The OMRAN MAROON Engineers Company (OMEC) was registered in 2000 (registration
number: 162525) in Tehran as private company and has initiated its wide range of
activities in various sectors including water industry, buildings, railway and road, facilities,
equipment, power plants and etc. since then.
OMEC has made rapid progress over the past years due to help of experts and skilled
workforce, so that it has obtained various valid international licenses and certificates by
implementation of huge projects at national and international level such as the first rank
by Plan and Budget Organization of the Islamic Republic of Iran considering most of its
activities and achievements.
The OMRAN MAROON Engineers Company seeks to expand its activities in various
sectors within Iran as well as in other countries through paying special attention to
training, enhanced workforce experiences, workplace’s health, safety and environment
(HSE) and fulfillment of its social mission. Value and wealth creation are considered
as our ultimate goals. We hope to achieve these valuable objectives and to have
ever-increasing excellence by the diligent cooperation among experts, staff and other
relevant agents as well as the frontier technology and advanced know-how.
M.habibaghahi
OMRAN MAROON Engineers Co. 5
Projects
Water
Projects
Biulding
Projects
Page 5
Industrial
Page 34
Page 48
OMRAN Projects Introduction, Feb. 2020
MAROON 6
& Water
Powerhouse
Projects
OMRAN MAROON Engineers Co. 7
AHMADBEIGLOO Page 6
Reservoir Dam & Related Structures
ABIVARD Page 8
Water Transfer Project from Tunnel to the Reservoir
UMA OYA Page 10
Multipurpose Development Project Power
BALAROOD Page 12
Reservoir Dam & Diversion Tunnel
TAZEKAND Page 14
Tazekand Dam & Related Structures
SHAHID ABBASPOUR Page 16
Renovating & Protecting Side Slopes
KAROON IV DAM Page 18
KAROON IV DAM Page 20
Excavation & Grouting of the Galleries & Grout Curtain
ROGUN Page 22
Dam Spillway & Tunnel
ABIVARD Page 24
water transfer tunnel and diversion dam
SANGTUDA II Page 26
Dam & hydro power plant in Tajikistan
KANI SIB Page 28
Reservoir Dam and BADINABAD Water Channel
GAVOSHAN Page 30
Dam
GAVOSHAN Page 32
Execution & lighting of Water Transfer Tunnel
SHAHID ABBASPOUR Page 34
Complementary operation
OMRAN 8 Projects Introduction, 2020
MAROON
AHMADBEIGLOO
Reservoir Dam &
Related Structures
AHMADBEIGLOO dam is located in northern SABALAN heights in
Ardabil province. This is an earth dam with clay core, with 64 meters
height from the top of the foundation and 528 meters crest length.
Water&Power The type of spillway is chute spillway and one diversion tunnel with
Projects
4.5 meters diameter and 298 meters length.
Building
Projects
General specification
Regional water
Industrial Biulding Employer company of Ardabil
Projects
location
Satellite image
location Ardabil province
Controlling Seasonal flood,
improving agricultural lands
Purposes of project
irrigations
Technical specification
Type of dam Earth fill dam with clay core
Dam height 64 meters from foundation
9
OMRAN MAROON Engineers Co.
AHMADBEIGLOO
Reservoir dam &
related structures
OMRAN 10 Projects Introduction, 2020
MAROON
ABIVARD
Water Transfer Project from Tunnel to the
Reservoir of ABIVARD Dam (ESPIAN)
The main purpose of the project is construction of water transmission channel to
Abivard reservoir dam and flood control to prevent damage to agricultural lands
Water&Power due to rising elevation of the river (construction of Abivard diversion dam) and trans-
Projects
ferring water from the diversion dam to Shourkal area and Abivard dam reservoir
(tunnel construction and water transfer channel) with the purpose of supplying a
part of Daregaz city potable water and irrigation of agricultural lands (modern irriga-
tion and drainage systems) located in south east of Daregaz city and Lotfabad area.
Building
Projects
General specification
Industrial Biulding
Projects
Regional water company of
Employer Khorasan Razavi
location
Satellite image
location Khorasan Razavi Province
Transferring water from Zang-
lanlou diversion dam to Abivard
Purposes of project
dam reservoir.
Technical specification
Total Channel length 15,000 meters
11
OMRAN MAROON Engineers Co.
ABIVARD
Water Transfer Project
from Tunnel to the
Reservoir of ABIVARD
Dam (ESPIAN)
OMRAN 12 Projects Introduction, 2020
MAROON
UMA OYA
Uma Oya Multipurpose Development
Project Power and Link Tunnels in Sri lanka
Uma Oya Multipurpose Project is being implemented in the southeast of Sri
Lanka. Uma Oya Headrace Tunnel, which is about 15,600 meters long, is the
Water&Power major part of the project. OMRAN MAROON Engineers Company (OMEC)
Projects
was honored to execute 2700 meters of this tunnel within 10 months under
the most difficult geological conditions.
Building
Projects
General specification
Farab Company
Employer
Industrial Biulding Location
Projects Satellite image
location Southeast of Sri Lanka
Water conveyance, hydro-
Purposes of project electric power generation and
agricultural use
Technical specification
Total Channel length 15,600 meters
The diameter of the tunnel 4.30 meters
Total Channel length TBM
13
OMRAN MAROON Engineers Co.
UMA OYA
Multipurpose
Development Project
Power and Link Tunnels in
Sri lanka
OMRAN 14 Projects Introduction, 2020
MAROON
BALAROOD
Reservoir Dam & Diversion Tunnel
BALAROOD reservoir dam and its diversion tunnel is con-
sidered to control massive and destructive of BALAROOD
river floods as well as supplying water for 12,600 hectares
Water&Power
Projects of downstream lands.
Building
Projects
Industrial Biulding
Projects
General specification
Khuzestan water and power
Employer authority
Satellite image location
location Khuzestan province
Seasonal flood control
Purposes of project agricultural irrigation
improvement
15
OMRAN MAROON Engineers Co.
BALAROOD
Reservoir Dam &
Diversion Tunnel
Technical specification
Type of dam Earth fill dam with clay core
Dam height 83.5 meters
Dam reservoir volume 131.000.000 cubic meter
OMRAN 16 Projects Introduction, 2020
MAROON
TAZEKAND
Tazekand Dam & Related Structures
The purpose of this project is taking advantage of seasond flood of the Sambourchai
river and its branches optimize agricultural lands irrigation of 6.3 million cubic meters
for 507 hectares, providing 5.2 million cubic meters of drinking water to Tazeh Kand
town and the suburbs, providing 0.5 million cubic meters water for industries demand
Water&Power
Projects and providing 9.1 million cubic meters water of environmental issues.
Building
Projects
General specification
Regional water Company of
Employer Ardabil
Industrial Biulding
Projects
Satellite image Dam body location
location Ardabil Province
seasonal flood control,
agricultural irrigation improve-
Purposes of project ment, providing drinking water
to the area
Technical specification
Type of Dam clay core earth fill dam
Dam Height 48 meters
17
OMRAN MAROON Engineers Co.
TAZEKAND
Tazekand Dam & Related
Structures
OMRAN 18 Projects Introduction, 2020
MAROON
SHAHID ABBASPOUR
Renovating & Protecting Side Slopes of
SHAHID ABBASPOUR Dam Spillway.
Renovating and protecting area between two buckets of Shaheed Abbas
pour dam aimed at reconstructing the damaged flip bucket and stabiliza-
Water&Power tion and re-enforcing the sides’ spillway of dam to prevent probable falling
Projects
and erosion when the second power plant structure outlet span of spillway
gates are opened.
Building
Projects
General specification
Khuzestan water and power
Employer Authority
Industrial Biulding
Projects Satellite image Location
location Khuzestan province
Spillway Flip Bucket
Purposes of project rectification sides’ spillway
slope stabilization
Technical specification
Spillway type Concrete chute
Discharge capacity 16,200 cubic meters/second
Number of spillway gates 3
19
OMRAN MAROON Engineers Co.
SHAHID ABBASPOUR
Renovating &
Protecting Side Slopes
OMRAN 20 Projects Introduction, 2020
MAROON
KAROON IV
DAM
Karoon-4 storage dam and power plant are located in Chaharrmahal and
Bakhtiari province in order to provide hydro power and control flood of the
upstream Karoon-3 dam. This project includes dam body excavation and
Water&Power
Projects coffer dam execution management.
Building
Projects
General specification
Iran Water and Power Resourc-
Employer es Development Co.
Industrial Biulding
Projects
Satellite image Location
Chaharmahal and Bakhtiary
location Province
Water diversion from main
river for drying operation exca-
Purposes of project vation of left and right bank of
main body
Technical specification
coffer dam type clay core Earth fill dam
coffer dam height 45.5 meters
21
OMRAN MAROON Engineers Co.
KAROON IV DAM
OMRAN 22 Projects Introduction, 2020
MAROON
KAROON IV DAM
Excavation & Grouting of the Galleries &
Grout Curtain of Karoon 4- Dam
Karun-4 power plant and Reservoir Dam is located in Chahar
Water&Power Mahal Bakhtiari Province of Karun River with the aim of supply-
Projects
ing hydroelectric energy and upstream flood control of Karun-3
dam. This project includes excavation and concreting of galler-
ies and grout curtain of Karun-4 dam.
Building
Projects
General specification
Iran Water and Power Resourc-
Employer es Development Co.
Satellite image Dam body and facilities
Chaharmahal and Bakhtiary
location Province
Preventing water leakage from
Industrial Biulding Purposes of project dam’s banks
Projects
Technical specification
Dam type 14,250 meters
Total length of the Galleries and
tunnels 45.5 meters
Total length of drainage borehole 9,400 meters
Total length of Exploring borehole 18,250 meters
Total length of grouting and grout
curtain 433,500 meters
23
OMRAN MAROON Engineers Co.
KAROON IV DAM
Excavation & Grouting
of the Galleries
OMRAN 24 Projects Introduction, 2020
MAROON
ROGUN
Dam Spillway & Tunnel
ROGUN Dam is located in the vicinity of ROGUN city in Tajikistan. The con-
tract includes the construction of spillway tunnel and required hydro-me-
chanical equipment.
Water&Power This project is a part of ROGUN dam and power-plant which will be the high-
Projects
est earth fill dam in the world (335 meters). The project is a 5900-meter long
drill and blast method tunnel with diameters ranging from 8 to 17 meters
which is became more complicated with vertical and inclined shaft.
Building General specification
Projects
Employer ROGUN Hydropower plant
Satellite image project location
ROGUN City Tajikistan
location
Control of Rogun dam’s reservoir water
Purposes of project elevation
Industrial Biulding
Projects
Technical specification
access & aeration tunnels 4100 meters Length / 10-meter diameter
Main shaft 1,800 meters length / 17-meter diameter
Inclined shaft 9,400 meters
Oval vertical shaft 140 meters length- (Oval shape 14*21)
Crane room 60 meters length /16 width /35-meter height
Power house cavern 60m*30m*13m and 57m*22m*18m
25
OMRAN MAROON Engineers Co.
ROGUN
Dam Spillway & Tunnel
OMRAN 26 Projects Introduction, 2020
MAROON
ABIVARD
water transfer tunnel and diversion dam
(ZANGELANLU)
This project with goal of water transfer to Shourkal area from Zanglanlou and
irrigation south-east of Dargaz and finally storage of extra water and irrigating Lot-
fabad agricultural lands constructed in 50 Kilometers to south-east of Dargaz city.
Water&Power
Projects The project is a 5700 meters long water transfer tunnel with 4 meters diameter
and 14000 meters long access road are major part of this project. Total diversion
dam length is 75 meters with 12 meters height which consists ogee spillway,
intake and bottom outlet.
Building
Projects
General specification
Industrial Biulding Employer Regional water company of
Projects Khorasan Razavi
Satellite image project location
location Khorasan Razavi province
Seasonal flood controlling,
Purposes of project transferring water to Abivard
dam reservoir
Technical specification
Type of dam Concrete
Dam height 12 meters
5700 meters with 4 meters
Transfer tunnel
diameter
27
OMRAN MAROON Engineers Co.
ABIVARD
water transfer tunnel &
diversion dam
OMRAN 28 Projects Introduction, 2020
MAROON
SANGTUDA II
Dam & hydro power plant in Tajikistan
Sangtuda 2 dam and hydro power plant is located in south west of
Water&Power
Projects Tajikistan, about 180 kilometers far from southeast of Dushanbe,
capital of Tajikistan. This dam and its power plant are built to supply
a part of energy of central Asia united electricity system.
Building
Projects
Industrial Biulding
Projects
General specification
Employer Farab international – Farab Co.
project location
Satellite image
location Khatlan Region – Tajikistan.
Supplying part of regional electricity and unified\
Purposes of project power system of Central Asia
29
OMRAN MAROON Engineers Co.
SANGTUDA II
Dam & hydro power
plant in Tajikistan
Technical specification
Type of dam clay core earth fill dam
Dam height 31.5 meters
Dam crest length 385 meters
Type of power house Surface
Capacity 220 MW (2 Units of 110 MW)
Average annual power 1000 GWH
generation:
OMRAN 30 Projects Introduction, 2020
MAROON
KANI SIB
Reservoir Dam and BADINABAD Water
Channel
The project consists of KANI SIB Clay Core Reservoir Dam with
68 meters height and 795 meters crest length, Badin Abad
concrete diversion dam with 11 meters height and 115 meters
Water&Power
Projects length and Badin-Abad with 6-kilometer long water channel
and access roads.
Building
Projects
General specification
Industrial Biulding Employer Iran Water and Power
Projects Resources Development Co.
Satellite image project location
location Western Azerbaijan province
Supplying water to Urmia Lake
Purposes of project from GELAAS
Technical specification
Dam type clay core earth fill dam
Dam height 68 meters
Crest length 795 meters
Total storage capacity 327 million cubic meters
31
OMRAN MAROON Engineers Co.
ABIVARD
water transfer tunnel &
diversion dam
OMRAN 32 Projects Introduction, 2020
MAROON
GAVOSHAN
Dam
Gavoshan storage dam project is located in 28 kilometers away from Sanandaj
city – Kurdistan province to transfer water from Gaveh River (Siravan main fork
river) to catchment area of Gharasoo.
Water&Power
Projects The type of OMRAN MAROON’s contract was Contract Management in this
project
Building
Projects
General specification
Employer Regional water company of Kermanshah
Industrial Biulding
Projects
Satellite image project location
location Kurdistan Province
Transferring water from Gaveh River to
Purposes of project Catchment area of Gharasoo - agricultural
lands irrigation improvement
Technical specification
Dam type Earth fill dam with clay core
Dam height 135 meters
Dam crest length 660 meters
Tunnel excavation 5100 meters
33
OMRAN MAROON Engineers Co.
GAVOSHAN
Dam
OMRAN 34 Projects Introduction, 2020
MAROON
GAVOSHAN
Execution 7 lighting of Gavoshan Water
Transfer Tunnel
The aim of executing Gavoshan tunnel is transferring Kaveh River’s water from
Gavoshan Dam to Kamyaran city to irrigate 21,000 hectares of Bilevar & Mian
Darband fields and supply about 63 million cubic meters of Kermanshah city
Water&Power
Projects potable water. OMRAN MAROON engineering company acted as the manag-
ing contract.
Building
Projects
General specification
Industrial Biulding Employer Regional water company of Kermanshah
Projects
Satellite image project location
location Kurdistan Province
Transferring Kaveh River’s Water to
Purposes of project Kamyaran city
Technical specification
Tunnel Type Water Transfer Tunnel (Excavated by TBM)
Main Tunnel Length 20,000 m
Access Tunnels Length 3,600 m
Diameter of tunnel drilling from 5.30 m to 7.40 m
35
OMRAN MAROON Engineers Co.
GAVOSHAN
Dam
OMRAN 36 Projects Introduction, 2020
MAROON
SHAHID ABBASPOUR
Complementary operation of SHAHID
ABBASPOUR Second Hydro Power Plant
Water&Power Second Power Plant of Shaheed ABBASPOUR Dam located in
Projects
Khuzestan province with capacity of 1000 MW consisting of
4*250 MW units. This part of contract consists repairing main
sealing and power plant cavern (with grouting of cement and
chemical components), construction of six kilometers of ac-
cess roads, renovation of buildings and asphalt of main and sub
roads of second power plant.
Building
Projects
Industrial Biulding
Projects
General specification
Employer Khuzestan water and power authority
Satellite image project location
Khuzestan province
location
Tunnels rectification, access roads construction, grout curtain
Purposes of project barrage and power plant cavern renovations.
37
OMRAN MAROON Engineers Co.
SHAHID ABBASPOUR
Complementary
operation
OMRAN Projects Introduction, Feb. 2020
MAROON 38
Building
Projects
OMRAN MAROON Engineers Co. 39
GOLESTAN Page 38
Commercial & Administrative Complex
NAVAL TRAFFIC CONTROL TOWER Page 40
CHABAHAR Naval Traffic Control Tower
ANDIMESHK–AHVAZ Road Page 42
Construction of Road
SADRA (new city) Page 43
MEHR residential complex of SADRA
GOL-E- MARYAM Page 44
commercial complex
ENGHELAB Subway Station Page 46
Construction of Subway Station and the
Tunnel on its Sides
NEGIN OFOGH NIAYESH Page 18
Administrative-Commercial
Complex & five-star hotel
OMRAN 40 Projects Introduction, 2020
MAROON
GOLESTAN
Commercial
& Administrative Complex
GOLESTAN Commercial and Administrative Complex is under construc-
tion with 173,000 square meters area in Tehran. Moreover, the structure of
35-storey twin tower is made of Concrete.
Water&Power
Projects
Building
Projects
General specification
SABA Business
Employer Development Co.
Industrial Biulding Tehran province
Projects location
Providing Official-Commercial
Purposes of project space in Tehran.
41
OMRAN MAROON Engineers Co.
GOLESTAN
Commercial &
Administrative Complex
OMRAN 42 Projects Introduction, 2020
MAROON
NAVAL TRAFFIC
CONTROL TOWER
Construction of CHABAHAR Naval Traffic
Control Tower
Water&Power
Projects
Chabahar Naval Traffic Control Tower is 60m high including an administrative
building. This project has been designed considering the following quantitative
and qualitative objectives.
- Full view towards the port areas at ports of Shahid Beheshti and Shahid Kalantari,
waterway, breakwater inlet, anchorage as well as operation of port equipment and
facilities.
- Establishment of Vessel Traffic Service (VTS), Maritime Rescue Sub-Centre
Building (MRCC), Technical Room and operational areas.
Projects
- Enhancement of safety factor of Chabahar Port.
- Symbol of marine tourism
Industrial Biulding
Projects
General specification
General authority of ports and maritime of
Employer Sistan and Baluchistan
location Sistan & Baluchistan Province
Development of infrastructure required for
Purposes of project Chabahar Port
43
OMRAN MAROON Engineers Co.
Construction of
CHABAHAR
Naval Traffic Control Tower
OMRAN 44 Projects Introduction, 2020
MAROON
ANDIMESHK–AHVAZ
Road
Construction of Road
Water&Power Asphalt paving improvement of 75 km of Ahvaz-Andimeshk, round trip totally
Projects 150 km including technical buildings, road shoulders, U-turns and parking lots,
bypass, patching, sealing and shaving asphalt, Binder and Topeka layers, Guard-
Rails, installing traffic signs and road markings on entire way.
Building
Projects
Industrial Biulding
Projects
General specification
Main Office of Road and Urban Development
Employer of Khuzestan
location Khuzestan province
Improvement and asphalt paving, U-turns,
Purposes of project parking lots & bypass
Technical specification
Road length 150 kilometers
OMRAN OMRAN MAROON Engineers Co. 45
MAROON
SADRA (new city)
MEHR residential complex of SADRA
The main aim of this project is to provide afford-
able apartments for low income people. SADRA
new city is located near Shiraz and include 690
units in 23 buildings.
Water&Power
Projects
Building
Projects
Industrial Biulding
Projects
General specification
SADRA New City construction co.
Employer
location Fars Province
Purposes of project Construction of MEHR residential buildings
OMRAN 46 Projects Introduction, 2020
MAROON
GOL-E- MARYAM
commercial complex
This complex with 126,000 square meters area is located in one of the
most crowded areas in Tehran, includes seven underground floors, with
30-meter depth from the ground level, and four storeys over the ground
Water&Power level.
Projects
This is the first urban project with the special features in designing and
construction approach. In fact, the system of structure of the ground floor
retains from concrete structure into steel structure through 70 centime-
ters thickness concrete. Not only this, but also total axes are changed at
this level. Besides, steel columns are filled with concrete.
Building
Projects
Industrial Biulding
Projects
General specification
Employer Naji sazan Amin Co.
location Tehran province
Execution of building to create
Purposes of project commercial space
47
OMRAN MAROON Engineers Co.
GOL-E- MARYAM
commercial complex
OMRAN 48 Projects Introduction, 2020
MAROON
ENGHELAB
Subway Station
Construction of ENGHELAB Subway
Station and the Tunnel on its Sides
Water&Power This project includes station structure and architec-
Projects ture, accesses, main tunnel excavation and lining of
1500 meters.
Building
Projects
Industrial Biulding
Projects General specification
Tehran urban and suburban Railway Company
Employer
location Tehran City – Tehran province
Purposes of project Reducing urban traffic – facilitating intra-urban trips
Technical specification
Station type underground
Station Area 3000 square meters
Tunnel length 1500 meters
OMRAN OMRAN MAROON Engineers Co. 49
MAROON
NEGIN OFOGH
NIAYESH
Administrative-Commercial
Complex & five-star hotel
Negin Ofogh Niayesh Administrative-Commercial
Water&Power Complex and five-star hotel is under construction
Projects
with 319,000 square meter area in Tehran. This
complex has two towers with 40 floors.
Building
Projects
Industrial Biulding
Projects
General specification
Employer Negin Ofogh Niayesh Co.
location Tehran Province
Providing administrative-commercial space
Purposes of project and 5-storey hotel in Tehran.
Technical specification
Structure type Concrete
OMRAN Projects Introduction, Feb. 2020
MAROON 50
Industrial
Projects