AIR OPERATION Design and Construction of an air oper- pcoromjepclet ted
CENTER - BAGHDAD, ation center to support 85 personnel with
IRAQ an operation floor and multiple support
offices in Baghdad, Iraq. The facility has a
1,550 square meter floor area.

www.77insaat.com 52 Buildings & Facilities

Energy Projects
Energy Investment Projects
Dams & Water Structures
Runways & Aprons
Pipeline & Steel Storage Tanks
Other Projects

02

Energy Projects

www.77insaat.com 54 EPrnoejregcyts

RENOVATE PRIME :: Renovate/repair/update/overhaul 77 Construction Company provides pcoromjepclet ted
POWER/ ELECTRICAL Prime Power Plant systems to provide all labor and materials to conduct
DISTRIBUTION/ 25.5 MW generator capacity with assessments, surveys, and develop detailed
FEEDERS AND STEP infrastructure. final engineering design documents,
DOWN :: Provide prime power to existing and technical specifications, and analysis of
TRANSFORMER new facilities, extend prime power and the electrical loads, coordination, and
BUILDING, BALAD, associated infrastructure as noted arc flash protection. Also 77 CC provides
IRAQ herein. construction services necessary for the
:: Extend new 11kV feeders from Base demolition and reconstruction of a
Step Down Facility, (Bldg. 5010), to complete and operational electrical system.
existing Prime Power Plant to provide In addition to this 77 CC constructs
32 MVA capacity in each feeder. building enclosures around the three
:: Provide demolition and replacement existing switchgear lineups at the
of 11kV/33kV equipment and cables Prime Power Plant Site, constructs an
at Step Down Building 5010 to provide administrative area at Control Room A,
32 MVA capacity performs site improvements to fences
:: Provide new underground cables from and roads, and provides non 11kV/33kV
the 33kV switchgear to the Iraqi related renovations to Step-Down Bldg.
Ministry of Electricity (MoE) 33kV 5010.
overhead towers. Final connection to
tower conductors by MoE.

www.77insaat.com 56 EPrnoejregcyts

POWER PLANT New Compound Power Plant and Main * Construction of UTL-2 (new power plant)
REPLACEMENT AND Office Telephone Exchange Building * Construction of UTL-3A (central office/telephone excange)
UTILITY Construcion Works; Rehabilitation of * Removal of electrical equipment in UTL-1 (existing power plant)
INFRASTRUCTURE existing power plant Building that will * New 11kV loop site electrical distribution. (at site)
UPGRADES, MASTER be used as a Warehouse and Central * Underground fuel tank installation and connections. (at site)
PLAN Cooling Center. SOW is including NOB, * Dedicated site fire main distribution system (at site)
IMPLEMENTATION U.S. NOX1, NoX2 GCP Annex, GCP-WHA, * Sanitary Sewer Line (at site)
EMBASSY BAGHDAD, RSO-WHA, GMP, REC, CMR, DCM, * Storm sewer line (at site)
IRAQ MSGQ , SDA-1 to 6, DFAC, South Gym, * Water System (at site)
Water Plant / Storage Building Optional * Waste water treatment plant effluent treatment, distribution and storage
Renovation Works; New 11kV Medium * Telecom (at site)
Voltage Ring Line, Multi type Under- * Landscape, roads...
ground Fuel Storage Systems Installation, * New site domestic hot water distribution system to selected existing buildings
New Fire Extinguishing System, New
Domestic Hot Water System, the New (at site only)
Cold Water System, New Perimeter * New site chilled water distribution system to selected existing buildings (at site only)
Lighting System ,Sanitary Sewage Lines, * Chiller installation to UTL-1
Storm Sewage Lines, Rehabilitation of * 8 COGEN Heat recovery equipment installation to UTL-2
Site Telecom System, Rehabilitation * Rehabilitation of the existing power plant (UTL-1) to warehouse and chiller plant
of plumbing system; Landscaping and * New perimeter security lighting system
Irrigation System. * Additional 2 COGEN Heat Recovery Equipments at UTL-2 together with required

equipments and piping.
cporomjepclet ted

www.77insaat.com 58 Buildings & Facilities
Energy Projects

Energy Investment Projects
Dams & Water Structures
Runways & Aprons
Pipeline & Steel Storage Tanks
Other Projects

03

Energy Projects
Investment

www.77insaat.com 60 EPrnoejregcyts

15 MW KANDAHAR Construction of a 15 MW Solar Power cporomjepclet ted
SOLAR POWER Plant in Kandahar Province, Afghanistan.
PLANT, KANDAHAR, Main components inside the Facility
AFGHANISTAN are PV arrays, inverters, transformers,
electrical building, control room and
distribution center.

Project Name : 15MW Solar Power Plant Kandahar Afghanistan
Project Company : 77 Construction Company
Project Location : Kandahar / Afghanistan
Project Duration : 10 Months
Guarantees : Escrow Account
Project Highlights : It is the first BOT (Build Operate Transfer) type Investment project
completed in Afghanistan. Investor will operate the plant for 20 years.
EPC Contactor : 77 Insaat and Taahhut A.S
Manufacturer : Hanhwa Q Cells Qidong Co., Ltd. (“Hanhwa”), ABB, Schletter

www.77insaat.com 62 Energy
IPnrvoejesctmtsent

opnrogjoecintg

KAJAKI 100MW Project Name : Kajaki 100MW Hydro Power Plant Investment Project
HYDRO POWER
PLANT INVESTMENT Project Company : 77 Construction USA Corp
PROJECT
AFGHANISTAN Project Location : Kajaki/Helmand Province / Afghanistan

Project Duration : Phase I (Construction of 100MW Power Plant) 2.5 years, Phase II (Construction of Spillway and Installation of Radial Gates)

1.5 years.

Guarantees : Sovereign Guarantee is provided by Ministry of Finance Afghanistan. Sovereign Guarantee is covering the payment obligations

of Afghanistan Electricity Utility (DABS)

Project Highlights : Kajaki HEPP Project was constructed between 1951 and 1953 on the Helmand River. Subsequent to the construction of the

dam, the Kajaki Power Station was recommended with an installation of 150-MW capacity in two stages and the first Power

Plant had its 2 x 16.5 MW turbines installed by USAID in 1975, later the 18.5 MW capacity third turbine was commissioned

and installed by 77 Construction USA Corp between 2014 and 2016 under USAID funded Kajaki Phase I project. The second

Phase of the Project (Construction of 100MW capacity second Power House) was not started due to the unstable political

situation in Afghanistan. 77 Construction USA Corp proposed Government of Afghanistan to invest and complete the second

phase of the Project under a Build Operate and Transfer contract after completing the installation of 18.5 MW capacity third

turbine in Kajaki as a contractor.

EPC Contactor : 77 Insaat and Taahhut A.S is planned to be the Engineering Procurement and Construction (EPC) Contactor for the

Project Turbine

Manufacturer : 77 Insaat and Taahhut A.S has entered into a contract with Voith Hydro GmbH & Co. KG for the electro-mechanical

equipment procurement of the Project

Feasibility Report : The Feasibility Report of the Project was prepared by Hidro Dizayn Engineering and Consultancy Inc., a Group Company of

LAHMEYER INTERNATIONAL

www.77insaat.com 64 Energy
IPnrvoejesctmtsent

25MW WIND 77 Construction USA Corp (“77 77 Construction USA Corp’s proposal ponrogjoecintg
PROJECT IN HERAT Construction USA Corp” or the “Seller”) was green lighted by USAID for further
AFGHANISTAN has proposed to design, build, finance, considerations on December 10, 2018. 77
commission, operate, and maintain a 25 Construction USA Corp shared all the
MW MWe / 30,4 MW wind powered technical and financial details of the Herat
electric generation facility (the “Project”) WF Project with USAID after this date. On
in the Province of Herat, Afghanistan, 14 March, 2019, 77CUSA was informed that
and shall sell all generated energy by Government of Afghanistan authorities such
the Facility to Da Afghanistan Breshna as DABS, Ministry of Energy and Water
Sherkat (“DABS” or the “Purchaser”) for (“MEW’’), Land Authority (“ARAZI’’),
20 years with the proposal submitted to National Environmental Protection Agency
United States Agency for (“NEPA’’) and Central Partnership Authority
International Development (“USAID”) (“CPA’’) are fully involved in the BAA
under Afghanistan Broad Agency Projects and are helping to support and
Announcement (‘’BAA’’) for Energy facilitate in completing the co-development
Program on September 04, 2018. and finally implementation of the Project.

The Power Purchase Agreement (‘’PPA’’)
negotiations are on going with DABS,
the parties are planning to sign the PPA
agreement on October 2019.

www.77insaat.com 66 Buildings & Facilities
Energy Projects
Energy Investment Projects

Dams & Water Structures
Runways & Aprons
Pipeline & Steel Storage Tanks
Other Projects

04

SDtarumcstu&reWsater

www.77insaat.com 68 Dams &
WStrautcetrures

DAHLA DAM The Dahla Dam Improvement Project pcoromjepclet ted
IMPROVEMENT will raise Dahla Dam seven meters to
PROJECT PH1, increase reservoir storage for irrigation
DAHLA, in the Arghandab Valley and future
AFGHANISTAN municipal water supply for Kandahar
City. Phase 1 of the project consists of
modifications to the inlet, outlet works,
and appurtenant structures to
accommodate an eight meter dam raise.

www.77insaat.com 70 Dams &
WStrautcetrures

INSTALLATION OF The scope of Kajaki Project is Installation cporomjepclet ted
TURBINE GENERATOR of Turbine Generator Unit #2 and re-
UNIT #2 AT KAJAKI furbishment of Governor, Excitation and
DAM HYDROPOWER Automation Systems of Unit #1 and Unit
PLANT, KAJAKI, #3 at Kajaki HPP in Helmand Province /
AFGHANISTAN Afghanistan.

www.77insaat.com 72 Buildings & Facilities
Energy Projects
Energy Investment Projects
Dams & Water Structures

Runways & Aprons
Pipeline & Steel Storage Tanks
Other Projects

05

Runways & Aprons

www.77insaat.com 74 ARupnrownasys &

REPAIR AIRFIELD This project includes demolition, removal, pcoromjepclet ted
PAVEMENTS and replacement of deteriorated concrete
SATHER AIRBASE, pavement and joint seal material for
IRAQ eight separate airfield features. The
airfield markings that were removed
with the demolished pavement are also
be repainted. The runway repair project
includes removal of the rubber deposits
in the landing/touchdown zones and
restriping of the touchdown areas. Totally
27.000 m3 concrete to be removed and
replaced in this project.

www.77insaat.com 76 ARupnrownasys &

BALAD AIRFIELD Scope of work includes replacement of pcoromjepclet ted
RUNWAY 12/30 damaged or cracked pavement,
REPAIR PROJECT, resurfacing of Runway & Taxiway A, B,
BALAD D (approximately 200.000 squaremeter of
IRAQ Asphalt pavement), replacement of joint
sealants and repainting of entire Runway
& Taxiway.

www.77insaat.com 78 ARupnrownasys &

CAS APRON CAS Apron Expansion project consists of Project will include access road, pcoromjepclet ted
EXANSION PROJECT the design and construction of an apron pavement markings, edge lighting, area
BAGRAM AIRFIELD, currently designed for approximately 32 lighting, utilities and other necessary site
AFGHANISTAN fighter aircraft by a paved aircraft apron improvements. The Project also includes
with shoulders, to provide space for 46 relocating existing revetments, installing
fighter aircraft with space for an new revetments, construction of HAMS
additional 4 aircraft on the taxiway. pad, Trim pad, Fabric Aircraf Shelter,
Armament pad, Expeditionary Fighter
Shelters, AOM facility and NDI facility.

www.77insaat.com 80 ARupnrownasys &

CONSTRUCTION OF Construction of 25,500 m2 concrete area pcoromjepclet ted
TEMPORARY including a landing zone, two helicopter
FERNANDEZ LANDING parking aprons and a taxiway connecting
ZONE, the landing zone to aprons and a
(GREEN ZONE) helicopter maintenance hangar with a
BAGHDAD height of 13.5m and an area of 3,950 m2.
IRAQ

www.77insaat.com 82 ARupnrownasys &

RE-EXECUTION The project involves the modernization of on
AIRSTRIP, RUNWAYS, the airport through the reconstruction of hold
TAXIWAYS, EXIT the taxiways and take-off runways. Scope
TAXIWAYS AND of work includes provision and installation
LIGHTING IN of subbase, crushed stone base course,
AL KUFRA AIRPORT base bitumen course, binder and wearing
LIBYA courses, concrete slab for the airport
rehabilitation.

www.77insaat.com 84 ARupnrownasys &

BLAHA – ECP & Entry Control Point and pcoromjepclet ted
ACCESS ROAD, Access Roads
CAMP BASTION
AFGHANISTAN The project includes construction of a new
ECP and access roads at Camp Bastion,
Afghanistan. Primary facilities include the
ECP with inspection area, guard towers,
fencing, lighting, material transfer point,
control building, canine area, asphalt
roads, and ATFP barriers.

Basic Load Ammo Holding Area

The project includes approximately a
22,500 square meters (m2) of aircraft ramp
area dedicated for handling hazardous
cargo in Camp Bastion, Afghanistan.
The primary facilities include a ramp
parking area, ladder connecting taxiway,
and vehicular access road.

www.77insaat.com 86 ARupnrownasys &

SPEICHER AIRBASE 77 Construction is operating a cporomjepclet ted
RUNWAY & ROAD fully functional Asphalt Batch Plant in
ASPHALT PAVEMENTS Camp Speicher (Tikrit/Iraq) capable
IRAQ of producing Hot Mix Asphalt Airfield
Pavements and Hot Mix Asphalt Road
Pavements, and having associated
Support Equipment for purposes of
laying road and runway asphalt to various
locations in Camp Speicher.

www.77insaat.com 88 Buildings & Facilities
Energy Projects
Energy Investment Projects
Dams & Water Structures
Runways & Aprons

Pipeline & Steel Storage Tanks
Other Projects

06

Pipeline &TaSntkesel
Storage

www.77insaat.com 90 Pipeline &
SSttoeeral ge Tanks

ENGINEERING, BETWEEN Scope: ponrogjoecintg
PROCUREMENT & Expansion of existing well pads by
CONSTRUCTION FOR LUKOIL MID-EAST LIMITED hook up of fifty two (52) wells at six
WELL PADS AND existing well pads
EXPANSION AND # 2, 5, 7, 8, IO and 12 (guaranteed part
HOOK-UP OF SICIM S.P.A. AND 77 INSAAT VE of the scope of WORK);
HISTORICAL WELLS TAAHHUT A.S. CONSORTIUM
AT THE WEST QURNA :: Hook-Up of 2 water injection wells,
(PHASE 2) CONTRACT WQ#2 I 5 at WP#8 and WQ# 232 at
AREA AT WEST QURNA, WP#7 (guaranteed
IRAQ part of the scope of WORK)
:: Hook-up of historical well # WQ-
08 to manifold of existing well
pad# 2 (provisional part of
the scope of WORK);
:: Hook-up of historical well# WQ-
148 to manifold of existing well pad #7
(provisional part of
the scope of WORK).

www.77insaat.com 92 Pipeline &
SSttoeeral ge Tanks

EPC CONSTRUCTION OF SCOPE OF WORK FACILITY I: length. It is a dual lane, two-way road system; total ponrogjoecintg
CLUSTER M1 WITH Cluster M1 road width 7m with I.5m shoulders on both sides,
ACCESS ROAD AND a. Oil police checkpoint; with temporary Security Checkpoint at WQ-2 security
SECURITY FACILITIES AT b. 2 x Watch Towers (at least perimeter;
CLUSTER M3 AT THE 7.0 meters height total, made of b. Road signs and boards;
WEST QURNA FIELD concrete, UL 752 level 3 bulletproof c. Protection of existing underground services (any pipes
(PHASE 2) protection of walls and windows) with and/or cables) etc.
REPUBLIC OF IRAQ AC and searchlights. SCOPE OF WORK FACILITY 3: SECURITY
c. Well Pad / embankments; FACILITIES FOR CLUSTER M3
d. Drilling rig concrete pile foundations; a. Anti-ram arm barrier;
e. Cellars; b. 3.6 meters height T-Wall Fence with anti-climbing
f. Mud I water pits; protection;
g. Anchored HDPE lining membrane; c. Sliding steel gates (at least 7.5 meters wide), UL752
h. Security protection structures level 3 bulletproof type, with motor and anti-climbing
(T-Wall Fence with concertina above, protection;
anti-ram ditch, sliding d. Oil Police Checkpoint as described in this SECTION
bulletproof gates, anti-ram barriers); III and SECTION IV;
SCOPE OF WORK FACILITY 2: e. 2 x Watch Towers (at least 7.0 meters height total,
ACCESS ROAD made of concrete, UL 752 level 3 bulletproof
a. Access Road (including DESIGN) protection of walls and windows) with AC and
to the FACILITY I (Cluster MI) with searchlights.
required associated f. Restoration of the access road to CLUSTER M3
structures such as bridges, pipe culverts, after all activities on FACILITY 3 are completed.
storm drainage pipes, etc. The pro
posed access road and emergency road
to FACILITY I (Cluster MI) are ap
proximately 12,000 meters in total

www.77insaat.com 94 Pipeline &
SSttoeeral ge Tanks

DAMMAM Engineering, Procurement and pcoromjepclet ted
DECENTRALIZED Construction of Dammam Decentralized
WATER INJECTION Water Injection Facilities for Water
FACILITIES FOR Supply Wells at the West Qurna II Site,
WATER SUPPLY Basra, IRAQ for LUKOIL Company..
WELLS AT THE WEST The project includes construction of
QURNA (PHASE 2), three new water wells, their connection
IRAQ to existing oil production wells, renewal
of existing oil production well piping and
accessories, chemical injection skid, ICCS,
instrumentation, electrical and telecom
systems, and security measures.

www.77insaat.com 96 Pipeline &
SSttoeeral ge Tanks

CENTRAL Infrastructure and Construction Works cporomjepclet ted
PROCESSING FACILITY at 550,000 BPD CPF and Oil Well Pads. ​
AND OIL WELL PAD T Wall Security Perimeters, Foundations
INFRASTRUCTURE and Construction of Substations, Utility
WORKS AT WEST Buildings, Underground Pipe Road
QURNA-2 OIL FIELD, Crossings, Water Piping Networks,
LUKOIL OVERSEAS Grouting Works, Earthworks, Access
PROJECT Roads, Cast in Situ Pile Foundations,
BASRA Precast Production of Well Cellars, Pipe
IRAQ Trenches and Cable Trenches and Other
Civil Works for Oil Well Pads; fast track
production and installation meeting
critical timetables of the oil sector;
subcontractor to Samsung Engineering
and LukOil Mid East Limited.

www.77insaat.com 98 Pipeline &
SSttoeeral ge Tanks

WATER SYSTEM Scope of work covers provision of all opnrogjoecintg
REPAIR PHASE 1 construction and design activities for new
PROJECT, water supply wells, performing drilling,
DJIBOUTI installation, and appropriate technical
testing for six (6) pilot boreholes, an
existing production water supply well
cleaning and rehabilitation study to assess
the existing condition of current wells
at Camp Lemonnier, Djibouti. Upon
completion of the boreholes and water
production analysis, the government will
select a minimum of three (3) locations
for construction of new production water
supply wells. After that connection of new
water wells to the raw water
distribution system and updating the
ROWPU Industrial Controls System (ICS)
at Camp Lemonnier, Djibouti with
appropriate technical testing will be
executed.