Report ABB Terminal A3 - Version 16 1 2 34 56 78
A A
© Copyright 2020 Hitachi P B =E03
Cable type +C1.C1.20 Cable type
C NYSY 19x2.5mm²
-XQB8 NYSY 19x2.5mm²
D NYSY 19x2.5mm²
E Terminal strip
Cable designations Target Target Cable designations Signal
Internal Pin External Pin -WG2L231 Placement in B
-WG2L241 schematics/Y44.C1 +DCF102 C
Device designation Device designation -WG1L203 /Y44.C2 QB1 Close D
/Y44.C2 QB1 Open
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT =E03 +C1.C1.30 -XQB2 1 E/UK 1 /Y44.C3 DS1 REMOTE
=E03 +C1.U1.06 -KF1 1 (-X52) 2 /Y44.C4 DS1 MOTOR MCB FAIL
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E03 +C1.U1.06 -KF1 3 (-X52) M 4/6.SNB 1 3
=E03 +C1.U1.06 -KF1 5 (-X52) M 4/6.SNB 2 4 /Y62.C2 +DCF204
=E03 +C1.U1.06 -KF1 7 (-X52) M 4/6.SNB 3 5 /Y62.C2 QB8_OPEN
M 4/6.SNB 4 6 /Y62.C2 QB8_CLOSE
=E03 +C1.C1.30 -XQB2 61 M 4/6.SNB 5 61 /M23.D1 +DCF203
=E03 +C1.A1.10 -KQB8OP A1 M 4/6.SNB 6 62 /M23.D3 QB2_LOCAL_ITL
=E03 +C1.A1.10 -KQB8CL A1 M 4/6.SNB 61 63 /M23.D2
=E03 +C1.A2.20 -XDCF203 104 M 4/6.SNB 62 101 /M23.D2 QB8_OPEN
=E03 +C1.C1.20 -XQB8 111 M 4/6.SNB 63 102 /M23.D3 QB8_CLOSE
=E03 +C1.U2.06 -S1 19 M 4/6.SNB101 103 /M23.D4 -DCF203
=E03 +C1.U1.06 -KF1 13 (-X42) M 4/6.SNB102 104 /M23.D6 -DCF203
=E03 +C1.U1.06 -KF1 15 (-X42) M 4/6.SNB103 105 /M23.D6 QB8_LOCAL_ITL
=E03 +C1.A2.20 -XDCF203 504 M 4/6.SNB104 106 /M23.D5 QB8_LOCAL_ITL
M 4/6.SNB105 107 /M23.D4 QB2_LOCAL_ITL
=E03 +C1.C1.20 -XQB8 102 M 4/6.SNB106 108 /M23.D4 QB2_LOCAL_ITL
M 4/6.SNB107 109
M 4/6.SNB108 110
M 4/6.SNB109 111
M 4/6.SNB110 112
M 4/6.SNB111 113
M 4/6.SNB112 114
M 4/6.SNB113
M 4/6.SNB114 E
FEM62
E/UK
F Based on 25-03-2021 Prepared 22-09-2021 MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
A AS MANUFACTURED 22-09-2021 KD Approved 22-09-2021 MA Terminal table Resp. dept. +C1.C1.20
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XQB8 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1164
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-001 n. sheet 1165
1
34 5 67 8
Report ABB Terminal A3 - Version 16 1 2 34 56 78
A A
© Copyright 2020 Hitachi P B =E03
Cable type +C1.C1.20 Cable type
C NYSY 19x2.5mm²
-XQC9 NYSY 19x2.5mm²
D
E Cable designations Target Terminal strip Target Cable designations Signal
Internal External -WG2L241
Pin Pin -WG2L231 Placement in/Y44.C5 +DCF102 B
Device designation Device designation schematics/Y44.C6 ESL QC9 CLOSE C
/Y44.C6 ESL QC9 OPEN
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT =E03 +C1.C1.20 -XQB8 1 E/UK 1
=E03 +C1.U1.06 -KF1 9 (-X52) 2 /Y62.C4 +DCF204
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E03 +C1.U1.06 -KF1 11 (-X52) M 4/6.SNB 1 3 /Y62.C4 QC9_OPEN
M 4/6.SNB 2 4 /Y62.C4 QC9_CLOSE
=E03 +C1.C1.20 -XQB8 61 M 4/6.SNB 3 61 /M24.D2 QB8_LOCAL_ITL
=E03 +C1.A1.10 -KQC9OP A1 M 4/6.SNB 4 62 /M24.D3 QB8_LOCAL_ITL
=E03 +C1.A1.10 -KQC9CL A1 M 4/6.SNB 61 63 /M24.D5 QB8_LOCAL_ITL
=E03 +C1.A1.10 -KLVT1 21 M 4/6.SNB 62 101 /M24.D6 -DCF203
=E03 +C1.C1.20 -XQC9 103 M 4/6.SNB 63 102
=E03 +C1.C1.20 -XQC9 102 M 4/6.SNB101 103
=E03 +C1.A2.20 -XDCF203 504 M 4/6.SNB102 104
M 4/6.SNB103 105
M 4/6.SNB104 106 D
M 4/6.SNB105 107
M 4/6.SNB106 108
M 4/6.SNB107 109
M 4/6.SNB108 110
M 4/6.SNB109 111
M 4/6.SNB110
M 4/6.SNB111
FEM62
E/UK
E
F Based on 25-03-2021 Prepared 22-09-2021 MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
A AS MANUFACTURED 22-09-2021 KD Approved 22-09-2021 MA Terminal table Resp. dept. +C1.C1.20
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XQC9 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1165
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-001 n. sheet 1166
1
34 5 67 8
Report ABB Terminal A3 - Version 16 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi P =E03
Cable type +C1.C1.30 Cable type
NYSY 19x2.5mm²
-XQA1 NYSY 19x2.5mm²
NYSY 19x2.5mm²
Terminal strip
Cable designations Target Target Cable designations Signal
Internal External -WG1L204
-WG1L203 Placement in
B Device designation Pin Device designation Pin -WG1L201 schematics B
=E03 +C1.C1.30 -XQA1 8 E/UK 1 /Y41.C2 +DCF102
2 /Y41.C2 QA1 L1 Close
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT =E03 +C1.U1.06 -KF1 1 (-X31) M 4/6.SNB 1 3 /Y41.C3 QA1 L1 Open
M 4/6.SNB 2 4 /Y41.C4 QA1 L2 Close
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E03 +C1.U1.06 -KF1 3 (-X31) M 4/6.SNB 3 5 /Y41.C4 QA1 L2 Open
M 4/6.SNB 4 6 /Y41.C5 QA1 L3 Close
=E03 +C1.U1.06 -KF1 5 (-X31) M 4/6.SNB 5 7 /Y41.C6 QA1 L3 Open
M 4/6.SNB 6 8 /Y42.C2 +DCF102
=E03 +C1.U1.06 -KF1 7 (-X31) M 4/6.SNB 7 9 /Y42.C2 CB SF6 Alarm
M 4/6.SNB 8 10 /Y42.C3 CB SF6 Lockout
=E03 +C1.U1.06 -KF1 9 (-X31) M 4/6.SNB 9 11 /Y42.C3 CB Spring Charged
M 4/6.SNB 10 12 /Y42.C4 Pole Discrepancy
C =E03 +C1.U1.06 -KF1 11 (-X31) M 4/6.SNB 11 13 /Y42.C5 CB MOTOR MCB TRIP C
M 4/6.SNB 12 14 /Y42.C6 CB AC MCB Trip D
=E03 +C1.C1.30 -XQB1 1 M 4/6.SNB 13 15 /Y42.C7 CB Remote E
M 4/6.SNB 14 16 /Y42.C7 CB Local
=E03 +C1.A1.10 -K501 A1 M 4/6.SNB 15 61 /Y61.C1 +DCF204
M 4/6.SNB 16 62 /Y61.C2 QA1 OPEN
=E03 +C1.A1.10 -K501 31 M 4/6.SNB 61 63 /Y61.C2 QA1 _CLOSED
M 4/6.SNB 62 101 /N11.B2 QA1 Close
=E03 +C1.U1.06 -KF1 5 (-X32) M 4/6.SNB 63 102 /N11.B2 QA1 Close
M 4/6.SNB101 103 /N11.B2 QA1 Close
=E03 +C1.U1.06 -KF1 7 (-X32) M 4/6.SNB102 104 /N11.D2 TRIP1_R
M 4/6.SNB103 105 /N11.D4 TRIP1_R
=E03 +C1.U1.06 -KF1 9 (-X32) M 4/6.SNB104 106 /N11.D6 TRIP1_R
M 4/6.SNB105 107 /N11.D7 TRIP1_R
=E03 +C1.U1.06 -KF1 11 (-X32) M 4/6.SNB106 108 /N12.C1 TRIP1_R
M 4/6.SNB107 109 /N12.C3 TRIP1_R
D =E03 +C1.U1.06 -KF1 13 (-X32) M 4/6.SNB108 110 /N12.C4 TRIP1_R
M 4/6.SNB109 111 /N11.D2 TRIP1_S
=E03 +C1.U1.06 -KF1 15 (-X32) M 4/6.SNB110
M 4/6.SNB111
=E03 +C1.A2.20 -XDCF204 105
Prepared 22-09-2021
=E03 +C1.A1.10 -KQA1OP A1 Approved 22-09-2021
Project PT. PLN PERSERO
=E03 +C1.A1.10 -KQA1CL A1
DSS 150KV KIS
=E03 +C1.A2.20 -XDCF101 104 ACP20051
34
=E03 +C1.U1.06 -KF1 2 (-X61)
E =E03 +C1.U2.17 -XT4 16
=E03 +C1.U2.17 -K86.1 114
=E03 +C1.U2.17 -K86.2 114
=E03 +C1.U2.17 -K86.3 114
=E03 +C1.U2.17 -P11 14
F Based on 25-03-2021 KD MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
A AS MANUFACTURED 22-09-2021 MR MA Terminal table Resp. dept. +C1.C1.30
B AS BUILT DCC EMA
Date Name -XQA1 PGGA Rev. ind. B Language en
Rev. Revision note Sheet 1166
2 HITACHI Doc. no. JBTB.056-KIS-EM-E-001 n. sheet 1167
1
5 67 8
Report ABB Terminal A3 - Version 16 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi P =E03
Cable type +C1.C1.30 Cable type
NYSY 19x2.5mm²
-XQA1
Cable designations Target Target Cable designations Signal
Internal Terminal strip External -WG1L201
/N11.D4 TRIP1_S
B Device designation Pin Device designation Pin Placement in/N11.D6 TRIP1_S B
schematics/N11.D7 TRIP1_S C
/N12.D2 TRIP1_S D
=E03 +C1.U2.17 -XT4 18 M 4/6.SNB112 112 /N12.D3 TRIP1_S E
M 4/6.SNB113 113 /N12.D4 TRIP1_S
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT =E03 +C1.U2.17 -K86.1 116 M 4/6.SNB114 114 /N11.D2 TRIP1_T
=E03 +C1.U2.17 -K86.2 116 M 4/6.SNB115 115 /N11.D4 TRIP1_T
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E03 +C1.U2.17 -K86.3 116 M 4/6.SNB116 116 /N11.D7 TRIP1_T
=E03 +C1.U2.17 -P21 14 M 4/6.SNB117 117 /N11.D8 TRIP1_T
M 4/6.SNB118 118 /N12.D2 TRIP1_T
=E03 +C1.U2.17 -XT4 20 M 4/6.SNB119 119 /N12.D3 TRIP1_T
M 4/6.SNB120 120 /N12.D5 TRIP1_T
C M 4/6.SNB121 121 /N12.D5 TRIP1_R
M 4/6.SNB122 122 /N12.D5 TRIP1_S
=E03 +C1.U2.17 -K86.1 118 M 4/6.SNB123 123 /N12.D5 TRIP1_T
M 4/6.SNB124 124 /N12.D6 QA1_L1_PRE-CLOSE
=E03 +C1.U2.17 -K86.2 118 M 4/6.SNB125 125 /N12.D6 QA1_L2_PRE-CLOSE
M 4/6.SNB126 126 /N12.D7 QA1_L3_PRE-CLOSE
=E03 +C1.U2.17 -K86.3 118 M 4/6.SNB127 127 /N12.D7 QA1_TC1_L1
M 4/6.SNB128 128 /N12.D8 QA1_TC1_L2
=E03 +C1.U2.17 -P31 14 M 4/6.SNB129 129 /N12.D8 QA1_TC1_L3
M 4/6.SNB130 130 /N21.B2 +DCF201
=E03 +C1.U2.17 -P11 15 M 4/6.SNB131 131 /N21.B2 +DCF201
M 4/6.SNB132 132 /N21.B2 +DCF201
=E03 +C1.U2.17 -P21 15 M 4/6.SNB133 133 /N21.D3 TRIP2
M 4/6.SNB201 201 /N21.D3 TRIP2
=E03 +C1.U2.17 -P31 15 M 4/6.SNB202 202 /N21.D6 TRIP2
M 4/6.SNB203 203 /N21.D7 TRIP2
D =E03 +C1.U2.17 -P11 16 M 4/6.SNB204 204 /N22.C1 TRIP2
M 4/6.SNB205 205 /N22.C3 TRIP2
=E03 +C1.U2.17 -P21 16 M 4/6.SNB206 206
M 4/6.SNB207 207
=E03 +C1.U2.17 -P31 16 M 4/6.SNB208 208
M 4/6.SNB209 209
=E03 +C1.A1.10 -KOC 14
Prepared 22-09-2021
=E03 +C1.A1.10 -KOC 24 Approved 22-09-2021
Project PT. PLN PERSERO
=E03 +C1.A1.10 -KOC 34
DSS 150KV KIS
=E03 +C1.A2.20 -XDCF201 102 ACP20051
34
E =E03 +C1.U1.14 -KF2 2 (-X61)
=E03 +CP1.C.30 -X1QA1 202
=E03 +C1.U2.17 -XT4 24
=E03 +C1.U2.17 -K86.1 214
=E03 +C1.U2.17 -K86.2 214
=E03 +C1.U2.17 -K86.3 214
F Based on 25-03-2021 KD MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
A AS MANUFACTURED 22-09-2021 MR MA Terminal table Resp. dept. +C1.C1.30
B AS BUILT DCC EMA
Date Name -XQA1 PGGA Rev. ind. B Language en
Rev. Revision note Sheet 1167
2 HITACHI Doc. no. JBTB.056-KIS-EM-E-001 n. sheet 1168
1
5 67 8
Report ABB Terminal A3 - Version 16 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi P =E03
Cable type +C1.C1.30 Cable type
NYSY 19x2.5mm²
-XQA1 NYSY 19x2.5mm²
Cable designations Target Terminal strip Target Cable designations Signal
Internal External -WG1L202
-WG1L201 /N22.C4 TRIP2Placement in
B Device designation Pin Device designation Pin /N21.D3 TRIP2schematics B
/N21.D4 TRIP2 C
=E03 +C1.U2.17 -P12 14 M 4/6.SNB210 210 /N21.D6 TRIP2 D
M 4/6.SNB211 211 /N21.D7 TRIP2 E
=E03 +CP1.C.30 -X1QA1 203 M 4/6.SNB212 212 /N22.D2 TRIP2
M 4/6.SNB213 213 /N22.D3 TRIP2
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT =E03 +C1.U2.17 -XT4 26 M 4/6.SNB214 214 /N22.D4 TRIP2
M 4/6.SNB215 215 /N21.D3 TRIP2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E03 +C1.U2.17 -K86.1 226 M 4/6.SNB216 216 /N21.D4 TRIP2
M 4/6.SNB217 217 /N21.D6 TRIP2
=E03 +C1.U2.17 -K86.2 226 M 4/6.SNB218 218 /N21.D8 TRIP2
M 4/6.SNB219 219 /N22.D2 TRIP2
=E03 +C1.U2.17 -K86.3 226 M 4/6.SNB220 220 /N22.D3 TRIP2
M 4/6.SNB221 221 /N22.D5 TRIP2
=E03 +C1.U2.17 -P22 14 M 4/6.SNB222 222 /N22.D5 TRIP2
M 4/6.SNB223 223 /N22.D5 TRIP2
C =E03 +CP1.C.30 -X1QA1 204 M 4/6.SNB224 224 /N22.D5 TRIP2
M 4/6.SNB225 225 /N22.D6 QA1_L1_PRE-CLOSE
=E03 +C1.U2.17 -XT4 22 M 4/6.SNB226 226 /N22.D6 QA1_L2_PRE-CLOSE
M 4/6.SNB227 227 /N22.D7 QA1_L3_PRE-CLOSE
=E03 +C1.U2.17 -K86.1 228 M 4/6.SNB228 228 /N22.D2 -DCF201
M 4/6.SNB229 229 /N22.D3 +DCF201
=E03 +C1.U2.17 -K86.2 228 M 4/6.SNB230 230 /N22.D7 +DCF101
M 4/6.SNB231 231 /N22.D8 #44474878
=E03 +C1.U2.17 -K86.3 228 M 4/6.SNB232 232 /N22.D8 #44474879
M 4/6.SNB233 233
=E03 +C1.U2.17 -P32 14 M 4/6.SNB234 234 /M12.D2 QA1_CLOSE_CMD
M 4/6.SNB235 235 /M12.D1 -DCF101
=E03 +C1.U2.17 -P12 15 M 4/6.SNB236 236 /M12.C2 QA1 Close
M 4/6.SNB301 301 /M12.D4 QA1_TC1_L1
D =E03 +C1.U2.17 -P22 15 M 4/6.SNB302 302
M 4/6.SNB303 303
=E03 +C1.U2.17 -P32 15 M 4/6.SNB304 304
=E03 +C1.U2.17 -P12 16 Prepared 22-09-2021
Approved 22-09-2021
=E03 +C1.U2.17 -P22 16 Project PT. PLN PERSERO
=E03 +C1.U2.17 -P32 16 DSS 150KV KIS
ACP20051
=E03 +C1.A2.20 -XDCF201 502 34
=E03 +C1.A2.20 -XDCF201 103
E
=E03 +C1.A1.10 -KOE 14
=E03 +C1.A2.20 -XDCF101 502
=E03 +C1.A1.10 -KOE 13
=E03 +C1.U1.06 -KF1 7 (-X61)
F Based on 25-03-2021 KD MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
A AS MANUFACTURED 22-09-2021 MR MA Terminal table Resp. dept. +C1.C1.30
B AS BUILT DCC EMA
Date Name -XQA1 PGGA Rev. ind. B Language en
Rev. Revision note Sheet 1168
2 HITACHI Doc. no. JBTB.056-KIS-EM-E-001 n. sheet 1169
1
5 67 8
Report ABB Terminal A3 - Version 16 1 2 34 56 78
A A
© Copyright 2020 Hitachi P B Target =E03
Cable type Internal +C1.C1.30 Cable type
C NYSY 19x2.5mm²
Device designation -XQA1 NYSY 19x2.5mm²
NYSY 19x2.5mm²
Terminal strip
Cable designations Target Cable designations Signal
Pin External Pin -WG2L231 Placement in B
-WG2L221 schematics/M12.C3 QA1 Close C
M 4/6.SNB305 Device designation -WG2L211 /M12.C7 QA1 Close
M 4/6.SNB306 /M12.D7 QA1_LOCAL_ITL
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT M 4/6.SNB307 305 /M12.D6 QA1_LOCAL_ITL
M 4/6.SNB308 306 /M12.D6 QA1_LOCAL_ITL
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. M 4/6.SNB309 307 /M12.D5 QA1_LOCAL_ITL
M 4/6.SNB310 308 /M12.D4 QA1_LOCAL_ITL
M 4/6.SNB311 309 /M12.D3 QA1_LOCAL_ITL
M 4/6.SNB312 310
M 4/6.SNB313 311
M 4/6.SNB314 312
313
FEM62 314
E/UK
D D
EE
F Based on 25-03-2021 Prepared 22-09-2021 MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
A AS MANUFACTURED 22-09-2021 KD Approved 22-09-2021 MA Terminal table Resp. dept. +C1.C1.30
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XQA1 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1169
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-001 n. sheet 1170
1
34 5 67 8
Report ABB Terminal A3 - Version 16 1 2 34 56 78
A A
© Copyright 2020 Hitachi P B =E03
Cable type +C1.C1.30 Cable type
C NYSY 19x2.5mm²
-XQB1 NYSY 7x2.5mm²
D NYSY 19x2.5mm²
E Terminal strip NYSY 19x2.5mm²
Cable designations Target Pin Target Pin Cable designations Placement in Signal B
Internal External -WG2L211 schematics C
-WG2L212 /Y43.C1 +DCF102 D
Device designation Device designation -WG2L221 /Y43.C2 QB1 Close E
-WG1L203 /Y43.C2 QB1 Open
/Y43.C3 DS1 REMOTE
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT =E03 +C1.C1.30 -XQA1 8 E/UK 1 /Y43.C4 DS1 MOTOR MCB FAIL
=E03 +C1.U1.06 -KF1 1 (-X51) 2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E03 +C1.U1.06 -KF1 3 (-X51) M 4/6.SNB 1 3 /Y61.C4 +DCF204
=E03 +C1.U1.06 -KF1 5 (-X51) M 4/6.SNB 2 4 /Y61.C4 QB1_OPEN
=E03 +C1.U1.06 -KF1 7 (-X51) M 4/6.SNB 3 5 /Y61.C4 QB1_CLOSE
M 4/6.SNB 4 6 /M21.D1 +DCF203
=E03 +C1.C1.30 -XQB2 61 M 4/6.SNB 5 61 /M21.D3 QB1_LOCAL_ITL
=E03 +C1.A1.10 -KQB1OP A1 M 4/6.SNB 6 62 /M21.D2 +DCF203
=E03 +C1.A1.10 -KQB1CL A1 M 4/6.SNB 61 63 /M21.D2 QB1_OPEN
=E03 +C1.A2.20 -XDCF203 102 M 4/6.SNB 62 101 /M21.D3 QB1_CLOSE
=E03 +C1.C1.30 -XQB1 113 M 4/6.SNB 63 102 /M21.D4 -DCF203
=E03 +C1.U2.06 -S1 7 M 4/6.SNB101 103 /M21.D6 -DCF203
=E03 +C1.U1.06 -KF1 13 (-X41) M 4/6.SNB102 104 /M21.D7 -DCF203
=E03 +C1.U1.06 -KF1 15 (-X41) M 4/6.SNB103 105 /M21.D7 QB1_LOCAL_ITL
=E03 +C1.A2.20 -XDCF203 502 M 4/6.SNB104 106 /M21.D7 QB1_LOCAL_ITL
M 4/6.SNB105 107 /M21.D7 QB1_LOCAL_ITL
=E03 +C1.C1.10 -KBCL1 14 M 4/6.SNB106 108 /M21.D4 QB1_LOCAL_ITL
=E03 +C1.C1.10 -KBCL1 11 M 4/6.SNB107 109 /M21.D4 QB1_LOCAL_ITL
M 4/6.SNB108 110 /M21.D6 QB1_LOCAL_ITL
=E03 +C1.C1.30 -XQB1 112 M 4/6.SNB109 111 /M21.D5 QB1_LOCAL_ITL
=E03 +C1.C1.30 -XQB1 111 M 4/6.SNB110 112
=E03 +C1.C1.30 -XQB1 102 M 4/6.SNB111 113
M 4/6.SNB112 114
M 4/6.SNB113 115
M 4/6.SNB114 116
M 4/6.SNB115 117
M 4/6.SNB116 118
M 4/6.SNB117 119
M 4/6.SNB118 120
M 4/6.SNB119
F Based on 25-03-2021 KD M 4/6.SNB120 MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
A AS MANUFACTURED 22-09-2021 MR MA Terminal table Resp. dept. +C1.C1.30
B AS BUILT FEM62 DCC EMA
Date Name -XQB1 PGGA Rev. ind. B Language en
Rev. Revision note Prepared 22-09-2021 Sheet 1170
2 Approved 22-09-2021 HITACHI Doc. no. JBTB.056-KIS-EM-E-001 n. sheet 1171
1 Project PT. PLN PERSERO
5 67 8
DSS 150KV KIS
ACP20051
34
Report ABB Terminal A3 - Version 16 1 2 34 56 78
A A
© Copyright 2020 Hitachi P B =E03
Cable type +C1.C1.30 Cable type
C NYSY 19x2.5mm²
-XQB2 NYSY 7x2.5mm²
D NYSY 19x2.5mm²
E Terminal strip NYSY 19x2.5mm²
Cable designations Target Pin Target Pin Cable designations Placement in Signal B
Internal External -WG2L221 schematics C
-WG2L222 /Y43.C5 +DCF102 D
Device designation Device designation -WG2L211 /Y43.C6 QB2 Close E
-WG1L203 /Y43.C6 QB2 Open
/Y43.C7 DS2 REMOTE
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT =E03 +C1.C1.20 -XQB8 1 E/UK 1 /Y43.C8 DS2 MOTOR MCB FAIL
=E03 +C1.U1.06 -KF1 9 (-X51) 2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E03 +C1.U1.06 -KF1 11 (-X51) M 4/6.SNB 1 3 /Y61.C6 +DCF204
=E03 +C1.U1.06 -KF1 13 (-X51) M 4/6.SNB 2 4 /Y61.C6 -QB2 OPEN
=E03 +C1.U1.06 -KF1 15 (-X51) M 4/6.SNB 3 5 /Y61.C6 -QB2 CLOSE
M 4/6.SNB 4 6 /M22.D1 +DCF203
=E03 +C1.C1.30 -XQB1 61 M 4/6.SNB 5 61 /M22.D3 QB2_LOCAL_ITL
=E03 +C1.A1.10 -KQB2OP A1 M 4/6.SNB 6 62 /M22.D2 +DCF203
=E03 +C1.A1.10 -KQB2CL A1 M 4/6.SNB 61 63 /M22.D2 QB2_OPEN
=E03 +C1.A2.20 -XDCF203 103 M 4/6.SNB 62 101 /M22.D3 QB2_CLOSE
=E03 +C1.C1.30 -XQB2 113 M 4/6.SNB 63 102 /M22.D4 -DCF203
=E03 +C1.U2.06 -S1 11 M 4/6.SNB101 103 /M22.D6 -DCF203
=E03 +C1.U1.06 -KF1 16 (-X41) M 4/6.SNB102 104 /M22.D7 -DCF203
=E03 +C1.U1.06 -KF1 18 (-X41) M 4/6.SNB103 105 /M22.D7 QB2_LOCAL_ITL
=E03 +C1.A2.20 -XDCF203 503 M 4/6.SNB104 106 /M22.D7 QB2_LOCAL_ITL
M 4/6.SNB105 107 /M22.D7 QB2_LOCAL_ITL
=E03 +C1.C1.10 -KBCL1 44 M 4/6.SNB106 108 /M22.D4 QB2_LOCAL_ITL
=E03 +C1.C1.10 -KBCL1 41 M 4/6.SNB107 109 /M22.D4 QB2_LOCAL_ITL
M 4/6.SNB108 110 /M22.D6 QB2_LOCAL_ITL
=E03 +C1.C1.30 -XQB2 112 M 4/6.SNB109 111 /M22.D5 QB2_LOCAL_ITL
=E03 +C1.C1.30 -XQB2 111 M 4/6.SNB110 112
=E03 +C1.C1.30 -XQB2 102 M 4/6.SNB111 113
M 4/6.SNB112 114
M 4/6.SNB113 115
M 4/6.SNB114 116
M 4/6.SNB115 117
M 4/6.SNB116 118
M 4/6.SNB117 119
M 4/6.SNB118 120
M 4/6.SNB119
F Based on 25-03-2021 KD M 4/6.SNB120 MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
A AS MANUFACTURED 22-09-2021 MR MA Terminal table Resp. dept. +C1.C1.30
B AS BUILT FEM62 DCC EMA
Date Name -XQB2 PGGA Rev. ind. B Language en
Rev. Revision note Prepared 22-09-2021 Sheet 1171
2 Approved 22-09-2021 HITACHI Doc. no. JBTB.056-KIS-EM-E-001 n. sheet 1172
1 Project PT. PLN PERSERO
5 67 8
DSS 150KV KIS
ACP20051
34
Report ABB Terminal A3 - Version 16 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi P Target =E03
B Cable type Internal +C1.C1.30 Cable type
Cable designations Device designation -XQB2 Target Cable designations Signal
External
Terminal strip Pin Placement in B
Device designation schematics
Pin
E/UK
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT C C
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. DD
EE
F Based on 25-03-2021 Prepared 22-09-2021 MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
A AS MANUFACTURED 22-09-2021 KD Approved 22-09-2021 MA Terminal table Resp. dept. +C1.C1.30
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XQB2 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1172
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-001 n. sheet 1173
1
34 5 67 8
Report ABB Terminal A3 - Version 16 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi P =E03
Cable type +C1.C2.20 Cable type
NYSY 4x4mm²
-XAC NYSY 4x4mm²
NYSY 2x4mm²
Terminal strip NYSY 4x4mm²
NYSY 2x4mm²
NYSY 4x4mm²
TargetCable designationsPin Target Pin Cable designations Placement in Signal B
Internal External -WG79L21 schematics C
:1 :R -WG79L26 /G12.B1 ACM_R D
Device designation :1 Device designation :S -WG79L22 /G12.B2 ACM_R
:3 :T -WG79L27 /G12.B2 ACM_S
B :3 =E00 +EQ3401 -X01 :N -WG79L23 /G12.B2 ACM_S
:5 :R -WG79L28 /G12.B2 ACM_T
=E03 +C1.C2.10 -F91 :5 =E00 +EQ3401 -X01 :1 /G12.B2 ACM_T
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT =E03 +C1.C2.10 -F92 :7N E/UK 1 :S /G12.B3 AC_N
=E03 +C1.C2.10 -F91 :102 2 =E00 +EQ3401 -X01 :T /G12.B3 AC_N
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E03 +C1.C2.10 -F92 :1 ZS 6 1 3 :N /G14.B1 ACM_R
=E03 +C1.C2.10 -F91 ZS 6 2 4 =E00 +EQ3401 -X01 :3 /G14.B1 ACM_R
=E03 +C1.C2.10 -F92 :3 ZS 6 3 5 /G14.B2 ACM_S
ZS 6 4 6 =E00 +EQ3401 -X03 /G14.B2 ACM_S
C =E03 +C1.C2.10 -F91 :5 ZS 6 5 7 =E03 +C1.C2.10 -F97 /G14.B2 ACM_T
ZS 6 6 8 =E00 +EQ3401 -X03 /G14.B2 ACM_T
=E03 +C1.C2.20 -XAC :7N ZS 6 7 11 /G14.B2 AC_N
=E03 +C1.C2.10 -F93 ZS 6 8 12 =E00 +EQ3401 -X03 /G14.B2 AC_N
2 ZS 6 11 13
=E03 +C1.C2.10 -F93 112 ZS 6 12 14 =E00 +EQ3401 -X03
ZS 6 13 15 =E03 +C1.C2.10 -F97
=E03 +C1.C2.10 -F93 8 ZS 6 14 16
2 ZS 6 15 17
D =E03 +C1.C2.10 -F93 4 ZS 6 16 18
6 ZS 6 17 19
E =E03 +C1.C2.10 -F92 8N ZS 6 18 20 =E03 +QA1 -X1 21 BU RD /G13.D1 ACM_R E
=E03 +C1.C2.20 -XAC 4 ZS 6 19 101 =E03 +QA1 -X1 22 BU BK YE RD /G13.D2 AC_N
F Based on =E03 +C1.C2.20 -XAC 102 ZS 6 20 102 =E03 +QA1 -X1 15 BU BK /G14.D1 ACM_R
A AS MANUFACTURED =E03 +C1.C2.10 -F93 122 ZS 4 101 103 =E03 +QA1 -X1 17 BK YE RD /G14.D2 ACM_S
B AS BUILT =E03 +C1.C2.10 -F93 2 ZS 4 102 104 =E03 +QA1 -X1 19 BU BK /G14.D2 ACM_T
=E03 +C1.C2.10 -F93 4 ZS 4 103 105 =E03 +QA1 -X1 16 RD /G14.D2 AC_N
Rev. Revision note =E03 +C1.C2.10 -F93 6 ZS 4 104 106 =E03 +QB1 -X1 20 /G13.D2 ACM_S
=E03 +C1.C2.10 -F92 131 ZS 4 105 111 =E03 +QB1 -X1 21 /G13.D3 AC_N
1 =E03 +C1.C2.20 -XAC 6 ZS 4 106 112 =E03 +QB1 -X1 1 /G14.D3 ACM_R
=E03 +C1.C2.20 -XAC 132 ZS 4 111 113 =E03 +QB1 -X1 2 /G14.D3 ACM_S
=E03 +C1.C2.10 -F94 112 ZS 4 112 114 =E03 +QB1 -X1 3 /G14.D4 ACM_T
=E03 +C1.C2.10 -F94 2 ZS 4 113 115 =E03 +QB2 -X1 20 /G13.D4 ACM_T
=E03 +C1.C2.10 -F94 ZS 4 114 121 =E03 +QB2 -X1 21 /G13.D4 AC_N
=E03 +C1.C2.20 -XAC KD ZS 4 115 122 =E03 +QB2 -X1 1 /G14.D4 ACM_R
=E03 +C1.C2.10 -F92 MR ZS 4 121 123
=E03 +C1.C2.20 -XAC ZS 4 122
=E03 +C1.C2.20 -XAC Name ZS 4 123 MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
=E03 +C1.C2.10 -F95 MA Terminal table Resp. dept. +C1.C2.20
Prepared 22-09-2021 DCC EMA
25-03-2021 Approved 22-09-2021 -XAC PGGA Rev. ind. B Language en
22-09-2021 Project PT. PLN PERSERO Sheet 1173
HITACHI Doc. no. JBTB.056-KIS-EM-E-001 n. sheet 1174
Date DSS 150KV KIS
ACP20051 5 67 8
2 34
Report ABB Terminal A3 - Version 16 1 2 34 56 78
A A
© Copyright 2020 Hitachi P B Target =E03
Cable type Internal +C1.C2.20 Cable type
C NYSY 4x4mm²
Device designation -XAC NYSY 2x4mm²
D =E03 +C1.C2.10 -F95 NYSY 4x4mm²
=E03 +C1.C2.10 -F95 Terminal strip NYSY 2x4mm²
=E03 +C1.C2.10 -F97
Cable designations =E03 +C1.C2.10 -F97 Target Cable designations Signal
External BK YE -WG79L28
=E03 +C1.C2.20 -XAC Pin Pin Placement in B
=E03 +C1.C2.20 -XAC Device designation -WG79L24 schematics
=E03 +C1.C2.20 -XAC =E03 +QB2 -X1 2 -WG79L29
=E03 +C1.C2.20 -XAC 4 ZS 4 124 124 =E03 +QB2 -X1 3 -WG79L25 /G14.D5 ACM_S
=E03 +C1.C2.10 -F96 6 ZS 4 125 125 =E03 +C1 -AC P /G14.D5 ACM_T
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT =E03 +C1.C2.10 -F96 2 ZS 4 126 126 =E03 +C1 -AC N /G14.D7 ACM_R
=E03 +C1.C2.10 -F96 4 ZS 4 127 127 /G14.D8 AC_N
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 128
=E03 +C1.C2.20 -XAC ZS 4 128 129
=E03 +C1.C2.20 -XAC 130
ZS 4 129 131
132
ZS 4 130 133
134
139 ZS 4 131 135 =E03 +QB8 -X1 20 BU BK /G13.D5 ACM_T
121 136 =E03 +QB8 -X1 21 BK YE RD /G13.D5 AC_N
122 137 =E03 +QB8 -X1 1 /G14.D6 ACM_R
140 ZS 4 132 138 =E03 +QB8 -X1 2 /G14.D6 ACM_S
139 =E03 +QB8 -X1 3 /G14.D6 ACM_T
2 ZS 4 133 140 C
4 ZS 4 134
6 ZS 4 135
ZS 4 136
ZS 4 137
ZS 4 138
131 ZS 4 139 =E03 +QC9 -XT1 3 BU BK /G13.D6 ACM_T
=E03 +QC9 -XT1 4 /G13.D7 AC_N
132 ZS 4 140
ES 4
E/UK
D
EE
F Based on 25-03-2021 Prepared 22-09-2021 MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
A AS MANUFACTURED 22-09-2021 KD Approved 22-09-2021 MA Terminal table Resp. dept. +C1.C2.20
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XAC PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1174
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-001 n. sheet 1175
1
34 5 67 8
Report ABB Terminal A3 - Version 16 1 2 34 56 78
A A
© Copyright 2020 Hitachi P B Target =E03
Cable type Internal +C1.C2.20 Cable type
C
Cable designations Device designation -XAC1 Target Cable designations Signal
D =E03 +C1.C2.10 -F91 External
=E03 +C1.C2.10 -F91 Terminal strip /G12.D1 ACM_R
=E03 +C1.C2.10 -F91 Device designation /G12.D2 ACM_R
=E03 +C1.C2.10 -F91 Pin =E03 +C1.C2.60 -XG1 Pin Placement in/G12.D2 ACM_R B
=E03 +C1 -E92 =E03 +C1 -XG91 P schematics/G12.D2 ACM_S C
=E03 +C1 -E91 # /G12.D2 ACM_S
2 ZS 4 1 1 =E03 +C1 -XG91 /G12.D2 ACM_S
ZS 4 2 2 # /G12.D2 ACM_T
3 =E03 +C1 -XG91 /G12.D2 ACM_T
ZS 4 3 4 =E03 +C1.C2.20 -XAC1 # /G12.D3 ACM_T
5 =E03 +C1.C2.60 -XG1 13 /G12.D3 AC_N
Print: 3/25/2022 150kV=E03+CP1-BANGIL OHL-JBTB.056-KIS-EM-E-001-Rev-B_AS BUILT 4 ZS 4 4 6 =E03 +C1 -XG91 N /G12.D3 AC_N
ZS 4 5 7 =E03 +C1.C2.20 -XAC1 # /G12.D3 AC_N
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 8 =E03 +C1.A2.20 -E93 10 /G12.F2 AC_N
ZS 4 6 9 N
10
6 ZS 4 7 11
ZS 4 8 12
13
ZS 4 9 14
15
8N ZS 4 10 16
ZS 4 11 17
18
ZS 4 12
X2 ZS 4 13
X2
ZS 4 14
ZS 4 15
ZS 4 16
ZS 4 17
ZS 4 18
ES 4
E/UK D
EE
F Based on 25-03-2021 Prepared 22-09-2021 MR Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E03 F
A AS MANUFACTURED 22-09-2021 KD Approved 22-09-2021 MA Terminal table Resp. dept. +C1.C2.20
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XAC1 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-001 Sheet 1175
1
34 5 67 n. sheet
8
ID HitachiABB Title page A3 - Version 01 1 2 34 56 7 8
A A
© Copyright 2020 ABB B
B Customer : PT. PLN (PERSERO) C
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s Order : ACP20051 D
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C Plant : GI 150kV BANGIL
Equipment : SCHEMATIC DIAGRAM RED670 BANGIL TOWARD KIS
CONTROL AND PROTECTION PANEL
D Title : SCHEMATIC DIAGRAM RED670
EE
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM RED670
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS en
28-09-2021 Title page 1
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language 22
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet
2 34 56 No.sheets
78
ID HitachiABB Report frame A3 - Version 01 1 23 4 5 67 8
Description 2 Rev. Revision note Sheet n.sh. Description 1 Description 2 Rev. Revision note
© Copyright 2020 ABB Sheet n.sh. Description 1
Title page B AS BUILT
A 12 1 - 1103 B AS BUILT A
SYMBOL LEGENDS B AS BUILT B
2 3 List of contents F21 IED VIEW B AS BUILT C
F21 ANALOG INPUT B AS BUILT D
3 4 SCHEMATIC DIAGRAM COMM/AUX POWER CIRCUITS B AS BUILT E
F21 BINARY OUTPUT B AS BUILT
4 D02.4 CUBICLE LAYOUT F21 -TRIP CIRCUIT1 B AS BUILT
F21 MPU BINARY INPUTS B AS BUILT
D02.4 L01.4 SCHEMATIC DIAGRAM F21 MPU BINARY INPUTS B AS BUILT
F21 MPU BINARY INPUTS B AS BUILT
B L01.4 N01.5 SCHEMATIC DIAGRAM
F21 MPU BINARY INPUTS B AS BUILT
N01.5 N01.6 SCHEMATIC DIAGRAM
F21 LINE COMMUNICATION B AS BUILT
N01.6 N01.7 SCHEMATIC DIAGRAM
F21 DFR INTERFACE B AS BUILT
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s N01.7 N01.8 SCHEMATIC DIAGRAM
F21 BINARY OUTPUT SPARE B AS BUILT
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. N01.8 N01.9 SCHEMATIC DIAGRAM
DEVICE OVERVIEW - F21 B AS BUILT
N01.9 N01 SCHEMATIC DIAGRAM DEVICE OVERVIEW - F21 B AS BUILT
.10 DEVICE OVERVIEW - F21 B AS BUILT
=E0x+EF10 B AS BUILT
C =E0x+EF10.C.40-XF21 B AS BUILT
=E0x+EF10.C.40-XF21 B AS BUILT
N01 N01 SCHEMATIC DIAGRAM =E0x+EF10.C.40-XTEL1 B AS BUILT
.10 .11
N01 N01 SCHEMATIC DIAGRAM
.11 .12
N01 N01 SCHEMATIC DIAGRAM
.12 .13
N01 Z03.1 SCHEMATIC DIAGRAM
D .13
Z03.1 Z03.2 SCHEMATIC DIAGRAM
Z03.2 Z03.3 SCHEMATIC DIAGRAM
Z03.3 1001 SCHEMATIC DIAGRAM
1001 1101 Parts list
1101 1102 Terminal table
E 1102 1103 Terminal table
1103 Terminal table
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. List of contents Ref.Des. F
A FOR APPROVAL KD Approved 10-12-2020 MA List of contents
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EAB en
28-09-2021 HITACHI 2
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language 3
Date Name ACP20051 56
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet
2 34 n. sheet
78
12 3 4 5 6 7 8
SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION
© Copyright 2020 ABB A TERMINAL IN GENERAL OPTOCOUPLER OPERATED BY CIRCUIT BREAKER THREE PHASE A
BINARY INPUT TURNING STAR WINDING B
N/O CONTACT
(NORMALLY OPEN)
N/C CONTACT TERMINAL WITH PLUG BINARY OUTPUT OPERATED BY CRANK DISCONNECTOR THREE PHASE WINDING
(NORMALLY CLOSED) WITH NEUTRAL
B PROTECTIVE EARTHING FO CONNECTOR OPERATED BY LEVER EARTH SWITCH THREE PHASE
ZIG-ZAG WINDING
CHANGE-OVER CONTACT
Print: 9/28/2021 150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B TEST CONTACT BLOCK, AUXILIARY RELAY PLUG CONNECTOR M OPERATED BY MOTOR WAVE TRAP THREE PHASE DELTA
SHORT CIRCUIT BEFORE (1 COIL) & OPEN DELTA WINDING
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. OPENING
N/C CONTACT BISTABLE RELAY ANALOG INPUT TRANSFORMER WITH LIGHTNING ARRESTOR CONNECTOR
(SET AND RESET COIL) TWO WINDING EARTH
(LATE OPENING)
TRANSFORMER WITH C
C THREE WINDING
N/O CONTACT MINIATURE CIRCUIT POWER SUPPLY
(PASSING WHEN ACTUATED) BREAKER
N/O CONTACT LAMP FAN AUTO TRANSFORMER DIODE
(EARLY CLOSING) RESISTANCE CAPACITOR
HEATING RESISTOR D
D CHANGE-OVER CONTACT
HOR REACTOR
(MAKE BEFORE BREAK) N
SIGNAL SOURCE / DESTINATION SEMAPHORE DIRECT CURRENT M MOTOR
FOR CONNECTION BETWEEN
DIFFERENT PAGES
1 SWITCH, 2 POSITIONS ALTERNATING G GENERATOR DOOR SWITCH
0 CURRENT
E CT TERMINAL E
DISCONNECTABLE
WITH BRIDGE SEPARABLE, 0
4 POLES 1
2 KEY SWITCH, CURRENT
OPERATED BY KEY TRANSFORMER LINK
3 POSITIONS
VT TERMINALS CONDUCTOR OPERATED BY VOLTAGE FUSE
DISCONNECTABLE PUSHING TRANSFORMER
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS en
28-09-2021 SYMBOL LEGENDS 3
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language 4
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet
2 34 56 n. sheet
78
ID HitachiABB Layout A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 ABB
B B
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s C NEW TERMINALS
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. D -XF21 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 C
48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 D
E RED670*2.2-C42X00-F01-B1X0-BB-CB-B-B6-CD1AD1AX-KKKXABXXXXXY
F Based on ABB Ready Start Trip -F21 -X31 -X41 -X51 -X61 -X401
A FOR APPROVAL 1 1 1 1
B AS BUILT -F21 PE 2 2 2 2 -P1 1
-X11 3 3 3 3 RX 2
Rev. Revision note 4 4 4 4 TX 3
1 5 5 5 5 4
1 6 6 6 6 -P1 5
2 7 7 7 7 RX 6
8 8 8 8 TX 7
3 9 9 9 9 8
10 10 10 10 -P1 9
4 11 11 11 11 RX 10
12 12 12 12 TX 11
5 13 13 13 13 12
14 14 14 14 -X305 13
I ESC Clear 15 15 15 15 A 14
O 16 16 16 16 15
? 17 17 17 17 B 16
18 18 18 18 17
R -X306 18
L -X32 -X42 -X52 -X62 A 19
1 1 1 1 20
2 2 2 2 B 21 -XTEL1 E E E E E E E E E E E E E E E E E E E EE
3 3 3 3 22 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
4 4 4 4 23
5 5 5 5 24
6 6 6 6
7 7 7 7 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
8 8 8 8
9 9 9 9
10 10 10 10
11 11 11 11
12 12 12 12
13 13 13 13
14 14 14 14
15 15 15 15
16 16 16 16
17 17 17 17
18 18 18 18
-S11 -S12 -XTEL1
-S11 -S12 13 21 E
86 65
9 11 10 9
10 12 12 11
57 87
24 43
-F211 - DIFFERENTIAL PROTECTION IED
-S11 - AR ON/OFF SELECTOR SWITCH
-S12 - AR SP/TP SS
10-12-2020 Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Assembly drawing Ref.Des. =E0x F
28-09-2021 KD Approved 10-12-2020 MA CUBICLE LAYOUT DCC ELU +EF10
MA Project PT. PLN (PERSERO)
Date F21 IED VIEW Resp. dept. PGGA Rev. ind. B Language en
GI 150kV BANGIL
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-015 Sheet 4
n. sheet D02.4
34 56
78
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
A
© Copyright 2020 ABB A ANALOG INPUT- MPU B
+EF10 C
PROTECTION PANEL D
E
B
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s REF DWG: L-401-BG150 SHT-D02/1 REF DWG: L-401-BG150 SHT-D02/1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. -X21 -X511
EXISTING TERMINAL
21 23 25 27 1357 REF DWG: L-401-BG150 SHT-X01/2
22 24 26 28
2468 21
C BPR
22
BPN
+U.05 -F21
MPU -X401 1 3 5 7 -X401 13 -X401 15 -X401 17 -X401 19
RED670
+ + + + + + + +
P40#AI.02 P40#AI.03 P40#AI.04 P40#AI.07 P40#AI.08 P40#AI.09 P40#AI.10
P40#AI.01
CT: CT: CT: CT: VT: VT: VT: VT:
1A 1A 1A 1A 0-340V 0-340V 0-340V 0-340V
/Z03.1.B4 - /Z03.1.B4 - /Z03.1.C4 - /Z03.1.D4 - /Z03.1.D4 - /Z03.1.D4 - /Z03.1.E4 -
/Z03.1.B4 -
20
D 2468 14 16 18
-X21
TEST PLUG
10 12 18 20
E
9 11 17 19
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS
28-09-2021 F21 ANALOG INPUT
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet D02.4
2 34 56 n. sheet L01.4
78
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
A
© Copyright 2020 ABB A MPU SUPPLY B
+EF10 C
PROTECTION PANEL D
B -X401
EXISTING TERMINAL
REF DWG: L-401-BG150 SHT-N01/3
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s 3
T1+
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 6
#44475144
-X21 13 15
TEST PLUG
C 14 16
+U.05 -F21 -X11 4
MPU
RED670
/Z03.1.B6 100FX /Z03.1.B6 100FX /Z03.1.C6 100FX +
LC Ethernet port Ethernet port Ethernet port
LC 90-250VDC
LC LC LC LC /Z03.1.B1
PE
D RX TX -P1 RX TX -P1 RX TX -P1 -
5
EE
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS
28-09-2021 COMM/AUX POWER CIRCUITS
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet L01.4
2 34 56 n. sheet N01.5
78
ID HitachiABB Frame A3 - Version 01 1 2 34 5 6 7 8
© Copyright 2020 ABB MPU TRIP - LOCKOUT1 50BF-THREE PH-START SPARE QA1 - AR CLOSE COMMAND CB SYNCH RELEASE MPU OPTD IED NOT READY
SPARE
A SPARE A
+EF10
PROTECTION PANEL
/N01.12.B7 T1+
+U.05-F21:14 (-X62)
B B
C
+U.05 -F21 -X41 17 -X42 11 -X42 14 -X42 8 -X41 14 -X42 17 -X11 3 1
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s MPU
RED670
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
RELAY READY
P4#BO.11 P4#BO.12 P4#BO.19 P4#BO.20 P4#BO.21 P4#BO.22 P4#BO.17 P4#BO.18 P4#BO.09 P4#BO.10 P4#BO.23 P4#BO.24
/Z03.3.E3 /Z03.3.E3 /Z03.3.D4 /Z03.3.D4 /Z03.3.D4 /Z03.3.E4 /Z03.3.D3 /Z03.3.E3 /Z03.3.E4
16 18 10 12 13 15 /Z03.3.C4 /Z03.3.C4 13 15 16 /Z03.3.E4 /Z03.1.B3
79 18 2
C
10
-X211
9
EXISTING TEST SWITCH EXISTING RELAY EXISTING RELAY SYNCH RELEASE INITIATION
13
D -XF21 12 -XF21 15 16 D
E
-F87C 11 14
-B21 -F50BF1 -F25
2 16 13
T2+ 50BF-3 PH-START T1+
-B22 -X522
4 2
#44475162 Auto Reclose Cmd
-A179
24
G1+
25
CB CLOSE REL
REF DWG: L-401-BG150 SHT-N02/3 REF DWG: L-401-BG150 SHT-N05/1 REF DWG: L-401-BG150 SHT-M01/1 REF DWG: L-401-BG150 SHT-X01/3
E
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS
28-09-2021 F21 BINARY OUTPUT
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet N01.5
2 34 56 n. sheet N01.6
78
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 ABB COIL 1 - TRIP R MPU TRIP1 COIL 1 - TRIP T B
+EF10 COIL 1 - TRIP S
C
PROTECTION PANEL -X211 4
D
B TEST SWITCH -K435-2 E
C 1
2
D
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s +U.05 -F21 -X41 2 -X41 5
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. MPU
RED670
P4#BO.01 P4#BO.02 P4#BO.03 P4#BO.04
/Z03.3.B3 /Z03.3.B3 /Z03.3.B3 /Z03.3.C3
1 3 4 6
-X211 6 REF DWG: L-401-BG150 SHT-N01/1
5 8
TEST SWITCH 7
4
3
-X501
12 3
E
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS
28-09-2021 F21 -TRIP CIRCUIT1
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet N01.6
2 34 56 n. sheet N01.7
78
ID HitachiABB Frame A3 - Version 01 1 2 3 4 5 67 8
A
© Copyright 2020 ABB A QA1 - L1 OPEN QA1 - L3 OPEN
B
+EF10 QA1 - L2 OPEN
PROTECTION PANEL
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s B CB CONTACT TO BE CHECKED AT SITE SINCE ALL ARE IN SERIES EXISTING TERMINAL REF DWG: L-401-BG150 SHT-Z02/5
REF DWG: L-401-BG150 SHT-N04/1 REF DWG: L-401-BG150 SHT-N04/1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. EXISTING TERMINAL
-X620
C
6
/MA2.8 T1+
-X620 -X620
10 4
T1+ QA L1 Open
REF DWG: L-401-BG150 SHT-N04/1
-X620
D
8
QA L2 Open
-X620
9
QA L3 Open
-X620
#
T1+
-X620
#
QA L1 Close
-X620
#
QA L2 Close
-X620
#
QA L3 Close
-X2
20
AR BLOCK
-K401
4
BBP OPTD
C
T1+ /N01.8.D1
+C.40-XF21:1
D
+U.05 -F21
MPU -X31 1 -X31 3 -X31 5 -X31 7 -X31 9 -X31 11 -X31 13 -X31 15
RED670 + + + + + + +
E+ P3#BI.02 P3#BI.03 P3#BI.04 P3#BI.05 P3#BI.06 P3#BI.07 P3#BI.08 E
110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC
P3#BI.01
110-125VDC /Z03.2.B3 - /Z03.2.B3 - /Z03.2.C3 - /Z03.2.C3 - /Z03.2.C3 - /Z03.2.D3 - /Z03.2.D3 -
/Z03.2.B3 - 4 6 8 10 12 14 16
2
-K435-2 T1- /N01.8.F1
+U.05-F21:2 (-X32)
2
T1-
REF DWG: L-401-BG150 SHT-N03/1
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS
28-09-2021 F21 MPU BINARY INPUTS
GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
Rev. Revision note Doc. no. JBTB.056-KIS-EM-E-015 Sheet N01.7
2 34 56 n. sheet N01.8
1
78
ID HitachiABB Frame A3 - Version 01 1 2 3 4 56 7 8
© Copyright 2020 ABB A SYNC ON BB - MCB VT OK SPARE LINE VT MCB OK QA1 - POLE DISCREPANCY
EXTERNAL RESET AR BLOCK-CB CLOSE SPG DISCH
+EF10 SPARE A
PROTECTION PANEL **NOTE:WIRING TO BE DONE FROM AUX RELAY TO NEW TERMINAL
**NOTE:WIRING TO BE DONE FROM AUX RELAY TO NEW TERMINAL
B B
REF DWG: L-401-BG150 SHT-L01/1 REF DWG: L-401-BG150 SHT-N04/1 REF DWG: L-401-BG150 SHT-X01/4 REF DWG: L-401-BG150 SHT-N01/3 **
-K435-2 REF DWG: L-401-BG150 SHT-V01/1
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s T1+ -X620 T1+ /N01.10.B1
4 ** -K463:9
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 2
-X2 7 8 LINE PROTN. VT MCB OK 76 7 9
13 -K444 VT SUPV OK -K451 CB PD OPTD -K450 CB AIR PRESSURE LOW
SYNC ON 9 3 11
C C
1 2 NEW TERMINAL 4
-XF21 -XF21 3 -XF21
-XF21
/N01.7.D8 T1+ T1+ /N01.9.D1
-X620:# +U.14-S11:2
D D
+U.05 -F21 -X32 1 -X32 3 -X32 5 -X32 7 -X32 9 -X32 11 -X32 13 -X32 15 E
MPU + + + + + + + +
RED670
P3#BI.09 P3#BI.10 P3#BI.11 P3#BI.12 P3#BI.13 P3#BI.14 P3#BI.15 P3#BI.16
E 110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC
/Z03.2.B4 - /Z03.2.B4 - /Z03.2.B4 - /Z03.2.C4 - /Z03.2.C4 - /Z03.2.C4 - /Z03.2.D4 - /Z03.2.D4 -
2 4 6 8 10 12 14 16
/N01.7.F8 T1- T1- /N01.9.F1
+U.05-F21:16 (-X31) +U.05-F21:2 (-X51)
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS
28-09-2021 F21 MPU BINARY INPUTS
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet N01.8
2 34 56 n. sheet N01.9
78
ID HitachiABB Frame A3 - Version 01 1 2 3 4 5 6 7 8
A
© Copyright 2020 ABB A AR ON AR OFF SPAR TRAP/SPAR DEF RECEIVE TELE COMM FAIL
DTT RECEIVE B
>=E00 +Y.02 TPAR DISTANCE RECEIVE
TELECOM PANEL TBA REF DWG: XXXX
-X16-1-6
B -X15-1-6 -X15-1--8 -X16-1-8
TO MUX ICON
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s -X15-2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 6
T1+
-X15-2
5
DISTANCE REC
-X15-2
7
DEF RECEIVE
-X16-2
5
DTT RECEIVE
-X16-2
7
COMM HEALTHY
C +EF10 C
PROTECTION PANEL
12 3 4 5 CONVERTER
-XTEL1
/N01.8.D8 T1+ T1+ /N01.10.C1
+C.40-XF21:1 -X21:21
24 AR ON 1 2 D
AR OFF 2
D AR ON/OFF SELECTOR SWITCH-S12 COMM HEALTHY /N01.10.D1
+U.05-F21:1 (-X52)
-S11 SPAR/N01.13.D3 1 3 5
TPAR
/N01.13.D2 1 3 STPAR
AR SP/TP SS
+U.05 -F21 LDCM SHORT RANGE LDCM MEDIUM RANGE
(SPARE)
MPU -X51 1 -X51 3 -X51 5 -X51 7 -X51 9 -X51 11 -X51 13 -X51 15 -X305 B A
-X306 B A
RED670
E ++++++++ E
P5#BI.01 P5#BI.02 P5#BI.03 P5#BI.04 P5#BI.05 P5#BI.06 P5#BI.07 P5#BI.08 RX TX FC(Tx) FC(Rx)
110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC IEC61850 /Z03.1.E6
IEC61850
/Z03.2.B6 - /Z03.2.B6 - /Z03.2.B6 - /Z03.2.C6 - /Z03.2.C6 - /Z03.2.C6 - /Z03.2.D6 - /Z03.2.D6 - /Z03.1.D6
2 4 6 8 10 12 14 16
/N01.8.F8 T1- T1- /N01.10.F1
+U.05-F21:16 (-X32) +U.05-F21:2 (-X52)
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS
28-09-2021 F21 MPU BINARY INPUTS
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet N01.9
2 34 56 n. sheet N01.10
78
ID HitachiABB Frame A3 - Version 01 12 3 4 5 6 7 8
© Copyright 2020 ABB TEL COMM GUARD OK MPU IN TEST SPARE SPARE SPARE SPARE SPARE
A QA1 - CLOSE CMD A
+EF10
PROTECTION PANEL
**NOTE:WIRING TO BE DONE FROM AUX RELAY TO NEW TERMINAL
B REF DWG: L-401-BG150 SHT-X01/3 B
/N01.8.B7 T1+
-K450:6
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s 89
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. -K463 CB CLOSE CMD
11
C NEW TERMINAL C
7
5 6 8 9 10
-XF21 D
/N01.9.D8 T1+
+C.40-XTEL1:1
D /N01.9.D6 COMM HEALTHY -X21
+C.40-XTEL1:5
EXISTING TEST SWITCH
21
22
+U.05 -F21
MPU -X52 1 -X52 3 -X52 5 -X52 7 -X52 9 -X52 11 -X52 13 -X52 15
RED670 + + + + + + +
E+ P5#BI.10 P5#BI.11 P5#BI.12 P5#BI.13 P5#BI.14 P5#BI.15 P5#BI.16 E
110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC 110-125VDC
P5#BI.09
110-125VDC /Z03.2.B8 - /Z03.2.B8 - /Z03.2.C8 - /Z03.2.C8 - /Z03.2.C8 - /Z03.2.D8 - /Z03.2.D8 -
/Z03.2.B8 - 4 6 8 10 12 14 16
2
/N01.9.F8 T1-
+U.05-F21:16 (-X51)
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS
28-09-2021 F21 MPU BINARY INPUTS
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet N01.10
2 34 56 n. sheet N01.11
78
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
© Copyright 2020 ABB A DISTANCE SEND DTT SEND +ES10 TELCOM CARRIER FAIL
DEF SEND
>=E00 +Y.02 CONTROL PANEL SPARE A
TELECOM PANEL Note: to new unit B
TBA
B
REF DWG: XXXX
REF DWG: L-401-BG150 SHT-V01/3
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s -X15.2 -X15.2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 1 2
T1+ DISTANCE SEND
-X15.2
4
DEF SEND
-X16.2
2
DTT SEND (REMOTE TRIP)
-X720
18
SA+
-X720
19
CARRIER FAIL
+EF10 8 9 10 12 13 14 15 C
D
C PROTECTION PANEL -XTEL1 -XTEL1
6 11
-XTEL1 -XTEL1
-X21 -X810
EXISTING TEST SWITCH 6
T1+
D 19
-X810
**
20 7
DTT SEND (REMOTE TRIP)
REF DWG: L-401-BG150 SHT-N03/1
+U.05 -F21
MPU -X42 2 -X42 5 -X62 17
RED670
E E
P4#BO.13 P4#BO.14 P4#BO.15 P4#BO.16 P6#BO.23 P6#BO.24
/Z03.3.E8 /Z03.3.E8
/Z03.3.B4 /Z03.3.B4 /Z03.3.B4 /Z03.3.C4 16 18
1 3 46
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS
28-09-2021 F21 LINE COMMUNICATION
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet N01.11
2 34 56 n. sheet N01.12
78
ID HitachiABB Frame A3 - Version 01 1 2 3 45 6 7 8
A
© Copyright 2020 ABB A 21 R-PH TRIP 21 T-PH TRIP DIST Z2 OPTD AIDED TRIP ANY TRIP B
21 S-PH TRIP DEF OPTD
+EF10 DIST Z3 OPTD SOTF OPTD SPARE C
PROTECTION PANEL -K410 T1+ /N01.5.B3 D
+U.05-F21:11 (-X42) E
+U.05 -F21 15
T1+
MPU
RED670 -X61 2 -X61 5 -X61 8 -X61 11 -X62 14
B P6#BO.01 P6#BO.02 P6#BO.03 P6#BO.04 P6#BO.05 P6#BO.06 P6#BO.07 P6#BO.08 P6#BO.21 P6#BO.22
/Z03.3.B6 /Z03.3.B6 /Z03.3.B6 /Z03.3.C6 /Z03.3.C6 /Z03.3.C6 /Z03.3.D6 /Z03.3.D6 /Z03.3.D8 /Z03.3.E8
13 46 79 10 12 13 15
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s C 14
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. D -X211
EXISTING ANNUNCIATOR 13
E EXISTING RELAY
-H110
27
T1+
-H110
18
21 R-PH TRIP
-H110
20
21 S-PH TRIP
-H110
22
21 T-PH TRIP
-H110
24
DEF OPTD
-H110
17
DIST Z1 OPTD
-H110
19
DIST Z2 OPTD
-H110
21
AIDED TRIP
-H110
23
SOTF TRIP
-K1219
10
#44475161
REF DWG: L-401-BG150 SHT-N01/4
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS
28-09-2021 F21 DFR INTERFACE
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet N01.12
2 34 56 n. sheet N01.13
78
ID HitachiABB Frame A3 - Version 01 1 2 34 56 7 8
A
© Copyright 2020 ABB A NEW TERMINAL B
+EF10 24 27 30 33 36 C
PROTECTION PANEL D
E
A/R IN PROGRESS/SUCCESS
21
-XF21
B +U.05 -F21 -X61 14 -X61 17 -X62 2 -X62 5 -X62 8 -X62 11
MPU
RED670
P6#BO.09 P6#BO.10 P6#BO.11 P6#BO.12 P6#BO.13 P6#BO.14 P6#BO.15 P6#BO.16 P6#BO.17 P6#BO.18 P6#BO.19 P6#BO.20
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s /Z03.3.D6 /Z03.3.E6 /Z03.3.E6 /Z03.3.E6 /Z03.3.B8 /Z03.3.B8 /Z03.3.B8 /Z03.3.C8 /Z03.3.C8 /Z03.3.C8 /Z03.3.D8 /Z03.3.D8
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 13 15 16 18 13 46 79 10 12
-XF21
22 23 25 26 28 29 31 32 34 35 37 38
C
NEW TERMINAL
ANUNCIATOR
NEW SWITCH FOR AR FUNCTION
D
-S11 /N01.9.D2 -S12 /N01.9.D3
1 1
2
32
4
3 7
5 9
6 11 6
5
E8
7 SPAR 1
AR ON 1 TPAR 2
STPAR 3
AR OFF 2 AR SP/TP SS
AR ON/OFF SELECTOR SWITCH
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS
28-09-2021 F21 BINARY OUTPUT SPARE
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet N01.13
2 34 56 n. sheet Z03.1
78
ID HitachiABB Frame A3 - Version 01 1 2 34 56 78
© Copyright 2020 ABB A RED670*2.2-C42X00-F01-B1X0-BB-CB-B-B6-CD1AD1AX-KKKXABXXXXXY A
+EF10 -F21 1MRK002239-BB Transformer input module 1MRK002247-AC Communication interface module -P1 Indication HMI
TRM SFP LED
PROTECTION PANEL -X11 1A, 110-220V, 50/60Hz -X401 LC RX
POWER SUPPLY MODULE Ethernet port /L01.4.D2
PSM 2 F211-IL1 +1 100FX
90-250VDC 3 /D02.4.D2 LC TX
P40#AI.01 CT: 1A Communication interface module
-X11 /N01.5.C8 -2 SFP -P1
1 F211-IL2 +3
4+ Ethernet port LC RX
P40#AI.02 CT: 1A /D02.4.D2 100FX /L01.4.D3
5 - -4
/L01.4.D6 F211-IL3 +5 Communication interface module LC TX
SFP
B 90-250VDC P40#AI.03 CT: 1A /D02.4.D2 -P1 B
-6 Ethernet port
PE F211-IN +7 100FX LC RX 1
/L01.4.D4 2
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s RELAY READY P40#AI.04 CT: 1A /D02.4.D3 3
-8 LC TX 4
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C +9 5
- 10 6
P40#AI.05 CT: 1A + 11 7
- 12
P40#AI.06 CT: 1A + 13 M1MPRUK002122-AB COMMUNICATION INTERFACE MODULE C
/D02.4.D4 RED670 LDCM 8
- 14 9
+ 15 Optical budget 7/11dB, 850nm, ST connectors 10
11
F211-UL1 /D02.4.D4 12
- 16 13
P40#AI.07 VT: 0-340V + 17 -X305 14
15
/D02.4.D4 TX A
- 18 D
F211-UL2 + 19 IEC61850 RX B /N01.9.E7
1MRK002311-AA
D P40#AI.08 VT: 0-340V /D02.4.D7 MPU >+EF10.U.05 >-F21
E - 20 RED670
F211-UL3 + 21 Communication interface module
- 22 IEC61850 LDCM
+ 23
- 24 Optical budget 23dB, 1310nm
P40#AI.09 VT: 0-340V
-X306
V-BUS FC(Rx) A
FC(Tx) B /N01.9.E8
P40#AI.10 VT: 0-340V
E
P40#AI.11 VT: 0-340V
P40#AI.12 VT: 0-340V
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS en
28-09-2021 DEVICE OVERVIEW - F21 Z03.1
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language Z03.2
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet
2 34 56 n. sheet
78
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
© Copyright 2020 ABB A 1MRK000508-BD BINARY INPUT MODULE 1MRK000508-BD BINARY INPUT MODULE 1MRK000508-BD BINARY INPUT MODULE 1MRK000508-BD A
BIM BIM BIM B
+EF10 -F21 -X31 110-125VDC, 50mA -X32 110-125VDC, 50mA -X51 110-125VDC, 50mA -X52 C
D
PROTECTION PANEL +1 +1 +1 +1
/N01.7.E2 /N01.8.E2 /N01.9.E2 /N01.10.E2
BINARY INPUT MODULE
BIM -2 -2 -2 -2
110-125VDC, 50mA
+3 +3 +3
QA1 - L1 OPEN /N01.7.E2 SYNC ON AR ON /N01.9.E2 TEL COMM GUARD OK /N01.10.E3
P3#BI.01 110-125VDC -4 P3#BI.09 110-125VDC P5#BI.01 110-125VDC -4 P5#BI.09 110-125VDC -4
B QA1 - L2 OPEN +5 SPARE +3 AR OFF +5 QA1 - CLOSE CMD +5
/N01.7.E3 P3#BI.10 /N01.8.E3 /N01.9.E3 /N01.10.E3
P3#BI.02 110-125VDC 110-125VDC P5#BI.02 110-125VDC P5#BI.10 110-125VDC
-6 -4 -6 -6
QA1 - L3 OPEN +7 BB - MCB VT OK +5 SPAR +7 MPU IN TEST +7
/N01.7.E4 /N01.8.E3 /N01.9.E3 /N01.10.E4
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s P3#BI.03 110-125VDC P3#BI.11 110-125VDC P5#BI.03 110-125VDC P5#BI.11 110-125VDC
-8 -6 -8 -8
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
QA1 - L1 CLOSE +9 SPARE +7 TPAR +9 SPARE +9
/N01.7.E4 P3#BI.12 /N01.8.E4 /N01.9.E4 /N01.10.E5
P3#BI.04 110-125VDC 110-125VDC P5#BI.04 110-125VDC P5#BI.12 110-125VDC
- 10 -8 - 10 - 10
C QA1 - L2 CLOSE + 11 LINE VT MCB OK +9 TRAP/SPAR + 11 SPARE + 11
/N01.7.E5 /N01.8.E4 /N01.9.E4 /N01.10.E6
P3#BI.05 110-125VDC P3#BI.13 110-125VDC P5#BI.05 110-125VDC P5#BI.13 110-125VDC
- 12 - 10 - 12 - 12
QA1 - L3 CLOSE + 13 EXTERNAL RESET + 11 DISTANCE RECEIVE + 13 SPARE + 13
/N01.7.E6 /N01.8.E5 /N01.9.E5 /N01.10.E7
P3#BI.06 110-125VDC P3#BI.14 110-125VDC P5#BI.06 110-125VDC P5#BI.14 110-125VDC
- 14 - 12 - 14 - 14
AR BLOCK + 15 QA1 - POLE DISCREPANCY + 13 DEF RECEIVE + 15 SPARE + 15
/N01.7.E6 /N01.8.E6 /N01.9.E6 /N01.10.E8
P3#BI.07 110-125VDC P3#BI.15 110-125VDC P5#BI.07 110-125VDC P5#BI.15 110-125VDC
- 16 - 14 - 16 - 16
BBP OPTD(INVERTED) AR BLOCK-CB CLOSE SPG DISCH + 15 DTT RECEIVE SPARE
- /N01.8.E6
D
16
P3#BI.08 110-125VDC P3#BI.16 110-125VDC P5#BI.08 110-125VDC P5#BI.16 110-125VDC
EE
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS en
28-09-2021 DEVICE OVERVIEW - F21 Z03.2
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language Z03.3
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet
2 34 56 n. sheet
78
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
© Copyright 2020 ABB A 1MRK000614-AB BINARY OUTPUT MODULE 1MRK000614-AB BINARY OUTPUT MODULE 1MRK000614-AB BINARY OUTPUT MODULE 1MRK000614-AB A
BOM BOM BOM B
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s +EF10 -F21 -X41 -X42 -X61 -X62 C
DISTANCE SEND 21 R-PH TRIP SPARE D
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. PROTECTION PANEL 2 P4#BO.13 2 P6#BO.01 2 P6#BO.13 2 E
BINARY OUTPUT MODULE /N01.6.C3 DEF SEND /N01.11.E2 21 S-PH TRIP /N01.12.B2 SPARE /N01.13.B3
BOM P4#BO.14 P6#BO.02 P6#BO.14
1 DTT SEND 1 21 T-PH TRIP 1 SPARE 1
COIL 1 - TRIP R P4#BO.15 P6#BO.03 P6#BO.15
P4#BO.01 3 3 DEF OPTD 3 SPARE 3
/N01.6.C3 /N01.11.E2 P6#BO.04 /N01.12.B3 P6#BO.16 /N01.13.B3
B COIL 1 - TRIP S DIST Z2 OPTD SPARE
5 5 P6#BO.05 5 P6#BO.17 5
P4#BO.02 /N01.6.C4 /N01.11.E2 DIST Z3 OPTD /N01.12.B3 SPARE /N01.13.B4
COIL 1 - TRIP T P6#BO.06 P6#BO.18
P4#BO.03 4 4 AIDED TRIP 4 SPARE 4
P6#BO.07 P6#BO.19
P4#BO.04 6 P4#BO.16 6 SOTF OPTD 6 SPARE 6
/N01.6.C4 QA1 - AR CLOSE COMMAND /N01.11.E3 P6#BO.08 /N01.12.B4 P6#BO.20 /N01.13.B4
C COIL 2 - TRIP R P4#BO.17 SPARE ANY TRIP
8 SPARE 8 P6#BO.09 8 P6#BO.21 8
P4#BO.05 7 P4#BO.18 /N01.5.C5 SPARE /N01.12.B4 SPARE /N01.13.B5
COIL 2 - TRIP S 50BF-THREE PH-START P6#BO.10 P6#BO.22
P4#BO.06 9 P4#BO.19 7 SPARE 7 TELCOM CARRIER FAIL 7
COIL 2 - TRIP T 11 SPARE P6#BO.11 P6#BO.23
P4#BO.07 10 P4#BO.20 9 SPARE 9 SPARE 9
SPARE /N01.5.C6 P6#BO.12 /N01.12.B4 P6#BO.24 /N01.13.B5
D 12 P4#BO.21
14 SPARE 11 11 11
P4#BO.08 P4#BO.22 /N01.5.C3 /N01.12.B5 /N01.13.B6
CB SYNCH RELEASE /N01.5.C6 MPU OPTD
P4#BO.09 13 P4#BO.23 10 10 10
P4#BO.10 15 12 12 12
MPU TRIP - LOCKOUT1 /N01.5.C7 /N01.5.C4 /N01.12.B5 /N01.13.B6
E 17 14 14 14
/N01.5.C2 /N01.5.C4 /N01.13.B1 /N01.12.B6
P4#BO.11
16 13 13 13
P4#BO.12
18 15 15 15
/N01.5.C2 /N01.5.C4 /N01.13.B2 /N01.12.B6
17 17 17
/N01.5.C7 /N01.13.B2 /N01.11.E7
16 16 16
P4#BO.24 18 18 18
/N01.5.C8 /N01.13.B3 /N01.11.E7
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Circuit diagram Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA SCHEMATIC DIAGRAM
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EFS en
28-09-2021 DEVICE OVERVIEW - F21 Z03.3
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language 1001
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet
2 34 56 n. sheet
78
ID HitachiABB Report frame A3 - Version 01 1 23 4 5 6 78
Technical data Remark Article number Manufacturer
© Copyright 2020 ABB Pos. Location Device Device Type designation Manufacturer number Qty. Pages
A designation description
A
1 +C.40 -XF21
Disconnect terminal M 4/6.SNB 400V, 20A 0.5-4mm², max 2 wires, grey 1SNA115986R0000 ABB Entrelec 1SNA115986R0000 48 4,N01.5,N01.8,N01.10,N01.13
End bracket E/UK 400V, 20A Grey GZN 590043P0007 Phoenix Contact 1201442 14
Cover FEM62 C42, VER. 2.2 CONFIGURED 0.5-4mm², max 2 wires, grey 1SNA114994R0700 ABB Entrelec 1SNA114994R0700 14
Grey
2 +C.40 -XTEL1 Disconnect terminal M 4/6.SNB 1SNA115986R0000 ABB Entrelec 1SNA115986R0000 18 4,N01.9,N01.11
End bracket E/UK GZN 590043P0007 Phoenix Contact 1201442 2 4,N01.9
Cover FEM62 1SNA114994R0700 ABB Entrelec 1SNA114994R0700 1 4,N01.9
3 +U.05 -F21 Numerical line differential RED670 1MRK004810-KG ABB RED670*2.2-C42X00-F01- 1 Z03.1
protection IED B1X0-BB-CB-B-B6-
B PSM 1MRK002239-BB ABB CD1AD1AX-KKKXABXXXXXY B
Power supply module BIM 1MRK000508-BD ABB 1MRK002239-BB
Binary input module BOM 90-250VDC 50/60Hz 1MRK000614-AB ABB 1MRK000508-BD 1 4,L01.4,N01.5,Z03.1
Binary output module 110-125VDC, 50mA 16 inputs 1MRK000614-AB 2 4,N01.7,N01.8,N01.9,N01.10,Z03.2
24 output relays 1MRK002122-AB ABB 2 4,N01.5,N01.6,N01.11,
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s 1MRK002122-AB
Line data communication module LDCM Optical budget 7/11dB, 850nm, ST Optical short range, 2/3 km 1MRK002311-AA ABB N01.12,N01.13,Z03.3
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. connectors 1MRK005500-AA ABB
Optical medium range, c:a 65km 1MRK002247-AC ABB 1 4,N01.9,Z03.1
Optical budget 23dB, 1310nm Version 2.2 1MRK002420-BA ABB
C Line data communication module LDCM 100Base-FX, LC connectors 6I+6U, Ring lug connector 1MRK000151-VB ABB 1MRK002311-AA 1 4,N01.9,Z03.1 C
Ethernet module SFP 1A, 110-220V, 50/60Hz For 3/4x19" case, grey ABB 1MRK005500-AA 3 4,L01.4,Z03.1
4 +U.14 Transformer input module TRM 3/4x19", Version 2.2 Kraus & Naimer 1MRK002247-AC 1 4,D02.4,Z03.1
Mounting kit 19" mounting kit 8xI/O, 1xTRM Medium size, Rex670 V2.2 1MRK002420-BA 14
Rack casing 3/4x19" REx670 rack casing 1MRK000151-VB 14
15 LED indication module LED Double throw switch without off, 2 Engraving: PRC: Text 1, 1 4,Z03.1
change-over contacts, 30 degree switchplate: 0 degree: Text 2, 90 CA10-A721-600 FT2
-S11 Switch 2 2-pos. contacts without 0 position switching, Fixed Type degree: Text 3 1 4,N01.9,N01.13
5 +U.14 -S12 Switch 2 3-pos. contacts without 0 position Multistep switch without "OFF", 2 Engraving: PRC: Text1, Kraus & Naimer CG8 A250-600 FT2-V 1 4,N01.9,N01.13
pole, 60 degree switching switchplate: 270 degree: Text2,
330 degree: Text3, 30 degree:
Text4
D D
EE
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Parts list Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA Parts list +EF10
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EPB
28-09-2021 =E0x+EF10 en
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language 1001
Date Name ACP20051 HITACHI 1101
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet
2 34 56 n. sheet
78
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 ABB =E0x
B Cable type +EF10.C.40 Cable type
C Cable designations Target -XF21 Target Cable designations Signal
Internal External
D Terminal strip /N01.8.C2 T1+
Device designation Device designation /N01.8.C3 SYNC OVER
E Pin Pin /N01.8.C4 BB2 VT OKPlacement in B
/N01.8.C5 RESETschematics C
F Based on /N01.10.C4 T1+ D
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s A FOR APPROVAL =E0x +EF10.U.14 -S11 2 E/UK 1 /N01.10.C4 SPARE
B AS BUILT =E0x +EF10.U.05 -F21 3 (-X32) 2 /N01.10.C5 SPARE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E0x +EF10.U.05 -F21 7 (-X32) M 4/6.SNB 1 3 /N01.10.C6 SPARE
Rev. Revision note =E0x +EF10.U.05 -F21 11 (-X32) M 4/6.SNB 2 4 /N01.10.C7 SPARE
=E0x +EF10 -X21 M 4/6.SNB 3 5 /N01.10.C8 SPARE
1 =E0x +EF10.U.05 -F21 21 M 4/6.SNB 4 6 /N01.5.D4 T1+
=E0x +EF10.U.05 -F21 7 (-X52) M 4/6.SNB 5 7 /N01.5.D4 50BF-TPH-START
=E0x +EF10.U.05 -F21 9 (-X52) M 4/6.SNB 6 8 /N01.5.D4 #44475119
=E0x +EF10.U.05 -F21 11 (-X52) M 4/6.SNB 7 9 /N01.5.D7 +DCF204
=E0x +EF10.U.05 -F21 13 (-X52) M 4/6.SNB 8 10 /N01.5.D7 MPU OPTD
=E0x +EF10.U.05 -F21 15 (-X52) M 4/6.SNB 9 11 /N01.5.D8 MPU FAILURE
=E0x +EF10.U.05 -F21 14 (-X42) M 4/6.SNB 10 12
=E0x +EF10.U.05 -F21 13 (-X42) M 4/6.SNB 11 13
=E0x +EF10.U.05 -F21 15 (-X42) M 4/6.SNB 12 14
=E0x +EF10.U.05 -F21 17 (-X42) M 4/6.SNB 13 15
=E0x +EF10.U.05 -F21 16 (-X42) M 4/6.SNB 14 16
2 (-X11) M 4/6.SNB 15 17
M 4/6.SNB 16 18
=E0x +EF10.U.05 -F21 14 (-X61) M 4/6.SNB 17 19 /N01.13.B1 SPARE E
=E0x +EF10.U.05 -F21 13 (-X61) M 4/6.SNB 18 20 /N01.13.C1SPARE
=E0x +EF10.U.05 -F21 15 (-X61) M 4/6.SNB 19 21 /N01.13.C2 SPARE
=E0x +EF10.U.05 -F21 17 (-X61) M 4/6.SNB 20 22 /N01.13.B2 SPARE
=E0x +EF10.U.05 -F21 16 (-X61) M 4/6.SNB 21 23 /N01.13.C2 SPARE
=E0x +EF10.U.05 -F21 18 (-X61) M 4/6.SNB 22 24 /N01.13.C3 SPARE
=E0x +EF10.U.05 -F21 2 (-X62) M 4/6.SNB 23 25 /N01.13.B3 #44475122
=E0x +EF10.U.05 -F21 1 (-X62) M 4/6.SNB 24 26 /N01.13.C3 #44475123
=E0x +EF10.U.05 -F21 3 (-X62) M 4/6.SNB 25 27 /N01.13.C3 #44475124
=E0x +EF10.U.05 -F21 5 (-X62) M 4/6.SNB 26 28 /N01.13.B4 #44475125
M 4/6.SNB 27 29
M 4/6.SNB 28 30
M 4/6.SNB 29
M 4/6.SNB 30 KD Title 150KV OHL BANGIL-KIS Doc. kind. Ref.Des. =E0x F
MA Terminal table +EF10.C.40
10-12-2020 KD Prepared 10-12-2020 DCC EMA
28-09-2021 MA Approved 10-12-2020 -XF21
Project PT. PLN (PERSERO) Resp. dept. PGGA Rev. ind. B Language en
Date Name HITACHI
GI 150kV BANGIL Doc. no. JBTB.056-KIS-EM-E-015 Sheet 1101
2 ACP20051 56 n. sheet 1102
34
78
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 ABB B =E0x
Cable type +EF10.C.40 Cable type
C
Cable designations Target -XF21 Target Cable designations Signal
D Internal External
Terminal strip /N01.13.C4 #44475126
Device designation Device designation /N01.13.C4 #44475127
=E0x +EF10.U.05 -F21 Pin Pin Placement in/N01.13.B5 #44475128 B
=E0x +EF10.U.05 -F21 4 (-X62) schematics/N01.13.C5 #44475129 C
=E0x +EF10.U.05 -F21 6 (-X62) /N01.13.C5 #44475130
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s =E0x +EF10.U.05 -F21 8 (-X62) M 4/6.SNB 31 31 /N01.13.B6 #44475131
=E0x +EF10.U.05 -F21 7 (-X62) M 4/6.SNB 32 32 /N01.13.C6 #44475132
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E0x +EF10.U.05 -F21 9 (-X62) M 4/6.SNB 33 33 /N01.13.C6 #44475133
=E0x +EF10.U.05 -F21 11 (-X62) M 4/6.SNB 34 34
=E0x +EF10.U.05 -F21 10 (-X62) M 4/6.SNB 35 35
12 (-X62) M 4/6.SNB 36 36
M 4/6.SNB 37 37
M 4/6.SNB 38 38 D
M 4/6.SNB 39 39
M 4/6.SNB 40 40
M 4/6.SNB 41 41
M 4/6.SNB 42 42
M 4/6.SNB 43 43
M 4/6.SNB 44 44
M 4/6.SNB 45 45
M 4/6.SNB 46 46
M 4/6.SNB 47 47
M 4/6.SNB 48 48
FEM62
EE
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA Terminal table +EF10.C.40
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EMA
28-09-2021 -XF21
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 Doc. no. JBTB.056-KIS-EM-E-015 Sheet 1102
2 34 56 n. sheet 1103
78
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 ABB B =E0x
Cable type +EF10.C.40 Cable type
C
Cable designations Target -XTEL1 Target Cable designations Signal
D Internal External
E Terminal strip
Device designation Device designation
Pin Pin Placement in B
schematics C
D
Print: 9/28/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\Remote\150kV=E00+CP1-Remote Line-Bangil-KIS_Rev-B.e3s =E0x +EF10 -X21 21 E/UK 1 /N01.9.C4 T1+
=E0x +EF10.U.05 -F21 11 (-X51) 2 /N01.9.C4 DISTANCE REC
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E0x +EF10.U.05 -F21 13 (-X51) M 4/6.SNB 1 3 /N01.9.C5 DEF RECEIVE
=E0x +EF10.U.05 -F21 15 (-X51) M 4/6.SNB 2 4 /N01.9.C6 DTT RECEIVE
=E0x +EF10.U.05 -F21 1 (-X52) M 4/6.SNB 3 5 /N01.9.C6 COMM HEALTHY
=E0x +EF10 -X21 M 4/6.SNB 4 6 /N01.11.C2 T1+
19 M 4/6.SNB 5 7
=E0x +EF10.U.05 -F21 M 4/6.SNB 6 8 /N01.11.C3DISTANCE SEND
=E0x +EF10.U.05 -F21 1 (-X42) M 4/6.SNB 7 9 /N01.11.C3DEF SEND
=E0x +EF10.U.05 -F21 3 (-X42) M 4/6.SNB 8 10 /N01.11.C4DTT SEND (REMOTE TRIP)
=E0x +EF10 -X810 4 (-X42) M 4/6.SNB 9 11 /N01.11.C5 T1+
=E0x +EF10 -X810 M 4/6.SNB 10 12 /N01.11.C6DTT SEND (REMOTE TRIP)
=E0x +EF10.U.05 -F21 6 M 4/6.SNB 11 13 /N01.11.C7 SA+
=E0x +EF10.U.05 -F21 7 M 4/6.SNB 12 14 /N01.11.C8CARRIER FAIL
=E0x +EF10.U.05 -F21 17 (-X62) M 4/6.SNB 13 15 /N01.11.C8 #44475101
16 (-X62) M 4/6.SNB 14 16
18 (-X62) M 4/6.SNB 15 17
M 4/6.SNB 16 18
M 4/6.SNB 17
M 4/6.SNB 18
FEM62
E/UK
E
F Based on Prepared 10-12-2020 KD Title 150KV OHL BANGIL-KIS Doc. kind. Ref.Des. =E0x F
A FOR APPROVAL KD Approved 10-12-2020 MA Terminal table +EF10.C.40
B AS BUILT 10-12-2020 MA Project PT. PLN (PERSERO) DCC EMA
28-09-2021 -XTEL1
Rev. Revision note GI 150kV BANGIL Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI
1 JBTB.056-KIS-EM-E-015 Sheet 1103
2 34 56 n. sheet
Doc. no.
78
ID HitachiABB Title page A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 ABB B
B Customer : PT. PLN (PERSERO) C
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s Order : ACP20051 D
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C Plant : DSS 150KV KIS
Equipment : 150KV COMMMON DRAWING
D Title : SCHEMATIC DIAGRAM
EE
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 Title page 1
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 10
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 No.sheets
2 34 56
7 8
ID HitachiABB Report frame A3 - Version 01 1 23 4 5 67 8
Sheet n.sh. Description 1 Description 2 Rev. Revision note Sheet n.sh. Description 1 Description 2 Rev. Revision note
© Copyright 2020 ABB A 12
TITLE PAGE B AS BUILT A
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s 2 21 LIST OF CONTENT 1 - 28 B AS BUILT B
21 22 SCHEMATIC DIAGRAM 110V DC SUPPLY FOR CRP/MK B AS BUILT C
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 22 23 SCHEMATIC DIAGRAM 110V DC SUPPLY FOR CRP/MK B AS BUILT
23 24 SCHEMATIC DIAGRAM SAS AC & DC SUPPLY B AS BUILT
20KV SAS AC SUPPLY B AS BUILT
B 24 25 SCHEMATIC DIAGRAM 400/230V AC SUPPLY FOR CRP B AS BUILT
400/230V AC SUPPLY FOR MK B AS BUILT
25 26 SCHEMATIC DIAGRAM 400/230V AC SUPPLY FOR MOTOR B AS BUILT
26 27 SCHEMATIC DIAGRAM MK TEMP SENSOR COMMUNICATION B AS BUILT
27 28 SCHEMATIC DIAGRAM
28 SCHEMATIC DIAGRAM
C
DD
EE
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. LIST OF CONTENT Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA LIST OF CONTENT
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EAB en
22-09-2021 HITACHI 2
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 21
Date Name ACP20051 56
1 Doc. no. JBTB.056-KIS-EM-E-011 Sheet
2 34 n. sheet
78
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
© Copyright 2020 ABB 110V DC SUPPLY CRP/MK REF DWG NO: GI-110/KIS-883/2020 SH: 19-18/54 MCB - Q03, 2P , 20A, 15kA A
B
A MCB - Q02, 2P , 20A, 15kA MCB - Q01, 2P , 20A, 15kA C
D
=E00 +EQ3411 E
110V DC DISTRIBUTION PANEL 1
MCB - Q04, 2P , 20A, 15kA
-X04 -X02 -X01 -X03
1+ 1+ 1+ 1+
+DC1 +DC1 +DC1 +DC1
2- 2- 2- 2-
-DC1 -DC1 -DC1 -DC1
=E00 +EQ3412 MCB - Q04, 2P , 20A, 15kA REF DWG NO: GI-110/KIS-883/2020 SH: 21-22/54 MCB - Q01, 2P , 20A, 15kA MCB - Q03, 2P , 20A, 15kA
MCB - Q02, 2P , 20A, 15kA
110V DC DISTRIBUTION PANEL 2
B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s -X04 -X02 -X01 -X03
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 1+ 1+ 1+ 1+
+DC2 +DC2 +DC2 +DC2
2- 2- 2- 2-
-DC2 -DC2 -DC2 -DC2
=E01 +CP1 =E02 +CP1 =E03 +CP1 =E04 +CP1
CRP BUS COUPLER CRP PORONG OHL CRP BANGIL OHL CRP KTT UGC
102 502 102 502 102 502 102 502 102 502 102 502 102 502 102 502
501 501
101 501 101 501 101 501 101 501 101 501 101 101 501 101
-XDC1 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2
C
=E01 +C1 =E02 +C1 =E03 +C1 =E04 +C1
MK BUS COUPLER MK PORONG OHL MK BANGIL OHL MK KTT UGC
D 101 501 101 501 101 501 101 501 101 501 101 501 101 501
101 501 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2
-XDC1
REF DWG: JBTB1.056-KIS-EM-E-005/L11/L12/L13/L14 REF DWG: JBTB1.056-KIS-EM-E-002/L11/L12/L13/L14 REF DWG: JBTB1.056-KIS-EM-E-001/L11/L12/L13/L14 REF DWG: JBTB1.056-KIS-EM-E-003/L11/L12/L13/L14
E
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 110V DC SUPPLY FOR CRP/MK 21
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 22
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 12 34 5 6 7 8
A
© Copyright 2020 ABB A 110V DC SUPPLY CRP/MK B
=E00 +EQ3411 REF DWG NO: GI-110/KIS-883/2020 SH: 19-18/54 MCB - Q13, 2P , 20A, 15kA C
MCB - Q11, 2P , 20A, 15kA
110V DC DISTRIBUTION PANEL 1 D
MCB - Q05, 2P , 20A, 15kA E
-X05 -X11 -X13
1+ 1+ 1+
+DC1 +DC1 +DC1
2- 2- 1-
-DC1 -DC1 -DC1
=E00 +EQ3412 MCB - Q05, 2P , 20A, 15kA REF DWG NO: GI-110/KIS-883/2020 SH: 21/54 REF DWG NO: GI-110/KIS-883/2020 SH: 22/54
MCB - Q10, 2P , 20A, 15kA MCB - Q13, 2P , 20A, 15kA
110V DC DISTRIBUTION PANEL 2
B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s -X05 -X10 -X09
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 1+ 1+ 1+
+DC2 +DC2 +DC2
2- 1- 1-
-DC2 -DC2 -DC2
=E05 +CP1 =E00 +CM1 =E00 +DFR1 =E00 +DFR2
CRP TRAFO-1 ENERGY METER PANEL DFR PANEL1 DFR PANEL2
102 502 102 502 101 501 101 501 + - + -
501
101 501 101 -XDC1 -XDC2 -TP31 -TP31
-XDC1 -XDC2
C
REF DWG: JBTB1.056-KIS-EM-E-011/L11 REF DWG: JBTB1.056-KIS-EM-F-001/ SH 03 OF 15 REF DWG: JBTB1.056-KIS-EM-F-001/ SH 08 OF 15
=E05 +C1
MK TRAFO-1
D 101 501 101 501
-XDC1 -XDC2
REF DWG: JBTB1.056-KIS-EM-E-004/L11/L12/L13/L14
E
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 110V DC SUPPLY FOR CRP/MK 22
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 23
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
© Copyright 2020 ABB A REF DWG NO: GI-110/KIS-845/2020 SH: 17 OFF 54 -X07 A
MCB - Q07, 2P , 20A, 15kA B
+EQ3411 C
1+ 2- D
110V DC DISTRIBUTION PANEL 1
MCB - Q07, 2P , 20A, 15kA
+EQ3412 REF DWG NO: GI-110/KIS-883/2020 SH: 22 OF 54
110V DC DISTRIBUTION PANEL 2 1+ 2-
B RN
-X02
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E00 +Inverter -X01 -X07
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. INVERTER SUPPLY =E00 +EQ3421 MCB - Q04,2P , 20A, 15kA
REF DWG NO: GI-48/TTY-XXX/2020 SH:XX
RN 48V DC DISTRIBUTION PANEL
=E00 +EQ3401-X06 N -X04
ACM_N
C 400/230V AC DISTRIBUTION PANELS 1+
ACM_S +48V DC
REF DWG NO: GI-400/KIS-882/2020 SH: 12 OF27 1-
MCB - Q11 ,3P , 20A, 15kA -48V DC
=E00 +CX1 =E00 +CX2
SAS PANEL - 1 SAS PANEL - 2
D
E E
12 3 4 5 6 7 8 1 2 101 102 501 502 101 501 101 501 12 3 4 5 6 7 8 1 2 101 501 101 102 501 502
-XAC. -XAC3 -XDC1 -XDC2 -XDC3 -XAC -XAC3 -XDC1 -XDC2 -XDC2
REF DWG: JBTB1.056-KIS-EM-E-012/21/22 REF DWG: JBTB1.056-KIS-EM-E-013/21/22
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 SAS AC & DC SUPPLY 23
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 24
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 34 56 78
© Copyright 2020 ABB A REF DWG NO: GI-110/KIS-845/2020 SH: 17 MCB - Q01,2P , 20A, 15kA MCB - Q05, 2P , 20A, 15kA A
MCB - Q04, 2P , 20A, 15kA REF DWG NO: GI-48/KIS-XXX/2020 SH:XX B
+EQ3413 -X04 -X05 C
1+ 2- =J00 +C1 D
110V DC DISTRIBUTION PANEL 3 1+ E
20kV MERGING UNIT MK +DC1
=E00 +EQ3401 2-
-DC1
400/230V AC DISTRIBUTION PANEL REF DWG NO: GI-400/KIS-882/2020 SH: 12 OF27
-X21 -X21
B
R N
MCB - Q11 ,3P , 20A, 15kAACM_R ACM_N
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E00 +Inverter -X03RN
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. INVERTER SUPPLY -X011+ 2-
+EQ3422
C 48V DC DISTRIBUTION PANEL 2
=J00 +CX1
20KV SAS PANEL
D
12 3 4 5 6 7 8 1 2 101 501 101 501 12 3 4 5 6 7 8 101 501
-XAC. -XAC3 -XDC1 -XDC3 -XAC. -XDC1
REF DWG: JBTB1.056-KIS-EM-E-014/21/22 REF DWG: JBTB1.056-KIS-EM-E-011/22
E
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 20KV SAS AC SUPPLY 24
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 25
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 12 34 5 67 8
A
© Copyright 2020 ABB 230V AC SUPPLY FOR CRP
-X02
-X02 A
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E00 +EQ3401 =E02 +CP1 =E03 +CP1 B
C
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 400/230V AC DISTRIBUTION PANEL PORONG OHL BANGIL OHL D
E
REF DWG NO: GI-400/KIS-882/2020 SH: 12 OF27 REF DWG: JBTB1.056-KIS-EM-E-002/G11 REF DWG: JBTB1.056-KIS-EM-E-0011/G11
MCB - Q02 ,2P , 20A, 15kA
RN
B
=E01 +CP1
BUS COUPLER
REF DWG: JBTB1.056-KIS-EM-E-005/G11
C 12 34 56 78 1 2 34 56 78 1 2 34 56 78
-XAC. -XAC. -XAC.
=E04 +CP1 =E00 +CM1 =E05 +CP1
KTT BAY ENERGU METERING PANEL TRAFO-1
REF DWG: JBTB1.056-KIS-EM-E-003/G11 REF DWG: JBTB1.056-KIS-EM-E-009/G11 REF DWG: JBTB1.056-KIS-EM-E-004/G11
D
1 2 34 56 78 1 2 34 56 78 1 2 34 56 78
-XAC. -XAC. -XAC.
E
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 400/230V AC SUPPLY FOR CRP 25
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 26
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 12 3 45 67 8
© Copyright 2020 ABB A AC SUPPLY MARSHALLING KIOSK REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 A
HEATING/LIGHTING MCB - Q01,3P , 40A, 15kA B
=E00 +EQ3401 C
REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 D
400/230V AC DISTRIBUTION PANEL MCB - Q05,3P , 20A, 15kA
REF DWG: GI-400/KIS-882/2020 SH 13 OF 27
MCB - Q13,3P , 20A, 15kA
-X13 -X05 -X01
R R R
ACM_R ACM_R ACM_R
S S S
ACM_S ACM_S ACM_S
T T T
ACM_T ACM_T ACM_T
N N N
AC_N AC_N AC_N
B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E01 +C1 =E02 +C1 =E03 +C1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. MK BUS COUPLER PORONG OHL BANGIL OHL
12 34 56 78 1 2 34 56 78 1 2 34 56 78
C -XAC -XAC -XAC
REF DWG: JBTB1.056-KIS-EM-E-005/G12 REF DWG: JBTB1.056-KIS-EM-E-002/G14/G12 REF DWG: JBTB1.056-KIS-EM-E-001/G14/G12
=E00 +EQ3401 REF DWG: GI-400/KIS-882/2020 SH 13 OF 27 REF DWG: GI-400/KIS-882/2020 SH 14 OF 27 REF DWG: GI-400/KIS-882/2020 SH 16 OF 27
MCB - Q10,3P , 20A, 15kA MCB - Q18,3P , 20A, 15kA MCB - Q34,3P , 32A, 15kA
400/230V AC DISTRIBUTION PANEL
D
-X10 -X18 -X34
R R R
ACM_R ACM_R ACM_R
S S S
ACM_S ACM_S ACM_S
T T N
ACM_T ACM_T ACM_T
N N T
AC_N AC_N AC_N
=E04 +C1 =E05 +C1 =E05 +T1.C1
KTT BAY TRAFO-1 TRAFO-1 MK
E E
1 2 34 56 78 1 2 34 56 78 -X1
-XAC -XAC L1
ACM_R
-X1
L2
ACM_S
-X1
L3
ACM_T
-X1
N
AC_N
REF DWG: JBTB1.056-KIS-EM-E-003/G12 REF DWG: JBTB1.056-KIS-EM-E-004/G12 DRAWING NO. PS-PX-070-FOMB SH: 14 OF 19
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 400/230V AC SUPPLY FOR MK 26
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 27
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 123 45 67 8
© Copyright 2020 ABB A AC SUPPLY MARSHALLING KIOSK TRAFO MK MOTOR/HEATING/LITGHTING/TAP CHANGER DRIVE A
CB/DS MOTOR SUPPLY B
=E00 +EQ3401 REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 C
REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 MCB - Q03,3P , 40A, 15kA
400/230V AC DISTRIBUTION PANEL MCB - Q08,3P , 20A, 15kA
REF DWG: GI-400/KIS-882/2020 SH 13 OF 27-X15 -X08 -X03RSTN
MCB - Q15,3P , 20A, 15kA RSTN
RSTN
B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E01 +C1 =E02 +C1 =E03 +C1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. MK BUS COUPLER PORONG OHL BANGIL OHL
11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18
C -XAC -XAC -XAC
REF DWG: JBTB1.056-KIS-EM-E-005/G14 REF DWG: JBTB1.056-KIS-EM-E-002/G14/G14 REF DWG: JBTB1.056-KIS-EM-E-001/G14/G14
=E00 +EQ3401 REF DWG: GI-400/KIS-882/2020 SH 13 OF 27 REF DWG: GI-400/KIS-882/2020 SH 14 OF 27
MCB - Q11,3P , 20A, 15kA MCB - Q19,3P , 20A, 15kA
400/230V AC DISTRIBUTION PANEL
RSTN D
D
-X11RSTN -X19
=E04 +C1 =E05 +C1
KTT BAY TRAFO-1
E E
11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18
-XAC -XAC
REF DWG: JBTB1.056-KIS-EM-E-003/G14 REF DWG: JBTB1.056-KIS-EM-E-004/G14
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 400/230V AC SUPPLY FOR MOTOR 27
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 28
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 23 4 56 7 8
A
© Copyright 2020 ABB A MK TEMPERATURE SENSOR MONITORING SIGNAL TO RTU B
=E00 +CX1 -KF21.81 C
SAS PANEL - 1 RTU560 D
E
RTU(DAISY CHAIN)
CP2
D+
#
D-
#
GND
#
Shld
-XCOM
B 12 3 4
REF DWG: JBTB1.056-KIS-EM-E-012 SH 39
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E01 +C1 =E04 +C1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. MK BUS COUPLER KTT BAY
-XCOM -XCOM
12 3 4 12 3 4
C REF DWG: JBTB1.056-KIS-EM-E-005 SH L24
=E02 +C1 =E05 +C1
PORONG OHL TRAFO-1
D -XCOM -XCOM
12 3 4 12 3 4
=E03 +C1 -XCOM
BANGIL OHL 12 3 4
E
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) MA SCHEMATIC DIAGRAM DCC EFS en
22-09-2021 28
Rev. Revision note DSS 150KV KIS MK TEMP SENSOR COMMUNICATION Resp. dept. PGGA Rev. ind. B Language
Date Name ACP20051 Sheet
1 HITACHI Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34
56 7 8
ID HitachiABB Title page A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. B
B Customer : PT. PLN (PERSERO) C
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s Order : ACP20051 D
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C Plant : DSS 150KV KIS
Equipment : 150KV ENERGY METER PANEL
D Title : SCHEMATIC DIAGRAM
EE
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 Title page 1
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language 48
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 No.sheets
2 34 56
7 8
IDABB Report frame A3 - Version 03 1 2 34 5 67 8
Description 2 Rev. Revision note
© Copyright 2020 Hitachi P Sheet n.sh. Description 1 Description 2 Rev. Revision note Sheet n.sh. Description 1
A 12 =E00+CM1 B AS BUILT
TITLE PAGE B AS BUILT 1005 1101 PARTS LIST =E00+CM1-PE B AS BUILT A
2 8 LIST OF CONTENT =E00+CM1.A.30-XDC1 B AS BUILT B
8 21 SYMBOL LEGENDS 1 - 1117 B AS BUILT 1101 1102 TERMINAL TABLE =E00+CM1.A.30-XDC2 B AS BUILT C
21 22 CUBICLE LAYOUT =E00+CM1.A.30-XDCF101 B AS BUILT D
22 23 CUBICLE LAYOUT B AS BUILT 1102 1103 TERMINAL TABLE =E00+CM1.A.30-XDCF102 B AS BUILT
=E00+CM1.A.30-XDCF103 B AS BUILT
B 23 24 CUBICLE LAYOUT FRONT VIEW WITH DOOR B AS BUILT 1103 1104 TERMINAL TABLE =E00+CM1.A.30-XDCF104 B AS BUILT
=E00+CM1.A.30-XDCF105 B AS BUILT
24 25 CUBICLE LAYOUT SECTION VIEW INCL. LOCATION DESIGNATION B AS BUILT 1104 1105 TERMINAL TABLE =E00+CM1.A.30-XDCF201 B AS BUILT
25 26 CUBICLE LAYOUT =E00+CM1.A.40-BI1.X1 B AS BUILT
26 D11 CUBICLE LAYOUT FIXED FRAME VIEW B AS BUILT 1105 1106 TERMINAL TABLE =E00+CM1.A.40-BI1.X2 B AS BUILT
D11 D12 SCHEMATIC DIAGRAM =E00+CM1.A.40-BI1.X3 B AS BUILT
D12 D13 SCHEMATIC DIAGRAM INSIDE VIEW B AS BUILT 1106 1107 TERMINAL TABLE =E00+CM1.A.40-BI1.X4 B AS BUILT
D13 D14 SCHEMATIC DIAGRAM =E00+CM1.A.40-BU1.X1 B AS BUILT
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s INSIDE REAR VIEW B AS BUILT 1107 1108 TERMINAL TABLE =E00+CM1.A.40-BU1.X2 B AS BUILT
C =E00+CM1.A.40-X811 B AS BUILT
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. LIST OF LABELS B AS BUILT 1108 1109 TERMINAL TABLE =E00+CM1.A.40-XAC B AS BUILT
D14 G11 SCHEMATIC DIAGRAM
G11 L11 SCHEMATIC DIAGRAM ENERGY METER MAIN P51.1=E04 B AS BUILT 1109 1110 TERMINAL TABLE
L11 L12 SCHEMATIC DIAGRAM
L12 L16 SCHEMATIC DIAGRAM ENERGY METER CHECK P51.2=E04 B AS BUILT 1110 1111 TERMINAL TABLE
L16 Y21 SCHEMATIC DIAGRAM
Y21 Y23 SCHEMATIC DIAGRAM ENERGY METER MAIN P51.3=E05 B AS BUILT 1111 1112 TERMINAL TABLE
D ENERGY METER CHECK P51.4=E05 B AS BUILT 1112 1113 TERMINAL TABLE
Y23 Y24 SCHEMATIC DIAGRAM CRP AC POWER SUPPLY B AS BUILT 1113 1114 TERMINAL TABLE
Y24 Z11 SCHEMATIC DIAGRAM
Z11 Z12 SCHEMATIC DIAGRAM 110V DC1 SUPPLY B AS BUILT 1114 1115 TERMINAL TABLE
Z12 Z13 SCHEMATIC DIAGRAM
Z13 Z14 SCHEMATIC DIAGRAM 110V DC2 SUPPLY B AS BUILT 1115 1116 TERMINAL TABLE
Z14 Z21 SCHEMATIC DIAGRAM
IED PSM B AS BUILT 1116 1117 TERMINAL TABLE
E Z21 Z22 SCHEMATIC DIAGRAM
COMMON ALARM B AS BUILT 1117 TERMINAL TABLE
Z22 1001 SCHEMATIC DIAGRAM
1001 1002 PARTS LIST COMMUNICATION INTERFACE B AS BUILT
1002 1003 PARTS LIST
1003 1004 PARTS LIST COMMUNICATION INTERFACE B AS BUILT
1004 1005 PARTS LIST
DEVICE OVERVIEW - P51.1 B AS BUILT
F Based on
A AS MANUFACTURED DEVICE OVERVIEW - P51.2 B AS BUILT
B AS BUILT
DEVICE OVERVIEW - P51.3 B AS BUILT
Rev. Revision note
DEVICE OVERVIEW - P51.4 B AS BUILT
1
DEVICE OVERVIEW - ESW1 B AS BUILT E
DEVICE OVERVIEW - ESW2 B AS BUILT
=E00+CM1 B AS BUILT
=E00+CM1 B AS BUILT
=E00+CM1 B AS BUILT
=E00+CM1 B AS BUILT
Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. LIST OF CONTENT Ref.Des. =E00 F
Approved 22-09-2021 MA LIST OF CONTENT
25-03-2021 KD Project PT. PLN (PERSERO) DCC EAB en
22-09-2021 MR HITACHI 2
DSS 150KV KIS 56 Resp. dept. - Rev. ind. B Language 8
Date Name ACP20051
Doc. no. JBTB.056-KIS-EM-E-006 Sheet
2 34 n. sheet
78
© Copyright 2020 Hitachi Power Grids. 12 3 4 5 6 7 8
SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION
A TERMINAL IN GENERAL OPTOCOUPLER OPERATED BY CIRCUIT BREAKER THREE PHASE A
BINARY INPUT TURNING STAR WINDING B
N/O CONTACT
(NORMALLY OPEN)
N/C CONTACT TERMINAL WITH PLUG BINARY OUTPUT OPERATED BY CRANK DISCONNECTOR THREE PHASE WINDING
(NORMALLY CLOSED) WITH NEUTRAL
B PROTECTIVE EARTHING FO CONNECTOR OPERATED BY LEVER EARTH SWITCH THREE PHASE
ZIG-ZAG WINDING
CHANGE-OVER CONTACT
Print: 9/27/2021 150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT TEST CONTACT BLOCK, AUXILIARY RELAY PLUG CONNECTOR M OPERATED BY MOTOR WAVE TRAP THREE PHASE DELTA
SHORT CIRCUIT BEFORE (1 COIL) & OPEN DELTA WINDING
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. OPENING
N/C CONTACT BISTABLE RELAY ANALOG INPUT TRANSFORMER WITH LIGHTNING ARRESTOR CONNECTOR
(SET AND RESET COIL) TWO WINDING EARTH
(LATE OPENING)
TRANSFORMER WITH C
C THREE WINDING
N/O CONTACT MINIATURE CIRCUIT POWER SUPPLY
(PASSING WHEN ACTUATED) BREAKER
N/O CONTACT LAMP FAN AUTO TRANSFORMER DIODE
(EARLY CLOSING) RESISTANCE CAPACITOR
HEATING RESISTOR D
D CHANGE-OVER CONTACT
HOR REACTOR
(MAKE BEFORE BREAK) N
SIGNAL SOURCE / DESTINATION SEMAPHORE DIRECT CURRENT M MOTOR
FOR CONNECTION BETWEEN
DIFFERENT PAGES
1 SWITCH, 2 POSITIONS ALTERNATING G GENERATOR DOOR SWITCH
0 CURRENT LINK
E CT TERMINAL E
DISCONNECTABLE
WITH BRIDGE SEPARABLE, 0
4 POLES 1
2 KEY SWITCH, CURRENT
OPERATED BY KEY TRANSFORMER
3 POSITIONS
VT TERMINALS CONDUCTOR OPERATED BY VOLTAGE FUSE
DISCONNECTABLE PUSHING TRANSFORMER
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SYMBOL LEGENDS
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 HITACHI 8
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language 21
Date Name ACP20051 56 Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34
7 8
ID HitachiABB Layout A3 - Version 01 1 2 3 4 5 67 8
A
© Copyright 2020 Hitachi Power Grids. 150KV ENERGY METER PANEL =E00+CM1 A
BI B
I REFERENCE DOCUMENTS: - C
FRAME TYPE FIXED D
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s FIXED FRAME HIGH 43U E
OPENING ANGLE 90°
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ACCESS DOOR FRONT AND REAR
TECHNICAL DATA:
HEIGHT X WIDTH X DEPTH 2200MM H X 800MM W X 800MM D
WEIGHT APPROX. - 350KG
PROTECTION CLASS IP42
DOOR LOCK 5MM HANDLING PIN, DOUBLE WEB
CUBICLE COVER SHEETS COLOUR (OUTSIDE/INSIDE) RAL7032, TEXTURED
COVER PLATE COLOUR (MOUNTED ON FIXED FRAME) RAL7032, SMOOTH
C RATED SUPPLY VOLTAGE AC 400/230V, 50HZ
RATED SUPPLY VOLTAGE DC 220V
CUBICLE ILLUMINATION 60W
HEATING WITH INTEGRATED THERMOSTAT 55W
HEATING CONTROL THERMOSTAT & HYGROSTAT
VENTILATION EXHAUST FILTERS AND FANS
AC POWER OUTLET 1PHASE, 10A, TYPE SCHUKO
CABLE DUCT PVC
WIRE INSULATION
2100 WIRE END SLEEVE PVC 70°C
2200 WIRE MARKING
WITH PLASTIC SLEEVE
CONDUCTOR MATERIAL
2100 KTH/Q, WHITE WITH BLACK INSCRIPTION, 12MM
-K1:A2 -K1:A2 / -X1:51 -K1:A2 / -X1:51 -X1:51
COPPER PLAIN MULTISTRANDED FLEXIBLE
D WIRE COLOUR, CONDUCTOR CROSS SECTION AC MULTICORE CABLE, 1.5MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION CONTROL/SIGNAL DC GREY, 1.5MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION DC MAIN GREY, 4MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION VT CIRCUITS RED, YELLOW, BLACK, BLUE - 2.5MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION CT CIRCUITS RED, YELLOW, BLACK, BLUE - 4MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION EARTHING GREEN / YELLOW, 4MM²
CONDUCTOR CROSS SECTION EMC EARTHING 16MM²
E TERMINAL ABB ENTRELEC/PHOENIX CONTACT
TERMINAL VT URTK/S
II TERMINAL CT URTK/S WITH SHORTING FACILITY
TERMINAL AC/DC MAIN INPUT ZS 6
F Based on TERMINAL AC/DC DISTRIBUTION ZS 4
A AS MANUFACTURED TERMINAL PROTECTION/REMOTE INTERFACE M 4/6.SNB
B AS BUILT TERMINAL GROUND (ON EARTHING BAR) AZK35
TERMINAL PRIMARY PROCESS M 4/6.SNB
Rev. Revision note
II
1
100.00 100.00
800.00 Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
KD Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
25-03-2021 MR Project PT. PLN (PERSERO) DCC ELU
22-09-2021 FRONT VIEW WITH DOOR
DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 21
Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 22
2 34 56
7 8
ID HitachiABB Layout A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. B Drawing Pocket 800 B
800
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s C 540mm BOTTOM VIEW 800 C
90° +A +C FIXED FRAME
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. D 90° +V D
E 800 +U E
CROSS SECTIONAL VIEW II - II
FIXED FRAME
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC ELU
22-09-2021 SECTION VIEW INCL. LOCATION DESIGNATION
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 22
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 23
2 34 56
7 8
ID HitachiABB Layout A3 - Version 01 1 23 4 56 7 8
A A
© Copyright 2020 Hitachi Power Grids. B +U FRONT VIEW FIXED FRAME +W SIDE VIEW
B
C -CM1 -CM1
D U -KC1
E 01 -KC1 -KC2
02
03 -KC2
04
05
06 -P51.1 -P51.2
07
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s 08 EDMI Mk6N
09
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. BILLING
RESET
SELECT
PULSE 1 PULSE
Wh varh
10
11
12
13
14
15 -X1.1 -X1.2 -X2.1 -X2.2
16 C
17
18
19
20 -P51.3 -P51.4
21
22 EDMI Mk6N
BILLING
RESET
SELECT
PULSE 1 PULSE
Wh varh
23
24
25
26
27 D
28 -X3.1 -X3.2 -X4.1 -X4.2
29
30
31
32
33
34
35
36
37
38 E
39
40
41
42
43
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC ELU
22-09-2021 FIXED FRAME VIEW
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 23
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 24
2 34 56
7 8