uprpdoajteects 02 04 05
IssuFNeoArWS0hAu2BraEXCTouEnNcSilION
06 HHWAOASTMAEEBRIFARONT HDIALNMGUINNGIAGISALRADNEDN
For Manara For Cooperative Manama - Bahrain
HDPAFPEOFVPUOESSLROIONDCPAGIMBALLEEN&T Investment House
For NASEEJ - Bahrain 08
Dilmunia - Bahrain
AMAS/LUWZI- Bahrain 06 CASOUESRNVRSEUEYGLTISATNETRED
07 For Diyar Al-
5PRROEJCELCATMSAITNION Muharraq
PROCESS R2D5EESVSIETDLOEORNPETMYIAELNT
For Gulf Group Muharraq - Bahrain
Awali, Busaiteen,
Muharraq, Hidd,Juffair- Juffair- Bahrain
Bahrain
HCOIGRHPLOIGRHATTSE
NEWSLETTER 09
Issue — 02
PLANNING | ARCHITECTURAL | IYSEOAR90C0O1M:2P0L0E8TOIONNE
INTERIOR DESIGN | CIVIL | STRUCTURAL | BCNOOEWOARRDDDEISNIAGTNOR ON
MECHANICAL | ELECTRICAL | APAESRTCYH2R0I1S6TMAS
LAND SURVEYING
10
0273
AWAEWINSASERNIDCGEIN(UEKE)R
11 1
SSAYUERSPIPCAOHNRAVTRICIFTTOYIMR S
ANSARI ENGINEERING SERIVCES
hasabi: a water front Home ANSARI ENGINEERING SERIVCES - NEWSLETTER
‘HASABI:
A WATERFRONT HOME
PHASE 1 COMMENCED
AES in association with P&T Architect have been designing
the Master Plan Concept Improvements for this exciting new
premier waterfronted residential development on the south
east coast of Bahrain.
Design of the first stage of the residential villas and apartment
units has begun in conjunction with the marine Phase 1
construction site activities. Phase 1 will include a sea pool and
a new waterfront beach which are due for completion for the
project offical launch later this year.
‘Phase1 of the Marine
Works is now nearing
completion with the
creation of the canals
and marinas.
2
Issue 02
The first channel of Phase 1 was
completed in the beginning of May
and was flooded on 15th May 2017.
The rest of Phase 1 will be completed
in October this year.
OVERVIEW
This luxurious seafront
project, Hasabi, is located on
reclaimed land on the south-
east shores of the island of
Bahrain.
The project features canal
- fronted 3 and 4 bedroom
villas with private jetties
together with seafront four
storey apartments facing
onto boating Marinas.
The Central 40,000 sqm
landscaped themed feature
island is reserved for
recreation and hospitality
with beaches, sea water
pool, children’s play world,
a health and spa club plus
floating villas and a 200-key
boutique hotel. Jogging trails
and pedestrian bridges link
the neighbourhood crescent-
shaped, tree-lined avenues to
provide a unique residential
development with exclusive
features and resident
facilities.
ANSARI ENGINEERING SERIVCES 3
dilmunia: hanging garden ANSARI ENGINEERING SERIVCES - NEWSLETTER
DILMUNIA: HANGING GARDEN
SERVICEd APARTMENTS & CAnal fronted retail units
Architectural ,Structural,
MEP Detailed Design,
and Site Supervision is
by Ansari Engineering.
This award-winning twin site fronting onto
the Dilmunia Canal provides 278 serviced
five -star apartments and 196 freehold
apartments with 4100 sq.m. retail units
and total basement parking for 662 cars.
Ansari Engineering Services were
selected by the client for this design
and build project to provide the details
for the architectural, stuctural and MEP
facilities for these two 10 Storey Serviced
accommodation and freehold apartments
on Dilmunia Island.
The building structures have been designed
with the latest technology using post-
tension slabs with 2.5m edge cantilevers
supported on curved RCC frames with shear
walls bearing on piles. Piling construction
has began on site. The project is due for
completion in June 2018.
4
Issue 02 NAWAB EXTENSION FOR SHURA COUNCIL
NAWAB
EXTENSION
for Shura Council
Tenders are due to be AES were appointed by Special
completed later this Projects (MOWMUP) to carry out
year with a construction the architectural, structural ,MEP &
period of 14 calender Interior Design for this prestigious
months. Nawab office extension.
The design comprises a four-storey
office building with customed
layout for the Speakers and
Secretary General office suites
plus offices for the 32 MPs in a total
area of 6057sqm. The building,
which is linked to the existing two-
storey office facility, contains a
theatre & V/VIP Royal Majlis.
As requested, the design is
Traditional Bahraini with
a blend of modern and
traditional for the Interior
Design & FF & E (Fixtures
Fitings and Equipments).
ANSARI ENGINEERING SERIVCES 5
ANSARI ENGINEERING SERIVCES - NEWSLETTER
PPP SOCIAL & AFFORDABLE Design Finished &
HOUSING DEVELOPMENT Supervision is ongoing
for Naseej
ppp: social & affordable housing The total development provides 2,483 villas, 9
apartment towers consisting of 202 apartments
with 18 retail units and 2 split level car-parks
Construction began on the three infrastructure after 18 months on site the LEED award of a Neighbourhood
sites situated at Luwzi, Demistan, due to land acquisition issues. Development Certificate at Luwzi,
and AMAS Islands 13 and 14, Duraz, Despite these challenges the and a New construction certificate at
in June 2014. The sites comprised contractors are on target to complete AMAS as soon as the client completes
17 separate groups of housing all remaining units by the end of the provision of new services that
to be handed over to the client, 2017. This comprises 2,483 villas, form part of the overall development
a combination of Naseej and nine apartment towers consisting of requirements.
Ministry of Housing, in phases up to 202 apartments with 18 retail units Another significant achievement has
November 2016. and two split level car-parks, plus all been the first Estidama Certification
Many technical and administrative infrastructure. for one villa at Luwzi, the first award
factors combined to make this More significantly, the construction of its kind outside Abu Dhabi, where
an unusual challenging project, will have successfully employed LEED the scheme was first developed and
not least being the removal of building techniques that will result in from where it is still administered.
132 housing units and associated
Reclamation ProjectsOn-going / completed Galali, Busaiteen, Arad,GCC Plot
and Hidd
AES was appointed as the marine
Consultants/Engineer for the
reclamation of two plots at Galali
situated on the south of Diyar Al
Muharraq. The reclamation area of
the plots combined is 300,000 sq.m.
The works involve the mechanical
reclamation of the sea using the
truck-tip method and the provision of
shore protection rock revetment on
three sides of the plot. The works are
ongoing.
6
AES is also supervising as the Marine Issue 02 2ju5fsftaoirrey: Residential development
Consultant/Engineer the reclamation
of north-west Busaiteen. The area of 25 Storey
reclamation is approximate 305,000 Residential
sq.m, and the works also include the Development
construction of shore protection using
rock revetments. The reclamation method in Juffair
used is the hydraulic-filling method and
the water depth ranges up to 8m at the for Gulf Hotel Group
north-west end of the plot.
In addition, AES has been appointed SUPERVISION
Marine Consultants for the reclamation of in Progress
the plot at Arad near Arad Fort. The area of
reclamation is approximate 130,500 sq.m. This serviced residental tower provides a premier
The design has been completed and the mix of 1, 2 and 3 bedroom suites to five-star luxury
project is at the tender stage. quality. A total of 109 apartments are provided.
One of the most recent completed projects In addition, a seven level parking structure provides
AES supervised as a marine Consultant/ 151 parking spaces to the rear with direct access to
Engineer was the North Busaiteen the mezzanine lift lobby and business centre.
Reclamation Project. AES was appointed The five-star hotel residental suite facilities include
by the Bureau of Telecommunication a business conference centre plus a roof top sports
for the GCC. The area of reclamation and recreation centre with gym, jacuzzi, steam
was approximate 40,000 sq.m. and room, sauna and aerobic pool. A Cafe Delice , retail
also involved the construction of shore units and laundry are also provided at ground level.
protection structures. The project was The concept design, architectural, structural, MEP
completed successfully in January this and interior design were carried out in-house by
year. AES.
Another project AES completed Supervision by AES has completed structural top
successfully as the appointed marine out of all 25 floors and work has now commenced
Consultant/Engineer was at Hidd where on the interior fit outs and finishes and the first
the reclamation area was approximately floor 2 bedroom model unit with full interior design
80,500 sq.m. The project was completed is now complete and avaliable for inspection.
successfully in May this year.
Construction and hand over to the Client
is due to take place in June 2018.
ANSARI ENGINEERING SERIVCES 7
ANSARI ENGINEERING SERIVCES - NEWSLETTER
AES REGISTERED
SURVEY CONSULTANT
for Diyar Al-Muharraq
Diyar Al Muharraq is a massive project
located in Al-Muharraq in the Kingdom
of Bahrain. It covers seven artificial
Islands that are designed to a be a
self-contained city with commercial
and residential facilities. The mixed-
use development covers an area of 12
square kilometers, and offers 30,000
residential units to accommodate more
than 100,000 residents.
Ansari Engineering Services is a
registered survey consultant for the
project and our role is to assist the
master planner to implement the
concept of the project and all aspects of
surveying and subdivision of the assets.
All the subdivisions and survey for
earth work and infrastructure for
the different developers has been
conducted by AES.
AL-OYOUN LAND SUBDIVISON
FOR DIYAR ALMUHARRAQ
Subdivision of assets in the development has
been done for Al–Oyoun Project. The procedure
includes setting out of parent plots, computation
of coordinates for plots such as villa, green areas
and substation etc, as well as proceeding up to
preparation and issuance of land certificates for
the plots.
In this connection, subdivision has been
completed and recorded for Assets 22B-1, 22B-
2 , 23A-1, 23A-2 , 12A-7 and 12B-8 for 3,650
individual plots.
8
Issue 02
ISO 9001:2008
ONE YEAR COMPLETION
NEW DESIGN
COORDINATOR
ONBOARD
AES successfully completed the first External Surveillance AES management are pleased to
Audit for ISO 9001:2008 Certification in October 2016. The welcome Nidhi Mathur, who has joined
audit was conducted by the external auditor AJA. Assessment the architectural team as a project
is performed to ensure that AES’s Quality Management coordinator.
System (QMS) continues to meet all elements of the Nidhi will be responsible for the
scope of certification and effectively maintains the entire inter-departmental coordination of
requirements of the ISO 9001:2008 International Standard. design development projects and
The final outcome of the audit confirmed once more a well- implementation of ISO procedures.
implemented Quality Management System. There were two We welcome Nidhi and offer our support
minor non-conformances identified and ten observations in making a success of this pivotal role.
raised which all were eventually closed. Good practices were
observed in terms of management review, internal audits “Maintaining ISO Certification
and record keeping. AES’s QMS remains effective and has simply validates AES’s unwavering
been recommended for continued certification. commitment to deliver quality service
Well done to all QMS Quality Team! ”to its customers
NICK ZAPATERO
— QMS Department
AES 2016
CHRISTMAS PARTY
AES management and staff enjoyed a
Christmas party in December to celebrate the
festive occasion and another successful year for
the company.
Mr. Ali Al-Ansari thanked the staff for their
effort over the last year and expressed his
optimism for the new year.
ANSARI ENGINEERING SERIVCES 9
aes engineer wins ice (uk) awardANSARI ENGINEERING SERIVCES - NEWSLETTER
AESWENINGINSEEIRCE (UK) AWARD
REGIONAL AWARD FOR THE ice (uk)
Ansari Engineering Management and staff
are pleased to offer our congratulations to
Sumesh Shankar who has won a prestigious
regional award for the ICE (UK).
Mr. Ali Al-Ansari (right) presents the financial
award to Sumesh Shankar.
Sumesh Shankar receives the ICE award.
AES management are pleased to confirm
that they will also match the cash award
made by the competition organizers ICE
(UK).
Sumesh is now waiting for an invitation to
attend the international finals to be held in
London later in the year.
Mr Ansari stated that this award is not
only a testament to the technical skills of
Sumesh, it also raises awareness of the
AES brand and capabilities, so thank-you
Sumesh.
10
Issue 02
AES ” The EY team that took part in the run. aes CHARITY SUPPORT FOR SYRIAN VICTIMS
SCUHPAPROIRTTY
On behalf of the EY team, I wanted to send
VSICYTRIIMAFNOSR you a message to show our appreciation
for the hugely generous donation you
Ansari Engineering Services participated by made. You have helped us raise US$ 13,000
staff fundraising and donating to the Syrian for Syrian refugees living in the Za’atari
Refugees charity through a sponsored Refugee Camp in Jordan.
run(Dubai Marathon 2017) to support IRC The money will be donated to the
(International Rescue Committee). International Rescue Committee (IRC),
Mr. Mark Stanley, son of Mr. Mike Stanley the and will be used to provide uprooted
Commercial Manager of AES, took part in the families with medical care, clean water,
Marathon along with the sponsorship of AES sanitation, education, women’s protection
management and staff.
”services and other vital aid.
MARK STANLEY
— EY Team
Special thanks to all of AES employees
who have donated for this noble cause to
provide a better future for all the Syrian
refugees.
Please visit the following link to find out
more about the fundraising campaign.
https://www.crowdrise.com/IRC-Syria
fundraiser/eycustomer-team
ANSARI ENGINEERING SERIVCES 11
AIsNsSuAeR0I2ENGINEERING SERIVCES - NEWSLETTER
CONSULTING SEINNGCEIN1E9E7R8S
& ARCHITECTS
ISO 9001:2008 Certified Company
12 0273