2.8 AREA / SIDINGWISE PERFORMAN
CCL/
APR to
Siding FOIS Offer Allot Ldg. 2018-19 Total Avg
Code Demurrage Time Ldg
Time
Adv LB Rks Hrs
DHO (L/No-I) DNCS 62 62 91 28 5 56 505 965 10:36
DHO-(L/No-II) DNSD 45 45 139 15 5 67 543 1224 8:48
DHO II (TAR) TCSB 480 459 353 41 5 252 957 2012 5:41
NSD DNCP
JAN I PSJA 407 400 254 27 2 132 825 2070 8:08
JAN II JRGD 139 139 118 22 2 83 1083 1679 14:13
KG (WSH) KGLI 1 1 12 3 12 124 171 14:15
KGW-II (OCP) KWJP 64 64 55 10 21 277 528 9:36
Kathra/Wsh KTWY 14 14 16 3 1 16 326 404 25:15
Kathra/W/Sdg KWSP
Swang SCW 22 22 40 17 2 39 207 407 10:10
TOTAL 1234 1206 1078 166 22 678 4847 9460 8:46
NCE OF COAL LOADING [IN RAKES]
/ DHO
AUG
Offer Allot 2019-20 Total Avg Loading
Demurrage Time Ldg Rakes/Day Var.
Time
Ldg. Adv LB Rks Hrs of Ldg.
18-19 19-20 /Day
77 77 77 12 2 69 897 1278 16:35 0.6 0.5 -0.09
137 137 104 17 83 952 1487 14:17 0.9 0.7 -0.23
276 239 249 10 3 195 1239 2032 8:09 2.3 1.6 -0.68
334 318 242 33 4 173 820 2027 8:22 1.7 1.6 -0.08
318 294 223 40 147 896 2006 8:59 0.8 1.5 0.69
0.1 -0.08
217 201 155 13 1 121 1311 2089 13:28 0.4 1.0 0.65
10 10 161 34 5 152 2034 2844 17:39 0.1 1.1 0.95
8 8 65 58 60 373 698 10:44 0.3 0.4 0.16
1377 1284 1276 217 15 1000 8522 14461 11:19 7.0 8.3 1.29
2.9 SIDINGWISE PERFO
Sdg / FOIS 2018-19 Avg Ldg O
Area Code Time
Demurrage 1
D-CHUA DCSN (In Hrs)
Offer Allot Ldg. Adv. LB Rks Hrs
2:53
208 174 267 186 64 164
DCH Wharf DWWS 132 127 134 18 27 69 3:29
JAYANT JCSS
BINA BCSK 53 53 82 3 72 278 6:18
KRSL BWWL 143 143 100 93 184 4:51
SPUR-I SSMN 96 96 88 3 86 263 5:59
SPUR-II SPUS 105 105 94 2 90 204 5:12 1
Jhingurda JRGD 27 27 377 18:24
TOTAL 737 698 792 212 459 1539 4:44 5
ORMANCE OF COAL LOADING
NCL
August
2019-20 Avg Ldg Supply Var.
Time Rakes/Day of Ldg.
Demurrage
(In Hrs) 18-19 19-20 /Day
Offer Allot Ldg. Adv. LB Rks Hrs Total
Time 8.61 8.97 0.35
149 149 278 217 122 405
1094 3:56
94 94 89 5 65 300 570 6:24 4.32 2.87 -1.45
47 47 66 1 64 432 657 9:57 2.65 2.13 -0.52
77 77 100 86 174 478 4:46 3.23 3.23
79 79 116 4 87 176 522 4:30 2.84 3.74 0.90
140 140 102 3 67 225 503 4:55 3.03 3.29 0.26
12 12 51 5 41 289 5:40 0.87 1.65 0.77
598 598 802 230 496 1753 4113 5:07 25.55 25.87 0.32
CHOPAN AREA
GHQ HINDALCO K
MQX PVT. SDG BXLL
MERALGRAM PDLS
JRQ PVT. SDG
OBRA
RNQ SLBN
PKCI
ADITYA BIRLA
PVT. SDG
BXLL G/S
BHP SDG
LIME STONE & DOLOMITE
32.5 KM/ SPEED-30 KMPH
BINA/W SDG JAYANT SDG DCH SDG
3.41/ DAY 0.27/ DAY 8.8/ DAY
DIST-1.0 KM DIST-6.5 KM DIST-6.0 KM
SKTN
KRSL GS
0.6/ DAY
KRSL DCH/W SDG
4.17/ DAY
BINA SDG DIST-6.3 KM
2.47/ DAY
JGRD SDG DIST-1.5 KM
0.83/ DAY
ANPR DIST-7 KM SPUR I&II SDG
5.90/ DAY
SPUR-III GS TO KATNI (WCR)
0.7/ DAY
DIST-7 KM MHDA
SGRL
KRLR SPUR-X GS MHDA G/S
0.3/ DAY 1.2/DAY
DIST-7 KM
CPU TO CHUNAR(NCR)
Double Line
Single Line
Coal Ldg. Sdg
Goods Shed
2.10 SIDINGWISE PERFOR
N
APR to A
2018-19
Demurrage Avg Ldg
Time
Sdg / FOIS Allot Ldg. Adv. LB Rks Hrs Total
Area Code Offer Time (In Hrs)
D-CHUA DCSN 1192 1244 1303 793 333 911 3842 2:56
DCH Wharf DWWS 608 601 627 35 155 330 2209 3:31
JAYANT JCSS
BINA BCSK 248 236 368 45 345 1615 2741 7:26
KRSL BWWL 588 584 540 36 452 820 2452 4:32
SPUR-I SSMN 445 441 402 11 383 1111 2331 5:47
SPUR-II SPUS 544 540 506 31 399 1053 2542 5:01
Jhingurda JGRD 129 1 130 1927 2586 20:02
TOTAL 3625 3646 3875 952 2197 7767 18703 4:49
2.11 SIDINGWISE PERFORMANCE OF C
2018-19 A
Demurrage Total L
Time Ti
Siding FOIS Offer Allot Ldg. Adv LB Rks Hrs 1025 12
Code 24 24 82 61 4 79 782 149 7
West Bko 10 10 20 38 353 5
Chasnalla WBCC 69 69 2 147 1527 8
Banadag CCSP 103 34 171 17
Total NTPC 967 Goods
20 20 61 4 98
17 17 126 6
DGD G/S DGSC 7 28 125 7
KDS/N KDS 37 37 5 51
SNMY 21 21 12 79 251 6
Total 15 15 Good
12 12
Banadag BNDG 34 34
13 13
BERMO BRMO 15 15 10 55 158 7
9 9 1 8 48 123 8
BRKA LTBK 35 36
20 20 8 35 95
BRKA OSBK 15 15
11 11 5 8 130 3
KDH-CMT KSNT 6 13 78 6
200 201 13 157 237 15
KUJU BEGS
4 4 43 4
TORI G/S TPST 35 35 9 74 253 7
32 32 7 17 117 5
RHR RSCR 32 32 7 99 172 11
23 23 8 46 101 9
PTRU GS PTRU 126 126
363 364
BHKD GS BHKD
KKAS GS KKAS 1 81 552 1507 7
BIRATOLI BIRT Good
Kushmahi KUHM
Total G/Shed
SLBN SLBN 1 1 21 5
MHDA MHDA 25 174 279 7
21 153 313 9
KRSL GS KRSL
SPUR-III SGRL 1 5 164 5
2 3 118 5
SPUR-X SPXS
Total G/Shed 50 336 895 7
1 143 967 2653 7
G Total G/Shed
COAL LOADING OF G/S & OTHERS [IN RAKES]
August
2019-20 Loading
Avg Demurrage Avg Rakes/Day Var.
Ldg of Ldg.
ime Offer Allot Total Ldg
2:30 12 12 /Day
7:27 14 14 Ldg. Adv LB Rks Hrs Time Time 18-19 19-20 -0.06
5:06 212 80 -0.10
8:55 238 26 17 54 80 1035 1282 16:01 2.6 2.6 4.61
s Shed (BCCL) 212 4.45
309 1 5 123 207 12:10 0.6 0.5
0.10
23 13 30 650 3:03 2.2 6.8 -0.55
0.13
4 55 98 1188 2139 6:55 5.5 10.0 -0.32
27
6:18 23 14 77 192 8:20 0.6 0.7
7:21 0.5
4 1 1 21 0.1
6:47 27 15 78 213 7:53 1.2 0.9
ds Shed (CCL)
7:31 4 4 4 23 43 10:45 0.7 0.1 -0.55
8:12 10 10
8 8 1 9 66 6:36 0.5 0.3 -0.16
3:49 27 27
6:00 2 2 1 1 46 0.4 0.3 -0.13
5:48 31 31
4:46 4 4 82 3:02 1.1 0.9 -0.23
7:01 8 8
5:51 8 8 8 4:00 0.4 0.1 -0.35
1:28 29 37
9:10 14 14 2 5 143 4:36 0.5 1.0 0.52
153 19 4:45 0.3 0.1 -0.16
47 2 6 46 5:45 1.2 0.3 -0.90
11
68 5 7 46 5:45 0.6 0.3 -0.39
16
142 12 18 197 5:19 0.5 1.2 0.71
322
6 38 110 7:51 0.4 0.5 0.10
7:29 145 33 107 806 5:16 6.5 4.9 -1.55
ds Shed (NCL)
5:15 44 0.1 -0.13
7:58 11 11 60 223 4:44 1.1 1.5 0.39
9:46 68 4 14 65 5:54 1.0 0.4 -0.68
5:07 16 31 100 442 6:30 1.0 2.2 1.16
5:07 139 6 48 120 7:30 0.7 0.5 -0.23
7:06 311 52 222 850 5:59 4.1 4.6 0.52
7:17 100 407 1869 5:48 11.7 10.4 -1.35
2.12 GOODS SHEDS COAL LOADI
APR to A
2018-19
Siding FOIS Offer Allot Ldg. Adv. LB Demurrage Avg
Code 239 239 436 202 7 Rks Hrs Ldg
West Bko 114 109 122 1 Time
Chasnalla WBCC 545 544 202 1
Banadag CCSP 898 348 1102 9 434 3446 10:56
Total NTPC
25 149 5:51
201 744 4:21
660 4339 7:07
Goods She
DGD G/S DGSC 111 112 1 62 282 8:41
KDS/N KDS
SNMY 23 23 8 66 7:00
Total
134 135 1 70 348 8:24
Goods Sh
Banadag BNDG 28 28 1 1 2:57
BERMO BRMO 174 172 75 256 6:20
BRKA LTBK 119 119 1 53 220 6:56
BRKA OSBK 102 101 39 140
KDH-CMT KSNT 68 68 10 24 3:55
KUJU BEGS 43 43 19 126 7:57
TORI G/S TPST 146 145 2 104 788 10:29
RHR RSCR 83 82 21 131 6:25
PTRU GS PTRU 194 193 94 368 6:48
BHKD GS BHKD 107 106 19 66 5:32
KKAS GS KKAS 46 46 1 23 193 9:06
BIRATOLI BIRT 43 42 24 125 7:30
Kushmahi KUHM
Total G/Shed 1153 1145 4 482 2438 6:56
Goods Sh
SLBN SLBN 7 7
168 2 2 4:44
MHDA MHDA 114 168 9
115 90 387 5:17
KRSL GS KRSL 45 116 9
449 9 78 727 11:15
SPUR-III SGRL 1736 115
45 39 260 7:09
SPUR-X SPXS 451 3 13 5:06
1731 212 1390 7:16
Total G/Shed 5 764 4176 7:08
G Total G/Shed
ING PERFORMANCE [IN RAKES]
AUG Ldg. 2019-20 Demurrage Avg Loading Var.
427 Rks Hrs Ldg Rakes/Day of Ldg.
Offer Allot 98 Adv LB 420 3881 Time 18-19 19-20
91 91 1008 316 1 /Day
78 78 1533 23 2 15 229 12:10 2.8 2.8 -0.06
74 154 7:11 0.8 0.6 -0.16
1008 339 3 509 4264 3:00 3.6 6.6 3.03
1177 169 5:49 7.2 10.0 2.82
ed (BCCL)
0.01
113 113 66 242 7:03 0.7 0.7 -0.15
0.2 0.29
45 45 0.3 0.15
158 158 22 122 7:40 1.0
hed (CCL) -0.18
88 364 7:13 0.9 -0.55
-0.34
87 88 75 415 9:37 0.2 0.6 -0.34
67 67 20 154 7:28 1.1 0.4 0.31
49 49 8 19 5:26 0.8 0.3 -0.18
116 116 1 1 3:03 0.7 0.8 0.51
16 16 3 5 5:03 0.4 0.1 -0.16
223 223 108 350 6:28 0.3 1.5 -0.68
58 58 7 45 5:26 0.9 0.4 -0.23
89 89 37 118 6:19 0.5 0.6 0.69
71 71 36 122 6:41 1.3 0.5 0.22
143 151 51 258 6:31 0.7 1.0 0.12
74 75 28 192 7:12 0.3 0.5 -0.80
19 19 8 41 7:06 0.3 0.1
1012 1022 382 1720 6:22 6.7 -0.05
hed (NCL) 7.5 0.07
-0.17
176 179 51 257 4:32 0.0 1.2 0.68
0.59
90 90 30 133 6:18 1.1 0.6 1.12
0.47
219 219 63 254 6:19 0.8 1.4
135 135 27 158 6:00 0.9
620 623 171 802 5:44 0.8 4.1
1790 1803 641 2886 6:13 0.3 11.8
2.9
11.3
2.13 GENERAL GOODS LOA
Month DHN MGS DNR
2018-19 2019-20 2018-19 2019-20 2018-19 2019-20 2
APR 213 251 62 28 22 16
MAY 202 220 76 22 26 29
JUN 200 230 74 17 42 14
JUL 202 212 26 16 23 23
AUG 186 217 20 25 16 17
SEP 189 19 15
OCT 191 30 15
NOV 204 32 26
DEC 242 29 12
JAN 255 29 17
FEB 247 17 14
MAR 329 23 34
Total 2660 1130 437 108 262 99
Avg/Day 7.29 9.26 1.20 0.89 0.72 0.81
ADING OF ECR (In Rakes) TOTAL
SEE SPJ
2018-19 2019-20 2018-19 2019-20 2018-19 2019-20
83 93 48 42 428 430
133 154 76 94 513 519
137 139 78 102 531 502
107 100 69 75 427 426
95 92 59 78 376 429
96 51 370 0
91 55 382 0
85 53 400 0
93 49 425 0
71 64 436 0
60 62 400 0
93 86 565 0
1144 578 750 391 5253 2306
3.13 4.74 2.05 3.20 14.39 18.90
3.1 Zonal Interchange
2018-19
I/C Point T/O M/O TOTAL T/O
JAJ 10.61
KIUL 0.35 9.13 19.74 10.87
MGR 4.26
Sub Total 15.22 0.68 1.03 0.35
PKA 21.35
Total ER 36.57 3.48 7.74 3.55
CPU 3.48
MGS/NC 37.06 13.29 28.51 14.77
Total NCR 40.54
MGS/NR 19.61 18.13 39.48 18.94
CHPG 9.90
PNYA 5.10 31.42 67.99 33.71
Total NER 15.00
KIR 11.61 4.06 7.54 4.13
PRNA 0.84
Total NFR 12.45 35.71 72.77 36.06
WCR/MHDA 11.13
BRKA 8.29 39.77 80.31 40.19
GMO 2.65
JNN 0.90 19.77 39.38 23.58
PEH 1.48
RJB 7.68 11.32 21.22 8.26
TORI 0.00
Total SER 21.00 8.03 13.13 4.45
Total ECR 156.30
19.35 34.35 12.71
10.29 21.90 13.33
0.16 1.00 0.32
10.45 22.90 13.65
11.19 22.32 13.39
5.90 14.19 8.03
1.89 4.54 2.55
1.58 2.48 0.77
0.77 2.25 1.68
12.52 20.20 6.16
0.39 0.39 0.45
23.05 44.05 19.64
155.00 311.30 156.87
(Avg/Day In Rake) AUG
2019-20 T/O % Variation
2.45 M/O
M/O TOTAL 0.00 -7.45 TOTAL
-16.67 -33.82 -2.13
8.45 19.32 -2.96 3.74 -22.33
-11.29 -5.87 -7.49
0.45 0.80 -7.82 6.07 -4.31
18.68 1.02 -3.32
3.61 7.16 -2.70 10.34 -3.74
-0.86 -4.31 14.19
12.51 27.28 20.24 -2.82 -3.49
-16.57 1.01 -1.83
19.23 38.17 -12.75 -2.03 10.59
-15.27 -11.58 -8.81
31.74 65.45 14.81 -5.99 -12.03
-61.90 5.93 -10.04
4.48 8.61 9.64 81.25 10.64
20.31 7.08 -39.00
34.17 70.23 -3.14 13.05 8.47
-3.77 16.95 16.67
38.65 78.84 -14.44 24.34 5.21
13.51 27.22 7.93
19.97 43.55 -19.79 9.09 12.10
#DIV/0! -12.94 12.00
11.09 19.35 -6.48 15.38 -15.54
0.36 1.74 130.77
7.10 11.55 0.54 -2.18
0.45
18.19 30.90
10.90 24.23
0.29 0.61
11.19 24.84
12.65 26.04
6.90 14.93
2.35 4.90
2.01 2.78
0.84 2.52
10.90 17.06
0.45 0.90
23.45 43.09
155.84 312.71
3.2 Total Interchange (Avg/Day In Rake) Up to AUG
2018-19 2019-20 % Variation
I/C Point T/O M/O TOTAL T/O M/O TOTAL T/O M/O TOTAL
JAJ
KIUL 10.70 9.65 20.35 11.03 8.42 19.45 3.08 -12.75 -4.42
MGR
Sub Total 0.50 0.79 1.29 0.54 0.61 1.15 8.00 -22.78 -10.85
PKA
Total ER 4.05 3.36 7.41 4.29 3.54 7.83 5.93 5.36 5.67
CPU
MGS/NC 15.25 13.80 29.05 15.86 12.57 28.43 4.00 -8.91 -2.13
Total NCR
MGS/NR 20.95 18.51 39.46 20.67 20.04 40.71 -1.34 8.27 3.17
CHPG
PNYA 36.20 32.31 68.51 36.53 32.61 69.14 0.91 0.93 0.92
Total NER
KIR 3.39 3.80 7.19 4.07 4.31 8.38 20.06 13.42 16.55
PRNA
Total NFR 37.54 36.06 73.60 35.75 34.20 69.95 -4.77 -5.16 -4.96
WCR/MHDA
BRKA 40.93 39.86 80.79 39.82 38.51 78.33 -2.71 -3.39 -3.04
GMO
JNN 19.14 19.94 39.08 24.55 20.68 45.23 28.27 3.71 15.74
PEH
RJB 10.03 11.12 21.15 8.49 10.32 18.81 -15.35 -7.19 -11.06
TORI
Total SER 5.67 8.59 14.26 5.00 7.30 12.30 -11.82 -15.02 -13.74
Total ECR
15.70 19.71 35.41 13.49 17.62 31.11 -14.08 -10.60 -12.14
11.21 10.35 21.56 10.91 10.08 20.99 -2.68 -2.61 -2.64
0.54 0.19 0.73 0.32 0.44 0.76 -40.74 131.58 4.11
11.75 10.54 22.29 11.23 10.52 21.75 -4.43 -0.19 -2.42
10.98 10.90 21.88 12.29 12.44 24.73 11.93 14.13 13.03
8.35 7.28 15.63 8.29 7.74 16.03 -0.72 6.32 2.56
3.30 1.72 5.02 3.95 2.17 6.12 19.70 26.16 21.91
1.01 1.49 2.50 0.33 1.52 1.85 -67.33 2.01 -26.00
1.60 0.80 2.40 1.82 1.39 3.21 13.75 73.75 33.75
7.89 12.19 20.08 6.22 13.23 19.45 -21.17 8.53 -3.14
0.00 0.26 0.26 0.58 0.84 1.42 260.00 223.08 446.15
22.15 23.74 45.89 21.19 26.89 48.08 -4.33 13.27 4.77
156.85 157.00 313.85 159.10 159.27 318.37 1.43 1.45 1.44
3.3 Receipt of Empties BOXN & BOBR (Avg/Day) In Rakes
AUG
BOXN BOBR Net (N+R)
2018-19 2019-20 2018-19 2019-20
2018-19 2019-20
Rly T/O M/O Net T/O M/O Net T/O M/O Net T/O M/O Net
MGS/NC 14.58 0.16 14.42 17.71 0.06 17.65 2.87 0.00 2.87 1.16 0.00 1.16 17.29 18.81
CPU 2.61 0.00 2.61 3.84 0.00 3.84 0.48 0.00 0.48 0.00 0.00 0.00 3.09 3.84
NR 14.77 0.00 14.77 17.35 0.03 17.32 0.94 0.00 0.94 0.42 0.00 0.42 15.71 17.74
MHDA 7.90 0.00 7.90 11.71 0.06 11.65 0.00 0.00 0.00 0.10 0.00 0.10 7.90 11.75
ER 4.26 3.74 0.52 2.77 4.52 -1.75 4.19 0.13 4.06 4.81 0.03 4.78 4.58 3.03
SER 1.03 2.39 -1.36 1.10 0.39 0.71 0.00 0.00 0.00 0.29 0.00 0.29 -1.36 1.00
NER 0.42 0.00 0.42 0.03 0.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.42 0.03
Total 45.57 6.29 39.28 54.51 5.06 49.45 8.48 0.13 8.35 6.78 0.03 6.75 47.63 56.20
UP TO AUG
BOXN BOBR Net (N+R)
2018-19 2019-20 2018-19 2019-20
2018-19 2019-20
Rly T/O M/O Net T/O M/O Net T/O M/O Net T/O M/O Net
MGS/NC 15.68 0.18 15.50 15.95 0.04 15.91 2.52 0.00 2.52 1.59 0.00 1.59 18.02 17.50
CPU 2.63 0.00 2.63 3.61 0.01 3.60 0.37 0.00 0.37 0.10 0.00 0.10 3.00 3.70
NR 15.04 0.00 15.04 18.76 0.01 18.75 1.07 0.00 1.07 1.07 0.00 1.07 16.11 19.82
MHDA 7.59 0.01 7.58 9.69 0.03 9.66 0.16 0.00 0.16 0.07 0.01 0.06 7.74 9.72
ER 4.08 3.65 0.43 3.69 2.93 0.76 4.58 0.26 4.32 5.11 0.03 5.08 4.75 5.84
SER 1.31 1.65 -0.34 0.37 2.41 -2.04 0.02 0.01 0.01 0.06 0.00 0.06 -0.33 -1.98
NER 0.60 0.00 0.60 0.06 0.00 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.60 0.06
Total 46.93 5.49 41.44 52.13 5.43 46.70 8.72 0.27 8.45 8.00 0.04 7.96 49.89 54.66
3.4 Divisional Interchange (Avg/Day In Rake)
2018-19 AUG % Variation
2019-20
I/C Point TO DDU TO DHN TOTAL TO DDU TO DHN TOTAL TO DDU TO DHN TOTAL
MPO
GHD 27.74 27.68 55.42 22.52 28.03 50.55 -18.82 1.26 -8.79
BNF 28.19 27.61 55.80 29.42 29.19 58.61 4.36 5.72 5.04
PG TO DHN TO DNR TOTAL TO DHN TO DNR TOTAL TO DHN TO DNR TOTAL
KG
KCA/EOCM 0.00 0.00 0.00 3.74 4.74 8.48 #DIV/0! #DIV/0! #DIV/0!
ARA
TO DDU TO DNR TOTAL TO DDU TO DNR TOTAL TO DDU TO DNR TOTAL
SAE/DKGS
PHLG 2.52 2.48 5.00 1.71 1.68 3.39 -32.14 -32.26 -32.20
MFP 2.32 3.13 5.45 0.74 0.94 1.68 -68.10 -69.97 -69.17
KVC
SPJ 4.65 4.55 9.20 4.65 4.00 8.65 0.00 -12.09 -5.98
KGG
MNE 0.03 0.23 0.26 0.00 0.32 0.32 -100.00 39.13 23.08
TO SEE TO DNR TOTAL TO SEE TO DNR TOTAL TO SEE TO DNR TOTAL
8.87 8.23 17.10 11.23 8.52 19.75 26.61 3.52 15.50
1.84 0.48 2.32 1.52 1.03 2.55 -17.39 114.58 9.91
TO SEE TO SPJ TOTAL TO SEE TO SPJ TOTAL TO SEE TO SPJ TOTAL
7.55 8.00 15.55 3.65 3.29 6.94 -51.66 -58.88 -55.37
0.00 0.00 0.00 5.32 6.68 12.00 #DIV/0! #DIV/0! #DIV/0!
5.45 7.00 12.45 5.39 6.19 11.58 -1.10 -11.57 -6.99
4.32 5.52 9.84 3.23 4.39 7.62 -25.23 -20.47 -22.56
1.61 1.00 2.61 1.26 1.35 2.61 -21.74 35.00 0.00
4.1 RAKE WISE INWARD HOLDING & RELE
A
JUMBO
2018-19 2019-20 2018-19
MONTH Inward Rel % age Inward Rel % age Inward Rel %
Holding Holding Holding
APRIL 50.57 24.90 49.24 46.20 26.10 56.49 30.47 20.17 6
MAY
JUN 53.39 25.29 47.37 44.50 23.39 52.56 32.29 20.74 6
JUL
AUG 57.40 28.33 49.36 41.37 21.43 51.80 31.60 20.93 6
SEP
OCT 53.06 27.81 52.41 41.90 21.26 50.74 24.29 16.35 6
NOV
DEC 49.39 24.97 50.56 34.39 19.10 55.54 25.10 16.06 6
JAN
FEB 48.47 26.23 54.12 26.77 17.07 6
MAR
AVG 44.65 25.42 56.93 26.81 15.65 5
47.33 25.97 54.87 30.03 18.10 6
46.32 28.13 60.73 35.65 23.10 6
50.16 29.13 58.07 40.10 24.16 6
48.00 28.11 58.56 36.61 22.39 6
50.58 28.43 56.21 38.23 24.35 6
49.94 26.89 53.85 41.67 22.26 53.41 31.50 19.92 6
EASE OF JUMBO , BOXN & BOBR (Avg/Day)
AUG
BOXN BOBR
2019-20 2018-19 2019-20
% age Inward Rel % age Inward Rel % age Inward Rel % age
Holding Holding Holding
66.19 37.47 24.10 64.32 8.87 18.80 211.95 8.57 15.67 182.85
64.23 33.73 21.03 62.35 8.58 17.77 207.11 9.67 15.35 158.74
66.24 31.53 21.00 66.60 9.30 16.70 179.57 8.13 15.07 185.36
67.31 30.84 18.19 58.98 9.06 16.42 181.24 8.39 14.03 167.22
63.98 32.00 20.03 62.59 8.74 16.00 183.07 7.94 12.35 155.54
63.77 8.97 16.13 179.82
58.37 10.39 17.6 169.49
60.27 10.57 18.50 175.02
64.80 9.23 14.94 161.86
60.25 9.16 13.84 151.09
61.16 10.89 13.93 127.92
63.69 7.42 12.22 164.69
63.25 33.11 20.87 63.02 9.27 16.07 173.47 8.54 14.49 169.72
4.2 Division wise Inward Holding & Release
AUG
JUMBO
2018-19 2019-20
Div. Inward Holding Release % Rel Inward Holding Release % Rel
DHN 1.71 1.19 69.59 1.71 1.03 60.23
MGS 2.48 1.81 72.98 1.00 1.16 116.00
DNR 7.06 5.23 74.08 5.65 4.97 87.96
SEE 9.74 6.32 64.89 6.32 5.29 83.70
SPJ 12.55 10.42 83.03 9.10 6.65 73.08
BOXN
2018-19 2019-20
Inward Holding Release
Div. % Rel Inward Holding Release % Rel
DHN 8.10 8.13 65.54
MGS 1.26 1.16 100.37 12.42 8.14 137.10
DNR 4.00 4.13 132.12
SEE 0.19 0.23 92.06 2.48 3.40 78.57
SPJ 1.90 2.41 124.19
103.25 2.74 3.62
121.05 0.84 0.66
126.84 3.39 4.21
BOBR
2018-19 2019-20
Div. I/W Hold Release % Rel I/W Hold Release % Rel
DHN 8.45 15.77 186.63 7.94 12.32 155.16
DNR 0.29 0.23 79.31 0.00 0.03 0.00
4.3 TXR EXAMINATION PROFILE FOR AUG'2019
2019-20 Avg. Repair/Day Avg.C&W Time/Rake
Depot Type Aug.18 Aug.19 Aug.18 Aug.19
MGS CC 5.61 5.55 5:52 5:45
PREM. 6.58 6.65 6:38 5:54
BRWD E-E 1.35 2.32 4:35 5:08
PTRU OTHERS 0.74 0.74 4:34 4:34
PEH TOTAL 14.28 15.26 5:56 5:25
CC 10.87 2.16 05:05 05:51
OBRA PREM. - - - -
NRPA E-E 1.13 0.90 04:57 05:37
GHZ TOTAL 12.00 3.06 05:01 05:44
PREM. 10.61 4.29 04:00 04:15
E-E 0.68 3.94 04:00 04:15
TOTAL 11.29 8.23 04:00 04:15
CC 7.58 4.71 04:55 05:40
PREM. - - - -
E-E 6.97 4.71 04:00 04:00
TOTAL 14.55 9.42 04:27 04:50
CC 2.97 2.29 05:10 05:17
PREM. 5.13 3.23 04:57 05:07
E-E 3.13 1.32 04:52 04:25
TOTAL 11.23 6.84 04:59 04:56
BCN 1.50 2.00 05:15 05:45
BTPN 1.60 1.90 04:31 04:21
5.1 DIVISIONWSIE TERMIN
Inward for the month
No. of Rakes Arr. To Plct. Plct. To Rele
Division Aug.18 Aug.19 Aug.18 Aug.19 Aug.18 Au
DHN 876 803 01:10 02:06 08:57 09
DNR 325 314 05:54 02:51 14:01 10
MGS 126 168 04:46 02:14 19:23 15
SEE 249 218 04:51 04:01 12:45 12
SPJ 497 452 01:16 01:27 12:58 13
ECR 2073 1955 02:36 02:18 11:48 11
Outward for the mont
No. of Rakes Arr. To Plct. Plct. To Load
Division Aug.18 Aug.19 Aug.18 Aug.19 Aug.18 Au
DHN
2617 2865 01:16 01:23 08:51 08
DNR 16 30 01:58 08:04 11:41 06
MGS 22 24 02:03 04:05 13:38 13
SEE 86 89 02:15 02:36 06:24 08
SPJ 56 72 00:14 00:18 01:35 01
ECR 2797 3080 01:17 01:29 08:41 08
NAL PERFORMANCE
h of AUG, 2019
ease Release To Despatch Total Detention
ug.19 Var.in total
Aug.18 Aug.19 Aug.18 Aug.19 detn. In %
9:56
02:53 04:42 13:00 16:44 28.72
0:15 06:24 03:58 26:19 17:04 -35.15
5:35 01:25 03:34 25:34 21:23 -16.36
2:38 11:46 10:47 29:22 27:26 -6.58
3:24 02:55 07:57 17:09 22:48 32.94
1:34 04:25 05:55 18:49 19:47 5.14
th of AUG, 2019
ding Loading To Despatch Total Detention
ug.19 Var.in total
Aug.18 Aug.19 Aug.18 Aug.19 detn. In %
8:37
02:52 03:25 12:59 13:25 3.34
6:11 11:10 5:28 24:49 19:43 -20.55
3:49 01:57 04:16 17:38 22:10 25.71
8:08 07:56 05:42 16:35 16:26 -0.90
1:30 04:13 06:36 6:02 8:24 39.23
8:27 03:05 03:35 13:03 13:31 3.58
5.2 Division wise Sticky Terminals (where total detention >24 hrs.)
For the month of August, 2019 (Inward)
DIV. NAME OF TERMINALS NO. OF RAKES ARRIVAL TO PLACEMENT RELEASE TO TOTAL
PLACEMENT TO RELEASE DESPATCH DETENTION
DUGDA COAL WASHERY SIDING 5
POL SIDING, DHANBAD 6 0:48 66:57 10:48 78:33
DHANBAD JN. 1 4:10 37:05 5:48 47:03
BARKA KANA JN. 8 0:00 8:40 34:00 42:40
ACC/SINDARI 37 3:20 14:19 21:51 39:31
FCI SDG DHN SDG, DHANBAD JN. 3 16:26 16:34 3:19 36:21
LINE NO.10,BARKAKANA 3 1:55 22:18 11:01 35:15
DHN HAZARIBAGH TOWN 2 0:12 14:46 17:20 32:19
M/S GRASIM INDUSTRIES LIMITED 5 0:20 23:07 5:45 29:12
HAZARIBAGH ROAD 1 2:29 26:13 0:29 29:11
GRASIM INDUSTRIES LIMITED 11 2:17 18:40 5:35 26:32
IOC LTD. JAYANT SHAKTINAGAR 6 1:34 13:44 11:09 26:27
LANCO ANPARA (ANPARA C) TPS PVT. 10 4:09 17:32 3:41 25:23
BHURKUNDA 12 1:52 13:59 9:08 25:00
DALTONGANJ 10 0:34 11:01 13:14 24:51
FCI SDG, BUXAR 1 0:43 16:21 7:37 24:42
WENA 3 1:20 48:10 2:13 51:43
BUXAR 6 0:40 25:05 10:46 36:31
JAMUI 18 8:49 14:58 10:57 34:45
DNR 19 6:50 14:55 8:22 30:08
WARIS ALEGANJ 12 5:29 15:50 7:19 28:38
ARA 23 3:50 13:19 8:53 26:03
DANAPUR 6 0:49 15:54 7:53 24:38
CONTAINER SIDING FATUHA 6 4:13 17:25 2:57 24:35
DDU 4 4:59 23:06 14:02 42:08
MGS PAHALEJA 2 0:29 6:38 22:10 29:19
BHABUA ROAD 5 0:21 21:45 3:56 26:03
GARHARA GDS MARSHALLING YARD 8 5:17 17:21 14:44 37:22
BARAUNI JN. 28 1:32 8:46 24:25 34:44
SARAI 8 9:09 15:40 4:16 29:06
KHAGARIA JN. 1 0:13 10:23 17:50 28:28
SEE 57 1:05 25:55 1:25 28:25
TILRATH 34 3:40 13:57 10:01 27:38
NARAYANPUR ANANT 23 2:01 14:41 9:10 25:53
KARPOORIGRAM 1 1:21 13:05 11:02 25:29
BEGU SARAI 2 0:35 19:55 12:35 33:05
SAKRI JN. 22 0:25 14:01 16:15 30:42
RIGA 13 2:53 13:21 13:39 29:54
DARBHANGA JN. 24 3:31 17:34 8:39 29:44
JANAKPUR ROAD 23 2:20 17:04 10:17 29:42
LAHERIA SARAI 1 3:13 13:08 12:42 29:03
DAURAM MADHEPURA 12 0:46 26:55 1:22 29:03
JAYNAGAR 5 0:55 15:13 12:35 28:45
SPJ 17 0:28 11:23 15:26 27:17
SAHARSA JN. 5 2:06 14:30 9:40 26:17
KHAJAULI 18 0:15 12:32 13:00 25:47
SITAMARHI 20 0:51 12:07 11:55 24:53
HARINAGAR 22 1:56 13:51 8:29 24:17
TARSARAI 2:28 13:59 7:48 24:16
MAHWAL
BAPUDHAM MOTIHARI
6.1 SHED WISE GOODS OUTAGE FOR AUG'2019
Month GMO Electric loco BJU ECR
Target Actual
April Target Actual DDU Target Actual
May Target Actual 22.6 18.5
June 210.20 214.17 104.30 110.9 22.6 17.98 337.10 343.57
July 104.30 112.55 26.1 25.7
August 215.50 218.36 101.60 112.90 29.7 25.55 342.40 348.89
September 102.60 114.15 29.7 25.51
October 221.60 223.00 103.40 114.27 349.30 361.6
November
December 222.30 227.37 354.60 367.07
January
February 223.20 227.80 356.30 367.58
March
Avarage 218.56 222.14 103.24 112.95 26.14 22.65 347.94 357.74
Diesel loco ECR ECR
Target Actual
MONTH DDU PTRU SPJ 197.86 203.51
194.44 199.88
April TAR ACT TAR ACT TAR ACT 204.43 210.95
May 173.56 178.72
June 34.80 35.49 99.34 101.02 63.72 67 156.46 163.26
July
August 33.90 34.57 96.82 99.43 63.72 65.88
September
October 40.20 40.92 96.01 97.98 68.22 72.05
November
December 30.57 30.95 90.07 91.65 52.92 56.12
January
February 13.08 23.54 97.84 90.88 45.54 48.84
March 30.51 33.09 96.02 96.19 58.82 61.98 185.35 191.26
Avarage
6.2 TERRITORIAL OUTAGE DIESEL & ELECTRIC LOCO
GOODS OUTAGE
Months Electric Diesel Total
April 2018-19 2019-20 2018-19 2019-20 2018-19 2019-20
May
June 338.6 409.5 235.6 230.9 574.2 640.4
July
August 331.9 345.4 234.9 251 566.8 596.4
Average
325.2 332.1 244.9 241.4 570.1 573.5
299.5 333.59 239.6 191.16 539.1 524.75
309.9 337.5 259.2 210.57 569.1 548.07
321.02 351.62 242.84 225.01 563.86 576.62
Months Electric COACHING OUTAGE Total
April Diesel
May
June 2018-19 2019-20 2018-19 2019-20 2018-19 2019-20
July
August 124 134.2 179 165 303 299.2
Average
123.5 138.6 189.7 156.7 313.2 295.3
132.3 148 183.7 154.1 316 302.1
135.7 146.99 180.8 136.57 316.5 283.56
136 160.57 181.7 122.6 317.7 283.17
130.30 145.67 182.98 146.99 313.28 292.67
6.3 ECR Divisionwise Loc
LOCO HOL
DHN MGS DNR
DSL ELC DSL ELC DSL ELC
18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20
APR. 87.1 90.8 183.2 228.6 12.42 15.9 83.88 94.8 16.03 14.0 40.94 39.2
MAY 84.1 95.87 176.9 198.6 13.90 18.27 88.25 73.26 15.65 14.65 36.15 35.23
JUN 92.8 92.0 179.4 185.9 12.34 14.9 82.90 74.1 18.56 19.0 36.98 33.3
JUL 101.4 80.3 169.8 197.8 13.68 9.9 78.54 68.5 16.70 11.5 33.29 32.6
AUG 100.6 94.9 172.7 197.5 15.73 10.7 82.61 73.1 19.27 7.6 34.46 32.7
SEP 101.0 161.2 12.26 68.48 16.80 32.14
OCT 95.0 179.5 14.91 83.13 20.23 39.24
NOV 103.0 157.0 13.00 76.00 16.00 34.00
DEC 98.1 194.9 14.94 75.44 19.82 36.43
JAN 102.2 212.5 18.71 90.41 20.06 35.67
FEB 104.1 206.5 15.53 90.08 16.90 37.61
MAR 107.7 216.6 17.46 86.10 12.45 39.32
AVG 98.1 90.8 184.2 201.7 14.6 13.9 82.2 76.7 17.4 13.3 36.4 34.6
LOCO UTILIZ
DHN MGS DNR
DSL ELC DSL ELC DSL ELC
18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20
APR. 330.3 190.1 354.3 263.8 331.0 335.5 436.3 381.2 348.6 348.6 340.6 374.3
MAY 334.8 292.7 351.2 341.5 342.5 315.7 410.1 415.6 347.4 347.5 349.7 356.6
JUN 309.5 414.5 332.3 414.4 340.3 318.8 400.9 413.1 320.7 361.5 330.8 359.5
JUL 307.3 425.0 348.0 415.5 358.0 398.8 424.6 467.0 356.3 411.4 360.8 376.3
AUG 316.2 430.6 352.6 427.6 364.1 397.2 413.2 454.5 354.2 457.2 349.5 391.3
SEP 308.7 352.7 367.9 440.2 367.7 353.5
OCT 278.2 323.4 346.2 413.8 334.8 340.1
NOV 290.4 363.4 368.0 410.9 365.2 365.7
DEC 243.3 292.6 364.9 428.3 361.2 361.5
JAN 221.2 278.9 348.5 399.8 366.3 382.3
FEB 218.6 269.1 351.0 392.7 376.0 374.0
MAR 195.1 269.2 342.5 419.2 364.3 371.6
Avg. 279.5 350.6 324.0 372.6 352.1 353.2 415.8 426.3 355.2 385.3 356.7 371.6
co Holding & Utilisation.
LDING AUG'19 SPJ ECR
SEE DSL
ELC DSL ELC ELC
DSL
18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20
47.82 41.4 23.37 26.6 32.09 30.6 7.3 195.43 192.6 332.54 396.4
52.84 50.91 21.94 15.58 39.80 32.68 1.13 6.46 206.28 212.4 325.27 329.2
49.07 45.8 20.98 19.8 40.33 33.7 2.03 6.7 213.05 200.4 322.47 319.0
41.36 33.2 16.11 19.1 37.43 27.8 2.24 5.7 210.53 162.6 299.25 323.7
52.67 37.0 17.10 20.9 44.59 31.1 1.49 6.7 232.88 181.3 308.73 330.8
48.37 15.06 42.89 1.88 221.28 277.40
0.51
44.60 16.41 30.89 0.60 205.66 318.89
31.00 18.00 42.00 1.00 205.00 286.00
40.76 22.16 29.79 2.41 203.43 331.30
43.16 22.77 31.39 5.78 215.52 367.16
38.69 24.97 28.05 7.13 203.30 366.24
45.26 23.87 29.85 5.91 212.74 371.83
44.6 41.6 20.2 20.4 35.8 31.2 2.7 6.6 210.4 189.9 325.6 339.8
ZATION AUG'19 SPJ ECR
SEE
DSL ELC DSL ELC DSL ELC
18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20
242.6 207.7 206.4 207.4 310.2 281.7 149.3 166.9 309.2 228.8 364.4 296.4
223.2 268.0 205.1 224.1 322.4 278.2 174.4 183.2 308.2 289.5 357.0 351.1
234.5 290.5 210.1 255.4 302.5 360.3 246.7 320.1 294.6 367.9 343.5 398.5
255.3 379.6 246.0 352.0 340.8 407.3 246.2 430.0 323.5 410.4 325.1 420.0
231.4 373.9 228.4 358.7 335.7 403.4 247.9 399.3 308.0 413.4 362.9 426.1
250.6 219.4 330.9 193.0 307.2 369.3
281.5 219.3 317.8 254.9 293.5 344.3
309.3 232.8 367.1 191.3 315.5 369.6
266.1 205.7 345.9 263.8 278.9 325.5
240.7 220.7 339.9 184.1 263.6 313.3
240.0 215.1 313.5 180.6 254.9 304.4
222.5 215.3 306.1 200.1 235.6 309.9
249.8 303.9 218.7 279.5 327.7 346.2 211.0 299.9 291.1 342.0 340.8 378.4
6.4 SECTION-WISE HOR AND SPEED FOR ALL TRAINS As On Date : 31-08-2019
DIVISIO NO OF TRAINS HOR SPEED
N DRTN DIST Daily Prgs
SECTION Daily Prgs Daily Prgs
DHN BRKA-GMIA
UP 52 6 183 2:57 3:43 8.2 8.3
DNR CPU-GHD
GHD-BRKA DN 52 11 326 5:24 2:11 5.8 18.5
MGS GMIA-CRP
GMO-PKA UP 141 7 293 6:37 7:49 11.2 11.5
SEE KQR-HZBN
MPO-GMO DN 141 10 280 4:36 6:28 8 11.1
SPJ RJB-GMO
DDU-DNR UP 218 19 672 22:27 6:50 6 21.2
DKGS-TALL
DNR-MKA DN 218 36 1010 8:15 7:31 18.5 20.3
MKA-JAJ UP 32 16 318 2:46 3:26 7.1 5.9
DDU-JTHT
GHD-DDU DN 32 9 271 1:45 4:25 12.7 5.7
JTHT-MPO
SEB-GHD UP 44 16 436 4:21 2:58 7 10
BJU-DKGS
DN 44 17 571 1:52 2:47 16.5 10
BJU-KIR
CI-MFP UP 80 3 48 0:43 2:41 33 17
HJP-BCA
MFP-BJU DN 80 9 305 6:16 6:08 12 13.1
DBG-SMI
MNE-SPJ UP 164 33 870 4:40 6:07 27.7 22.9
RXL-NKE
SMI-RXL DN 164 41 1080 7:08 6:46 19.2 19.9
VKNR-MFP
UP 21 21 519 1:32 2:14 12 8.1
DN 21 14 417 1:53 1:52 9.9 9.2
UP 202 8 112 2:44 5:08 25.8 32.5
DN 202 6 150 4:19 6:16 30.3 26.2
UP 8 13 440 1:19 1:09 5.5 6.2
DN 8 0 2 0:00 2:50 0 4.3
UP 99 7 157 4:40 4:29 17.3 16.8
DN 99 11 332 3:51 3:16 13.2 13.7
UP 86 6 229 8:51 5:06 8.2 9.8
DN 86 10 319 2:51 4:40 15 11.8
UP 3 85 2614 2:38 2:56 .6 .5
DN 3 35 821 1:49 1:46 .8 .8
UP 216 26 770 5:14 5:59 40.9 35.7
DN 216 22 795 5:07 6:28 41.8 33.3
UP 205 56 1662 4:19 4:46 35.5 30.6
DN 205 62 1898 5:06 5:21 31.5 27.9
UP 93 25 894 1:58 2:20 46.7 38.4
DN 93 26 912 2:01 2:45 45.1 32.5
UP 6 5 256 0:43 1:40 9.6 3.3
DN 6 8 224 1:28 2:08 4.3 2.9
UP 178 21 560 5:02 6:59 23.2 18.1
DN 178 23 520 6:56 6:59 18.8 18.7
UP 105 16 378 4:13 5:35 12.9 10.4
DN 105 14 291 2:14 3:48 18.4 15
UP 71 9 227 2:37 4:31 27.3 15.8
DN 71 10 272 3:30 3:43 20.4 19.2
UP 103 25 730 4:01 5:40 10.6 8.5
DN 103 25 639 5:36 7:05 9.8 8.2
UP 68 2 43 2:42 3:07 25.1 18.9
DN 68 1 104 1:39 2:22 41.1 26.5
UP 94 5 120 2:40 3:47 32.1 21.7
DN 94 5 106 10:47 3:02 7.9 27.1
UP 41 1 1 0:07 0:07 62.7 62.7
DN 41 6 128 4:10 3:19 9.8 12.1
UP 82 8 186 3:16 3:41 24.9 22.1
DN 82 6 148 3:06 2:50 26.7 28.7
UP 210 14 362 6:21 6:23 15.9 15
DN 210 9 239 8:34 7:56 12.3 13.3
6.5 Performance of Loco Pilot Goods (two spell combined )
Total No.
of Loco
Div lobby slot <80 Hrs % <80 Hrs 80-104 Hrs %80-104 Hrs. >104 Hrs %>104 Hrs
Pilot
(Goods)
BRKA 12.50 21.93 32.50 57.02 12.00 21.05 57
BRWD 13.50 8.74 60.00 38.83 81.00 52.43 155
DHN 04.08.2019 to 19.00 17.04 89.50 80.27 3.00 2.69 112
DHN GMO 31.08.2019 13.50 7.36 145.50 79.29 24.50 13.35 184
11.00 22.92 35.50 73.96 1.50 3.13 48
KLRE
KRSL 5.50 9.73 19.50 34.51 31.50 55.75 57
PTRU 9.00 6.04 17.00 11.41 123.00 82.55 149
DNR 28.07.2019 to 63.00 50.00 50.00 39.68 13.00 10.32 126
DNR PNBE 24.08.2019 33.00 48.53 27.50 40.44 7.50 11.03 68
JAJ 46.50 55.36 31.50 37.50 6.00 7.14 84
ECLM 83.50 23.79 260.00 74.07 7.50 2.14 351
MGS 133.50 85.58 15.00 9.62 7.50 4.81 156
GAYA
BJU 04.08.2019 to 22.50 13.16 82.00 47.95 66.50 38.89 171
SEE 31.08.2019 60.00 44.61 61.00 45.35 13.50 10.04 135
14.50 53.70 10.00 37.04 2.50 9.26 27
MFP
DBG
NKE 35.00 43.75 39.50 49.38 5.50 6.88 80
SPJ 21.50 59.72 13.50 37.50 1.00 2.78 36
SHC
SPJ 19.50 36.45 19.50 36.45 14.50 27.10 54
7.1 Block figur
Div. Block APRIL MAY JUNE JULY Aug
DHN Machine Block Asked 908.00 898.00 798.20 896.30 1447.00
DNR Machine Block Given 508.15 800.00 676.25 625.15 1020.54
MGS 513.20 809.30 580.30 690.35 1032.59
SEE Machine Block Availed 954.55 707.50 928.30 920.00 1054.19
SPJ 717.15 613.10 727.15 691.30 798.38
Other Block Asked 727.00 613.10 740.00 691.30 793.45
Other Block Given 924.00 1040.00 1032.00 1040.00 1184.00
Other Block Availed 461.60 540.25 601.10 498.30 534.75
Machine Block Asked 461.60 540.25 601.10 498.30 534.75
Machine Block Given 800.50 819.00 738.75 832.50 754.00
547.91 501.75 477.19 432.16 413.77
Machine Block Availed 547.91 501.75 477.19 432.16 413.77
718.25 807.01 808.42 606.08 712.75
Other Block Asked 667.30 744.15 675.70 462.00 644.92
Other Block Given 664.30 744.15 659.17 451.50 638.92
Other Block Availed 667.33 701.08 727.50 827.25 733.20
Machine Block Asked 622.08 691.58 681.00 801.92 699.45
Machine Block Given 607.08 660.08 657.75 769.84 685.45
648.00 687.00 844.00 872.00 723.00
Machine Block Availed 513.40 560.22 383.20 357.25 644.34
521.40 564.54 389.45 360.15 644.34
Other Block Asked 1378.00 1195.0 1015.00 1197.50 1445.00
Other Block Given 859.50 775.13 628.53 696.55 634.40
Other Block Availed 880.55 801.18 631.03 715.10 635.55
Machine Block Asked 932.00 948.00 913.38 606.08 918.00
Machine Block Given 491.15 625.38 530.03 462.00 503.36
491.15 625.38 530.03 451.50 503.36
Machine Block Availed 1100.58 912.50 690.33 827.25 690.07
770.58 702.40 488.00 801.92 536.29
Other Block Asked 770.58 702.40 488.00 769.84 536.29
Other Block Given
Other Block Availed
Machine Block Asked
Machine Block Given
Machine Block Availed
Other Block Asked
Other Block Given
Other Block Availed
res for AUG'19
Sept. Oct. NOV. DEC. JAN Feb. March. Total
0 4947.50
4 3630.09
9 3625.74
9 4564.54
3547.08
3564.85
0 5220.00
2636.00
2636.00
3944.75
2372.78
2372.78
3652.51
3194.07
3158.04
3656.36
3496.03
3380.20
3774.00
2458.41
2479.88
0 6230.50
3594.11
3663.41
4317.46
2611.92
2601.42
4220.73
3299.19
3267.11
7.2 Comparative da
Types of Block P.
Machine and Other block 2018
2019
OHE 2018
2019
ROB/RUB/LHS 2018
RE 2019
2018
2019
ock figures AUG'19
October Nov. Dec. Jan. Feb. March Total
20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20 18-19 19-20
2299 2420
1397 2908
1041 955
1522 1650
1988 2057
732 156
1331 1516
1083 1451
275
0 930
948 2226
1716
0
0 0
0 1832
1007 1656
708
7.4 COMPARITIVE PROGRESS OF TRACK MACHINES
S.No. Type Month Comparitive Progress During The Year (In km/No.)
1
2 2019-20 2018-19 2017-18
3
4 DEEP SCREENING April 34.24 29.28 24.60
May 41.98 24.93 28.86
June 31.45 25.62 29.13
July 31.06 28.38 23.73
August 41.91 20.49 28.02
September 30.93 34.88
October 180.64 30.74 25.74
November 32.72 34.94
December 30.07 35.25
Janaury 26.88 28.36
February 27.48 40.21
March 18.50 19.06
Total 326.02 352.78
PT. & XING TAMPING April 291 257 180
May 323 276 158
June 270 187 186
July 249 305 235
August 360 264 266
September 258 231
October 1493 214 284
November 295 251
December 219 265
Janaury 275 224
February 257 302
March 269 171
Total 3076 2753
PLAING TAMPING BY CSM & TXP. April 281 195 221
May 281 179 250
June 287 134 249
July 243 280 185
August 244 197 206
September 185 252
October 1336 175 290
November 140 285
December 285 248
Janaury 271 248
February 218 256
March 271 135
Total 2532 2827
PLAIN TAMPING(DUO) April 386 341 264
May 495 390 354
June 410 218 346
July 320 334 337
August 415 311 400
September 306 431
October 2026 274 362
November 289 392
December 288 340
Janaury 399 370
February 316 495
March 364 289
Total 3830 4380
S.No. Type Month Comparitive Progress During The Year (In km/No.)
5 April
6 May 5.52 4.86 3.19
7 June
8 July 8.23 7.53 3.92
August
September 6.03 5.92 6.05
October
November 9.85 8.48 7.31
December
CTR BY PQRS Janaury 12.42 9.10 10.21
February
March 7.35 8.23
Total
April 9.40 3.42
May
June 5.04 8.50
July
August 7.71 8.76
September
October 4.82 9.76
November
December 4.13 12.23
Janaury
February 42.05 7.58 6.71
March 81.92 88.29
Total
April 3.58 2.25 3.22
May
June 5.60 3.29 2.63
July
August 3.61 4.00 2.70
September
October 2.77 4.30 4.66
November
CTR BY TRT December 0.87 1.16 2.55
Janaury
February 0.00 0.25
March
Total 4.23 1.50
April 2.58 5.74
May
June 2.60 7.45
July
August 3.06 6.72
September
October 3.64 5.09
November
December 16.43 4.43 2.53
January 35.54 45.04
February
March 28 24 0
Total 63 1
PT. & XING LAYING/DEEP 42 2
SCREENING BY T-28
39 2
6 17 2
73
11 9
04
10 5
22 1
30
0 5
47 108 34
33840 44000 56000
51640 48000 30000
53020 44000 46000
Ballasting(Cu. m) 73520 70000 42000
76260 48000 34000
44000 36000
46000 32000
24000 32000
28000 48000
36000 36000
46000 42000
38000 44000
288280 516000 478000
8.1 Basic Informations
1. Mail Express Trains running over ECR
Originating/Terminating 146 Pair
Passing Through 140 Pair
Intra Zonal 18 Pair
Total 304 Pair
2. Passenger Trains running over ECR
ECR owning MEMU DEMU Conventional Total
Other Railway 130 54 90 274
Total 38 14 56 108
168 68 146 382
3. ECR owning Trains running with LHB Coaches
Sl Train No. HOG/No. Train Name Electric
of Rakes End to End
1. 12309/12310 2/2 RJPB-NDLS Rajdhani Express Y
2. 12397/12398 2/2 GAYA – NDLS Mahabodhi Express Y
3. 12393/12394 2/2 RJPB-NDLS Sampoorn Kranti Express Y
4. 12561/12562 0/3 JYG-NDLS Swatantrta Senani Express N
5. 13257/13258 2/3 DNR-ANVT Jansadharan Express Y
6. 12389/12390 0/1 Gaya-Chennai Egmore Express N
7. 12355/12356 1/1 RJPB-JAT Archana Express N
8. 12395/12396 0/1 RJPB-AII Ziyarat Express N
9. 13281/13282 RJPB-NTSK Express N
10. 82355/82356 0/2 PNBE – CSMT Suvidha Express N
11. 13307/13308 * 0/4 DHN-FZR Ganga Sutlej Express N
12. 12553/12554 * 4/4 SHC-NDLS Vaishali Express Y
13. 15563/15564 * 0/1 JYG-UDN Antyodaya Express N
14. 22551/22552* 0/1 DBG-JUC Antyodaya Express N
15. 15551/15552* DBG- BCY Antyodaya Express N
16. 15547/15548* 0/1 JYG-LTT Antyodaya Express N
17. 15279/15280* 1/1 SHC-ANVT-Purabiya Express Y
18. 15233/34/35/36* 0/1 DBG-HWH/KOAA Express N
19. 22353/22354 0/1 PNBE-BAND Humsafar Express N
20. 15529/30/31/32* 0/1 SHC-ANVT/ASR Jansadharan Express N
21. 13205/13206* 1/1 SHC-PPTA Janhit Express Y
22. 12567/12568** 1/1 SHC-PNBE Rajya Rani Express (w.e.f. Y
05.04.19)
23. 12565/12566** 1/1 DBG-NDLS S Kranti Express (1 Rake w.e.f. N
(2 CBC) 10.04.19) (Elec–SPJ-NDLS)
24 13237/38/39/40** 4/4 PNBE-KOTA Express (w.e.f. 19.05.19) Y
(13239/13240
4- days)
25 13201/13202** 0/4 RJPB-LTT Express (w.e.f. 13.07.19) N
26 13245/46/47/48** 0/1 RJPB-KYQ/NJP Capital Express (1 Rake N
w.e.f. 10.08.19)
27 15267/15268** 0/1 RXL-LTT Antyodaya Express ( w.e.f. 31.08.19) N
*Converted/Introduced in 2018-19
**Converted to LHB in 2019-20
4. ECR owning Antyodaya Express
Sl Train No. No. of Rakes Train Name
1. 22551/22552 1 DBG-JUC Antyodaya Express
2. 15551/15552 DBG-BCY Antyodaya Express
3. 15563/15564 1 JYG-UDN Antyodaya Express
4. 15547/15548 1 JYG-LTT Antyodaya Express
5. 15267/15268 1 RXL-LTT Antyodaya Express
5. ECR owning Train running with Deen Dayalu Coaches
Sl Train No. No. of Rakes Train Name
1. 15559/15560 1 DBG-ADI Jansadharan Express
6. ECR owning Humsafar Express
Sl Train No. No. of Rakes Train Name
PNBE-BAND Humsafar Express
1. 22353/54 1
7. Coaching Depot Over ECR
Division Depot No. of Pit Lines & Capacity
DNR RNCC P 1 – 23, P 2 – 24, P 3 – 24, P 4 - 24
DNR P 1 – 24, P 2 – 24, P 3 – 24
DHN RGD P 1 - 24
MGS PNBE P 1- 24, P 2 – 15
SEE DHN P 1 – 17, P 2 – 22, P 3 – 24, P 4 - 24
BRKA P 1 - 13
SPJ SGRL P 1 - 10
GMO P 1 - 15
GAYA P 1- 24, P 2 – 24
BJU P 1- 24, P 2 – 24
MFP P 1- 24, P 2 – 22
DBG P 1- 26, P 2 – 23
JYG P 1- 24
RXL P 1- 24
SPJ P 1- 24
SHC P 1- 24
8. List of Standardized Trains of ECR
Depot Total No. Train No. No. of Rake Load Remarks
of rakes Rake Type
GAYA 12397/12398 (GAYA-NDLS) 22 --
RJPB 03 12389/12390 (GAYA-MS) 02 LHB
SHC 13237/13238 (PNBE-KOTA) 01
08 13239/13240 (PNBE-KOTA) LHB 22 w.e.f. 28.07.19
13201/13202 (RJPB-LTT) 04 LHB 22 w.e.f. 01.09.19
05 12355/12356 (RJPB-JAT)
12553/12554 (SHC-NDLS) 04
15279/15280 (SHC-ANVT) 01
04
01
8.2 Trains (in pairs) Originating/Terminating from important terminals of ECR
Div Station No. of M/Exp No. of Pass Trains
DHN Dhanbad 11 07
Singrauli 06 --
DNR Chopan 03 05
30 31
MGS Patna 14 --
SEE Rajendra Nagar (T) 09 04
07 06
SPJ Danapur 03 05
Patliputra 02 03
01 06
Rajgir 01 03
Islampur 06 24
02 13
Ara 02 --
Jhajha 14 12
Gaya 08 10
Deen Dayal Upadhyay Jn 12 09
Bhabhua 13 06
Muzaffarpur 12
Barauni 12+1 Spl 12
Darbhanga 10+1 Spl 01
Jaynagar 12
Saharsa 05 --
Raxaul 02 --
Sitamarhi 01
Narkatiyaganj 01
Bapudham Motihari
Purnia Court
Rake Reversals of Trains (in pairs) over ECR
Div Station No. of M/Exp No. of Pass Trains
DHN Barkakana 03 02
DNR 05 --
MGS Chopan 01 02
SEE Gomoh 01 01
SPJ Patherdih 01 --
04 --
Kiul 01 --
Gaya 01 01
Dehri On Sone 06 --
Sasaram 11 --
Muzaffarpur 04 --
Samastipur 04 --
Sagauli -- 02
Saharsa
Sitamarhi
8.3 Maintenance (PM & SM) at Coaching Depot Over ECR
Division Depot PM SM
M/Exp Pass.
M/Exp Pass.
-- --
RNCC 17 -- 03 --
-- --
DNR DNR 05 01 05 --
RGD 01 -- 01 --
-- --
PNBE 01 -- -- --
-- --
DHN 09 01 --
-- --
DHN BRKA 01 02 05 --
SGRL 02 -- 03 --
-- --
GMO -- 02 01 --
-- --
MGS GAYA 02 04 01 --
SEE BJU 03 --
MFP 05 --
DBG 07 01
JYG 06 --
SPJ RXL 04 01
SPJ -- 10
SHC * 05 --
*Exclusively LHB rakes.
Important Terminal having PF & Washing Pit less than 24 Coaches
Div Station Total No. PF No. Present Total W/Pit No. Present
DHN of PF Capacity No. of Capacity
DNR (Less than W/Pit (Less than 24
24 Coaches) Coaches)
MGS
SEE DHN 07 4 18 Coaches 04 1 17 Coaches
SPJ 5 17 Coaches 2 22 Coaches
PNBE 10 8 18 Coaches 02 2 15 Coaches
RJPB 04 1 23 Coaches 04 1 23 Coaches
4 22 Coaches -- --
GAYA 09 5 16 Coaches 02 -- --
8 23 Coaches -- --
4 21 Coaches -- --
DDU 08 5 18 Coaches Nil -- --
6 21 Coaches -- --
MFP 04 -- -- 02 2 22 Coaches
DBG 05 -- -- 02 2 23 Coaches
SPJ 07 4 22 Coaches 01 -- --
7 23 Coaches -- --
SHC 05 3 22 Coaches 01 -- --
4 22 Coaches -- --
Detail of Passenger Services (MEMU/DEMU/ICF)
Rake Type No. of Rakes Rakes Rakes Total No. of
in Use Introduced in Introduced in Services
MEMU
DEMU 40 2018-19 2019-20 130
18 12 04 54
ICF 30 04 02 90
-- --
8.4 Details of Section (Division wise) over ECR
Division Section Length Track Traction Max.
(KM) Permissible
PKA-CBH Double Line Electric Speed (KMPH)
CBH-GAYA 94.42 Double Line Electric
PKA-PEH 113.91 Single Line Electric 130
KQR-KWAR- MMD 30.15 Single Line Diesel 130
KQR-HZBN-BRKA 110.23 Single Line Diesel 100
BRKA - SDWR 136.74 Single Line Diesel 50
60
DHN-KTH-CRP 6.40 DHN-KDS- D/L, Electric 60
KDS-JNN-Twin S/L,
DHN 34.12 Electric 80
JNN-CRP- S/L
GMO-BRKA 100.62 Electric 100
GMO-CRP- D/L,
DNR BRKA-LTHR 117.20 CRP-JAN- Twin S/L, Electric 100
Electric
LTHR-GHD 101.22 JAN-BRKA - S/L Diesel 110
GHD-CPU 141.43 Diesel 100
CPU-KRLR 49.45 BRKA-PTRU- S/L, Diesel 75
KRLR-SGRL-MHDA 19.16 PTRU-LTHR- D/L Electric 75
KRLR-SKTN 32.13 Electric 65
JAJ-TALL 83.15 Double Line Electric 110
TALL-BKP 48.56 Single Line Electric 110
BKP-DNR 55.11 Single Line Electric 110
DNR-BXR 108.03 Single Line Electric 110
BXR-MGS 94.07 Single Line Electric 110
KIUL-GAYA 129.23 Double Line Electric 100
PNBE-GAYA 91.75 Double Line Electric 100
BKP-RGD 53.00 Double Line Diesel 100
RGD-TIA 46.08 Double Line Electric 75
DLN-TRG 10.67 Double Line Electric 30
HTZU-RDUM Single Line Electric 60
HTZU-MKA 7.69 Double Line Electric 60
RJO- HTZU 8.30 Single Line 50
3.34 Single Line Electric 80
RJO-BJU 9.83 Single Line Electric
single Line 80
FUT-IPR 42.67 Single Line 55
DHWN-BEHS 38.28 Double Line
RJO-DKGS - D/L,
DKGS-BJU- Twin S/L
Single Line
Single Line
Division Section Length Track Traction Max.
(KM) Permissible
MGS MPO-DOS 90.40 Double Line Electric Speed (KMPH)
DOS-DDU 117.85 Triple Line Electric
DOS-GHD 98.56 Double Line Electric 130
SSM-PIRO 58.54 Single Line Electric 130
PIRO-ARA 38.66 Single Line Electric 110
80
KIR-MNE 115.00 KIR-KUE - D/L, Electric 65
KUE -KIBH- S/L,
MNE-BJU 64.28 KIBH-MNE- D/L Electric 110
BJU-MFP 102.73 Electric (KUE-KTRH-50)
Double Line
MFP-SEE 59.36 Double Line Electric 110
110
SEE SEE-CPR 53.64 MFP-BNR - D/L, Electric
71.31 BNR-GWH-S/L, Electric 110
BCA-SPP-HJP GWH-SEE- D/L
15.27 Electric 110
SEE-PPTA Double Line 110
Single Line Electric 50
(Digha Bridge-
Single Line Electric 60)
Electric 50
PMU-PPTA 16.57 Single Line Electric (Digha Bridge-
Diesel 60)
MFP-NKE 159.12 Single Line Diesel 100
NKE-PNYA 64.09 Single Line Diesel 100
RXL-SGL 29.12 Single Line Diesel 100
RXL-NKE 40.64 Single Line Diesel 80
MFP-SMI 64.52 Single Line Diesel 100
SMI-BGU 32.52 Single Line Diesel 100
BGU-CAO 29.78 Single Line Diesel 80
CAO-RXL 23.74 Single Line Diesel 80
SMI-DBG 68.01 Single Line Diesel 100
DBG-SKI 19.31 Single Line Diesel 100
48.69 Single Line Electric 80
SPJ SKI-JYG 35.50 Single Line Electric 30
37.42 Single Line Diesel 100
SKI-BIRL 85.88 Single Line Diesel 110
DBG-SPJ 43.13 Single Line Diesel 80
SPJ-KGG 20.12 Single Line Diesel 100
SHC-MNE 22.13 Single Line Diesel 50
SHC-DMH 19.71 Single Line 75
DMH-MRIJ 26.61 Single Line 60
MRIJ-BNKI 15.29 Single Line 60
BNKI-PRNA 16.40 Single Line 85
BNKI-BAKT
SHC-GEB
8.5 Traction changing Point Over ECR (Station)
Sr. Div Traction Train From To Traction change
No. changing No. Diesel to Electric or
DBRG DLI
1 station 14055 DLI BDRG Electric to Diesel.
14056 AGC DE
2 DDU 12319 KOAA KOAA ED
12320 AGC AGC ED
3 (12 Pair) 13167 KOAA KOAA DE
13168 AGC LKU DE
4 BJU 12353 HWH HWH ED
12354 LKU CSTM ED
5 (10 Pair) 12361 ASN ASN DE
12362 CSTM JSM ED
6 SPJ 12371 HWH HWH DE
12372 JSM NDLS ED
7 (02 Pair) 12875 PURI PURI DE
12876 NDLS ASR ED
8 CPU 13005 HWH HWH DE
13006 ASR DDN ED
9 (06 Pair) 13009 HWH HWH DE
13010 DDN ED
10 13151 KOAA JAT DE
13152 JAT KOAA ED
11 13307 DHN FZR DE
13308 FZR DHN ED
12 MGS 18103 TATA ASR DE
13 18104 ASR TATA ED
13185 SDAH JYG DE
14 13186 JYG SDAH ED
12569 JYG JYG DE
15 12570 ANVT ANVT DE
13043 HWH RXL ED
16 13044 RXL HWH ED
13137 KOAA AMH DE
17 13138 AMH KOAA ED
13165 KOAA SMI DE
18 13166 SMI KOAA ED
15233 KOAA DBG DE
19 15234 DBG KOAA ED
15235 HWH DBG DE
20 15236 DBG HWH ED
17005 HYB RXL DE
21 17006 RXL HYB ED
17007 SC SMI DE
22 17008 DBG ED
13135 KOAA SC DE
23 13136 JYG JYG ED
12565 DBG KOAA DE
24 12566 NDLS NDLS DE
12561 JYG DBG ED
25 12562 NDLS NDLS DE
11447 JBP JYG ED
26 11448 HWH HWH DE
18009 SRC JBP ED
27 18010 AII AII DE
18101 TATA SRC DE
28 18102 JAT JAT DE
19413 ADI TATA DE
29 19414 KOAA KOAA DE
19607 KOAA ADI DE
30 19608 AII AII ED
13025 HWH KOAA DE
31 13026 BPL BPL ED
HWH DE
32
33
34 SEE
35
36
37
38
39
40
41
42
43
44
45
46 SPJ
47
48
49
50
51
52
53
54 DHN
55
56
57
58
59
60
(i) Proposed (Partial) Elimination of Diesel under wire
Existing Traction Proposed Traction
Sl Train No. from To freq Electric Diesel Electric Diesel
From To From To From To From To
1 14055/14056 BDRT DLI 7 DLI DDU DDU BDRT DLI BGP BGP BDRT
2 15653/15654 GHY JAT 1 -- -- GHY JAT JAT KIR KIR GHY
3 20503/20504 NDLS DBRG 1 -- -- NDLS DBRG NDLS KIR KIR DBRG
4 12523/12524 NDLS NJP 2 -- -- NDLS NJP NDLS KIR KIR NJP
5 13414/13413 DLI MLDT 3 -- -- DLI MLDT DLI BGP BGP MLDT
(ii) Proposed (End to End) Elimination of Diesel under wire
Existing Traction Proposed Traction
Sl Train No. from To freq Electric Diesel Electric Diesel
From To From To From To From To
1 55007/55008 GKP PPTA 7 -- -- GKP PPTA GKP PPTA -- --
(iii) Diesel Underwire eliminated this year over ECR (Up to August 2019)
SI. Train no.& Name Traction Frequency Electrified section w.e.f.
1 53225/53226 (BKP - GAYA) Pass End to End 6 day From to 22.04.2019
2 53222/53221 (BKP - RGD) pass End to End 6 day 22.04.2019
3 53224/53223 (BKP - RGD) pass End to End 6 day BKP GAYA 23.04.2019
4 18633/18634 (RNC - PNBE)Exp. Weekly 25.05.2019
5 18639/18640 (RNC - ARA) Exp. End to End weekly BKP RGD 25.05.2019
6 53374/53371 (BRKA - KQR) Pass. End to End Daily 21.05.2019
7 54272/54271 (DDU - ARA) pass. End to End Daily BKP RGD 22.05.2019
8 54273/54274 (ARA - SSM) pass. End to End Daily 23.05.2019
9 53626/53627 (GAYA - KIUL) pass End to End Daily RNC PNBE 22.05.2019
10 53629/53630 (GAYA - KIUL)Pass End to End Daily 22.05.2019
11 13249/13250 (PNBE - BBU) Exp. End to End Daily RNC ARA 22.05.2019
12 53211/53212 (PNBE - SSM) pass. End to End Daily 22.05.2019
13 15051/15052 (KOAA - GKP) Exp. End to End weekly BRKA KQR 31.05.2019
14 12557/12558 (ANVT - MFP) Exp. End to End Daily 29.05.2019
15 19305/19306 (INDB - KYQ) Exp. End to End Weekly DDU ARA 23.05.2019
16 15273/15274 (ANVT - RXL) Exp. Daily 29.05.2019
17 15001/15002 (MFP - DDN) Exp. End to End Weekly ARA SSM 01.06.2019
18 12368/12367 (ANVT - BGP) Exp End to End Daily 01.06.2019
19 15051/15052 (KOAA - GKP) Exp. End to End Weekly GAYA KIUL 31.05.2019
20 19039/19040 (BDTS – MFP) Exp. End to End Three Dyas 03.06.2019
21 15201/15202 & 25201/25202 End to End 6 Days GAYA KIUL 30.05.2019
End to End
(NKE/RXL-PPTA) Exp. PNBE BBU
22 12538/12537(MUV - MFP) Exp.
23 55029/55030 (GKP - NKE) Pass PNBE SSM
24 55041/55042 (GKP - NKE) Pass
25 55071/55072 (GKP - NKE) Pass KOAA GKP
26 55073/55074 (GKP - NKE) Pass
27 55079/55080 (GKP - NKE) Pass ANVT MFP
28 55081/55082 (GKP - NKE) Pass
29 18101/18102 (TATA - JAT) Exp. INDB KIR
30 18009/18010 (SRC - AII) Exp.
31 53351/53352 (BRWD - CAR) Exp. ANVT RXL
32 18613/18614 (HTE - CPU) Exp.
33 19607/19608 (KOAA AII) Exp. DDN MFP
ANVT BGP
KOAA GKP
BDTS MFP
PPTA NKE/RXL
End to End Three Days MFP GKP 03.06.2019
End to End Daily GKP NKE 03.06.2019
End to End Daily GKP NKE 03.06.2019
End to End Daily GKP NKE 03.06.2019
End to End Daily GKP NKE 03.06.2019
End to End Daily GKP NKE 03.06.2019
Daily GKP NKE 03.06.2019
End to End Daily TATA CPU 14.06.2019
SRC CPU 14.06.2019
Weekly BRWD CPU 14.06.2019
Daily HTE CPU 15.06.2019
KOAA CPU 13.06.2019
Tri weekly
Weekly
SI. Train no.& Name Traction Frequency Electrified section w.e.f.
From to
34 19414/19413 (KOAA - ADI) Exp Weekly KOAA CPU 15.06.2019
35 53343/53344 (GMO - CPU) End to End Daily GMO CPU 28.06.2019
36 11448/11447 (HWH – JBP) Exp. Daily HWH CPU 28.06.2019
37 14371/14372 (BRWD - CPU)Exp. End - to - End Daily BRWD CPU 30.062019
38 12873/12874 (HTE - ANVT ) Exp Tri weekly HTE CPU 02.07.2019
39 23347/23348 (GHD - SGRL) Exp. Daily GHD CPU 06.07.2019
40 53372/53373 (BRKA - KQR)Pass End - to - End Daily BRKA KQR 06.07.2019
41 13402/13401 (DNR - BGP) Exp End - to - End Daily DNR BGP 06.07.2019
42 13419/13420 (MFP - BGP) Exp. End - to - End Daily MFP BGP 06.07.2019
43 15098/15097 (JAT - BGP) Exp. End - to - End weekly JAT BGP 23.07.2019
44 18603/18604 (RNC - BGP) Exp. End - to - End Tri - weekly RNC BGP 25.07.2019
45 12253/12254 (YPR - BGP) Exp. End - to - End weekly YPR BGP 28.07.2019
46 20506/20505 (NDLS - DBRT) Exp. Weekly NDLS DBRT 28.07.2019
47 15631/15632 (BME - GHY) Exp. Bi weekly AF KIR 28.07.2019
48 12350/12349(NDLS - BGP) Exp. End - to - End weekly NDLS BGP 30.07.2019
49 22405/22406 (ANVT-BGP) EXP. End - to - End Tri - weekly ANVT BGP 14.08.2019
50 15215/15216 (MFP-NKE) Exp. End - to - End Daily MFP NKE 31.08.2019
51 15531/15532 (SHC-ASR) Exp. End - to - End Weekly SHC ASR
52 14603/14604 (SHC-ASR) Exp. End - to - End Weekly SHC ASR After CRS
53 55565/55566 (SHC-SPJ) Pass. End - to - End Daily SHC SPJ Sanction
54 55567/55534 (SHC-SPJ) Pass. End - to - End Daily SHC SPJ
8.6 Key performance
Sl. Indices F.Y.2018-19
1 Punctuality Performance 64.17
(M/Exp.)
47.2
2 Punctuality Performance (Pass.) 75.61
44.38
3 Right Time Start % (M/Exp) 64.68
4 Right Time Start % (Pass.) 9.47
5 Originating train Punctuality 14483
6 Time Delay %age
8979
7 No. of Trains Made Up (M/Exp.)
2513
8 No. of trains started late ex 84 coaches
originating station 1402 Coaches
9 No. of trains Lost in ECR >=240” 9 trains
Total-93 Trains
10 Permanent augmentation
11 Temporary augmentation 3289 trips
12 Conversion into LHB
(90 pairs +3 One way)
13 Running of Special trains
22 Pairs
14 Conversion of Conventional (17 MEMU +5 DEMU)
services to MEMU/DEMU
17 pairs
15 Introduction of trains 09 pairs
16 Extension of trains 02 pairs
17 Increase in frequency (Pair of trains) 55 pairs
18 New Stoppages