OMRAN MAROON Engineers Co. 51
EAST Cement Factory Page 50
Construction of Development Plan
of Unit 4 Production Line
ABYEK Page 52
Construction of ABYEK Cement
Factory-Production Line 2
PEYVAND GOLESTAN Page 54
Cement factory
FIROUZKOH Page 56
Construction of Production
Line of FIROUZKOH Cement Factory
LAMERD Page 58
Cement Factory OF Fars Province
Midook Page 60
Copper Complex
ABYEK Cement Factory Page 62
Modification & Development
of Cooking Unit
Behbahan Cement Factory Page 63
Reservoir Dam & Related Structures
OMRAN 52 Projects Introduction, 2020
MAROON
EAST CEMENT FACTORY
This project includes first and second part of production
line structures such as Crusher, Pre-Heater, Raw Material
Silos, Cement Silos, Cement Mill, Windward House, etc.
Water&Power
Projects
Building
Projects
General specification
Shargh (Mashad) Cement
Employer Company
Satellite image location
location Khorasan-e Razavi Province
Industrial Biulding To Increase production
Projects
Purposes of project capacity
53
OMRAN MAROON Engineers Co.
Construction of Development Plan of
Unit 4 Production Line
EAST CEMENT
FACTORY
Construction of
Development Plan
OMRAN 54 Projects Introduction, 2020
MAROON
ABYEK
Construction of ABYEK Cement
Factory-Production Line 2
Water&Power
Projects This project includes construction of the second production line
of Abyek cement factory were executed simultaneously with the
operation of first line. Project main structures are Material Mill
building, Pre-Heater and its associated structures. Cooling Tower, ID
fan, Cooler, Furnace and its platform, Third air pipe, Material Trans-
fer Gallery between Material Mill Feed and Material Mill to the Kiln
Feed, Clinker Transfer Tunnel, Steel Structure between Pre-Heater
and Ceiling of Material Silos, Power Substations, Facilities channel
Building and other structures.
Projects
Industrial Biulding
Projects
General specification
Abyek Cement Co.
Employer
location Ghazvin Province
Increasing production capacity
Purposes of project from 5500 to 7500 tons a day
55
OMRAN MAROON Engineers Co.
ABYEK
Construction of ABYEK
Cement Factory
Production Line 2
OMRAN 56 Projects Introduction, 2020
MAROON
PEYVAND GOLESTAN
Cement factory
The aim of execution of this project is supplying the north-
east part of the country’s cement consumption with 3200
tons capacity.
Water&Power
Projects
Building
Projects
General specification
Employer Peyvand Golestan Cement Co.
location Golestan Province
Producing 3200 tons Cement
Industrial Biulding
Projects Purposes of project per day.
57
OMRAN MAROON Engineers Co.
PEYVAND
GOLESTAN
Cement factory
OMRAN 58 Projects Introduction, 2020
MAROON
Water&Power
Projects
FIROUZKOH
Construction of Production
Line of FIROUZKOH Cement Factory
Building
Projects
Industrial Biulding
Projects
General specification
Fars and Khuzestan Cement
Employer Engineering services
location Tehran Province
production of 3300 tons Ce-
Purposes of project ment per day
59
OMRAN MAROON Engineers Co.
FIROUZKOH
Cement factory
OMRAN 60 Projects Introduction, 2020
MAROON
LAMERD
Cement Factory OF Fars Province
Water&Power
Projects
Building
Projects
The scope of this project is to construct civil, electro-me-
chanical, works of production
Line buildings from crusher to the cooler facilities.
Industrial Biulding
Projects
General specification
Fars and Khuzestan Cement
Developer Engineering services Co.
Fars province
location
Purposes of project Production of 3800 tons
cement per day
61
OMRAN MAROON Engineers Co.
LAMERD
Cement factory
Fars Province
OMRAN 62 Projects Introduction, 2020
MAROON
Midook
Copper Complex
Midook Copper Factory is located at 142 km north-west of
Sarcheshmeh Copper complex in Kerman providence to
provide copper concentrate.
Water&Power
Projects
Building
Projects
General specification
Iran copper industries organi-
Employer zation
location Kerman Province
Industrial Biulding To Supply copper Concentrate
Projects
Purposes of project
63
OMRAN MAROON Engineers Co.
Midook
Copper Complex
OMRAN 64 Projects Introduction, 2020
MAROON
ABYEK
Cement Factory
Modification & Development of Cooking Unit
The main aim of modification and development of existing pre-heater tower is
to increase the capacity of structure. Besides, due to the active production line,
the process of doing the project can be involved. On the other hand, adding or
Water&Power eliminating the metallic elements as well as the construction of the metallic
Projects
structures, next to the existing pre- heater, done with 3 storeys and 64 meters
height. Furthermore, a kiln feed with 38 meters height in 8 levels has been built
next to the pre-heater.
The concrete bypass as well as additive silos with different thicknesses are of
27- and 38-meters height respectively. Due to the concrete roof and cones on
the lower and inside of the silos, the project executed in the complicated pro-
cess.A still gypsum silo with 22m height with 7m diameters next to the above-
mentioned structures was carried out.
Building
Projects
Industrial Biulding
Projects
General specification
Abyek Cement Company
Employer
location Qazvin Province
Increasing daily production ca-
Purposes of project pacity from 5,500 to 7,500 tons
OMRAN OMRAN MAROON Engineers Co. 65
MAROON
Behbahan
Cement Factory
Increase in Production capacity
This contract includes the implementation of
the foundation and steel structure as well as
kiln feed restoration, etc.
Water&Power
Projects
Building
Projects
Industrial Biulding
Projects
General specification
Behbahan Cement Company
Employer
location Khuzestan Province
Repair and correction of structure to improve
Purposes of project production capacity
Project Glossary
OMR AN
MAROON
Est.2000
No. 23 - 29th St. - Saadat Abad Ave.
Tehran- Iran
+98 21 88 68 68 80
+98 21 88 68 67 60
[email protected]