The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.

HE Primavera P6 Training for EPC Projects

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by Hemp.Engineering, 2022-03-02 01:13:58

HE Primavera P6 Training for EPC Projects

HE Primavera P6 Training for EPC Projects

Keywords: PPrimavera P6 Training

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Planning & Project Control Data
Configuring an Activity, Tab General

Repeat process

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Planning & Project Control Data
Configuring an Activity, Tab Status

Repeat process

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Planning & Project Control Data
Configuring an Activity, Tab Resources

Repeat process

HEMP ENGINEERING Pty Ltd From the Menu
Select View, and from the
EPCM Project Management using Primavera drop menu:
Your Planning & Project Controls Solution Select Bottom Layout Option

Planning & Project Control Data Add and Remove as required
Configuring an Activity, Adding new Tab

Repeat process

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Planning & Project Control Data
Configuring an Activity, Relationship Tab

Repeat process

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Planning & Project Control Data
Configuring an Activity, Codes Tab

Repeat process

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Planning & Project Control Data
Configuring an Activity, Risk Tab

Repeat process

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Planning & Project Control Data
Configuring an Activity, Notebooks Tab

Repeat process

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Planning & Project Control Data
Configuring an Activity, WPs & Docs Tab

Repeat process

HEMP ENGINEERING Pty Ltd Dimensions:
Length: 20 mts
EPCM Project Management using Primavera Width: 10 mts
Your Planning & Project Controls Solution Thickness: 0.15 mts

Planning & Project Control Data MH Calculation:
Configuring an Activity, Resource Tab Concrete slab

Repeat process

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Construction of the “S” curve

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Construction of the “S” curve
Option A

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Construction of the “S” curve
Option B

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Construction of the “S” curve
Option B

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Baseline the Project

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

What is a Baseline in Project Management?
In project management, the baseline is the original range, total cost
and schedule of a project.

It is used to measure the amount of deviation of performance from
the original plan.

Before the execution of the project, the baseline must be properly
defined and documented.

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Baseline the Project
Starting point used for comparisons

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Baseline the Project

From the Menu
Select Project, from the drop menu:

Select Maintain Baseline

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Baseline the Project

Press Add Bottom

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Baseline the Project

Press Ok Bottom

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Baseline the Project

Press Close Bottom

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Baseline the Project

From the Menu
Select Project, from the drop menu:

Select from Project Baseline window, the project to be assigned as the Baseline
Press oK

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Baseline the Project

From the Menu
Edit bars format

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Baseline the Project

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Deliverables when submitting the Project Baseline

Basis of the Schedule

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control

The purpose of Project Execution and Control is to
develop the product or service that the project was
commissioned to deliver. Typically, this is the longest
phase of the project management lifecycle, where most
resources are applied.

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control

Project Execution and Control utilizes all the plans,
schedules, procedures and templates that were prepared
and anticipated during prior phases.

Unanticipated events and situations will inevitably be
encountered, and the Project Manager and Project Team
will be taxed to capacity to deal with them while minimizing
impact on the project’s

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control
The importance of a Progress Measurement System

Progress Measurement System will answer questions like:

How far a project actually progressed?

How far should a project have progressed by a particular date?

Where are the progress deviations?

What is the progress curve that ensures a normal project development

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control
Progress Measurement System Relations

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control
Necessity of Measuring Progress

Progress measurement allows a numeric comparison with the baseline plan. Ea
Progress sets the basis for productivity calculations
Progress is related to expenses and allows cash flow estimation
Progress in combination with cost information allows the use of Earned Value

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control
Necessity of Measuring Progress

Progress is a standard measure of work accomplished
It is used by the project members

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control
Necessity of Measuring Progress

Progress in combination with Cost information allows the use of Earned V

Earned Value = Budget * % Progress
Schedule Performance Index (SPI) = Earned Value /Planned Value
Cost Performance Index = (CPI) = Earned Value/Expended value
Cost Forecast (BAC) = Budget/CPI
Duration Forecast = Original Duration/SPI

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control
Necessity of Measuring Progress

Progress measurement sets the basis for productivity and forecasting cal

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control
Necessity of Measuring Progress

Actual Earned Value in combination with budget and duration forecast can provide
cost and schedule forecasting

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control
Primavera P6 and Excel interface

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control
Trend

All Data is contained in one database

Progress calculation methods standardised

Storage of Historical Data

Reports are available for any stage of data

Control of Users privileges

System available via Internet or Intranet

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control
Development Phases

First Stage
Tables Design
Planned (from Schedule)
Actual Progress calculations

Second Stage
Planned (from Schedule)
and Actual Curves

Third Stage
Productivity Calculations,
Forecast

HEMP ENGINEERING Pty Ltd EXECUTIVE
SUMMARY
EPCM Project Management using Primavera
Your Planning & Project Controls Solution PROJECT(S)

Project Execution and Control Risks, Costs, Time, Quality

ROLL UP PROCESS LEVELS OF PLANNING

PROJECT PHASES
Design, Procurement
Construction

REPORTING MATRIX
WBS, Activity Codes, Work Packs, Disciplines, Work

Fronts

UPDATING LEVEL
Activities at P6

Actual dates, % Progress, Forecast dates

MEASUREMENT SYSTEM (%)
Activity Steps, Price Schedule, Earned Value

ESTIMATION
Labor, Material, Equipments, BOQ

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control: Scheduling the Project

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control: Scheduling the Project

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control: Scheduling the Project

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control: Scheduling the Project

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control: Scheduling the Project

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control: Scheduling the Project

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control: Scheduling the Project

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control: Scheduling the Project

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Project Execution and Control

Corrective Actions

▪ Reducing the durations of activities on, or near, the
critical path,

▪ Providing more work time and changing calendars,
▪ Reducing the project scope and deleting activities,
▪ Changing activity relationships so activities take place

concurrently,
▪ Changing the plan and therefore changing the logic to

reduce the overall length of the critical path.

WHAT IF, NONE OF THE ABOVE WORKS?

HEMP ENGINEERING Pty Ltd

EPCM Project Management using Primavera
Your Planning & Project Controls Solution

Re-Baseline and
The Typical Considerations
for Re-Baseline a Project


Click to View FlipBook Version