e indicators (Coaching)
July'19 Aug'19 Remarks/ Aug'18
Variation
w.r.t. July'19
70.22 77.02 (+) 06.80 69.25
66.8 69.87 (+) 03.07 37.68
77.27 77.88 (+) 00.61 78.65
51.85 62.79 (+) 10.94 41.71
68.52 75.2 (+) 06.68 70.23
4.71 (-) 01.59 7.26
6.3
1060 (-) 131 1235
1191
715 692 (-) 23 682
94 55 (-) 39 107
10 coaches 16 coaches (+) 6 Coaches 02 coaches
92 coaches 21 coaches (-) 71 coaches 284 coaches
1 train (1 rake)
1 trains 3 train (3 rakes) (+) 2 trains
Total-08
Trains Total-09 (+) 1 train Total-55 Trains
309 trips Trains
302 trips (-) 7 trips 481 trips
(8 pairs +0
One way) (8 pairs +1 (+) 1 One way (55 pairs +0 One
One way) way)
03 Pairs (+) 01 Pair
04 Pairs (+) 01 DEMU 04 Pairs
(03 DEMU) (02 MEMU +02
(04 DEMU) (+) 2 pairs
Nil (-) 2 pairs DEMU)
2 pairs 2 pairs 03 pairs
Nil 03 pairs
Nil
Nil Nil Nil
Nil
Nil Nil Nil
8.7 Punctu
Division Target % Aug'19 July'19
Dhanbad M/E Punct %age Punct %age
91 M/E Pass M/E Pass
91.11 84.81 92.31 82.91
Danapur 85 86.56 79.88 81.1 70.82
Mughalsarai 85 88.23 78.92 81.25 66.31
Sonpur 70 70.42 57.57 67.27 52.74
Samastipur 75 78.41 67.53 69.56 52.25
ECR 75 77.02 69.87 70.22 66.80
uality of ECR
Aug'18 Cummul. Upto Aug F.Y. 2018-19
Punct %age M/E Pass
M/E Pass 2019-20 2018-19 89.82 56.77
M/E Pass M/E Pass
92.3 48.56 90.22 73.04 90.74 48.48
81.27 56.22 75.9 69.45 72.56 55.34 78.16 61.58
76.83 37.87 79.53 59.8 65.52 36.94 70.55 42.13
66.34 26.5 59.57 45.03 54.73 27.88 61.04 38.98
78.83 39.07 62.08 50.5 70.14 36.07 76.13 47.26
69.25 37.68 66.22 58.66 58.65 37.52 64.17 47.2
8.8 Punctuality of Orig
Division (Aug'19) (July'19)
Dhanbad M/E Pass M/E Pass M
Danapur 88.16 76.86 90.37 73.82 90
Mughalsarai 90.47 71.84 83.01 65.88 83
Sonpur 85.63 71.30 72.93 53.53 78
Samastipur 68.32 43.11 59.82 39.14 71
67.05 55.05 48.14 43.03 69
ECR 75.20 66.67 68.52 60.27 70
Right Time S
Division (Aug'19) (July'19)
Dhanbad M/E Pass M/E Pass M
Danapur 77.07 66.78 80.37 56.07
Mughalsarai 76.25 62.02 84.89 55.24 75
Sonpur 86.23 75.44 65.35 37.80 85
Samastipur 69.88 45.88 64.11 42.57 73
83.18 60.49 69.03 46.28 66
ECR 77.88 62.79 77.27 51.85 76
78
ginating Trains of ECR
(Aug'18) Cummulative (Upto Aug) F.Y. 2018-19
2019-20 2018-19
M/E Pass M/E Pass M/E Pass M/E Pass
0.89 41.35 87.7.3 47.55
3.21 50.85 89.92 62.32 88.87 40.45 79.15 55.99
8.98 20.42 27.87 53.66
1.35 9.36 79.58 63.83 72.94 49.93 60.0 22.2
9.19 28.53 64.67 38.26
0.23 34.52 69.33 44.76 51.58 18.73 64.68 43.46
53.65 29.42 54.57 11.07
49.45 42.57 56.72 26.32
64.83 54.75 57.52 26.32
Start % of ECR
(Aug'18) Cummulative (Upto Aug) F.Y. 2018-19
2019-20 2018-19
M/E Pass M/E Pass M/E Pass M/E Pass
73.83 47.16
5.96 48.86 78.19 50.89 72.50 52.73 85.07 51.27
61.22 30.84
5.96 46.55 81.62 54.59 79.33 45.68 63.1 36.3
71.18 45.79
3.86 30.59 72.15 44.25 61.84 29.56 75.61 44.38
6.29 33.3 56.98 33.13 56.50 30.77
6.02 41.45 67.14 44.64 62.62 39.44
8.65 41.71 73.64 47.58 70.14 41.13
8.9 Details of Asset failures in ECR (as per ICMS)
Sl Items Aug'19 July'19 Aug'18 F.Y. Cumm. (Upto Aug) F.Y. 2018-
No. 2019-20 2018-19 Variation 19
1 Accident 10 16 5 54 26 28 76
2 ACP 2037 1834 389 5961 1407 4554 3498
3 Agitation 739 15 46 -31 67
4 Miscreant 50 48 22 234 178 56 504
5 Law & Order 15 8 42 71 159 -88 395
6 Bad Weather 25 37 11 125 70 55 143
7 Commercial 5 4 3 18 25 -7 29
8 Pressure trouble 51 32 54 210 249 -39 637
9 Brake binding 90 56 33 223 129 94 226
10 Hot Axle 4 3 1 12 9 3 27
11 Train parting 8 8 5 27 10 17 19
12 S/detch Coaches 3 5 0 16 14 2 28
13 S/detch Wagons 27 16 2 55 16 39 24
C&W Others (weighbridge defective,
14 wagon door open/broken, knuckle broken, 110 73 0 274 0 274 51
coupling defective, flat tyre etc.)
15 Dsl loco/DMU failure 79 77 37 253 142 111 302
16 Dsl Crew account 21 10 42 139 271 -132 519
17 Dsl Loco Others (LOR, Loco trouble, 34 46 22 152 102 50 244
Sander fault etc.)
18 Elec.loco failure 166 133 65 504 350 154 658
19 Elec Crew account 22 37 60 229 383 -154 811
20 Elec Loco Others (LOR, Loco trouble, 114 92 217 326 596 -270 1250
Fuelling account, Stalling etc.)
21 Elec G 52 49 18 183 157 26 235
22 EMU defective 15 15 0 32 0 32 2
23 Rail/Weld Failure 31 47 21 120 84 36 414
24 Banner flag 10 11 1 27 9 18 24
25 Block burst (Engg, S&T, OHE, RE) 108 110 127 628 806 -178 1843
Engg others (Including extra Caution,
Engg gateman, IMR caution, Engg staff
26 lapses, Jerk felt, Water logging, track 302 369 49 941 225 716 553
material missing, track buckling, machine
failure etc.)
27 Incident 115 99 79 485 415 70 869
28 L/C incidents 137 108 90 549 536 13 1074
29 OHE failure 73 95 11 305 85 220 217
30 RE 83 88 12 408 186 222 412
31 Run over 131 141 84 536 437 99 990
Signal failure (Axle Counter, track circuit, 856 828 498 3246 2154 1092 4761
140 113 311 249
32 RRI, L/C Gate signal, H/Signal, Adv. Str, 137 15 424
IBH failure etc.)
33 BI failure
34 Point failure 227 246 92 758 384 374 805
35 Control failure 82 67 19 247 111 136 263
36 COA/ICMS failure 62 27 1 114 10 104 34
8.10 Factors affecting punctuality of ECR
Months Aug'19 July'19 Aug'18 Cummulative Upto Aug F.Year
Factors Reported Punct % Punct Punct 2019-20 2018-19 2018-19
Lost 8726 % % Punct Punct Punct
%
Extra CD 77.02 8842 70.22 8772 69.25 42141 % %
Block Bursts 2005 2633 2697 14236 66.22 43210 99709
Other Engg. Failures 64.17
58.65
Total 17866 35726
Head No. of %age No. of %age No. of %age No. of %age No. of %age No. of %age
Trains Contrib Trains Contri Trains Contrib Trains Contrib Trains Contri Trains Contri
Lost ution Lost bution Lost ution Lost ution Lost bution Lost bution
Development Works Engineering 520 25.94 690 26.21 468 17.35 3421 24.03 3525 19.73 7488 20.96
46 2.29 44 1.67 33 1.22 243 1.71 326 1.82 668 1.87
0 0.00 38 1.44 54 2.00 87 0.61 314 1.76 570 1.60
566 28.23 772 29.32 555 20.58 3751 26.35 4165 23.31 8726 24.42
Construction 32 1.60 47 1.79 34 1.26 638 4.48 386 2.16 1001 2.80
Planned Block 129 6.43 128 4.86 201 7.45 1000 7.02 1251 7.00 2329 6.52
(O/Line+Const.)
NI (O/Line+ Proj.+ 82 4.09 53 2.01 51 1.89 695 4.88 249 1.39 921 2.58
Const.)
Railway Electrification 20 1.00 19 0.72 2 0.07 95 0.67 95 0.53 198 0.55
Total 263 13.12 247 9.38 288 10.68 2428 17.06 1981 11.09 4449 12.45
Asset Failure S&T 134 6.68 266 10.10 289 10.72 997 7.00 1272 7.12 2365 6.62
OHE 17 0.85 46 1.75 15 0.56 160 1.12 215 1.20 299 0.84
Diesel Loco 29 1.45 43 1.63 80 2.97 211 1.48 328 1.84 687 1.92
C&W 37 1.85 59 2.24 60 2.22 255 1.79 291 1.63 571 1.60
Electric Loco 48 2.39 78 2.96 53 1.97 274 1.92 285 1.60 524 1.47
Electric (G) 5 0.25 17 0.65 14 0.52 71 0.50 200 1.12 258 0.72
Total 270 13.47 509 19.33 511 18.95 1968 13.82 2591 14.50 4704 13.17
Law & Order 11 0.55 8 0.30 171 6.34 108 0.76 918 5.14 1502 4.20
Agitation 5 0.25 11 0.42 25 0.93 46 0.32 74 0.41 116 0.32
External Factors ACP 212 10.57 235 8.93 258 9.57 1248 8.77 1186 6.64 2794 7.82
Miscreant Activities 9 0.45 18 0.68 16 0.59 76 0.53 107 0.60 273 0.76
LC Gate 69 3.44 56 2.13 99 3.67 394 2.77 610 3.41 1148 3.21
Incident 59 2.94 83 3.15 107 3.97 408 2.87 407 2.28 979 2.74
Run Over 49 2.44 63 2.39 72 2.67 262 1.84 421 2.36 856 2.40
Bad Weather 12 0.60 39 1.48 11 0.41 125 0.88 204 1.14 476 1.33
Total 426 21.25 513 19.48 759 28.14 2667 18.73 3927 21.98 8144 22.80
Internal Factors Rescheduling (F) 0 0.00 0 0.00 0 0.00 0 0.00 1063 5.95 1063 2.98
Out of Path 115 5.74 174 6.61 151 5.60 795 5.58 1151 6.44 2422 6.78
Other Rly. 265 13.22 286 10.86 255 9.45 1722 12.10 1161 6.50 3050 8.54
Traffic 58 2.89 106 4.03 150 5.56 683 4.80 1248 6.99 2190 6.13
0 0.00 0 0.00 0 0.00 0.00 106 0.59 106 0.30
Rescheduling (Local) 0 0.00 0 0.00 0 0.00 0 0.00 0.21 38 0.11
Others 25 1.25 15 0.57 6 0.22 0 0.70 38 0.87 418 1.17
Accident 0.40 0.33 100 0.25 156 0.18 71 0.20
8 0.45 7 0.27 9 0.48 36 0.60 33 1.38 345 0.97
Commercial 9 23.94 4 0.15 13 21.65 86 24.04 246 29.12 9703 27.16
Due 480 592 22.48 584 3422 5202
Total
8.11 Major Development Wor
Div Sec Stn/B/S Date Brief Work/Unusuals
DNR ec
From To
IPR- Pre NI from 16.08.19 to 18.08.19 ,
FUT IPR 16.08.19 25.08.19 NI on 19.08.19 & Post NI from
20.08.19 to 25.08.19
Pre NI from 17.08.19 to 25.08.19 ,
MGS DDU- SSM 17.08.19 03.09.19 NI work from 26.08.19 to 28.08.19
MPO & TRD block from 29.08.19 to
03.09.19
DNR KIUL- SHK 23.08.19 29.08.19 Pre NI from 23.08.19 to 27.08.19 ,
GAYA & NI from 28.08.19 to 29.08.19
SPJ MFP- KUMB 28.08.19 31.08.19 Pre NI from 28.08.19 to 30.08.19 ,
PNYA & NI on 31.08.19.
04.08.19 Tfc + Power block for erection of
DNR DNR- DNR- *** steel structure over railway track at
PPTA PPTA 10.08.19 Km 552/07-09 for provision of
elevated corridor
04.08.19
DNR PNBE- Barh 05.08.19 *** Tfc + Power block for curved Track
JAJ on Dn line and 3rd line
06.08.19
DNR PNBE- MKB- 30.08.19 *** 4 hrs Traffic cum power block for
JAJ BRYA Strengthening of Bridge no. 152
between MKB-BRYA at Km
428/18-26
Major unusuals in the
ER/ Derailment of BOXN/E/27504 at
ASN
Div. JAJ- KEE- 24.08.19 25.08.19 18.05 hrs(24.08.19) blocking both
ASN JMT UP & DN Line, cleared at 17.15 hrs
SPJ
on 25.08.19
DBG- HYT- 28.07.19 02.08.19 Breaches bet HYT-TLWA at 03.30
SPJ TLWA hrs on 28.07.19 to 12.00 hrs of
02.08.19
rks in the Month of Aug'19
Trains Trains S/T & S/O Diverted Regulati R/Sch
Lost Cancelled Total
Punct M/Exp on
M/E Pass M/E Pass M/E Pass M/E Pass
2 4 *** 4 8 *** *** *** *** *** 18
9 55 30 36 82 *** 4 *** *** *** *** 207
4 4 *** 14 *** *** *** *** 1 7 30
*** *** *** 11
1 2 *** *** 8 *** 6 *** *** 15
2 *** *** 7 *** *** ***
8 1 *** 7 *** *** *** 5 *** *** 21
*** *** *** 4 *** *** *** *** 2 *** 6
k *** *** *** *** *** *** *** *** *** *** 0
*** 1 *** *** 1
*** *** *** *** *** ***
3 *** 4 *** *** 2 1 1 1 12
e Month of Aug'19
s 31 19 2 *** 1 *** 37 *** *** *** 90
0 65 *** *** *** 350
15 16 35 117 75 27
8.12 Train Reporting in ICMS by ECR (Aug’19)
Departure Reporting (97.72%) Arrival Reporting (95.41%)
Ranking of ECR over Indian Railway
9.1 Critical Capacity enhancement works > completed in
AUG'19 and expected in SEP'19
HEAD AUG'2019 SEP'2019
DIVISION SECTION DIVISION SECTION
DOUBLING DHN Dudhinagar- SEE Bhagwanpur - Ghoswar
Jharokhas (6.85 KM) (14.35 km)
G.C NIL NIL
NEW LINE NIL DNR SHK-SARSA-JAMALPUR
DHN (11.70 km)
NIL
3RD LINE Interlocking at TORI BY-PASS BET.
Kumarbag Terminal BIRATOLI-
MAHUAMILAN(9 KM)
NIL
SPJ DHN MAHUMAMILAN
STATION
YARD REMODELLING MGS E.I.commissioned at
Sasaram
MGS MANPUR & BHABHUA
Islampur and ROAD
Seikhpura
DNR
Interlocking at MGS E.I. AT MANPUR &
SPJ Kumarbag Terminal BHABHUA ROAD
NON-INTERLOCKING MGS
E.I.commissioned at DHN TORI-SHIVPUR DOUBLE
DNR Sasaram LINE
SPJ Islampur and
ELECTRIFICATION Seikhpura DNR PAIMAR-LINE 4,5 &6
DNR Samastipur- DHN
Khagaria section REMA-
(84.84 km) MAHESHMUNDA
UCPC siding at
Daniawan (4.034
km)
9.2 Future infrastructural critical works.
S.No. Category Critical work
1 Doubling Bhagwanpur-Ghoshwar in HJP-MFP section
Hajipur – Mouinudinnagar
2 3rd line Karaila Road – Shaktinagar- Singrauli
3 Standardization of Samastipur Darbhanga
4 Muzaffarpur - Valmikinagar
5 loop Patratu – Sonnagar
6 Electrification
Yard Remodelling Main line (Kuchman – Jhajha)
7
8 Fly overs Obra-Singrauli-Shaktinagar
9 Coaching Terminal Muzaffarpur – Sitamarhi
Narkatiaganj- Darbhanga/Jaynagar
10 Long Haul Loop Kiul RRI
lines Patratu RRI
11 Muzaffarpur RRI
12 Bye – pass Baktiyarpur – Karnauti
Tori
TSS Garwa Road
Gomoh
Additional loop line Patliuputra, Jaynagar
IBH/IBS CIC section UP & DN with 3rd line between PTRU- GHD.
Darbhanga
Saraigarh
Lalitgram
Saharsha
Mankatha
Garwa Road
Tori.
Renukut
Nagar Untari
Hazaribagh Town
Balumath
Nalanda
Kuchman down loop
Biharsharif 3rd line
Bansipur Down loop
Semapur – Katihar
Dighwara - Badagopal
9.3 VACANCY POSITION IN IMPORTANT SAFETY CATEGORY POSTS (AUGUST 2019)
Post Grade Pay Sanctioned Men On Promotional Direct Total
Strength Roll Quota Recruitment Vacancies
Vacancies Quota 1124
vacancies 257
192
A. TRAFFIC OPERATING 12252 11128 1540 -416 65
41
A1. Station Master Cadre 3438 3181 255 2 49
-8
Station Master/Dy.SS/SS 4600 1322 1130 192 0 833
Station Master/Dy.SS/SS 4200 2116 2051 63 2
A2. Controller Cadre 233 192 45 -4
Chief Controller 4600 188 139 49 0
Section Controller 4200 45 53 -4 -4
A3. Guard Cadre 3777 2944 833 0
Mail Guard 4200+500 405 361 44 0 44
4200 462 347 115 0 115
Passenger Guard 4200 1382 942 440 0 440
Senior Goods Guard 2800 1528 1294 234 0 234
Goods Guard 0 0 0
A4. Switchmen 1800 0 0 0 419 419
A5. Gateman (Traffic) 1325 906 0 419 419
Traffic Gateman 2400 1325 906 407 -833 -426
A6. Cabinman/Leverman/ 1900 3479 3905
Pointsman/Box & Traffic Porter 1900 13 0 13
cadre 1800 112 99 0 0 0
Cabinmaster 1900 0 0 30 0 30
Cabinman 1800 373 343 17 0 17
Leverman 1800 18 1 347 0 347
Leverman 1800 907 560 0 -9 -9
Pointsman 337 346 0 -838 -838
Pointsman 1675 2513 0 14 14
Traffic Porter 57 43
Box Porter 2644 -906 1738
10183 8445
B. LOCO RUNNING
B1. Loco Pilot Cadre 4846 3915 931 0 931
(Mail/Express/Passenger/ Goods) 247 226 21 0 21
Mechanical Loco Pilot (Mail) 4200+100
0
Mechanical Loco Pilot (Passenger) 4200+500 346 298 48 0 48
Mechanical Loco Pilot (Goods) & 1357 1106 251 0 251
278 232 46 0 46
Loco Pilot (Goods) as drafted
supervisors 4200
Electrical Loco Pilot (Mail) 4200+100
0
Electrical Loco Pilot (Passenger) 4200+500 279 262 17 0 17
Electrical Loco Pilot (Goods) & 4200 2339 1791 548 0 548
Loco Pilot (Goods) as drafted 0 0 0 0 0
supervisors 4200 471 -28
B2. Motormen 2400 730 90 287 0 259
B3. Shunters 4200 188 96 98 0 98
Mechancial Loco Pilot Shunting 2400 187 124 91 0 91
Mechancial Loco Pilot Shunting 178 161 54 -28 54
Electrical Loco Pilot Shunting 2400 177 44 -878 16
Electrical Loco Pilot Shunting 1900 4607 4059 1426 548
B4. Assistant Loco Pilots 0
Mechancial Senior Assistant Loco 2400 1534 926 608 -274 608
Pilot 1900 384 742 -84 -358
Mechancial Assistant Loco Pilot 4600 0
Electrical Senior Assistant Loco 2150 1096 1054 -604 1054
Pilot 539 1295 -152 -756
Electrical Assistant Loco Pilot 0
Loco Inspector 0 0 0 0