The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by , 2017-03-04 01:24:05

Aldar_Magazine_Feb2017 (4)

Aldar_Magazine_Feb2017 (4)

www.aldarint.com

Supply and Install Water
Treatment Plant – Nasiryah,
Iraq

Project Info

Construction Date
November 2011
Current Progress
100%
Description of Work
Grading, sub-grading, pouring concrete for foundations of sedimentation tanks, supply and install
sedimentation tanks, pressure filter and all connection piping, electrical panels with all power and
control panels. Installing pumps and all alum and chlorine system dose systems.
Client: Ministry of Municipality and Public works

101

www.aldarint.com
102

www.aldarint.com

Supply and Install
Polyethylene Pipeline

Project Info

Construction Date
September 2010
Current Progress
100%
Description of Work
Supply and installing polyethylene pipe at Basra gov. which including excavation, laying, back-filling,
and connection, testing and commissioning.
Client: Basra Water Directorate

103

www.aldarint.com

Supplying and Install 4 Units
Water Treatment for Shat
Al Arab Project

Project Info

Construction Date
February 2009
Current Progress
100%
Description of Work
Supplying and install 4 unit of water treatment for Shat Al Arab Water project in Basrah, each unit
capacity is 400 m3/h.
Client: Basra Water Directorate
Location : Basra – Iraq
Year of Construction: 2007 – 2008

104

www.aldarint.com
105

www.aldarint.com

Line Polyethylene Water
Pipeline Network 14 Tamoz
Street

Project Info

Construction Date
June 2009
Current Progress
100%
Description of Work
Line Polyethylene Water Pipeline Network in the 14 Tamoz Street, size 500mm and 450mm.
Client: Basra Water Directorate
Location: Basra, Iraq
Year of Construction: 2009 – 2010

106

www.aldarint.com

Supply and Install 4 Units
Water Treatment for Al
Hussain Project

Project Info

Construction Date
October 2009
Current Progress
100%
Description of Work
Supplying and install 4 units of water treatment for Hay Al Hussain Water Project in Basrah ,
capacity of each unit is 400 m3/h
Client: Basra Water Directorate
Location: Basra – Iraq
Year of Construction: 2008 – 2009

107

www.aldarint.com

ME&I at Khor Azubair Gas
Unit

Project Info

Construction Date
February 2008
Current Progress
100%
Client: KBR
Location: Khor Azubair/Basra/Iraq
Year of Construction: 2007 – 2008

108

www.aldarint.com

Scope of Work in KAZ area was as follows:
„„Installation and hook-up of gas treatment facility.
„„Erection of ME&I equipment and structures
„„Tie-ins in gas treatment facility existing
„„Interconnecting to gas treatment facility
„„Installation of power and control cables.

109





Basra Main Office: www.aldarint.com USA Office:
306 Street # 18 , Building # 36, 111 Calvert Street, Suite 2700 -
Al Baradya, Basra,Iraq Wasit Office: Unit 2739
Phone IQ: (+964) 780 924 4388 Adar Camp, Badra Oil field, Baltimore, MD 21202
Fax: (888) 501-1082 Wasit, Iraq Office: (410) 385-5230 x-5232
Email: [email protected] Phone IQ : (+964) 780 917 1519 Mobile: (301)788-7331
Email: [email protected]
Sharjah Office:
SAIF Office P8 -05 – 26 Baghdad Office:
P.O. Box 8978 Sharjah UAE 35 Al-Jami's St, Jadriyah,
Phone (UAE): (+971) 56 6930669 Karada, Baghdad, Iraq
Email: [email protected] Phone IQ: (+964) 770 261 8824
Email: [email protected]


Click to View FlipBook Version