The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by smayansmit, 2023-07-06 13:25:34

proposal studio kayu

proposal studio kayu

PROPOSAL PEMBANGUNAN STUDIO KAYU SMK NEGERI 1 SENI DAN INDUSTRI KREATIF ASMAT TAHUN 2023 KOMPETENSI KEAHLIAN : SENI KRIYA KAYU DAN ROTAN NAUTIKA KAPAL PENANGKAP IKAN TAHUN 2023


PEMERINTAH DAERAH KABUPATEN ASMAT DINAS PENDIDIKAN Jalan Pemda 04 Nomor 15 Distrik Agats 99777 Email: [email protected], Website : dikmudora-asmatkab.org Nomor : Lampiran : Hal : Bantuan Pembangunan STUDIO KAYU SMK Negeri 1 Seni dan Industri Kreatif Asmat Yth. Direktur Pembinaan Sekolah Menengah Kejuruan Direktorat Jenderal Pendidikan Dasar dan Menengah Kementerian Pendidikan dan Kebudayaan Di Jakarta Dalam rangka mempermudah pemerataan untuk memperoleh kesempatan belajar pada jenjang pendidikan menengah khususnya Sekolah Menengah Kejuruan, bersama ini kami mengajukan permohonan program Bantuan Pembangunan STUDIO KAYU SMK Negeri 1 Seni dan Industri Kreatif Asmat Kabupaten/Kota Asmat Provinsi Papua Selatan. Sebagai bahan pertimbangan, kami informasikan lahan untuk pembangunan Laboratorium/Studio Kayu SMK Negeri 1 Seni dan Industri Kreatif Asmat telah siap bangun dan merupakan milik Pemerintah Daerah, yang peruntukannya untuk pembangunan SMK. Bersama ini pula kami sampaikan proposal Pembangunan Laboratorium/Studio Kayu SMK 1 Seni dan Industri Kreatif Asmat. Demikian atas perhatiannya, kami sampaikan terima kasih. Agats, 11 Februari 2023 Mengetahui, Kepala Dinas Pendidikan Tembusan Yth : 1. Sekda Kab. Asmat 2. Dirjen Dikdasmen di Jakarta; 3. Kasubdit Kelembagaan dan Sarana Prasarana SMK; Barbalina Toisuta,SE NIP 19650120 198812 1 002


LEMBAR PENGESAHAN PROPOSAL BANTUAN PEMBANGUNAN STUDIO KAYU SMK NEGERI 1 SENI DAN INDUSTRI KREATIF ASMAT Mengetahui; Kepala Dinas Pendidikan Kabupaten Asmat Barbalina Toisuta,SE NIP 19650120 198812 1 002 Plt. Kepala Sekolah David Kamur, S.Th NIP 19800212 201004 1001


BAB I PENDAHULUAN A. Latar belakang Guna mewujudkan visi Indonesia menjadi top 10 ekonomi dunia pada tahun 2030 pemerintah Indonesia melalui kementerian perindustrian telah menyiapkan peta jalan Making Indonesia 4.0 dalam menghadapi tantangan era revolusi industri 4.0. Pembangunan kualitas sumber daya manusia menjadi salah satu prioritas dalam agenda making Indonesia 4.0. Memasuki revolusi industri 4.0, transformasi dan integrasi lingkungan kerja fisik ke lingkungan kerja digital seperti penggunaan kecerdasan buatan (Aritificial Intellegence, AI), robotika, dan inovasi digital lainnya sudah semakin banyak digunakan di tempat kerja. Untuk itu pengembangan peta jalan pendidikan vokasi Indonesia 2020–2035 harus mengantisipasi perubahan besar yang terjadi akibat disrupsi teknologi baik cara belajar, cara bekerja dan kebiasaan hidup di masa depan. Sekolah Menengah Kejuruan (SMK) sebagai bagian dari pendidikan vokasi pada jenjang menengah diharapkan mampu menghasilkan tenaga teknis industri yang relevan dengan kebutuhan dunia kerja saat ini dan masa depan. Untuk meningkatkan kualitas dan daya saing SDM pemerintah telah mengeluarkan intruksi Presiden nomor 9 tahun 2016 tentang Revitalisasi SMK. Untuk semakin menguatkan program peningkatan kualitas lulusan SMK, Kementerian Pendidikan dan Kebudayaan telah menetapkan Standar Nasional Pendidikan SMK melalui Peraturan Menteri Pendidikan dan Kebudayaan Republik Indonesia Nomer 34 tahun 2018 (SNP SMK). Dalam SNP SMK standar kompetensi lulusan SMK meliputi 9 area kompetensi yang mencakup aspek karakter (soft skills), kompetensi teknis dan kewirausahaan. Prosser & Quigley (1950) menyataan pendidikan kejuruan akan efektif jika peralatan, mesin, dan tugas kerja sesuai dengan lingkungan dimana lulusan akan bekerja. Dukungan peralatan yang relevan dengan industri, penataan lingkungan belajar sesuai dengan lingkungan kerja di industri dan program pembelajaran yang sesuai dengan tugas-tugas yang akan dikerjakan di industri menjadi factor penting dalam pencapaian kompetensi lulusan SMK. Menghadapi era revolusi industri 4.0, kemajuan teknologi di berbagai bidang akan mengubah kebutuhan SDM di dunia kerja. Untuk itu diperlukan dukungan dan pengembangan peralatan praktik yang mendukung penyiapan lulusan SMK sebagai tenaga kerja yang memenuhi kualifikasi dan kompetensi SDM di era revolusi industri 4.0. Diperlukan pembaharuan terusmenerus peralatan praktik SMK, kompetensi guru, dan kurikulum menyesuaikan dengan dinamika yang ada di industri. Untuk meminimalkan gap teknologi dan kompetensi dengan dunia kerja dan serta memberikan penjaminan mutu maka diperlukan norma, standar, prosedur, dan kriteria di bidang sarana prasarana SMK. Norma dan standar peralatan praktik SMK bertujuan untuk memberikan panduan bagi para pemangku kepentingan dalam pengembangan sarana dan prasarana SMK yang relevan dengan tuntutan pasar kerja nasional dan global. Norma dan standar peralatan praktik ini dirancang berlandaskan pada kebutuhan kurikulum, kerangka kualifikasi dan standar kompetensi kerja nasional Indonesia, relevan dengan jabatan lulusan SMK di industri, kebutuhan pedagogis dan berorientasi industri 4.0 memenuhi persyaratan keselamatan dan kesehatan kerja. Tujuan pendidikan tersebut disebutkan pula dalam Misi Renstra Direktorat Jenderal Pendidikan Vokasi 2020-2024 Kementerian Pendidikan dan Kebudayaan Mewujudkan Pendidikan yang relevan dan berkualitas tinggi, merata dan berkelanjutan, didukung oleh infrastruktur dan teknologi.


Dalam mewujudkan misi tersebut, maka tahun 2020-2024, akan dilaksanakan program berupa Fasilitasi Pengembangan Pusat Keunggulan (Center Of Excellence) di SMK, yang dalam implementasinya diharapkan dapat membantu memperkuat tata kelola pembelajaran sekolah berbasis industri, peningkatan kualitas dan mutu guru melalui sasaran intervensi untuk 1) Sarana; 2) Prasarana; 3) Penerapan Pembelajaran Industri; 4) Sertifikasi dan 5) Budaya Kerja. Bidang Prioritas Revitalisasi SMK yang menjadi local pengembangan adalah 1) local mesin dan konstruksi, 2) ekonomi kreatif, 3) keperawatan dan 4) perhotelan. Bidang prioritas ini disesuaikan dengan perubahan kebutuhan serta trend perkembangan dunia kerja sehingga SMK mampu menghasilkan lulusan yang sesuai dengan kebutuhan. Sesuai dengan Instruksi Presiden Nomor 9 Tahun 2016 tentang Revitalisasi SMK dalam rangka peningkatan kualitas dan daya saing SDM Indonesia, Kemendikbud masih membutuhkan tindak lanjut yang lebih komprehensif di tahun pembangunan 2020-2024. Peta jalan pengembangan SMK yang belum dibuat oleh semua provinsi membuat langkah implementasi pembangunan SMK lambat secara nasional. Populasi penduduk Indonesia terbanyak adalah pada Pulau Jawa dan Sumatra dengan proporsi SMK kedua pulau tersebut mencapai 78%. Tingginya SMK pada area tersebut dikarenakan oleh tingginya jumlah dan pertumbuhan lapangan pekerjaan pada kedua pulau tersebut dan juga populasi demografisnya. Jumlah SMK di Pulau Jawa sebesar 57,2%, Pulau Sumatera sebesar 20,9%, Sulawesi sebesar 8,2%, Bali dan Nusa Tenggara sebesar 8,2%, Kalimantan sebesar (5,1%), Maluku sebesar 241 SMK (1,7%), dan Papua sebesar 1,4%. Saat ini SMK di Indonesia hampir seluruhnya memiliki sarana dan prasarana yang dapat menunjang proses pembelajaran, namun banyak ditemukan sarana dan prasarana tersebut saat ini belum dikelola dengan panduan yang baik dan tidak sesuai standar yang ditetapkan. Sebagai salah satu faktor pendukung keberhasilan program pendidikan dalam proses pembelajaran dan menciptakan lulusan yang kompeten, sarana dan prasarana sekolah khususnya Sekolah Menengah Kejuruan(SMK) harus benarbenar mendapat perhatian lebih. SMK sebagai jenjang pendidikan yang bertujuan menciptakan lulusan yang terampil dan memiliki daya saing di pasar kerja tentunya harus dibekali tidak hanya teori namun juga praktik di sekolah yang sesuai dengan standar kebutuhan industri. Jika SMK tidak memiliki atau kekurangan fasilitas praktik maka akan menimbulkan kesenjangan antara pemahaman teori dan praktik yang pada akhirnya akan menghasilkan mutu lulusan yang rendah. Pengelolaan sarana dan prasarana merupakan suatu proses pengurusan, penataan dan pengaturan kegiatan secara sistematis agar berfungsi menurut fungsinya masing-masing dalam rangka mencapai tujuan yang ditetapkan. Untuk itu agar tujuan setiap sekolah dapat tercapai, baik dalam menciptakan ruang belajar yang nyaman dan aman serta menghasilkan lulusan berkualitas diperlukan kerjasama antar pihak dalam membangun motivasi untuk bersama mengelola infrastruktur sekolah dengan baik. Infrastruktur pendidikan yang memadai dan sesuai standar nasional merupakan kebutuhan yang harus dipenuhi agar dapat menghasilkan sumberdaya manusia yang berkualitas dan berdaya saing. Kurang terpenuhinya standar akan berdampak pada rendahnya kesiapan SDM dalam memasuki pasar kerja baik dalam keahlian, penguasaan kompetensi kejuruan, serta sikap kerja yang baik. Pemerintah melalui Direktorat Sekolah Menengah Kejuruan Direktorat Jenderal Pendidikan Vokasi Kementerian Pendidikan Dan Kebudayaan 2021 telah menetapkan norma dan standar fasilitas. Dasar dari penetapan norma dan standar seperangkat peralatan praktik SMK adalah kebutuhan pedagogi dalam implementasi kurikulum, kebutuhan kompetensi untuk posisi jabatan pertama lulusan SMK di


industri, pelaksanaan uji kompetensi skema sertifikasi KKNI level II/III, dan mengantisipasi perubahan struktur tenaga kerja masa depan di era revolusi industri 4.0. Untuk mendukung efektifitas pembelajaran maka pemenuhan seperangkat peralatan menggunakan rasio peralatan adalah 1:1 atau 1:2 dan atau 1:4 yang disesuaikan dengan strategi pembelajaran, capaian kompetensi, kapasitas ruang, level teknologi, level keterampilan dan pembiayaan. Untuk mendukung pengembangan teaching factory melalui tata kelola SMK Badan Layanan Umum Daerah (BLUD) dapat dikembangkan peralatan yang mendukung untuk meningkatkan nilai jual produk/jasa seperti peralatan kemasan point of sale dan sejenisnya sebagai peralatan penunjang untuk mendukung kegiatan teaching factory SMK dalam dalam menumbuhkan kompetensi, kemandirian dan kewirausahaan. Dalam SNP SMK 2018 ruang praktik Kompetensi Keahlian Kriya Kreatif Kayu dan Rotan berfungsi sebagai tempat untuk melaksanakan kegiatan pembelajaran seperti pengerjaan kayu dasar/kerja bangku/kerja manual, ukir-pahat, anyam-raut, kerja bubut kayu, terawang kayu, jok (upholestry), penyelesaian akhir. Besarnya luasan minimum ruang kompetensi keahlian Kriya Kreatif Kayu dan Rotan adalah 150 m2 (seratus lima puluh meter persegi). Berdasarkan uraian di atas maka sangat pentingnya ruangan laboratorium/studio praktek SMK terhadap ketersediaan lulusan yang terampil dan berjiwa wirausaha. B. Tujuan dan Sasaran Tujuan 1. Laboratorium/Studio Kayu sebagai tempat praktek dari teori pembelajaran 2. Laboratorium/Studio Kayu menghasilkan lulusan yang terampil di dunia kerja atau wirausaha 3. Laboratorium/Studio Kayu mendukung ketercapaian Teaching Factory dan LSP-1 di tahun mendatang. Sasaran Sasaran dari penyusunan proposal ini adalah bentuk partisipasi negara dalam menyediakan laboratorium/studio kayu yang memadai untuk ketercapaian lulusan yang terampil dan berjiwa wirausaha. C. Sumber Dana Anggaran yang diperlukan dalam pembangunan Gedung Asrama SMK Negeri 1 Seni dan Industri Kreatif Asmat sebesar Rp. 50.000.000,- (Lima puluh juta rupiah)


BAB II PROFIL SEKOLAH A. Identitas Sekolah 1. Nama Sekolah : SMK NEGERI 1 SENI DAN INDUSTRI KREATIF ASMAT Status : Negeri Alamat Sekolah : Jl. Jokowi-Kamp. Kaye Agats – Asmat – Papua Provinsi : Papua Selatan Kabupaten/Kota : Asmat Distrik : Agats Desa : Bis Agats Jalan : Jl. Jokowi Agats – Asmat – Papua Kode Pos : 99977 E-mail : [email protected] 2. Nomor Pokok Sekolah Nasional : 60304066 3. Nomor Data Sekolah (NDS) : - B. Identitas Kepala Sekolah 1. Nama Plt. Kepala Sekolah : David Kamur, S.Th 2. Pendidikan Terakhir : Srata 1 (S1) 3. Jurusan : Teologi 4. Nomor HP : 085326848437 C. Jumlah Siswa dan Rombongan Belajar KELAS JUMLAH SISWA JUMLAH ROMBEL X Seni Kriya Kayu dan Rotan 34 1 X Nautika Kapal 34 1 XI Seni Kriya Kayu dan Rotan 49 2 XI Nautika Kapal 29 1


XII Seni Kriya Kayu dan Rotan 22 1 XII Nautika Kapal 68 2 Jumlah 236 8 D. Tenaga Pendidik dan kependidikan TENAGA KEPENDIDIKAN JUMLAH PNS HONORER Guru Mata Pelajaran 11 18 Pegawai Tata Usaha - 2 Laboran (Komputer) - - Pustakawan - - Penjaga Sekolah - 1 E. Keadaan Guru IJAZAH TERTINGGI JUMLAH PNS PPPK HONORER S3/S2 - - S1 5 7 10 D3 5 D2/D1/SLTA 3 F. Akreditasi Sekolah a. Nilai Akreditasi = b. Kategori Akreditas = (KADALUARSA)


G. Data Lahan dan Bangunan Sekolah a. Luas Lahan Sekolah Seluruhnya = 75.000 m2 dan 15.000 m2 (unit distrik) b. Status kepemilikan lahan Sekolah: Sertifikat (Hak Ulayat), dengan luas lahan= 75.000 m2 dan 15.000 m2 c. Keadaan Sarana JENIS SARANA JML RUANG KONDISI RUANG KET. B RR RS RB Ruang Kelas 8 √ Ruang Praktek 2 √ Satu ruangan digunaka n untuk ruang kelas Lab Komputer 1 √ Ruang Tata Usaha 1 √ Ruang Kepala Sekolah 1 √ Ruang Guru 1 √ Ruang UKS 1 √ Ruang OSIS/PRAMUKA 1 √ Ruang BP/BK 1 √ Gudang 1 √ Kantin 1 √ WC/KM Murid 2 √ WC/KM Guru 2 √ Perpustakaan 1 √


BAB III PENUTUP Proposal ini dibuat sesuai dengan kebutuhan kelengkapan sarana dan prasarana SMK Negeri 1 Seni dan Industri Kreatif Asmat; bahwa Laboratorium/Studio Kayu menjadi sarana ketercapaian lulusan yang terampil dan berjiwa wirausaha. Kami menyadari bahwa biaya ini cukup besar, namun melihat pentingnya Laboratorium/studio Kayu, maka kami memberanikan diri untuk mengajukan proposal ini. Semoga proposal ini dapat dipertimbangkan dengan bijak demi kemajuan dan pengembangan pendidikan di lingkungan SMK Negeri 1 Seni dan Industri Kreatif Asmat. Terima kasih untuk perhatian dan dukungan semua pihak yang peduli akan kemajuan dan perkembangan pendidikan di bumi Asmat tercinta. Semoga Tuhan memberkati kita.


KANTO LAP UPA SELASAR SELASAR RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 PERPUSTAKAAN R. LABORATORIUM IPA JALAN JA RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 SELASAR SELASAR SELASAR RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 SELASAR SELASAR RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 SELASAR SELASAR RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 JAMBAN RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 RUANG KELAS ± 0.00 AREA PENGEMBANGAN MASTER PLAN 1 : 500 TAMAN 12 9 12 4 4 4 4 7 6 TAMAN 9 10 TEMPAT SAMPAH 11 14 14 15 PENAMPUNGAN AIR HUJAN 7 PENAMPUNGAN AIR HUJAN WARNA BACKGROUND KUNING ADALAH RUANGAN YANG ADA


PEMBERI TUGAS NOMOR KETERANGAN APBN 2018 APBD 2018 TGL OLEH REVISI KEMENTRIAN PENDIDIKAN KEBUDAYAAN DIREKTORAT JENDRAL PENDIDIKAN DASAR DAN MENENGAH DIREKTORAT PEMBINAAN SMK PAKET KEAHLIAN : 1. SENI UKIR 2. SENI LUKIS 3. SENI TARI PEKERJAAN PEMBANGUNAN SMK SENI DAN EKONOMI KREATIF PAPUA DI ASMAT KABUPATEN ASMAT PROVINSI PAPUA PERENCANA DAN PENGAWAS TIM PERENCANA DAN PENGAWAS USB SMK SENI DAN EKONOMI KREATIF PAPUA DI ASMAT JUDUL GAMBAR MASTERPLAN SKALA TGL NO. LBR JLH. LBR 1 : 500 6 JUNI 2018 1 1 DIKETAHUI: KEPALA DINAS PENDIDIKAN PROVINSI PAPUA ELIAS WONDA, S.Pd NIP: 19610706 1984 1 013 DIKETAHUI: NIP: ............................... DIGAMBAR : TIM PERENCANA ISA PONGSIBIDANG, ST KETUA DIPERIKSA: KETUA TIM PENDIRI USB SMK SENI DAN EKONOMI KREATIF PAPUA DI ASMAT AMIDUS FONOTABA, S.Pd NIP: 19690929 1990 031006 DIREKTUR PEMBINAAN SMK OR PANGAN ACARA R. LABORATORIUM BIOLOGI R. LABORATORIUM KOMPUTER N JEMBATAN UTAMA_AGATS ALAN MASUK R. PRAKTIK SISWA SELASAR SELASAR R. LAB KOMPUTER R. PRAKTIK SISWA R. Lab/ Studio Kayu LAPANGAN 0LAHRAGA AREA PENGEMBANGAN AREA PENGEMBANGAN 2 3 1 5 5 5 5 5 8 TAMAN 9 TAMAN 9 12 12 13 14 14 16 RUANG GURU 17 JAMBAN 6 7 TEMPAT SAMPAH PENAMPUNGAN AIR HUJAN 11 LOKASI PERSIAPAN LABORATORIUM/ STUDIO KAYU


DENAH TANAH SMK NEGERI 1 SEN LETAK SMK NEGERI 1 SENI DA


NI DAN INDUSTRI KREATIF ASMAT AN INDUSTRI KREATIF ASMAT


DENAH TANAH SMK NEGERI 1 SEN


NI DAN INDUSTRI KREATIF ASMAT


T


Skala 1 : 100 TAMPAK SAMPING KANAN Skala 1 : 100 TAMPAK SAMPING KIRI


Skala 1 : 100 TAMPAK DEPAN Skala 1 : 100 TAMPAK BELAKANG


PEKERJAAN : PEMBANGUNAN LABORATORIUM/STUDIO KRIYA KAYU LOKASI : DISTRIK AGATS - KAB. ASMAT T.A. : 2023 SATUAN TOTAL HARGA HARGA (Rp) (Rp) 1 34 5 6 I. PEKERJAAN PERSIAPAN 1 Pembersihan lokasi M2 135.000 24,000.00 3,240,000.00 2 Pemasangan Bowplank M' 30.000 88,355.60 2,650,668.00 3 Direksi Keat M2 9.000 724,845.00 6,523,605.00 Sub Total 12,414,273.00 II. PEKERJAAN KAYU & BETON 1 Galian Tanah Pondasi M3 23.224 171,450.00 3,981,809.66 2 Pas. Cerucut Umpak Ky. Mangi - mangi , P = 4 M Bh 252.000 155,380.00 39,155,760.00 3 Pas. Gelagar Anak Ky Kls I 2 X 5/10 cm M3 0.630 7,043,640.00 4,437,493.20 4 Urugan Tanah Kembali M3 13.129 78,000.00 1,024,055.76 5 Cor. Pondasi Telapak 80 x 80 x 25 (Camp. 1 Pc : 2 Ps : 3 Kr) M3 10.080 6,909,978.15 69,652,579.80 – Pembsian Besi Ø 12 mm Kg 1,115.803 29,301.38 32,694,558.61 – Lantai Kerja Papan Ky. Kls I M3 1.200 7,174,640.00 8,606,698.14 – Bekisting Telapak Kayu Kelas II M2 50.400 234,258.00 11,806,603.20 6 Cor Tiang Kolom Pondasi 20x20 , (Camp. 1 Pc : 2 Ps : 3 Kr) M3 4.032 6,909,978.15 27,861,031.92 – Pembsian Besi Ø 12 mm Kg 1,051.747 29,301.38 30,817,639.11 – Pembsian Besi Ø 6 mm Kg 101.538 29,301.38 2,975,213.56 – Bekisting Kolom M2 69.640 234,258.00 16,313,727.12 7 Pekerjaan Balok Gelagar Beton Uk. 20/25 & 15/25 cm, (Camp. 1 Pc : 2 Ps : 3 Kr) – Beton Gelagar M3 7.717 6,909,978.15 53,321,278.30 – Besi Beton Ø 12 Mm Kg 1,156.254 29,301.38 33,879,820.33 – Besi Beton Ø 6 Mm Kg 190.807 29,301.38 5,590,911.85 – Bekisting Gelagar M2 65.790 234,258.00 15,411,833.82 8 Pekerjaan Plat Lantai Beton Bertulang t=10 cm, (Camp. 1 Pc : 2 Ps : 3 Kr) – Beton Plat Lantai M3 16.500 6,909,978.15 114,014,639.55 – Besi Beton Ø 10 Mm Kg 1,886.100 29,301.38 55,265,323.39 – Bekisting Plat Lantai memakai tripleks T = 6 MM M2 107.000 259,195.50 27,733,918.50 9 Pemasangan Lantai Keramik Uk. 40 x 40 cm M2 165.000 443,231.80 73,133,247.00 Sub Total 627,678,142.84 III. PEKERJAAN KAYU, KAP & ATAP 1 Pas. Tiang Ukir Bh 6.000 1,800,600.00 10,803,600.00 2 Pekerjaan Dinding Ky Kls I, 2/20 cm M2 98.230 511,652.80 50,259,654.54 3 Rangka Dinding, Kusen, Pintu, dan Jendela Ky Kls I M3 2.706 8,911,140.00 24,109,089.27 4 Pas. Dinding Dalam Tripleks 3 mm M2 203.083 51,598.00 10,478,697.27 5 Pas. Plin Ky Besi Untuk Dinding Dalam 9 cm M2 8.376 535,559.28 4,485,844.53 6 M3 1.727 6,762,640.00 11,675,697.96 7 Pas. Gording 5/10 cm Ky Kelas II M3 1.856 8,017,890.00 14,879,199.37 8 Pas. Atap Spandek Zincalume 0.35 mm M2 246.423 249,375.32 61,451,764.11 9 Pas. Nok Stuk Seng Aluminium (SNI) M' 18.820 87,760.00 1,651,643.20 10 Top Gevel Papan Kayu Merah M2 2.823 140,052.00 395,366.80 11 Pas. Lisplank Atas & Lisplank Bawah Ky Kls I M2 21.673 206,697.00 4,479,640.73 12 Baut 15 - 35 Bh 36.000 30,500.00 1,098,000.00 13 Pagar Teras M3 0.393 8,897,140.00 3,494,796.59 Sub Total 199,262,994.38 Pas. Kuda - Kuda 5/10 cm Ky Kelas II – Beton Telapak – Beton Tiang ESTIMATE ENGINEERING (EE) NO. URAIAN PEKERJAAN SATUAN VOLUME 2


IV. PEKERJAAN PINTU DAN JENDELA 1 Pintu Panel Kembar Bh 4,330,824.00 1.000 4,330,824.00 2 Pintu Panel Bh 2,265,662.00 2.000 4,531,324.00 3 Pas. Jendela Kaca Bh 18.000 869,921.10 15,658,579.80 4 Pas. Jalusi Kayu Kelas I (Lapis Has Nyamuk) M2 3.929 183,980.00 722,857.42 Sub Total 25,243,585.22 V. PEKERJAAN PENGECETAN 1 Cat Untuk Dinding Tripleks M2 203.083 19,878.00 4,036,891.83 2 Cat Kilat Kayu ( Dinding Papan, Kusen, Lisplank, Daun Pintu & Jendela) M2 120.295 75,900.00 9,130,413.27 Sub Total 13,167,305.10 VI. PEMASANGAN INSTALASI LISTRIK 1 Lampu XL 18 Watt Bh 8.000 265,400.00 2,123,200.00 2 Saklar Ganda Bh 1.000 87,150.00 87,150.00 3 Saklar Tunggal Bh 3.000 72,150.00 216,450.00 3 Stop Kontak Bh 3.000 134,200.00 402,600.00 4 Sekring Cast Bh 1.000 473,560.00 473,560.00 Sub Total 3,302,960.00


PEKERJAAN : PEMBANGUNAN LABORATORIUM/STUDIO KRIYA KAYU LOKASI : DISTRIK AGATS - KAB. ASMAT TAHUN : 2023 HARGA SATUAN (Rp) 1 34 5 6 I. KELOMPOK BATU DAN PASIR 1 Batu Kali MA.1 M3 2,514,800.00 2 Batu Kerikil MA.2 M3 2,862,800.00 3 Batu Bata 5 x 10 x 20 MA.3 Bh 5,700.00 4 Bata Ringan Citicon (60x20x10) Cm MA.4 3,023,600.00 5 Tanah Urug / timbun MA.5 M3 1,323,600.00 6 Pasir Semen MA.6 M3 2,989,300.00 7 Pasir Ayakan MA.7 M3 3,018,300.00 8 Pasir Urug MA.8 2,502,900.00 9 Tiang Pancang Beton (20x20) K.250, P=2,5 M MA.9 Btg 1,279,600.00 10 Tiang Pancang Beton (20x20) K.250, P=4 M MA.10 Btg 1,567,400.00 11 Tiang Pancang Beton (20x20) K.500, P=4 M MA.11 Btg 1,663,200.00 12 Tiang Pancang Beton (20x20) K.500, P=6 M MA.12 Btg 2,305,800.00 II. KELOMPOK SEMEN 1 Semen PC 50 kg MB.1 Zak 240,400.00 2 Semen Putih 50 kg MB.2 Zak 380,400.00 3 Semen Untuk Batah Ringan MB.3 Zak 490,400.00 4 Air MB.4 M3 200,000.00 III. KELOMPOK KAYU GERGAJIAN 1 Kayu Besi Balok MC.1 M3 3,502,400.00 2 Kayu Besi Papan MC.2 M3 3,502,400.00 3 Kayu Merah balok MC.3 M3 2,852,400.00 4 Kayu Merah Papan MC.4 M3 2,852,400.00 5 Umpak Kayu besi (Panjang 4 m) MC.5 Btg 210,800.00 6 Umpak Kayu besi (Panjang 6 m) MC.6 Btg 316,200.00 7 Umpak kayu merah (Panjang 4 m) MC.7 Btg 105,400.00 8 Umpak kayu merah (Panjang 6 m) MC.8 Btg 160,700.00 9 Umpak Kayu besi Uk. 15/15 (Panjang 4 m) MC.9 Btg 315,200.00 10 Umpak Kayu merah Uk. 15/15 (Panjang 4 m) MC.10 Btg 256,700.00 11 Tripleks 3 mm MC.11 Lbr 90,000.00 12 Tripleks 4 mm MC.12 Lbr 145,000.00 13 Tripleks 6 mm MC.13 Lbr 210,100.00 14 Tripleks 9 mm MC.14 Lbr 313,400.00 15 Tripleks 12 mm MC.15 Lbr 420,200.00 16 Teakwood 122 x 244 cm MC.16 Lbr 255,000.00 17 Teakwood 244 x 0,9 cm MC.17 Lbr 235,000.00 18 Plywood-Multiplex MC.18 Lbr 455,000.00 19 Jabarwood polos MC.19 Lbr 105,000.00 20 Jabarwood bergaris MC.20 Lbr 115,000.00 21 Soft boart MC.21 Lbr 205,000.00 22 Formika polos 122 x 244 cm2 MC.22 Lbr 305,000.00 23 Hard board MC.23 Lbr 255,000.00 24 Melamine MC.24 Lbr 195,000.00 25 Gypsum Board (120X240X9) Cm2 MC.25 Lbr 260,100.00 26 Papan Sillkat (GRC) t= 15 Mm MC.26 Lbr 610,100.00 27 Papan Sillkat (GRC) t= 8 Mm MC.27 Lbr 560,100.00 28 Metal Stud MC.28 Btg 80,100.00 29 U Runner MC.29 Btg 70,100.00 30 Rockwool MC.30 Roll 160,100.00 31 Kayu mangi-mangi MC.31 Btg 45,300.00 KODE ITEM PEMERINTAH KABUPATEN ASMAT BAGIAN TATA PEMERINTAHAN SEKRETARIAT DAERAH 2 HARGA SATUAN BAHAN BANGUNAN NO URAIAN BAHAN BANGUNAN SATUAN KETERANGAN


HARGA SATUAN (Rp) 1 34 5 6 KODE ITEM 2 NO URAIAN BAHAN BANGUNAN SATUAN KETERANGAN 32 Tiang ukir MC.32 Btg 1,800,600.00 33 Kayu Lat 1X3 Cm MC.33 M' 14,000.00 34 Biaya Bongkar Bekisting MC.34 M3 55,800.00 IV. KELOMPOK ATAP 1 Asbes gelombang besar MD.1 Lbr 230,100.00 2 Asbes gelombang kecil MD.2 Lbr 170,100.00 3 Sirap MD.3 Lbr 110,100.00 4 Seng BJLS 0.2 MD.4 Lbr 100,100.00 5 Seng BJLS 0.3 MD.5 Lbr 130,100.00 6 Seng Plastik MD.6 Lbr 100,100.00 7 Seng fiberglass MD.7 Lbr 160,100.00 8 Seng plat BJLS 0.2 MD.8 Lbr 130,100.00 9 Seng plat BJLS 0.3 MD.9 Lbr 160,100.00 10 Seng plat 0.2 lebar 45 cm MD.10 M' 46,000.00 11 Seng plat 0.2 lebar 50 cm MD.11 M' 51,000.00 12 Seng plat 0.3 lebar 45 cm MD.12 M' 61,000.00 13 Seng plat 0.3 lebar 50 cm MD.13 M' 71,000.00 14 Atap Aluminium Bjls 0,3 MD.14 Lbr 200,100.00 15 Seng Plat Aluminium MD.15 M1 90,100.00 16 Atap Galvalum Painted 0,2 (SNI) MD.16 Lbr 100,100.00 17 Atap Galvalum Painted 0,3 (SNI) MD.17 Lbr 130,100.00 18 Galvalume C-75.100 MD.18 M' 65,200.00 19 Galvalume C-75.75 MD.19 M' 55,200.00 20 Reng Roof Bottom U33.45 MD.20 M' 35,100.00 21 Screw Cteks 12-4X50 MD.21 Bh 11,600.00 22 Screw Cteks 10X16-16 MD.22 Bh 12,600.00 23 Dynabolt Dia. 12X120 Mm MD.23 Bh 35,100.00 24 Nok Sincalume 0.35 Mm MD.24 M1 85,000.00 25 Atap Spandek Zincalume 0.35 Mm MD.25 M2 119,109.38 26 Kalsiboard Ling t= 9 Mm MD.26 Lbr 310,100.00 27 Talang Jurai 0.3 Mm MD.27 M1 75,100.00 V. KELOMPOK LANTAI 1 Ubin abu-abu 20 x 20 ME.1 Karton 163,400.00 2 Ubin berwarna 20 x 20 ME.2 Karton 163,400.00 3 Ubin mozaik 40 x 40 ME.3 Karton 180,200.00 4 Plin keramik 10 x 30 ME.4 Karton 133,400.00 5 Plin keramik 10 x 60 ME.5 Karton 133,400.00 6 Tegel keramik 20 x 20 / warna ME.6 Karton 178,400.00 7 Tegel keramik 30 x 30 / warna ME.7 Karton 185,200.00 8 Tegel porselen 11 x 11 ME.8 Karton 173,900.00 9 Tegel porselen 20 x 20 ME.9 Karton 203,400.00 10 Tegel porselen 30 x 30 ME.10 Karton 185,200.00 11 Granit 60 X 60 Mm ME.11 Karton 520,200.00 VI. KELOMPOK BESI DAN BAJA 1 Tralis MF.1 Btg 30,500.00 2 Besi beton dia 6 mm MF.2 Kg 25,087.50 2,587.50 3 Besi beton dia 8 mm MF.3 Kg 25,087.50 4 Besi beton dia 10 mm MF.4 Kg 25,087.50 5 Besi beton dia 12 mm MF.5 Kg 25,087.50 6 Besi beton dia 14 mm MF.6 Kg 25,087.50 7 Besi beton dia 16 mm MF.7 Kg 25,087.50 8 Baut 5/8" panjang 30 cm MF.8 Bh 32,500.00 9 Baut 5/8" panjang 20 cm MF.9 Bh 30,500.00 10 Baut 3/8" panjang 20 cm + mur + ring MF.10 Bh 20,500.00 11 Baut 3/8" panjang 35 cm + mur + ring MF.11 Bh 30,500.00 12 Kawat Ikat beton MF.12 Kg 40,500.00 13 Kawat Seng MF.13 Kg 50,500.00 14 Besi Profil CNP MF.14 Kg 45,200.00 15 Baja Siku L 100 X 100 X 10 MF.15 Kg 45,200.00 16 Besi Plat Baja t= 4 - 25 Mm MF.16 Kg 45,200.00 17 Besi Hollow 30X30, t= 2.7 Mm MF.17 M' 80,200.00 18 Besi Hollow 40X40, t= 3 Mm MF.18 M' 140,200.00 19 Besi Hollow 20X40, t= 0.35 Mm MF.19 M' 85,200.00 20 Besi Lat Kaca 1X1 Mm MF.20 M' 50,200.00 21 Bondek P=6 M, L 1 m, t= 0.75 Mm (Galvanized) MF.21 M2 380,200.00


HARGA SATUAN (Rp) 1 34 5 6 KODE ITEM 2 NO URAIAN BAHAN BANGUNAN SATUAN KETERANGAN 22 Bondek P=6 M, L 1 m, t= 1.00 Mm (Galvanized) MF.22 M2 490,200.00 23 Baja Profil WF 200 mm s/d 500 mm MF.23 Kg 45,200.00 VII. KELOMPOK PIPA 1 Talang plastik bulat PVC 6" MG.1 Btg 182,400.00 2 Talang plastik bulat PVC 8" MG.2 Btg 207,200.00 3 Talang plastik kotak PVC 6" MG.3 Btg 247,400.00 4 Talang plastik kotak PVC 8" MG.4 Btg 397,800.00 5 Gantungan talang MG.5 Bh 27,100.00 6 Pipa leideng GIV 3/4" MG.6 Btg 113,500.00 7 Pipa leideng GIV 1/2" MG.7 Btg 96,300.00 8 Pipa leideng GIV 1" MG.8 Btg 138,700.00 9 Pipa leideng GIV 2" MG.9 Btg 241,400.00 10 Pipa leideng GIV 3" MG.10 Btg 291,900.00 11 Pipa leideng GIV 4" MG.11 Btg 413,500.00 12 Pipa listrik besi 5/8" MG.12 Btg 67,000.00 13 Pipa plastik dia 3" MG.13 Btg 273,600.00 14 Les aluminium 1/2" MG.14 Btg 42,000.00 15 Les aluminium 1" MG.15 Btg 46,500.00 16 Les aluminium 2" MG.16 Btg 52,100.00 17 Pipa PVC 5" (AW) a = 4 m MG.17 Btg 325,000.00 18 Pipa PVC 4" (AW) a = 4 m MG.18 Btg 279,200.00 19 Pipa PVC 3" (D) a = 4 m MG.19 Btg 199,500.00 20 Pipa PVC 2" (D) a = 4 m MG.20 Btg 148,300.00 21 Pipa PVC 1/2" (AW) a = 4 m MG.21 Btg 70,100.00 22 Pipa PVC 1" (AW) a = 4 m MG.22 Btg 97,100.00 23 Pipa PVC 3/4" (AW) a = 4 m MG.23 Btg 79,500.00 24 Sambungan L bough 3" MG.24 Bh 74,100.00 25 Sambungan L bough 4" MG.25 Bh 82,800.00 26 Lem plastik MG.26 Bh 30,000.00 27 Pipa HDPE Dia 8" MG.27 M' 836,800.00 28 Pipa HDPE Dia 6" MG.28 M' 658,500.00 29 Pipa HDPE Dia 4" MG.29 M' 301,200.00 30 Pipa HDPE Dia 3" MG.30 M' 160,200.00 31 Pipa HDPE Dia 2 1/2" MG.31 M' 124,200.00 32 Pipa HDPE Dia 2" MG.32 M' 88,400.00 33 Pipa HDPE Dia 1 - 1/2" MG.33 M' 58,900.00 34 Pipa HDPE Dia 3/4" MG.34 M' 74,200.00 35 Pipa HDPE Dia 1/2" MG.35 M' 40,400.00 36 Water Metetr 1/2" MG.36 Bh 429,400.00 37 Kran air 1/2 MG.37 Bh 41,500.00 38 Gate Valve 1/2 MG.38 Bh 92,200.00 39 Dop 1/2 MG.39 Bh 20,400.00 40 Bend 90/Elbow 1/2 MG.40 Bh 51,000.00 41 Female Threaded adaftor 1/2 MG.41 Bh 58,600.00 42 Male Threaded adaftor 1/2 MG.42 Bh 57,500.00 43 Tee 1/2 MG.43 Bh 96,600.00 44 Pvc Clamp Saddle 3' x 1/2' MG.44 Bh 230,800.00 45 Pvc Clamp Saddle 110 x 3/4' MG.45 Bh 313,600.00 46 Pvc Clamp Saddle 200 x 3/4' MG.46 Bh 1,565,100.00 47 Flange 200 mm MG.47 Bh 2,000,100.00 48 Flange 175 mm MG.48 Bh 1,841,100.00 49 Flange 75 mm MG.49 Bh 941,100.00 50 Karet paking MG.50 Bh 36,600.00 51 Tee 75 x 75 x 75 MG.51 Bh 1,229,100.00 52 Bend 90 dia 175 mm HDPE MG.52 Bh 2,402,100.00 53 Bend 22.5 dia 150 mm all flange MG.53 Bh 1,570,600.00 54 Bend 90 dia 150 mm all flange MG.54 Bh 1,550,100.00 55 Bend 90 dia 100 mm all flange MG.55 Bh 1,382,100.00 56 Bend 90 dia 75 mm all flange MG.56 Bh 914,100.00 57 Gate Valve 175 mm cl all flange MG.57 Bh 4,640,100.00 58 Gate Valve 150 mm cl all flange MG.58 Bh 3,645,100.00 59 Gate Valve 100 mm cl all flange MG.59 Bh 2,630,100.00 60 Gate Valve 75 mm cl all flange MG.60 Bh 1,790,100.00 61 Gate Valve 50 mm cl all flange MG.61 Bh 974,100.00


HARGA SATUAN (Rp) 1 34 5 6 KODE ITEM 2 NO URAIAN BAHAN BANGUNAN SATUAN KETERANGAN 62 End cap/Dop 175 mm MG.62 Bh 1,116,100.00 63 End cap/Dop 150 mm MG.63 Bh 983,600.00 64 End cap/Dop 100 mm (4") MG.64 Bh 580,800.00 65 End cap/Dop 75 mm MG.65 Bh 437,700.00 66 Tee 150 mm x 150 mm x 150 mm MG.66 Bh 2,085,100.00 67 Tee 150 mm x 150 mm x 100 mm MG.67 Bh 2,052,600.00 68 Tee 150 mm x 150 mm x 75 mm MG.68 Bh 1,790,100.00 69 Tee 100 mm x 100 mm x 75 mm MG.69 Bh 1,433,100.00 70 Reducer 175 mm x 150 mm MG.70 Bh 1,292,600.00 71 Reducer 100 mm x 75 mm MG.71 Bh 733,100.00 72 Kunci ring MG.72 Bh 3,200.00 73 Kunci inggris MG.73 Bh 61,700.00 74 Pipa Galvanis 1/2" MG.74 22,500.00 75 Pipa Galvanis 3/4" MG.75 32,500.00 76 Pipa Galvanis 1" MG.76 47,500.00 77 Pipa Galvanis 11/2" MG.77 57,500.00 78 Pipa Galvanis 3" MG.78 102,500.00 79 Pipa Galvanis 4" MG.79 122,500.00 VIII. KELOMPOK CAT / ASPAL 1 Cat tembok MH.1 Kg 25,100.00 2 Cat meny kayu MH.2 Kg 55,100.00 3 Cat kilat kayu MH.3 Kg 90,100.00 4 Cat Vernis MH.4 Kg 95,100.00 5 Residu / ter MH.5 Kg 20,100.00 6 Cat besi kilat MH.6 Kg 85,100.00 7 Meny besi MH.7 Kg 60,100.00 8 Tiner MH.8 Ltr 70,100.00 9 Plamur tembok MH.9 Kg 55,100.00 10 Amplas kayu MH.10 Lbr 30,100.00 11 Amplas besi MH.11 Lbr 30,100.00 12 Aspal MH.12 Kg 40,100.00 13 Cat besi crom MH.13 Kg 85,100.00 14 Dempul kayu MH.14 Kg 55,100.00 15 Politur apache MH.15 Ltr 90,100.00 16 Cat besi MH.16 Kg 85,100.00 17 Karung MH.17 Bh 10,500.00 18 Minyak tanah MH.18 Ltr 7,500.00 19 Kuas MH.19 Bh 15,500.00 20 Kuas Rol MH.20 Bh 45,500.00 21 Binyak Bekisting/ Oli Beks MH.21 Liter 1,500.00 22 Lem Kayu MH.22 Kg 50,500.00 IX. KELOMPOK KACA 1 Kaca polos 3 mm MI.1 M2 210,100.00 2 Kaca polos 5 mm MI.2 M2 310,100.00 3 Kaca buram 3 mm MI.3 M2 200,100.00 4 Kaca buram 4 mm MI.4 M2 210,100.00 5 Kaca buram 5 mm MI.5 M2 310,100.00 6 Kawat has nyamuk MI.6 M' 60,100.00 7 Kaca nako 4 klip MI.7 Set 160,100.00 8 Kaca nako 8 klip MI.8 Set 310,100.00 9 Kaca nako 5 mm polos MI.9 Lbr 34,300.00 10 Kaca nako 5 mm riben MI.10 Lbr 40,400.00 11 Kaca ryben 3 mm MI.11 M2 160,100.00 12 Kaca riben 4 mm MI.12 M2 180,100.00 13 Kaca riben 5 mm MI.13 M2 210,100.00 14 Has nyamuk nilon MI.14 M2 42,000.00 X. KELOMPOK LISTRIK 1 Kabel listrik NYM 2,5 x 2 - 100 m MJ.1 M' 25,000.00 2 Kabel listrik NGA / NYA 1 x 2,5 mm MJ.2 M' 16,800.00 3 Saklar tunggal MJ.3 Bh 32,000.00 4 Saklar double MJ.4 Bh 47,000.00 5 Stop kontak MJ.5 Bh 37,000.00 6 Lampu philips SL 18 VA MJ.6 Bh 67,000.00


HARGA SATUAN (Rp) 1 34 5 6 KODE ITEM 2 NO URAIAN BAHAN BANGUNAN SATUAN KETERANGAN 7 Lampu philips SL 23 VA MJ.7 Bh 77,000.00 8 Lampu philips SL 14 VA MJ.8 Bh 47,000.00 9 Lampu pijar 40 watt MJ.9 Bh 37,000.00 10 Bor listrik 1500 watt MJ.10 Bh 2,270,200.00 11 Generator 2,7 KVA MJ.11 Bh 8,602,400.00 12 Klem Kabel MJ.12 Dos 25,500.00 13 Isolasi MJ.13 Bh 15,500.00 14 Fitting Lampu MJ.14 Bh 20,500.00 15 MCB (Sekring cast) MJ.15 Bh 135,700.00 16 Box MCB MJ.16 Bh 20,500.00 17 Panel Box Komplit MJ.17 Unit 7,702,000.00 XI. KELOMPOK PENGGANTUNG 1 Kunci tanam kuda terbang dua slagh MK.1 Bh 200,500.00 2 Kunci union prilih MK.2 Bh 210,500.00 3 Kunci gembok 1" MK.3 Bh 30,500.00 4 Engsel kuningan 2" MK.4 Bh 40,500.00 5 Engsel kuningan 3" MK.5 Bh 35,500.00 6 Grendel MK.6 Bh 40,500.00 7 Kait pintu MK.7 Bh 15,500.00 8 Kait jendela MK.8 Bh 15,500.00 9 Kait angin 6" MK.9 Bh 20,500.00 10 Kait angin 8" MK.10 Bh 30,500.00 XII. KELOMPOK SANITAIR 1 Kloset duduk porselen lengkap merk KIA ML.1 Bh 2,505,100.00 2 Kloset jongkok porselen ML.2 Bh 305,100.00 3 Wastafel porselen lengkap ML.3 Bh 1,105,100.00 4 Wastafel porselen tanpa kaca ML.4 Bh 705,100.00 5 Kran air biasa ML.5 Bh 35,500.00 6 Kran air kuningan ML.6 Bh 50,500.00 7 Pompa air sanyo ML.7 Bh 750,500.00 8 Bak air 250 L ML.8 Bh 605,100.00 9 Tanki air / prifil tank 1100 L ML.9 Bh 2,905,100.00 10 Tempat cuci piring satu lubang ML.10 Bh 425,500.00 11 Tempat cuci piring lubang ganda ML.11 Bh 720,500.00 12 Biotech Septitank Kaps. 800 Liter/ Setara ML.12 Bh 8,130,100.00 13 Biotech Septitank Kaps. 1200 Liter/ Setara ML.13 Bh 9,130,100.00 14 Biotech Septitank Kaps. 1600 Liter/ Setara ML.14 Bh 10,130,100.00 15 Biotech Septitank Kaps. 5000 Liter/ Setara ML.15 Bh 43,130,100.00 16 Biotech Septitank Kaps. 7000 Liter/ Setara ML.16 Bh 48,130,100.00 17 Pasang Instalasi Air ML.17 Ls 2,131,500.00 18 Biaya Pasang Tanki Air ML.18 Ls 60,900.00 19 Biaya Pasang Bio Septitank ML.19 Ls 182,700.00 XIII. KELOMPOK PAKU 1 Paku tripleks MM.1 Kg 45,500.00 2 Paku seng MM.2 Kg 60,500.00 3 Paku jembatan 7 cm MM.3 Kg 50,500.00 4 Paku jembatan 10 cm MM.4 Kg 50,500.00 5 Paku campuran MM.5 Kg 35,500.00 6 Paku tembok MM.6 Bh 55,500.00 7 Paku 1" MM.7 Kg 37,500.00 8 Paku 2" MM.8 Kg 38,500.00 9 Paku 3" MM.9 Kg 39,500.00 10 Paku 4" MM.10 Kg 39,500.00 11 Paku 5" MM.11 Kg 39,500.00 12 Paku Skrup MM.12 Kg 1,600.00 13 Paku asbes MM.13 Kg 45,500.00 14 Skrup GRC MM.14 Bh 1,600.00


HARGA SATUAN (Rp) 1 34 5 6 KODE ITEM 2 NO URAIAN BAHAN BANGUNAN SATUAN KETERANGAN XIV. KELOMPOK TENAGA KERJA 1 Buruh angkut L.1 Oh 115,000.00 2 Pekerja L.2 Oh 135,000.00 3 Tukang L.3 Oh 170,000.00 4 Kepala tukang L.4 Oh 190,000.00 5 Mandor L.5 Oh 210,000.00 XV. KELOMPOK SEWA ALAT 1 Gerobak S.1 Hr 152,000.00 2 Katrol S.2 Hr 1,776,000.00 3 Concrete Mixer S.3 Jam 60,000.00 4 Alat Bantu S.4 Ls 10,000.00 Biaya Pemasangan Ls 31,230.00


PEKERJAAN : PEMBANGUNAN LABORATORIUM/STUDIO KRIYA KAYU LOKASI : DISTRIK AGATS - KAB. ASMAT TAHUN : 2023 HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 345 6 A. 1 PASANG BOUWPLANK PUPR-CK.A.1 M' Papan kayu merah MC.4 M3 2,852,400.00 0.007 19,966.80 Kayu skor kayu merah MC.3 M3 2,852,400.00 0.012 34,228.80 Paku campuran MM.5 KG 35,500.00 0.020 710.00 Pekerja L.2 OH 135,000.00 0.100 13,500.00 Tukang L.3 OH 170,000.00 0.100 17,000.00 Kepala tukang L.4 OH 190,000.00 0.010 1,900.00 Mandor L.5 OH 210,000.00 0.005 1,050.00 Jumlah 88,355.60 2 BARAK KERJA/DIREKSI KEET PUPR-CK.A.2 M2 3.000 Kayu mangi-mangi MC.31 Btg 45,300.00 135,900.00 0.050 Kayu merah MC.4 M3 2,852,400.00 142,620.00 0.500 Paku campuran MM.5 KG 35,500.00 17,750.00 0.150 Paku seng MM.2 KG 60,500.00 9,075.00 2.000 Seng 0.20 (SNI) MD.4 LBR 100,100.00 200,200.00 0.250 Pekerja L.2 OH 135,000.00 33,750.00 0.490 Tukang L.3 OH 170,000.00 83,300.00 0.400 Kepala tukang L.4 OH 190,000.00 76,000.00 0.125 Mandor L.5 OH 210,000.00 26,250.00 Jumlah 724,845.00 3a GALIAN TANAH LUMPUR DALAM 1 M PUPR-CK.A.3a M3 1.200 Pekerja L.2 OH 135,000.00 162,000.00 0.045 Mandor L.5 OH 210,000.000 9,450.00 Jumlah 171,450.00 3b GALIAN TANAH BIASA DALAM 1 M PUPR-CK.A.3b M3 0.750 Pekerja L.2 OH 135,000.00 101,250.00 0.025 Mandor L.5 OH 210,000.000 5,250.00 Jumlah 106,500.00 3c GALIAN TANAH LUMPUR DALAM 2 M PUPR-CK.A.3c M3 0.900 Pekerja L.2 OH 135,000.00 121,500.00 0.045 Mandor L.5 OH 210,000.000 9,450.00 Jumlah 130,950.00 3d GALIAN TANAH BIASA DALAM 3 M PUPR-CK.A.3d M3 1.050 Pekerja L.2 OH 135,000.00 141,750.00 0.067 Mandor L.5 OH 210,000.000 14,070.00 Jumlah 155,820.00 3e TANAH DIANGKAT SEJAUH 30 M (MAX) PUPR-CK.A.3e M3 0.310 Pekerja L.2 OH 135,000.00 41,796.00 0.030 Mandor L.5 OH 210,000.00 6,300.00 Jumlah 48,096.00 PEKERJAAN PERSIPAN DAN TANAH DAFTAR ANALISA SATUAN PEKERJAAN UNTUK PEKERJAAN BANGUNAN 2 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp)


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 4a URUGAN TANAH KEMBALI PUPR-CK.A.4a M3 0.500 Pekerja L.2 OH 135,000.00 67,500.00 0.050 Mandor L.5 OH 210,000.00 10,500.00 Jumlah 78,000.00 4b URUGAN TANAH PUPR-CK.A.4b M3 1.200 Tanah timbun L.2 M3 1,323,600.00 1,588,320.00 0.300 Pekerja L.5 OH 135,000.00 40,500.00 0.010 Mandor OH 210,000.00 2,100.00 Jumlah 1,630,920.00 4c URUGAN PASIR PUPR-CK.A.4c M3 1.200 Pasir urug MA.6 M3 2,989,300.00 3,587,160.00 0.300 Pekerja L.2 OH 135,000.00 40,500.00 0.010 Mandor L.5 OH 210,000.00 2,100.00 Jumlah 3,629,760.00 5 PEMBERSIHAN LOKASI MANUAL PUPR-CK.A.5 M2 0.100 Pekerja L.2 OH 135,000.00 13,500.00 0.050 Mandor L.5 OH 210,000.00 10,500.00 Jumlah 24,000.00


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 6 PENIMBUNAN, PERATAAN DAN PUPR-CK.A.6 M3 PEMADATAN (MANUAL) 1.250 Tanah timbun MA.5 M3 1,323,600.00 1,654,500.00 0.200 Pekerja L.2 OH 135,000.00 27,000.00 0.150 Mandor L.5 OH 210,000.00 31,500.00 1.000 Alat bantu S.4 Ls 10,000.00 10,000.00 Jumlah 1,723,000.00 1a PONDASI BATA, CAMPURAN 1 PC : 2 PS PUPR-CK.B.1a M3 ( MANUAL ) 649.000 Batu Bata MA.3 Bh 5,700.00 3,699,300 5.774 Semen @ 50 Kg MB.1 Zak 240,400.00 1,387,989 0.412 Pasir Semen MA.6 M3 2,989,300.00 1,232,801 2.857 Pekerja L.2 Oh 135,000.00 385,714 1.286 Tukang L.3 Oh 170,000.00 218,571 0.129 Kepala tukang L.4 Oh 190,000.00 24,429 0.143 Mandor L.5 Oh 210,000.00 30,000 Jumlah 6,978,804.55 1b PONDASI BATA, CAMPURAN 1 PC : 3 PS PUPR-CK.B.1b M3 ( MANUAL ) 649.000 Batu Bata MA.3 Bh 5,700.00 3,699,300 4.330 Semen @ 50 Kg MB.1 Zak 240,400.00 1,040,992 0.464 Pasir Semen MA.6 M3 2,989,300.00 1,386,902 2.857 Pekerja L.2 Oh 135,000.00 385,714 1.286 Tukang L.3 Oh 170,000.00 218,571 0.129 Kepala tukang L.4 Oh 190,000.00 24,429 0.143 Mandor L.5 Oh 210,000.00 30,000 Jumlah 6,785,907.44 1c PONDASI BATA, CAMPURAN 1 PC : 4 PS PUPR-CK.B.1b M3 ( MANUAL ) 649.000 Batu Bata MA.3 Bh 3,699,300 5,700.00 3.464 Semen @ 50 Kg MB.1 Zak 832,793 240,400.00 0.495 Pasir Semen MA.6 M3 1,479,362 2,989,300.00 2.857 Pekerja L.2 Oh 385,714 135,000.00 1.286 Tukang L.3 Oh 218,571 170,000.00 0.129 Kepala tukang L.4 Oh 24,429 190,000.00 0.143 Mandor L.5 Oh 30,000 210,000.00 Jumlah 6,670,169.16 2a PONDASI BATU BELAH, CAMP. 1 PC : 3 PS PUPR-CK.B.2a M3 ( MANUAL ) 1.200 Batu Kali / Batu Belah 15/20 MA.1 Bh 3,017,760 2,514,800.00 4.040 Semen @ 50 Kg MB.1 Zak 971,216 240,400.00 0.485 Pasir Semen MA.6 M3 1,449,811 2,989,300.00 1.500 Pekerja L.2 Oh 202,500 135,000.00 0.750 Tukang L.3 Oh 127,500 170,000.00 0.075 Kepala tukang L.4 Oh 14,250 190,000.00 0.075 Mandor L.5 Oh 15,750 210,000.00 Jumlah 5,798,786.50 2b PONDASI BATU BELAH, CAMP. 1 PC : 4 PS PUPR-CK.B.2b M3 B. PEKERJAAN PONDASI DAN PASANGAN BATA


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) ( MANUAL ) 1.200 Batu Kali / Batu Belah 15/20 MA.12 Bh 3,017,760 2,514,800.00 2.720 Semen @ 50 Kg MC.6 Zak 653,888 240,400.00 0.520 Pasir Semen MB.3 M3 1,554,436 2,989,300.00 1.500 Pekerja L.2 Oh 202,500 135,000.00 0.750 Tukang L.3 Oh 127,500 170,000.00 0.075 Kepala tukang L.4 Oh 14,250 190,000.00 0.075 Mandor L.5 Oh 15,750 210,000.00 Jumlah 5,586,084.00 3 PONDASI BATU KOSONG (ANSTAMPING) PUPR-CK.B.3 M3 1.200 Batu Kali / Batu Belah 15/20 MA.1 Bh 3,017,760 2,514,800.00 0.432 Pasir Urug MA.8 M3 1,081,253 2,502,900.00 0.780 Pekerja L.2 Oh 105,300 135,000.00 0.390 Tukang L.3 Oh 66,300 170,000.00 0.039 Kepala tukang L.4 Oh 7,410 190,000.00 0.039 Mandor L.5 Oh 8,190 210,000.00 Jumlah 4,286,212.80


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 1a TIANG PANCANG KAYU BESI 4 M (MANUAL) PUPR-CK.C.1a M' 1.000 Tiang pancang MC.5 Btg 210,800.00 210,800.00 0.333 Alat bantu S.4 Jam 10,000.00 3,330.00 0.500 Pekerja L.2 Oh 135,000.00 67,500.00 0.200 Tukang L.3 Oh 170,000.00 34,000.00 0.025 Mandor L.5 Oh 210,000.00 5,250.00 Jumlah 320,880.00 1b TIANG PANCANG KAYU BESI 4 M (MANUAL) PUPR-CK.C.1b M' 1.000 Tiang pancang MC.5 Btg 70,048.00 70,048.00 0.333 Alat bantu S.4 Jam 10,000.00 3,330.00 0.500 Pekerja L.2 Oh 135,000.00 67,500.00 0.200 Tukang L.3 Oh 170,000.00 34,000.00 0.025 Mandor L.5 Oh 210,000.00 5,250.00 Jumlah 180,128.00 1c TIANG PANCANG KAYU BESI 6 M (MANUAL) PUPR-CK.C.1c M' 1.000 Tiang pancang MC.6 Btg 316,200.00 316,200.00 0.333 Alat bantu S.4 Jam 10,000.00 3,330.00 0.500 Pekerja L.2 Oh 135,000.00 67,500.00 0.200 Tukang L.3 Oh 170,000.00 34,000.00 0.025 Mandor L.5 Oh 210,000.00 5,250.00 Jumlah 426,280.00 1.000 Tiang pancang 15/15 MC.9 M' 315,200.00 315,200.00 0.333 Alat bantu S.4 Btg 10,000.00 3,330.00 0.500 Pekerja L.2 Jam 135,000.00 67,500.00 0.200 Tukang L.3 Oh 170,000.00 34,000.00 0.025 Mandor L.5 Oh 210,000.00 5,250.00 Jumlah 425,280.00 2a TIANG BETON 20,4 Mpa, P=2.5 M, PUPR-CK.C.2a Bh 20/20 - MANUAL 1.000 Tiang Pancang fc=20,4 Mpa (K250) MA.9 Btg 1,279,600.00 1,279,600.00 0.333 Alat bantu S.4 Jam 10,000.00 3,330.00 1.304 Pekerja L.2 Oh 135,000.00 176,080.50 0.130 Tukang L.3 Oh 170,000.00 22,173.10 0.013 Kepala tukang L.4 Oh 190,000.00 2,478.17 0.008 Mandor L.5 Oh 210,000.00 1,722.00 Jumlah 1,485,383.77 2b TIANG BETON 20,4 Mpa, P=4 M, PUPR-CK.C.2b Bh 20/20 - MANUAL 1.000 Tiang Pancang fc=20,4 Mpa (K250) MA.10 Btg 1,567,400.00 1,567,400.00 1.304 Alat bantu S.4 Jam 10,000.00 13,043.00 1.739 Pekerja L.2 Oh 135,000.00 234,765.00 0.174 Tukang L.3 Oh 170,000.00 29,563.00 0.017 Kepala tukang L.4 Oh 190,000.00 3,304.10 0.011 Mandor L.5 Oh 210,000.00 2,289.00 Jumlah 1,850,364.10 Bh C. PEKERJAAN PONDASI TIANG PANCANG TIANG PANCANG BALOK KAYU BESI UK. 15X15, P= 4 M KAYU GERGAJIAN (MANUAL) 1d PUPR-CK.C.1d


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 2c TIANG BETON 40,7 MPa, P = 4M, 20/20 - MANUAL PUPR-CK.C.2c Bh 1.000 Tiang Pancang fc=40.7 Mpa (K500) MA.11 Btg 1,663,200.00 1,663,200.00 1.739 Alat Bantu S.4 Jam 10,000.00 17,390.00 1.739 Pekerja L.2 Oh 135,000.00 234,765.00 0.174 Tukang L.3 Oh 170,000.00 29,563.00 0.017 Kepala Tukang L.4 Oh 190,000.00 3,304.10 0.011 Mandor L.5 Oh 210,000.00 2,289.00 Jumlah 1,950,511.10 2d TIANG BETON 40,7 MPa, P = 4 M, 20/20 - MANUAL PUPR-CK.C.2d Bh 1.000 Tiang Pancang fc=40.7 Mpa (K500) MA.12 Btg 2,305,800.00 2,305,800.00 1.739 Alat Bantu S.4 Jam 10,000.00 17,390.00 1.739 Pekerja L.2 Oh 135,000.00 234,765.00 0.174 Tukang L.3 Oh 170,000.00 29,563.00 0.017 Kepala Tukang L.4 Oh 190,000.00 3,304.10 0.011 Mandor L.5 Oh 210,000.00 2,289.00 Jumlah 2,593,111.10


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 3 TIANG PANCANG KAYU MANGI - MANGI, P= 4 M (MANUAL) PUPR-CK.C.3 M' 1.000 Tiang pancang kayu Mangi - mangi MC.31 Btg 45,300.00 45,300.00 0.333 Alat bantu S.4 Jam 10,000.00 3,330.00 0.500 Pekerja L.2 Oh 135,000.00 67,500.00 0.200 Tukang L.3 Oh 170,000.00 34,000.00 0.025 Mandor L.5 Oh 210,000.00 5,250.00 Jumlah 155,380.00 1a CAMPURAN BETON 1 PC : 2 PS - Manual PUPR-CK.D.1a M3 15.150 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 3,642,060.00 1.082 Pasir Semen MA.6 M3 2,989,300.00 3,234,849.64 0.300 Mandor L.5 Oh 210,000.00 63,000.00 0.100 Kepala tukang L.4 Oh 190,000.00 19,000.00 1.000 Tukang L.3 Oh 170,000.00 170,000.00 6.000 Pekerja L.2 Oh 135,000.00 810,000.00 Jumlah 7,938,909.64 1b CAMPURAN BETON 1 PC : 3PS - Manual PUPR-CK.D.1b M3 11.363 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 2,731,545.00 1.217 Pasir Semen MA.6 M3 2,989,300.00 3,639,205.85 0.300 Mandor L.5 Oh 210,000.00 63,000.00 0.100 Kepala tukang L.4 Oh 190,000.00 19,000.00 1.000 Tukang L.3 Oh 170,000.00 170,000.00 6.000 Pekerja L.2 Oh 135,000.00 810,000.00 Jumlah 7,432,750.85 1c CAMPURAN BETON 1 PC : 4 PS - Manual PUPR-CK.D.1c M3 9.090 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 2,185,236.00 1.299 Pasir Semen MA.6 M3 2,989,300.00 3,881,819.57 0.300 Mandor L.5 Oh 210,000.00 63,000.00 0.100 Kepala tukang L.4 Oh 190,000.00 19,000.00 1.000 Tukang L.3 Oh 170,000.00 170,000.00 6.000 Pekerja L.2 Oh 135,000.00 810,000.00 Jumlah 7,129,055.57 1d CAMPURAN BETON 1 PC : 5 PS - Manual PUPR-CK.D.1d M3 7.575 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,821,030.00 1.353 Pasir Semen MA.6 M3 2,989,300.00 4,043,562.05 0.300 Mandor L.5 Oh 210,000.00 63,000.00 0.100 Kepala tukang L.4 Oh 190,000.00 19,000.00 1.000 Tukang L.3 Oh 170,000.00 170,000.00 6.000 Pekerja L.2 Oh 135,000.00 810,000.00 Jumlah 6,926,592.05 1e CAMPURAN BETON 1 PC : 6 PS - Manual PUPR-CK.D.1e M3 6.493 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,560,882.85 1.391 Pasir Semen MA.6 M3 2,989,300.00 4,159,092.40 0.300 Mandor L.5 Oh 210,000.00 63,000.00 0.100 Kepala tukang L.4 Oh 190,000.00 19,000.00 1.000 Tukang L.3 Oh 170,000.00 170,000.00 6.000 Pekerja L.2 Oh 135,000.00 810,000.00 Jumlah 6,781,975.25 2 COR TRASSAM 1 PC : 2 PS - Manual PUPR-CK.D.2 M3 D. PEKERJAAN BETON


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 12.800 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 3,077,120.00 0.960 Pasir Semen MA.6 M3 2,989,300.00 2,869,728.00 6.000 Pekerja L.2 Oh 135,000.00 810,000.00 1.000 Tukang L.3 Oh 170,000.00 170,000.00 0.100 Kepala Tukang L.4 Oh 190,000.00 19,000.00 0.300 Mandor L.5 Oh 210,000.00 63,000.00 Jumlah 7,008,848.00 3a CAMPURAN BETON 1 PC : 2PS : 3 KR - Manual PUPR-CK.D.3a M3 7.575 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,821,030.00 0.541 Pasir Semen MA.6 M3 2,989,300.00 1,617,424.82 0.842 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,409,523.34 0.300 Mandor L.5 Oh 210,000.00 63,000.00 0.100 Kepala tukang L.4 Oh 190,000.00 19,000.00 1.000 Tukang L.3 Oh 170,000.00 170,000.00 6.000 Pekerja L.2 Oh 135,000.00 810,000.00 Jumlah 6,909,978.15


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 3b CAMPURAN BETON 1 PC : 2PS : 5 KR - Manual PUPR-CK.D.3b M3 5.050 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,214,020.00 0.541 Pasir Semen MA.6 M3 2,989,300.00 1,617,424.82 0.935 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,677,248.15 0.300 Mandor L.5 Oh 210,000.00 63,000.00 0.100 Kepala tukang L.4 Oh 190,000.00 19,000.00 1.000 Tukang L.3 Oh 170,000.00 170,000.00 6.000 Pekerja L.2 Oh 135,000.00 810,000.00 Jumlah 6,570,692.97 3c CAMPURAN BETON 1 PC : 2PS : 5 KR - Manual PUPR-CK.D.3c M3 4.132 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 993,289.09 0.590 Pasir Semen MA.6 M3 2,989,300.00 1,764,463.44 0.918 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,628,570.91 0.300 Mandor L.5 Oh 210,000.00 63,000.00 0.100 Kepala tukang L.4 Oh 190,000.00 19,000.00 1.000 Tukang L.3 Oh 170,000.00 170,000.00 6.000 Pekerja L.2 Oh 135,000.00 810,000.00 Jumlah 6,448,323.44 4 BETON MUTU f'c = 7,4 MPa (K100) PUPR-CK.D.4 M3 4.940 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,187,576 0.621 Pasir Semen MA.6 M3 2,989,300.00 1,855,501 0.740 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,118,472 0.215 Air MB.4 M3 200,000.00 43,000 1.650 Pekerja L.2 Oh 135,000.00 222,750 0.275 Tukang L.3 Oh 170,000.00 46,750 0.028 Kepala Tukang L.4 Oh 190,000.00 5,225 0.083 Mandor L.5 Oh 210,000.00 17,325 Jumlah 5,496,599.21 5 BETON MUTU f'c = 9.8 Mpa (K125) PUPR-CK.D.5 M3 5.520 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,327,008 0.591 Pasir Semen MA.6 M3 2,989,300.00 1,767,957 0.750 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,146,040 0.215 Air MB.4 M3 200,000.00 43,000 1.650 Pekerja L.2 Oh 135,000.00 222,750 0.275 Tukang L.3 Oh 170,000.00 46,750 0.028 Kepala Tukang L.4 Oh 190,000.00 5,225 0.083 Mandor L.5 Oh 210,000.00 17,325 Jumlah 5,576,055.13 6 BETON MUTU f'c = 12.2 Mpa (K150) PUPR-CK.D.6 M3 5.980 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,437,592 0.571 Pasir Semen MA.6 M3 2,989,300.00 1,706,037 0.753 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,156,642 0.215 Air MB.4 M3 200,000.00 43,000 1.650 Pekerja L.2 Oh 135,000.00 222,750 0.275 Tukang L.3 Oh 170,000.00 46,750 0.028 Kepala Tukang L.4 Oh 190,000.00 5,225 0.083 Mandor L.5 Oh 210,000.00 17,325 Jumlah 5,635,320.88 7 LANTAI KERJA BETON MUTU f'c 7,4 Mpa (K100) PUPR-CK.D.7 M3 4.600 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,105,840.00 0.638 Pasir Semen MA.6 M3 2,989,300.00 1,906,746.39


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 0.761 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,177,848.56 0.200 Air MB.4 M3 200,000.00 40,000.00 1.200 Pekerja L.2 Oh 135,000.00 162,000.00 0.200 Tukang L.3 Oh 170,000.00 34,000.00 0.020 Kepala Tukang L.4 Oh 190,000.00 3,800.00 0.060 Mandor L.5 Oh 210,000.00 12,600.00 Jumlah 5,442,834.95 8 BETON MUTU f'c = 12.2 Mpa (K150) PUPR-CK.D.8 M3 6.520 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,567,408 0.543 Pasir Semen MA.6 M3 2,989,300.00 1,622,763 0.762 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,182,089 0.215 Air MB.4 M3 200,000.00 43,000 1.650 Pekerja L.2 Oh 135,000.00 222,750 0.275 Tukang L.3 Oh 170,000.00 46,750 0.028 Kepala Tukang L.4 Oh 190,000.00 5,225 0.083 Mandor L.5 Oh 210,000.00 17,325 Jumlah 5,707,310.63


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 9 BETON MUTU f'c = 16.9 Mpa (K200) PUPR-CK.D.9 M3 7.040 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,692,416 0.522 Pasir Semen MA.6 M3 2,989,300.00 1,560,842 0.764 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,186,331 0.215 Air MB.4 M3 200,000.00 43,000 1.650 Pekerja L.2 Oh 135,000.00 222,750 0.275 Tukang L.3 Oh 170,000.00 46,750 0.028 Kepala Tukang L.4 Oh 190,000.00 5,225 0.083 Mandor L.5 Oh 210,000.00 17,325 Jumlah 5,774,638.61 10 BETON MUTU f'c = 19.3 Mpa (K225) PUPR-CK.D.10 M3 7.420 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,783,768 0.499 Pasir Semen MA.6 M3 2,989,300.00 1,490,379 0.776 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,220,261 0.215 Air MB.4 M3 200,000.00 43,000 1.650 Pekerja L.2 Oh 135,000.00 222,750 0.275 Tukang L.3 Oh 170,000.00 46,750 0.028 Kepala Tukang L.4 Oh 190,000.00 5,225 0.083 Mandor L.5 Oh 210,000.00 17,325 Jumlah 5,829,458.02 11 BETON MUTU f'c = 21.7 Mpa (K250) PUPR-CK.D.11 M3 7.680 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,846,272 0.494 Pasir Semen MA.6 M3 2,989,300.00 1,477,568 0.770 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,203,295 0.215 Air MB.4 M3 200,000.00 43,000 1.650 Pekerja L.2 Oh 135,000.00 222,750 0.275 Tukang L.3 Oh 170,000.00 46,750 0.028 Kepala Tukang L.4 Oh 190,000.00 5,225 0.083 Mandor L.5 Oh 210,000.00 17,325 Jumlah 5,862,185.99 12 BETON MUTU f'c = 24 Mpa (K275) PUPR-CK.D.12 M3 8.120 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,952,048 0.489 Pasir Semen MA.6 M3 2,989,300.00 1,460,487 0.760 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,175,728 0.215 Air MB.4 M3 200,000.00 43,000 1.650 Pekerja L.2 Oh 135,000.00 222,750 0.275 Tukang L.3 Oh 170,000.00 46,750 0.028 Kepala Tukang L.4 Oh 190,000.00 5,225 0.083 Mandor L.5 Oh 210,000.00 17,325 Jumlah 5,923,312.57 13 BETON MUTU f'c = 26,4 MPa (K300) PUPR-CK.D.13 M3 8.260 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 1,985,704 0.486 Pasir Semen MA.6 M3 2,989,300.00 1,454,081 0.756 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,165,125 0.215 Air MB.4 M3 200,000.00 43,000 1.650 Pekerja L.2 Oh 135,000.00 222,750 0.275 Tukang L.3 Oh 170,000.00 46,750 0.028 Kepala Tukang L.4 Oh 190,000.00 5,225 0.083 Mandor L.5 Oh 210,000.00 17,325 Jumlah 5,939,959.97 14 BETON MUTU f'c = 28.8 MPa (K325) PUPR-CK.D.14 M3


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 8.780 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 2,110,712 0.479 Pasir Semen MA.6 M3 2,989,300.00 1,430,594 0.745 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,133,316 0.215 Air MB.4 M3 200,000.00 43,000 1.650 Pekerja L.2 Oh 135,000.00 222,750 0.275 Tukang L.3 Oh 170,000.00 46,750 0.028 Kepala Tukang L.4 Oh 190,000.00 5,225 0.083 Mandor L.5 Oh 210,000.00 17,325 Jumlah 6,009,671.72 15 BETON MUTU f'c = 31.2MPa (K350) PUPR-CK.D.15 M3 8.960 Semen Portland (PC) @ 50 Kg MB.1 Zak 240,400.00 2,153,984 0.476 Pasir Semen MA.6 M3 2,989,300.00 1,424,188 0.741 Kerikil / Batu Pecah MA.2 M3 2,862,800.00 2,120,593 0.215 Air MB.4 M3 200,000.00 43,000 1.650 Pekerja L.2 Oh 135,000.00 222,750 0.275 Tukang L.3 Oh 170,000.00 46,750 0.028 Kepala Tukang L.4 Oh 190,000.00 5,225 0.083 Mandor L.5 Oh 210,000.00 17,325 Jumlah 6,033,814.52


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 16 PEMBESIAN BESI POLOS / ULIR Ø 6 mm SNI PUPR-CK.D.16 Kg 1.050 Besi Beton Dia. 6 mm SNI (P = 12 m) MF.2 Bh 25,087.50 26,341.88 0.015 Kawat Beton MF.12 Kg 40,500.00 607.50 0.007 Pekerja L.2 Oh 135,000.00 945.00 0.007 Tukang L.3 Oh 170,000.00 1,190.00 0.001 Kepala tukang L.4 Oh 190,000.00 133.00 0.000 Mandor L.5 Oh 210,000.00 84.00 Jumlah 29,301.38 17 PEMBESIAN BESI POLOS / ULIR Ø 8 mm SNI PUPR-CK.D.17 Kg 1.050 Besi Beton Dia. 8mm SNI (P = 12 m) MF.3 Bh 25,087.50 26,341.88 0.015 Kawat Beton MF.12 Kg 40,500.00 607.50 0.007 Pekerja L.2 Oh 135,000.00 945.00 0.007 Tukang L.3 Oh 170,000.00 1,190.00 0.001 Kepala tukang L.4 Oh 190,000.00 133.00 0.000 Mandor L.5 Oh 210,000.00 84.00 Jumlah 29,301.38 18 PEMBESIAN BESI POLOS / ULIR Ø 10 mm SNI PUPR-CK.D.18 Kg 1.050 Besi Beton Dia. 10 mm SNI (P = 12 m) MF.4 Bh 25,087.50 26,341.88 0.015 Kawat Beton MF.12 Kg 40,500.00 607.50 0.007 Pekerja L.2 Oh 135,000.00 945.00 0.007 Tukang L.3 Oh 170,000.00 1,190.00 0.001 Kepala tukang L.4 Oh 190,000.00 133.00 0.000 Mandor L.5 Oh 210,000.00 84.00 Jumlah 29,301.38 19 PEMBESIAN BESI POLOS / ULIR Ø 12 mm SNI PUPR-CK.D.19 Kg 1.050 Besi Beton Dia. 12 mm SNI (P = 12 m) MF.5 Bh 25,087.50 26,341.88 0.015 Kawat Beton MF.12 Kg 40,500.00 607.50 0.007 Pekerja L.2 Oh 135,000.00 945.00 0.007 Tukang L.3 Oh 170,000.00 1,190.00 0.001 Kepala tukang L.4 Oh 190,000.00 133.00 0.000 Mandor L.5 Oh 210,000.00 84.00 Jumlah 29,301.38 20 PEMBESIAN BESI POLOS / ULIR Ø 16 mm SNI PUPR-CK.D.20 Kg 1.050 Besi Beton Dia. 16 mm SNI (P = 12 m) MF.6 Bh 25,087.50 26,341.88 0.015 Kawat Beton MF.12 Kg 40,500.00 607.50 0.007 Pekerja L.2 Oh 135,000.00 945.00 0.007 Tukang L.3 Oh 170,000.00 1,190.00 0.001 Kepala tukang L.4 Oh 190,000.00 133.00 0.000 Mandor L.5 Oh 210,000.00 84.00 Jumlah 29,301.38 21a PASANG BEKISTING UNTUK PONDASI PUPR-CK.D.21a M2 0.040 Kayu Merah MC.3/MC4 M3 2,852,400.00 114,096.00 0.300 Paku Campuran MM.5 Kg 35,500.00 10,650.00 0.100 Minyak Bekisting MH.21 Liter 1,500.00 150.00 0.520 Pekerja L.2 Oh 135,000.00 70,200.00 0.260 Tukang L.3 Oh 170,000.00 44,200.00 0.026 Kepala tukang L.4 Oh 190,000.00 4,940.00 0.026 Mandor L.5 Oh 210,000.00 5,460.00 Jumlah 249,696.00 21b PASANG BEKISTING UNTUK SLOOF PUPR-CK.D.21b M2


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 0.045 Kayu Merah MC.3/MC4 M3 2,852,400.00 128,358.00 0.300 Paku Campuran MM.5 Kg 35,500.00 10,650.00 0.100 Minyak Bekisting MH.21 Liter 1,500.00 150.00 0.300 Pekerja L.2 Oh 135,000.00 40,500.00 0.260 Tukang L.3 Oh 170,000.00 44,200.00 0.026 Kepala tukang L.4 Oh 190,000.00 4,940.00 0.026 Mandor L.5 Oh 210,000.00 5,460.00 Jumlah 234,258.00 21c PASANG BEKISTING UNTUK KOLOM PUPR-CK.D.21c M2 0.040 Kayu Merah MC.3 M3 2,852,400.00 114,096.00 0.400 Paku Campuran MM.5 Kg 35,500.00 14,200.00 0.200 Minyak Bekisting MH.21 Liter 1,500.00 300.00 0.015 Balok Kayu Merah MC.4 M3 2,852,400.00 42,786.00 0.350 Plywood Tebal 9 mm MC.18 Lmbr 455,000.00 159,250.00 2.000 Kayu Mangi - Mangi MC.31 Btg 45,300.00 90,600.00 0.660 Pekerja L.2 Oh 135,000.00 89,100.00 0.330 Tukang L.3 Oh 170,000.00 56,100.00 0.033 Kepala tukang L.4 Oh 190,000.00 6,270.00 0.033 Mandor L.5 Oh 210,000.00 6,930.00 Jumlah 579,632.00


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 21d BEKISTING UNTUK PLAT LANTAI PAKAI PLYWOOD PUPR-CK.D.21d M2 0.040 Kayu Merah MC.3 M3 2,852,400.00 114,096.00 0.400 Paku Campuran MM.5 Kg 35,500.00 14,200.00 0.200 Minyak Bekisting MH.21 Liter 1,500.00 300.00 0.015 Balok Kayu Merah MC.4 M3 2,852,400.00 42,786.00 0.350 Plywood Tebal 9 mm MC.18 Lmbr 455,000.00 159,250.00 6.000 Kayu Mangi - Mangi MC.31 Btg 45,300.00 271,800.00 0.660 Pekerja L.2 Oh 135,000.00 89,100.00 0.330 Tukang L.3 Oh 170,000.00 56,100.00 0.033 Kepala tukang L.4 Oh 190,000.00 6,270.00 0.033 Mandor L.5 Oh 210,000.00 6,930.00 Jumlah 760,832.00 21e PASANG BEKISTING UNTUK KOLOM PAKAI PLYWOOD PUPR-CK.D.21e M2 0.040 Kayu Merah MC.3 M3 2,852,400.00 114,096.00 0.400 Paku Campuran MM.5 Kg 35,500.00 14,200.00 0.200 Minyak Bekisting MH.21 Liter 1,500.00 300.00 0.018 Balok Kayu Merah MC.4 M3 2,852,400.00 51,343.20 0.350 Plywood Tebal 9 mm MC.18 Lmbr 455,000.00 159,250.00 2.000 Kayu Mangi - Mangi MC.31 Btg 45,300.00 90,600.00 0.660 Pekerja L.2 Oh 135,000.00 89,100.00 0.330 Tukang L.3 Oh 170,000.00 56,100.00 0.033 Kepala tukang L.4 Oh 190,000.00 6,270.00 0.033 Mandor L.5 Oh 210,000.00 6,930.00 Jumlah 588,189.20 21f PASANG BEKISTING UNTUK DINDING PAKAI PLYWOOD PUPR-CK.D.21f M2 0.030 Kayu Merah MC.3 M3 2,852,400.00 85,572.00 0.400 Paku Campuran MM.5 Kg 35,500.00 14,200.00 0.200 Minyak Bekisting MH.21 Liter 1,500.00 300.00 0.020 Balok Kayu Merah MC.4 M3 2,852,400.00 57,048.00 0.350 Plywood Tebal 9 mm MC.18 Lmbr 455,000.00 159,250.00 3.000 Kayu Mangi - Mangi MC.31 Btg 45,300.00 135,900.00 0.660 Pekerja L.2 Oh 135,000.00 89,100.00 0.330 Tukang L.3 Oh 170,000.00 56,100.00 0.033 Kepala tukang L.4 Oh 190,000.00 6,270.00 0.033 Mandor L.5 Oh 210,000.00 6,930.00 Jumlah 610,670.00 22 CETAKAN BETON / BEKISTING MEMAKAI PAPAN PUPR-CK.D.22 M2 0.017 Balok Kayu Merah MC.4 M3 2,852,400.00 48,490.80 0.024 Papan Kayu Merah MC.3 M3 2,852,400.00 68,457.60 0.400 Paku Campuran MM.5 Kg 35,500.00 14,200.00 0.200 Pekerja L.2 Oh 135,000.00 27,000.00 0.500 Tukang L.3 Oh 170,000.00 85,000.00 0.050 Kepala tukang L.4 Oh 190,000.00 9,500.00 0.010 Mandor L.5 Oh 210,000.00 2,100.00 Jumlah 254,748.40 23 CETAKAN BETON / BEKISTING MEMAKAI MULTIPLEK PUPR-CK.D.23 M2 0.017 Balok Kayu Merah MC.4 M3 2,852,400.00 48,490.80 0.347 Tripleks (1,22 x 2.44 cm) MC.15 Lmbr 210,100.00 72,904.70 0.400 Paku Campuran MM.5 Kg 35,500.00 14,200.00 0.200 Pekerja L.2 Oh 135,000.00 27,000.00 0.500 Tukang L.3 Oh 170,000.00 85,000.00 0.050 Kepala tukang L.4 Oh 190,000.00 9,500.00


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 0.010 Mandor L.5 Oh 210,000.00 2,100.00 Jumlah 259,195.50 24 MEMBONGKAR CETAKAN / BEKISTING BETON PUPR-CK.D.24 M2 0.040 Pekerja L.4 Oh 135,000.00 5,400.00 Jumlah 5,400.00 1a PASANGAN DINDING BATA 1 PC : 4 PS TEBAL 1 BATA PUPR-CK.D.1a M2 140.000 Batu Bata MA.3 Bh 5,700.00 798,000.00 0.531 Semen @ 50 Kg MB.1 Zak 240,400.00 127,652.40 0.093 Pasir Ayakan MA.7 M3 3,018,300.00 280,701.90 0.600 Pekerja L.2 Oh 135,000.00 81,000.00 0.200 Tukang L.3 Oh 170,000.00 34,000.00 0.020 Kepala tukang L.4 Oh 190,000.00 3,800.00 0.030 Mandor L.5 Oh 210,000.00 6,300.00 Jumlah 1,331,454.30 E PEKERJAAN PASANGAN DINDING


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 1b PASANGAN DINDING BATA 1 PC : 3 PS TEBAL 1 BATA PUPR-CK.D.1b M2 140.000 Batu Bata MA.3 Bh 5,700.00 798,000.00 0.659 Semen @ 50 Kg MB.1 Zak 240,400.00 158,423.60 0.091 Pasir Ayakan MA.7 M3 3,018,300.00 274,665.30 0.600 Pekerja L.2 Oh 135,000.00 81,000.00 0.200 Tukang L.3 Oh 170,000.00 34,000.00 0.020 Kepala tukang L.4 Oh 190,000.00 3,800.00 0.030 Mandor L.5 Oh 210,000.00 6,300.00 Jumlah 1,356,188.90 2a PASANGAN DINDING BATA 1 PC : 4 PS TEBAL 1/2 BATA PUPR-CK.D.2a M2 70.000 Batu Bata MA.3 Bh 5,700.00 399,000.00 0.230 Semen @ 50 Kg MB.1 Zak 240,400.00 55,292.00 0.043 Pasir Ayakan MA.7 M3 3,018,300.00 129,786.90 0.300 Pekerja L.2 Oh 135,000.00 40,500.00 0.100 Tukang L.3 Oh 170,000.00 17,000.00 0.010 Kepala tukang L.4 Oh 190,000.00 1,900.00 0.015 Mandor L.5 Oh 210,000.00 3,150.00 Jumlah 646,628.90 2b PASANGAN DINDING BATA 1 PC : 3 PS TEBAL 1/2 BATA PUPR-CK.D.2b M2 70.000 Batu Bata MA.3 Bh 5,700.00 399,000.00 0.287 Semen @ 50 Kg MB.1 Zak 240,400.00 69,090.96 0.040 Pasir Ayakan MA.7 M3 3,018,300.00 120,732.00 0.300 Pekerja L.2 Oh 135,000.00 40,500.00 0.100 Tukang L.3 Oh 170,000.00 17,000.00 0.010 Kepala tukang L.4 Oh 190,000.00 1,900.00 0.015 Mandor L.5 Oh 210,000.00 3,150.00 Jumlah 651,372.96 3a PASANGAN DINDING BATA 1 PC : 4 PS TEBAL 1/4 BATA PUPR-CK.D.3a M2 35.000 Batu Bata MA.3 Bh 5,700.00 199,500.00 0.189 Semen @ 50 Kg MB.1 Zak 240,400.00 45,435.60 0.025 Pasir Ayakan MA.7 M3 3,018,300.00 75,457.50 0.300 Pekerja L.2 Oh 135,000.00 40,500.00 0.100 Tukang L.3 Oh 170,000.00 17,000.00 0.010 Kepala tukang L.4 Oh 190,000.00 1,900.00 0.010 Mandor L.5 Oh 210,000.00 2,100.00 Jumlah 381,893.10 3b PASANGAN DINDING BATA 1 PC : 3 PS TEBAL 1/4 BATA PUPR-CK.D.3b M2 35.000 Batu Bata MA.3 Bh 5,700.00 199,500.00 0.229 Semen @ 50 Kg MB.1 Zak 240,400.00 55,051.60 0.030 Pasir Ayakan MA.7 M3 3,018,300.00 90,549.00 0.300 Pekerja L.2 Oh 135,000.00 40,500.00 0.100 Tukang L.3 Oh 170,000.00 17,000.00 0.010 Kepala tukang L.4 Oh 190,000.00 1,900.00 0.010 Mandor L.5 Oh 210,000.00 2,100.00 Jumlah 406,600.60 4 PASANGAN DINDING BATA RINGAN CITICON PUPR-CK.D.4 M2 (60 x 20 x 10) Hb 10 cm CAMP 1 : 4 0.151 Bata Ringan Citicon 60 x 20 x 10 cm MA.4 M3 3,023,600.00 455,361.45 0.243 Portland Cement (Khusus) @ 40 Kg MB.3 Zak 490,400.00 118,971.04 0.010 Pasir ayakan MA.7 M3 3,018,300.00 30,183.00 0.280 Besi Angker Dia. 8 mm MF.3 Kg - -


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 0.300 Pekerja L.2 Oh 135,000.00 40,500.00 0.100 Tukang L.3 Oh 170,000.00 17,000.00 0.010 Kepala tukang L.4 Oh 190,000.00 1,900.00 0.015 Mandor L.5 Oh 210,000.00 3,150.00 Jumlah 667,065.49 5a DINDING PAPAN KAYU KELAS I TEBAL 2 CM PUPR-CK.D.5a M2 0.022 Kayu Besi MC.2 M3 3,502,400.00 77,052.80 0.200 Paku Campuran MM.5 Kg 35,500.00 7,100.00 0.600 Pekerja L.2 Oh 135,000.00 81,000.00 1.800 Tukang L.3 Oh 170,000.00 306,000.00 0.180 Kepala tukang L.4 Oh 190,000.00 34,200.00 0.030 Mandor L.5 Oh 210,000.00 6,300.00 Jumlah 511,652.80 5b DINDING PAPAN KAYU KELAS II TEBAL 2 CM PUPR-CK.D.5b M2 0.028 Kayu Merah MC.4 M3 2,852,400.00 79,867.20 0.200 Paku Campuran MM.5 Kg 35,500.00 7,100.00 0.450 Pekerja L.2 Oh 135,000.00 60,750.00 1.200 Tukang L.3 Oh 170,000.00 204,000.00 0.200 Kepala tukang L.4 Oh 190,000.00 38,000.00 0.023 Mandor L.5 Oh 210,000.00 4,830.00 Jumlah 394,547.20


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 6a DINDING TRIPLEKS 3 MM PUPR-CK.D.6a M2 0.350 Tripleks 3 mm MC.11 Lmbr 90,000.00 31,500.00 0.050 Paku Tripleks MM.1 Kg 45,500.00 2,275.00 0.025 Pekerja L.2 Oh 135,000.00 3,375.00 0.075 Tukang L.3 Oh 170,000.00 12,750.00 0.008 Kepala tukang L.4 Oh 190,000.00 1,425.00 0.001 Mandor L.5 Oh 210,000.00 273.00 Jumlah 51,598.00 6b DINDING DOUBLE TRIPLEKS PUPR-CK.D.6b M2 2.000 Dinding Tripleks PUPR-CK.D.6a M2 51,598.00 103,196.00 Jumlah 103,196.00 6c DINDING TEAKWOOD 122 X 144 CM PUPR-CK.D.6c M2 0.350 Teakwood 3 mm MC.16 Lmbr 255,000.00 89,250.00 0.050 Paku Tripleks MM.1 Kg 45,500.00 2,275.00 0.025 Pekerja L.2 Oh 135,000.00 3,375.00 0.075 Tukang L.3 Oh 170,000.00 12,750.00 0.008 Kepala tukang L.4 Oh 190,000.00 1,425.00 0.001 Mandor L.5 Oh 210,000.00 273.00 Jumlah 109,348.00 7 DINDING SENG PLAT PUPR-CK.D.7 M2 0.670 Seng Plat MD.8 Lmbr 130,100.00 87,167.00 0.030 Papan Kayu Merah MC.4 M3 2,852,400.00 85,572.00 0.040 Paku Campuran MM.5 Kg 35,500.00 1,420.00 0.050 Pekerja L.2 Oh 135,000.00 6,750.00 0.250 Tukang L.3 Oh 170,000.00 42,500.00 0.025 Kepala tukang L.4 Oh 190,000.00 4,750.00 0.003 Mandor L.5 Oh 210,000.00 525.00 Jumlah 228,684.00 8a PLESTERAN 1 PC : 3 PS TEBAL 15 mm PUPR-CK.D.8a M2 0.156 Semen @ 50 Kg MB.1 Zak 240,400.00 37,387.01 0.023 Pasir ayakan MA.7 M3 3,018,300.00 69,420.90 0.300 Pekerja L.2 Oh 135,000.00 40,500.00 0.150 Tukang L.3 Oh 170,000.00 25,500.00 0.015 Kepala tukang L.4 Oh 190,000.00 2,850.00 0.015 Mandor L.5 Oh 210,000.00 3,150.00 Jumlah 178,807.91 8b PLESTERAN 1 PC : 2 PS TBL 15 MM PUPR-CK.D.8b M2 0.204 Semen @ 50 Kg MB.1 Zak 240,400.00 49,156.99 0.020 Pasir ayakan MA.7 M3 3,018,300.00 60,366.00 0.300 Pekerja L.2 Oh 135,000.00 40,500.00 0.150 Tukang L.3 Oh 170,000.00 25,500.00 0.015 Kepala tukang L.4 Oh 190,000.00 2,850.00 0.015 Mandor L.5 Oh 210,000.00 3,150.00 Jumlah 181,522.99 8c PLESTERAN 1 PC : 4 PS TBL 15 MM PUPR-CK.D.8c M2 0.125 Semen @ 50 Kg MB.1 Zak 240,400.00 30,001.92 0.024 Pasir ayakan MA.7 M3 3,018,300.00 72,439.20 0.300 Pekerja L.2 Oh 135,000.00 40,500.00 0.150 Tukang L.3 Oh 170,000.00 25,500.00 0.015 Kepala tukang L.4 Oh 190,000.00 2,850.00


HARGA BAHAN BAHAN/ ALAT/ (Rp) 1 2 345 6 NO KOMPONEN SATUAN KODE KOMPOEN UPAH (Rp) 0.015 Mandor L.5 Oh 210,000.00 3,150.00 Jumlah 174,441.12 9 PLESTERAN 1 PC : 2 PS LAPIS PUPR-CK.D.9 TEGEL PORSELIN 11 X 11 CM 1.050 Tegel porselin 11 x 11 cm ME.8 Karton 173,900.00 182,595.00 0.204 Semen @ 50 Kg MB.1 Zak 240,400.00 49,156.99 0.050 Semen putih MB.2 Zak 380,400.00 19,020.00 0.020 Pasir ayakan MA.7 M3 3,018,300.00 60,366.00 0.500 Pekerja L.2 Oh 135,000.00 67,500.00 0.750 Tukang L.3 Oh 170,000.00 127,500.00 0.075 Kepala tukang L.4 Oh 190,000.00 14,250.00 0.050 Mandor L.5 Oh 210,000.00 10,500.00 Jumlah 530,887.99 10 PASANG PLIN KERAMIK (10 x 30 cm) PUPR-CK.D.10 M2 0.141 Plin keramik 10 x 30 ME.4 Karton 133,400.00 18,836.08 0.025 Semen @ 50 Kg MB.1 Zak 240,400.00 5,961.92 0.003 Pasir ayakan MA.7 M3 3,018,300.00 9,054.90 0.090 Pekerja L.2 Oh 135,000.00 12,150.00 0.090 Tukang L.3 Oh 170,000.00 15,300.00 0.009 Kepala tukang L.4 Oh 190,000.00 1,710.00 0.005 Mandor L.5 Oh 210,000.00 1,050.00 Jumlah 64,062.90 M2


Click to View FlipBook Version