Drop Object Prevention Awareness

Dropped Object Prevention Booklet

CPADRMREPOAVPIGPEENND: LiTOftinBIgOSJaEfeNCty T

? ? ?APA YANG ANDA PERLU TAHU TENTANG

AKTIVITI MENGANGKAT (LIFTING ACTIVITY)

ANDA BERHAK UNTUK MEMBERHENTIKAN KERJA!
PEMBERITAHUAN KEMALANGAN
APAKAH DEFINISI AKTIVITI MENGANGKAT ?
CONTOH PENYIMPANAN YANG BAIK
APAKAH HAZAD DALAM AKTIVITI MENGANGKAT?
DO’S AND DONT’S
PENERANGAN

Rujukan

https://www.dosh.gov.my/index.php/construction-safety-v/lifting-works
PETRONAS Technical Standard : Lifting and Hoisting – PTS 18.52.06
December 2018
HSE Minimum Requirement Volume I:Task Specific – 6.6 Lifting
Operation

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY

ANDA BERHAK MEMBERHENTIKAN KERJA!

APAKAH TINDAKAN YANG PERLU DIAMBIL SEKIRANYA
TERDAPAT KERJA YANG TIDAK SELAMAT DAN BOLEH
MENYEBABKAN KEMALANGAN?

1 STOP WORK! 2 Jangan melakukan
kerja tersebut

3 4Dapatkan nasihat Laporkan kepada orang
daripada orang yang atasan atau HSE
mahir personal

Hak Untuk Memberhentikan Kerja

Semua pekerja boleh menolak untuk
melakukan kerja yang dirasakan tidak
selamat
Semua individu berhak memberhentikan
kerja apabila terdapat keadaan yang
mengugat keselamatan dan kesihatan
pekerja atau persekitaran semulajadi

SETIAP PEKERJA PERLU MEMBETULKAN PERLAKUAN
ATAU KEADAAN YANG TIDAK SELAMAT

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY

PEMBERITAHUAN
KEMALANGAN

APAKAH TINDAKAN YANG PERLU DIAMBIL
SEKIRANYA TERDAPAT KEMALANGAN DI
TEMPAT KERJA ANDA?

Melaporkan kemalangan kepada penyelia atau
HSE di limbungan dengan segera

Penyelia/HSE melaporkan dengan segera
kepada pengurus projek/jabatan dan menelefon
mana-mana nombor kecemasan untuk bantuan

Pengurus Projek/Jabatan/HSE perlu dengan segera
melaporkan kepada CQHSE dalam masa 24 jam untuk

tindakan selanjutnya

NOMBOR TELEFON KECEMASAN

JABATAN TALIAN TERUS
Klinik Pembangunan 07-268 2222
Bilik Operasi (24Jam) 07-268 3333
07-268 4444
Security (24Jam) Channel 1
UHF Walkie Talkie

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY

APAKAH DEFINISI AKTIVITI MENGANGKAT?

Operasi mengangkat bebanan adalah satu aktiviti kerja bagi
memudahkan mengangkat atau memindahkan bebanan yang
besar dan berat dari satu tempat ke tempat lain dengan cara
yang betul dan selamat
ASAS KERJA-KERJA MENGANGKAT

Perancangan Penyediaan Penyeliaan Pemeriksaan
kerja-kerja sistem kerja kerja-kerja Kren
mengangkat mengangkat
selamat

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY

KATEGORI AKTIVITI MENGANGKAT

1.0 Kerja mengangkat ROUTINE
kurang daripada LIFTING
20 MT
1.1 Operasi rutin kren 2.0 Generik JHA mestilah
1.2 Operasi disediakan untuk operasi
mengangkat yang mengangkat yang rutin
berulang dimana, jenis dan lokasi
menggunakan hendaklah dikenalpasti
peralatan yang sama dan diberitahu semasa
1.3 Operasi taklimat
mengangkat
rutin dengan loose
lifting equipment

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY

KATEGORI AKTIVITI MENGANGKAT

Spesifik JHA HEAVY &
hendaklah CRITICAL
disediakan LIFTING
dan diberitahu
semasa taklimat

Lifting plan hendaklah dihasilkan Kerja mengangkat
bersama client, disemak dan lebih daripada 20 MT
disahkan oleh PMT.Kandungan
yang perlu ada perlu selaras
seperti di dalam HSE Minimum
Requirements (Volume I) Task
Specific Prosedur

Critical Lifting seperti mengangkat pekerja menggunakan
peralatan mengangkat, special load boiler, vessel) dan
mengangkat beban lebih daripada 80% berat kapasiti
peralatan mengangkat

SUMMARY

Type of JHA PTW Lifting Certificate of Shackle/Pad
Lifting - Plan Lifting Appliances eye MPI Report
Generic
Routing Generic --
(<20T)

Heavy/ Specific Yes Specific Yes Yes
Critical
Lifting

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY

KEPERLUAN SEBELUM MELAKUKAN
AKTIVITI MENGANGKAT

LATIHAN & 1 KENALPASTI
KOMPETENSI 2 RISIKO
3
Crane Operator HEMP / JHA
Berdaftar dengan JKKP dan Taklimat Toolbox Talk
masih sah digunakan Lawat Tapak

Rigger & Signalman ALAT
Wajib hadir dan lulus ke PELINDUNG
kelas Rigging and Slinging
Lulus latihan ulangan DIRI (PPE)
(refresher) 3 tahun sekali
‘PPE’ asas
PERSIAPAN - Coverall
DOKUMEN & - Safety Goggles
TEMPAT KERJA - Safety boots/shoes
- Safety Helmet
Prosedur Kerja 4
Sistem Permit bagi Heavy Lifting ‘PPE’ spesifik pada aktiviti
Lifting Plan
Rekod setiap penyelenggaraan,
pembaikian dan pemeriksaan

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY

KATEGORI
PERALATAN
MENGANGKAT

LIFTING EQUIPMENT

PERALATAN PERALATAN PERALATAN
MENGANGKAT MENGANGKAT BANTU ANGKAT

LIFTING LIFTING LIFTING
APPLIANCES EQUIPMENT ACCESSORIES

Crane Load Carrier Sling
Winch Personal Turnbuckle
Runaway Beam/ Transfer Unit Eye Bolt &
Monorail Eye Nut
Chain Block Swivel Ring
Overhead Hoist Snatch Block
Pad Eyes &
Lifting point

SISTEM KOD WARNA MMHE UNTUK
PEMERIKSAAN ALAT BANTU
MENGANGKAT (LIFTING ACCESSORIES)

BULAN KOD WARNA

JANUARI - JUN HIJAU
JULAI - DISEMBER KUNING

Pemeriksaan alatan mestilah dilakukan oleh orang yang
kompeten sebelum alat tersebut digunakan bagi memastikan
tiada kerosakan, kecacatan dan selamat digunakan

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 10

LIFTING APPLIANCES

MOBILE CRANE OVERHEAD CRANE

CHAIN BLOCK

CRAWLER CRANE

CRANE BLOCK

PORTAL CRANE

WINCH

JIB CRANE

LIFTING ACCESSORIES

PLATE CLAMP WIRE ROPE SLING WEBBING SLING
CHAIN SLING

SHACKLE EYEBOLT
SLING HOOKS

SPREADER BEAM

WIRE CLIP

PULLEY TURNBUCKLE SWAGE SOCKET WEDGE SOCKET

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 11

CONTOH
PENYIMPANAN
YANG BAIK
UNTUK
PERALATAN
MENGANGKAT

13

APAKAH
HAZAD
DALAM AKTIVITI
MENGANGKAT

12

CUACA KEADAAN TANAH/LANTAI
ANGIN KENCANG, PETIR YANG TIDAK STABIL

DAN RIBUT 4

3

CRANE OVERLOAD TERSEPIT DIANTARA GANTRY CRANE
YANG BERGERAK DAN STRUKTUR
5 BANGUNAN/OBJEK

6

OBJEK TERJATUH DILANGGAR DENGAN BEBAN
YANG BERGERAK

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 15

78

TERSEPIT DIANTARA TITIK BUTA
LOAD DAN LIFTING (BLIND SPOT)

GEAR 10

9

TERKENA BESI KETIKA TERSANDUNG KETIKA MENGUNDUR
MELEPASKAN TALI SEMASA MEMBERI ARAHAN
PENGIKAT

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 16

PCAODKNEATROPOEHSR-ACAKOLAANTNTAONH

BANTU ANGKAT YANG

TIDAK BOLEH

DIGUNAKAN LAGI

CONTOH-CONTOH KEROSAKAN

Broken Wires Kinked Wire

Abraded /Worn Wire Popped Core

Corrosion Heat Damage

Bird Caging Damaged Fittings

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 18

CONTOH-CONTOH KEROSAKAN

Acid/Caustic Burns Cut Edge Cut

Melting/Charring Abrasions Puncture

Weld Spatter Broken/Worn Stiches Damaged Eye
18
Embedded Materials TENSILE BREAK Missing / Illegible Tag

UV Degradation Red Core Yarn Knot

Crushed Webbing Snag Damaged Hardware

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 19

CONTOH-CONTOH KEROSAKAN

Bent / Deformed Chain Link Incorrect Hardware & Pitting

Broken Chain Stretched Chain Link

Heat Damage Weld Splatter

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 20

DO’S AND DONT’S

DO’S DONT’S

Shackles (Manufacture stamp)

DO’S

DO’S DONT’S

Wire Sling (Storage)

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 21

DO’S AND DONT’S

DO’S DONT’S

Lever Block

DO’S DONT’S

Plate Clamp (Identification Tag)

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 22

DO’S AND DONT’S

DO’S DONT’S

Split Pin

DO’S DONT’S

Wire Sling (Kink)

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 23

DO’S AND DONT’S

DO’S DONT’S

Safety Latch

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 24

DO’S AND DONT’S DONT’S
DONT’S
DO’S DONT’S
DO’S DONT’S
DO’S
DO’S

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 25

DO’S AND DONT’S DONT’S

DO’S

DO’S

DONT’S

DONT’S

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 26

DO’S AND DONT’S DONT’S

DO’S

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 27

DO’S AND DONT’S

DO’S DO’S

DONT’S
NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 28

DO’S AND DONT’S

DO’S DO’S

DONT’S
NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 29

DO’S AND DONT’S

DONT’S DONT’S

Tidak Mengangkat Beban Tidak Melakukan Aktiviti
Dari Tepi Lain Semasa

Mengendalikan Kren

DONT’S DONT’S

Tidak Duduk Diatas Beban Tidak Duduk Dibawah Beban
Dan Membenarkan Keadaan Dan Membenarkan Keadaan

Tidak Selamat Tidak Selamat

DONT’S DONT’S

Tidak Mengendalikan Kren Tidak Meninggalkan Beban
Dalam Keadaan Tergesa-gesa Tergantung Selepas Waktu

Bekerja/semasa Rehat

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 30

DO’S AND DONT’S

DONT’S DO’S

Tidak Menggunakan Kren Untuk Sentiasa Menggunakan
Mengeluarkan Objek Tagline Atau Push/Pull
Yang Tersangkut Sticks Untuk Mengawal Beban

DONT’S DO’S

Sentiasa berkomunikasi sentiasa memastikan beban
sebelum dan semasa operasi diikat (secured)

mengangkat dilakukan sebelum mengangkat

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 31

PENERANGAN

APA YANG ANDA PERLU TAHU DAN
HARUS LAKUKAN

Perancangan Semua kerja-kerja mengangkat haruslah
kerja-kerja dirancang, dengan mengambil kira semua
mengangkat risiko-risiko yang boleh dijangka, supaya
ianya dibuat dengan selamat.

Perancangan haruslah memberi perhatian
kepada:

Risiko-risiko yang dikenalpasti semasa pentaksiran
risiko
Sumber-sumber yang diperlukan
Prosedur-prosedur
Tanggungjawab-tanggungjawab supaya kerja
mengangkat dibuat dengan selamat.

Penyediaan Tahap penyeliaan yang mencukupi hendaklah
sistem kerja diadakan untuk kerja mengangkat, berkadaran
dengan tahap risiko dan pekerja yang terlibat
selamat semasa kerja mengangkat.

Penyelia Mengangkat haruslah
Mengarah dan menyelia kerja mengangkat bagi
memastikan ianya dibuat mengikut pernyataan
kaedah.
Kompeten dan diberi latihan yang sesuai
mempunyai pengalaman yang mencukupi untuk
menjalankan semua tugas dan mempunyai kuasa
untuk menghentikan kerja jika bahaya.

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 33

APA YANG ANDA PERLU TAHU DAN
HARUS LAKUKAN

Perancangan haruslah menghasilkan satu sistem
kerja selamat atau pernyataan kaedah yang bertulis
dan haruslah difahami oleh setiap orang yang
terlibat.

Penyeliaan Elemen-elemen penting termasuklah:
kerja-kerja Perancangan kerja dan JHA/HEMP – termasuklah
mengangkat persediaan tapak, pemasangan dan perombakan kren.
Pemilihan, penyediaan dan penggunaan kren dan
peralatan kerja yang sesuai, termasuklah perkiraan
bagi pengisyaratan dan penalian yang selamat.
Penyediaan pekerja (penyelia, operator, jurutali dan
juru isyarat) yang kompeten & bilangan mencukupi.
Jenis-jenis beban yang akan diangkat termasuklah
kaedah dan komponen mengikat.
Pemeriksaan teliti, laporan dan dokumen berkaitan
penyenggaraan dan pemeriksaan kren dan
peralatannya.
Pencegahan pergerakan dan penggunaan kren tanpa
kebenaran.
Beban maksimum yang akan diangkat,carta beban
sudut bum, jejari beban dan kapasiti mengangkat
Langkah-langkah memastikan keselamatan pekerja
dan orang lain yang tidak terlibat dalam kerja
mengangkat.

Pemeriksaan Keseluruhan kren hendaklah diperiksa oleh pegawai
Kren JKKP setiap tempoh 15 bulan.
Orang yang Bertanggungjawab (OYB) haruslah
memeriksa kren pada sela masa yang disyorkan oleh
pembuat. Pemeriksaan ini lebih terperinci dan tertumpu.
Rekod-rekod pemeriksaan dan ujian hendaklah
sentiasa sedia untuk disemak oleh pegawai JKKP.

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 34

SIAPAKAH YANG TERLIBAT DALAM
KERJA - KERJA MENGANGKAT?

Area Owner / Project Owner

Orang yang bertanggungjawab sepenuh terhadap
semua aktiviti yang dijalankan di dalam Kawasan atau
di dalam sesuatu projek
Memastikan keperluan yang diperlukan sebelum
memulakan aktiviti mengangkat cukup,mematuhi
prosedur dan selamat digunakan
Memastikan pekerja yang terlibat faham dan mematuhi
semua peraturan dan cara kerja yang betul semasa
aktiviti tersebut dijalankan

Lifting Supervisor / Lifting Competent Person

Pekerja yang dilantik untuk merancang kerja mengangkat
Pekerja yang bertanggungjawab menyelia semasa
aktiviti dijalankan di site dan memastikan kerja mengang-
kat dilakukan dalam keadaan yang selamat
Pekerja yang telah diberi latihan yang sesuai dan
mempunyai pengetahuan praktikal dan teoritikal
berkenaan kerja mengangkat yang akan dibuat
Melakukan taklimat keselamatan dan mengesahkan
segala dokumen yang berkaitan betul dan tepat dengan
aktiviti mengangkat

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 35

SIAPAKAH YANG TERLIBAT DALAM
KERJA - KERJA MENGANGKAT?

Lifting Equipment Maintainer (FAS)

Bertanggungjawab untuk melakukan penjagaan
(maintenance) terhadap peralatan mengangkat
Menyimpan semua rekod berkeaadan maintenance,
repair dan inspection dengan teratur

Signalman

Pekerja telah menghadiri latihan Rigging and
Slinging dan masih sah tarikh luput
Pekerja tidak boleh menjadi rigger pada masa yang
sama semasa aktiviti mengangkat dilakukan
Menyelaras pergerakan mengangkat dan megekalkan
komunikasi ataupun hubungan visual
Mengambil bahagian dalam taklimat JHA

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 36

SIAPAKAH YANG TERLIBAT DALAM
KERJA - KERJA MENGANGKAT?

Rigger

Pekerja telah menghadiri latihan Rigging and Slinging
dan masih sah tarikh luput
Memastikan semua peralatan mengangkat (webbing,
slings, shackles dan lain-lain mengikut SWL, in dalam
keadaan baik dan disahkan (certified)
Mengetahui berat, bentuk, pusat gravity beban yang
hendak diangkat
Membuat pengikatan yang sesuai, stabil, seimbang dan
tiada loose item
Menggunakan tag lines untuk mengawal beban
Melaporkan kerosakan pada peralatan mengangkat
kepada supervisor
Barricade kawasan mengangkat dengan signage

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 37

ANTARA LANGKAH KAWALAN DALAM
AKTIVITI MENGANGKAT

Pengasingan Mengasingkan peralatan yang
rosak,tamat tarikh luput bagi
mengelakkan daripada digunakan

Kawalan Mengurangkan hazad ketika
Kejuruteraan mengangkat dengan menggunakan

peralatan bantu angkat yang telah
lulus pemeriksaan

PeKnatwadablairnan Memastikan sumber yang diperlukan oleh
orang yang terlibat adalah mencukupi
seperti latihan, kompetensi,tunjuk arah
(Signage), Tool Box, kawalan kecemasan
dan lain-lain

PerlinDdiuringan Perlu disediakan mengikut keperluan dan
aktiviti yang dijalankan

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 38

KEMALANGAN!
APA YANG PERLU ANDA LAKUKAN?

Memberitahu Telefon / Telefon Bimbit
Kecemasan Penggera Kecemasan
Walkie Talkie

Aktifkan Siren Kebakaran / Letupan
Tindakan - Bunyi siren yang panjang dan berterusan
- Pengosongan tempat kerja dengan segera
Kecemasan Kemalangan / Kejadian
Pekerja - Bunyi siren yang panjang pendek pada sela 3 saat

- Elak dari panik
- Tutup semua elektrik
- Bergerak kearah laluan terdekat
- Berkumpul di kawasan perhimpunan
- Lapor diri kepada Penyelia anda
- Beritahu jika ada orang cedera atau hilang

Penyelia Pastikan semua pekerja keluar dengan
Pekerja selamat ke kawasan perhimpunan
Menyediakan senarai kiraan pekerja
Laporkan jika ada orang yang masih berada
di dalam kren kepada orang yang ditugaskan
di kawasan Perhimpunan

Bergerak dengan tenang, cepat DAN elakkan
daripada menolak orang di depan
Bergerak ke kawasan perhimpunan dan
menunggu arahan pihak bertugas

ERT Bergerak dengan pantas dan selamat ke tempat
kejadian
Menjalankan operasi menyelamat seperti yang
ditetapkan oleh prosedur yang berkaitan.

NO WORK SO URGENT THAT WE CANNOT TAKE TIME TO DO IT SAFELY 39

brought to you by
CQHSE,

Compiled by:
Nur Adiba binti Mohd Kamal
Mohamad Saharudin Bin Jemahar
Mohamad Ashraf bin Othman
Aida bin Othman
Mohd Faiz Bin Abd Majid
Mohd Asri bin Yahya
First edition Oct 2020