The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by NUR FARAHYANA, 2022-07-29 10:45:55

PPK2 Mekanikal Unit - Oct 2022

Progress Report Ebook

Gambar Projek Terkini
(PIC:PJ Franky)

Tajuk Projek :

DAIF SABAH (2020) – GANTIAN 13 UNIT BILIK DARJAH, 4 UNIT
RUMAH GURU, BANGUNAN PENTADBIRAN DAN MAKMAL
SAINS DI SK. TIBABAR, SABAH (REKA DAN BINA)

KONTROKTOR : JURUBINA UTAMA SDN BHD
NO. KONTRAK :
TARIKH MILIK TAPAK : 13hb. MEI, 2022
TARIKH SIAP ASAL : 06hb. JUN, 2024
EXTENSION OF TIME (EOT) : (1).

(2).

TARIKH SIAP BAHARU : 06hb. JUN, 2024

HARGA KONTRAK ASAL : RM19,878,888.00

KEMAJUAN ( ) : JADUAL = % SEBENAR = %

Bil Mechanical Works =(0%)

1. SISTEM PENYAMAN UDARA DAN PENGUDARAAN MEKANIKAL

2. SISTEM PENCEGAH KEBAKARAN

3. SISTEM PERPAIPAN AIR SEJUK DALAMAN & PERPAIPAN SANITARI

TEMPOH SIAP : 111 MINGGU

KAEDAH PELAKSANAAN : REKA & BINA

PEGAWAI PENGUASA : Ir. JASMIE BIN WAHAB

PELANGGAN : KEM. PENDIDIKAN MALAYSIA

PERUNDING MEKANIKAL :

HODT(M) : Ir. Ts. Hj. MOHAMAD ZAINAL BIN BAKAR

WPP(M) : Ir. ABDULDAN BIN ADTONG

KOS KONTRAK MEKANIKAL : RM

STATUS PROJEK TERKINI
- Reka & Bina
- Kontraktor Utama telah dilantik
- Lawatan Pemeriksaan Harta pelanggan telah dilaksanakan
(1). Sistem Penyaman Udara Dan Pengudaraan Mekanikal
(2). Sistem Pencegah Kebakaran
(3). 'Sistem Perpaipan Air Sejuk Dalaman & Perpaipan Sanitari

Gambar Projek Terkini
(PIC:PJ Franky)

Tajuk Projek :

PENJARA LAHAD DATU, SABAH. (REKA & BINA)

KONTRAKTOR : JAHSIA SDN. BHD.
NO KONTRAK : JKR/IP/CKUB/130/2017
TARIKH MILIK TAPAK : 16 NOVEMBER 2017
TARIKH SIAP ASAL : 15 NOVEMBER 2020

TARIKH SIAP BAHARU EOT 1: 05 JANUARI 2021
HARGA KONTRAK ASAL EOT 2: 09 MAC 2021
HARGA KONTRAK SEMASA EOT 3: 21 JULAI 2021
KEMAJUAN KERJA – EOT 4: 19 SEPTEMBER 2021
EOT 5: 24 FEB 2022
NSC MEKANIKAL
SKOP KERJA MEKANIKAL : EOT 6: 1 MAC 2022
: RM 182, 000, 000. 00
TEMPOH SIAP : RM 176 713 360. 00
KAEDAH PERLAKSANAAN
P. PENGUASA : KUARTERS 80%
PELANGGAN PPROPER PRISON 68%
PERUNDING M&E ( BASE ON financial)

HOPT :-
WPP(M) : INTERNAL COLD WATER SYSTEM
KOS KONTRAK MEKANIKAL
INTERNAL SANITARY SYSTEM,
FIRE PROTECTION SYSTEM,
AIR CONDITIONING SYSTEM,
: 36 BULAN

: REKA & BINA

: Ir. JASNI BIN WAHAB

: KDN/ JABATAN PENJARA MALAYSIA

: NASMIE ENGINEERS SDN.BHD
(PROPER PRISON)

: PERUNDING JAYA REKA SDN.BHD
(KUARTERS)

: CAWANGAN KERJA KESELAMATAN

:

: 1. Kuarters ( Rm 3,098,052.00)
2. Proper Prison (Rm 8,666,244.4)

Gambar Projek Terkini
(PIC:PJ Jomot)

STATUS PROJEK TERKINI:
N/A

Tajuk Projek :

KERJA-KERJA PEMBAIKAN STRUKTUR DAN
PENYELENGGARAAN BANGUNAN SERTA LAIN-LAIN
KERJA BERKAITAN DI SMK BENONI PAPAR, SABAH

KONTRAKTOR : NORFILA ENTERPRISE
NO KONTRAK : JKR/IP/CSFB/17/2020
TARIKH MILIK TAPAK : 14 MAY 2021
TARIKH SIAP ASAL : 23 DISEMBER 2021

TARIKH SIAP BAHARU E.O.T 21 Feb 2022
HARGA KONTRAK ASAL : 23 APRIL 2022
KEMAJUAN KERJA – : RM 1,318,815.00
NSC MEKANIKAL : 100%
SKOP KERJA MEKANIKAL :-
: INTERNAL COLD WATER SYSTEM
TEMPOH SIAP
KAEDAH PERLAKSANAAN INTERNAL SANITARY SYSTEM,
P. PENGUASA SSTP (PAM),
PELANGGAN : 32 MINGGU
PERUNDING M&E
: KONVENSIONAL DALAMAN
HOPT
WPP(M) : JURUTERA AWAM PENGUASA
KOS KONTRAK MEKANIKAL
STATUS PROJEK TERKINI: : KDN/ JABATAN PENJARA MALAYSIA
N/A
: NASMIE ENGINEERS SDN.BHD
(PROPER PRISON)

: PERUNDING JAYA REKA SDN.BHD
(KUARTERS)

: PENGARAH CAWANGAN SENGGARA(CSFB)

:

: RM 205,660.00

Gambar Projek Terkini
(PIC:PJ Jomot)

SSTP Pump Replacement

Tajuk Projek :

JPKK - PEMBINAAN TAMBAHAN BANGUNAN AKADEMIK
DAN FASILITI LUARBAGI KAMPUS KOLEJ KOMUNITI
TAMBUNAN, SABAH (REKA & BINA)

KONTRAKTOR : HARTAMAS BORNEO
NO KONTRAK
TARIKH MILIK TAPAK : JKR/IP/CKUB/07/2021
TARIKH SIAP ASAL
: 31 DISEMBER 2020

: 04 JANUARI 2023
EOT 1: 05 MAC 2023

TARIKH SIAP BAHARU : 05 MAC 2023
HARGA KONTRAK ASAL : RM 19,650,000.00
KEMAJUAN KERJA – :
NSC MEKANIKAL : 0%
SKOP KERJA MEKANIKAL : 1. AIR-CONDITIONING AND VENTILATION

TEMPOH SIAP 2. INTERNAL COLD WATER SYSTEM
KAEDAH PERLAKSANAAN 3. INTERNAL SANITARY SYSTEM
P. PENGUASA 4. FIRE FITING
PELANGGAN 5. KITCHEN EQUIPMENT
PERUNDING M&E 6. LIQUEFIED PETROLEUM GAS
7. COMPRESSESD AIR
: 26 BULAN

: REKA & BINA

: PASUKAN PROJEK KHAS 2, JKR MALAYSIA

: KEMENTERIAN PENDIDIKAN TINGGI

: ATL KONSULT SDN.BHD.

HODT :
:
WPP(M) :
: RM 1,655,029.00
KOS KONTRAK MEKANIKAL

STATUS PROJEK TERKINI:
N/A

Gambar Projek Terkini
(PIC:PJ Jomot)

Tajuk Projek :

KERJA-KERJA PEMBAIKAN STRUKTUR DAN

PENYELENGGARAAN BANGUNAN SERTA LAIN-LAIN

KERJA BERKAITAN DI SMK NABAWAN, NABAWAN SABAH

KONTRAKTOR : HARKAT CONSTRUCTION
NO KONTRAK : JKR/IP/CSFB/16/2020
TARIKH MILIK TAPAK : 03 MEI 2021
TARIKH SIAP ASAL : 12 DISEMBER 2021

E.O.T.1. FEBRUARY 2022
E.O.T.2. 5 MAC 2022

TARIKH SIAP BAHARU : PROSES PERMOHONAN E.O.T
HARGA KONTRAK ASAL : RM 1,500,000.00
KEMAJUAN KERJA – : 100%
NSC MEKANIKAL : 100%
SKOP KERJA MEKANIKAL : 1. AIR-CONDITIONING AND VENTILATION

TEMPOH SIAP 2. INTERNAL COLD WATER SYSTEM
KAEDAH PERLAKSANAAN : 32 MINGGU
P. PENGUASA
: KONVENSIONAL DALAMAN
PELANGGAN
PERUNDING M&E : PENGARAH PEMBINAAN, PASUKAN PROJEK
KHAS 2, JKR

: KEMENTERIAN PELAJARAN MALAYSIA

:-

HOPT :
: CSFB
WPP(M) :
: RM 115,260.00
KOS KONTRAK MEKANIKAL

STATUS PROJEK TERKINI:
N/A

Gambar Projek Terkini
(PIC:PJ Jomot)

Tajuk Projek :

KERJA-KERJA PENYELENGGARAAN SEKOLAH-SEKOLAH DI BAWAH
SELIAAN BAHAGIAN PENGURUSAN SEKOLAH BERASRAMA PENUH
BAGI SEKOLAH MENENGAH SAINS LAHAD DATU, SABAH

KONTRAKTOR : SHAFIE’S X-COM ENTERPRISE
NO KONTRAK
TARIKH MILIK TAPAK : JKR/IP/CSFB/31/2021
TARIKH SIAP ASAL
: 11 JANUARI 2021

: 27 JUN 2021
EOT 1: 3 NOVEMBER 2021

TARIKH SIAP BAHARU :
HARGA KONTRAK ASAL : RM 1,351,970.00
KEMAJUAN KERJA – : 100%
NSC MEKANIKAL : 100%
SKOP KERJA MEKANIKAL : 1. AIR-CONDITIONING AND VENTILATION

TEMPOH SIAP 2. TRANSFER PUMP
KAEDAH PERLAKSANAAN : 24 MINGGU
P. PENGUASA
: KONVENSIONAL DALAMAN
PELANGGAN
PERUNDING M&E : PENGARAH PEMBINAAN, PASUKAN PROJEK
KHAS 2, JKR

: KEMENTERIAN PENDIDIKAN MALAYSIA

:-

HOPT :
: CSFB
WPP(M) :
: RM 118,200.00
KOS KONTRAK MEKANIKAL
STATUS PROJEK TERKINI:
N/A

Gambar Projek Terkini
(PIC:PJ Jomot)

Transfer Pump Installation

Tajuk Projek :

PEMBINAAN MAKMAL KOMPUTER SABAH (MENYIAPKAN
BAKI KERJA BAGI 37 MAKMAL KOMPUTER) ZON 3

KONTRAKTOR : SYARIKAT GVC INDAH SDN.BHD
NO KONTRAK : JKR/IP/CKUB/98/2020
TARIKH MILIK TAPAK : 15 MAC 2021
TARIKH SIAP ASAL : 14 SEPTEMBER 2021

TARIKH SIAP BAHARU (ZON 3)
HARGA KONTRAK ASAL 1. SK BUANG SAYANG KINABTANGAN (2B)
KEMAJUAN KERJA – 2. SK SRI DARUN LAHAD DATU (2B)
NSC MEKANIKAL 3. SK TANJUNG LABIAN LAHAD DATU (2A)
SKOP KERJA MEKANIKAL 4. SK BALUNG TAWAU (2A)
TEMPOH SIAP 5. SK KEM KABOTA TAWAU (3A)
KAEDAH PERLAKSANAAN 6. SK MEROTAII BESAR (3A)
P. PENGUASA :
PELANGGAN : RM 260,596.00 (ZON 3)
PERUNDING M&E :
: 100%
: 1. AIR-CONDITIONING AND VENTILATION
2. TRANSFER PUMP
:

: KONVENSIONAL DALAMAN

:

: KEMENTERIAN PENDIDIKAN MALAYSIA

:-

HOPT :
:
WPP(M) :
: RM 260,596.00
KOS KONTRAK MEKANIKAL

STATUS PROJEK TERKINI:
N/A

Gambar Projek Terkini
(PIC:PJ Jomot)

Tajuk Projek :

PEMBINAAN RUMAH KELUARGA ANGKATAN
TENTERA (RKAT) ANGKATAN TUGAS BERSAMA 2
DI KEM KUKUSAN TAWAU

KONTRAKTOR : BUMI HANDAL SDN.BHD
NO KONTRAK : JKR/IP/CKUB/189/2021
TARIKH MILIK TAPAK : 16 SEPTEMBER 2021
TARIKH SIAP ASAL : 7 JULAI 2024

TARIKH SIAP BAHARU :
HARGA KONTRAK ASAL : RM 77, 777, 222.00
KEMAJUAN KERJA – :
NSC MEKANIKAL : O%
SKOP KERJA MEKANIKAL : 1. AIR-CONDITIONING AND VENTILATION

TEMPOH SIAP 2. SISTEM PERPAIPAN SANITARI
KAEDAH PERLAKSANAAN 3. SISTEM BEKALAN AIR DALAMAN
P. PENGUASA 4. SISTEM PENCEGAH KEBAKARAN
PELANGGAN : 148 MINGGU
PERUNDING M&E
: KONVENSIONAL PERUNDING

: Ir. JASMI BIN WAHAB

: KEMENTERIAN PERTAHANAN MALAYSIA

: JURUTERA PERUNDING INTELEK SDN. BHD

HOPT :
:
WPP(M) :
:
KOS KONTRAK MEKANIKAL

STATUS PROJEK TERKINI:
N/A

Gambar Projek Terkini
(PIC:PJ Jomot)

Tajuk Projek :

KERJA-KERJA PEMBAIKAN STRUKTUR DAN
PENYELENGGARAAN BANGUNAN SERTA LAIN-LAIN
KERJA BERKAITAN DI SMK LIKAS, KOTA KINABALU

KONTRAKTOR : JULANG JUTA SDN.BHD
NO KONTRAK :
TARIKH MILIK TAPAK : 15 OKTOBER 2021
TARIKH SIAP ASAL : 12 MAY 2022

TARIKH SIAP BAHARU :
HARGA KONTRAK ASAL : RM 1, 299, 900. 00
KEMAJUAN KERJA – : 52.5%
NSC MEKANIKAL : 58%
SKOP KERJA MEKANIKAL : 1. AIR-CONDITIONING AND VENTILATION

TEMPOH SIAP : 30 MINGGU

KAEDAH PERLAKSANAAN : KONVENSIONAL DALAMAN

P. PENGUASA :

PELANGGAN : KEMENTERIAN PENDIDIKAN MALAYSIA

PERUNDING M&E :

HOPT :
:
WPP(M) :
: RM 119,200.00
KOS KONTRAK MEKANIKAL

STATUS PROJEK TERKINI:
N/A

Gambar Projek Terkini
(PIC:PJ Jomot)

Tajuk Projek : WAWASAN NEGARA

NAIKTARAF KEM
KUNDASANG, SABAH

KONTRAKTOR : UNITED EC BUILDERS
NO KONTRAK :
TARIKH MILIK TAPAK : 1 MAC 2022
TARIKH SIAP ASAL : 30 OKTOBER 2022

TARIKH SIAP BAHARU :
HARGA KONTRAK ASAL : RM 2,153,845.00
KEMAJUAN KERJA – : 0%
NSC MEKANIKAL :-
SKOP KERJA MEKANIKAL : 1. INTERNAL COLD WATER

TEMPOH SIAP 2. INTERNAL SANITARY
KAEDAH PERLAKSANAAN 3. INSTANT WATER HEATER
P. PENGUASA 4. MINI STORAGE WATER HEATER
PELANGGAN : 8 BULAN
PERUNDING M&E
: KONVENSIONAL DALAMAN

:

:

:-

HOPT :
:
WPP(M) :
: RM 69,490.00
KOS KONTRAK MEKANIKAL

STATUS PROJEK TERKINI:
N/A

Gambar Projek Terkini
(PIC:PJ Jomot)

Kelulusan Bahan

Tajuk Projek :

PEMBINAAN MAKMAL KOMPUTER SABAH (MENYIAPKAN
BAKI KERJA BAGI 37 MAKMAL KOMPUTER) ZON 4

KONTRAKTOR : SYARIKAT GVC INDAH SDN.BHD
NO KONTRAK : JKR/IP/CKUB/98/2020
TARIKH MILIK TAPAK : 14 - 06 - 2021
TARIKH SIAP ASAL : 13 - 06 - 2022

TARIKH SIAP BAHARU : N/A

HARGA KONTRAK ASAL : RM 7,432,697.00

KEMAJUAN KERJA-April : 98%
2022
Tiada
NSC MEKANIKAL : % Jadual

SKOP KERJA MEKANIKAL 100% % Sebenar

FIRE PROTECTION SYSTEM : 100%

AIR CONDITIONING SYSTEM, : 100% 100%

TEMPOH SIAP : 12 BULAN
KAEDAH PERLAKSANAAN : N/A
P. PENGUASA : JURUTERA AWAM KANAN, PPK 2
PELANGGAN : KEM. PENDIDIKAN MALAYSIA
PERUNDING MEKANIKAL : N/A
HODT : CAWANGAN KEJURUTERAAN AWAM DAN

WPP(M) STUKTUR
: IR. ABDULDAN BIN ADTONG

KOS KONTRAK MEKANIKAL : RM 555,896.00

VO. MEKANIKAL / OMISSION / RASIONALISASI:-
1.SMK Pengiran Omar Sipitang – VO Telah diluluskan ( Penggalan Penghawa dingin sedia ada)
Tiada dalam BQ.

2. Omission Telah Dibuat Sebanyak RM 62,500.00 (Untuk Semua Sekolah)

Gambar Projek Terkini
(PIC:PJ Lazimih)

ISU DI TAPAK:
1.Penghawa dingin telah siap dipasang
(Sk Timbua Ranau, Sk Pandiwan Nabawan, Sk Paguokon Tenom, Sk Tun Datu Haji Musapha
Kudat, Sk Pekan Sipitang Dan Smk Pengiran Omar Sipitang,sk Pinambawan Tuaran , Sk
Malubang Pitas, Smk Banggi Dan Sk Padang Banggi)
2.Pemasangan fire extinguisher
Semua telah dipasang semua sekolah
3. NCP telah ditutup
A. Sk Tun Datu Haji Mustapha
B. Sk Pekan Sipitang
C. Smk Pemgiran Omar Sipitang
3. Tiada pemasangan penghawa dingin untuk sk balambangan kudat( bekalan elektrik tiada)
menggunakan solar sahaja.
4. Testing telah di lakukan disemua sekolah.
5. Lawatan bersama pelanggan telah dilakukan disemua sekloah.

STATUS PROJEK TERKINI:
N/A

Text

SK TIMBUA RANAU

SK MALUBANG PITAS,

Gambar Projek Terkini
(PIC:PJ Lazimih)

SMK BANGGI KUDAT

SK PAGUOKON TENOM

SK PANDIWAN NABAWAN

SK PENIMBAWAN TUARAN

SK PEKAN SIPITANG

Gambar Projek Terkini
(PIC:PJ Lazimih)

SMK PENGIRAN OMAR SIPITANG

SMK BANGGI KUDAT

SK PADANG BANGGI KUDAT

SK BALAMBANGAN KUDAT

SK TUN HAJI MUSTPHA KUDAT

Tajuk Projek :

PROJEK PEMBINAAN SEKOLAH BAHARU 18 BILIK DARJAH, 8
UNIT KURTERS, ASRAMA 300 MURID (150 LELAKI, 150
PEREMPUAN) DAN LAIN-LAIN KEMUDAHAN DI SMK ULU SAPI
TELUPID, SABAH ( REKA DAN BINA).

KONTRAKTOR : DERRIDA (M) SDN.BHD
NO KONTRAK : JKR/IP/CKUB/21377/2020
TARIKH MILIK TAPAK : 18 OKTOBER 2021
TARIKH SIAP ASAL : 06 OKTOBER 2024

TARIKH SIAP BAHARU : N/A

HARGA KONTRAK ASAL : RM 58,925,001.00
KEMAJUAN KERJA – April 2022 : 2.76%

NSC MEKANIKAL : TIADA % Sebenar
SKOP KERJA MEKANIKAL : % Jadual 0%
INTERNAL COLD WATER SYSTEM
0%

INTERNAL SANITARY SYSTEM : 0% 0%

FIRE PROTECTION SYSTEM : 0% 0%

AIR CONDITIONING SYSTEM : 0% 0%

KITCHEN EQUIPMENT SYSTEM : 0% 0%
COLD ROOM 0% 0%
EMERGENCY SHOWER& EYE 0%
WASH : 0%
FUME CUPBORD
TEMPOH SIAP : 0% 0%
KAEDAH PERLAKSANAAN
P. PENGUASA : 155 MINGGU
PELANGGAN
PERUNDING MEKANIKAL : TENDER (REKA DAN BINA)
HODT
: PENGARAH PPK2

: KEM. PENDIDIKAN MALAYSIA

: ATL KONSULT SDN.BHD

: PENDIDIKAN & PENGAJIAN TINGGI (SPR)(CKM)

WPP(M) : Ir. ABDULDAN BIN ADTONG
KOS KONTRAK MEKANIKAL : NA

Gambar Projek Terkini
(PIC:PJ Lazimih)

STATUS PROJEK TERKINI:
N/A

Tajuk Projek :

PROJEK PEMBINAAN SEKOLAH BAHARU 24 BILIK DARJAH, 8 UNIT
KURTERS, ASRAMA 200 MURID (100 LELAKI, 100 PEREMPUAN) DAN
LAIN-LAIN KEMUDAHAN DI SEKOLAH MENENGAH KEBANGSAAN BATU
SAPI II, SANDAKAN, SABAH ( REKA DAN BINA).

KONTRAKTOR : BANGKIT ENERGY & PRO LOGISTIC (EM)SDN.BHD
NO KONTRAK : JKR/IP/CKUB/282/2021
TARIKH MILIK TAPAK : 07 - 10 - 2021

TARIKH SIAP ASAL : 02 - 10 - 2024

TARIKH SIAP BAHARU : N/A

HARGA KONTRAK ASAL : RM61,789,899.00
KEMAJUAN KERJA – April 2022 :
2%
NSC MEKANIKAL : % Sebenar
SKOP KERJA MEKANIKAL : - 0%
INTERNAL COLD WATER SYSTEM % Jadual

0%

INTERNAL SANITARY SYSTEM : 0% 0%

FIRE PROTECTION SYSTEM : 0% 0%

AIR CONDITIONING SYSTEM, : 0% 0%

KITCHEN EQUIPMENT SYSTEM : 0% 0%
: 0% 0%
COLD ROOM : 0% 0%

EMERGENCY SHOWER& EYE : :0% 156 MINGGU 0%
WASH
TFEUMMPEOCHUPSBIAOPRD : TENDER (REKA DAN BINA)
KAEDAH PERLAKSANAAN
P. PENGUASA : PENGARAH PPK2

PELANGGAN : KEM. PENDIDIKAN MALAYSIA
PERUNDING MEKANIKAL : PETAREKA PERUNDING (S)SDN.BHD
HODT : PENDIDIKAN & PENGAJIAN TINGGI (SPR)(CKM)

WPP(M) : IR. ABDULDAN BIN ADTONG

KOS KONTRAK MEKANIKAL : NA

Gambar Projek Terkini
(PIC:PJ Lazimih)

STATUS PROJEK TERKINI:
N/A

Tajuk Projek :

NAIKTARAF FASILITI DAN KEMUDAHAN ASRAMA
PELAJAR DI IKBN KINARUT, SABAH

KONTRAKTOR : RAZ ENTERPRISE
NO KONTRAK/TENDER LOT T22A, BLOK C TINGKAT 1 SERTA LIGHT
INDUSTRIAL, BATU 2,9000 SANDAKAN SABAH

: JKR/IP/CSFB/T/19/2021

TARIKH MILIK TAPAK : 01 MAC 2022
TARIKH SIAP ASAL : 10 OKTOBER 2022

TARIKH SIAP BAHARU : N/A

HARGA KONTRAK ASAL : RM1,296,645.00
40%
KEMAJUAN KERJA - April 2022 :

NSC MEKANIKAL : TIADA % Sebenar
: % Jadual 30%
SKOP KERJA MEKANIKAL :
50% 30%
INTERNAL COLD WATER
SYSTEM 50%
INTERNAL SANITARY SYSTEM

VENTALITATION FAN : 30% 15%

TEMPOH SIAP : 32 MINGGU

KAEDAH PERLAKSANAAN : KONVENSIONAL DALAMAN

P. PENGUASA : JURUTERA AWAM KANAN, PPK2
PELANGGAN : KBS( IKBAN KINARUT)
PERUNDING MEKANIKAL : N/A
HODT :

WPP(M) : IR. ABDULDAN BIN ADTONG

KOS KONTRAK MEKANIKAL : RM141,000.00

Gambar Projek Terkini
(PIC:PJ Lazimih)

ISU DI TAPAK:
Dalam proses menanggal dan pemasangan kerja –perja skop mekanikal

STATUS PROJEK TERKINI:
Kelulusan bahan dan dalam shop drawing telah di berikan kepada kontraktor

Tandas lelaki Kawasan Dobi Pelajar

Tajuk Projek :

NAIKTARAF FASILITI BSGI KURSUS BAHARU PEMASANGAN DAN
PENYELENGGARAAN ELEKTRIK SATU FASA DAN TIGA FASA
MENGGUANAKANPENSIJILAN DUAL IAITU SIJIL KEMAHIRAN
MALAYSIA (SKM) DAN KNX DI IKBN KINARUT, SABAH.

KONTRAKTOR : SABAR IMAN ENTERPRISE
Pejabat incubator, Lot 18,S11, tingkat 2, Wisma
NO KONTRAK SEDCO, Costal Highway,88000 Kota Kinabalu Sabah
TARIKH MILIK TAPAK
: JKR/IP/CSFB/19/2020

: 01 MAC 2022

TARIKH SIAP ASAL : 10 OKTOBER 2021

TARIKH SIAP BAHARU : 10 OKTOBER 2021

HARGA KONTRAK ASAL : RM807,137.45 % Sebenar
: 40%
KEMAJUAN KERJA : TIADA 30%

NSC MEKANIKAL % Jadual 30%
SKOP KERJA MEKANIKAL : 50%
INTERNAL COLD WATER
SYSTEM : 50%
INTERNAL SANITARY SYSTEM

AIR CONDITIONING SYSTEM, : 50% 30%

VENTALITATION FAN 50% 30%

TEMPOH SIAP : 32 MINGGU
KAEDAH PERLAKSANAAN : KONVENSIONAL DALAMAN

P. PENGUASA : JURUTERA AWAM KANAN, PPK2
PELANGGAN : KBS(IKBN KINARUT)
PERUNDING MEKANIKAL : N/A
WPP(M) : IR. ABDULDAN BIN ADTONG

KOS KONTRAK MEKANIKAL : RM114,410.00

STATUS PROJEK : Dalam proses Pembinaan

Gambar Projek Terkini
(PIC:PJ Lazimih)

ISU DI TAPAK:
Dalam proses menanggal dan pemasangan kerja –perja skop mekanikal
STATUS PROJEK TERKINI:
Kelulusan bahan dan dalam shop drawing telah di berikan kepada kontraktor

Tangki Air …

Tajuk Projek :

SISTEM PENCEGAH KEBAKARAN DAN SISTEM MEKANIKAL BERKAITAN UNTUK
PEMBANGUNAN SISTEM KESELAMATAN ELEKTRONIK BERSEPADU SKEB DI 18
PENJARA – PENJARA KOTA KINABALU, PENJARA WANITA KOTA KINABALU,
SEKOLAH HENRY GURNEY KENINGAU, PENJARA TAWAU DAN PENJARA SANDAKAN

KONTRAKTOR : ELECTRICA TECHNOLOGY SDN BHD

NO KONTRAK : NA
TARIKH MILIK TAPAK :-
TARIKH SIAP ASAL :-

TARIKH SIAP BAHARU : N/A

HARGA KONTRAK ASAL :
KEMAJUAN KERJA – 2022 : 0%

NSC MEKANIKAL : MNA INTEGRATED RESOURCES (M) SDN BHD
:
SKOP KERJA MEKANIKAL : % Jadual % Sebenar

INTERNAL COLD WATER 0% 0%
SYSTEM
INTERNAL SANITARY SYSTEM 0% 0%

AIR CONDITIONING SYSTEM, : 0% 0%

VENTILATION FAN : 0% 0%

TEMPOH SIAP :

KAEDAH PERLAKSANAAN : NSC
P. PENGUASA : JURUTERA ELEKTRIK PENGUASA KANAN,

PELANGGAN PPK2
PERUNDING MEKANIKAL : PENJARA MALAYSIA
HODT : N/A
:-

WPP(M) : IR. ABDULDAN BIN ADTONG

KOS KONTRAK MEKANIKAL :-

Gambar Projek Terkini
(PIC:PJ Lazimih)

STATUS PROJEK TERKINI:
NSC Telah dilantik

Mesyuarat Kordinasi Mekanikal
Bersama NSC dan Main Con
membincangkan Isu Status
CPM Penyerahan Shop
Drawing Method Statement dan
Kelulusan Bahan

SABAH

TABURAN PROJEK SARAWAK

KONTRAKTOR : BANGKIT ENERGY & PRO LOGISTIC (EM) SDN. BHD.

NO KONTRAK : JKR/IP/CKUB/93/2020

TARIKH MILIK TAPAK : 19/6/2020

TARIKH SIAP ASAL : 15/12/2022
EOT 1 – 60 HARI (PKP)

TARIKH SIAP BAHARU : 13/2/2023

HARGA KONTRAK ASAL : RM 118,289,899.00

KEMAJUAN KERJA - SEPT 2021 : 45% (Jadual) / 56.00% +31 DAYS (Sebenar)

NSC MEKANIKAL : N/A

SKOP KERJA MEKANIKAL % Jadual % Sebenar

INTERNAL COLD WATER SYSTEM : 17.19 % 17.19 %

INTERNAL SANITARY SYSTEM : 45.14 % 45.14 %

FIRE PROTECTION SYSTEM : 1.61 % 1.61 %

AIR CONDITIONING SYSTEM : 5.54 % 5.54 %

LIFT SYSTEM : 0% 0%

KITCHEN EQUIPMENT : 0% 0%

NATURAL GAS SYSTEM : 0% 0%

FUEL DISPENSING SYSTEM / BULK FUEL : 34.59 % 34.59 %
INSTALLATION

HIGH PRESSURE PUMPING SYSTEM FOR : 22.94 % 22.94 %
VEHICLE WASH

OIL INTERCEPTOR 70 % 70%

BOAT SLIPWAY, CRADDLE & WINCH SYSTEM : 0% 0%

TEMPOH SIAP : 31 BULAN 26 HARI

KAEDAH PERLAKSANAAN : REKA DAN BINA/TENDER TERBUKA

P. PENGUASA : PENGARAH PEMBINAAN, PPK2

PELANGGAN : KEM. DALAM NEGERI (KDN)

PERUNDING MEKANIKAL : Perunding Malca Sdn Bhd
Iir. Kuan Chin Jong – 019 8348978
Ir. Ahmad Husairi (RE) – 0193253597

HODT : Ir. AZIZAH KASIM & Ir. SHAHLAN
013-9359240

WPP(M) : En. Mohd Herman bin Abu Bakar

KOS KONTRAK MEKANIKAL : RM 13,006,242.00

Tajuk Projek :

CADANGAN PEMBINAAN KOMPLEKS AGENSI
PENGUATKUASAAN MARITIM MALAYSIA (APMM)
DAERAH MARITIM MIRI, SARAWAK (REKA DAN BINA)

Gambar Projek Terkini
(PIC:JMK HERMAN)

STATUS PROJEK TERKINI:
Surat mohon bukti pengesahan Bomba berkaitan pengeluaran skop hosereel di blok kuarter
berketinggian 8 tingkat dengan lif lobi tertutup dan tangga yang tertutup.

KONTRAKTOR : RIAPLUS SDN. BHD.
NO KONTRAK
TARIKH MILIK TAPAK : JKR/IP/ CKUB/94/2020
TARIKH SIAP ASAL
TARIKH SIAP BAHARU : 25/6/2020
HARGA KONTRAK ASAL
KEMAJUAN KERJA - SEPT 2021 : 18/10/2023

: 17/12/2023

: RM 289,200,000.00

: 16.97% (Jadual) / 18.83% +12 DAYS
(Sebenar)

NSC MEKANIKAL : N/A

SKOP KERJA MEKANIKAL % Jadual % Sebenar

INTERNAL COLD WATER SYSTEM : 10.31 % 10.31 %

INTERNAL SANITARY SYSTEM : 68.79 % 68.79 %

FIRE PROTECTION SYSTEM : 16.95 % 16.95 %

AIR CONDITIONING SYSTEM : 0.96 % 0.96 %

LIFT, ESCALATOR & DUMBWAITER SYSTEM : 10 % 10 %

MEDICAL GASES PIPELINE SYSTEM : 1.63 % 1.63 %

STERILIZERS AND ASSOCIATED EQUIPMENT : 0% 0%

HEAT PUMPS, BOILERS, CALORIFIERS AND : 0% 0%
STEAM/HOT WATER RETICULATION SYSTEM

LIQUIDIFIED PETROLEUM GAS (LPG) : 0% 0%

DENTAL UNIT AND EQUIPMENTS 0% 0%

BUILDING SUPERVISORY SYSTEM : 2.01 % 2.01 %

LABORATORY EQUIPMENTS : 0% 0%

TEMPOH SIAP : 41 BULAN 22 HARI

KAEDAH PERLAKSANAAN : REKA DAN BINA/TENDER TERBUKA

P. PENGUASA : PENGARAH PEMBINAAN, PPK2

PELANGGAN : KEM. KESIHATAN MALAYSIA

PERUNDING MEKANIKAL : KVA CONSULT
Iir. Pua - 0196622829

HODT : Ir. YATIM
019-302 7070

WPP(M) : IR. ABDULDAN BIN ADTONG

KOS KONTRAK MEKANIKAL : RM 71,385,186.00

Tajuk Projek :

PEMBINAAN BANGUNAN TAMBAHAN HOSPITAL
MIRI, SARAWAK (REKA DAN BINA)- TENDER SEMULA

Gambar Projek Terkini
(PIC:JMK Herman)

STATUS PROJEK TERKINI:
N/A

KONTRAKTOR : MCS MANAGEMENT SDN. BHD.
NO KONTRAK : JKR/IP/CKUB/75/2020
TARIKH MILIK TAPAK : 30-06-2020
TARIKH SIAP ASAL : 26/12/2023

TARIKH SIAP BAHARU EOT 1 – 60 HARI (PKP)
HARGA KONTRAK ASAL : 24/2/2024
KEMAJUAN KERJA - SEPT 2021 : RM 165,000,000.00
: 24.89% (Jadual) / 19.69 % -59 Days (Sebenar)

NSC MEKANIKAL : N/A % Sebenar
SKOP KERJA MEKANIKAL % Jadual 0%
AIR CONDITIONING AND MECHANICAL
VENTILATION SYSTEMS : 0% 0%
LIFTS SYSTEM 0%
MEDICAL GASES PIPELINE SYSTEMS : 0%
: 0%

FIRE PROTECTION SYSTEMS : 0% 0%
: 0% 0%
HEAT PUMP AND HOT WATER RETICULATION
SYSTEM : 0% 0%

LIQUIDIFIED PETROLEUM GASES (LPG) : 0% 0%
SYSTEM : 0% 0%

BUILDING SUPERVISORY SYSTEM : 0% 0%

KITCHEN EQUIPMENT (CENTRAL PLATING)
AND FOOD TROLLEYS

INTERNAL COLD WATER PLUMBING

INTERNAL SANITARY AND WASTE WATER : 0% 0%
SYSTEM

REVERSE OSMOSIS WATER SYSTEM : 0% 0%

TEMPOH SIAP : 44 BULAN

KAEDAH PERLAKSANAAN : REKA DAN BINA/TENDER TERBUKA

P. PENGUASA : PENGARAH PEMBINAAN, PPK2

PELANGGAN : KEM. KESIHATAN MALAYSIA

PERUNDING MEKANIKAL : J Rogers Preston (Ir. KUAN 019-8348978)

HODT : Ir. YATIM (0196428414)

WPP(M) : IR. ABDULDAN BIN ADTONG

KOS KONTTRaAjKukMPErKoAjNekIK:AL : RM 37,518,800.00

CADANGAN PEMBINAAN HOSPITAL LAWAS (76 KATIL)
LAWAS, SARAWAK (REKA DAN BINA) FASA 2B : KERJA
BANGUNAN DAN KERJA-KERJA BERKAITAN - TENDER
SEMULA.

Gambar Projek Terkini
(PIC:JMK Herman)

STATUS PROJEK TERKINI:
N/A

KONTRAKTOR : DERMAGA MAKMUR SDN BHD
NO KONTRAK
TARIKH MILIK TAPAK : JKR/IP/CKUB/37/2018
TARIKH SIAP ASAL
: 22/2/2018

: 17/2/2021
EOT 1 – 56 HARI (PKP)
EOT 2 – 58 HARI (PKPB)
EOT 3 – 78 HARI (Isu Tenaga Kerja –
Penutupan Sempadan - PKP)
EOT 4 – 60 HARI (PKP)
EOT 5 – 91 HARI (Isu Kesukaran
mendapat bekalan perabot)

TARIKH SIAP SEBENAR (CPC) : 26-01-2022
HARGA KONTRAK ASAL
KEMAJUAN KERJA - SEPT 2021 : RM 39,165,285.98

NSC MEKANIKAL : 100% (Jadual) / 97.33% -41 DAYS
SKOP KERJA MEKANIKAL
INTERNAL COLD WATER SYSTEM (Sebenar)
INTERNAL SANITARY SYSTEM LAD 1 – 43 Hari
PORTABLE FIRE EXTIGUISHER
VENTILATION SYSTEM : N/A
TEMPOH SIAP
KAEDAH PERLAKSANAAN % Jadual % Sebenar
P. PENGUASA
PELANGGAN : 100 % 100 %

: 100 % 100 %

: 100 % 100 %

: 100 % 100 %

: 47 BULAN 5 HARI

: REKA DAN BINA/TENDER TERHAD

: PENGARAH PEMBINAAN, PPK2

: KEM. PERTAHANAN (MINDEF)

PERUNDING MEKANIKAL : PERUNDING WES SDN BHD
kuan

HODT : Ir. AZIZAH KASIM & Ir. SHAHLAN
013-9359240

WPP(M) : En. Mohd Herman bin Abu Bakar

KOS KONTRAK MEKANIKAL : RM 1000,000.00

Tajuk Projek :

PEMBINAAN RUMAH KELUARGA ANGKATAN
TENTERA (RKAT) DI KEM SRI MIRI, MIRI, SARAWAK -
FASA 2 (REKA & BINA)

Gambar Projek Terkini
(PIC:JMK Herman)

STATUS PROJEK TERKINI:
N/A

KONTRAKTOR : S&I URBAN DESIGNERS SDN. BHD.

NO KONTRAK : JKR/IP/CKUB/345/2021

TARIKH MILIK TAPAK : 15/12/2021

TARIKH SIAP ASAL : 15/6/2025

TARIKH SIAP BAHARU : 15/6/2025

HARGA KONTRAK ASAL : RM 174,000,000.00

KEMAJUAN KERJA - SEPT 2021 : 0% (Jadual) / 0% +0 DAYS (Sebenar)

NSC MEKANIKAL : N/A

SKOP KERJA MEKANIKAL % Jadual % Sebenar

INTERNAL COLD WATER SYSTEM : 0% 0%

INTERNAL SANITARY SYSTEM : 0% 0%

FIRE PROTECTION SYSTEM : 0% 0%

AIR CONDITIONING SYSTEM : 0% 0%

LIQUIDIFIED PETROLEUM GASES (LPG) : 0% 0%
SYSTEM

KITCHEN EQUIPMENT : 0% 0%

BOOSTER PUMP : 0% 0%

PORTABLE AIR COMPRESSOR & WATER JET : 0% 0%

WASHER EXTRACTOR & TUMBLE DRYER : 0% 0%

TEMPOH SIAP : 42 BULAN

KAEDAH PERLAKSANAAN : REKA DAN BINA/RUNDING TERUS

P. PENGUASA : PENGARAH PEMBINAAN, PPK2

PELANGGAN : KEM. PERTAHANAN (MINDEF)

PERUNDING MEKANIKAL : Perunding UZL
Ho Yong Kai – 013 8143008
HODT
: Ir. AZIZAH KASIM & Ir. Naguib
WPP(M) 012-6694799
KOS KONTRAK MEKANIKAL
STATUS PROJEK TERKINI: : En. Mohd Herman bin Abu Bakar
N/A
: RM 1,850,000.00

Tajuk Projek :

PROJEK PEMBINAAN PANGKALAN PASUKAN
GERAKAN UDARA PDRM SARAWAK (REKA DAN BINA)

Gambar Projek Terkini
(PIC:JMK Herman)

KONTRAKTOR : MIRECONT SDN. BHD.

NO KONTRAK : JKR/IP/CKUB/

TARIKH MILIK TAPAK : 8/3/2022

TARIKH SIAP ASAL : 3/3/2025

TARIKH SIAP BAHARU : 3/3/2025

HARGA KONTRAK ASAL : RM 212,430,647.58

KEMAJUAN KERJA - SEPT 2021 : 0% (Jadual) / 0% +0 DAYS (Sebenar)

NSC MEKANIKAL : NSC BELUM LANTIK

SKOP KERJA MEKANIKAL % Jadual % Sebenar

INTERNAL COLD WATER SYSTEM : 0% 0%

INTERNAL SANITARY SYSTEM : 0% 0%

FIRE PROTECTION SYSTEM : 0% 0%

AIR CONDITIONING & VENTILATION SYSTEM : 0% 0%

SHOOTING RANGE SYSTEM : 0% 0%

LAB EQUIPMENT : 0% 0%

KITCHEN EQUIPMENT : 0% 0%

TEMPOH SIAP : 35 BULAN 23 HARI

KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING /TENDER
TERBUKA

P. PENGUASA : PENGARAH PEMBINAAN, PPK2
PELANGGAN :
KEM. DALAM NEGERI (KDN)

PERUNDING MEKANIKAL : Perunding MME SDN BHD
Ir abg mohammad moasili bin hj naili
HODT Dayang Zainab – 013-8038700
WPP(M)
KOS KONTRAK MEKANIKAL : Ir. AZIZAH KASIM & Ir. Naguib
012-6694799
STATUS PROJEK TERKINI:
N/A : Ir. Abduldan bin Adtong

: - BELUM ADA KONTRAK NSC -
RM 16,400,000.00 (PDA)

Tajuk Projek :

PEMBINAAN KOMPLEKS BATALION 10, PGA, SARIKEI,
SARAWAK)

Gambar Projek Terkini
(PIC:JMK Herman)

KONTRAKTOR : WEKAJAYA SDN. BHD.
NO KONTRAK
TARIKH MILIK TAPAK : JKR/IP/CKUB/225/2020
TARIKH SIAP ASAL
: 16/12/2020
TARIKH SIAP BAHARU
HARGA KONTRAK ASAL : 13/6/2023
KEMAJUAN KERJA - SEPT 2021 EOT 1 – 60 HARI (PKP)

NSC MEKANIKAL : 12/8/2023
SKOP KERJA MEKANIKAL
INTERNAL COLD WATER SYSTEM : RM 38,800,000.00
INTERNAL SANITARY SYSTEM
FIRE PROTECTION SYSTEM : 15% (Jadual) / 16% +10 DAYS
AIR CONDITIONING SYSTEM (Sebenar)
LIQUIDIFIED PETROLEUM GASES (LPG)
SYSTEM : N/A
KITCHEN EQUIPMENT
BOOSTER PUMP % Jadual % Sebenar
PORTABLE AIR COMPRESSOR & WATER JET
: 0% 0%

: 0% 0%

: 0% 0%

: 0% 0%

: 0% 0%

: 0% 0%
: 0% 0%
: 0% 0%

WASHER EXTRACTOR & TUMBLE DRYER : 0% 0%
32 BULAN
TEMPOH SIAP :

KAEDAH PERLAKSANAAN : REKA DAN BINA/TENDER TERBUKA

P. PENGUASA : PENGARAH PEMBINAAN, PPK2

PELANGGAN : KEM. PERTAHANAN (MINDEF)

PERUNDING MEKANIKAL : Perunding UZL
Ho Yong Kai – 013 8143008
HODT
: Ir. AZIZAH KASIM & Ir. Naguib
WPP(M) 012-6694799
KOS KONTRAK MEKANIKAL
STATUS PROJEK TERKINI: : En. Mohd Herman bin Abu Bakar
N/A
: RM 1,850,000.00

Tajuk Projek :

PEMBINAAN KEM 2 SKN RAJD, OYA, SIBU, SARAWAK
(REKA & BINA)


Click to View FlipBook Version