The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by hosting, 2022-04-08 04:29:31

77insaat

77insaat

“Architecture is the learned game,
correct and magnificent, of forms
assembled in the light.”

Le Corbusier

www.77insaat.com Following its establishment in 1988,
77 Group developed a reputable record in
a very short period of time by successfully
completing contracts undertaken in various
construction projects mainly in earthworks,
asphalt roads, motorways, tunnels, bridges,
viaducts, piling, hydraulic structures, aprons,
airfield runway repairs, troop billeting, life

support and accommodation camps;

2 ABOUUTS

TS facilities and buildings including mainly military barracks,
aviation hangars, an air operation center, waste management
and various other infrastructure projects in the civil sector;
as well, refinery infrastructure, surface facilities, oil well pad
infrastructure works, oil well hook up piping and the installation
of oil field electromechanical equipment in the oil & gas sector.

77 Construction Co. was established in Iraq in 1998, which
has developed fast and has become one of the most prestigious
companies in the construction and the oil & gas sectors, having
very important contributions to the reconstruction efforts of
Iraq during and after the war.

Subsequent to the company’s success in Iraq, in 2009, 77
Construction Co. was awarded its first project in Afghanistan.
In a very short period of time, the company has completed
more than fifteen construction projects in various types and
different locations across Afghanistan.

77 Construction has expanded to Africa with a military housing
project, Bachelor Headquarters in Djibouti; as well the success
of the group was appreciated by the Libya Government and
international contractors in Libya.

77 Group motto is to achieve a permanent quality and timely
completion of contracts undertaken. 77 Group companies
have a good standing record of finished contracts with no
default record.

77 Group has adhered to the contribution of local participation
in international projects as a main principle and is open to
cooperate with local and international companies in realization
of construction projects worldwide.

www.77insaat.com 77 Group has based its quality policy on establishing unlimited customer
satisfaction with all parties served and thus aiming to realize the projects
undertaken in conformity with specifications and standards of the
contract, providing economical solutions and timely completion with full
compliance to Health and Safety standards.

4 In parallel to this policy 77 Group has successfully completed all of its
contracts so far without any conflict with its customers, which has placed
77 Group companies among the leading and most sought companies in
its sector.

Efforts of “77 Construction” on quality system have been awarded
with ISO 9001, 14001 & OHSAS 18001 Certificates.

QPUOALLIICTYY

www.77insaat.com 6 Buildings & Facilities
Energy Projects
Energy Investment Projects
Dams & Water Structures
Runways & Aprons
Pipeline & Steel Storage Tanks
Other Projects

01

Buildings & Facilities

www.77insaat.com 8 FBaucilidlitiinegss &

P920 BACHELOR This project includes the construction In addition to the 125 2+0 Navy Units the cporomjepclet ted
QUARTERS, CAMP of a 6,000 square meter (64,583 square building includes an Entrance Vestibule,
LEMONNIER, foot) three story building for use as a Entrance Lobby, Interior Corridors, Public
DJIBOUTI permanent party military Bachelor Toilets, Laundry Room(s), Multi Purpose
Quarters (BQ). The building contains Room(s), Housekeeping/Janitor Closet(s),
125 double occupancy 2+0 Navy Units. Vending space, Recycling space, Enclosed
The BQ will be constructed at Camp Stairs and facility support spaces including
Lemonnier in Djibouti, Africa. Mechanical Rooms, Electrical Rooms and
Telecommunications Rooms to provide a
complete and functional BQ.

Mechanical systems include plumbing,
fire protection, and heating, ventilating,
and air conditioning (HVAC) systems.
Electrical systems include information
systems, cable TV, wiring for telephone
and local area network (LAN) data, a
building alarm system for fire and mass
notification, lighting and power.

www.77insaat.com 10 FBaucilidlitiinegss &

REHABILITATION, The Scope of Works awarded to The Scope of Potential Works to be opnrogjoecintg
DEVELOPMENT AND 77 Insaat ve Taahhut A.S. awarded to
FURNISHING OF 77 Insaat ve Taahhut A.S.
SUWAYRAH AIR BASE, :: Civil, Structural, Masonry works to
IRAQ complete 221 buildings :: Steel Structure, Architectural &
(Duration:18 Months) Finishing Works to complete
:: Electrical Works to complete 221 buildings
221 buildings (Duration: 21 Months)
(Duration: 25 Months) :: Site Preparation, Civil, Landscaping &
Road Works for Suwayrah
Air Base Project
(Duration: 18 Months)

Figure: Form and rebar works for FPS founda

CONTRACTORS QUALITY CONTROL REPORT (QCR)  PROJECT: EDI ‐ Various Base Impr
DAILY LOG OF CONSTRUCTION  Romania 
BRYAN 77 CONSTRUCTION JV 
CONTRACT NUMBER:W912GB17
 

Figure: Excavation for Storm Drainage Man

www.77insaat.com 12 BFaucilidlitiinegss &Figure: Pond excavation works 

ation wall 

rove MK,  DATE: 09 July 2019 
7C0019  DAILY QC PICTURES

re: Continue installation of FPS reinforced concrete walls 

nholes  VARIOUS BASE The contract will consist of the design The project also includes fire protection ponrogjoecintg
IMPROVEMENTS, and construction of new Multi Modal and alarm systems installation for inhabited
MIHAIL Improvements, and new Fuel Storage facilities. The Fuel Storage Capacity will
KOGALNICEANU Capacity. The Multi Modal will include include all work necessary to provide
AIR BASE, all work necessary to provide a new rail containment for bulk fuel tanks, truck load/
ROMANIA spur with load/off-load capabilities, off-load stands, an operations building and
staging areas, and wash facilities as road repair/realignment. Construction
well as a new airfield terminal and includes area fire and lightning protection
operations center consisting of a ready systems. Supporting facilities include site
building, shipping and receiving facility, development, connectors for additional
storage yard, marshalling areas, and fuel receipt capability, utilities and
improvements to the existing access connections, perimeter security, lighting,
road along the inside perimeter of the paving, walks, curbs, gutters, storm
compound. Supporting facilities include drainage, landscaping, fencing, and
site development, utilities, perimeter signage. The business goals of the contract
security devices, lighting, paving, walks, are to provide real property repair,
curbs, and gutters, storm drainage, environmental work, force protection
landscaping, fencing, and signage. work, utility infrastructure, design build,
and construction service.

www.77insaat.com 14 FBaucilidlitiinegss &

MOSUL RIGHT Client ponrogjoecintg
SIDE SEWAGE Ministry of Municipalities Baghdad, Iraq
TRUNK LINE
MOSUL, Date of start
IRAQ November 2019

Date of completion
December 2020

Specifications
25 km Trunk Line,250 mm-3.000 mm
CTP Pipes

www.77insaat.com 16 FBaucilidlitiinegss &

MOSUL WASTE Client opnrogjoecintg
WATER TREATMENT Ministry of Municipalities Baghdad, Iraq
PLANT RIGHT
SIDE STAGE 1 Date of start
MOSUL, October 2013
IRAQ
Date of Restart
May 2019

Date of completion
March 2021

Specifications
Turnkey construction of
100.000 m³ / day WWTP of
Mosul Right Side 1

www.77insaat.com 18 FBaucilidlitiinegss &

MOSUL WASTE Client opnrogjoecintg
WATER TREATMENT Ministry of Municipalities Baghdad, Iraq
PLANT RIGHT
SIDE STAGE 2 Date of start
MOSUL, October 2013
IRAQ
Date of Restart
May 2019

Date of completion
March 2021

Specifications
Turnkey construction of
100.000 m³ / day WWTP of
Mosul Right Side 2

www.77insaat.com 20 FBaucilidlitiinegss &

MOSUL WASTE Client ponrogjoecintg
WATER TREATMENT Ministry of Municipalities Baghdad, Iraq
PLANT LEFT SIDE
STAGE 1 Date of start
MOSUL, June 2013
IRAQ
Date of Restart
May 2019

Date of completion
July 2021

Specifications
Turnkey construction of
100.000 m³ / day WWTP of
Mosul Left Side 1

www.77insaat.com 22 FBaucilidlitiinegss &

MOSUL WASTE Client ponrogjoecintg
WATER TREATMENT Ministry of Municipalities Baghdad, Iraq
PLANT LEFT SIDE
STAGE 2 Date of start
MOSUL, June 2013
IRAQ
Date of Restart
May 2019

Date of completion
March 2021

Specifications
Turnkey construction of
100.000 m³ / day WWTP of
Mosul Left Side2

www.77insaat.com 24 FBaucilidlitiinegss &

BADRA CPF PHASE-2 Project includes design and construction pcoromjepclet ted
CIVIL & BUILDING of civil works for LPG Storage, Heating
WORKS Medium, Refrigeration, Gas Train B,
GAZPROM PROJECT, GTG, Gas Train A, Under Ground, Road
IRAQ & Paving Works, Sulphur Storage, SRU
& Pits.

www.77insaat.com 26 FBaucilidlitiinegss &

cporomjepclet ted

F-16 SUPPORT Under the Foreign Military Sales (FMS) case, 1- AIRCRAFT MAINTENANCE HANGAR 7087N AREA=8,301 sq.m
FACILITIES PACKAGE IQ-D-SAG, the Iraqi Ministry of Defense (MOD)
#6, BALAD AIR BASE, has requirements for design and construction of 2- SQUADRON HEADQUARTER 7011N AREA=3,926 sq.m
IRAQ eleven (11) new facility buildings including; new
F-16 Facility Standard Design site adaptation 3- AIRCRAFT APRON SUNSHADE 7002N AREA=3,263 sq.m
facility buildings, and associated utilities and
infrastructure for Iraq Air Force (IQAF) located on 4- POWER CHECK PAD AREA=1,996 sq.m
Balad Air Base (AB) in the Salah ad Din Province,
Iraq. This design build project consists of new 5- FUEL CELL MAINTENANCE 7086N AREA=924 sq.m
facilities and infrastructure for the Iraq Air Force
in order to support their newly acquired F-16 6- MISSILE MAINTENANCE FACILITY 2550N AREA=476 sq.m
aircraft. Contractor shall construct the new facilities
and associated infrastructure. All facilities shall 7- AIRCRAFT WASHRACK 7008N AREA=407 sq.m
be constructed in accordance with all applicable
building codes and internationally recognized 8- FIRE PUMP HOUSE 7080N AREA=152 sq.m
standards.
9- HYDRAZINE FACILITY 7029N AREA=98 sq.m

10-LATRINES 6566N, 6505N, 6350N AREA=84 sq.m

11-BOOSTER PUMP HOUSE 7011N, 7087N AREA=63 sq.m

12-Underground Utilities

13-2 CST Tank with Capacity 350 M3 Each

14-Service Roads and Parking Lots (13,000 Sqm)

www.77insaat.com 28 FBaucilidlitiinegss &

BARRACKS 15-18 The Project is defined as construction cporomjepclet ted
PROJECT, BAGRAM of contingency standard design concrete
AIRFIELD, masonry unit (CMU) barracks. Facilities
AFGHANISTAN include four (4) barracks 15-18, to provide
housing for 640 military personnel.
Supporting facilities include electrical,
water, and sewage distribution systems,
mechanical systems, information systems,
site improvements, roads, drainage,
and parking at Bagram Airfield (BAF),
Afghanistan

www.77insaat.com 30 FBaucilidlitiinegss &

BARRACKS 19-23 The Project is defined as construction of The project package has one (1) barracks cporomjepclet ted
PROJECT, BAGRAM contingency standard design as building sited separately from the other
AIRFIELD, determined to be concrete masonry unit four (4) barracks buildings. The four
AFGHANISTAN (CMU) barracks. Facilities include five (5) (4) barracks buildings are planned for
barracks 19-23, to provide housing of 800 collocation in the current area of the
military personnel. Supporting facilities Supply Support Area (SSA) which is to be
include electrical, water, and sewage relocated and demolished.
distribution systems, mechanical systems,
information systems, site improvements,
roads, drainage, and parking at Bagram
Airfield (BAF), Afghanistan.

www.77insaat.com 32 FBaucilidlitiinegss &

WASTE MANAGEMENT The Design/Build Solid Waste pcoromjepclet ted
COMPLEX PROJECT, Management Complex project consists
BAGRAM AIRFIELD, of primary facilities to include an 8
AFGHANISTAN ton per day incinerator unit, a medical
incinerator, a covered storage and sorting
facility with a recycling facility, hazardous
waste storage, compost facility, concrete
ash holding area, waste management
office, vector control facility, scale
house, multi use facility, maintenance
building, CSO building and antiterrorism
measures. The supporting facilities include
electricity, information systems, water,
sewer, gas, site improvements, evaporation
pond and concrete roads & pads.

www.77insaat.com 34 FBaucilidlitiinegss &

pcoromjepclet ted

UMMC P-341 PROJECT, 1) OPERATIONS GROUP communications, exterior fencing, 6) EMSG HEADQUARTERS AND
BAGRAM AIRFIELD, electrical outlets, and electrical connection
AFGHANISTAN COMMAND AND CONTROL to base grid power TOWN HALL:
Construction of a 557 SM blast and
Project includes the construction FACILITY: 4) BRAVO AREA LIGHTING: ballistic proof concrete facility to serve
of seven (7) projects in Construction of two story concrete Design and construction/installation as the Expeditionary Mission Support
Bagram Air Field. building. Facility will include all site of Area Lighting on BRAVO Apron at Group Headquarters as well as the Wing’s
preparation, concrete foundation and Bagram Air Base in Afghanistan. Work Town Hall. Work includes interior and
The scopes of work of the UMMC pavement for parking, HVAC, exterior will include utilities, intrusion detection exterior plumbing, HVAC, electrical,
Program-341 projects are; and interior lighting, Intelligent Facility system, and communications equipment, force protection, fire alarms, and exterior
interior finishes, communications, exterior raised flooring and all necessary site meeting area.
fencing, and utilities connection to base preparation, mast foundations, high mast
grid power. lights, cables, conduit, and all associated 7) NETWORK CONTROL CENTER
utilities. Work will include all necessary
2) TACTICAL FIGHTER SQUAD site preparation, mast foundations, (NCC):
OPS: Construction of a concrete facility. high mast lights, cables, conduits, and Design and construction of a Network
Facility will include all site preparation, associated utilities. Control Center (NCC) building
concrete foundation and pavement for with adequate power, cooling, dust
parking, HVAC, exterior and interior 5) TACTICAL FIGHTER AMU: resistance, and space to handle inter base
lighting, interior finishes, communications, Construction of a one story communications support throughout the
exterior fencing, electrical outlets, and pre-engineered steel framed building. AOR. Facility will include but not limited
electrical connection to base grid power Facility will include all site preparation, to, site work, concrete facility, utilities, and
concrete foundation and pavement for intrusion detection and communication
3) FLIGHT LINE FIRE STATION: parking, HVAC, exterior and interior equipment.
Construct pre-engineered steel framed lighting, interior finishes, communications,
building. Facility will include all exterior fencing, electrical outlets, and
site preparation, concrete foundation and electrical connection to base grid power.
pavement for parking, HVAC, exterior
and interior lighting, interior finishes,

www.77insaat.com 36 FBaucilidlitiinegss &

ENTRY CONTROL The project is defined as the construction cporomjepclet ted
FACILITY-1 PROJECT, of an Entry Control Facility at Bagram
BAGRAM Air Field (BAF). Primary facilities include
AIRFILED the entry control facility with inspection
AFGHANISTAN area/material transfer point, guard
towers, fencing, lighting, roads and
building information systems. Supporting
facilities include all required utilities, site
improvements, information systems, and
antiterrorism measures. Additionally,
the project will include a Design Build
Administration facility.

www.77insaat.com 38 FBaucilidlitiinegss &

CONSTRUCTION OF Construction of four two story barracks, cporomjepclet ted
BEDDOWN BARRACKS, two latrines and a DFAC in Bagram
BAGRAM AIRFIELD, Airfield-Afghanistan. Four reinforced
AFGHANISTAN concrete barracks have the same design
with a cloased area of 2375m2. Two
latrines have a total closed area of 390m2
and the reinforced concrete DFAC has a
total cloased area of 2754m2.

www.77insaat.com 40 FBaucilidlitiinegss &

DESIGN AND Construct a munitions storage complex Providing heating, ventilation and air-conditioning cporomjepclet ted
CONSTRUCT at Balad AB, Iraq to include, munitions (HVAC) systems. It also includes the delivery to
MUNITIONS storage facilities, munitions maintenance site, erection, setting to work, adjusting, testing,
STORAGE AREA, facilities, administrative facilities, storage balancing and handing over in perfect operating
IRAQ pads, revetments, lightning protection, and running condition all of the HVAC equipment
roads, utilities, fencing, site work, interior including all necessary associated mechanical
fire detection and alarm systems, interior works at LSA Anaconda.
telephone & data system, Exterior
Communication Ductbank System and
multiple power generators.

www.77insaat.com 42 FBaucilidlitiinegss &

CONSTRUCTION OF Scope of work consists of general site cporomjepclet ted
TROOP BILLETING preparation, grading and excavation,
AND SUPPORTING site storm water management, 2,175m
FACILITIES, FOB road construction, 32ea 21’x40’ bunker
PAYNE, construction, 105ea 20’x32.5’ tent
AFGHANISTAN installation, 14ea latrine and 14ea
shower containers construction, 1ea
laundry building construction, 1ea
875m2 DFAC construction for 1,000
personnel, installation of water & waste
water systems and power generation and
distribution system.

www.77insaat.com 44 FBaucilidlitiinegss &

CONSTRUCTION OF Scope of work consists of general site cporomjepclet ted
TROOP preparation /grading & excavation), site
BILLETING AND storm water management, 1,163m road
SUPPORTING construction, 20ea 21’x40’ bunker
FACILITIES, construction, 80ea 20’x32.5’ tent installation,
FOB GERONIMO, 12ea latrine and 12ea shower containers
AFGHANISTAN construction, 1ea laundry building
construction, 1ea 750m2 DFAC construction
for 500 personnel, installation of water &
waste water systems and power generation &
distribution system.

www.77insaat.com 46 FBaucilidlitiinegss &

DESIGN AND Design build for the North & South cporomjepclet ted
CONSTRUCT NORTH & Control Points includes: road paving
SOUTH ENTRY and hardstands for vehicles, installation
CONTROL POINT AND of force protection wall and barriers,
TRUCK LANE PYPASS installation of vehicle barriers,
ROAD, chain link security fence, including
BALAD AIR BASE pedestrian gates and vehicle gates, test fire
IRAQ pit reconstruction, search areas and search
canopy for vehicles, buildings and facilities
for Entry Control Point operations,
electrical prime power generation and
distribution, communications connections
and distribution, area lighting at LSA
Anaconda, Balad, Iraq.

www.77insaat.com 48 FBaucilidlitiinegss &

AVIATION OPERATION Construction of a new facility to support pcoromjepclet ted
FACILITY BAGHDAD, aviation operations of the DoS
IRAQ Diplomatic Security Service in Baghdad
International Airport, Iraq. The project
includes a flight operation area supporting
several helicopters and two fixed wing
aircraft, one hangar, restrooms, concrete
aprons, force protection, elecrical system,
water storage and distribution system and
Sewage collection & storage systems.