:md callback service, in accordance with r:t/.er,Tt~ the contract from :2.
) lf tD. ,at no additional cost. After until
Lf ID , we recommend you continue a regularly

scheduled preventive maintenance program to protect your investment and to ensure optimum operating performance.

Our representative will discuss this with you.

We thank you for choosing ThyssenKrupp Elevator.

ThyssenKrupp Elevato'r

BY ~~LQ . x~our

oATEGNEo Bfofoq

NIGMC0404

06/09/2009 TUE 08:52 FAX 773 645 7581 UNIVERSAL ELEVATOR 141001/001

BERGLUND Building Dlvisio11
Restoration [);vis;on
CONSTRUCTION

Est11bliNhed 1911

4rN : ;l&_tf~~~ (,.

?~,)<: '. ..:?/::.< - 7.><G - 6'ht:!<.. '1

SUBCONTRACTOR GUARANTEE/WARRANTY

for

506043- Francis W. Parker School North Wing Renovation

Subcontractor: Universal Elevator Werks
3260 W. Grand Ave.
Chicago, IL 60651

Scope of Work: Freight Door Installation

Date of Substantial completion: February 24, 2009

(~',,yve, the undersigned, herewith guarantee/warranty the {Freight Door Iastgllation} work against
'''°,~defects in material or workmanship or any nonconformity with the requirements of the contract

documents for a period of ONE (1) YEAR from the date of Substantial Completion.

If during the guarantee/warranty period, any faulty materials or defects in materials or

workmanship are found, we agree to promptly replace and repair them, together with any
damage to finish, fixtures, equipment, or furnishings due to our defective work upon notification
by the Architect or Owner at no additional expense to the Owner.

Title:
Date: 6.9.09

111 Eai,tWacker Drive, Suite 2450 * Chicago, Dlil1fJi'i 60601 • Telephone: 312.726.6624 • l:<'acsbmlc: 312.726.6629
Received Time Jun. 9. 2009 9:03AM No. 2595vww.beglundco.com

DME ACCESS, INC.

Since 1977

STAIRWAY LIFTS • WHEELCHAIR LIFTS •RESIDENCE ELEVATORS •LU/LA ELEVATORS • RESIDENTIAL & COMMERCIAL PROJECTS

March 20, 2009

Francis W. Parker School
330 W. Webster Ave.
Chicago, IL 60614

To Whom It May Concern:

We at DME ACCESS, Inc. would like to congratulate you on the purchase of
your Vertical Wheelchair Lift. The warranty on your new lift includes one
E_lanned Maintenance Visit (PMV), to be performed during the initial warranty
period. We currently do not have any contact information, please call our office
as soon as possible for scheduling.

Thank you for your business and enjoy your new lift!

Sincerely,

j! )tJ.u.~

Katie

DME ACCESS, Inc.

1717 Industrial Drive• Montgomery, IL 60538 • 630-892-7400 •Fax 630-892-7401 • 1-800-689-6075

I DME ACCESS, INC.

Since 1977
RESIDENTIALELEVATORS • LU/LAELEVATORS • STAIRWAYLIFTS • WHEELCHAIRLIFTS • DUMBWAITERS

GUARANTEE/WARRANTY
FOR

FRANCIS W. PARKER SCHOOL
VERTICAL WHEELCHAIR LIFT

General Contractor: Property Management Advisors, Inc.
150 South Wacker, Suite 670
Chicago, IL 60606

DME ACCESS, Inc. hereby guarantees the Vertical Wheelchair Lift work for Francis W.
Parker School, 330 W. Webster Chicago, IL 60614. The vertical wheelchair lift work has
been done in accordance with the drawings and specifications. The work as installed will
fulfill the requirements of the guarantee I warranty as specified below:
The National Wheel-0-Vator BC-144, Serial #133491, warranty includes a One Year
Labor & Three Years Parts Warranty w/One Planned Maintenance Visit from the date
of acceptance, which is:
February 24, 2009.

DME ACCESS, Inc.

Dave Hallman, President

1717 INDUSTRIAL DRIVE •MONTGOMERY, IL 60538
630-892-7400 •FAX 630-892-7401

www.dmeaccess.com [email protected]

N* .

northstar lrre protection

875 Blue Gentian Road, Eagan, MN 55121 (651) 456-9111 (Phone) (651} 456-9222 (Fax)

SUBCONTRACTOR GUARANTEE/WARRANTY

for
506043- Francis W. Parker School North Wing Renovation

Subcontractor: Northstar Fire Protection
2009 W. 21st St.
Broadview, IL 60155

Scope of Work: FIRE PROTECTION

Date of Substantial Completion: February 24, 2009

We, the undersigned, herewith guarantee/warranty the FIRE PROTECTION _

work against defects in material or workmanship or any nonconformity with the requirements of

the contract documents for a period of ONE (1) YEAR from the date of Substantial Completion .
.. r .

If during the guarantee/warranty period, any faulty materials or defects in materials or
workmanship are found, we agree to promptly replace and repair them, together with any
damage to finish, fixtures, equipment, or furnishings due to our defective work upon notification
by the Architect or Owner at no additional expense to the Owner.

Signature: ~~---·-

Printed Name: R. COLIN BARNETT

~~~~~~~~~~~~~~~~~~

Title: PRESIDENT

Date: 4/22/09

~~~~~~~~~~~~~~~~~~~~~~

BERGLUND Transmittal
F CONSTRUCTION
Project: 506043-FWPS North Wing Ren. & Add.
Establish•d 1911
Architect's 200 5.18.00
Berglund Construction Company Project No.:
111 E. Wacker Drive, Suite 2450
Chicago, IL 60601 Transmittal No.: 269
Phone: 312.726. 6624
Fax: 312.726 .6629 Date Sent: 03/ 26/10

From: Merrell Jones
Berglund Construction Company
Phone: (312) 726-6624, Ext. 3359
Fax: (312) 726-6629
E-mail: mjones@berg lundco.com

To: Damian Jones Items listed are being sent

Francis W. Parker School 0 Enclosed
330 West Webster Avenue D Under Separate Cover
Chicag o, IL 60614

Phone: (773) 797-5103 Via: Messenger Service to Francis Parker

Fax: (773) 549-4669

E-mail: [email protected] FedEx Ground to Nagle Hartray

cc: Dirk Danker - Nagle Hartray Danker Kagan (Tracking No. 871896410020772)

McKay Penney Architects Ltd. - Phone: (312)

425-1000 - Fax: (312) 425-1001,

Chad Matesi - Project Management Advisors,

Inc. (TRANSMITTAL ONLY)

BCC File

!subject: Closeout Documents: Warranties

We are transmitting the following to you:

D Architectural Drawings D 0 & M Manuals D Addenda 0 Other: Closeout
D Engineering Drawings 0 MSDS/Reports D Change Orders
D Shop Drawings D Product Data D Contract Warranties
D Plans D Samples D Letters
D Prints D Specifications D Payment Application

Specification Architect's Comments (7/13/09) Comments Number of
Copies
07141: 2 year installer warranty specified. 1- All Sealants' REVISED warranty 2
year submitted enclosed. Please insert behind tab 12
(Waterproofing) of the Warranty Manual. 2
07142: 2 year installer warranty specified. 1- (The All Sealants' one-year warranty 2
07550 : year submitted currently inserted may be discarded.)
No warranty documentation submitted Same as Above 2
2
07811: 2 year manufacturer's warranty Jones & Cleary warranty enclosed, along
08211: specified, to be signed by the installer. with manufacturer's 20 year warranty.
1-year submitted Please insert behind tab 14 (Membrane
Life of Installation warranty specified. Roofing) of the Warranty Manual.
Spray Insulations' warranty enclosed.
Please insert behind tab 15 (Sprayed
Fireproofing) of the Warranty Manual.
Eggers manufacturer warranty from

Transmittal - (Page 2 of 3)

Project: 506043-FWPS North Wing Ren. & Add .

Establish•d 1911 Architect's 2005.18.00
Project No.:

Transmittal No.: 269

Date Sent: 03/26/10

NOTE 08411: 1-year submitted Palatine Builders' Sunnly. Please insert 0
08520: No warranty documentation submitted behind tab 18 of Warranty Manual. 0
08911 : No warranty documentation submitted To Be Submitted at a Later Date 0
10101: No warranty documentation submitted 2
11000: 50 year warranty specified. 1-year [ o Be Submitted at a Later Date 2
11132: submitted 2
[ o Be Submitted at a Later Date
12660: Incorrect date noted for start of warranty 2
Previously submitted. Refer to Claridge
14240: No warranty documentation submitted warranty under Section 29 in Warranty 2
Manual. (Copy has been attachedfor your
15000: 10 year warranty specified. 1-year reference.) 2
submitted Gala Systems REVISED warranty
15975: enclosed. Please insert behind tab 31 of 2
16000: No warranty documentation submitted Warranty Manual. 2
Carney & Co. warranty enclosed for
1-year guarantee specified to commence Projection Screens. There was no tab
from the date of acceptance of work. originally created for this category in the
Submitted guarantee commences from Warranty Manual. Therefore, please insert
the subcontractor's presumed date of this warranty behind tab 39, which will not
completion for the various equipment be used. For your convenience, I have
and systems. attached two (2) labels in order to re-label
No warranty documentation submitted tab 42 to read "42 ) Projection Screens".
Jezet Seating REVISED warranty
No warranty documentation submitted enclosed. Please insert behind tab 3~of
Warranty Manual. (The Jezet Seating one-
year warranty currently inserted may be
discarded.)
Previously submitted. Refer to
ThyssenKrupp warranty under Section 38
in Warranty Manual. Note: Warranty
date reflects date offinal acceptance and
will not be revised. (Copy has been
attached for your reference.)
See attached letter from Berglund Project
Executive, Larry Wiley, along with
manufacturer warranties submitted by
Westside Mechanical. Please insert
behind tab 45 of Warranty Manual.

Previously submitted. Refer to Johnson
Controls' warranty under Section 46 in
Warranty Manual. (Copy has been
attached/or your reference.)
Block Electric warranties enclosed.
Please insert behind tab 47 of Warranty
Manual.

Transmittal - (Page 3 of 3)

Project: 506043-FWPS North Wing Ren. & Add.

E•tabli•hed 1911 Architect's 2005.18.00
Project No.:

Transmittal No.: 269

Date Sent: 03/26/10

Notes: Mr. Jones,

For your use, please find enclosed subcontractor and manufacturer warranties (in duplicate) that were not
previously included in the Warranty Manuals for the North Wing project. For your convenience, I have also
enclosed two (2) copies of a revised Table of Contents for each of your manuals, along with a quantity of
sheet protectors.

A copy of each warranty will also be submitted to Mr. Dirk Danker at Nagle Hartray for reference.

If you have any questions or concerns, please feel free to contact me at the number as listed on page 1 of
this transmittal.

Thank you.

_...,,,,..215~ ~--- Merrell Jones - Administrative Assistant 03/26/10
----.-~-------- ~----- Printed Name - Title Date
From Signatw

II II

NagleHartrayDankerKaganMcKayPenney

312.425.1000
312. 425.1001
w.w1.nhdkmp.com

' 30 West Monroe Street
Chicago, Illinois 60603
~, Ntemorc:tndum / / ,/ ~ - , , ~

Date: 13 July 2009

Re: Francis W. Parker School - North Wing Renovations & Additions
Project Close-out documentation: Warranties
NHDKMP No. 2005.18.00

To:
Damian Jones, Bob Haugh, Chad Matesi, Roger McCarron, Larry Wiley

Via: email

From: CC:
Andrew Gale Dirk Danker

Comments:

NHDKMP has reviewed the warranties submitted by Berglund Construction Company in partial fulfillment of the close out
procedures for the above listed project. We note the following deviations from the contract documents:

07141: 2 year installer warranty specified. 1-year submitted
07142: 2 year installer warranty specified. 1-year submitted
07811: 2 year manufacturer's warranty specified, to be signed by the installer. 1-year submitted
07550: No warranty documentation submitted
08211: Life of Installation warranty specified. 1-year submitted
08411: No warranty documentation submitted
08520: No warranty documentation submitted
08911: No warranty documentation submitted 10101: 50 year warranty specified. 1-year submitted
11000: Incorrect date noted for start of warranty
11132: No warranty documentation submitted
12660: 10 year warranty specified. 1-year submitted
14240: No warranty documentation submitted
15000: 1-year guarantee specified to commence from the date of acceptance of work. Submitted guarantee commences from the
subcontractor's presumed date of completion for the various equipment and systems.
15975: No warranty documentation submitted
16000: No warranty documentation submitted

Thank you,
Andrew Gale

Merrell Jones Merrell Jones
Monday, March 29, 2010 5:51 PM
From: 'Chad Matesi (PMA)'
Sent: Dirk Danker (Nagle Hartray); [email protected]; Larry Wiley
To: Francis Parker North Wing Warranties Submitted to Owner
Cc: Warranties Submitted per Architect's Comments.pdf
Subject:
Attachments:

Chad,

Per NHDKMP's memo dated 7/13/09, we have submitted to the Owner all of the outstanding warranties with the
exception of 08411, 08520, 08911, which will be submitted at a later date. We have also sent a copy of those warranties
to Mr. Dirk Danker at Nagle Hartray for record.

Please feel free to contact me if you have any questions or concerns.

Thank
you.

BERGLUND CONSTRUCTION

Tracking:

1

Recipient Delivery
'Chad Matesi (PMA)' Delivered: 3/29/2010 5:51 PM
Dirk Danker (Nagle Hartray)
[email protected]
Larry Wiley

2

CARNEY 636 SCHNEIDER DRIVE SOUTH ELGIN , ILLINOIS 60177
PHONE : (847) 931-4440 FAX: (847) 931-4498

www.carneyandco.com

0 and
COMPANY, INC.
ARCHITECTURAL SPECIALTIES - - - - - - - - - - - - -

Larry Wiley January 12, 2010
Berglund Construction
111 E. Wacker Dr. - Suite 2450 RE : FRANCIS W. PARKER SCHOOL
Chicago, IL 60601 NORTH WING ADDITION
CHICAGO, IL

LETTER OF GUARANTEE

We , the undersigned , herewith guarantee the PROJECTION SCREENS furnished by us,
installed by others, against defects in material and workmanship for a period of one (1) year
commencing February 24, 2009. We agree to correct or replace any defective material
found within this period at no cost to the Owner, provided claim is made in writing and
manufacturers' installation and maintenance instructions have been followed ; improper
usage, neglect or ordinary wear and tear excluded .

Operating and Maintenance Data provided by each manufacturer and placed inside
each carton at the time of shipment.

This guarantee supersedes all previous guarantees, written or implied.

CARNEY and COMPANY, INC.

Dan~ ~

vice President

H~/ TM

p EN I x
flRf SYSTfMS

PHOENIX FIRE SYSTEM WARRANTY

WARRANTY STATEMENT:

Phoenix Fire Systems, Inc. warrants to the Purchaser of new fire system product(s)
that during the effective period of the warranty, such products shall be free of defects
in workmanship and material(s).

The warranty period will terminate immediately following the earliest occurrence of
either of the following dates:

'FIRE PROTECTION SYSTEMS'
Twelve (12) months have elapsed following the date of substantial completion of the
system installation.
Eighteen (18) months have elapsed following shipment of any system or subsystem
from Phoenix Fire Systems to Contractor/Owner.

'REPLACEMENT PARTS OR SYSTEM: COMPONENTS'
Twelve (12) months have elapsed following the date of shipment of system
components.

WARRANTY OBLIGATION:

Phoenix Fire System's responsibility under the terms of this warranty shall be to
repair or replace solely at Phoenix Fire System's deten11ination, any system
component which fails to perform as intended during the period of this warranty.
Purchaser is obligated to notify Phoenix Fire Systems in writing within 10 days of
any apparent component failure. Purchaser is further obligated to maintain this
system(s) in accordance with current NFPA Standards. Failure to maintain said
system in accordance with NFPA Standards shall void warranty.

(j

144 Nebraska Street , frankfort , ll 0 0 413 - 1101 • 8 1 5 . 404 . 9 30 0 • fa x 815 . 404.9338

Should service or repairs be perfonned by any person, firm, or corporation other than
Phoenix Fire Systems during the tern1s of this warranty, than said warranty shall be
voided.

Any replacement parts provided shall be warranted only for the balance of the
original warranty period.

WARRANTY EXCLUSIONS:

Labor, travel, or expenses for field service outside of Phoenix Fire Systems' normal
business hours. (No1mal Hours, Monday thru Friday, 7:30 a.m. to 4:30 p.m.)
Failure of components due to external causes such as electrical surges, including
lightning or static electricity, physical damage, contamination, moisture, improper
installation, or component use.
System batteries.
Field labor to repair or replace equipment furnished for installation by others.
Recharging of system due to component failure. Warranty covers repair or
replacement of component(s) only.

Effective Date of Warranty: February 24, 2009
Expiration Date:
Phoenix Fire Systems Project No. February 24, 2010

Project Name: 064280-20
Address:
Francis W. Parker School
Description of Work:
330 W. Webster Avenue - 3rd Floor
Chicago, IL. 60614

Installation of FM-200 Clean Agent
Fire Suppression System for the
Server Room.

n(CYJ PHOENIX FIRE SYSTEMS, INC.
/" 744 Nebraska Street
P Hr:;;;' E N I X Frankfort, IL. 60423-1701
FIR[ SYSTfMS Phone: 815-464-9300
Fax: 815-464-9338
Website: www.phoenixfire.com

CERTIFICATE OF COMPLETION

To: Berglund Construction Company Date: March 2, 2009
111 E. Wacker Drive - Suite 2450 Project: Francis W. Parker School
Chicago, IL. 60601
330 W. Webster Avenue - 3rd Floor
Chicago, IL. 60614

Attn: Merrell Jones

Phoenix Fire Systems

Project #: 064280-20

Description of Work: Installation of FM-200 Clean Agent Fire Suppression System for
the Server Room.

This is to confirm that Phoenix Fire Systems, Inc. has performed all work required per our

contract documents for the above referenced project effective February 24, 2009

Warranty shall extend for one year from this date.

If we can be of any further assistance, please contact our office.

Very truly yours,

Phoenix Fire Systems, Inc.

t!~e#

President

n• FETTES, LOVE & SIEBEN

PLUMBING & HEATING CONTRACTORS

4325 NORTH LINCOLN AVENUE• CHICAGO, ILLINOIS 60618
TELEPHONE (773) 935-7260 FAX (773) 935-9395

Francis Parker School Northwing

SUBCONTRACTOR: Fettes, Love & Sieben
4325 N. Lincoin Ave.
Chicago, Illinois 60618

SCOPE OF WORK: Plumbing

DATE OF SUBSTANTIAL COMPLETION: February 24, 2009

We, the undersigned, herewith guarantee/warrant the PLUMBING work against defects in
material of workmanship or any nonconformity with requirements of the Contract
Documents for a period of one (1) year from the date of Substantial Completion .

If, during the guarantee/warranty period , any faulty material or defects in materials of
workmanship are found, we agree to promptly replace and repair them together with any
damage to finish, fixtures, equipment or furnishings due to our defective work upon
notification by the Architect or Owner at no additional expense to the Owner.

John R. Wolf
By

Secretary

Title

Warranty

Metropolitan Industries, Inc. warrants to the original purchaser of each Metropolitan product(s) that
any part thereof which proves to be defective in. material or workmanship within one (1) year from date
of installation or 18 months from manufacture date, whichever comes first, will be replaced at no
charge with a new or remanufactured pflrl, F.O.B. factory, provided that the product is properly
installed, maintained, serviced, and operated under normal conditions and according to manufacturer's
instructions. Purchaser shall assume all responsibility and expense for removal, reinstal/ation and
freight. Any item(s) designated as manufactured by others shall be covered only by the express
warranty of the manufacturer thereof. This warranty does not apply to damage resulting from accident,
alteration, design misuse or abuse.

If the material furnished the buyer shall fail to conform to this contract or any of the terms of this written
warranty, Metropolitan Industries, Inc. shall replace such nonconforming material at the original point
of delivery and furnish instruction for its disposition. Any transportation Charges involved in such
disposition shall be for the Buyer's account. The Buyer's exclusive and sole remedy on account or in
respect of the furnishing of material that does not conform to this contract, or its written warranty, shall
be to secure replacement thereof as aforesaid. Metropolitan Industries, Inc. shall not in any event be
liable for the cost of any labor expended on any such material or for any incidental or consequential
damages to anyone by reason of the fact that such material does not conform to this contract or to this
written warranty.

ALL IMPLIED WARRANTIES, INCLUDING THE IMPLIED WARRANTY OF MERCHANTABILITY
AND THE IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE, LIMITED IN
DURATION TO THE SAME EXTENT AS THE EXPRESS WARRANTY CONTAINED HEREIN. Some
states do not allow limitations on how long an implied warranty last, so the above /Imitation may not
appfy to you.

MANUFACTURER EXPRESSLY DISCLAIMS AND EXCLUDES ANY LIABILITY FOR
CONSEQUENTIAL OR INCIDENTAL DAMAGES FOR BREACH OF ANY EXPRESS OR IMPLIED
WARRANTY ARISING IN CONNECTION WITH THIS PRODUCT, INCLUDING WITHOUT
LIMITATION, WHETHER IN TORT, NEGLIGENCE, STRICT LIABILITY CONTRACT OR
OTHERWISE. Some states do not allow the exclusion or limitation of incidental or consequential
damages, so the above limitation or exclusion may not apply to you.

This warranty gives you specific legal rights, and you may also have other rights which vary from state
to state.

NOTE: Metropolitan Industries, Inc. reserves the right to make revisions to its products and their specifications, and to this
bulletin and related information without notice.

BERGLUND Transmittal
F CONSTRUCTION
Project: 506043-FWPS North Wing Ren. & Add.
Establish•d 1911
Architect's 200 5.18.00
Berglund Construction Company Project No.:
111 E. Wacker Drive, Suite 2450
Chicago, IL 60601 Transmittal No.: 269
Phone: 312.726. 6624
Fax: 312.726 .6629 Date Sent: 03/ 26/10

From: Merrell Jones
Berglund Construction Company
Phone: (312) 726-6624, Ext. 3359
Fax: (312) 726-6629
E-mail: mjones@berg lundco.com

To: Damian Jones Items listed are being sent

Francis W. Parker School 0 Enclosed
330 West Webster Avenue D Under Separate Cover
Chicag o, IL 60614

Phone: (773) 797-5103 Via: Messenger Service to Francis Parker

Fax: (773) 549-4669

E-mail: [email protected] FedEx Ground to Nagle Hartray

cc: Dirk Danker - Nagle Hartray Danker Kagan (Tracking No. 871896410020772)

McKay Penney Architects Ltd. - Phone: (312)

425-1000 - Fax: (312) 425-1001,

Chad Matesi - Project Management Advisors,

Inc. (TRANSMITTAL ONLY)

BCC File

!subject: Closeout Documents: Warranties

We are transmitting the following to you:

D Architectural Drawings D 0 & M Manuals D Addenda 0 Other: Closeout
D Engineering Drawings 0 MSDS/Reports D Change Orders
D Shop Drawings D Product Data D Contract Warranties
D Plans D Samples D Letters
D Prints D Specifications D Payment Application

Specification Architect's Comments (7/13/09) Comments Number of
Copies
07141: 2 year installer warranty specified. 1- All Sealants' REVISED warranty 2
year submitted enclosed. Please insert behind tab 12
(Waterproofing) of the Warranty Manual. 2
07142: 2 year installer warranty specified. 1- (The All Sealants' one-year warranty 2
07550 : year submitted currently inserted may be discarded.)
No warranty documentation submitted Same as Above 2
2
07811: 2 year manufacturer's warranty Jones & Cleary warranty enclosed, along
08211: specified, to be signed by the installer. with manufacturer's 20 year warranty.
1-year submitted Please insert behind tab 14 (Membrane
Life of Installation warranty specified. Roofing) of the Warranty Manual.
Spray Insulations' warranty enclosed.
Please insert behind tab 15 (Sprayed
Fireproofing) of the Warranty Manual.
Eggers manufacturer warranty from

Transmittal - (Page 2 of 3)

Project: 506043-FWPS North Wing Ren. & Add .

Establish•d 1911 Architect's 2005.18.00
Project No.:

Transmittal No.: 269

Date Sent: 03/26/10

NOTE 08411: 1-year submitted Palatine Builders' Sunnly. Please insert 0
08520: No warranty documentation submitted behind tab 18 of Warranty Manual. 0
08911 : No warranty documentation submitted To Be Submitted at a Later Date 0
10101: No warranty documentation submitted 2
11000: 50 year warranty specified. 1-year [ o Be Submitted at a Later Date 2
11132: submitted 2
[ o Be Submitted at a Later Date
12660: Incorrect date noted for start of warranty 2
Previously submitted. Refer to Claridge
14240: No warranty documentation submitted warranty under Section 29 in Warranty 2
Manual. (Copy has been attachedfor your
15000: 10 year warranty specified. 1-year reference.) 2
submitted Gala Systems REVISED warranty
15975: enclosed. Please insert behind tab 31 of 2
16000: No warranty documentation submitted Warranty Manual. 2
Carney & Co. warranty enclosed for
1-year guarantee specified to commence Projection Screens. There was no tab
from the date of acceptance of work. originally created for this category in the
Submitted guarantee commences from Warranty Manual. Therefore, please insert
the subcontractor's presumed date of this warranty behind tab 39, which will not
completion for the various equipment be used. For your convenience, I have
and systems. attached two (2) labels in order to re-label
No warranty documentation submitted tab 42 to read "42 ) Projection Screens".
Jezet Seating REVISED warranty
No warranty documentation submitted enclosed. Please insert behind tab 3~of
Warranty Manual. (The Jezet Seating one-
year warranty currently inserted may be
discarded.)
Previously submitted. Refer to
ThyssenKrupp warranty under Section 38
in Warranty Manual. Note: Warranty
date reflects date offinal acceptance and
will not be revised. (Copy has been
attached for your reference.)
See attached letter from Berglund Project
Executive, Larry Wiley, along with
manufacturer warranties submitted by
Westside Mechanical. Please insert
behind tab 45 of Warranty Manual.

Previously submitted. Refer to Johnson
Controls' warranty under Section 46 in
Warranty Manual. (Copy has been
attached/or your reference.)
Block Electric warranties enclosed.
Please insert behind tab 47 of Warranty
Manual.

Transmittal - (Page 3 of 3)

Project: 506043-FWPS North Wing Ren. & Add.

E•tabli•hed 1911 Architect's 2005.18.00
Project No.:

Transmittal No.: 269

Date Sent: 03/26/10

Notes: Mr. Jones,

For your use, please find enclosed subcontractor and manufacturer warranties (in duplicate) that were not
previously included in the Warranty Manuals for the North Wing project. For your convenience, I have also
enclosed two (2) copies of a revised Table of Contents for each of your manuals, along with a quantity of
sheet protectors.

A copy of each warranty will also be submitted to Mr. Dirk Danker at Nagle Hartray for reference.

If you have any questions or concerns, please feel free to contact me at the number as listed on page 1 of
this transmittal.

Thank you.

_...,,,,..215~ ~--- Merrell Jones - Administrative Assistant 03/26/10