Aldar_Magazine_Feb2017 (4)

Aldar_Magazine_Feb2017 (4)

www.aldarint.com
Calibration Capability

„„Compressive Strength Machine
„„Compressive / Tensile Load Cell
„„Torque Tester
„„Torque wrench
„„Torque Multiplier
„„Torque Screwdriver
OIL ANALYSIS
Imagine being able to see the damage happening to your equipment from extremely minute wear
particles and debris. Oil analysis is a preventive maintenance tool that uncovers fixable problems
before they become catastrophic failures. For you, it means less unscheduled downtime and
increased equipment reliability, productivity and profitability. Oil analysis with Aldar Int. can;
Extend oil drain interval
„„Extend equipment life
„„Identify problems before equipment failure site

51

www.aldarint.com

supply chain

Oil and gas supply chain require experienced, dedicated services. There is no room for error.
Mistakes can be costly. Companies demand excellence from their resources. Plus deep domain
knowledge of all areas within the sector.
It is a matter of trust. The peace of mind you get when you have complete confidence in your
resources.
Aldarís Oil & Gas experts provide a full range of onshorenservices. Customized supply chain
solutions for specific needs and turnkey solutions 24/7.
We operate multiple strategic bases inn Iraq, some in extremely challenging environments, to
provide our support services to the industry. Whether itís the transportation of a drill pipe to a land-
based yard, rig mobilisation, agency services for supplies and personnel, or delivering specialised
heavy equipment and spare parts through an integrated supply chain, Aldar International is your
one-stop solution.
We understand that one day lost in construction or production can significantly impact development
costs, and as such are completely transparent in our approach to oil and gas supply chain,
providing you with more than one solution to every challenge.
DELIVERING MULTIMODAL TRANSPORT SOLUTIONS

„„Our focus extends beyond moving cargo - we help you translate complex supply chain
requirements into transportable solutions.

„„By giving our clients complete visibility of the impact supply chain has on the overall cost of
an item, we empower you to consider alternate supply sources and engage multiple transport
modes to meet your operational and financial objectives.

52

www.aldarint.com
53

www.aldarint.com
54

www.aldarint.com

Projects

55

www.aldarint.com

installation of pipe line and
piping works at Zubair oil
field

Project Info

Construction Date
JUN, 2016 to JUN, 2019
Current Progress
100%
Client Name: ENI/ZFOD
Project Location: Zubair Oilfield – Basra, Iraq
Project Information: Al Dar International has been contracted for installation of pipe line
and piping works at Zubair oil field .

56

www.aldarint.com

Scope of Work
Supply material, manpower, equipment and tools to installation and commissioning the pipe line
and piping system.

The work including but not limited the following :
„„Fabrication and installation and testing piping system at well head for around 400 oil and water
wells.
„„Supplying all missing materials such as ( pipes , fitting , flanges , valves , etc...).
„„Installation and testing the flow lines between the well head and the manifolds with different
sizes (6” up to 12 “) with total length (178,000 mtr).
„„Installation and testing the pipe lines between the existing plants with different sizes ( 16” up to
48 “) with total length (145,000 mtr).
„„Installation and testing the MV and LV cables with different sizes ( 70 mm2 up to 500mm2)
along with pipe line with total length (145,000 mtr) .
„„Installation and commissioning the electrical power equipment (LER and the related
equipment’s ) at the well head locations.
„„Installation and commissioning the instrument equipment (control panels and the related
equipment’s ) at the well head locations.
„„Installation and commissioning all the instrument SS tubes and the related fittings at the well
head area .
„„Demolition and installation new piping system at the existing plants at the Zubair oil field with
all the related works (testing and commissioning )
„„Sand blasting and painting all the fabricated piping system .
„„Supplying , fabrication and installation all kind of steel pipe supports .

57

www.aldarint.com

Electrical Installations
– IRAQ, Badra CPF Phase 2
Project

Project Info

Construction Date
March 2017
Current Progress
100%
Client Name
Samsung Engineering/Gazprom Neft Badra

58

www.aldarint.com
Project Location
Badara Oilfield – Wasit, Iraq
Project Information
Al Dar International has been contracted to execute all the Electrical works at the Central
Processing Facility Phase 2, Badra Oil Field, Iraq.

59

www.aldarint.com

Scope of Work
The work includes but not limited to;

„„Installation and Commissioning of Diesel
Generator Set.

„„Power Transformer
(132/33kv,33/11kv,11/0.4kv,)

„„EHV GIS panel.
„„LV Power Distribution Panel.
„„LV Switchgear and MCC Panel.
„„MV Switchgear Panel.
„„Installation of Battery Packages
„„NGR and VSD Panel.
„„Power Capacitor System, Power

Monitoring System , SCADA PMS/ECS
„„Bus duct Systems (indoor and outdoor)
„„Power System (Cable tray, Cable pulling

LV &HV (1.5mm2 to 630mm2), Glanding
and Termination
„„Installation of Fiber Optic Cables
„„CCTV Systems
„„Communication Systems (Paging, P/A,
Wireless Radio)
„„Grounding System
„„Fire Alarm System
„„Telephone System
„„Lighting System

60

www.aldarint.com

Fire Fighting System works
– IRAQ, Badra CPF Phase 2
Project

Project Info

Construction Date
27th, February, 2015 to 31, March, 2017
Current Progress
100%
Client Name
Samsung Engineering/Gazprom Neft Badra
Project Location
Badra Oilfield – Wasit, Iraq

61

www.aldarint.com

Project Information
Al Dar International have been contracted for Supply and Installation of Fire fighting System at the
Central Processing Facility Phase 2 – Badra Oil Field, Iraq.
Scope of Work
Supply the Materials, Manpower, Equipment and Tools for installation of Fire Fighting, Piping Works
and FM 200 Systems at Central Processing Facility Phase 2 at Badra, Iraq.
62

www.aldarint.com
The works include but not limited to;

„„Supplying, Fabrication and Installation of all the Piping Steel support
„„Supply of all the Pipes, Fittings & Valves
„„Fabrication, Sand Blasting & Painting of all the fabricated spools
„„Erection & Installation of all the piping Spools & Valves at the crude oil tanks and other facilities.
„„Pre-Commissioning works by completing the Hydrotest & Pneumatic Test for the Fire Fighting

System & FM 200 System.
„„Installation of all the FM 200 Fire Suppression System Equipment, Cabinet and Connecting it to

the other piping Systems.

63

www.aldarint.com

GTG Works – IRAQ, Badra CPF
Phase 2 Project

Project Info

Construction Date
28th, February, 2015 to 31, March, 2017
Current Progress
100%
Client Name
Samsung Engineering/Gazprom Neft Badra
Project Location
Badra Oilfield – Wasit, Iraq

64

www.aldarint.com

Project Information
Al Dar International has been contracted for installation of 5 Gas Turbine Units with Total capacity
of 125MW for the Central Processing Facility Phase 2 Project at Badra Oil Field, Iraq. The
scope of Work including but not Limited to Installation of Mechanical, Electrical, Instrument and
interconnection Piping, with all related Pre-commissioning Work;

„„Preparation of Civil Works (Chipping and „„First Alignment
Padding) „„Final Alignment
„„Pre Commissioning
„„Installation of generators/Gas Turbine, „„Start up And Commissioning
LOM, Stacks, Cooler fans and all related „„Power Generation Sets
equipment and Pumps

65

www.aldarint.com „„Miscellaneous
„„Inlet air System
„„Gas Turbine „„Exhaust System
„„Lube Oil Module (Oil Tank + Gear) „„Stack
„„Generator „„Lube Oil Cooler
„„Gas Turbine Enclosure „„Lube Oil Mist Separator
„„Control Compartment – 1 „„Bearing Cooling Fan
„„Control Compartment – 2
„„Generator Aux Cubicle
„„CO2 Fire Fighting container
„„Compressor Water Washing Pump Skid

66

www.aldarint.com

Instrumentation Works
– IRAQ, Badra CPF Phase 2
Project

Project Info

Construction Date
20th, December, 2015 to 31. March, 2017
Current Progress
100%
Client Name
Samsung Engineering/Gazprom Neft Badra
Project Location
Badra Oilfield – Wasit, Iraq

67

www.aldarint.com
Project Information
Al Dar International has been contracted to do on for the Instrumentation Works for the Central
Processing Facility Phase 2 at Badra Oil Field, Iraq.
Scope of Work
Supply of Manpower, Equipment, Tools, installation and Pre commissioning of all instrumentation
work. The Work will include but not limited to;

„„Analyzer Common Cabinet
„„Cable Tray and Fittings, Ladder and Straight
„„DCS, EWS, HIS (OWS), Marshaling Panel, Network Panel, PIMS
„„ESD, EWS, Marshaling Panel, System Panel
„„Fire and Gas Panel
„„Flame Detector, UV/IRIMG_8107
„„Flow Gauge Panel
„„Flow Transmitter Gas Detector – Combustible

68

www.aldarint.com

„„Instrument Cable (Different Sizes)
„„Junction Box
„„Level Gauge, Level Transmitter
„„Metering System
„„Loop Test
„„Metering EWS
„„MMS, EWS/MCS
„„MMS Panel
„„Temperature Gauge, Transmitter, Indicator
„„Pressure Transmitter, Pressure Gauge
„„Process Stream Analyzer
„„Control Valves
„„PLC Panel
„„All Tubing and Conduits Works
„„Calibration Services

69

www.aldarint.com

Piping Works – IRAQ, Badra
CPF Phase 2 Project

Project Info

Construction Date
28th, February, 2015 to 31, March, 2017
Current Progress
100%
Client Name
Samsung Engineering/Gazprom Neft Badra
Project Location
Badra Oilfield – Wasit, Iraq

70

www.aldarint.com
Project Information
Al Dar International has been contracted to Provide Piping Works for the Central Processing Facility
phase 2 at Badra Oil Field, Iraq.
Scope of Work

„„Custom Pipe Fabrication (Shield Metal Arc Welding (SMAW), Gas Tungsten Arc Welding
(GTAW) & Plasma Cutting)

„„Fabrication and Installation of Piping Systems (CS, SS, Alloy Steel)
„„Installation of Pipeline
„„Fabrication and Installation of Wellhead and Manifold Systems
„„Compressor and Pump Station Construction
„„Meter and Regulator Station Construction

71

www.aldarint.com
„„Launcher and Receiver Fabrication and Installation
„„Turn-around Services
„„Hot tapping Services
„„Installation of Valves and Other Piping Elements
„„Sandblasting, Panting and Coating Services
„„NDT
„„Hydro Testing Services
„„Pigging and Cleaning Services
„„Flange Torqueing and Bolt Tensioning
„„Installation of GRP Piping and Fittings
„„Installation of HDPE, PE Piping and Fittings
„„Cathodic Protection Services

72

www.aldarint.com

erection of pipe rack (steel
structure )at CPF , Badra oil
field

Project Info

Construction Date
NOV, 2013 to JAN, 2015
Current Progress
100%
Client Name
Petrofac /Gazprome Neft Badra
Project Location
Badra Oilfield – Wassit, Iraq

73

www.aldarint.com
Project Information
Al Dar International has been contracted for erection of pipe rack (steel structure ) at CPF, Badra oil
field.
Scope of Work
Supply manpower , equipment and tools to installation and the steel structure (pipe rack ),
The work including but not limited the following:

„„Erection the steel structure with all the related works with around (6500 KG ).
„„Touch up paint all the scratched steel members.

74

www.aldarint.com

Mechanical Installations
– IRAQ, Badra CPF Phase 2
Project

Project Info

Construction Date
20th, December, 2015 to 30th, June, 2017
Current Progress
100%
Project Location
Badra Oilfield - Wasit Iraq
Client
Samsung Engineering/Gazprom Neft Badra
Project Information
Al Dar International has been contracted to do Mechanical Equipment installation for the Central
Processing Facility 2 at Badra Oil Field, Iraq.

75

www.aldarint.com
Scope of Work

„„Installation of Rotating Equipment (High/Medium Gas Compressor (6 Units), Horizontal &
Centrifugal Pumps, Electrical Crane, Chemical Injection Units, TEG Refrigeration Package).

„„Installation of Stationary Equipment (Vessels, Drums, Columns, Heat Exchangers, Filters).
„„Fabrication and Installation of Storage Tanks.
„„Hydrostatic Testing and Cleaning Services.

76

www.aldarint.com

HVAC Works for Control &
Substation Buildings

Project Info

Construction Date
April 2015
Current Progress
100%
Scope of Works
Supply and Install galvanized steel with corrosion resistance coating and insect screen, galvanized
steel frame, blade and accessories.
Stainless steel frame, blade and accessories, low leakage type, AMCA Class II (MIN.)

77

www.aldarint.com

E&I Works Slug Catcher
Project

Project Info

Construction Date
June 2015
Current Progress
100%
Scope of Work
Electrical and Instrumentation Work (cable laying, cable tray & cable support installation, cable
termination, instrumentation works).

78

www.aldarint.com

Air Blowing and Chemical
Cleaning – FCP Gas Train 1
and 2

Project Info

Construction Date
July 2015
Current Progress
100%
Scope of Work
The below described scope of work is for Train 1 only. Train 2 scope of work currently is not
fully clear. Once SOLAR packages arrive from Houston and cleanliness inspections have been
completed, Work-packs shall be generated by COMPANY and will be submitted to Subcontractor
for executions using the same unit rates as defined for Train.

79

www.aldarint.com

Air Blowing
A Boroscope exercise was carried out on skids delivered from Houston, process skids and pipe
rack modules. The findings, minor debris and scaling, deem it necessary to perform air blowing as
per the following work packs:

„„Work Pack no. 1 – Instrument Air
„„Work Pack no. 2 – 1st Stage Filter Sep
„„Work Pack no. 3 – 1st Stage Discharge Coolers
„„Work Pack no. 4 – 2nd Stage Compression.
„„Work Pack no. 5 – 2nd Stage Discharge Cooler
„„Work Pack no. 6 – Station Recycle
„„Work Pack no. 7 – FG/SG Pipework
„„Work Pack no. 8 – FG/SG Skid
„„Work Pack no. 9 – FGC Skid
„„Work Pack no. 10 – Turbine Utility Skid

Air Blowing will be carried out as per the referred procedure “FCP Gas Train 1 Cleanliness” (Doc.
no. GAS1-GP1-SIP-MP-6025-0001). Subcontractor shall supply all manpower, consumables, tools,
plant and equipment to execute air blowing works.

Chemical Cleaning
In addition to the air blowing it has been decided that chemical cleaning should be carried out on
the following systems as per the referred marked-up P&IDs
System : Material
Fuel Gas : Stainless Steel & Carbon Steel
Seal Gas : Stainless Steel
N2 : Stainless Steel

80

www.aldarint.com

Mechanical Cleaning for
Static Equipment at KAZ
Plant

Project Info

Construction Date
July 2015
Current Progress
100%
Scope of Work
The SOW for this project is contained but not limited to complete this tasks:
Dismantling of existing piping, equipment, exchangers, heaters for mechanical cleaning and re-
installation work. The work includes mechanical works, purging, hydro testing, and fabrication for
some items.

81

www.aldarint.com

Operation and Maintenance
Contracts for Badra Oil
Field

Project Info

Construction Date
August 2015
Current Progress
100%
Provisions of competent, experienced and a professional manpower and equipment/vehicle as
further described in this scope of service to support:

„„Pre commissioning
„„Commissioning
„„Maintenance
„„Shutdown activities

82

www.aldarint.com
83

www.aldarint.com

Modular Building
Installation – MOD

Project Info

Construction Date
September 2015
Current Progress
100%
Scope of Work
Installation of prefabricated steel structural buildings for LCR, LER, guard house and four guard
towers each one consisting of three stories.
The project is located in WQ1, the work includes but not limited to steel structure installation,
electrical work, cable try installation, HVAQ system installation, G&F system.

84

www.aldarint.com

Modular Building
Installation – DS7 Water
Injection System

Project Info

Construction Date
September 2015
Current Progress
100%
Scope of Work
Installation of prefabricated steel structural building for LCR. The project is located in WQ1, the
work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ
system installation, G&F system.

85

www.aldarint.com
86

www.aldarint.com

Flow Line and Piping System
for Gas Compressor Station

Project Info

Construction Date
July 2014
Current Progress
100%
Description of Work
Fabrication, welding and installing flow line and piping system will all pipe fittings at Hamar Mushrif
gas compressor station Basra – Iraq
Client: BGC Shell – Iraq
Location: Hamar Mushrif/ Basra/Iraq
Year: 2013

87

www.aldarint.com

Hydro Test and Pneumatic
Test at CPF

Project Info

Construction Date
July 2014
Current Progress
100%
Description of Work
Hydro test and Pneumatic test at CPF
Client: Petrofac
Location: Badra Oilfield / Waset / Iraq
Year: 2013 –2014

88

www.aldarint.com
89

www.aldarint.com

Piping and Equipment
Insulation

Project Info

Construction Date
August 2014
Current Progress
100%
Description of Work
Project name: Piping and Equipment Insulation – Badra Oil Field
Year : 2013
Description:
Provide manpower, materials, equipment and all the required for piping and equipment insulation
works, for pipes (2? to up to 48? ) and for vessels. This project has been performed by skilled
mechanicals and labors and we got a many certificates from Petrofac.
Client: Petrofac

90

www.aldarint.com

Scaffolding – Procurement
and Erection

Project Info

Construction Date
August 2014
Current Progress
100%
Project Name: Provide and
Erection of Scaffolding
Year: 2013.
Description
Provide Material, Manpower,
Equipment and all the required to
erection and Install scaffolding in
Badra Oil field – Wasit/Iraq.

91

www.aldarint.com

Supply and Installation of
Scaffolds in Khor Azubair
Gas Plant

Project Info

Construction Date
November 2014
Current Progress
100%
Client: Technip /BGC/ Shell.

92

www.aldarint.com
Installation
Providing various required Scaffolding along with required skilled manpower, Scaffolding materials.
The scope will start from mobilization/ demobilization of skilled & experienced manpower, required
scaffolding materials, equipment, tools & tackles to COMPANY site for erecting or dismantling of
Scaffolding as per COMPANY Scaffolding procedures and permit requirements and the types of
scaffolding is including but not limited to the following:

„„Supply and install Tube and Coupler cantilever scaffolding type.
„„Supply and Install Tube and Coupler suspender scaffolding Type.
„„Supply and install Tube and Coupler mobile Scaffolding type.
„„Supply and install Tube and Coupler Tower scaffolds type.
„„Location: Khor Azubair Gas Plant – Basra – Iraq

93

www.aldarint.com

Rehabilitation of Motorized
Gate Valve 36?, Class 150

Project Info

Construction Date
October 2013
Current Progress
100%
Description of Work
Rehabilitation of Motorized Gate Valve 36?, Class 150 which including but not limited to repair
and replace the major parts such as Gate, Shaft, O-Rings as well as the hydro-test efforts and
commissioning .
Client: South Oil Company

94

www.aldarint.com
95

www.aldarint.com

Cleaning and Painting of
66,000m3 Tank Farm

Project Info

Construction Date
November 2013
Current Progress
100%
Description of Work
Cleaning by Grit-blasting and painting by of Tank Farm by capacity of 66,000 cubic metres at Toba
Storage Tanks Complex, the work including but not limited to; erection, grit-blasting and painting by
three layers with all testing and commissioning.
Client: Scop
Owner: South Oil Company

96

www.aldarint.com

Majnon Pipe Line – Majnon
Field Basra, Iraq

Project Info

Construction Date
March 2012
Current Progress
100%
Project Name : Majnon Pipe Line – Basra- Iraq
Description of work : Fabrication, welding and laying pipe line and pipe fittings at Majnon
Oilfield – Basra – Iraq
Client: Shell – Iraq
Location : Majnon Oilfield – Basra – Iraq
Year of Construction: 2011 -2012

97

www.aldarint.com

Garraf Oil and Gas Project
in Nassriya (FCP)

Project Info

Construction Date
July 2012
Current Progress
100%
Description of Work
Project Name: (FCP) Garraf Oil and Gas project in Nassriya.
First Commercial and Production (FCP) Garraf Oil and Gas project in Southern Iraq. The project
includes the EPC of storage tanks and the construction of piping systems, process units, LP &
ATM. The current FCP Garraf project is designed for 100kbpd oil from the Mishrif formation utilizing
two (2) oil processing trains of 50 kbpd capacity each.
Client: Lakeshore Toltest Corporation
Location: Garraf Oilfield / Nassrya / Iraq
Year of Construction: 2011 – 2012

98

www.aldarint.com

Supply and Install HV
Electrical Equipment

Project Info

Construction Date
October 2012
Current Progress
100%
Description of Work
The installation of 11KV, 22 KV and 33KV, substations. Our services also include CT, PT & LA,
isolators, gantries and towers.
Client: JCCI/Babil
Location: Babil—Iraq
Year of Construction: 2010 -2011.

99

www.aldarint.com

Al–Shefaa Electrical Power
Cable Project

Project Info

Construction Date
April 2011
Current Progress
100%
Description of Work
Installation of a new electrical network by: Supply & installation of an over head line 200 circular &
38 lattice steel poles. Supply & installation of 10 transformers (Capacity 250KVA) with accessories
Client: Mott MacDonald
Location: Basra—Iraq
Year of Construction: 2012 -2013