FACTS
rom our historical climate data:
April, May, June, July, August, September, October
mum temperature of 32°C (89°F).
imum temperature of 30°C (86°F).
uld be avoided if you are not a big fan of rain.
22
4.0 SENSORY E
01 07 08
02
08 07
01
03
02
04
03
04
A
05 B
C
D
BA
CD
WAKAF
ANALYSIS SYNTHESIS
EXPOSE TO HUMAN COVER THE SIGHT
ACTIVITY TO SOUTH WITH TREES,FENCES
WEST OR FACADE
RESIDENCE HOUSE SYNTHESIS
PROVIDE A BEAUTIFUL
ANALYSIS LANDSCAOE AS A
EXPOSE TO WELCOMING
RESIDENCE ACROSS SINGNATURE OF THE
IN THE NORTH
ZAINI LIN BUILDING
ANALYSIS CAFETERIA SYNTHESIS
COVER IT WITH
05 EXPOSE TO PEOPLE LANDSCAPE OR
ACTIVITIES IN ZAINI FAÇADE
LIN CAFERIA NORTH
WEST D
E SYNTHESIS
ANALYSIS MAINTAN RO BLOCK
EXPOSE TO HIGH HIGH PRESSURE WIND
COCONUT TREES COMIMNG FROM THE
IN THE WEST SOUTH
LEAD TREES
(LEUCAENALEUCHEPALA)
ANALYSIS SYNTHESIS
EXPOSE TO MAINTAN SOME OF
EXISTENCE TREES IT AS SOURCE OF
IN THE EAST AND HERBS
SOUTH
APARTMENT SYNTHESIS
PROVIDE A
ANALYSIS BEAUTIFUL
EXPOSE TO
APARTMENT IN LANDSCAPE AS A
WELCOMING
THE EAST NORTH SIGNATURE OF THE
E BUILDING
23
AIR MOVEMENT
INVENTORY
ANALYSIS SYNTHESIS 01
POSITIVE NICE USE FOR
SOUND PUBLIC AREA
COME FROM
THIS WAZE B
02
ANALYSIS
SYNTHESIS
LOUND DO NOT PUT
SOUND PUBLIC AREA
FROM THE AT NEGATIVE 03
VEHICLES A SIDE
ON THE
ROADWAY SYNTHESIS
GOOD AREA
ANALYSIS C FOR CHILLING VIEW INTO THE SIT
POSITIVE
SOUND COME
FROM TREES
AND BUSHES
A
B
03 06
C
ANALYSIS INVENTORY
06 FRESH AIR SYNTHESIS
FROM THE SEA
BECAUSE IT IS
COOLED AND KEEP THE
BEAH CLEAN
THE AIR FEEL
COMFOR TABLE 03
04 ANALYSIS 06 SYNTHESIS
TE 05 ROAD AT THE 04
USING
LEFT SIDE IS MATERIAL
NEGATIVE SOUND
BECAUSE BAD PROOFING
AIR COME FROM
VEHICLES SYNTHESIS
ANALYSIS PLANT MORE
TREES
THE TREE
PRODUCE GOOD
AIR AS IT CAN
ABSORB CARBON
DIOXIDE AND
RELEASE
OXYGEN
C
24
5.0 NATURAL PHYSICA
CONTOUR
ANALYSI
• The co
the gro
is not v
even th
in a rel
area
SURFACE WATER RUNOFF
As the rain continues, water reaching the ground surface
rate of rainfall (intensity) exceeds the infiltration capacity
other depressions are filled with water (depression storag
AL FEATURES
IS SYNTHESIS
ontour shows • If we want to do construction we do
ound elevation not need much time to level the land
very significant or add land in the area. But we can
hough the site is also use the existing land because
latively steep the land in the area is not very
significant height.
infiltrates into the soil until it reaches a stage where the
y of the soil. Thereafter, surface puddles, ditches, and
ge), and after that overland flow as runoff is generated.
25
VEGETATION
5
1
Palm Tree
2
Tanjung Tree
3
4
Forest Wild Bushes
26
MAJOR LAND FEATURES
• In this site plan shown they have steeps
slopes and a summit, which is the highest
point of elevation
• Landforms ate natural physical features of the
Earth’s surface. As an element of topography, a
landform id defined by its shape, location and how
it was formed
A – FLAT AREA
B – SLOPE AREA
C – SLOPE AREA
27
SLOPE
Materials and methods for reinforcing slopes to prov
required stability
Some of these parameters will be constrained to mee
specific needs of the site or project so that the specifi
parameters can be varied to produce acceptable
performance depending on the case
Earth slopes should be
designed to maintain
stability of conditions and
loads.
The slope of the earth should also be planned
so that excessive deformation is not
experienced over a lifetime or so that the
deformation that occurs does not adversely
affect the way it travels
The "design" of the earth's slope generally
involves the selection of some of the
following combinations to produce final slope
that will meet the performance requirements.
Slope geometry to include slope, slope width,
vide the and slope height,
Materials and methods for providing
et the appropriate surface drainage and / or
ic groundwater.
Slope material to include the selection of
filling material for the embankment,
28
6.0 MAN-MADE FEATU
LAND BREEZE
Strength-land breeze makes it cooling
during the night.
Seaward wind originating from land.
Occurs during night time.
Land cools faster than water.
Hot air from sea rises and is
replaced By cool air from land.
URES
SEA BREEZE
Strength-sea breeze makes it cooling during
the day
Observed-safe site due to weak tides and
waves.
landward wind originating from sea.
occurs during day time.
land heats faster than water.
hot air on land rises, replaced by influx
Of cool air from sea.
29
SOIL
Compact Loamy
Loam stone
below Course
Loamy
• Soil conditions require soil borings and a soils report wh
soil type and bearing capacity. Sometimes the soils test i
until after schematic design so that only the soil in the ar
building will be located is tested.
Compact Coarse
Send below rade.
Compact Sandy
Loamy below
Coarse Sandy
Sandy soil
SOIL TYPE AREA(%)
hich describes LAOMY SOIL 65%
is not done SANDY 20%
rea where the 15%
LAOMY SOIL
SANDY SOIL
30
GROUND COVER AND CONDITION
Site Scar :
Appatent previous
excatation
Ditch and access
easement are
bare soil
This site is on
stable condition
N
31
ON SITE DRAIN ANA
2 Ope
WAKAF rain
1 SYN
Cov
that
2
ANALYSIS 1
There are five wakaf on
Pantai Purnama. The stairs
are steep.
SYNTHESIS
Add a new stairs and
improve the safety. Parking
lot limited parking and
irregular
parking. Add more parking
lot and make it organized.
ALYSIS
en drainage and the drain path is too small causing
nwater to escape from the path.
NTHETIS
ver the large drains with lids and enlarge drain passages so
t rainwater does not com out of the passages.
SIGNBOARD
3
3
ANALYSIS
Railings Lack of Railings on
the cliff.
SYNTHESIS
Increase the number of
wakaf places because Pantai
Purnama is an attraction for
people to hang out.
32
1
2
2 ANALYSIS
BUMP There are road bump at the st
so that vehicles do not drive f
bumper sign at the entrance
SYNTHESIS
Add another road bumper sig
Add Railings to the cliffs to k
and up the stairs.
1
STREET LIGHT POLE
ANALYSIS
There are 5 street light pole near the
site. No need to remove and needs to be
added for the use of the proposed site.
Wall to withstand land soil are less
strong.
SYNTHETIS
Create a stronger wall or increase the
number of trees in the wall area
teep junction path. more road bump
fast on steep roads. There is road
gn and placed at the right of the road
keep People safe while going down
33
7.0 UTILITIES
INVENTORY CHECK
STREET LAMP
TELECOM POLE
SERVICE ROAD
34
ANALYSIS & SYNTHESIS
SERVICE ROAD
STREET LAMP
TELECOM POLE
STREET LAMP TELECOM SERVICE
POLE ROAD
STRENGHT making the main provide connecting
road bright in telephone and between the main
the dark internet signal roads to the
strength proposed site
WEAKNESS lack of street insufficient unsatisfactory road
lighting in the telecome pole. conditions as well
proposed site as potholes
area
OPPORTUNITY Electrical is Telekom access There are some
provided near is provided near existing service
the proposed proposed site road nearby
site
THREAD Street lamp not Out far from Two side of
fully from the site propose site do not
maintenance hence lower have service road
access of at all and there is
telecom not possible
entrance road into
the site
SYNTHESIS -provide more -need to provide -provide more
streets light for telecom pole at service roads into
user of proposed the proposed and around site
site site -maintenance
-maintenance regularly
regularly
35
ANALYSIS & SYNTHESIS
DIS
TNB
SUB
N
DRA
FIR
HYD
WAT
SUP
MA
SPOSAL STRENGHT WEAKNESS OPPORTUN TREAT
ITY
garbage lack of approriate public
trucks drives garbage location attraction
everyday disposal makes it hard
area,smelly closed to to maintain
B near to tnb proposed site cleanliness
BSTUATIO substuation only one tnb provide and
substuation proposed 37 meter a
AIN drain around around the drain with a way from
site proposed bit depth proposed site
area
RE lot of scape approciate small drain
DRANT to place new drain place that can
fire hydrant provided but cause water
ATER to small water supply over flowed
PPLY nearby with is provided not qualified
water supply only fire near to ubbl
hydrant only proposed site requirement
ANHOLE nearby to detected
manhole around site manhole is can cause
was no lack
provided small svc blockade watersupply
capasitor near the site
water supply
to support a provided
whole area manhole near
with the
manhole proposed site
provided fully
maintanance
36
LANDMARK
TELUK KEMANG
Teluk Kemang beach serves as another major
landmark as it used to be the one of the largest and
most popular beach in Teluk Kemang. A beach that
is often the focus of tourists in Port Dickson with the
cleanliness and liveliness of the beach.
PD OSTRICH FARM
One of the most popular places in Port Dickson and
an area not far from the proposed site which is 500
m from the site. Pd ostrich is very suitable to be a
land on the proposed site
POLITEKNIK PORT DICKSON
An educational institution not far from the
proposed site only 400 m away. The polytechnic can
serve as a strong benchmark of the proposed site
due to its popularity and the closest area
37
8.0 HUMAN CULTURE
MONTHLY HOUSEHOLD INCOME
AND EXPENDITURE, 2019
• Intermediate • Incidents of
income (M40) poverty 4.3%
RM 4,959
• Average • Average
expenditure income RM
RM 4,083 6,393
E
131,764 POPULATION PORT
DICKSON, NEGERI SEMBILAN.
• Male- 69800 • Bumiputera-65700
• Female-61900 • China-31800
• Indian-25600
• Other-800
• 0-4 – 23.2% • Industrial
• 15-64 – 69.7% • Business
• 65+ - 7.1% • Fishing
• Hospitality sectors
38
• Activity hotspot Commercial
at 9 a.m.
Housing
• Activity hotspot
at 12 p.m. Transportation
Beach
• Activity hotspot
at 4 p.m. 1&2 )
Port Dickson beach an
• Crime hotspot Purnama beach are the
points in this area as th
attractive resorts and h
activities to do in this a
3)
Zaini Lin Cafeteria is
available on Sri Purna
cafe also a focal point
visitors when they com
The number of custom
depends on the visitor
the beach at that day.
nd Sri S Nice resort area and tourist spot
e focal with a multi-racial population and
hey are many hotels and homestay nearby.
have many
area. W Most of the stalls and games such
as banana boat are on Port
the only cafe Dickson Beach and not on Sri
ama Beach. This Purnama Beach which makes the
area a little boring.
at this area for
me at this beach. O Open many more stalls or beach
mer usually activities such as banana boat and
rs who come to create job opportunities for
coastal control to ensure coastal
areas are better protected and can
be more attractive to foreign
tourist.
T Lack of controls for crime
prevention such as drinking
alcohol, pick pockets and drugs.
4)
Port Dickson Polytechnic one of
the institution around Port
Dickson. This polytechnic can
accommodate approximately
1,200 full-time student and 374
academic lecturers and assisted
by 118 support staff.
5)
The night market also is one of
the focal point, especially the
polytechnic students. This night
market only open at Wednesday.
This is also one of the sources of
income for traders.
39
9.0 CIRCULATION
MACRO DIRECTION
1
2
3
4
1 PLAZA TOL
PORT DICKSON
Distance from site
to plaza tol 34.5km
2 PD WATERFRONT
Distance from site
to PD waterfront
14. 2 km
3 PASIR PANJANG
Distance from site
10.7 km
4 KAMPUNG
KUALA LINGGI ,
MELAKA
Distance from site
21.8 km
40
MICRO DIRECTION
1) H . Port
Dickson – distance
4.8 km from site
2) Teluk kemang –
distance 1.5 km
from site
3) Politeknik Port
Dickson – 1.6km
4) Tanjung Tuan –
4.6km
5) Lexis Hibiscuss –
5.2km
1
2
3
45
41
VEHICLE CIRCULATION
This vehicles circulation showed the density of traffic at J
showed the traffic flow at the site .Through the analysis,
occurred along the street.
Jalan Raya Batu 5, Port Dickson. The time lapse below
there are several issues which causes the problem
Has bus stop on the
main road across
opposite the Jalan
Perdana 4 junction
Safety for roads or
highways near the project
area is guaranteed by the
presence of traffic light
nearby
There is a bus stop across
the street near the shop
area opposite the bus stop
at the exit to the main
road.
Has a bus stop at one of
the exit intersections to the
main road. The bus stop is
always busy until evening
only
42
CIRCULATION : PEDESTRIAN
Existing pedestrian road (blue) at the site is not much. O
of the other pedestrian road are actually quite far from s
ANALYSIS
Because of the lack pedestrian route that is closer to the
user comfort to walk around. A new pedestrian road (re
pedestrian road around the site for the user also for the
Other than pedestrian road at the opposite, most
site.
Existing pedestrian road next to the site
e site, we propose a new pedestrian route to maximizes
ed) next to the site that will be connected to the existing
public by make a gap at the existing parking lot.
43
SYNTHESIS
Other than adding pedestrian road (red) closer to the s
add new pedestrian road (red) from the site to the main
nearest bus stop (141m from Jalan Kemang12), for use
site, we also propose to
n road and to the
er's facilities.
44
VIEW FROM MAP TO SHOW THE R
ROUTE
45
PROPOSE TO ADD A LAMP POST A
PEDESTRIAN ROAD
(ROUTE TO ADD NEW 141M FROM JALAN KEMANG 12 LAMP PO
Propose to add lamp posts along with the new
pedestrian road for users comfort and security
purpose, so that users still can use the road at night.
ALONGSIDE WITH THE
OST)
46
PROPOSE TO ADD MORE PEDEST
FROM SITE TO THE NEAREST BUS
Bus stop (Jalan Pantai) Nearest bus stop is Route to add
new 141m from Jalan Kemang 12