The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by sss, 2022-08-05 01:38:38

SSS Pre-Qualification 2022

SSS Pre-Qualification 2022

SSS/HSE/02/ 2020
HSE POLICY

7.0 EMERGENCY RESPONSE, PREPAREDNESS AND EVACUATION PLAN

Emergency plans to ensure employee safety in case of fire or other emergency shall be prepared,
in writing, and reviewed with all affected employees. Emergency preparedness plans shall comply
from the requirements as per SSS procedure (Site Emergency Plan)

Plans shall include escape procedures and routes, critical plant operations, employee accounting
following an emergency evacuation, rescue and medical duties, means of reporting emergencies,
and persons to be contacted for information or clarification.

a) On-site emergency planning shall be integrated with off-site emergency support.
(Documentation of specific on-site emergency services shall be made. This can include
written agreements, memorandum for record, telephone conversation logs, etc. The
emergency services provider should be offered an on-site orientation of the project and
associated hazards.)

b) Planning for any operation shall include the total system response capabilities to minimize
the consequences of accidents or natural disaster and shall consider communications,
rescue, first aid, medical, emergency response, emergency equipment, and training
requirements.

EMERGENCY CALL OUT PROCEDURE

In the event of any Emergency the following must be contacted

Serious Emergency - Call

Call

Give – your name, your company, and location reference, inform the emergency and details of
Emergency (Fire Explosion, Heart attack, serious accident, environmental spillage etc.), and then
call the SSS Operations Manager without fail.

EMERGENCY RESPONSE PROCEDURE –

When you hear the alarm:- Be calm and no panic ,Stop the job you are doing ,Walk out and close
your office door ,Look at the wind socks to determine the wind direction ,Walk to the muster point
according to the route

When you are at muster point: - Look for your supervisor quietly, Line up within your group,
Supervisors get the head count. Supervisors shall conduct the head counts to emergency
coordinator. Our Muster Point will be outside, near the gate area. When there is/are missing
person(s) occurs - Search team (selected HSE staff) will be activated, Conduct site search for
missing person, When situation is safe to go back to work: -Receiving the notice from

HSE In-Charge that the situation is safe to go back, Emergency coordinator will give the order of
going back to work, Work force will re-enter the site orderly and calmly.

Sky Steel Systems LLC, P.O. Box 36646, Dubai, UAE; Tel: +971 (0)4 2212 111; Email: [email protected]; Web: www.skysteel.com;
Page 14 of 18

SSS/HSE/02/ 2020
HSE POLICY

SSS will notice the details including:
(1) Identification of all potential emergency situations
(2) Emergency Communications Network
(3) Emergency Alarm System
(4) Individuals’ roles and responsibilities in an emergency
(5) Evacuation routes and assembly points (Muster Point)
(6) Systematic shutdown of operations to minimize loss and reduce additional hazards
(7) Emergency Control Centre (ECC) to collect information and direct activities
(8) A procedure for termination of the emergency situation
(9) Emergency and evacuation drill and simulation

In case of emergency, following is the contact source which shall be followed

ACCIDENT

OPERATIONS FOREMAN/SUPV’R MEDICAL TEAM
MANAGER
SITE ENGINEER
TECHNICAL
DIRECTOR HSE
DEPARTMENT

Sky Steel Systems LLC, P.O. Box 36646, Dubai, UAE; Tel: +971 (0)4 2212 111; Email: [email protected]; Web: www.skysteel.com;
Page 15 of 18

SSS/HSE/02/ 2020
HSE POLICY

8.0 SECURITY CONTROL PLAN
8.1 Security Procedure
SSS will follow with the Clients’ established Guideline on Security Matters and will
coordinate and comply with the Clients’ Security very closely to reflect the Clients' security
policy on SITE and Camp and also for the Gate Entry Control, and to know the Rules to all
employees and Guards.
8.2 Entry / Egress Control
SSS will order to all employees to wear Personal Identification Card (ID card) to meet the
Gate Control requirements at the designated gates if required by the client.

Sky Steel Systems LLC, P.O. Box 36646, Dubai, UAE; Tel: +971 (0)4 2212 111; Email: [email protected]; Web: www.skysteel.com;
Page 16 of 18

SSS/HSE/02/ 2020
HSE POLICY

9.0 HSE ORGANIZATION AND RESPONSIBILITY
9.1 HSE Organization

HSE REP. OFFICER
(ACTING HSSE MANAGER)

HSE SUPERVISOR /
TBA OFFICERS

HSE INSPECTOR’S
TBA

FIRST AIDER’S FIRE WATCHERS / FIRE
TBA
FIGHTERS
TBA

Sky Steel Systems LLC, P.O. Box 36646, Dubai, UAE; Tel: +971 (0)4 2212 111; Email: [email protected]; Web: www.skysteel.com;
Page 17 of 18

SSS/HSE/02/ 2020
HSE POLICY

9.2 HSE Committee Organization

HSE REP, SITE
OFFICER MANAGER

CONST’N
MANAGER

HSE HSE COMMITTEE
SUPERVISOR ORGANIZATION

PLANNING
MANAGER

LINE ADMIN
SUPERVISOR MANAGER

********************END OF DOCUMENT-HSE POLICY *************************

Sky Steel Systems LLC, P.O. Box 36646, Dubai, UAE; Tel: +971 (0)4 2212 111; Email: [email protected]; Web: www.skysteel.com;
Page 18 of 18

PRE-QUALIFICATION

Organizational Chart of the Company

Sky Steel Systems LLC, P.O. Box 36646, Dubai, UAE
Tel: +971 4 221 2111
Email: [email protected], Web: www.skysteel.com

ORGANIZATIONAL CHART OF THE COMPANY

BOARD OF DIRECTORS

CEO

TECHNICAL MANAGER SALES & OPERATIONS FINANCE & ADMIN PROJECT ENGINEER
MANAGER MANAGER
TECHNICAL
COORDINATOR SALES & OPERATIONS ACCOUNTANTS
COORDINATOR
PRO
DESIGN ENGINEER SALES ENGINEER SITE ENGINEER HEAD OF
DRAFTSMAN ESTIMATION ENGINEER MAINTENANCE IT DEPARTMENT
ELECTRICAL ENGINEER
QA/QC MATERIAL PLANNING MAINTENANCE
ENGINEER
ENGINEER
MAINTENANCE
FOREMAN FOREMAN

PRE-QUALIFICATION

Organizational Chart of Personnel on a Project

Sky Steel Systems LLC, P.O. Box 36646, Dubai, UAE
Tel: +971 4 221 2111
Email: [email protected], Web: www.skysteel.com



PRE-QUALIFICATION

List of Key Personnel with Contact Number

Sky Steel Systems LLC, P.O. Box 36646, Dubai, UAE
Tel: +971 4 221 2111
Email: [email protected], Web: www.skysteel.com

List of Key Personnel with Contact Numbers

PRE-QUALIFICATION

Capabilities

Manpower · Equipment · Vehicles

Sky Steel Systems LLC, P.O. Box 36646, Dubai, UAE
Tel: +971 4 221 2111
Email: [email protected], Web: www.skysteel.com



PRE-QUALIFICATION

Legal Documents & Certification

Sky Steel Systems LLC, P.O. Box 36646, Dubai, UAE
Tel: +971 4 221 2111
Email: [email protected], Web: www.skysteel.com

‫رخصة صناعية‬
‫‪Industrial License‬‬

‫تفاصيل الرخصة ‪License Details /‬‬

‫‪License No.‬‬ ‫‪540534‬‬ ‫رقم الرخصة‬
‫شركة سكاي ستيل سيستمز (شركة ذات مسئولية محدودة)‬ ‫اسم الشركة‬
‫(‪Company Name SKY STEEL SYSTEMS )L L C‬‬
‫شركة سكاي ستيل سيستمز (ذ م م)‬ ‫السم التجارى‬

‫‪Trade Name‬‬ ‫(‪SKY STEEL SYSTEMS )L L C‬‬
‫‪Legal Type‬‬
‫‪Expiry Date‬‬ ‫(‪Limited Liability Company)LLC‬‬ ‫ذات مسئولية محدودة‬ ‫الشكل القانونى‬
‫‪23/12/2002‬‬ ‫تاريخ الصدار‬
‫‪22/12/2022‬‬ ‫تاريخ النتهاء‬ ‫‪Issue Date‬‬

‫® ‪D&B D-U-N-S‬‬ ‫‪561362547‬‬ ‫الرقم العالمي‬ ‫‪Main License No.‬‬ ‫‪540534‬‬ ‫رقم الرخصة الم‬
‫‪No.‬‬ ‫‪64934‬‬ ‫رقم السجل التجارى‬ ‫‪DCCI No.‬‬ ‫‪98051‬‬ ‫عضوية الغرفة‬
‫‪Register No.‬‬

‫الحصص ‪Share /‬‬ ‫الصفة ‪Role /‬‬ ‫الجنسية ‪Nationality /‬‬ ‫الطراف ‪License Members /‬‬
‫مدير ‪Manager /‬‬ ‫رقم الشخص‪ No./‬السم ‪Name /‬‬

‫اليمن ‪Yemen /‬‬ ‫وضاح حسن سالم صالح‬ ‫‪617096‬‬

‫‪WADHAH HASSAN SALEM SALEH‬‬

‫‪Steel Hangars & Sheds Manufacturing‬‬ ‫نشاط الرخصة التجارية ‪License Activities /‬‬
‫‪Access Cradles Manufacturing‬‬ ‫صناعة النشاءات المعدنية‬

‫صناعة حمالت التوصيل لصيانة البنية‬

‫العنوان ‪Address /‬‬

‫‪Phone No‬‬ ‫‪971-4-8802571‬‬ ‫تليفون‬ ‫‪P.O. Box‬‬ ‫‪36646‬‬ ‫صندوق بريد‬
‫‪Fax No‬‬ ‫‪971-4-8802572‬‬ ‫فاكس‬
‫‪Mobile No‬‬ ‫‪971-50-8857881‬‬ ‫هاتف متحرك‬ ‫‪Parcel ID‬‬ ‫‪597608‬‬ ‫رقم القطعة‬

‫مصنع ملك شركة تطوير مجمع دبي للستثمار ‪ -‬مجمع دبي للستثمار‪ -‬بردبي‬

‫البريد اللكتروني ‪Email /‬‬

‫الملحظات ‪Remarks /‬‬

‫تم نقل الموقع في ‪31/1/2010‬‬
‫تم اضافة وانسحاب الشريك في ‪27/05/2013‬‬

‫تم اضافة الشريك في ‪10/01/2017‬‬

‫‪Print Date‬‬ ‫تاريخ الطباعة ‪08/11/2021 16:56‬‬ ‫‪Receipt No.‬‬ ‫‪14132668‬‬ ‫رقم اليصال‬

‫يمكنك الن تجديد رخصتك التجارية من خلل الرسائل النصية القصيرة‪ ،‬أرسل رقم الرخصة إلى ‪( 6969‬دو‪/‬اتصالت) للحصول‬ ‫‪Get FREE access to‬‬
‫على اذن الدفع‪.‬‬ ‫‪Zoho One for the first‬‬

‫‪Now you can renew your trade license by sending a text message )SMS(. Send your trade‬‬ ‫‪year‬‬
‫‪license number to 6969 )Du/ Etisalat( to receive payment voucher.‬‬ ‫احصل على زوهو ون مجانا‪Ø‬‬

‫للسنة الولى‬ ‫‪Zoho.com/ded‬‬

‫وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية ‪.‬لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع ‪www.dubaided.gov.ae‬‬
‫‪Approved electronic document issued without signature by the Department of Economic Development. To verify the‬‬
‫‪license kindly visit www.dubaided.gov.ae‬‬

‫شهادة شهر قيد شركة فى السجل التجارى‬

‫‪Commercial Register‬‬

‫تفاصيل القــيد ‪Register Details /‬‬

‫‪Main Lice. Nr‬‬ ‫‪540534‬‬ ‫‪ Register No.‬رقم الرخصة الم‬ ‫‪64934‬‬ ‫رقم القيد‬

‫‪Company‬‬ ‫شركة سكاي ستيل سيستمز (شركة ذات مسئولية محدودة)‬
‫‪Name‬‬
‫(‪SKY STEEL SYSTEMS )L L C‬‬ ‫‪ Reg. Date‬تاريخ النتهاء‬ ‫ذات مسئولية محدودة‬ ‫الشكل القانونى‬
‫‪Legal Type‬‬ ‫(‪Limited Liability Company)LLC‬‬ ‫‪561362547‬‬ ‫‪23/12/2002‬‬
‫تاريخ الصدار‬
‫‪Expiry Date‬‬ ‫‪22/12/2022‬‬ ‫الرقم العالمي‬
‫‪D&B D-U-N-S‬‬ ‫®‬
‫‪No.‬‬

‫تفاصيل راس المال ‪Capital Details /‬‬

‫‪Nominated‬‬ ‫‪300,000‬‬ ‫السمى‬
‫‪Paid‬‬ ‫‪300,000‬‬ ‫المدفوع‬
‫‪No. of Shares‬‬ ‫عدد السهم‬
‫‪Currency‬‬ ‫‪0‬‬
‫العملة‬
‫‪UAE Dirhams‬‬ ‫درهم اماراتي‬

‫عنوان الرخصة ‪License Address /‬‬

‫مصنع ملك شركة تطوير مجمع دبي للستثمار ‪ -‬مجمع دبي للستثمار‪ -‬بردبي‬

‫عنوان السجل التجاري ‪Commerce Address /‬‬

‫‪Access Cradles Manufacturing‬‬ ‫مصنع ملك شركة تطوير مجمع دبي للستثمار ‪ -‬مجمع دبي للستثمار‪ -‬بردبي‬
‫‪Steel Hangars & Sheds Manufacturing‬‬ ‫أنشطة السجل ‪Register Activities /‬‬
‫صناعة حمالت التوصيل لصيانة البنية‬
‫صناعة النشاءات المعدنية‬

‫‪Print Date‬‬ ‫تاريخ الطباعة ‪08/11/2021 16:56‬‬ ‫‪Receipt No.‬‬ ‫‪14132668‬‬ ‫رقم اليصال‬

‫يمكنك الن تجديد رخصتك التجارية من خلل الرسائل النصية القصيرة‪ ،‬أرسل رقم الرخصة إلى ‪( 6969‬دو‪/‬اتصالت) للحصول‬ ‫‪Get FREE access to‬‬
‫على اذن الدفع‪.‬‬ ‫‪Zoho One for the first‬‬

‫‪Now you can renew your trade license by sending a text message )SMS(. Send your trade‬‬ ‫‪year‬‬
‫‪license number to 6969 )Du/ Etisalat( to receive payment voucher.‬‬ ‫احصل على زوهو ون مجانا‪Ø‬‬

‫للسنة الولى‬ ‫‪Zoho.com/ded‬‬

‫وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية ‪.‬لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع ‪www.dubaided.gov.ae‬‬
‫‪Approved electronic document issued without signature by the Department of Economic Development. To verify the‬‬
‫‪license kindly visit www.dubaided.gov.ae‬‬

License no. 540534 540534 ‫رقم الرخصة‬

Membership no. 98051 98051 ‫رقم العضوية‬

Registration no. 64934 64934 ‫رقم السجل التجاري‬

Trade Name SKY STEEL SYSTEMS (L L C) (‫السم التجاري شركة سكاي ستيل سيستمز )ذ م م‬

Legal Status Limited Liability Company(LLC) ‫الشكل القانوني ذات مسئولية محدودة‬

Activity Access Cradles Manufacturing ‫صناعة حمالت التوصيل لصيانة البنية‬ ‫نوع النشاط‬
Steel Hangars & Sheds ‫صناعة النشاءات المعدنية‬
Manufacturing

Member Since 23/12/2002 23/12/2002 ‫تاريخ النتساب‬
23/12/2002 ‫تاريخ الصدار‬
Date of Issue 23/12/2002 22/12/2022 ‫تاريخ النتهاء‬

Expiry Date 22/12/2022

‫‪Commercial License‬‬ ‫ﺭﺧـﺼــــــﺔ ﺗﺠﺎﺭﻳﺔ‬

‫‪Emerging Economic Establishment‬‬ ‫ﻣﻨﺸــــﺄﺓ ﺍﻗﺘﺼـــﺎﺩﻳــــﺔ ﻧﺎﺷﺌـــــــﺔ‬

‫‪License No‬‬ ‫‪:‬‬ ‫‪CN-4508347‬‬ ‫ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ ‪:‬‬
‫‪ADCCI No‬‬ ‫‪:‬‬ ‫‪8800025830‬‬ ‫ﻋﻀﻮﻳﺔ ﺍﻟﻐﺮﻓﺔ ‪:‬‬

‫‪Establishment Card‬‬ ‫‪:‬‬ ‫‪1441065‬‬ ‫ﻭﺯﺍﺭﺓ ﺍﻟﻤﻮﺍﺭﺩ ﺍﻟﺒﺸﺮﻳﺔ ﻭﺍﻟﺘﻮﻃﻴﻦ ‪:‬‬
‫‪MOHRE‬‬ ‫‪:‬‬ ‫‪800463‬‬ ‫ﺑﻄﺎﻗﺔ ﺍﻟﻤﻨﺸﺄﺓ‬
‫‪:Sole Proprietorship L.L.C.‬‬
‫‪Establishment Card‬‬ ‫‪:‬‬ ‫ﺍﻟﻬﻴﺌﺔ ﺍﻻﺗﺤﺎﺩﻳﺔ ﻟﻠﻬﻮﻳﺔ‬
‫‪ICA‬‬ ‫‪ :‬ﺷﺮﻛﺔ ﺍﻟﺸﺨﺺ ﺍﻟﻮﺍﺣﺪ ﺫ ﻡ ﻡ‬ ‫ﻭﺍﻟﺠﻨﺴﻴﺔ‪ -‬ﺑﻄﺎﻗﺔ ﺍﻟﻤﻨﺸﺄﺓ‬
‫‪Legal Form‬‬
‫ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻲ‬

‫‪Trade Name‬‬ ‫‪ :‬ﺳﻜﺎﻱ ﺳﺘﻴﻞ ﻷﻧﻈﻤﺔ ﺍﻟﺼﻴﺎﻧﺔ ‪ -‬ﺷﺮﻛﺔ ﺍﻟﺸﺨﺺ ﺍﻟﻮﺍﺣﺪ ﺫ ﻡ ﻡ‬ ‫ﺍﻹﺳﻢ ﺍﻟﺘﺠﺎﺭﻱ‬
‫‪Establishment Date‬‬ ‫‪: SKY STEEL SYSTEMS MAINTENANCE - SOLE PROPRIETORSHIP L.L.C.‬‬
‫‪Issue Date‬‬ ‫‪: 15/06/2022 :‬‬ ‫ﺗﺎﺭﻳﺦ ﺗﺄﺳﻴﺲ ﺍﻟﻤﻨﺸﺄﺓ‬
‫‪Expiry Date‬‬ ‫‪: 15/06/2022 :‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ‬
‫‪: 14/06/2023 :‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻹﻧﺘﻬﺎﺀ‬

‫ﺍﻟﺼﻠﺔ‬ ‫ﺍﻟﺠﻨﺴﻴﺔ‬ ‫ﺍﻟﻤﻼﻙ ‪ /‬ﺍﻟﺸﺮﻛﺎﺀ‬ ‫ﺍﻟﺮﻣﺰ‬
‫‪Role‬‬ ‫‪Nationality‬‬ ‫‪Owners / Partners‬‬ ‫‪No.‬‬

‫ﻣﺎﻟﻚ‬ ‫ﺍﻟﻤﻤﻠﻜﺔ ﺍﻟﻌﺮﺑﻴﺔ ﺍﻟﺴﻌﻮﺩﻳﺔ‬ ‫ﻋﺒﺪﺍﻟﻌﺰﻳﺰ ﺑﻦ ﺑﻜﺮ ﺑﻦ ﻣﺤﻤﺪ ﺑﻦ ﻻﺩﻥ‬ ‫‪42099749‬‬

‫‪Owner‬‬ ‫‪Saudi Arabia‬‬ ‫‪ABDALAZIZ BAKER M BINLADIN‬‬

‫ﻣﺪﻳﺮ‬ ‫ﺍﻟﻴﻤﻦ‬ ‫‪ 42065667‬ﻭﺿﺎﺡ ﺣﺴﻦ ﺳﺎﻟﻢ ﺻﺎﻟﺢ‬
‫‪Manager‬‬ ‫‪Yemen‬‬
‫‪WADHAH HASSAN SALEM SALEH‬‬

‫‪Commercial Activities :‬‬ ‫ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ ‪:‬‬
‫‪- Electromechanical Equipment Installation and Maintenance‬‬ ‫‪ -‬ﺃﻋﻤﺎﻝ ﺗﺮﻛﻴﺐ ﺍﻟﻤﻌﺪﺍﺕ ﺍﻟﻜﻬﺮﻭﻣﻴﻜﺎﻧﻴﻜﻴﺔ ﻭﺻﻴﺎﻧﺘﻬﺎ‬

‫‪Address‬‬ ‫‪:‬‬ ‫ﻣﺼﻔﺢ‪ ,‬ﻣﺼﻔﺢ ‪ ,~ : 0 ,26‬ﻣﺒﻨﻰ‪ ,‬ﺍﻟﺴﻴﺪ ﻋﺒﺪﺍﻟﻠﻪ ﺳﻬﻴﻞ ﻣﺤﻤﺪ ﻧﺼﻴﺐ ﻭ ﺍﺧﺮﻳﻦ‬ ‫‪:‬‬ ‫ﺍﻟﻌﻨﻮﺍﻥ‬

‫‪Onwani Address‬‬ ‫‪:‬‬ ‫ﺍﻟﻌﻨﻮﺍﻥ ﺍﻟﻤﻮﺣﺪ ‪:‬‬

‫ﻭﺛﻴﻘﺔ ﻣﻌﺘﻤﺪﺓ ﻭﺻﺎﺩﺭﺓ ﺑﺪﻭﻥ ﺗﻮﻗﻴﻊ ﺃﻭ ﺧﺘﻢ ﻣﻦ ﺩﺍﺋﺮﺓ ﺍﻟﺘﻨﻤﻴﺔ ﺍﻹﻗﺘﺼﺎﺩﻳﺔ ‪ -‬ﺃﺑﻮﻇﺒﻲ‪ .‬ﻟﻠﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻲ ﺍﻟﺮﺧﺼﺔ ﺑﺮﺟﺎﺀ ﺯﻳﺎﺭﺓ ﺍﻟﻤﻮﻗﻊ ‪www.adbc.gov.ae‬‬

‫‪Approved document issued without signature or stamp by the Department of Economic Development - Abu Dhabi. To verify the license kindly‬‬
‫‪visit www.adbc.gov.ae‬‬

‫‪Official Email‬‬ ‫‪:‬‬ ‫‪[email protected]‬‬ ‫ﺍﻟﺒﺮﻳﺪ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﺍﻟﺮﺳﻤﻲ ‪:‬‬

‫‪Official Mobile :‬‬ ‫‪971503561122‬‬ ‫ﺭﻗﻢ ﺍﻟﺘﻮﺍﺻﻞ ﺍﻟﺮﺳﻤﻲ ‪:‬‬

‫*‪*CN-4508347‬‬

‫‪www.adbc.gov.ae‬‬

REGISTRATION
CERTIFICATE

Issue Date: 22 November 2021
We hereby register the Sub Contractor: Sky Steel Systems LLC
ADCE Vendor Code: v0001880
With the following Civil Work Service(s): Other Services
Remarks: Window Cleaning (man

Registration Review Committee Signature 1

Disclaimer:
1) This prequalification approval does not absolve the sub-contractor from getting a ‘project specific approva
project, they should go through the sub-contractor submission process where they should prove resource al
authority upon the Sub Contractor.
2) This certificate is valid for one year from issue date.

C
nufacturing/installation of BMU)

Registration Review Committee Signature 2

al’ by the project consultant and by ADCE. Whenever a pre-qualified sub-contractor applies for a specific
llocation, financing position and proper engineering staff. The issuing of this certificate does not confer any

PRE-QUALIFICATION

Case Study

Sky Steel Systems LLC, P.O. Box 36646, Dubai, UAE
Tel: +971 4 221 2111
Email: [email protected], Web: www.skysteel.com





































CASE STUDY
ŝƐƚƌŝĐƚ ŽŽůŝŶŐ WůĂŶƚ͕ /DW͕ ƵďĂŝ͕ hŶŝƚĞĚ ƌĂď ŵŝƌĂƚĞƐ

WƌŽũĞĐƚ͗ ŝƐƚƌŝĐƚ ŽŽůŝŶŐ WůĂŶƚ͕ /DW
ůŝĞŶƚ͗ DWKt Z ŶĞƌŐLJ ^ŽůƵƚŝŽŶƐ
ŽŶƚƌĂĐƚŽƌ͗ ' ŶŐŝŶĞĞƌŝŶŐ
ŽŶƐƵůƚĂŶƚ͗ Z
WƌŽƉŽƐĞĚ ^LJƐƚĞŵ͗ ďƐĞŝůŝŶŐ ^LJƐƚĞŵ
zĞĂƌ ŽĨ ŽŵƉůĞƚŝŽŶ͗ ϮϬϮϭ

WZK: d Z/ &͗

dŚĞ ƉƌŽũĞĐƚ ĐŽŶƐŝƐƚ ŽĨ ĐŽŽůŝŶŐ ƚĂŶŬƐ ǁŚŝĐŚ ƌĞƋƵŝƌĞĚ ƚŽ ďĞ ĂĐĐĞƐƐĞĚ ǁŝƚŚ ĂďƐĞŝůŝŶŐ ƐLJƐƚĞŵ͘ dŚĞ ĂŶĐŚŽƌƐ ŚĂƐ ƚŽ ďĞ ŝŶƐƚĂůůĞĚ ŽŶ
ƚŚĞ ĞĚŐĞƐ ŽĨ ĐŽŽůŝŶŐ ƚĂŶŬƐ ǁŝƚŚ Wd& ŚĞĂƚ ŝŶƐƵůĂƚŽƌƐ͘

KǀĞƌǀŝĞǁ ŽĨ ƐŽůƵƚŝŽŶ͗

dŚĞ ĂŶĐŚŽƌƐ ƉƌŽƉŽƐĞĚ ǁĞƌĞ ƐƉĞĐŝĂů ƉƌŽƚƌƵĚŝŶŐ ďƌĂĐŬĞƚƐ
ǁŝƚŚ Wd& ŝŶƐƵůĂƚŽƌƐ ƚŽ ŵĂŝŶƚĂŝŶ ƚŚĞ ƚĞŵƉƌĂƚƵƌĞ ŽĨ ƚŚĞ
ƐƚƌƵĐƚƵƌĞ ĂŶĚ ŝŶƐƵůĂƚĞ ƚƌĂŶƐĨĞƌ ŽĨ ŚĞĂƚ ĨƌŽŵ , ' ďƌĂĐŬĞƚƐ ƚŽ
^ƚĂŝŶůĞƐƐ ^ƚĞĞů ĂŶĐŚŽƌƐ͘

ĂĐŚ ŶĐŚŽƌ ŝƐ ŝŶƐƚĂůůĞĚ ǁŝƚŚ ϭϬϬϬ ŵŵ ĚŝƐƚĂŶĐĞ ĂƉĂƌƚ ĨƌŽŵ
ĞĂĐŚ ŽƚŚĞƌ ĂŶĚ ǁŝůů ĂůůŽǁ ƚŚĞ ĂďƐĞŝůŝŶŐ ƚŽ ŚŽŽŬ ŚŝŵƐĞůĨ ĂŶĚ
ďƌŝŶŐ ŚƵŵ ĚŽǁŶ ƚŽǁĂƌĚƐ Ăůů ƐŝĚĞƐ ŽĨ ƚŚĞ ƚĂŶŬƐ͘

ĨƚĞƌ ŝŶƐƚĂůůĂƚŝŽŶ ĂŶĐŚŽƌƐ ĂƌĞ ƚĞƐƚĞĚ ǁŝƚŚ ƵƉƚŽ ϭϱŬE ƉƵůů ŽƵƚ
ƚĞƐƚ ďLJ Ă ƌĞŐŝƐƚĞƌĞĚ ƚŚŝƌĚ ƉĂƌƚLJ ŝŶƐƉĞĐƚŝŽŶ ĐŽŵƉĂŶLJ͘

CASE STUDY

RTA Traffic Management Centre, Dubai, United Arab Emirates

Project: RTA - Traffic Management Centre
Client: Road & Transport Authority, Dubai.
Contractor: Saudi Binladin Contracting
Consultant: Parsons
Proposed System: Abseiling System
Year of Completion: 2020

PROJECT BRIEF:

A concave shaped buildings with oval plan profile required full access all around. The roof area on this particular project also
includes a large elevated profile forming the architectural finished shape of the building. The anchors are installed on the steel
structure of the building

Overview of solution:

Due to the special architecture of the building and the
existing steel structure. Sky Steel System LLC designed a
special anchor to accomodate and to be installed on the steel
structure in compliance with standard BS795

Each Anchor is installed with 2000 mm distance apart from
each other and will allow the abseiling to hook himself and
bring hum down towards all sides of the building inluding the
centre part.

After installation anchors are tested with upto 15kN pull out
test by a registered third party inspection company.


Click to View FlipBook Version