The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.

D2.2 February 2009 | BORAL PLASTERBOARD D2 Walls D | Installation Details Selector+ PLASTERBOARD SYSTEMS Fire Rated Steel Framed Walls - Plasterboard Installation

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by , 2016-02-15 02:09:03

D Installation Details - Boral

D2.2 February 2009 | BORAL PLASTERBOARD D2 Walls D | Installation Details Selector+ PLASTERBOARD SYSTEMS Fire Rated Steel Framed Walls - Plasterboard Installation

D | Installation Details

D1 | General
D2 | Walls
D3 | Ceilings
D4 | Reference

InstallationD | Details

D | Contents

D1 | General D1.1 D3 | Ceilings D3.1
D1.3 D3.3
Installation and Fastening Sequence for Steel Studs Ceiling Construction Notes D3.4
Fastener Selection D2.1 Fire Rated Ceilings - Plasterboard Installation D3.5
D2.2 Fire Rated Ceilings - Back-blocking D3.8
D2 | Walls D2.5 Fire Rated Ceilings - Perimeter D3.9
D2.8 Fire Rated Ceilings - Bulkhead D3.10
Wall Construction Notes D2.9 Fire Rated Ceilings - Movement / Control Joints D3.11
Fire Rated Steel Framed Walls - Plasterboard Installation D2.11 Fire Rated Ceilings - Lights D3.13
Fire Rated Steel Framed Walls - Terminals and Junctions D2.13 Fire Rated Ceilings - Electrical and Loaded Penetrations D3.15
Fire Rated Steel Framed Walls - Base Details D2.14 Fire Rated Ceilings - Beam Protection D3.17
Fire Rated Steel Framed Walls - Head Details D2.17 Non Fire Rated Ceilings - Plasterboard Installation D3.18
Fire Rated Steel Framed Walls - Control / Movement Joints D2.20 Non Fire Rated Ceilings - Back-blocking D3.19
Fire Rated Steel Framed Walls - Door Details D2.22 Non Fire Rated Ceilings - Perimeter D3.20
Fire Rated Steel Framed Walls - Plumbing Penetrations D2.23 Non Fire Rated Ceilings - Bulkhead
Fire Rated Steel Framed Walls - Electrical Penetrations D2.25 Non Fire Rated Ceilings - Acoustic Details D4.1
Fire Rated Steel Framed Walls - HVAC Penetrations D2.26 D4.2
Fire Rated Steel Framed Walls - Access Panel D2.27 D4 | Reference
Non Fire Rated Steel Framed Walls - Plasterboard Installation D2.28
Non Fire Rated Steel Framed Walls - Base Details D2.28 Old / New Reference Guide
Non Fire Rated Steel Framed Walls - Head Details D2.29 Quick-Find Index
Non Fire Rated Steel Framed Walls - Control Joints D2.31
Non Fire Rated Steel Framed Walls - Back-blocking D2.34
Door Details - Non Fire Rated Steel Framed Walls D2.37
Non Fire Rated Steel Framed Walls - Plumbing Penetrations D2.38
Fire Rated Timber Framed Walls - Plasterboard Installation D2.39
Fire Rated Timber Framed Walls - Wall Junctions D2.40
Fire Rated Timber Framed Walls - Base Detail
Fire Rated Timber Framed Walls - Head Details
Fire Rated Timber Framed Walls - Plumbing Penetrations
Fire Rated Timber Framed Walls - Acoustic Details

InstallationD | Details

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

D1 | General

Installation and Fastening Sequence for Steel Studs

The first plasterboard sheet installed at a joint should be fixed
to the open side of a stud flange. Additional sheets are then
installed in the direction toward the closed side of the stud web.

When installing the first side, screw-fasten the plasterboard sheets
to studs at edges only, as illustrated in Figure 1 (positions 1 and 2).
Then, on the second side, fasten the edge (position 3) followed by
intermediate studs (position 4). Return to the first side and fasten
sheets to previously unattached studs (position 5).

34 INCORRECT DIRECTION IN RELATION TO STUD
Figure 2 - Incorrect Fastening Sequence
251
Bent flange Twisted stud
CORRECT DIRECTION IN RELATION TO STUD Lipped Joint Lipped Joint
Figure 1 - Correct Fastening Sequence
Figure 3 - Effect of Incorrect Fastening Sequence
Caution
D1 General
Avoid fixing Boral Plasterboard sheets in the direction from the closed
side of the stud to the open side of the stud web (Figure 2). This will
result in the first sheet at a joint being incorrectly screwed to
the flange on the closed side of the stud. The flange will then be
free to deflect when the next sheet is screwed to the open side
(Figure 2). This can permanently bend the flange, resulting in a
lipped joint.
If the stud is not supported firmly while the screws are driven,
the stud can twist from square, also resulting in a lipped joint
(Figure 3).
Do not fix plasterboard sheets in the direction from the closed
side of the stud to the open side of the stud web (Figure 2).
Do not screw the first sheet at a joint to the flange at the
closed side of a stud web.

BORAL PLASTERBOARD | February 2009 D1. 1

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

» Installation and Fastening Sequence for Steel Studs

Correct Installation

The correct direction of sheet installation is in the direction from CORRECT DIRECTION IN RELATION TO STUD
the open side of the stud to the closed side of the stud web Figure 4 - Correct Fastening Sequence Detail
(Figure 4). The first sheet installed at a joint is screwed to the
flange at the open side of the stud. The flange will initially deflect
then straighten as the screw pulls tight. Ensure that the stud
is adequately supported to avoid twisting, and fully screw this Flat Joint
sheet to the stud before continuing. Figure 5 - Effect of Correct Fastening Sequence

The next sheet is now screwed to the flange at the closed side
of the stud. The deflection on this part of the flange is very small,
and the previously installed sheet helps keep the assembly rigid
during the installation of the second sheet.

If fixed correctly the result is a flat joint with no lipping (Figure 5).
The correct installation sequence is illustrated in Figure 5 below.

Do fix plasterboard sheets in the direction from the open side of
the stud to the closed side of the stud (Figure 4).

Do screw the first sheet at a joint to the flange at the open side
of a stud.

D1 General

D1.2 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Fastener Selection

Plasterboard to Frame Fasteners

Timber Frame Steel Frame
Types S3 and
Plasterboard Boral Smooth Shank Boral Annular Ring Shank Galvanised Nails9 Type W Screws2 Type D4 Screws
Thickness (mm) Gold Passivated Nails9 Nails9 and Uni-nails9 (2.8 mm dia UNO) 6-9 x 25W wall
6-9 x 32W ceiling 6-18 x 257
1 x 10 40 softwood 30 40 softwood D, S
30 hardwood 30 hardwood 6-9 x 32W
6-18 x 257
1 x 13 40 softwood 30 40 softwood 6-9 x 40W D, S
30 hardwood 30 hardwood
- 6-18 x 30
1 x 16 50 - 50 softwood 6-9 x 40W D, S
40 hardwood 6-9 x 50W
6-9 x 50W 6-18 x 40D, S
1 x 25 - - - 6-9 x 60W
8-8 x 60W 6-18 x 30D, S
2 x 10 50 - 50 8-8 x 75W
6-18 x 40D, S
2 x 13 65 - 50
6-18 x 40D, S
13 + 16 65 - 50
6-18 x 45D, S
2 x 16 65 - 65
7-16 x 50S
3 x 13 - - 75 x 3.75
8-15 x 60S
3 x 16 - - 75 x 3.75

Plasterboard to Plasterboard Fasteners

Number of Layers of Plasterboard Type L10 Screws for
x Thickness Fixing Plasterboard
A to B
Plasterboard A Plasterboard B

1 x 13mm 13mm 10 - 8 x 32mm

1 x 16mm 16mm 10 - 8 x 38mm

1 x 16mm 2 x 16mm 6 - 8 x 50mm

Notes: 7. For ease of construction with framing steel gauges of less than 0.8mm BMT D1 General
use 30mm minimum screw length.
1. All screws to be to Australian Standard AS3566-1988 corrosion class 1.
2. “W” is a single start, needle point, bugle head type W gypsum screw for 8. Correct screw length is critical when fastening to resilient furring channel to
avoid acoustic bridging.
fixing to hardwood and softwood framing. In some instances double start
thread screws are permissible (refer Boral Plasterboard). 9. Nail lengths are minimums, however care is needed when selecting longer
3. “S” is a double start, needle point, bugle head type S gypsum screw for fixing nails to avoid nail bending in hardwoods or popping of plasterboard with
to steel gauges of up to 0.80mm BMT. unseasoned timber.
4. “D” is a double start, drill point, bugle head type D gypsum screw for fixing to
steel gauges 0.80 to 2.00mm BMT. 10. For wall systems only. Tables to be read in conjunction with plasterboard
5. “L” is a single start, needle point, bugle head type L gypsum screw for fixing installation details.
plasterboard to plasterboard.
6. Screw designation given as (minimum screw gauge) - (threads per inch +1) x
(minimum screw length).

BORAL PLASTERBOARD | February 2009 D1. 3

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

This page left blank intentionally.

D1 General

D1.4 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

D2 | Walls

Wall Construction Notes 7. Steel Studs in fire rated partitions are not to be fastened to
top and bottom tracks except boxed studs facing fire door
1. Steel stud wall systems are non load bearing unless openings, in which case the boxed studs are pop riveted to
noted otherwise. the tracks.

2. Wall systems should not be used where conditions of 8. Steel wall framing to Rondo specifications or approved
constant excessive moisture or humidity are prevalent ie, equivalent and spaced at 600mm centres maximum.
in excess of 90% relative humidity.
9. Components must not be used if fractured or damaged.
3. Movement joints should be put at building construction joint
locations. Control joints should be spaced at not more than 10. Butt joints to be backed by stud or nogging for fire rated
12 metre maximum centres in either direction. systems.

4. Finish all joints with Boral Plasterboard jointing system, 11. Mid span nogging is recommended for erection purposes for
compromising perforated tape and jointing compound. steel stud walls greater than 3600mm.

5. All approved fire rated penetrations must be installed and 12. Timber stud framing to AS1684, relevant Australian Standards
caulked in accordance with details provided in this manual. and spaced at 600mm centres maximum.

6. Fire rated systems must be assembled strictly in accordance 13. Fire rated timber systems shall be read in conjunction with
with relevant test reports, opinions, approved system details Timber Charfactor Tables in Section C3 of this manual.
and specifications.

D2 Walls

BORAL PLASTERBOARD | February 2009 D2. 1

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

Fire Rated Steel Framed Walls - Plasterboard Installation

Do not fasten 60mm Fasteners 25mm min screw length
plasterboard to top 200mm
and bottom tracks Fasteners @ 200mm max ctrs
on edges, staggered
Butt joints to fall Additional fasteners placed 60mm
on studs from top edge of sheet

Stagger horizontal 60mm
joints on opposite Screws 10 - 16mm min
wall face from sheet edges
550mm min
Fasteners @ 300mm ctrs
1 layer Boral Plasterboard 300mm on studs in field of board
Firestop® to each face. Screws 10 - 16mm min
Stagger vertical joints from sheet edges
600mm min both faces

CS studs
@ 600mm max ctrs

Acoustic insulation
if required

Bottom track

Fire Rated Steel Stud - Horizontal Fixing - Single Layer

Top track Do not fasten plasterboard to top
and bottom tracks
CS studs @ 600mm
max ctrs Vertical joints to be staggered
600mm min with joints on
Acoustic insulation opposite face
if required
Fasteners @ 300mm max ctrs in
1 layer Boral Plasterboard field of plasterboard
Firestop® each face

D2 Walls Bottom track Fasteners @ 200mm max ctrs on
edges staggered
Fire Rated Steel Stud - Vertical Fixing - Single Layer Fasteners 10 - 16mm
from edge of sheet
D2.2
February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

» Fire Rated Steel Framed Walls - Plasterboard Installation

Top track 200mm Stagger inner layer horizontal
joints between opposite linings by
CS studs 600mm max 200mm min or back with nogging
@ 600mm max ctrs
300mm Stagger joints in outer layers
Acoustic insulation 600mm min vertical and 300mm
if required 600mm min horizontal

Fasteners Tape and set joints to external
@ 600mm ctrs max layers only
in first layers
Fasteners @ 300mm max ctrs in
Stagger joints in first layer field of plasterboard
600mm on opposite
wall face Stagger fasteners 100mm
(fasteners 45mm min
2 layers Boral Plasterboard screw length)
Firestop® or Wet Area
Firestop™ to each side Fasteners @ 200mm max ctrs on
edges staggered
Fasteners to inner
layers to be Fasteners 10mm - 16mm from
25mm min edge of sheet
screw length
Do not fix plasterboard into top
and bottom tracks

Bottom track

Fire Rated Steel Stud - Horizontal Fixing - Multiple Layer

Top track 200mm Do not fasten plasterboard into
top and bottom tracks
CS studs 300mm
@ 600mm max ctrs Tape and set joints to external
600mm max layers only
Acoustic insulation
if required 600mm min Fasteners @ 200mm max ctrs on
edges staggered
Stagger vertical joints in D2 Walls
first layers 600mm min Fasteners @ 300mm max ctrs
on opposite wall face in field of plasterboard

2 layers Boral Plasterboard Stagger fasteners 100mm
Firestop® or Wet Area (fasteners 45mm min
Firestop™to each side screw length)

Fasteners to inner Fasteners 10mm - 16mm from
layers to be edge of sheet
25mm min Fasteners @ 600mm ctrs max
screw length in first layers

Bottom track

Fire Rated Steel Stud - Vertical Fixing - Multiple Layer

BORAL PLASTERBOARD | February 2009 D2. 3

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

» Fire Rated Steel Framed Walls - Plasterboard Installation

Top track 200mm Stagger joints in outer layers
600mm min vertical and 300mm
CS studs 600mm max 300mm min horizontal
@ 600mm max ctrs
600mm min Do not fasten plasterboard into
Acoustic insulation top and bottom tracks
if required
Tape and set joints to external
Stagger vertical joints in layers only
first layers 600mm min
on opposite wall face Fasteners @ 300mm max ctrs
in field of plasterboard
2 layers Boral Plasterboard
Firestop® or Wet Area Fasteners @ 200mm max ctrs on
Firestop™ to each side edges staggered

Fasteners to inner Stagger fasteners 100mm
layers to be (fasteners 45mm min screw
25mm min length)
screw length
Fasteners 10mm - 16mm from
Bottom track edge of sheet

Fire Rated Steel Stud - Mixed Orientation - Multiple Layer Fasteners @ 600mm ctrs max
in first layers

D2 Walls

D2.4 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Fire Rated Steel Framed Walls - Terminals and Junctions

External Boral Plasterboard Cornice
corner bead typ Adhesive

CS stud External corner bead typ
Joint reinforcement tape typ
0.75mm BMT galv sheet steel
Boral Plasterboard Cornice corner reinforcement screwed to
Adhesive studs @ 400mm ctrs
Joint treatment
Corner reinforcement tape typ Boral Plasterboard Firestop®
or Wet Area Firestop™

Boral Plasterboard Firestop® CS stud
or Wet Area Firestop™
Fire grade sealant or
Stopping angle Cornice Adhesive.
Caulk all perimeter gaps
Masonry wall (or other)

Acoustic sealant if required

Fastener

Single Stud Terminal and Junction Details (Twin stud, staggered stud layout similar)

Notes: D2 Walls
• Control joints must coincide with those occurring in the main building structure and/or at maximum 12 metre centres.
• Location of control joints should be verified with structural engineer.

BORAL PLASTERBOARD | February 2009 D2. 5

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

» Fire Rated Steel Framed Walls - Terminals and Junctions

Plasterboard as required for
fire resistance and acoustic ratings.
Fix to standard fire/acoustic details

CT or DT track as required
fixed to standard details

60°-120°

Studs to provide support at corner 60°-120°

Rondo PN 554 50 x 50 x 0.75 BMT
galv MS angle full height to all corners.
Fasten to adjacent stud
CS studs at not greater than
600mm ctrs to each leaf

Twin Steel Stud T-Junction Detail

CS studs at not greater than
600mm ctrs to each leaf
Plasterboard as required for
fire resistance and acoustic ratings.
Fix to standard fire/acoustic details

Rondo PN 554 50 x 50 x 0.75 BMT
galv MS angle full height to all corners.
Fasten to adjacent stud

CT or DT track as required
fixed to standard details

D2 Walls Extra studs
Twin Steel Stud Corner Detail to provide support at corner

D2.6 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

» Fire Rated Steel Framed Walls - Terminals and Junctions

Boral Plasterboard Firestop® as CT or DT track as required and
required for fire resistance level fixed to standard details
fixed to standard fire resisting
construction details 0°-180°

Rondo PN 554
50 x 50 x 0.75BMT galv MS angle
full height to all corners

Extra studs CS studs at not greater than
to provide support at corner 300mm ctrs

Staggered Steel Stud T-Junction Detail Clip ex Rondo PN 140
100mm long
Firestop® Plasterboard as
required for fire resistance level CS studs at not greater than
fixed to standard fire resisting 300mm ctrs
construction details
0°-180° Clip ex Rondo PN 140
CT or DT track as required and 100mm long
fixed to standard details

Rondo PN 554
50 x 50 x 0.75BMT galv MS angle
full height to all corners

Extra studs
to provide support at corner

Staggered Steel Stud Corner Detail D2 Walls

BORAL PLASTERBOARD | February 2009 D2. 7

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

Fire Rated Steel Framed Walls - Base Details

Skirting if required CS studs @ 600mm ctrs max
Boral Plasterboard Firestop®
Bottom track
Fill gaps with Boral Plasterboard Insulation if required
Cornice Adhesive or
fire grade sealant Fasteners @ 600mm ctrs max
Continuous bead of acoustic
Partition Base Detail sealant under bottom track
if required

D2 Walls Rondo PN 140 screw to stud Appropriate bottom track
to suit application
Staggered Stud Base Detail
Wet area side
CS studs @ 600mm ctrs max Boral Plasterboard
Boral Plasterboard Firestop® Wet Area Firestop®
Insulation if required Ceramic wall tiles
Skirting if required Wet area flashing (uPVC angle
Fasteners @ 600mm ctrs max cove) adhered to sub floor with
Continuous bead of acoustic wet area flashing adhesive
sealant under bottom track Flexible sealant relief joint
if required 5mm - 10mm
Bottom track fire grade wet area sealant
Fill gaps with Boral Plasterboard Floor tiles
Cornice Adhesive or fire grade
sealant February 2009 | BORAL PLASTERBOARD

Partition Wet Area Base Detail

D2.8

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Fire Rated Steel Framed Walls - Head Details

Fasteners @ 600mm ctrs max 16mm gap
Top track Caulk perimeter gaps with Boral
Plasterboard Cornice Adhesive or
Square finish, cornice or stopping fire grade sealant
bead if required
Boral Plasterboard CS studs @ 600mm ctrs max
Firestop® each side

Partition Head Detail

Fasteners @ 600mm ctrs max 20mm

Concrete soffit or Caulk gaps and any through voids
permanent formwork with fire grade sealant
Deflection Head track

Boral Plasterboard CS studs @ 600mm ctrs max D2 Walls
Firestop® each side
Fasteners @ 600mm ctrs max
Deflection Head Detail
Gap as required
Concrete soffit to suit application
or permanent formwork Square finish, cornice or stopping
bead if required
Caulk perimeter gaps with Boral Boral Plasterboard Firestop®
Plasterboard Cornice Adhesive or as required
fire grade sealant

Appropriate top track to
suit application

Rondo PN 140 screw to stud

Staggered Stud Head Detail D2. 9
BORAL PLASTERBOARD | February 2009

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

» Fire Rated Steel Framed Walls - Head Details

Insulation as required Floor

Boral Firestop® Plasterboard Tape and set or cornice finish
ceiling system continuous over
walls and direct fixed to joists or Continuously fill gap with fire
to furring/battens grade sealant
Continuous bead of sealant over
track and fix track to furring Boral Plasterboard Firestop®
channels as required

Fire Rated Wall to Fire Rated Ceiling Detail

D2 Walls

D2.10 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Fire Rated Steel Framed Walls - Control / Movement Joints

16mm Boral Plasterboard 20mm
Firestop® or Detail A
Wet Area Firestop™

Detail B

Detail C Stopping angle Masonry wall or other
Fastener
Fix plasterboard to second stud Acoustic sealant if required
not to end stud against wall Boral Plasterboard
fire grade sealant
Control Joint Details FRL 60/60/60 (also available in other FRLs) CS stud

Jointing 20mm max Stopping Bead to suit
16mm deep fire grade sealant
16mm Boral Plasterboard control joint
Firestop® or Masonry wall or other
Wet Area Firestop™ Acoustic sealant if required

CS stud Stopping Bead to suit
16mm deep fire grade sealant
Jointing Detail A 20mm control joint
Detail B max
16mm Boral Plasterboard 20mm Backing rod or tape backing
Firestop® or max
Wet Area Firestop™ Backing rod or tape backing
16mm deep fire grade sealant
CS stud control joint
Decorative expansion joint trim
CS stud (non fire rated section, D2 Walls
16mm Boral Plasterboard Rondo P35 shown)
Firestop® or
Wet Area Firestop™ D2. 11
Jointing

Detail C

BORAL PLASTERBOARD | February 2009

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

» Fire Rated Steel Framed Walls - Control/Movement Joints

16mm Boral Firestop® 160mm Expansion joint
150mm

10mm

Boral Plasterboard Firestop® Steel stud
back blocks adhered to back of
board on one side of partition Screw fix with laminating screws
with Cornice Adhesive this side only

16mm Boral Plasterboard
Firestop®

Movement Joint Detail FRL 60/60/60

Steel stud framed wall to normal
fire rated wall details

Laminate 16 or 25mm Firestop®
strips to full width and height as
shown using cornice adhesive

6 x 50 laminating screws @
600mm ctrs to one side of joint

Movement Joint Detail FRL 120/120/120

Notes:
• Maximum joint movement capacity +/-20mm horizontally in plane of wall.
• FRL of wall not to exceed 120/120/120.
• Floor tracks to be cut over width of required control joint.
D2 Walls Optional cover strap
30 - 50mm
150mm
180 - 200mm

D2.12 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Fire Rated Steel Framed Walls - Door Details

Fix box studs only to top and Note:
bottom tracks
Jamb studs may consist of double CS studs or boxed
Top track CS studs. This may be determined by structural
requirements or the fixing details recommended by
the door frame manufacturer.

Intermediate steel stud Door head trimmer ex track
Boxed studs at door jambs only

Door Head Trimmer Detail

Note:
Jamb studs may consist of double CS studs or boxed CS studs.
This may be determined by structural requirements or the fixing details recommended by the door frame manufacturer.

Boral Firestop® Plasterboard Notes:
Door head trimmer
• Details shown are generic only.
• Check with specific door frame manufacturer to

ensure that fire rating is maintained.

Metal door frame Boral Firestop® Plasterboard D2 Walls

Door Head Detail

Metal door frame
Boxed studs at jambs

Door Jamb Detail

BORAL PLASTERBOARD | February 2009 D2. 13

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

Fire Rated Steel Framed Walls - Plumbing Penetrations

2 layers 16mm Boral Plasterboard
Firestop® each side

Fire collars to both sides to Max 110mm uPVC
manufacturer’s details.
Seal gaps with fire grade sealant

Penetration Detail - uPVC Pipe - Single Stud - FRL NA/120/NA 100mm
Max 110mm uPVC
Ceramic wall tiles

Boral Plasterboard
Wet Area Firestop®.
For FRL 120/120/120 use 2 layers
Boral Wet Area Firestop™
Plasterboard

Fire Collar. Track nogging support if required
Seal gaps with fire grade sealant
D2 Walls
Plasterboard block ex 3 x 25mm
Boral Plasterboard Shaftliner™
and 1 layer Boral Plasterboard
Firestop® laminated together and
screw fixed to face sheet

Penetration Detail - uPVC Pipe - Twin Stud - FRL 60/60/60

D2.14 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

» Fire Rated Steel Framed Walls - Plumbing Penetrations

2 layers Boral Plasterboard 30mm
Firestop® each side

Fire Sealant

20mm 50mm
Max 152mm

Copper or steel pipe

Penetration Detail - Copper/Steel Pipe - Single Stud - FRL 120/120/- Ceramic tiles on Type 1 organic
based wall tile adhesive
300mm square panel 2 x 16mm
Boral Plasterboard Wet Area Firestop™ Fire grade sealant
plasterboard screw laminated together

Cast iron pipe 100mm max iron or copper

Boral Plasterboard Wet Area D2 Walls
Firestop™.

For FRL 120/120/120 use 2 layers
Boral Plasterboard Firestop®

Penetration Detail - Copper/Steel Pipe - Twin Stud - FRL 60/60/60

BORAL PLASTERBOARD | February 2009 D2. 15

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

» Fire Rated Steel Framed Walls - Plumbing Penetrations

Boral Plasterboard Ceramic wall tiles
Wet Area Firestop®

Provide nogging to back of tap set Flexible sealant
and secure pipes
Boral Plasterboard
300mm square piece of 16mm Wet Area Sealant
Boral Plasterboard Wet Area
Firestop™ screw fixed to face layer Plumbing pipes

CS stud

Boral Plasterboard Firestop®

Typical Plumbing Penetration Detail - Section Provide nogging to back of tap set
and secure pipes
300mm square piece of 16mm
Boral Plasterboard Wet Area
Firestop™ screw fixed to face layer

Boral Plasterboard Firestop®

CS stud

Ceramic wall tiles Boral Plasterboard
Flexible sealant Wet Area Firestop™

Boral Plasterboard
Wet Area Sealant

D2 Walls Typical Plumbing Penetration Detail - Plan

Notes:
The following instructions must be followed to achieve satisfactory results:
• Care should be taken to isolate copper pipes away from contact with steel framing to avoid problems with corrosion.
• Plasterboard linings are not to act as supports for piping.
• Piping is to be kept clear of face sheets and baffles.
• Ensure that baffles protect the areas immediately behind wall penetrations.
• Pipes are to penetrate one face only of the partition between any two wall studs.
• Total area of all openings between any two wall studs must be no greater than 5000mm2.

D2.16 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Fire Rated Steel Framed Walls - Electrical Penetrations

1 layer 16mm Boral Plasterboard Switch plate
Firestop® or Fire rated switch box as supplied
Wet Area Firestop™ each side by manufacturer

Optional insulation Switch plate fixing screws

Seal penetrations with sealant as Switch plate bracket
recommended by manufacturer

Fire Rated GPO Detail Only - Partition FRL 60/60/60 2 layers 13mm
Boral Plasterboard Firestop® or
1 layer 13mm Wet Area Firestop™
Boral Plasterboard Firestop® or Switch plate
Wet Area Firestop™ Fire rated switch box as supplied
Optional insulation by manufacturer
Switch plate fixing screws
Seal penetrations with sealant as
recommended by manufacturer Switch plate bracket

Fire Rated GPO Detail Only - Partition FRL 90/90/90 2 layers 16mm
Boral Plasterboard Firestop® or
2 layers 16mm Wet Area Firestop™
Boral Plasterboard Firestop® or Switch plate
Wet Area Firestop™ Fire rated switch box as supplied
Optional insulation by manufacturer
Switch plate fixing screws
Seal penetrations with sealant as
recommended by manufacturer Switch plate bracket

Fire Rated GPO Detail Only - Partition FRL 120/120/120 D2 Walls

BORAL PLASTERBOARD | February 2009 D2. 17

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

» Fire Rated Steel Framed Walls - Electrical Penetrations

Stud 50mm min 50mm min 150mm min

Boral Plasterboard Firestop® 50mm min
baffle in partition cavity

Note:
Only 2 non fire rated GPOs
on any wall face
per stud panel

Cutouts for 50mm min
non fire rated GPOs

Typical Layout Elevation - Non Fire Rated GPOs in Fire Rated Partition

50mm min 50mm min 1 layer 16mm Boral Plasterboard
Firestop® baffle in partition cavity.

Refer elevation this page

1 layer 16mm CS studs @ 600mm ctrs max
Boral Plasterboard Firestop® or
Wet Area Firestop™ Cutout for non fire rated GPO

Typical Layout Plan - Non Fire Rated GPOs in FRL 60/60/60 Partition 2 layers 13mm or 16mm
Boral Plasterboard Firestop®
50mm min 50mm min baffle in partition cavity.
Refer elevation this page

D2 Walls 2 layers 13mm or 16mm CS studs @ 600mm ctrs max
Boral Plasterboard Firestop® or Cutout for non fire rated GPO

Wet Area Firestop™

Typical Layout Plan - Non Fire Rated GPOs in FRL 90/90/90 and FRL 120/120/120 Partition

D2.18 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

» Fire Rated Steel Framed Walls - Electrical Penetrations

Dotted outline of Fyre-Seal-Mastic Pack out gaps with “IBS Strip”
overlap (30mm) on face of plasterboard

320mm
Max opening in wall 320mm x 95mm

Electrical cables

Metal cable tray 30mm Gaps filled with Fyre-Seal-Mastic
95mm
Penetration Detail - Cable Tray - Section Through Tray CS studs @ 600mm max ctrs
(refer to Selector+
2 layers 13mm or 16mm Plasterboard Systems)
Boral Plasterboard Firestop® or
Boral Plasterboard Wet Area Cover of Fyre-Seal-Mastic
Firestop™ to each face 50mm wide “IBS” strips
3mm
Outline of cable tray
Electrical cables

10mm

Penetration Detail - Cable Tray - Section Through Wall

D2 Walls

BORAL PLASTERBOARD | February 2009 D2. 19

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

Fire Rated Steel Framed Walls - HVAC Penetrations

1 layer 16mm Boral Plasterboard Damper body
Firestop® or Wet Area Firestop™

50mm wide x 16mm Boral
Plasterboard Firestop® or Wet
Area Firestop™ strip, laminated

around damper opening

27mm IBS rod in 16mm gap 22mm IBS rod in 12mm gap
covered with 5mm min covered with 5mm min
fire grade sealant fire grade sealant
Variation on treatment to top
Damper framing angle Bullocks Fire Damper type 4900 style P of 400mm x 200mm Bullocks
Damper Type 5650 style F
Fire grade sealant
behind framing angle 1 layer 16mm Boral Plasterboard
Firestop® or Wet Area Firestop™
Deflection head track support
use CS stud section for CS stud framing
400mm x 200mm damper

Typical Fire Damper Detail - FRL 60/60/60 Steel Stud Wall

16mm Boral Plasterboard 38mm x 38mm x 2.5mm thick Pop rivet
Firestop® or damper support angle
Wet Area Firestop™ CS stud damper support frame
300mm x 300mm
CS stud framing curtain damper body Nominal 16mm clearance
1.6mm galvanised steel between damper and support
frame

16mm Boral Plasterboard High temperature Rockwool
Firestop® or compressed to half its original
Wet Area Firestop™ thickness

D2 Walls Section Elevation

Typical Fire Damper Detail - FRL 60/60/60 Steel Stud Wall

Notes:

• Consult with Mechanical and Structural Engineers for details of methods of supporting damper at wall,
especially if damper opening exceeds 600mm x 900mm.

• Refer to fire damper manufacturer for alternative or additional fixing details.

D2.20 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

» Fire Rated Steel Framed Walls - HVAC Penetrations

1 layer 13mm Boral Plasterboard Damper body
Firestop® or Wet Area Firestop™
22mm IBS rod in 12mm gap
50mm wide x 13mm Boral covered with 5mm min
Plasterboard Firestop® or Wet fire grade sealant
Area Firestop™ strip, laminated Variation on treatment to top of
around damper opening 200mm H x 400mm W Bullocks
Damper type 5650 style F
27mm IBS rod in 16mm gap
covered with 5mm min 2 layers 13mm Boral Plasterboard
fire grade sealant Firestop® or Wet Area Firestop™
CS stud framing
Damper framing angle

Fire grade sealant Bullocks Fire Damper type 4900 style P
behind framing angle 900mm H x 600mm W

1 layer 13mm
Boral Plasterboard Firestop® or
Wet Area Firestop™

Deflection head track support
use CS stud section for
200mm x 400mm damper

Typical Fire Damper Detail - FRL 90/90/90 Steel Stud Wall

2 layers 16mm Boral Plasterboard Damper body
Firestop® or Wet Area Firestop™
22mm IBS rod in 12mm gap
50mm wide x 13mm Boral covered with 5mm min
Plasterboard Firestop® or Wet fire grade sealant
Area Firestop™ strip, laminated Variation on treatment to top of
around damper opening if using 200mm H x 400mm W Bullocks
partition system Ss3 Damper type 5650 style F

27mm IBS rod in 16mm gap 2 layers 16mm Boral Plasterboard
covered with 5mm min Firestop® or Wet Area Firestop™
fire grade sealant CS stud framing

Damper framing angle Bullocks Fire Damper type 4900 style P
900mm H x 600mm W
Fire grade sealant
behind framing angle D2 Walls

Deflection head track support
use CS stud section for
200mm x 400mm damper

Typical Fire Damper Detail - FRL 120/120/120 Steel Stud Wall

BORAL PLASTERBOARD | February 2009 D2. 21

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

Fire Rated Steel Framed Walls - Access Panel

Wall up to -/120/120 FRL 25mm
50mm min
Continuous 6 x 50mm 3M FS195
wrap strip adhered to panel Opening 600 x 600mm max 10 x 38mm gypsum laminating
screws @ 300mm x 300mm ctrs
8mm annular gap
Min 10mm Customwood (MDF)
Access panel 6 x 50mm type 1 or type 2 gypsum
Screw laminated 3 x 16mm screws @ 600mm ctrs max
Boral Plasterboard Firestop® Plastic "snap caps"
Frame opening in wall stud and if required
track. Line with same thickness
and number of layers of Boral
fire rated plasterboard as used
on face

Access Panel Detail

D2 Walls

D2.22 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Non Fire Rated Steel Framed Walls - Plasterboard Installation

Top track

Acoustic insulation 300mm max Joints to be staggered 600mm
if required max with joints on opposite face
200mm max
1 layer 10mm or 13mm Fasteners @ 200mm max ctrs
Boral Plasterboard on edges staggered
Standard Core or
Wet Area Plasterboard Fasteners @ 300mm max ctrs
each side in field of plasterboard

CS studs Pack to allow for 5 - 10mm gap
@ 600mm max ctrs between bottom of plasterboard
and floor
Bottom track Fasteners 10 - 16mm
from edge of sheet
Non Fire Rated Steel Stud - Vertical Fixing - Single Layer

Butt joint between framing
members and backblocked to
standard details

Temporary block or
permanent screw

No adhesive required
at sheet ends and edges

200mm min

1 layer 10mm or 13mm 230mm max Fasteners 10 - 16mm
Boral Plasterboard from sheet edges
Standard Core or Wet
Area Plasterboard to Acoustic insulation if required
each face. Stagger
vertical joints 600mm Pack to allow for 5 - 10mm max
min to both faces gap between bottom of
plasterboard and floor
CS studs
@ 600mm max ctrs Wallnuts of Boral Plasterboard
Stud Adhesive 25mm dia x 15mm
Bottom track high @ 230mm max ctrs

Non Fire Rated Steel Stud - Horizontal Fixing - Single Layer D2 Walls

Note:
For level 4 and 5 finish, butt joints to fall between framing members, otherwise butt joints may be fixed to studs.

BORAL PLASTERBOARD | February 2009 D2. 23

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

» Non Fire Rated Steel Framed Walls - Plasterboard Installation

Top track 300mm Stagger joints in layers
600mm min vertical and
CS studs @600mm max ctrs 200mm 300mm min horizontal
Studs bottomed in track
600mm max Tape and set joints
2 layers 10mm or 13mm Boral to external layers only
Plasterboard Standard Core to 300mm
each side as required Fasteners @ 300mm max
600mm in field of plasterboard
Stagger joints in layers
Stagger fasteners 100mm
Acoustic insulation (fasteners 45mm min screw length)
if required
Fasteners @ 600mm max ctrs
Fasteners to inner layers in first layers
to be 25mm
screw length Do not fix plasterboard
into top and bottom tracks

Fasteners 10mm - 16mm
from edge of sheet

Bottom track

Non Fire Rated Steel Stud - Horizontal Fixing - Multiple Layer

Top track 200mm Do not fix plasterboard
300mm into top and bottom tracks
CS studs @600mm max ctrs
Studs bottomed in track Tape and set joints
to external layers only
2 layers 10mm or 13mm Boral
Plasterboard Standard Core to Fasteners @ 300mm max
each side as required in field of plasterboard

Stagger joints in layers Stagger fasteners 100mm
(fasteners 45mm min screw length)
Acoustic insulation
if required Fasteners @ 200mm max ctrs
on edges staggered
Fasteners to inner layers
to be 25mm Fasteners 10mm - 16mm
screw length from edge of sheet
D2 Walls
600mm max
Bottom track

Non Fire Rated Steel Stud - Vertical Fixing - Multiple Layer

D2.24 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Non Fire Rated Steel Framed Walls - Base Details

Boral Plasterboard Standard Core Wet area side Ceramic tiles
Steel stud
Fasteners @ 600mm ctrs max Boral Plasterboard
refer to architectural specification Wet Area lining
Skirting if required
Bottom track Wet Area flashing cove adhered
5mm - 10mm gap, max to sub floor with Wet Area
flashing adhesive
Continuous bead of acoustic
sealant under plasterboard and Flexible sealant relief joint
track if required
Floor tiles
Standard Non Fire Rated Wall Base Detail
Screed

Bond breaker

5mm - 10mm Wet Area sealant

D2 Walls

BORAL PLASTERBOARD | February 2009 D2. 25

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

Non Fire Rated Steel Framed Walls - Head Details

Fasteners @ 600mm ctrs max Acoustic sealant if required
5 - 10mm
16mm

Cornice or square set and tape, Trim as required
allow for deflection as required Top track
CS studs @ 600mm ctrs max

Acoustic insulation if required 10mm or 13mm Boral
Plasterboard Standard Core

Standard Non Fire Rated Wall Head Detail

Top Cross Rail
Furring Channel
Ceiling
Type S screw

Boral Plasterboard

Wall Head Fixing to Suspended Ceiling Detail - Parallel to Furring Notes:

Top Cross Rail • Screw Fixed Ceiling Systems.
Furring Channel
Ceiling • Where possible, fasteners should be fixed
Toggle Bolt through the plasterboard ceiling into the steel
furring channel above, using type S screws of
Boral Plasterboard adequate length. Where furring channels cannot
be located, use toggle bolts or expanding type
fasteners which secure above the ceiling.

D2 Walls

Wall Head Fixing to Suspended Ceiling Detail - Perpendicular to Furring

D2.26 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Non Fire Rated Steel Framed Walls - Control Joints

Fix Boral Plasterboard to second 10mm
stud not to end stud against wall Detail A

Detail B Fastener

Boral Plasterboard Standard Core Beads of acoustic sealant
or Wet Area Plasterboard if required
CS stud
Masonry wall (or other)

10mm min - 150mm max

10mm max

Jointing Stopping beads to suit
Flexible sealant
Boral Plasterboard Standard Core Masonry wall
or Wet Area Plasterboard (or other)
Bead of acoustic sealant
CS studs if required

Detail A Expansion joint
(eg Rondo P35 shown)
Jointing
CS studs
Boral Plasterboard Standard Core
or Wet Area Plasterboard

Detail B

Control Joint Details

D2 Walls

BORAL PLASTERBOARD | February 2009 D2. 27

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

Non Fire Rated Steel Framed Walls - Back-blocking

50mm 300mm 50mm

Back-blocking between stitches D or S type screws
Boral plasterboard
Rondo Stitching Batten
Back-blocking Using Stitching Batten Detail fixed with 4 x S type screws

Door Details - Non Fire Rated Steel Framed Walls

Boral Plasterboard Standard Core Notes:
Door head trimmer
• Details shown are generic only.
• Check with specific door frame manufacturer for

alternative detailing.

D2 Walls Metal door frame Boral Plasterboard Standard Core

Door Head Detail - Non Fire Rated

Metal door frame

Boxed studs at jambs

Door Jamb Detail - Non Fire Rated

D2.28 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Non Fire Rated Steel Framed Walls - Plumbing Penetrations

Boral Plasterboard Ceramic wall tiles
Wet Area lining

Provide nogging to back of tap set Flexible sealant
and secure pipes
Boral Plasterboard
CS stud Wet Area Sealant
Boral Plasterboard Standard Core
Plumbing pipes

Typical Plumbing Penetration Detail - Section Provide nogging to back of tap set
and secure pipes
Boral Plasterboard Standard Core

CS stud

Ceramic wall tiles Boral Plasterboard
Flexible sealant Wet Area lining

Boral Plasterboard
Wet Area Sealant

Typical Plumbing Penetration Detail - Plan D2 Walls

Notes:
The following instructions must be followed to achieve satisfactory results:
• Care should be taken to isolate copper pipes away from contact with steel framing to avoid problems with corrosion.
• Plasterboard linings are not to act as supports for piping.
• Piping is to be kept clear of face sheets.

BORAL PLASTERBOARD | February 2009 D2. 29

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

This page left blank intentionally.

D2 Walls

D2.30 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Fire Rated Timber Framed Walls - Plasterboard Installation

Top plate 200mm Fasten plasterboard into top and
200mm bottom plates
Butt joints
to fall on studs 300mm Fasteners @ 200mm max ctrs
on edges, staggered
Stagger horizontal joints
on opposite wall face Type W screws to suit number of
200mm min where joint is layers of plasterboard
not backed by nogging Screws 10 - 16mm min
from sheet edges
1 layer Boral Plasterboard
Firestop® to each face. Fasteners @ 300mm ctrs
Stagger joints 600mm min on studs in field of board
both faces
Screws 10 - 16mm min
Timber studs from sheet edges
@ 600mm max ctrs
Fasten plasterboard into top and
Acoustic insulation bottom plates
if required
Joints to be staggered 600mm
Bottom plate max with joints on opposite face
Type W screws to suit number of
Fire Rated Timber Stud - Horizontal Fixing - Single Layer layers of plasterboard
Fasteners @ 300mm max ctrs
Top plate 200mm in field of plasterboard

Timber studs Fasteners @ 200mm max ctrs
@ 600mm max ctrs on edges staggered

Acoustic insulation Fasteners 10 - 16mm
if required from edge of sheet

1 layer Boral Plasterboard 300mm
Firestop® each face 200mm

Bottom plate D2 Walls

Fire Rated Timber Stud - Vertical Fixing - Single Layer

BORAL PLASTERBOARD | February 2009 D2. 31

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

» Fire Rated Timber Framed Walls - Plasterboard Installation

Top plate 200mm Fasten plasterboard
into top and bottom plates
2 layers Boral Plasterboard 300mm
Firestop® or Fasteners @ 200mm max ctrs
Wet Area Firestop™ to 600mm on edges staggered
each side max
600mm min Fasteners @ 300mm max ctrs
Acoustic insulation in field of plasterboard
if required
Tape and set joints
Stagger joints in first layers to external layers only
600mm min
Type W screws to suit number
Timber studs of layers of plasterboard
@ 600mm max ctrs
Fasteners 10mm - 16mm
200mm from edge of sheet
Bottom plate
Fasteners @ 600mm ctrs max
Fire Rated Timber Stud - Vertical Fixing - Multiple Layer in first layers

Top plate 200mm Stagger joints in outer layers
600mm min vertical and
2 layers Boral Plasterboard 600mm 300mm 300mm min horizontal
Firestop® or max
Wet Area Firestop™ to 600mm min Fasteners @ 200mm max ctrs
each side on edges staggered

Acoustic insulation Fasteners @ 300mm max ctrs
if required in field of plasterboard

Stagger joints in first layers Type W screws to suit number of
600mm min layers of plasterboard

Timber studs Tape and set joints
@ 600mm max ctrs to external layers only

D2 Walls Bottom plate 200mm Fix plasterboard into top and
bottom plates

Fasteners 10mm - 16mm
from edge of sheet

Fasteners @ 600mm ctrs max
in first layers

Fire Rated Timber Stud - Mixed Orientation - Multiple Layer

D2.32 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

» Fire Rated Timber Framed Walls - Plasterboard Installation

Top plate 200mm 200mm Stagger horizontal joints between
200mm opposite inner linings by 200mm
Timber studs 600mm 200mm min or back with nogging
@ 600mm max ctrs max 300mm
600mm Tape and set joints to external
2 layers Boral Plasterboard layers only
Firestop® or
Wet Area Firestop™ to Fasteners @ 200mm max ctrs on
each side edges staggered
Stagger vertical joints
in first layers 600mm min Type W screws to suit number of
layers of plasterboard
Acoustic insulation
if required Fasteners @ 300mm max ctrs in
field of plasterboard
Fasteners
@ 600mm ctrs max Fix plasterboard into top and
in first layers bottom plates

Bottom plate Fasteners 10mm - 16mm
from edge of sheet

Stagger joints in outer layers
600mm min vertical and
200mm min horizontal

Fire Rated Timber Stud - Horizontal Fixing - Multiple Layer

D2 Walls

BORAL PLASTERBOARD | February 2009 D2. 33

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

Fire Rated Timber Framed Walls - Wall Junctions

Additional stud to support
plasterboard corner as required

Timber stud framing

Single Timber Stud Wall Corner Junction Detail Boral Plasterboard Firestop®
as required to achieve FRL
Timber stud framing
Boral Plasterboard Firestop®
as required to achieve FRL

Single Timber Stud Wall T Junction Detail Additional studs to support
plasterboard corner as required
Boral Plasterboard Firestop®
as required to achieve FRL Timber stud
35mm thick for FRL 60/60/60
45mm thick for FRL 90/90/90

Timber stud framing Boral Plasterboard Standard Core

D2 Walls Fire sealant

Single Timber Stud Fire Rated Wall to Non Fire Rated Wall T Junction Detail

D2.34 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

» Fire Rated Timber Framed Walls - Wall Junctions

Stud to support Additional studs to support
plasterboard corner plasterboard corner as required
Timber stud
framing Boral Plasterboard Firestop®
as required to achieve FRL
20mm

Twin Timber Stud Wall - Corner Junction Detail

Timber stud Additional studs to support D2 Walls
framing plasterboard corner as required

20mm Boral Plasterboard Firestop®
as required to achieve FRL
Twin Timber Stud Wall - T Junction Detail
D2. 35
BORAL PLASTERBOARD | February 2009

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

» Fire Rated Timber Framed Walls - Wall Junctions

Studs staggered at not greater Boral Plasterboard Firestop®
than 300mm ctrs as required for the stated fire
resistance level and fixed to
standard fire resisting
construction details

0°-180°

Rondo PN 554, 50 x 50 x 0.75
BMT galv MS angle full height
to all corners

Provide extra stud for support
at corner

Staggered Timber Stud Wall - Corner Junction Detail

Boral Plasterboard Firestop®
as required for the stated fire
resistance level and fixed to
standard fire resisting
construction details

Studs staggered at not greater
than 300mm ctrs

0°-180°

Provide extra stud for support Rondo PN 554, 50 x 50 x 0.75
at corner BMT galv MS angle full height
to all corners
Staggered Timber Stud Wall - T Junction Detail
D2 Walls

D2.36 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Fire Rated Timber Framed Walls - Base Detail

Fasteners @ 600mm ctrs max Skirting as required
Continuous bead of acoustic
sealant behind top/bottom plate Fill gaps with cornice adhesive or
if required approved fire grade sealant.
Max gap 10mm
Standard Timber Stud Wall - Base Detail

D2 Walls

BORAL PLASTERBOARD | February 2009 D2. 37

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

Fire Rated Timber Framed Walls - Head Details

Soffit of equivalent FRL Cornice or square set as required
Fasteners @ 600mm ctrs max
Layers of Boral Plasterboard Timber stud wall as required
Firestop® as required and fixed
to standard fire rated details

Standard Timber Stud Wall - Head Detail Min 16mm deep
sealant
Soffit of equivalent FRL
29mm IBS rod Alternative Sealant Detail
Min 5mm deep sealant
Fasteners min 20mm below Notes:
track flange • Maximum FRL 120/120/120.
min xxdt 75 track • Caulk all gaps with Boral Cornice Adhesive or fire

Standard Timber Stud Wall - Deflection Head Detail grade sealant.
• Head track reaction and fastenings to Engineer’s
Compressed Rockwool between
battens and between roofing and designs.
top plate
Roofing batten/purlin Non combustible sheet or tile roofing
30 x 5mm steel flats fixed
to rafters and top of wall
@ 1200mm ctrs max

D2 Walls Layers of Boral Plasterboard Rafter or
Firestop® as required and fixed truss cord
to standard fire rated details
Timber stud wall as required
Standard Timber Stud Wall - Head to Roof Junction Detail Note:
Max FRL 120/120/120
D2.38
February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

Fire Rated Timber Framed Walls - Plumbing Penetrations

Seal around pipe penetration with300mm max Boral Plasterboard Firestop® or
fire grade sealant Wet Area Firestop™
300mm max
Nogging as required Angle 35 x 35 x 0.75 BMT min
fixed to stud @ 600mm max ctrs
top and bottom

Fire grade sealant

Flexible sealant

Small bore brass/copper pipe or
tap fitting 30mm dia max

Timber support batten for pipes

Ceramic tiles

Baffles ex Boral Plasterboard
Firestop® or Wet Area Firestop™
screw laminated to wall lining.
1 layer 13mm Boral Plasterboard
Firestop® for FRL 60/60/60
2 layers 13mm Boral Plasterboard
Firestop® for FRL 90/90/90
2 layers 16mm Boral Plasterboard
Firestop® for FRL 120/120/120

Standard Fire Rated Timber Stud Wall Plumbing Pipe Penetration - Section

Baffles ex Boral Plasterboard Firestop® or Wet Area Firestop™ screw laminated to wall lining.
1 layer 13mm Boral Plasterboard Firestop® for FRL 60/60/60
2 layers 13mm Boral Plasterboard Firestop® for FRL 90/90/90
2 layers 16mm Boral Plasterboard Firestop® for FRL 120/120/120

Timber studs @600mm max ctrs Timber support batten for pipes

Flexible sealant

50mm max 7mm
Ceramic tiles
Boral Plasterboard Firestop®
or Wet Area Firestop™ D2 Walls

Fire grade sealant

Standard Fire Rated Timber Stud Wall Plumbing Pipe Penetration - Plan

BORAL PLASTERBOARD | February 2009 D2. 39

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

Fire Rated Timber Framed Walls - Acoustic Details

Resilient Channel fixed adjacently Plasterboard to cantilever no
in corner to allow ease of greater than 40mm
plasterboard fixing
Resilient Channel fixed vertically
One or two layers of Boral to each stud with 6g x 32mm
plasterboard fixed horizontally to type W screws @ 600mm ctrs
Resilient Channel. Plasterboard Note:
thickness and type selected as Provide sufficient offset to ensure
required to achieve required fire plasterboard screw does not
and/or acoustic performance. bridge timber stud
Plasterboard fixing details as per
steel studs One or two layers of Boral
plasterboard fixed vertically or
Resilient Channel Vertical Application - Corner Detail horizontally to timber stud.
Plasterboard thickness and type
One or two layers of Boral selected as required to achieve
plasterboard fixed vertically to required fire and/or acoustic
Resilient Channel. Plasterboard performance
thickness and type selected as
required to achieve required fire One or two layers of Boral
and/or acoustic performance. plasterboard fixed vertically or
Plasterboard fixing details as per horizontally to timber stud.
steel studs Plasterboard thickness and type
selected as required to achieve
required fire and/or acoustic
performance

D2 WallsResilient Channel at bottom can Locate Resilient Channel
Resilient Channelsbe fixed with attachment flange100mm max above floor
@ 600mm max ctrsup for ease of attachment

Fire/acoustic sealant as required
both sides

Resilient Channel Horizontal Application - Base Detail

Notes:
• Resilient Channel to be located within 150mm of the ceiling.
• Extend Resilient Channel into all corners and attach to corner framing.
• Splice Resilient Channels directly over studs by inserting (not butting) the Resilient Channels and

driving screw fastener through both flanges into the stud.

D2.40 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

» Fire Rated Timber Framed Walls - Acoustic Details

80mm min

Timber inserts fixed vertically
between noggings. Alternatively,
extra nogging can be fixed for
attaching Sound Isolation Mounts

80mm min

28mm Furring Channels Sound Isolation Mount fixed
fixed vertically to @ 1200mm max vertical ctrs and
Sound Isolation Mounts to every stud with 6g x 50mm
W type screws
One or two layers of Boral
plasterboard fixed horizontally to One or two layers of Boral
Resilient Channel. Plasterboard plasterboard fixed vertically or
thickness and type selected as horizontally to timber stud.
required to achieve required fire Plasterboard thickness and type
and/or acoustic performance. selected as required to achieve
Plasterboard fixing details as per required fire and/or acoustic
steel studs performance

Sound Isolation Mount - Corner Detail 100mm max
Also applies at top plate
Furring Channel
D2 Walls
Sound Isolation Mount

Bottom plate

Fire/acoustic sealant
as required both sides

Sound Isolation Mount - Base Detail

BORAL PLASTERBOARD | February 2009 D2. 41

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

This page left blank intentionally.

D2 Walls

D2.42 February 2009 | BORAL PLASTERBOARD

Selector+ PLASTERBOARD SYSTEMS D | Installation Details

D3 | Ceilings

Ceiling Construction Notes

1. Movement joints should be put at building construction 7. Tape and finish with preferred Boral Plasterboard jointing
joint locations or where there is expected movement in the system.
building structure.
8. Pitch of ceiling to be in the range of 0-70° from horizontal
2. Control joints should be spaced at not more than 12 metre varying of minimum radius of 6000mm.
maximum centres in either direction (15 metre centres where
there is perimeter relief) and where there is change in 9. Ceiling framing to Rondo specifications or appropriate
substrate materials. Australian Standards.

3. Specifiers should be aware of the likelihood of frame 10. Boral plasterboard to be applied along or across supporting
movement due to structural, thermal and seasoning effects on member. Butt or end joints not formed on framing members
direct fixed plasterboard ceilings. Where necessary specify a should be back-blocked as detailed in the manual.
furred system to minimise the risk of ceiling damage due to
these effects. 11. For fire rated systems allow 20mm expansion gap (or at the
rate of 3mm per 1 metre run) to furring/resilient channels and
4. Furring/resilient channel/framing supports to be taken/ top cross rails.
provided within 50mm of ceiling perimeter. Minimum 15mm
end clearance to walls. 12. All approved fire rated penetrations must be installed and
caulked in accordance with details provided in this manual.
5. Boral Plasterboard ceiling systems are not designed to
support the weight of maintenance personnel, additional plant 13. For non fire rated systems, plasterboard may be fixed with
or storage loadings. screws or a combination of adhesive and screws.
A combination of adhesive and screws is the preferred
6. Thermal or acoustic insulation (maximum 2kg/m2) may be method for general application.
placed above plasterboard ceiling lining.
14. Where nails are to be used to fix plasterboard in
non fire rated systems, refer AS/NZ 2589.1 1997 for
recommendations.

D3 Ceilings

BORAL PLASTERBOARD | February 2009 D3. 1

D | Installation Details Selector+ PLASTERBOARD SYSTEMS

This page left blank intentionally.

D3 Ceilings

D3.2 February 2009 | BORAL PLASTERBOARD


Click to View FlipBook Version