Modular Systems Contd..
Assembly Area
All modular frames are aligned as per the Modular coordination drawings.
MEP Services are Assembled
and installed as per the
Modular installation drawings
151
Modular Systems Contd..
Packing and Transportation
Ready to Dispatch Module
152
Modular Systems Contd.. On site QA/QC
Our Specialized team complete the installation on-site.
Off-site & On-site QA/QC Inspections QA/QC team inspects final hanging and installation of
Modules on-site. Final Testing and commission of
modules will be done at site
Off site QA/QC
Our expert QA/QC Team inspects the completed MEP
modules within the factory and confirms that the
product meets the quality and fulfill the requirement
of the client before dispatch.
153
Modular Systems Contd.. Tower-1
Current Projects Tower-2
Project Name : The Address Harbour Point Tower 2
Location : Creek Harbour, Dubai
Scope of work : We Fab and Supply 678 Nos. of Multi-Trade modular Systems
Tower 2 : Nov 2019 to Aug 2021
Project Name : The Address Harbour Point Tower 1
Location : Creek Harbour, Dubai
154 Scope of work : We Fab and Supply 576 Nos. of Multi-Trade modular Systems
Tower 1 : Nov 2019 to Aug 2021
Modular Systems Contd.. Under Construction
Current Projects
Project Name : P42-03, (Dubai CommerCity) Main Package, Business Cluster Works – Phase-1
Location : Umm Ramool, Dubai
B1 Building : Oct 2021 to Present (Dec 2021)
Scope of work : We Fab and Supply 171 Nos. of Multi-Trade modular Systems
B3 Building : Oct 2021 to Present (Dec 2021)
155 Scope of work : We Fab and Supply 168 Nos. of Multi-Trade modular Systems
10 Quality Assurance / Quality Control
156
11 Quality Awards
157
Quality Awards contd..
158
Quality Awards contd..
159
Quality Awards contd..
160
12 Health & Safety
Health and Safety of all our employees and everyone else affected by our activities is of paramount importance
to us and it is an integral part of our business and ranks equally with all our activities of the organization.
IEMS IS COMMITTED TO:
Maintain a first class safety culture and strive to progress further.
The Risk Management process and ensuring consistency with the nature of the workplace and risk
assessment.
Meeting or exceeding applicable UAE Rules, Codes of Practice, Standards and Client’s Policies and Standards.
Ensuring continuous improvement in Health & Safety objectives and targets.
Encouraging and supporting Employees, Contractors and Visitors contributions to the improvement of
Health & Safety.
IEMS is committed to provide a safe and healthy workplace by the implementation of this Policy. Every
Engineer/Manager is expected to take responsibility and shall be accountable for implementing this Policy
within his area of responsibility.
Safety Awareness & Motivation:
Safety training forms part of the Company’s general training program. This training will include the requirement
of the existing relevant Statutory Regulations, Approved Code of Practices, Guidance Notes of British Standards
and IEMS Procedures. Site Safety Induction Training and Weekly Tool Box training is given to the workers as per
the safety plan for the individual projects. All Supervisors, Foremen & Charge hands will conduct tool box talks
every week to their respective work force as per the topic given by the Safety Officer. A record of Tool Box
meetings is maintained by the Safety Officer and a copy is sent weekly to the Head Office.
The Safety Manager along with the entire safety team have a weekly 3 hour continued teaching programme in
which a relevant safety topic is taught to his colleagues by each safety team member in turn.
IEMS Management is committed to practice a
161 “Zero Accident Policy”
throughout its operations in all projects
13 Company Assets
3 nos. Labour Camps with a Capacity to accommodate more than 2000 Workforce, complete with
Central Gas System, Kitchen & Dining, Worker's Sick Room & Parking for Buses.
Full-fledged Modular Factory to assemble pre-fabricated MEP modular frames.
Offices
Warehouses
Design Office with State-of-the-Art Technology
Latest Office Automation such as Computers, Software, Large format Plotters, Printers & Photocopiers
etc.
Fleet of Buses & Other Commercial Vehicles
Tools & Equipment
162
14 Office Location
163