Length Nos of door Length Nos of door Nos of jamb Painting to Door Frame H : Knot, stop and prime with dull aluminium wood primer and apply three coats of alkyd resin based paint as described to the following woodwork: D : Surfaces of door frame exceeding 150mm not exceeding 300mm girth U : m Head Jamb
Length Nos of door Length Nos of door Nos of jamb Painting to Door Frame H : Prepare and apply one coat of dull aluminium wood primer before fixing in position as described to the following woodwork: D : Back of door frame not exceeding 150mm U : m Head Jamb
No Sides / Jamb Nos of door Fixing Cramp H : Fixing Cramp D : 32mm x 3mm mild steel to BS 15, 225mm girth cramp, one end drilled and screwed to timber and the other end fishtailed and built into joints of brickwork. U : no
Ironmongeries
Ironmongeries
No Sides / Jamb Nos of door Ironmongeries H : Supply and fix the following ironmongery of the type and finish specified of other equal and approved to timber including all necessary matching screws as described: D : Pair 100mm x 75mm nylon ring steel butt hinges U : no
No Nos of door Ironmongeries H : Supply and fix the following ironmongery of the type and finish specified of other equal and approved to timber including all necessary matching screws as described: D : W.C indicating bolt U : no
No Nos of door Ironmongeries H : Supply and fix the following ironmongery of the type and finish specified of other equal and approved to timber including all necessary matching screws as described: D : Cylindrical lockset U : no
Length Nos of door Lintel H : Precast reinforced concrete Grade 20 including all formwork and hoisting and setting in position, bedded and jointing in cement and sand (1:3) mortar as described: D : 125mm x 225mm high lintel reinforced with and including 2 No. 16mm diameter mild steel bar with hooked ends and 6mm diameter stirrups at 230mm centers U : m
No Jamb Heelstone H : Precast concrete Grade 25 as described including all formwork and setting in position, bedding in cement and sand (1:3) mortar: D : 152mm x 51mm x 152mm high heelstone cast to suit profile of door frame with and including 2 No. 13mm diameter x 152mm long steel dowel, one end cast into concrete and other into foot of timber frame U : no Nos of door - normally used under jamb of door where located at toilets or other wet areas
Exercise Door
Exercise Door
ELEMENT WInclusive wIinNdow fraDme, caOsement/Wlourved window and ironmongeries Page 162
• timber casement window • metal casement window • adjustable lourved window • fixed louvred window Types of window
CASEMENT WINDOW
TAKING OFF LIST Lintel - m Casement - no Framing - no Glazing - m2 Architrave (if any) - m Ground/Backing/Packing Piece - m Painting - m Fixing Cramp - no Glazing Beads - m Ironmongeries - no CASEMENT WINDOW
Length Nos of window H : Precast reinforced concrete Grade 20 including all formwork and hoisting and setting in position, bedding and jointing in cement and sand (1:3) mortar as described: D : ____ mm x ____ mm high lintel reinforced with and including ___ Nos. ____ mm diameter mild steel bar with hooked ends and ____ mm diameter stirrups at _____ mm centers. U : m Same principles as door lintel
No Nos of window/location H : Supply and fix approved natural aluminium casement window and framing, glazing gasket complete with all requisite silicone sealant fillets, casement friction stay, fasteners and fixing lugs, all in accordance to manufacturer’s detail all as per drawing num. _________ . D : Casement window and framing overall size ______ mm x _____ mm comprising of ____ Nos of _____ mm x _____ mm top hung/side hung window. U : no
No Nos of window/location H : Approved float glass and glazing to aluminum frame (measure separately) including cutting glass to required sizes, waste and cleaning inside and outside upon completion as described:- D : ____ mm thick clear float glass to aluminium casement window (measure separately) and fixed with glazing gasket (measure separately) in panes of sizes _______ m2 U : no
No Nos of window/location H : Wrot pressure treated Group ‘B’ timber as described D :_____ mm thick casement window in ______ Nos leaves, each leaf constructed of _____ mm x _____ mm thick stiles all round, open for glazing (measure separately) including framing with _____ mm x _____ mm posts, mullion, transom, head and ______ mm x _____ mm cill all in accordance with Drawing Num.___________ U : no Framing (no) Consist of :- Head, Post, Cill, Mullion, Transom
Length Width Nos of window/location H : MSG or other equal and approved float glass and glazing to timber frame (measure separately) including cutting glass to required sizes, waste and cleaning inside and outside upon completion as described: D :_____ mm thick clear float glass to aluminium casement window (measure separately) and fixed with glazing gasket (measure separately) in panes of sizes _______ m2. U : m2
Architrave (if any) - Same principle as door. Ground/Backing/Packing Piece (m) - Same principle as door. Painting (m) - Same principle as door 1.casement 2.frame Fixing Cramps (no) - Same principle as door Ironmongeries (no) - Same principle as door fixing lugs fastener/stay
Nos of window/location Girth H : Wrot pressure treated Group B timber as described: D :_____ mm x _____ mm glazing beads. U : m Glazing Beads
LOUVER WINDOW
TAKING OFF LIST LOUVER WINDOW Timber Framing - no Metal Adjustable Louver - no Glass Louver Blade - no Architrave (if any) - m Ground/Backing/Packing Piece - m Painting - m Fixing Cramp - no Ironmongeries - no Lintel - m Security Bar - m Holes for security bar - no Painting to holes for security bar - m
no Nos of window/location H : Wrot pressure treated Group B timber as described: D : Window framing overall size _____ mm x _____ mm consisting of ____ equal panes, constructed of ____ mm x ____ mm twice rebated post and head, four times rebated mullion and transom including setting and fixing in position all in accordance Drawing Num. ________ . U : no
no Nos of column/pane Nos of window/location H : Metal Adjustable Louver D : Pair galvanized steel aluminium lacquered finish adjustable louver frame _____ mm high, each with clips of ____ Nos _____ mm wide glass louver blades (measure separately) complete with ____ Nos friction handle and screwed to timber frame (measure separately) . U : no Metal Adjustable Louver
no Nos of column/pane Nos of window/location H : Glass Louver Blade D : ____ mm thick transparent sheet glass louver blade as described ____ mm wide x ____ mm long with polished edges and fixing into clips of adjustable louver frame. (measure separately) U : no
Architrave (if any)-Same principle as door. Ground (m)-Same principle as door. Painting to timber frame (m)-Same principle as door. Fixing Cramps (no)-Same principle as door. Ironmongeries (no)-Same principle as door. Lintel (m)-Same principle as door. friction handle
Length Nos of column/pane Nos of window/location H : Security Bar D : ____ mm diameter mild steel security bar and fixed through timber posts and mullions.(measure separately) U : m
no Nos of column/pane Nos of window/location H : Holes for security bar D : ____ mm diameter holes for security bars through ____ mm thick timber posts and mullions. U : no
Length Nos of column/pane Nos of window/location H : Painting for security bar D : Prepare and apply one coat metallic primer and two coats of alkyd resin based paint on surfaces of metalwork not exceeding _____ mm girth U : no
Exercise Window
Exercise Window
NUR QIAM FARHANA ADNAN AUTHORS MUHAMMAD SUKRI BIN ABDUL HAMID Department of Civil Engineering
Alang – TieBeam, Collar Anjur – Nosing Awet – Cure Bar Keluli Sederhana – Mild SteelBar Bar Keluli Tegangan Tinggi – High TensileBar Bar Penetap – DowelBar Bata Muka – FacingBrick Batu Pintu – Heelstone Beban – Load Cucur Atap – Eaves Curam Bumbung – Roof Slope Gelegar/Jeriau Siling – Ceiling Joist Genting – Tile Genting Perabung – Ridge Capping Genting Perabung Miring – Hip Capping Hias Jenang – Architrave Jenang – Jamb Jenang Antara – Mullion Kaca Apungan – Float Glass KacaBerdawai – Wired Glass Kambi – Skirting Kasau – Rafter Kasau Lintang – Purlin Kasau Miring – Hip Rafter Kasau Pendek – Jack Rafter KayuBeloti –Batten Keluli Rakap – Stirrups KepinganBergelugur – Corrugated Sheet Kepingan Kaca Cerah – Clear Sheet Glass Kerangka – Frame, Carcassing Kerja Ikatan – Jointing Kumai –Bead Lapisan Alas – Primer Lapisan Asas – Undercoat Lapisan Bata – Brick Course Lapisan Kalis Lembap – Damp Proof Course Lapisan Kemas – Finishing Coat Lapisan Konkrit – Concrete Blinding Latar – Ground Latar Belakang – Base Layar Miring – Hipped End Lengkapan Pintu/Tingkap - Ironmongery Lintal – Lintel Lurah – Valley Membran Kalis Lembap – Damp Proof Membrane Pelindung Tetulang /Penutup Konkrit – Concrete Cover Pengikat Dinding – Bonding Tie Pengikat Keluli – Steel Fixing Cramp Pengukuh – Stiffener Penjarak – Spacer Pintu Berkaca – Glazed Door Pintu Berpanel – Paneled Door Pintu Rata – FLush Door Plat Dinding – Wall Plate Rabung Miring – Hip Rangka – Frame Rasuk – Beam Rasuk Berdiri - Upstand Beam Rasuk Terasing – Isolated Beam Rentang – Span Sesiku – Bend Sisi Atap – Verge Talang Cucur Atap – Gutter Talang Curah – Flashing Tampang Bawah Cucur Atap – Eaves Boarding Tampang Sisi Atap – Barge Board Tebar Layar – Gabled End Tetingkat – Riser Tetulang Bar – Bar Reinforcement Tetulang Jejaring – Fabric Reinforcement Tiang – Column Tiang Berkembar – Attached Column Tiang Sambut – Column Stump Tiang Terasing – Isolated Column Tindihan Hujung – End Lap Tindihan Sisi – Side Lap Tingkap Ram – Lourved Window Tulang Perabung – Ridge Board Tumpu Kasau – Fascia Board Tumpu Sisi – Barge Board Tupang – Strut
a.b as before a.b.d as before described adj. adjoining/adjustment agg. aggregate anclls. ancillaries appd. approved ard. around ave. average b brick b. & p. bend and point backg. backing battg. battering bd. board bdd. bedded bdg. boarding beddg. bedding benchg. benching b.f. before fixing bg. bearing b.i. built into bit. bitumen bk. brick bkts brackets bldg. building bms beams bott. bottom b/s both sides B.S British Standard bwk. brickwork bwall brickwall c.b. common brickwork/common bricks c &s / ct & sd cement and sand chfd. chamfered c.i. cast iron circ. circular clg. ceiling clg. jst. ceiling joist C.L centre line c.m. cement mortar commg./commcg commencing compactn. compaction conc. concrete conn. connection c.o.p. circular-on-plan copg. coping cos. course cts. centres Ddt. deduct dia. diameter dist. distance dp. deep d.p.c damp-proof courses d.p.m damp-proof membrane dr. door dressg dressing dwg. drawing e. exceeding ea. each E.G external girth emul. emulsion E.O extra over Eng. English engg. engineering exc. excavate excn./exc'n excavation exc'd excavated ext. external facewk.facework fcgs.facings fdns.foundations fillg.filling fin.finished flr.floor flr. lev.floor level f.o.fix only follg.following form.formation fr.frame frd.framed frg.framing frt.front ftg.footing f/c finishing coat fwk.formwork fxd.fixed gen. general gen. surf. general surface .g.i galvanised iron G.L ground level dr grade grano. granolithic grd. ground grd. lev. ground level groutg grouting gth. girth h.b half brick h.b.w. half brickwall h.c./h/c hardcore hi. high holl. hollow hor. horinzontal h.r half-round/ hand rail H.T high tensile I.G. internal girth includg. including int. internally jst joist jt. joint jtd. jointed kg. kilogram km. kilometre la. labour layg. laying len. length mat./mat'l material mech. mechanical med. medium M.G mean girth MH manhole min. minimum m/s measured separately m.s./MS mild steel msd measured n.e. not exceeding nec. necessary no. number nom. nominal NTS not to scale o/a overall o.s. one side o/w otherwise opg. opening ord. ordinary p. & s. planking and strutting pavg. paving p.c. prime cost p.c.r.c. precast reinforced concrete perm. permanent p.f. plain face plast. plastering/plaster ppt. parapet pr. pair prepd. prepared prepn. preparation proj. projection projg. projecting prov. provisional pt. paint ptd. pointed ptg. pointing pumpg. pumping qua. quality rad. radius rakg. raking r.c./reinf.conc. reinforced concrete rdd. rounded R.e.m.f.s. remove excavated materialfrom site reb. rebated rec. receive red. reduced red. lev./R.L./r.l. reduced level reinf. reinforcement rem. remove reqd. required ret. retaining retd. retained r.f & r. return,fill and ram ro. rough r.o.j raking ofjoints r.w.d.p. rainwater down pipes s. & s. sides and soffit sect. section sttg. setting Sktg. skirting s.l. short length slopg. sloping smth. smooth soff. soffit spec. specification spr spread sq. square std. standard stlwk. steelwork str. straight struct. structural surf. surface surrd. surround susp. suspended s.w. surface water t. tonne t. & g. tongued and grooved tankg. tanking tbr. timber th. thick thro. throated tr. trench trow. trowelled U.B universal beam u/c undercoat U.C universal column uPVC unplasticised poly vinyl chloride u/s underside vert. vertical vol. volume v.s vertical side wethd. weathered w.g. white glazed w.g.t. white glazed tiles w.g.w.t. white glazed wall tiles wi. with workg. working w.p waterproofing wrot. wrought wt. weight
Institution Of Surveyors Malaysia [2000]. The Malaysian Standard Method of Measurement Of Building Works, Second Edition [SMM 2]. Kuala Lumpur. 1. Abdullah, A & Abd Rashid, K [2003]. Pengukuran Kuantiti Bangunan: Berdasarkan SMM2. Kuala Lumpur. Prentice Hall Pearson Malaysia. 2. Ashworth, A. & Hogg, K., Willis’s [2001]. Practice And Procedure For The Quantity Surveyor, Blackwell Science. 3. Ashworth, A., Hogg, K., Willis, A. [2002]. Willis’s Practice And Procedure For The Quantity Surveying – 11th Edition. Blackwell Publishing. 4. Construction Industry Development Board [2003]. Malaysian Standard Method of Measurement For Civil Engineering Works. Kuala Lumpur. 5. Willis, J.A., Trench, W., Willis, C.J. [2005]. Willis’s Elements Of Quantity Surveying-10th Edition. Blackwell Science. 6.