FAKULTI PENDIDIKAN TEKN
UNIVERSITI TUN HUSS
Perincian Perancangan Aktiviti Pengajaran
Edisi 1/2021
NIKAL DAN VOKASIONAL
SEIN ONN MALAYSIA
FAKULTI PENDIDIKAN TEKN
UNIVERSITI TUN HUSS
Edisi 1/2021
NIKAL DAN VOKASIONAL
SEIN ONN MALAYSIA
FAKULTI PENDIDIKAN TEKN
UNIVERSITI TUN HUSS
Edisi 1/2021
NIKAL DAN VOKASIONAL
SEIN ONN MALAYSIA
FAKULTI PENDIDIKAN TEKN
UNIVERSITI TUN HUSS
Edisi 1/2021
NIKAL DAN VOKASIONAL
SEIN ONN MALAYSIA
FAKULTI PENDIDIKAN TEK
UNIVERSITI TUN HUS
Lampiran Dokumen / Bergambar (soalan kuiz / ujian / lemabaran ak
Gambar 1: Assessment
Edisi 1/2021
KNIKAL DAN VOKASIONAL
SSEIN ONN MALAYSIA
ktiviti / gambar dll.)
t menerusi google form
FAKULTI PENDIDIKAN TEK
UNIVERSITI TUN HUSS
RANCANGAN MENG
- KELAS D
Edisi 1/2021
KNIKAL DAN VOKASIONAL
SEIN ONN MALAYSIA
GAJAR MINGGUAN
DTC 5A -
FAKULTI PENDIDIKAN TEK
UNIVERSITI TUN HUSS
RANCANGAN MEN
BIL
Edisi 1/2021
KNIKAL DAN VOKASIONAL
SEIN ONN MALAYSIA
NGAJAR HARIAN
L1
FAKULTI PENDIDIKAN TEK
UNIVERSITI TUN HUSS
Edisi 1/2021
KNIKAL DAN VOKASIONAL
SEIN ONN MALAYSIA
FAKULTI PENDIDIKAN TEKN
UNIVERSITI TUN HUSS
Perincian Perancangan Aktiviti Pengajaran
Edisi 1/2021
NIKAL DAN VOKASIONAL
SEIN ONN MALAYSIA
FAKULTI PENDIDIKAN TEKN
UNIVERSITI TUN HUSS
Edisi 1/2021
NIKAL DAN VOKASIONAL
SEIN ONN MALAYSIA
FAKULTI PENDIDIKAN TEKN
UNIVERSITI TUN HUSS
Edisi 1/2021
NIKAL DAN VOKASIONAL
SEIN ONN MALAYSIA
FAKULTI PENDIDIKAN TEKN
UNIVERSITI TUN HUSS
Edisi 1/2021
NIKAL DAN VOKASIONAL
SEIN ONN MALAYSIA
FAKULTI PENDIDIKAN TEK
UNIVERSITI TUN HUS
Lampiran Dokumen / Bergambar (soalan kuiz / ujian / lemabaran ak
Gambar 1: Slai
Edisi 1/2021
KNIKAL DAN VOKASIONAL
SSEIN ONN MALAYSIA
ktiviti / gambar dll.)
id Power Point
FAKULTI PENDIDIKAN TEK
UNIVERSITI TUN HUS
Gambar 2: Assessme
Edisi 1/2021
KNIKAL DAN VOKASIONAL
SSEIN ONN MALAYSIA
ent menerusi Kahoot
Edisi 1/2021
BAHAN PENGAJ
Edisi 1/2021
JARAN & ABBM
SUBJEK: CONSTRUCTION MATERIAL
Gambar 1: Sla
Edisi 1/2021
aid Pengajaran
Gambar 2: Aktiviti-aktiviti, tugasan s
Edisi 1/2021
serta penilaian kendiri di dalam kelas
Gambar 3: Aktiviti-aktiviti, tugasan s
Edisi 1/2021
serta penilaian kendiri di dalam kelas
SUBJEK: PROJECT MANAGEMENT
Gambar 1: Slaid da
Edisi 1/2021
an video pengajaran
Gambar 2: Sla
Gambar 3: Aktiviti-aktiviti, tugasan s
Edisi 1/2021
aid pengajaran
serta penilaian kendiri di dalam kelas
Gambar 4: Aktiviti-aktiviti, tugasan s
Edisi 1/2021
serta penilaian kendiri di dalam kelas
Gambar 5: Aktiviti-aktiviti, tugasan s
Edisi 1/2021
serta penilaian kendiri di dalam kelas
SOALAN KUIZ /
UJIAN /
PEPERIKSAAN
Edisi 1/2021
SULIT
DCV50153
PROJECT MANAGEMENT
MAY - OCTOBER 2021
KOLEJ KEMAHIRAN TINGGI MARA SRI GADING
UNIT PENILAIAN DAN PERSIJILAN
FINAL ASSESSMENT
MAY - OCTOBER 2021 SESSION
COURSE : DCV50153 - PROJECT MANAGEMENT
DATE : NOVEMBER 2021
DURATION : 2 HOURS
PROGRAMME : DTE, DTC, DTF, DTG, DTH, DTM & DTV
DO NOT OPEN THIS QUESTION BOOKLET
UNTIL YOU ARE TOLD TO DO SO
Instructions :
1. This question paper consists of SECTION A and SECTION B.
2. Answer ALL questions in SECTION A and answer THREE (3)
questions in SECTION B.
3. SECTION A is compulsory.
4. Answer the question in the answer sheet provided.
This booklet contains 10 printed pages
©2021 Copyright KKTM Sri Gading [Next Page
SULIT
SULIT DCV50153
SECTION A
This section consists of ONE (1) question.
Answer ALL questions.
1. a. In term of breakdown structure, scope involves getting required to start
a project and the features the product would have that would meet its
stakeholder’s requirements.
i. List types of managements that involved in Work Breakdown
Structure (WBS) framework.
(3 marks)
ii. Compare between project and product scope.
(4 marks)
iii. Identify the meaning of Lead and Lag time with sketch aid.
(4 marks)
iv. Give two (2) forms of links activity that possibility involved in
Work Breakdown Structure framework.
(2 marks)
2
[Next Page
SULIT
SULIT DCV50153
Questions 1(b) refers to Table 1
Table 1: List of project activities
Activity Duration (week) Predecessor
A 5 None
B 8A
C 3B
D 4A
E 5C
F 7C
G 6 D, E
H 8F
I 6G
J 5 H, I
1. b. Table 1 shows the information of activity on arrow (AON). Based
on the information above
i. Calculate Early Start (ES), Late Start (LS), Early Finish (EF) and
Late Finish (LF) for activity B & J.
(8 marks)
ii. Determine the critical path for the network, total duration of the
project and Late Start (LS) for activity D & H.
(4 marks)
3
[Next page
SULIT
SULIT DCV50153
SECTION B
This section consists of FIVE (5) questions.
Answer THREE (3) questions only.
Question 1 refer to Attachment 1
1. a. Attachment 1 shows a simple bar graph schedule for a construction
project.
i. Calculate scheduled cumulative percentage progress.
(12 marks)
ii. Calculate actual cumulative percentage progress.
(5 marks)
iii. Plot S-Curve for physical progress of the project on the graph
paper.
(8 marks)
4