Gambar Projek Terkini (PIC:JM Maritha)


PEMBINAAN KUARTERS GUNASAMA PERSEKUTUAN BINTULU, SARAWAK Tajuk Projek : STATUS PROJEK TERKINI: PEMBINAAN KONTRAKTOR : SARATECH SDN.BHD. NO KONTRAK : JKR/IP/CKUB/246/2022 TARIKH MILIK TAPAK : 21/10/2022 TARIKH SIAP ASAL : 20/10/2024 TARIKH SIAP SEMASA : 20/10/2024 HARGA KONTRAK ASAL : RM 64,500,000.00 KEMAJUAN KERJA – Jan 2023 : BELUM ADA MAKLUMAT -SKALA NSC MEKANIKAL : TIDAK BERKENAAN SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER & SANITART PLUMBING SYSTEM : 0 % 0 % AIR CONDITIONING & VENTILATION SYSTEM : 0 % 0 % FIRE PROTECTION SYSTEM : 0 % 0 % TEMPOH SIAP : 24 BULAN KAEDAH PELAKSANAAN : REKA DAN BINA / TENDER TERBUKA P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : JABATAN PERDANA MENTERI (JPM) PERUNDING MEKANIKAL : HODT : Ir. SULAIMAN BIN KAMARI WPP(M) : BELUM ADA LANTIKAN WPP(M) KOS KONTRAK MEKANIKAL :


Gambar Projek Terkini (PIC:JM Maritha)


CADANGAN MENAIKTARAF SEKOLAH MENENGAH VOKASIONAL BETONG KEPADA KOLEJ VOKASIONAL BETONG, SARAWAK Tajuk Projek : KONTRAKTOR : AZAN ENGINEERING SDN. BHD. NO KONTRAK : KPM/BP/2020/3 TARIKH MILIK TAPAK : 15 OKTOBER 2020 TARIKH SIAP ASAL : 14 APRIL 2022 EOT 1 – 42 HARI EOT 2 – 60 HARI EOT 3 – 142 HARI TARIKH SIAP BAHARU : 22 JULAI 2022 HARGA KONTRAK ASAL : RM 15,300,000.00 KEMAJUAN KERJA : 44.00% (Jadual) / 35.00 % -59 Days (Sebenar) NSC MEKANIKAL : - SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 75% 50% INTERNAL SANITARY SYSTEM : 75% 20% FIRE PROTECTION SYSTEM : 75% 50% AIR CONDITIONING SYSTEM : 75% 50% LPG&KITCHEN EQUIPMENT : 75% 20% TEMPOH SIAP : 18 BULAN KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING / TENDER TERBUKA P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEM. PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : SiES ENGINEERS SDN BHD HODT : Ir AZMAN SALEM WPP(M) : FELIX KUNYAU KOS KONTRAK MEKANIKAL : RM STATUS PROJEK TERKINI: PEMBINAAN


Gambar Projek Terkini (PIC:PJ Hairi) VENTILATION SYSTEM AIR COMPRESSOR SYSTEM AIR CONDITIONING SYSTEM


PEMBINAAN GANTIAN PENUH 12 BD DAN LAIN-LAIN KEMUDAHAN DI SK JALAN HAJI BAKI, PADAWAN, SARAWAK. Tajuk Projek : STATUS PROJEK TERKINI: 1. Penilaian Kerja Tapak No 4 Telah Dijalankan Pada 31.01.2023 KONTRAKTOR : BWS ENGINEERING SDN. BHD. NO KONTRAK : JKR/IP/CKUB/83/2022 TARIKH MILIK TAPAK : 14 APRIL 2022 TARIKH SIAP ASAL : 5 JUN 2024 TARIKH SIAP BAHARU : - HARGA KONTRAK ASAL : RM 18,180,000.00 KEMAJUAN KERJA : 7.93% (Jadual) / 8.81% (Sebenar) NSC MEKANIKAL : PENDING TENDER BOT APPROVAL SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD-WATER SYSTEM : 4 % 1 % INTERNAL SANITARY SYSTEM : 13 % 16 % FIRE PROTECTION SYSTEM & BOOSTER PUMP : N/A N/A AIR CONDITIONING SYSTEM : N/A N/A KITCHEN EQUIPMENT : N/A N/A TEMPOH SIAP : 112 MINGGU KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : PERUNDING MEKANIKAL : JURUTERA SNS SDN. BHD. HODT : IR. TS. HJ. MOHAMAD ZAINI BIN BAKAR WPP(M) : EN. MOHD. HERMAN BIN ABU BAKAR KOS KONTRAK MEKANIKAL : RM 271,170.00 – PLUMBING AND SANITARY WORKS


Gambar Projek Terkini (PIC: PJ Hairi)) Pipe sleeves for Hose Reel Compartment Tandas Murid, Tandas Guru & Tandas Umum Aras 2


PEMBINAAN SEKOLAH BAHARU 18 BILIK DARJAH DAN (6 UNIT) RUMAH GURU DAN LAIN-LAIN KEMUDAHAN DI SEKOLAH KEBANGSAAN PANGKALAN KUAP, SAMARAHAN, SARAWAK Tajuk Projek : KONTRAKTOR : RIMBA HARTAWAN SDN. BHD. NO KONTRAK : KPM/BP/2019/11 TARIKH MILIK TAPAK : 1 FEBRUARI 2020 TARIKH SIAP ASAL : 1 DISEMBER 2021 EOT 1 – 56 HARI (Force majeure-PKP) EOT 2 - 60 HARI (Force majeure-PKP) EOT 3 – 66 HARI EOT 4 - 135 HARI TARIKH SIAP BAHARU : 13 September 2022 HARGA KONTRAK ASAL : RM 25,195, 029.20 KEMAJUAN KERJA : 100% NSC MEKANIKAL : - SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 100 % 100 % INTERNAL SANITARY SYSTEM : 100 % 100 % FIRE PROTECTION SYSTEM : 100 % 100 % AIR CONDITIONING SYSTEM : 100 % 100 % MECHANICAL VENTILATION SYSTEM : 100 % 100 % TEMPOH SIAP : 22 BULAN KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEM. PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : PERUNDING CH ENGINEERING SDN BHD (EN. AHMAD MUSTAQIM – 013-8085859) HODT : WPP(M) : Ir. Chee Kung Nee KOS KONTRAK MEKANIKAL : RM 943,860.00


Gambar Projek Terkini (PIC:PJ Hairi) STATUS PROJEK TERKINI: • Projek diserahkan pada bulan November 2022 • Tempoh DLP Tamat pada 12 September 2023


PEMBINAAN SEKOLAH BAHARU 24 BILIK DARJAH, (200) PELAJAR ASRAMA, (24 UNIT) RUMAH GURU DAN LAINLAIN KEMUDAHAN DI SEKOLAH KEBANGSAAN SAMALAJU, BINTULU, SARAWAK Tajuk Projek : KONTRAKTOR : SAMADO SDN. BHD. NO KONTRAK : KPM/BP/2019/5 TARIKH MILIK TAPAK : 27 JUN 2019 TARIKH SIAP ASAL : 26 JUN 2021 EOT 1 – 56 HARI (PKP) EOT 2 – 58 HARI (PKPB) EOT 3 – 23 HARI (KELEWATAN MENERIMA LUKISAN PEMBINAAN PROJEK) Eot 4 – 60 HARI (PKP 3.0) Eot 5 – 107 HARI (KELEWATAN MENERIMA LUKISAN PEMBINAAN ELEKTRIK PINDAAN 02 & KERJA BERKAITAN KELULUSAN DARIPADA SEB) Eot 6 – 84 HARI (ATAS ALASAN KERJA WANG PERUNTUKAN SEMENTARA BUILT IN FURNITURE & LAB FURNITURE) TARIKH SIAP BAHARU : 19 JULAI 2022 HARGA KONTRAK ASAL : RM 41,775,209.71 KEMAJUAN KERJA : 100.00% (Jadual) / 100.00 % (Sebenar) -21HARI NSC MEKANIKAL : - SKOP KERJA MEKANIKAL % Jadual % Sebenar PLUMBING & SANITARY WORKS : 100% 98% FIRE PROTECTION WORKS : 100% 98% AIR CONDITIONING AND MECHANICAL VENTILATION WORKS : 100% 99% KITCHEN EQUIPMENT WORKS : 100% 96% EXTERNAL WORKS : 100% 99% TEMPOH SIAP : 24 BULAN KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEM. PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : PERUNDING KAZ SDN BHD HODT : IR. HJH AISHAH HAZLINA BINTI MD DEAN WPP(M) : IR. ABG ASRI BIN ARIFFIN KOS KONTRAK MEKANIKAL : RM 2,162,549.20


Gambar Projek Terkini (PIC: PJ Hairi) STATUS PROJEK TERKINI: Isu pengujian masih pending di Kontraktor


PROJEK PEMBINAAN PANGKALAN PASUKAN GERAKAN UDARA PDRM SARAWAK (REKA DAN BINA) Tajuk Projek : KONTRAKTOR : S&I URBAN DESIGNERS SDN. BHD. NO KONTRAK : JKR/IP/CKUB/345/2021 TARIKH MILIK TAPAK : 15/12/2021 TARIKH SIAP ASAL : 15/6/2025 TARIKH SIAP BAHARU : 15/6/2025 HARGA KONTRAK ASAL : RM 174,000,000.00 KEMAJUAN KERJA : 0% (Jadual) / 0% +0 DAYS (Sebenar) NSC MEKANIKAL : N/A SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 0 % 0 % INTERNAL SANITARY SYSTEM : 0 % 0 % FIRE PROTECTION SYSTEM : 0 % 0 % AIR CONDITIONING SYSTEM : 0 % 0 % LIQUIDIFIED PETROLEUM GASES (LPG) SYSTEM : 0 % 0 % KITCHEN EQUIPMENT : 0 % 0 % BOOSTER PUMP : 0 % 0 % PORTABLE AIR COMPRESSOR & WATER JET : 0 % 0 % WASHER EXTRACTOR & TUMBLE DRYER : 0 % 0 % TEMPOH SIAP : 42 BULAN KAEDAH PERLAKSANAAN : REKA DAN BINA/RUNDING TERUS P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEM. PERTAHANAN (MINDEF) PERUNDING MEKANIKAL : Jurutera Perunding IRMZ Sdn Bhd Sarahill Consulting Sdn Bhd HODT : Ir. AZIZAH KASIM & Ir. Naguib 012-6694799 WPP(M) : En. Mohd Herman bin Abu Bakar KOS KONTRAK MEKANIKAL : RM 17,115,000.00 STATUS PROJEK TERKINI: N/A


Gambar Projek Terkini (PIC:PJ Hairi)


PEJABAT PENDIDIKAN DAERAH (PPD) SIMUNJAN, SARAWAK Tajuk Projek : STATUS PROJEK TERKINI: Siap KONTRAKTOR : D.D.K CONSTRUCTION NO KONTRAK : KPM/BP/2019/6 TARIKH MILIK TAPAK : 17-09-2019 TARIKH SIAP ASAL : 13-09-2021 TARIKH SIAP BAHARU : 27-01-2023 HARGA KONTRAK ASAL : RM 7,895,258.80 (Asal) RM 7,894,389.80 KEMAJUAN KERJA : 100% (Jadual) / 100% (Sebenar) NSC MEKANIKAL : N/A SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 100 % 95 % INTERNAL SANITARY SYSTEM : 100 % 90 % FIRE PROTECTION SYSTEM : 100 % 5 % AIR CONDITIONING SYSTEM : 100 % 8 % TEMPOH SIAP : 26 BULAN KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING/TENDER TERBUKA P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEM. PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : Perunding E-mechs Ir. Felix , Nelson HODT : Ir. ZAINI & Pn. Ernawati WPP(M) : Mohd Herman bin Abu Bakar KOS KONTRAK MEKANIKAL :


Gambar Projek Terkini (PIC:PJ Hairi)


PEMBINAAN FASA KEDUA INSTITUT KEMAHIRAN ISLAM SARAWAK Tajuk Projek : KONTRAKTOR : AZAN ENGINEERING SDN.BHD NO KONTRAK : JKR/IP/CKUB/39/2021 TARIKH MILIK TAPAK : 23-03-2021 NO KONTRAK : JKR/CKUB/IP/39/2021 TARIKH MILIK TAPAK : 23 MAC 2021 TARIKH SIAP ASAL : 18 MAC 2024 EOT 1 – 60 HARI (PKP) TARIKH SIAP BAHARU : 17 MEI 2024 HARGA KONTRAK ASAL : RM 34,289,933.00 KEMAJUAN KERJA : 33.00% (Jadual) / 33.00 % (Sebenar) NSC MEKANIKAL : 1. Khinas Global Ventures (Fire Fighting) 2. Enviroworks Engineering Solution (A/C) SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 20 % 20 % INTERNAL SANITARY SYSTEM : 20 % 20 % FIRE PROTECTION SYSTEM & BOOSTER PUMP : 5 % 5 % AIR CONDITIONING SYSTEM : 0 % 0 % TEMPOH SIAP : 156 MINGGU KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING/TENDER TERBUKA P. PENGUASA : PENGARAH PEMBINAAN, PPK2 KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING PELANGGAN : JABATAN KEMAJUAN ISLAM (JAKIM) PERUNDING MEKANIKAL : JURUTERA AZAN BERSEKUTU SDN. BHD. HODT : IR. SULAIMAN WPP(M) : IR. NIZAM MUSTAFA JINAL ABIDIN KOS KONTRAK MEKANIKAL : RM 1,389,800.00 – Fire Protection & Booster Pump System RM 1,700,000.00 – Air Conditioning System


Gambar Projek Terkini (PIC:PJ Hairi) ISU DI TAPAK: Lukisan pemasangan aktif mekanikal belum dikemukakan kepada BOMBA. Menunggu kelulusan lukisan Arkitek dari BOMBA. VO. MEKANIKAL / OMISSION / RASIONALISASI:- Omission Sistem Hose Reel Untuk Masjid. TINDAKAN /STATUS: Pihak Arkitek telah mengemaskini lukisan berdasarkan komen BOMBA dan akan mengemukakan semula kepada BOMBA. ELEVATED WATER TANK SUCTION TANK & PUMP HOUSE


PEMBANGUNAN SISTEM KESELAMATAN ELEKTRONIK BERSEPADU SKEB DI 18 PENJARA – PENJARA PUNCAK BORNEO (TAWARAN SEMULA) Tajuk Projek : ISU DI TAPAK: 1). No.Rujukan: BPT/JML/PPB/20 :Perkara: Fire Alarm sedia ada di MCR BLOCK 30 berselisih dengan dinding baru yang akan dibina. 2). Mohon pihak JKR memberi arahan dan tindakan berkenaan Fire Alarm sedia ada disebabkan adanya dinding baru. STATUS PROJEK TERKINI: Lawatan tapak bersama SO, WPP Utama, WPP Elektrikal, WPP Arkitek & WPP C&S pada 28 Februari 2023 KONTRAKTOR : JM Letrik Sdn. Bhd NO KONTRAK : JKR/IP/CKE/20/2022 TARIKH MILIK TAPAK : 01-03-2022 TARIKH SIAP ASAL : 27-02-2023 TARIKH SIAP BAHARU : 27-02-2023 HARGA KONTRAK ASAL : RM 11,288,000.00 KEMAJUAN KERJA : 29.42% (Jadual) / 34.99% +0 DAYS (Sebenar) NSC MEKANIKAL : N/A SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 0 % 0 % INTERNAL SANITARY SYSTEM : 0 % 0 % FIRE PROTECTION SYSTEM : 0 % 0 % AIR CONDITIONING SYSTEM : 0 % 0 % BOOSTER PUMP : 0 % 0 % TEMPOH SIAP : 26 BULAN KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING/TENDER TERBUKA P. PENGUASA : Pengarah II Cawangan Kejuruteraan Elektrik PELANGGAN : KEM. KESELAMATAN DALAM NEGERI PERUNDING MEKANIKAL : - HODT : Khairul Azmir WPP(M) : Ir. Abduldan bin Adtong KOS KONTRAK MEKANIKAL :


Gambar Projek Terkini (PIC:PJ Hairi)


KERJA-KERJA PENGGANTIAN DUA (2) UNIT LIF DAN LAIN-LAIN KERJA BERKAITAN DI CAWANGAN KHAS IBU PEJABAT POLIS KONTINJEN SARAWAK, KUCHING, SARAWAK. Tajuk Projek : KONTRAKTOR : HBS ENGINEERING SDN. BHD. NO KONTRAK : JKR/IP/CKM/226/2019 TARIKH MILIK TAPAK : 18 DISEMBER 2019 TARIKH SIAP ASAL : 21 APRIL 2021 TARIKH SIAP BAHARU : 11 JANUARI 2023 (FASA 2 _supplementary agreement) JUN 2023 (EOT 1) HARGA KONTRAK ASAL : RM 1,328,920.00 RM 4,553,920.00 (SEMASA) KEMAJUAN KERJA - JAN 2023 : 100% (Jadual) / 95 % (Sebenar) NSC MEKANIKAL : TIDAK BERKENAAN TEMPOH SIAP : 36 BULAN 25 HARI KAEDAH PERLAKSANAAN : JKR IN-HOUSE P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEM. DALAM NEGERI MALAYSIA PERUNDING MEKANIKAL : TIDAK BERKENAAN HODT : BURQANUDIN HUSSAIN WPP(M) : MOHD HERMAN BIN ABU BAKAR KOS KONTRAK MEKANIKAL : RM 4,553,920.00 VO. MEKANIKAL / OMISSION / RASIONALISASI/EOT:- 1. Permohonan EOT No. 3 (01/12/2022) 2. Permohonan VO Omission No. 1 (31/10/2022) ISU DI TAPAK: Kelulusan lukisan DB belum diterima untuk memulakan fabrication. Komen diterima semula pada 11/1/23 dan telah diberikan kepada drafter pembekal untuk pembaikan. STATUS PROJEK TERKINI: 1. Blok Kemboja, Kenanga, Melor & Mawar telah siap dicat di lif lobi. 2. Kerja-kerja testing di Blok Kenanga selesai. 3. Kerja pemasangan lif di Blok Cempaka selesai. 4. Kerja-kerja testing di Blok Melor bermula pada 1 Feb 2023


Gambar Projek Terkini (PIC:PJ Hairi)


SK BAKONG Tajuk Projek : KONTRAKTOR : R&D CONSTRUCTION SDN. BHD. NO KONTRAK : JKR/IP/CKUB/272/2022 TARIKH MILIK TAPAK : 27 OKTOBER 2022 TARIKH SIAP ASAL : 5 JUNE 2025 TARIKH SIAP BAHARU : - HARGA KONTRAK ASAL : RM 29,983,778.00 KEMAJUAN KERJA - DEC 2022 : %Jadual / % Sebenar Workprogramme belum diluluskan NSC MEKANIKAL : N/A SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 0 % 0 % INTERNAL SANITARY SYSTEM : 0 % 0 % FIRE PROTECTION SYSTEM & BOOSTER PUMP : 0 % 0 % AIR CONDITIONING SYSTEM : 0 % 0 % KITCHEN EQUIPMENT : 0 % 0 % LPG SERVICES 0% 0% TEMPOH SIAP : 136 MINGGU KAEDAH PERLAKSANAAN : REKA DAN BINA P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEMENTERIAN PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : HODT : WPP(M) : Ir. Abduldan bin Adtong KOS KONTRAK MEKANIKAL :


Gambar Projek Terkini (PIC:PJ Hairi) ISU DI TAPAK: 1.Kelulusan pena susunatur bangunan telah diperolehi pada 27 Januari 2023. Pihak kontraktor perunding dalam proses menyediakan lukisan terperinci dan persediaan RDI. STATUS PROJEK TERKINI: 1.MOA mekanikal masih dalam proses semakan HODT Mekanikal.


MENAIKTARAF SEKOLAH MENENGAH VOKASIONAL BINTULU KEPADA KOLEJ VOKASIONAL, BINTULU Tajuk Projek : STATUS PROJEK TERKINI: KONTRAKTOR : PERSADA SAUJANA (M) SDN. BHD. NO KONTRAK : KPM/BP/2020/11 TARIKH MILIK TAPAK : 15 OKTOBER 2020 TARIKH SIAP ASAL : 14 OKTOBER 2022 EOT 1 – 60 HARI (Force majeure-PKP) TARIKH SIAP BAHARU : 13 DISEMBER 2022 HARGA KONTRAK ASAL : RM 12,704,344.00 KEMAJUAN KERJA : 14 OKTOBER 2022 EOT 1 – 60 HARI (Force majeure-PKP) NSC MEKANIKAL : - SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : INTERNAL SANITARY SYSTEM : FIRE FIGHTING SYSTEM : AIR CONDITIONING SYSTEM : KITCHEN EXHAUST SYSTEM & LPG : FUME EXTRACTION SYSTEM : GAS MANIFOLD SYSTEM : 4 POST LIFT : COMPRESSED AIR PIPING : TEMPOH SIAP : 24 BULAN KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEM. PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : PERUNDING MME SDN BHD HODT : Ir. Hjh. Aishah Hazlina binti Md Dean WPP(M) : Ir. Abg. Mohd. Moasili b. Hj. Abg. Mohd. Nailie KOS KONTRAK MEKANIKAL : RM599,520.00 Pindaan Jadual Perancangan dan Pelaksanaan masih belum diluluskan kerana masih ada ulasan yang perlu dikemaskini oleh pihak kontraktor


Gambar Projek Terkini (PIC:PJ Joshua)


MENAIKTARAF SEKOLAH MENENGAH VOKASIONAL MIRI KEPADA KOLEJ VOKASIONAL MIRI, SARAWAK Tajuk Projek : STATUS PROJEK TERKINI: PEMBINAAN KONTRAKTOR : SYARIKAT CAHAYA BUMI NO KONTRAK : KPM/BP/2020/15 TARIKH MILIK TAPAK : 14-12-2020 TARIKH SIAP ASAL : 01-05-2022 TARIKH SIAP BAHARU : 04-11-2022 HARGA KONTRAK ASAL : RM 8,604,078.1 KEMAJUAN KERJA : 50.84% (Jadual) / 24.20% (Sebenar) – 26.64% (Varian) - 69 DAYS NSC MEKANIKAL : N/A SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 0 % 0 % INTERNAL SANITARY SYSTEM : 0 % 0 % FIRE PROTECTION SYSTEM : 0 % 0 % AIR CONDITIONING SYSTEM : 0 % 0 % LIQUIDIFIED PETROLEUM GASES (LPG) SYSTEM : 0 % 0 % KITCHEN EQUIPMENT : 0 % 0 % BOOSTER PUMP : 0 % 0 % TEMPOH SIAP : 26 BULAN KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING/TENDER TERBUKA P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEM. PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : Unikenyalang Engineering Sdn Bhd HODT : Ir. ZAINI & Pn. Ernawati WPP(M) : Unikenyalang Engineering Sdn Bhd KOS KONTRAK MEKANIKAL :


Gambar Projek Terkini (PIC:PJK JOSH)


PEMBINAAN GANTIAN 18 BILIK DARJAH DAN LAIN-LAIN KEMUDAHAN DI SEKOLAH MENENGAH KEBANGSAAN KANOWIT, KANOWIT, SARAWAK (REKA DAN BINA) Tajuk Projek : STATUS PROJEK TERKINI: PEMBINAAN KONTRAKTOR : SYARIKAT PERNIAGAAN DASRA SDN. BHD. NO KONTRAK : JKR/CKUB/21390/2022 TARIKH MILIK TAPAK : 14-01-2023 TARIKH SIAP ASAL : 09-01-2026 TARIKH SIAP BAHARU : HARGA KONTRAK ASAL : RM 49,900,000.00 KEMAJUAN KERJA : 0% (Jadual) / 0% +0 DAYS (Sebenar) NSC MEKANIKAL : N/A SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 0 % 0 % INTERNAL SANITARY SYSTEM : 0 % 0 % FIRE PROTECTION SYSTEM : 0 % 0 % AIR CONDITIONING SYSTEM : 0 % 0 % LIQUIDIFIED PETROLEUM GASES (LPG) SYSTEM : 0 % 0 % KITCHEN EQUIPMENT : 0 % 0 % BOOSTER PUMP : 0 % 0 % PORTABLE AIR COMPRESSOR & WATER JET : 0 % 0 % WASHER EXTRACTOR & TUMBLE DRYER : 0 % 0 % TEMPOH SIAP : 156 MINGGU KAEDAH PERLAKSANAAN : REKA DAN BINA / TENDER TERBUKA P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEMENTERIAN PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : HODT : Ir. ZAINI & Pn. Ernawati WPP(M) : Mohd Herman binAbu Bakar KOS KONTRAK MEKANIKAL : RM 1,763,480.00


Gambar Projek Terkini (PIC:PJK JOSH)


PEMBINAAN GANTIAN 6 BILIK DARJAH DAN LAIN-LAIN KEMUDAHAN MENGIKUT PIAWAI DI SEKOLAH KEBANGSAAN RANTAU PANJANG, PADAWAN, SARAWAK (REKA DAN BINA) Tajuk Projek : STATUS PROJEK TERKINI: PEMBINAAN KONTRAKTOR : R&D CONSTRUCTION SDN BHD NO KONTRAK : JKR/IP/CKUB/274/2022 TARIKH MILIK TAPAK : 11-11-2022 TARIKH SIAP ASAL : 24-04-2025 TARIKH SIAP BAHARU : HARGA KONTRAK ASAL : RM 20,993,778.00 KEMAJUAN KERJA : 0% (Jadual) / 0% +0 DAYS (Sebenar) NSC MEKANIKAL : N/A SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 0 % 0 % INTERNAL SANITARY SYSTEM : 0 % 0 % FIRE PROTECTION SYSTEM : 0 % 0 % AIR CONDITIONING SYSTEM : 0 % 0 % LIQUIDIFIED PETROLEUM GASES (LPG) SYSTEM : 0 % 0 % KITCHEN EQUIPMENT : 0 % 0 % BOOSTER PUMP : 0 % 0 % PORTABLE AIR COMPRESSOR & WATER JET : 0 % 0 % WASHER EXTRACTOR & TUMBLE DRYER : 0 % 0 % TEMPOH SIAP : 29 BULAN KAEDAH PERLAKSANAAN : REKA DAN BINA/TENDER TERBUKA P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEMENTERIAN PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : HODT : Ir. ZAINI & Pn. Ernawati WPP(M) : Mohd Herman binAbu Bakar KOS KONTRAK MEKANIKAL :


Gambar Projek Terkini (PIC:PJK JOSH)


PEMBINAAN GANTIAN 12 BILIK DARJAH DAN LAIN-LAIN KEMUDAHAN DI SMK LUNDU, LUNDU, SARAWAK (REKA DAN BINA) Tajuk Projek : STATUS PROJEK TERKINI: PEMBINAAN KONTRAKTOR : IZRA ENTERPRISE SDN. BHD. NO KONTRAK : JKR/IP/CKUB/114/2022 TARIKH MILIK TAPAK : 25-04-2022 TARIKH SIAP ASAL : 21-04-2024 TARIKH SIAP BAHARU : - HARGA KONTRAK ASAL : RM 23,999,000.00 KEMAJUAN KERJA : 41.00 % (Jadual) / 41.50 % + 0.50 % DAYS (Sebenar) 3 hari awal NSC MEKANIKAL : N/A SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 0 % 0 % INTERNAL SANITARY SYSTEM : 0 % 0 % FIRE PROTECTION SYSTEM : 0 % 0 % AIR CONDITIONING SYSTEM : 0 % 0 % LIQUIDIFIED PETROLEUM GASES (LPG) SYSTEM : 0 % 0 % KITCHEN EQUIPMENT : 0 % 0 % BOOSTER PUMP : 0 % 0 % PORTABLE AIR COMPRESSOR & WATER JET : 0 % 0 % WASHER EXTRACTOR & TUMBLE DRYER : 0 % 0 % TEMPOH SIAP : 24 BULAN KAEDAH PERLAKSANAAN : REKA DAN BINA/TENDER TERBUKA P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEM. PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : HODT : Ir. ZAINI & Pn. Ernawati WPP(M) : Mohd Herman bin Abu Bakar KOS KONTRAK MEKANIKAL :


Gambar Projek Terkini (PIC:PJK Josh)


PEMBINAAN GANTIAN PENUH 42 BILIK DARJAH, ASRAMA 300 PELAJAR (200P & 100L) DAN LAIN-LAIN KEMUDAHAN DI SMK LAKE, BAU, SARAWAK (REKA DAN BINA) Tajuk Projek : STATUS PROJEK TERKINI: PEMBINAAN KONTRAKTOR : EDEN EMPIRE DEVELOPMENT SDN. BHD. NO KONTRAK : JKR/CKUB/21387/2021 TARIKH MILIK TAPAK : 17-01-2023 TARIKH SIAP ASAL : 15-12-2025 TARIKH SIAP BAHARU : - HARGA KONTRAK ASAL : RM 78,888,000.00 KEMAJUAN KERJA : 0% (Jadual) / 0% +0 DAYS (Sebenar) NSC MEKANIKAL : N/A SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 0 % 0 % INTERNAL SANITARY SYSTEM : 0 % 0 % FIRE PROTECTION SYSTEM : 0 % 0 % AIR CONDITIONING SYSTEM : 0 % 0 % LIQUIDIFIED PETROLEUM GASES (LPG) SYSTEM : 0 % 0 % KITCHEN EQUIPMENT : 0 % 0 % BOOSTER PUMP : 0 % 0 % PORTABLE AIR COMPRESSOR & WATER JET : 0 % 0 % WASHER EXTRACTOR & TUMBLE DRYER : 0 % 0 % TEMPOH SIAP : 36 BULAN KAEDAH PERLAKSANAAN : REKA DAN BINA/TENDER TERBUKA P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEMENTERIAN PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : HODT : Ir. ZAINI & Pn. Ernawati WPP(M) : Mohd Herman binAbu Bakar KOS KONTRAK MEKANIKAL :


Gambar Projek Terkini (PIC:PJK Josh)


PEMBINAAN GANTIAN 12BD, LIMA (5) UNIT RUMAH GURU DAN LAIN-LAIN KEMUDAHAN DI SMK SRI SADONG, SIMUNJAN, SARAWAK Tajuk Projek : KONTRAKTOR : ALAMGHIR SDN. BHD. NO KONTRAK : JKR/IP/CKUB/60/2022 TARIKH MILIK TAPAK : 17/3/2022 TARIKH SIAP ASAL : 15/5/2024 TARIKH SIAP BAHARU : 15/5/2024 HARGA KONTRAK ASAL : RM 28,731,119.90 KEMAJUAN KERJA : 25.0 % (Jadual) / 24.0% (Sebenar) / 1.0 % (Varians) - 22 DAYS (lewat) NSC MEKANIKAL : N/A SKOP KERJA MEKANIKAL % Jadual % Sebenar INTERNAL COLD WATER SYSTEM : 0 % 0 % INTERNAL SANITARY SYSTEM : 0 % 0 % FIRE PROTECTION SYSTEM : 0 % 0 % AIR CONDITIONING SYSTEM : 0 % 0 % LIQUIDIFIED PETROLEUM GASES (LPG) SYSTEM : 0 % 0 % KITCHEN EQUIPMENT : 0 % 0 % BOOSTER PUMP : 0 % 0 % PORTABLE AIR COMPRESSOR & WATER JET : 0 % 0 % WASHER EXTRACTOR & TUMBLE DRYER : 0 % 0 % TEMPOH SIAP : 26 BULAN KAEDAH PERLAKSANAAN : KONVENSIONAL PERUNDING/TENDER TERBUKA P. PENGUASA : PENGARAH PEMBINAAN, PPK2 PELANGGAN : KEM. PENDIDIKAN MALAYSIA PERUNDING MEKANIKAL : Perunding CHL Sdn Bhd Ir. Mohd Dzulasri bin Hipeny HODT : Ir. ZAINI & Pn. Ernawati WPP(M) : Ir. Abduldan bin Adtong KOS KONTRAK MEKANIKAL : Belum lantik NSC (Anggaran RM1,530,000.00)


Gambar Projek Terkini (PIC:PJK JOSH) STATUS PROJEK TERKINI: N/A


SARAWAK


ACTIVITIES INTEREST EVENTS MICS ETC I.E. FEB 2023


BENGKEL PENGURUSAN RISIKO SK Tibabar , SK Nanamun, RKAT Lok Kawi dan SK Tagasan


VERIFIKASI HARTA PELANGGAN SK. Buit Hill LAWATAN TAPAK PPN Sabah Ke SPRM


KERJA-KERJA PEMERIKSAAN MENYELURUH KERJA-KERJA PENGUBAHSUAIAN PREMIS BAHARU JABATAN PENDAFTARAN NEGARA (JPN) TENOM JTK, PERKESO IPDAS KENINGAU


MESYUARAT PRA – PEMBINAAN: Sdaif Sabah (2021)- Pembinaan Bangunan Gantian Penuh 12 Bilik Darjah, Pentadbiran Dan Lain-lain Kemudahan Mengikut Piawai Di Sk Pekan Kimanis, Papar, Sabah (Reka Dan Bina) LAWATAN PEMERIKSAAN ASET TIDAK ALIH DI STOR KSSB, ECHO BUILDING


LAWATAN TAPAK TKP JKR ke Projek PGA BELURAN MAJLIS PENYERAHAN PROJEK SIAP Naiktaraf Fasiliti Dan Kemudahan Asrama Pelajar Di IKBN Kinarut, Sabah


AUDIT Projek Pembinaan Sekolah Baharu 24 Bilik Darjah, 8 Unit Kurters, Asrama 200 Murid (100 Lelaki, 100 Perempuan) Dan Lain-Lain Kemudahan Di Sekolah Menengah Kebangsaan Batu Sapi Ii, Sandakan, Sabah (Reka Dan Bina).


MAJLIS PENYERAHAN PROJEK SIAP Projek Pembinaan Bangunan Baharu Pejabat Pendidikan Daerah Simunjan, Samarahan


KURSUS LIF DAN ESKALATOR ASAS Penceramah: En.Herman Kursus Di JKR Terengganu 7-8 Feb 2023


LAWATAN KERJA Timbalan Menteri Kesihatan YB. Lukanisman ke site HPJ


LAWATAN TIMBALAN MENTERI HAL EHWAL UNDANG-UNDANG KE KOMPLEKS MAHKAMAH, KUCHING, SARAWAK Projek terlibat: Kerja-Kerja Penggantian Sistem Penyaman Udara Jenis ' Air-Cooled Chiller' Dan Lain-Lain Kerja Berkaitan Di Kompleks Mahkamah, Kuching, Sarawak