Design experience of substations including illumination layouts, preparation of technical
specifications for main and auxiliary equipment, Planning and execution of installation works,
inspection of equipment at works, testing and commissioning industrial electrification projects
including lighting works.

Languages: Speaking Reading Writing
Languages Excellent Excellent Excellent
Tamil Excellent Excellent Excellent
English Good
Hindi - -

Sept ’12 to till date -General Manager- Operations, Texas Powertech WLL, Qatar

Responsible for Overall Operations and Growth of Projects & Trading Division.

Role includes working out successful turnaround strategy & expansion of Project and trading division actives
in growth areas of Qatar & African markets. Presently leading a team of 150 motivated work force comprising
of Project engineers, Construction Mangers, Site Engineers, safety officers, Foreman and skilled technicians.
Projects involved are:

 Electrical Equipment Installation, Cabling laying & Termination, Earthing,lighting,lightning protection
Works for GIS S/S

 220/66/11kV Ahin Khalid Super S/S :Under Phase X Kahramaa package – Customer: Hyosung
 66/11kV Alwadi West S/S g - Under Ph X Kahramaa package – Customer: Hyosung
 220/66/11kV Naeeja Super S/S Upgrade- Under Ph X Kahramaa package – Customer: Hyosung
 220 Kv Shunt reactor installation – Bani Hajir - Under Ph X Kahramaa – Customer: Hyosung
 132/11kV Logistic Village – Under Phase X Kahramaa package – Customer: L&T
 220/66/11kV Doha Industrial Super – Under Phase X Kahramaa package – Customer:L&T

 220/66/11kV Duhail S/S – Under Phase X Kahramaa package – Customer :L&T
 66/11 KV Mesameer S/S – Phase XI- Kahramaa Package – Customer : L&T – Under execution
 Supply & Fixing of Kahramaa approved HV Cable cleats to Various Main contractors
 HV cable laying & Installation of cable supports

 Passive Fire cable coating works with Manufacturer at Following oil & Gas Installations

 Oryx GTL plant – Ras laffan- Qatar
 QAFACO – Qatar Fertilizer Company- Qatar
 QXY – Qatar

June 2008 to Aug 2012 – Country Manager: M3 Powertech, Kuwait

Responsible for setting up project division for Electrical Equipment installation & other allied electrical
services in Oil & Gas segment.

Role also includes market research; identify growth sectors, business development, tendering, order
procurement and successful execution and client management. Led a team of 100+ motivated work force
comprising Project Manager, Construction Mangers, Site Engineers, Safety officers Foreman and skilled
technicians. Major Projects involved during the tenure are

 KOC – Kuwait oil Company: EW/SW Project Phase 1&2 Abdally, North Kuwait – Complete electrical
installation works for effluent waste & Sewage Water treatment plant. Main contractor Petrofac -Sub
Contractor :L&T

 Electrical Equipment Installation, cabling & Termination,Earthing and Lighting and lightning
protection works for GIS S/S

 Wafra 132KV/11KV S/S -Under Ministry of Electricity & Water- Main Contractor L&T
 Shuaiba 132KV/11KV S/S- Under Ministry of Electricity & Water- Main Contractor L&T

Feb 2003 to April 2008 – General Manager: Powertech Constructions Pvt ltd,
Chennai

Overall responsible for tendering, Order booking, planning and Execution of projects & responsible for
operational profits. Projects involved during the tenure are:

 All electrical installations for Manali Petrochemicals Ltd Madras, including 110kV switchyard, 3.3kV
boards, LT boards, capacitor banks, etc.

 Total electrification including 11KV DG sets,transformers,PLC systems and high mast lighting
container depot at Bangalore

 Electrical distribution system for 3 MW wind farm for NEPC in southern tamilnadu
 TNEB Projects for 110kV XLPE, Copper cables laying, joints and termination and cable testing &

commissioning works between
o Anna Nagar – Korattur
o K.K. Nagar – Guindy
o Velachery – Guindy

 Site survey, Preparation of route drawing, design, tension calculation, Technical supervision for
laying and jointing works etc.

 132 kV Substation works for Amara raja batteries, Tirupathi
 230 kV Substation works in Karnataka
 Industrial Electrification works for Chemplast for their Mettur and Cuddalore plants.
 Various Building electrification works for Infosys Pvt Ltd & L&T InfoTech, in Chennai & Bangalore

Feb 2001 to Jan 2003 – Regional Head- National Sales: General Cable India, a
Fortune 500 Company, and India

Overall responsible for Growing Sales from scratch to US $ 50mn in a year and achieve top line growth of
Power cables. Role involves Preparation of extensive market research, Demand estimation across segments,
and Preparation of strategic plan document for brand promotion, analyses competition & business
development.

 Sales volume rose to INR 200 million within a year
 Generated enquires worth INR 5000 million for EHV, High temp conductors, specialty cables.
 Established Fresh sales team & large dealer/agent network across India
 Arranged approvals from Test houses and assisted in trail production.
 Succefully Managed Major accounts like Power grid corporation, Power Utilities, Descom’s ,EPC’s

& project Management of EHV and Specialty conductor (HTLS) turnkey contracts
 Succefully executed Turnkey 66 KV cabling contracts worth INR120 million for a contractor using

cables from Phelps dodge Thailand
 Obtained order for 66KV cables for Thailand unit (PDIC)

March 1990 to Jan 2001 – Dy General Manager- Southern India – NICCO
Corporation Ltd - Cable Sales& Turnkey Cabling contracts, Bangalore/Chennai &
Calcutta

Overall Responsibility of Southern region for marketing and sales of Medium Voltage , High Voltage and
Extra high voltage Power Cables and Speciality cables ( Rubber and E-beam cables) & project management
of EHV cabling contracts. Responsible for regions operational profit.

 Responsible for procurement of orders from Utilities & private customers of LV, MV power

and control cables.
 Project Management for successful execution & completion of EHV Turnkey Cable

contracts.
 Responsible for market creation through Technical selling, Account/Relationship

management for major accounts in sectors like power utilities & Distribution companies, major

EPC’s like Siemens,ABB,Alstom,L&T,

 Sales Increased by 200% to INR 1200million during my tenure in southern region ( 1996-

2000)

 Engineered business strategy culminating in orders for Special Electron Beam cross linked

cables for major sectors like railways, defines, steel plants, buildings, ports, mining, cement plants

etc.

 Handled Major clients like ICF,Defense,wind power segments with 80% market share
 Procured first ever Major 66 KV turnkey contracts formKPTCL
 Executed large HV power cables under ADB/world bank funded projects of southern utilities

 Implemented ISO for all southern regional offices
 Obtained certification from CPRI for HV and E-beam cables
 Developed technical marketing team to stand ahead of competition

 Key member of strategy planning group. characteristics of
 Reduced cost of HT cables by suggesting Hollow fillies & PE sheathing
 Developed cost effective & easy to use consumer test kit to demonstrate

conventional polymers like PVC Vs Ebeam cross linked polymers

March 1986 –Feb1990 – Sr Project Engineer- Genelec Ltd, Chennai

Responsible for Project execution & successful completion of electrical works, including arranging
transportation of over dimensional consignment Generating transformers from Chennai Port to NTPC site
and assist in testing & commissioning works. Projects involved during this tenure are:

 Successfully installed 10 nos 200 MVA Generating transformer erection & 63 MVAR
reactors for NTPC at Ramagundam

 Project in charge for 6 nos 110/25 KV traction substations for southern &SCl Railways in
India.

 Project engineer for 220/11 KV substation at KIOCL,karnataka
 Electrical Equipment installation works pellet plant at KIOCL
 Power factor improvement scheme at SAIL, Badravathi
 33/11 KV substation for south central railway at Hyderabad.
 132/33Kv substation at Nuclear fuel complex
 11 Kv distribution stations & lighting works

Sept 1984 –March 1986 – Project Engineer- Genelec Ltd, Chennai

Responsible for tendering, estimation, preparation of technical specifications, drawings and offers for clients
Planning and execution including supervision of subcontractors, progress monitoring and co-ordination and
worked as executive assistant for Regional manager for;

 400/200kV substation for National Thermal Power Corporation, Ramagundam & Munirabad
 132 KV switchyard for Nuclear fuel complex, AP
 110/25 Kv traction substation tenders for Indian railways
 132kV substation including 10 MVA transformers, 6.6kV switchgear, cables, etc. for Andhra

Cements, AP
 132kV substation and 11kV switchgear including 15 MVA transformers for VBC Ferro Alloys,

Hyderabad.
 220 KV switchyard at KIOCL
 110kV, 21 MVA substation, 17 nos. 6.6kV vacuum control panels and LT switchgear for Rajashree

Cements, Gulbarga, Karnataka.

SANKARANARAYANAN RAGHUNATHAN -SR PROJECT MANAGER
PROFILE
Bachelors Degree in Electrical Engineering with 31 years of experience in multi-disciplined areas of
Transmission, Distribution of electrical systems with work experience in project planning, design
review, supervision of erection, testing & commissioning of substations up to 400kV including Project
Management and implementation of HSEQ.

EXPERIENCE & SKILLS
2016-Present: Texas Powertech WLL, Doha. Qatar.
Deputy General Manager –Responsible for Electrical Contracts execution & QHSE Management.
2014-2015: Powertech Constructions Private Limited, Chennai, India.
Executive Director –Responsible for electrical turnkey contracts of the company from concept to
commissioning, including AC electrification of Solar Projects,

2001-2013: Mott MacDonald, Abu Dhabi, UAE

Lead Resident Engineer- (Sub stations up to 400 kV)

1999-2000: PB Power, Chennai, India
Business Development Manager-Business Development and providing Management Services to UAE,
UK, and South Africa Offices.
1996-1998: Kennedy & Donkin Middle East Ltd, Dubai, UAE
Resident Engineer- (Sub stations up to 400 kV)
1994-1995: PRV Constructions, Chennai, India
Project Manager- Business Development, Project Management for wind farm projects and outdoor
sub stations.
1992-1994: Parry Engineering & Exports Ltd, Chennai, India
Senior Executive- Responsible for the electrical turnkey contracts of the company from concept to
commissioning.
1989-1991: Plant Constructions Private, Chennai, India
Joint Manager- Business Development, tendering, planning and installation of various electrical
systems.
1985-1988: Genelec Limited, Chennai, India
Project Engineer- Planning and execution of 132 kV sub stations for Railways and Cement factory.

SUMMARY OF SELECTED PROJECTS
SOLAR POWER PROJECTS:
Electrification (AC side) of Solar Power Plants of approx. 60MW at various locations in Tamil Nadu,
India.
ADWEA/TRANSCO/AADC, Al Ain region - various substation Projects up to 400kV:

Page 1 of 2











































Sharavathi Generating Station, jog. (Generating Station) - 11/220Kv, 1035MW.

(HYDRO POWER STATION) 400/220kV
400/220kV
Udumalpet Receiving station (Tamil nadu) - 400/220kV
220/110/66/11kv.
Madurai Receiving station (Tamil nadu) - 220/110/33/11kv.
220/110/66/11kv.
Trichy Receiving station (Tamil nadu) - 220/110/33/11kv.
220/110/33/11kv.
Main Receiving Station, Shimoga. - 220/110/33/11kv.
220/110/33/11kv.
Kemar Receiving Station, Mangalore. - 220/110/11kv.
-75 stations (approx.)
Hassan Receiving Station, Hassan. - -75 stations (approx.)

Chikodi Receiving Station, Chikodi. -

Gadag Receiving Station, Gadag. -

Mahalingapur Receiving Station, Bagalkot -

Shahabad Receiving Station, Kapnoor Receiving station, Gulbarga. -

Humnabad Receiving Station, Bidar -

110kv stations (Hassan, Shimoga, Belgaum, Gadag, Udupi, Raichur, Gulbarga)

33kv stations (Hassan, Shimoga, Belgaum, Gadag, Udupi, Raichur, Gulbarga)

Technical Qualification: : ARULMIGU KALLALAGAR POLYTECHNIC
INSTITUTION NAME COLLEGE. Madurai-625106, Tamilnadu.

Percentage : 78.83% (First class with honors)
Course : D.E.E.E. (Diploma Electrical and Electronics Engg.,)
Period : 1999-2002

Software Exposure : Operating system: XP and Windows 7. RTUtill.8 (scada)
PERSONAL DETAILS: Packages: MS Office, AutoCAD 2008.

D.O.B : 07.06.1984.
: Male.
Gender : Tamil, English, Kannada

Language known : H8129471 (valid up to 28-12-2019)
: TN6420090001474
IDENTITY CARD DETAILS : CBOPS2930N
Passport Number
Driving License Number
PAN CARD Number

ANAND. M

Middle level assignments in Sr Engineer –Projects & Procurement with a leading organization of repute,
preferably in Chennai / Bangalore

PROFILE SUMMARY

 B.E. (EEE) with nearly 8 years of experience in Project Execution (Electrical)
 Possess sound knowledge of electrical wiring & windings works and electrical layout designing for substation

project/industries
 Hands-on experience in identifying faults and replacing parts in electrical equipments like Motor drives &other

home appliances
 Competent in handling entire electrical testing activities involving resource planning, in-process inspection

and co-ordination with internal / external departments
 Proven skills in project management, site execution and cost control for various projects like Electrification

Work at Springfeel Polyurethane Foams Ltd.-Pudupakkam, HT Cable Laying Work at Nokia SEZ Telecom
Park-Sriperumbudur and others
 Capable of creating plans, layouts & working drawings as per design requirement to ensure execution of
projects within time and budgeted parameters
 A keen communicator with honed interpersonal, problem solving and analytical abilities

CORE COMPETENCIES

 Designing the electrical transmission &distribution systems, handling the sizing of electrical equipment,
earthing & lighting layouts and equipment layouts

 Ensuring safe management and identifying the process for all engineering activities undertaken by the
Engineering Department

 Inspecting field sites to observe & evaluate facilities & structures and to collect field survey data &
measurements

 Ascertaining compliance to safety, economical and technical assessments to secure the best results
 Monitoring and executing projects with respect to budgeted cost, demand forecasts & time over-runs to

ensure timely execution
 Working on succession planning of the workforce & shift management activities, appraising the member’s

performance and providing feedback
 Conducting cost benefit analysis of the projects including feasibility studies, assessment of the

requirements, interface and commissioning

ORGANIZATIONAL EXPERIENCE

Aug’11 – Nov’14 M/s Texas Powertech W.L.L., Doha, Qatar as Sr Project Engineer
May’08 – Aug’11 M/sPowertech Constructions Pvt. Ltd., Chennai as Project Engineer

Role across the tenure:
 Developed schedule/bar chart for the supply materials & erection work

 Coordinated with the team members on site to monitor the work executed and report the same to the
Higher Authorities / Management

 Prepared:
o As-built and plant drawings
o Reports of procured materials
o Bills as per site measurement
o Offers &tender documents of the projects

 Executed electrical works like GIS Installation, Transformer Installation, Panel Installation, Tray, Cabling,
Termination, Lighting, Earthing, etc.

Highlights:
 Initiated Project Tracking Format to conclude Substation projects on time and within budget
 Faced and overcame key challenges like Fastrack Project Completion, planning and completion of project

in the estimated cost and duration
 Promoted to abroad Operations to execute the erection activity at Doha, Qatar
 Performed troubleshooting or problem solving exercise for Oil Filtration Equipmentthat helped in

Performing the Site Execution Activity
 Received appreciation letters and increment from the company in the year of 2009for timely & effective

execution of projects
IT SKILLS

 Conversant with MS Office (Word, PowerPoint,Excel &Outlook) and Internet Applications
ACADEMIC DETAILS

2008 B.E. (EEE) from Sri Sai Ram Engineering College, Tambaram, Anna University with 69%
2005 Diploma in Electrical and Electronics Engineering from Elumalai Polytechnic College, Villupuram,
Directorate of Technical Education (DOTE) with 78.71%
2002 Class X from Thiru Kamaraj Municipal Hr. Sec School, Villupuram, State Board with 69%

Other Course: (Technical & Software)
2010 Electrical Design from Dhanush Computer Service Pvt. Ltd., Hyderabad.
2014 Primavera P6 Management and planning Software Course from Credo Systemz., Velacherry. Chennai

CERTIFICATION / LICENCE

 Tamil Nadu Competency Certificate (C License) – C 45104

PERSONAL DETAILS

Date of Birth: 25th November, 1985

Languages Known: English &Tamil

For other details, please refer Annexure:

ANNEXURE

PROJECTS UNDERTAKEN

At M/s Texas Powertech W.L.L., Doha, Qatar

 33/11kV GIS Substation Work for the Project of Electrical Telecom Utilities for Support Service Area Phase I
& II and West End Extension, RasLaffan, Qatar (Substation -1,2 &3 through L&T)

 132/11kV Kahramaa Phase-X, Substation at Logistics Village (through L&T)
 132/11kV Kahramaa Phase-X, Substation at Al Kahranaa (through L&T)
 220/132/66/11kV Kahramaa Phase-X, Substation at Doha Industrial Super (through L&T)
 11kV Modification Work at Qatalum(through ABB)
 220/66/11kV Kahramaa Phase-X Substations at Duhail(through L&T)
 66/11kV Kahramaa Phase-XI Substations at Mesaimeer West (through L&T)
 132/11kV Kahramaa Phase-X Substations at Umm Salal Central (through L&T)

At M/s Powertech Constructions Pvt. Ltd., Chennai

 Electrification Work at Larsen & Toubro Ltd., Manapakkam
 Industrial Electrification Work at Chemplast Sanmar Limited, Cuddalore
 HT Cable Laying Work at Nokia SEZ Telecom Park, Sriperumbudur
 Industrial Electrification Work at Sanmar Speciality Chemicals Limited, Hosur
 Industrial Electrification Work at Sical Distriparks Limited, Tuticorin
 Electrification Work at Moser Baer India Limited, Sriperumbudur
 Electrification Work at Rajiv Gandhi National Relief and Welfare Trust, Karaikal
 Electrification Work at Springfeel Polyurethane Foams Ltd., Pudupakkam
 Electrification Work at Win Wind Power Energy Pvt. Ltd., Periapalayam
 Electrical Installation Work for Taj Fishermans Cove, Kovalam
 Dismantling & Re-erection of 500 kVA Transformer at Mohan Breweries & Distilleries Ltd., Chengalpet
 Electrification Work at Akshaya Pvt. Ltd., Urapakkam

Sathyanesan Nesaraj

E-mail : [email protected]

KEY Highlights of Project Exposure:

Ability to take initiative, influence events and get things done.
Self-starter with good communication skills.
Ability to meet deadline-base target.
Good knowledge of English, Hindi & Tamil, Malayalam
Confident of making significant contribution towards the success of organization

EDUCATIONAL PROFILE:

Plus Tow Passed (Higher Secondary Education)
Diploma in M.E
Diploma in D.T.P Passed.

 PROFESSIONAL EXPERIENCE : (13+ Years Exp ).

 TEXAS POWERTECH WLL (From May -16 to Till Date )

 Working as a senior Electrical Supervisor.

 Involved in execution of GIS Substation projects (GIS Intallation,Power Transformers
Constructional Power & control panel wiring works).

 Executing various GIS, 11kV Switchgears Installation,LVAC Panels installation at various
ongoing GIS Substation project sites.

 Training of Skilled Technicians for GIS & Power transformer installation and maintenance
works.

 Siemens Ltd, GURGAON.

Erection of GIS substation HAMIRPUR(H.P) (400kv/220kv) for power Grid & TATA
KALINGANAGER(Orissa) (220kv/132kv/33kv) for TSL &TATA JODA (220kv/33kv) for TSL &
MANASER(H.R) (400kv/220kv) for power Grid & BAGHPATH ( U.P) (400kV /220 kV) for power
Grid.

 Nov 2013 –TO- Till now G.I.S SUPERVISOR

GIS & GIB erection ,

 Co ordinations with client.

1 of 4

 Dealing with client regarding site progress.

 ELSIE, SA, SWITERLAND

Erection of GIS substation 400kV /220 kV for power Grid.

 Jan 2013 – Nov 2013 G.I.S SUPERVISOR

GIS & GIB erection ,

 Co ordinations with client.

 Dealing with client regarding site progress

 Siemens Ltd, Bangalore.

Erection of GIS substation Yelahanka 400k/220 kV (12 bays) for power Grid.

 Sep 2011 – Dec 2012 G.I.S SUPERVISOR

GIS & GIB erection ,

 Co ordinations with client.

 Dealing with client regarding site progress

 ABB Rathnagiri(Mumbai).

 Jan2011 to 2011 Aug. G.I.S SUPERVISOR

 Erection of 400kV GIS substation (12 Bays) for JSW RATHNAGIRI.

 GIS & GIB erection

 Execution of the substation works as per the time schedule

 MTPS -1x600MW Mettur dam, TAMILNADU
 AREVA T&D INDIA

2010 May to Dec. GIS SUPERVISOR

Execution of 220kV / 400 kV GIS substation

GIS &GIB erection & installation
 Erection of Electrical Equipment Parts

Execution of the substation works as per the time schedule