LOGO SK CONCESSION COMPANY : Work request No:
TOLL VERIFICATION AUDIT ELECTRICAL
Yearly
Audit Functionality/Rules and Good Practice Workgroup
Category Frequency
Year
HIGHWA TOLL PLAZA PIDION WITH AVC
DATE AUDIT CRITERIA
Login Function / Test Procedure Expected Result Result
1 Check system in login for Pidion Key in or card ID OK / Not OK
2 Execute LCS Application. TCD displays Badge No. N/A
3 N/A
4 Start Job : N/A
5 OK / Not OK
6 BOJ (Pidion) Date & Time: OK / Not OK
7 OK / Not OK
8 ID TC: OK / Not OK
9 OK / Not OK
Job No: Transactions executed.
BOJ (LCS) Date & Time:
ID TC :
Job No:
Check version LCS and PCS Similar version
Check pidion OS compatible with latest OS
Check Operating System (OS) Minimum Ms Window 7 or latest version
Check minimum Industrial PC (IPC) period. Minimum 10 years. (CC to prove record)
OTL will be permanently green when log in to the system. OTL change to green.
Check Toll Fare Rate; Lane and RTDM Similar current toll rate at lanes and RTDM
Check Time Synchronization with RTDM and Plaza Computer Syncronise with RTDM
Key in Lane System for trigger violation (breakdown / additional lane) System ready to operate.
& ID confirmation by supervisor Note : Lane ready to open and start
Logout Function / Test Procedure Expected Result Result
1 Check system feature to logout by pressing ‘TAMAT’ key to activate System able to logout and TCD display OK / Not OK
logout. ‘TERIMA’ or ‘BATAL’.
2 OK / Not OK
3 End Job : Transactions executed. OK / Not OK
4 EOJ (Pidion) Date & Time: OK / Not OK
5 ID TC: OTL change to red. OK / Not OK
Job No: All data able to transfer (docking to the
EOJ (LCS) Date & Time: system)
ID TC : Transfering time not more 10 minutes
Job No: Able to provide individual, classification
OTL will be permanently red when logout from the system. (violation) and summary report (EOJ
report).
Docking data to the system Note: Report must be provided within
Transfering time for pidion
Report printing
AVC Performance
Function / Test Procedure Expected Result Result
OK / Not OK
1 Check AVC performance. result The overall transactions result
Note : Compare the manual transacted with AVC detected performance should be 95.0%
using EOJ, Individual Transaction and manual counting.
Functionality test result: Witness by
Total Mark Organization
Tested by
Organization Date
Date
COMMENTS
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 292
LOGO SK CONCESSION COMPANY : Work request
TOLL VERIFICATION AUDIT No:
Audit Functionality/Rules and Good Practice Workgroup ELECTRICAL
Category Frequency Yearly
Year
Highway Plaza PIDION
Date Audit Criteria WITHOUT AVC
Login
Function / Test Procedure Expected Result Result
1
Check system in login for Pidion Key in or card ID OK / Not OK
2
3 Execute LCS Application. TCD displays Badge No. N/A
4 N/A
5 Start Job : N/A
6 OK / Not OK
7 BOJ (Pidion) Date & Time: OK / Not OK
8 OK / Not OK
Checking pidion with system off. Transactions executed
9
Logout ID TC:
1 Job No:
2 Check version LCS and PCS Similar version
3
Check pidion OS compatible with latest OS
Check Operating System (OS) Minimum Ms Window 7 or latest version
Check minimum Industrial PC (IPC) period Minimum 10 years. (CC to prove record)
OTL will be permanently green when log in to OTL change to green.
the system.
Check Toll Fare Rate; Lane and RTDM Similar current toll rate at lanes and RTDM
Check Time Synchronization with RTDM Syncronise with RTDM OK / Not OK
and Plaza Computer System (PCS)
Key in Lane System for trigger violation System ready to operate.
(breakdown / additional lane) & ID Note : Lane ready to open and start OK / Not OK
confirmation by supervisor operation
Function / Test Procedure Expected Result Result
OK / Not OK
Check system feature to logout by pressing System able to logout and TCD display
‘TAMAT’ key to activate logout. OK / Not OK
‘TERIMA’ or ‘BATAL’. OK / Not OK
End Job :
EOJ (Pidion) Date & Time:
Checking pidion with system off Return to lane mode selection screen.
ID TC:
Job No:
OTL will be permanently red when logout OTL change to red.
from the system.
All data able to transfer (docking to the
Docking data to the system system)
4 Transfering time for pidion Transfering time not more 10 minutes OK / Not OK
OK / Not OK
5 Report printing Able to provide individual, classification
(violation) and summary report (EOJ report).
Functionality test result: Note: Report must be provided within 15
Total Mark minutes
Tested by
Organization Witness by
Date Organization
Date
COMMENT
293 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LOGO SK CONCESSION COMPANY : Work request
TOLL VERIFICATION AUDIT No:
Audit Functionality/Rules and Good Practice Workgroup ELECTRICAL
Category Frequency Yearly
Year Plaza
Highway Audit Criteria Multi Class TNG
Date
Login Function / Test Procedure Expected Result Result
1 Check system in login for LCS Key in or card ID OK / Not OK
2 Execute LCS Application. TCD displays Badge No. N/A
3 N/A
4 Version LCS Similar version N/A
5 OK / Not OK
6 Start Job : OK Not OK
7 OK / Not OK
8 BOJ Date & Time: Transactions executed. OK / Not OK
9 ID TC: OK / Not OK
10 N/A
Job No:
11 OK / Not OK
Check version LCS and PCS Similar version OK / Not OK
12 :……………………………………… OK / Not OK
13 OK / Not OK
Logout Check last updated parameter for Latest updated parameter
1
2 TNG:……………………………. CC to prove last parameter updated & time
3
Check Operating System (OS) Minimum Ms Window 7 or latest version
4
Check minimum Industrial PC (IPC) period.
:………………..(year) Minimum 10 years. (CC to prove record)
Note : To mention / prove record IPC years.
Check functionality ABT / paydirect. Through EOJ report
OTL will be permanently green when log in to OTL change to green.
the system.
Check Time Synchronization with RTDM and Synchronise with RTDM
Plaza Computer System (PCS)
Check Toll Fare Rate; Lane and RTDM Similar current toll rate at lanes and RTDM
Check antivirus, security and policy latest updated version
Network Disconnect & Reconnect &
Execute transactions.
a) Time disconnect: …………….Time Transactions are able to be executed in
reconnect : ………………. degraded mode
b) Network status indicator refresh period: Both status of communication (dxn & rxn)
indicated accordingly within 2 minutes.
Network redundancy from lane (LCS) to Network redundancy.
plaza (PCS) level
Test Remote Monitoring Panel (RMP) for ALB can be controlled open and close from
Automatic Lane Barrier (ALB) functionality. Control Room
Function / Test Procedure Expected Result Result
OK / Not OK
Check system feature to logout by pressing System able to logout and TCD display OK / Not OK
OK / Not OK
‘TAMAT’ key to activate logout. ‘TERIMA’ or ‘BATAL’.
OK / Not OK
EOJ Date & Time:
ID TC: Return to lane mode selection screen.
Job No:
OTL will be permanently red when logout OTL change to red.
from the system.
Report printing Able to provide individual, classification
(violation) and summary report (EOJ report).
Note: Report must be provided within 15
minutes
AVC / Loop Detector (LD) Performance
Function / Test Procedure Expected Result Result
OK Not OK
Check AVC performance.
1 Compare the manual transacted with AVC The overall transactions result performance
detected result using EOJ, Individual should be 95% and above.
Transaction and manual counting.
Functionality test result : Witness by
Organization
Total Mark Date
Tested by
Organization
Date
COMMENTS
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 294
LOGO SK CONCESSION COMPANY : Work request
TOLL VERIFICATION AUDIT No:
Audit Functionality/Rules and Good Practice Workgroup ELECTRICAL
Category Frequency Yearly
Year
Highway Plaza DEDICATED
Date Audit Criteria TNG
Login
Function / Test Procedure Expected Result Result
1
Check system in login for LCS Key in or card ID OK / Not OK
2
3 Execute LCS Application. TCD displays Badge No. N/A
4 N/A
5 Version LCS Similar version OK / Not Ok
6 N/A
7 Start Job : OK / Not OK
8 OK / Not OK
9 BOJ Date & Time: Transactions executed. OK / Not OK
10 ID TC: OK / Not OK
11 OK / Not OK
Job No: N/A
12
Check version LCS and PCS Similar version OK / Not OK
13 :……………………………………… OK / Not OK
14 OK / Not OK
Logout Check last updated parameter for Latest updated parameter OK / Not OK
1
2 TNG:……………………………. CC to prove last parameter updated & time
3
Check auto log in / logout feature (either to be functional auto log in / log out.
4 calender date or operational date)
Check Operating System (OS) Minimum Ms Window 7 or latest version
Check minimum Industrial PC (IPC) period. Minimum 10 years. (CC to prove record)
Note : To mention / prove record IPC years.
Check functionality ABT / paydirect. Through EOJ report
OTL will be permanently green when log in to OTL change to green.
the system.
Check Time Synchronization with RTDM and Synchronise with RTDM
Plaza Computer System (PCS)
Check Toll Fare Rate; Lane and RTDM Similar current toll rate at lanes and RTDM
Check antivirus, security and policy latest updated version
Network Disconnect & Reconnect &
Execute transactions.
a) Time disconnect: …………….Time Transactions are able to be executed in
reconnect ::………………. degraded mode
b) Network status indicator refresh period: Both status of communication (dxn & rxn)
indicated accordingly within 2 minutes.
Network redundancy from lane (LCS) to Network redundancy.
plaza (PCS) level
Test Remote Monitoring Panel (RMP) for ALB can be controlled open and close from
Automatic Lane Barrier (ALB) functionality. Control Room
Function / Test Procedure Expected Result Result
OK / Not OK
Check system feature to logout by pressing System able to logout and TCD display OK / Not OK
OK / Not OK
‘TAMAT’ key to activate logout. ‘TERIMA’ or ‘BATAL’.
OK / Not OK
EOJ Date & Time:
ID TC: Return to lane mode selection screen.
Job No:
OTL will be permanently red when logout OTL change to red.
from the system.
Report printing Able to provide individual, classification
(violation) and summary report (EOJ report).
Note: Report must be provided within 15
minutes
Functionality test result : Witness by
Organization
Total Mark Date
Tested by
Organization
Date
COMMENTS
295 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LOGO SK CONCESSION COMPANY : Work request
TOLL VERIFICATION AUDIT No:
Audit Functionality/Rules and Good Practice Workgroup ELECTRICAL
Category Frequency Yearly
Year
Highway Plaza SMART TAG
Date Audit Criteria
Login
Function / Test Procedure Expected Result Result
1
Check system in login for LCS Key in or card ID OK / Not OK
2
3 Execute LCS Application. TCD displays Badge No. N/A
4 N/A
5 Version LCS Similar version OK / Not OK
6 N/A
7 Start Job : OK / Not OK
8 OK / Not OK
9 BOJ Date & Time: Transactions executed. OK / Not OK
10 ID TC: OK / Not OK
11 OK / Not OK
12 Job No: OK / Not OK
13 OK / Not OK
Check version LCS and PCS Similar version OK / Not OK
14 :………………………………………
OK / Not OK
15 Check last updated parameter for Latest updated parameter OK / Not OK
16 OK / Not OK
Logout TNG:……………………………. CC to prove last parameter updated & time OK / Not OK
1
2 Check auto log in / logout feature (either to be functional auto log in / log out.
calender date or operational date)
3
Check Operating System (OS) Minimum Ms Window 7 or latest version
4
Check minimum Industrial PC (IPC) period. Minimum 10 years. (CC to prove record)
Note : To mention / prove record IPC years.
Check functionality ABT / paydirect. Through EOJ report
OTL will be permanently green when log in to OTL change to green.
the system.
Check Time Synchronization with RTDM and Synchronise with RTDM
Plaza Computer System (PCS)
Check Toll Fare Rate; Lane and RTDM Similar current toll rate at lanes and RTDM
Check antivirus, security and policy latest updated version
Antenna Calibration and Lane Mapping Maintenance reports provided
detection angle (every 6 months)
Lane Enforcement camera and search Search and playback any violation and
images with date and time stamp. discrepancy cases.
Network Disconnect & Reconnect &
Execute transactions.
a) Time disconnect: …………….Time Transactions are able to be executed in
reconnect ::………………. degraded mode
b) Network status indicator refresh period: Both status of communication (dxn & rxn)
indicated accordingly within 2 minutes.
Network redundancy from lane (LCS) to Network redundancy.
plaza (PCS) level
Test Remote Monitoring Panel (RMP) for ALB can be controlled open and close from
Automatic Lane Barrier (ALB) functionality. Control Room
Function / Test Procedure Expected Result Result
OK / Not OK
Check system feature to logout by pressing System able to logout and TCD display
OK / Not OK
‘TAMAT’ key to activate logout. ‘TERIMA’ or ‘BATAL’.
OK / Not OK
EOJ Date & Time: Return to lane mode selection screen.
ID TC:
Job No:
OTL will be permanently red when logout OTL change to red.
from the system.
Report printing Able to provide individual, classification OK / Not OK
(violation) and summary report (EOJ report).
Note: Report must be provided within 15
minutes
Functionality test result : Witness by
Total Mark Organization
Tested by Date
Organization
Date
COMMENTS
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 296
LOGO SK CONCESSION COMPANY : Work request
No:
TOLL VERIFICATION AUDIT
Audit Functionality/Rules and Good Practice Workgroup ELECTRICAL
Category Frequency Yearly
Year Plaza
Highway Audit Criteria HYBRID RFID
Date
Login Function / Test Procedure Expected Result Result
1 Login System Key in or card ID OK / Not OK
2 TCD displays Badge No.
3 System ready to operate (**Teras / RTS OK / Not OK
/Pinelab /Quatriz )
4 ID confirmation by Supervisor
5
6 Check of MC N/A
7
8 Double Check Lane Peripheral System LCS Version (latest update), OTL, Loop, OK / Not OK
9 functionality RFID Reader, ALB, TFI , OB, OK / Not OK
10
ANPR, Lane Software
11
12 Network Readiness and Redundancy Network system should display in realtime OK / Not OK
13 accordingly
14
Status DB or parameter download
15
accordingly from CBO to RFID server and to The parameter or DB download will OK / Not OK
16
17 LCS
18
19 RFID transaction upload from LCS to RFID OK / Not OK
20 Server to CBO
21
22 Reader and Tag Communication OK / Not OK
23
Transaction Data (Normal, Exception) OK / Not OK
24
Data Validation OK / Not OK
Operation modes appear as follows:
Check Operation Mode 1. Smart Tag / TnG OK / Not OK
2. RFID
Job start
BOJ Date & Time: Transactions executed. OK / Not OK
Job No.:
Check Time Synchronization with RTDM and Syncronise with LCS, PCS, RTDM and OK / Not OK
Plaza Computer System (PCS) HQCS and CBO
Check Toll Fare Rate; Lane and RTDM Syncronise with RTDM OK / Not OK
Check Toll Fare Indicator (TFI) c/w siren TFI Functionalities OK / Not OK
beacon Deducted OK / Not OK
OK / Not OK
Card Balance
Network Disconnect & Execute transactions. Transactions are able to be executed.
Time disconnect : (Both status of comm. shall be indicate OK / Not OK
accordingly as a real time.
Network Reconnect & execute transaction
Time reconnect : Transactions are able to be executed OK / Not OK
Complete transaction time Not more than 2minute OK / Not OK
– LCS to PCS and CBO OK / Not OK
ALB Functionalities easly open and closed automatically OK / Not OK
Test RMP (ALB) functionality ALB shall be open and close from Controll OK / Not OK
Room
Antenna Calibration and Lane Mapping Reports provided OK / Not OK
detection angle (every 6 months)
Security and privacy policy Document procedure implemented OK / Not OK
Reporting ( Auto generated / on demand ) Report generated and accurate OK / Not OK
Lane Enforcement camera and search Search and playback any violation and OK / Not OK
images with date and time stamp. discrepancy cases.
Link and Delink e-wallet, TnG and any card System shall deducted from any registered OK / Not OK
(eg;debit and etc.) if any insufficient balance. card
Invalid, expired, blacklist and illegal card ID, The system will able to triggered all OK / Not OK
tag, cards uncommon transaction detection. To produce
proven report.
297 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
Logout Function / Test Procedure Expected Result Result
OK / Not OK
1 Check system in operation and ready to Ready for transaction. OK / Not OK
2 logout (standby mode). E.g. OTL red.
Press ‘TAMAT’ key to activate logout. TCD display ‘TERIMA’ or ‘BATAL’.
Confirm the logout by pressing ‘TERIMA’. OK / Not OK
3 Return to lane mode selection screen.
EOJ Date & Time: Job No.
4 OTL will be permanently red when logout OTL change to red. OK / Not OK
from the system.
Loop Detector (LD) Performance
Function / Test Procedure Expected Result Result
Check LD and/or VDC performance. The overall transactions result performance
for LD should be 95% (for Tag Lane), or ;
1 Compare the transaction result with LD/VDC The overall transactions result performance OK / Not OK
detected result using EOJ, Individual for VDC should be 95% (for BET Lane)
Transaction & manual counting
Functionality test result : Witness by
Organization
Total Mark Date
Tested by
Organization
Date
COMMENTS
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 298
LOGO SK CONCESSION COMPANY : Work request
TOLL VERIFICATION AUDIT No:
Audit Functionality/Rules and Good Practice Workgroup ELECTRICAL
Category Frequency Yearly
Year
Highway Plaza DEDICATED
Date Audit Criteria RFID
Login
Function / Test Procedure Expected Result Result
1
2 Login System Key in or card ID OK / Not OK
TCD displays Badge No.
3
4 System ready to operate (**Teras / RTS OK / Not OK
5 /Pinelab /Quatriz )
6 ID confirmation by Supervisor
7
8 Check of MC N/A
9
10 Double Check Lane Peripheral System LCS Version (latest update), OTL, Loop, OK / Not OK
functionality RFID Reader, ALB, TFI , OB,
11
12 ANPR, Lane Software
13
14 Network Readiness and Redundancy Network system should display in realtime OK / Not OK
accordingly
15
Status DB or parameter download
accordingly from CBO to RFID server and to The parameter or DB download will OK / Not OK
LCS
RFID transaction upload from LCS to RFID OK / Not OK
Server to CBO
Reader and Tag Communication OK / Not OK
Transaction Data (Normal, Exception) OK / Not OK
Data Validation OK / Not OK
Operation modes appear as follows:
Check Operation Mode 1. Smart Tag OK / Not OK
2. RFID
Job start
BOJ Date & Time: Transactions executed. OK / Not OK
Job No.:
Check Time Synchronization with RTDM and Syncronise with LCS, PCS, RTDM and OK / Not OK
Plaza Computer System (PCS) HQCS and CBO
Check Toll Fare Rate; Lane and RTDM Syncronise with RTDM OK / Not OK
Check Toll Fare Indicator (TFI) c/w siren TFI Functionalities OK / Not OK
beacon Deducted OK / Not OK
OK / Not OK
Card Balance
Network Disconnect & Execute transactions. Transactions are able to be executed.
Time disconnect : (Both status of comm. shall be indicate
accordingly as a real time.
Network Reconnect & execute transaction
Time reconnect : OK / Not OK
Transactions are able to be executed OK / Not OK
16 Complete transaction time Not more than 2minute OK / Not OK
– LCS to PCS and CBO
17 ALB Functionalities easly open and closed automatically OK / Not OK
18 Test RMP (ALB) functionality ALB shall be open and close from Controll OK / Not OK
Room
19 Antenna Calibration and Lane Mapping Reports provided OK / Not OK
detection angle (every 6 months)
20 Security and privacy policy Document procedure implemented OK / Not OK
21 Reporting ( Auto generated / on demand ) Report generated and accurate OK / Not OK
22 Lane Enforcement camera and search Search and playback any violation and OK / Not OK
images with date and time stamp. discrepancy cases.
23 Link and Delink e-wallet, TnG and any card System shall deducted from any registered OK / Not OK
(eg;debit and etc.) if any insufficient balance. card
24 Invalid, expired, blacklist and illegal card ID, The system will able to triggered all OK / Not OK
tag, cards uncommon transaction detection. To produce
proven report.
299 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
Logout Function / Test Procedure Expected Result Result
OK / Not OK
1 Check system in operation and ready to Ready for transaction.
2 logout (standby mode). E.g. OTL red. OK / Not OK
Press ‘TAMAT’ key to activate logout. TCD display ‘TERIMA’ or ‘BATAL’.
Confirm the logout by pressing ‘TERIMA’. OK / Not OK
3 Return to lane mode selection screen. OK / Not OK
EOJ Date & Time: Job No.
4 OTL will be permanently red when logout OTL change to red.
from the system.
Loop Detector (LD) Performance
Function / Test Procedure Expected Result Result
Check LD and/or VDC performance. The overall transactions result performance
for LD should be 95% (for Tag Lane), or ;
1 Compare the transaction result with LD/VDC The overall transactions result performance OK / Not OK
detected result using EOJ, Individual for VDC should be 95% (for BET Lane)
Transaction & manual counting
Functionality test result : Witness by
Organization
Total Mark Date
Tested by
Organization
Date
COMMENTS
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 300
LOGO SK CONCESSION COMPANY : Work request
TOLL VERIFICATION AUDIT No:
Audit Functionality/Rules and Good Practice Workgroup ELECTRICAL
Category Frequency Yearly
Year
Highway Plaza PLAZA
Date Audit Criteria
PLAZA OF MONITORING SYSTEM AND ACTIVITIES
Function / Test Procedure Expected Result Result
Ensure that all lanes information are
A Check the functionality of the RTDM menu. displayed and all transactions and parameter
information are updated accordingly in the
following menu:-
General Lane Status with establish all the OK / Not OK
functionalities and detection zone measure,
1 configuration and setting inclusive all the Overall of plaza lane status
communication, alert and acknowledgement
status.
2 Data parameter updated and downloadable To make sure latest parameter update and OK / Not OK
from HQCS, PCS and LCS base on the accurate on time.
preset setting or any scheduler event
3 Lane detail display with all the ID and lane Sort on individual lane detatil functionalities OK / Not OK
number
4 Alarm and exceptional monitoring panel Triggered any uncommond or discrepancy OK / Not OK
event
5 Time Syncronization Syncronization of the LCS,PCS and HQCS
base on the standard requirement.(SIRIM or OK / Not OK
GPS)
6 Operating System and Version To check latest update version of OS and OK / Not OK
system
7 AVC actitivies in realtime Classification of the vehicles detection real OK / Not OK
time
8 RTDM shall display lane OPEN and CLOSE All lane status fucntinalities in realtime OK / Not OK
status
9 Real Time Activities event log All event log appeared at RTDM in realtime. OK / Not OK
10 Login / logout status Real time OK / Not OK
11 Network status RTDM shall display network status and time
event.
RTDM shall display all current network and
i. All disconnect and reconnect status time event status with minimum 2 minutes OK / Not OK
allowance of the activities network.
301 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
12 To test on funtionality of RMP The ALB will remotely open from the control OK / Not OK
supervision building
Latest antivirus updated for all the Toll
13 Antivirus and Network Security implemented System with document policy provided OK / Not OK
implemented.
14 Reporting All transaction report generated not more OK / Not OK
than 15 minutes.
Monitoring realtime all lane operation and
15 Lane, Bound and Surveillance CCTV surveillance activities and and recorded OK / Not OK
Monitoring System complete with indentification, date and time
and able to access at anytime of the event for
backup purposes.
16 Mimic panel Mimic panel will triggered the signal and
alarm activated if any TNB power failure OK / Not OK
occur
Control are able to acknowledge and alert
17 Security switch buzzer or clear audible sound with indicate OK / Not OK
the lane event in case any emergency occur
by pressing the switch by the Toll Collector.
All TCS System Support and Toll
18 Essential Power Supply Backup ( Genset Supervisory Control Room with min 2 nos OK / Not OK
and UPS ) cross highmast. (Toll Plaza Canopy and
others fittings or places for safety and public
use required)
Functionality test result : Witness by
Total Mark Organization
Tested by Date
Organization
Date
COMMENTS
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 302
LOGO SK CONCESSION COMPANY : Work request
TOLL VERIFICATION AUDIT No:
Audit CategoryFunctionality/Rules and Good Practice Workgroup ELECTRICAL
Yearly
Year Frequency
Highway Plaza GENSET AND
Date Audit Criteria UPS
Appendix I (vi) GENSET / UNINTERUPTIBLE POWER SUPPLY (UPS) conti..
Others Good Practice and Requirement Standards
Function / Test Procedure Expected Result Result
1 Main power supply is down, UPS take over Genset take over after TNB power supply is OK / Not OK
before Genset running and all TCS system cut OFF within 10sec.
function as normal.
TNB Cut OFF buzzer on** OK / Not OK
Time Start :
Time End :
Mimic Panel Genset indicator ON/ OFF OK / Not OK
The following system shall function during
genset run:
LCS OK / Not OK
PCS OK / Not OK
HQCS OK / Not OK
RTDM OK / Not OK
Enforcement CCTV OK / Not OK
Lane and surveillance CCTV OK / Not OK
Air Cond Lane OK / Not OK
Air Cond Plaza OK / Not OK
Min. 2 Highmast Light Up*(ref. CA) OK / Not OK
Network and communication status OK / Not OK
Preventive maintenance on "No Load Test" To provide all the preventive reported
2 up to 5 minutes - monthly
inclusive all reading such as Engine Speed
Preventive maintenance "On Load Test" for (rpm), Water Temprature, Lubrication Oil
at least one (1) hour and take reading after Pressure, Hour Run Meter, Output Frequency
(Hz), Voltage Battery, Voltage Generator, OK / Not OK
20minutes of running - monthly
Good Housekeeping, Log Book and
endorsement by the competent person.
303 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
To verify the UPS standalone function min. 30 The system wil backup the essential supply to
minutes operation with 100% load
3 all lane and plaza level equipment and some OK / Not OK
parts of the Supervision Control Room
immediately.
UPS Standalone Time Start :
Load bank test twice a year Time End :
To provide all the preventive and detail tested
report with all the reading such as Input and
Output AC Volt, Rectifier Output, Inventer
Input, Output Current, DC Voltage, OK / Not OK
Frequency, Log Book and endorsement by
competent for semi annually and annually
~ Mimic panel indicator UPS indicator ON. OK / Not OK
The following system shall function during
genset run:
LCS OK / Not OK
PCS OK / Not OK
HQCS OK / Not OK
RTDM OK / Not OK
Enforcement CCTV OK / Not OK
Lane and surveillance CCTV OK / Not OK
Network and communication status OK / Not OK
4 Schematic drawing for essential supply and For maintenance purposes OK / Not OK
TCS OK / Not OK
Tripping and discrimination test ; L-E for Tripping at the individual lane only
5 selected lane
Supervision Engineer Monthly Report To provide visiting Supervision Engineer for
6 all electrical wiring, fitting condition and OK / Not OK
equipment setting reports.
7 Insulation Test for incoming and outgoing To provide yearly report OK / Not OK
cable for the Toll System
Functionality test result : Witness by
Total Mark Organization
Tested by Date
Organization
Date
COMMENTS
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 304
LAMPIRAN 7
LOGO SK
LEBUHRAYA……………….
SURAT PERAKUAN PENGESAHAN PRESTASI DAN
KETEPATAN DATA SISTEM KUTIPAN TOL (SPP)
Perakuan ini adalah bagi tahun
Nama Lebuh Raya
Nama Syarikat Konsesi
Sistem Kutipan Tol Terbuka / Tertutup / Terbuka dan Tertutup*
Tarikh Auditan
Pemeriksaan dan penyenggaraan peralatan serta Sistem Kutipan Tol (TCS) telah
dilaksanakan oleh Kontraktor / Pembekal / Konsultan / Konsesi* sekurang-
kurangnya satu (1) kali pada setiap bulan yang meliputi:
i. Pemeriksaan dan penyenggaraan berkaitan sistem software & hardware
peralatan kutipan tol;
ii. Penyemakan, verifikasi dan pengesahan ketepatan data; dan
iii. Penyemakan dan pengesahan ketepatan data Sistem Maklumat Tol (TIS).
Kami memperakukan bahawa peralatan dan TCS telah berfungsi dengan baik dan
data yang diterima bagi tempoh Januari hingga Disember ………….melalui TCS
adalah lengkap, tepat dan betul.
.......................................... ..........................................
Tandatangan Tandatangan Saksi
(Kontraktor / Pembekal / Konsultan Nama:
/ Konsesi) Jawatan:
Nama: Tarikh :
Jawatan: Cop syarikat:
Tarikh:
Cop syarikat:
305 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
Sambungan… SURAT PERAKUAN PENGESAHAN PRESTASI DAN
KETEPATAN DATA SISTEM KUTIPAN TOL (SPP)
Hasil dari auditan, pemeriksaan dan pengujian yang telah dijalankan, dengan ini
adalah diperakukan bahawa Sistem Kutipan Tol (TCS) adalah berfungsi / tidak
berfungsi* dengan baik dan berpandangan data trafik dan hasil tol bagi tahun
………………boleh diterima pakai berdasarkan kepada perkara dan kriteria berikut:-
BIL. PERKARA % PRESTASI**
KEWAJARAN PLAZA TOL………………..
Prestasi Peralatan
1 (Peripheral) 20 %
Prestasi Sistem & Integriti 35 %
2 Data
Prestasi Kefungsian
3 (aspek Mekanikal & 45 %
Elektrikal)
JUMLAH KESELURUHAN 100 %
100 %
Ketepatan Data & Sistem
4 Peralatan Tol Di Lorong
JUMLAH KESELURUHAN 100 %
Bersama-sama ini dikemukakan laporan lengkap mengenai auditan, pemeriksaan
dan pengujian yang telah dijalankan. Syarikat konsesi bertanggungjawab sepenuhnya
terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara
ini.
.......................................... ..........................................
Tandatangan Ketua Syarikat Tandatangan Saksi
Nama: Nama:
Jawatan: Jawatan:
Tarikh: Tarikh :
Cop syarikat: Cop syarikat:
Nota:
* Potong yang tidak berkaitan.
** Sila tambah ruangan sekiranya melebihi satu plaza tol
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 306
PROGRAM AUDIT LAMPIRAN 8
TEMPOH
Nama Lebuh Raya : DOKUMEN
Nama dan Alamat :
Syarikat Konsesi :
Firma Juruaudit Luar :
Tempoh Penyemakan :
NO. SKOP
Disediakan Oleh : Disahkan Oleh :
…………………………………………… ……………………………………………
Juruaudit Luar Syarikat Konsesi
Nama : Nama :
Jawatan: Jawatan:
Tarikh : Tarikh :
307 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 9
SULIT
SIJIL PENGESAHAN VERIFIKASI TRAFIK DAN HASIL TOL
(SISTEM TOL TERBUKA)
Lampiran 1(a)
SIJIL PENGESAHAN VERIFIKASI TRAFIK DAN HASIL TOL KESELURUHAN
SISTEM TOL TERBUKA
NAMA LEBUH RAYA :
TAHUN :
JUMLAH TRAFIK
BULAN KELAS 1 TRAFIK MENGIKUT KELAS KENDERAAN JUMLAH TRAFIK
KELAS 2 KELAS 3 KELAS 4 KELAS 5 KELAS 6 KELAS 7 KESELURUHAN
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
JUMLAH HASIL
BULAN KELAS 1 HASIL MENGIKUT KELAS KENDERAAN (RM) KELAS 7 JUMLAH HASIL
KELAS 2 KELAS 3 KELAS 4 KELAS 5 KELAS 6 KESELURUHAN
(RM)
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik dan hasil tol dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab
sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah trafik dan hasil tol
berdasarkan kepada maklumat dan pengiraan yang disediakan oleh syarikat konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
Nota: Ruangan Kelas 6 dan Kelas 7 hanya untuk Jambatan Pulau Pinang. SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 308
LAMPIRAN 9
SULIT
Lampiran 1(b)
SIJIL PENGESAHAN VERIFIKASI TRAFIK DAN HASIL TOL MENGIKUT PLAZA
SISTEM TOL TERBUKA
NAMA LEBUH RAYA :
NAMA PLAZA TOL :
TAHUN :
JUMLAH TRAFIK
BULAN TRAFIK MENGIKUT KELAS KENDERAAN JUMLAH TRAFIK
KESELURUHAN
JANUARI KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5 KELAS 6 KELAS 7
FEBRUARI `
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH TRAFIK
KESELURUHAN
JUMLAH HASIL
BULAN HASIL MENGIKUT KELAS KENDERAAN (RM) JUMLAH HASIL
KESELURUHAN
KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5 KELAS 6 KELAS 7
(RM)
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik dan hasil tol dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab sepenuhnya
terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah trafik dan hasil tol
berdasarkan kepada maklumat dan pengiraan yang disediakan oleh syarikat konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
Nota: Ruangan Kelas 6 dan Kelas 7 hanya untuk Jambatan Pulau Pinang. SULIT
309 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 10
SULIT
SIJIL PENGESAHAN VERIFIKASI TRAFIK DAN HASIL TOL Lampiran 2(a)
(SISTEM TOL TERTUTUP)
SIJIL PENGESAHAN VERIFIKASI TRAFIK KESELURUHAN
SISTEM TOL TERTUTUP
NAMA LEBUH RAYA :
TAHUN
:
BULAN TRAFIK MENGIKUT KELAS KENDERAAN (PLAZA TOL KELUAR) JUMLAH TRAFIK
KESELURUHAN
JANUARI KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab sepenuhnya terhadap sebarang
kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah trafik berdasarkan kepada maklumat dan
pengiraan yang disediakan oleh syarikat konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
SULIT 310
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 10
SULIT
Lampiran 2(b)
SIJIL PENGESAHAN VERIFIKASI TRAFIK PCU KM DAN HASIL TOL KESELURUHAN
SISTEM TOL TERTUTUP
NAMA LEBUH RAYA :
TAHUN
:
TRAFIK PCU KM MENGIKUT KELAS KENDERAAN JUMLAH
HASIL TOL
BULAN KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5 JUMLAH
TRAFIK (RM)
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik PCU KM dan hasil tol dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab
sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah trafik PCU KM dan hasil tol berdasarkan
kepada maklumat dan pengiraan yang disediakan oleh syarikat konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
311 SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 10
SULIT
Lampiran 2(c)
SIJIL PENGESAHAN VERIFIKASI TRAFIK KM DAN HASIL TOL KESELURUHAN
SISTEM TOL TERTUTUP
NAMA LEBUH RAYA :
TAHUN
:
BULAN KELAS 1 TRAFIK KM MENGIKUT KELAS KENDERAAN JUMLAH JUMLAH
KELAS 2 KELAS 3 KELAS 4 KELAS 5 TRAFIK HASIL TOL
(RM)
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik KM dan hasil tol dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab sepenuhnya
terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah trafik KM dan hasil tol
berdasarkan kepada maklumat dan pengiraan yang disediakan oleh syarikat konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
SULIT 312
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 11
SULIT
SIJIL PENGESAHAN VERIFIKASI TRAFIK DAN HASIL TOL Lampiran 3(a)
(SISTEM TOL TERBUKA DAN TERTUTUP)
SIJIL PENGESAHAN VERIFIKASI TRAFIK KESELURUHAN
SISTEM TOL TERBUKA DAN TERTUTUP
NAMA LEBUH RAYA :
TAHUN :
SISTEM TOL : TERBUKA
KELAS 1
BULAN TRAFIK MENGIKUT KELAS KENDERAAN JUMLAH
TRAFIK
JANUARI KELAS 2 KELAS 3 KELAS 4 KELAS 5 KESELURUHAN
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
SISTEM TOL : TERTUTUP
BULAN TRAFIK MENGIKUT KELAS KENDERAAN (PLAZA TOL KELUAR) JUMLAH
TRAFIK
JANUARI KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5 KESELURUHAN
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik keseluruhan berjumlah ................. dipersetujui tanpa prejudis. Pihak syarikat konsesi
bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah trafik berdasarkan kepada maklumat dan
pengiraan yang disediakan oleh syarikat konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
313 SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 11
SULIT
SIJIL PENGESAHAN VERIFIKASI HASIL TOL KESELURUHAN Lampiran 3(b)
SISTEM TOL TERBUKA DAN TERTUTUP
NAMA LEBUH RAYA :
TAHUN :
SISTEM TOL : TERBUKA
BULAN HASIL TOL MENGIKUT KELAS KENDERAAN (RM) JUMLAH HASIL TOL (RM)
KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
SISTEM TOL : TERTUTUP
BULAN HASIL TOL MENGIKUT KELAS KENDERAAN (RM) JUMLAH HASIL TOL (RM)
KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah hasil tol keseluruhan.................dipersetujui tanpa prejudis. Pihak syarikat konsesi
bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah hasil tol berdasarkan kepada
maklumat dan pengiraan yang disediakan oleh syarikat konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
SULIT 314
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 12
SULIT
SIJIL VERIFIKASI TRAFIK DAN HASIL TOL
(SISTEM TOL TERBUKA)
Lampiran 1(a)
SIJIL VERIFIKASI TRAFIK DAN HASIL TOL KESELURUHAN
SISTEM TOL TERBUKA
NAMA LEBUH RAYA :
TAHUN :
JUMLAH TRAFIK
BULAN KELAS 1 TRAFIK MENGIKUT KELAS KENDERAAN JUMLAH TRAFIK
KELAS 2 KELAS 3 KELAS 4 KELAS 5 KELAS 6 KELAS 7 KESELURUHAN
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH TRAFIK
KESELURUHAN
JUMLAH HASIL
BULAN KELAS 1 HASIL MENGIKUT KELAS KENDERAAN (RM) KELAS 7 JUMLAH HASIL
KELAS 2 KELAS 3 KELAS 4 KELAS 5 KELAS 6 KESELURUHAN
(RM)
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH HASIL TOL
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik dan hasil tol dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab sepenuhnya
terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
B-BTL-001/1(a) SEMAKAN: TARIKH:
Nota: Ruangan Kelas 6 dan Kelas 7 hanya untuk Jambatan Pulau Pinang. SULIT
315 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 12
SULIT
Lampiran 1(b)
SIJIL VERIFIKASI TRAFIK DAN HASIL TOL MENGIKUT PLAZA
SISTEM TOL TERBUKA
NAMA LEBUH RAYA :
NAMA PLAZA TOL :
TAHUN :
JUMLAH TRAFIK
BULAN TRAFIK MENGIKUT KELAS KENDERAAN JUMLAH TRAFIK
KESELURUHAN
JANUARI KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5 KELAS 6 KELAS 7
FEBRUARI `
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH TRAFIK
KESELURUHAN
JUMLAH HASIL
BULAN HASIL MENGIKUT KELAS KENDERAAN (RM) JUMLAH HASIL
KESELURUHAN
KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5 KELAS 6 KELAS 7
(RM)
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH HASIL TOL
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik dan hasil tol dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab sepenuhnya
terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
B-BTL-001/1(b) SEMAKAN: TARIKH:
Nota: Ruangan Kelas 6 dan Kelas 7 hanya untuk Jambatan Pulau Pinang. SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 316
LAMPIRAN 13
SULIT
SIJIL VERIFIKASI TRAFIK DAN HASIL TOL
(SISTEM TOL TERTUTUP)
Lampiran 2(a)
SIJIL VERIFIKASI TRAFIK KESELURUHAN
SISTEM TOL TERTUTUP
NAMA LEBUH RAYA :
TAHUN
:
BULAN TRAFIK MENGIKUT KELAS KENDERAAN (PLAZA TOL KELUAR) JUMLAH TRAFIK
KESELURUHAN
JANUARI KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
TRAFIK
KESELURUHAN
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab sepenuhnya terhadap
sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
B-BTL-001/2(a) SEMAKAN: TARIKH:
317 SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 13
SULIT
Lampiran 2(b)
SIJIL VERIFIKASI TRAFIK PCU KM DAN HASIL TOL KESELURUHAN
SISTEM TOL TERTUTUP
NAMA LEBUH RAYA :
TAHUN
:
TRAFIK PCU KM MENGIKUT KELAS KENDERAAN JUMLAH
HASIL TOL
BULAN KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5 JUMLAH
TRAFIK (RM)
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik PCU KM dan hasil tol dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab
sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
B-BTL-001/2(b) SEMAKAN: TARIKH:
SULIT 318
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 13
SULIT
Lampiran 2(c)
SIJIL VERIFIKASI TRAFIK KM DAN HASIL TOL KESELURUHAN
SISTEM TOL TERTUTUP
NAMA LEBUH RAYA :
TAHUN
:
TRAFIK KM MENGIKUT KELAS KENDERAAN JUMLAH
HASIL TOL
BULAN KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5 JUMLAH
TRAFIK (RM)
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik km dan hasil tol dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab
sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
B-BTL-001/2(c) SEMAKAN: TARIKH:
319 SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 14
SULIT
SIJIL VERIFIKASI TRAFIK DAN HASIL TOL
(SISTEM TOL TERBUKA DAN TERTUTUP)
Lampiran 3(a)
SIJIL VERIFIKASI TRAFIK KESELURUHAN
SISTEM TOL TERBUKA DAN TERTUTUP
NAMA LEBUH RAYA :
TAHUN :
SISTEM TOL : TERBUKA
BULAN TRAFIK MENGIKUT KELAS KENDERAAN JUMLAH TRAFIK
KESELURUHAN
JANUARI KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
TRAFIK
KESELURUHAN
SISTEM TOL : TERTUTUP
BULAN TRAFIK MENGIKUT KELAS KENDERAAN (PLAZA TOL KELUAR) JUMLAH TRAFIK
KESELURUHAN
JANUARI KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
TRAFIK
KESELURUHAN
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah trafik keseluruhan............dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab
sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini.
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
B-BTL-001/3(a) SEMAKAN: TARIKH:
SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 320
LAMPIRAN 14
SULIT
Lampiran 3(b)
SIJIL VERIFIKASI HASIL TOL KESELURUHAN
SISTEM TOL TERBUKA DAN TERTUTUP
NAMA LEBUH RAYA :
TAHUN :
SISTEM TOL : TERBUKA
BULAN HASIL TOL MENGIKUT KELAS KENDERAAN (RM) JUMLAH HASIL TOL (RM)
KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH HASIL TOL
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
SISTEM TOL : TERTUTUP
BULAN HASIL TOL MENGIKUT KELAS KENDERAAN (RM) JUMLAH HASIL TOL (RM)
KELAS 1 KELAS 2 KELAS 3 KELAS 4 KELAS 5
JANUARI
FEBRUARI
MAC
APRIL
MEI
JUN
JULAI
OGOS
SEPTEMBER
OKTOBER
NOVEMBER
DISEMBER
JUMLAH
JUMLAH HASIL KESELURUHAN (JUMLAH HASIL TOL DAN LAIN-LAIN)
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah hasil tol keseluruhan ..............dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab
sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara ini
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
B-BTL-001/3(b) SEMAKAN: TARIKH:
321 SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
SULIT LAMPIRAN 15
LEBUHRAYA ………………………………………………………………………………………. KENAIKAN/
SIJIL PENGESAHAN BAYARAN PENDAHULUAN PAMPASAN *PENANGGUHAN
PENGURANGAN KADAR TOL TAHUN….......
SISTEM TOL TERTUTUP
TOLL PLAZAS VEHICLE AGREED ACTUAL TOLL ACTUAL TOTAL EST IM AT ED ACTUAL TOLL ANCILLARY INCOME COM PENSAT ION
CLASS TOLL YEAR …. T RAFFIC TOLL REVENUE REVENUE AI AMOUNT
(RM) VOLUME YEAR ….
YEAR …. YEAR …. YEAR …. TA (RM) CA = ∑ (AT*TV) - (TA+AI)
AT (IN KM) (AT )*(T V) (RM)
(RM) TV (RM)
(RM)
(A) ( B ) (C) (D) = (A)*(C) (E) (F) (G) = (D) - (E + F)
CLASS 1
CLASS 2
CLASS 3
CLASS 4
CLASS 5
T OT AL
SISTEM TOL TERBUKA
TOLL PLAZA VEHICLE AGREED ACTUAL TOLL TOTAL TRAFFIC EST IM AT ED ACTUAL TOLL ANCILLARY INCOME COM PENSAT ION
CLASS TOLL YEAR …. VOLUME TOLL REVENUE REVENUE AI AMOUNT
(RM) YEAR …. YEAR ….
YEAR …. TV YEAR …. TA (RM) CA = ∑ (AT*TV) - (TA+AI)
AT (B) (AT )*(T V) (RM)
(RM) (RM)
(RM) (E)
(A)
(C) (D) = (A)*(C) (F) (G) = (D) - (E + F)
CLASS 1
CLASS 2
CLASS 3
CLASS 4
CLASS 5
T OT AL
i. ANGGARAN JUMLAH PAMPASAN TAHUN ………….. RM
ii. JUMLAH PENDAHULUAN PAMPASAN 50% DARIPADA (i) RM
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah pendahuluan pampasan *penangguhan kenaikan/ pengurangan kadar tol dipersetujui tanpa prejudis.
Pihak syarikat konsesi bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor
mengenai perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah pendahuluan pampasan
*penangguhan kenaikan/ pengurangan kadar tol berdasarkan kepada maklumat dan pengiraan yang disediakan oleh syarikat
konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
Catatan: Bayaran pendahuluan pampasan adalah merujuk kepada Klausa…………Perjanjian Konsesi........................bertarikh...................
Nota: *Potong mana yang tidak berkenaan SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 322
SULIT LAMPIRAN 16
LEBUHRAYA ……………………………………………………………………………………….
SIJIL BAYARAN PENDAHULUAN PAMPASAN *PENANGGUHAN KENAIKAN/ PENGURANGAN KADAR
TOL TAHUN….......
SISTEM TOL TERTUTUP
TOLL PLAZAS VEHICLE AGREED ACTUAL TOLL ACTUAL TOTAL EST IM AT ED ACTUAL TOLL ANCILLARY INCOME COM PENSAT ION
CLASS TOLL YEAR …. T RAFFIC TOLL REVENUE REVENUE AI AMOUNT
(RM) VOLUME YEAR ….
YEAR …. YEAR …. YEAR …. TA (RM) CA = ∑ (AT*TV) - (TA+AI)
AT (IN KM) (AT )*(T V) (RM)
(RM) TV (RM)
(RM)
(A) ( B ) (C) (D) = (A)*(C) (E) (F) (G) = (D) - (E + F)
CLASS 1
CLASS 2
CLASS 3
CLASS 4
CLASS 5
T OT AL
SISTEM TOL TERBUKA
TOLL PLAZA VEHICLE AGREED ACTUAL TOLL TOTAL TRAFFIC EST IM AT ED ACTUAL TOLL ANCILLARY INCOME COM PENSAT ION
CLASS TOLL YEAR …. VOLUME TOLL REVENUE REVENUE AI AMOUNT
(RM) YEAR …. YEAR ….
YEAR …. TV YEAR …. TA (RM) CA = ∑ (AT*TV) - (TA+AI)
AT (B) (AT )*(T V) (RM)
(RM) (RM)
(RM) (E)
(A)
(C) (D) = (A)*(C) (F) (G) = (D) - (E + F)
CLASS 1
CLASS 2
CLASS 3
CLASS 4
CLASS 5
T OT AL
i. ANGGARAN JUMLAH PAMPASAN TAHUN ………….. RM
ii. JUMLAH PENDAHULUAN PAMPASAN 50% DARIPADA (i) RM
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah pendahuluan pampasan *penangguhan kenaikan/ pengurangan kadar tol dipersetujui tanpa prejudis.
Pihak syarikat konsesi bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor
mengenai perkara ini.
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
Catatan: Bayaran pendahuluan pampasan adalah merujuk kepada Klausa…………Perjanjian Konsesi........................bertarikh...................
Nota: *Potong mana yang tidak berkenaan
323 SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
SULIT LAMPIRAN 17
LEBUHRAYA …………………………………………………………………………………………….
SIJIL PENGESAHAN BAYARAN PAMPASAN *PENANGGUHAN KENAIKAN/
PENGURANGAN KADAR TOL TAHUN …
SISTEM TOL TERTUTUP
AGREED ACTUAL TOLL ACT UAL AGREED TOLL ACTUAL TOLL ANCILLARY INCOME COMPENSATION AMOUNT
TOLL (RM) TOTAL TRAFFIC REVENUE REVENUE
VEHICLE AT VOLUME (IN KM) (AT )*(T V) TA AI CA = ∑ (AT*TV) - (TA+AI)
CLASS (RM) (RM) (RM)
TOLL PLAZAS TV (RM) (RM)
(A) ( B ) (C) (D) = (A)*(C) (E) (F) (G) = (D) - (E + F)
CLASS 1
CLASS 2
CLASS 3
CLASS 4
CLASS 5
T OT AL
SISTEM TOL TERBUKA
AGREED ACTUAL TOLL TOTAL TRAFFIC TOLL REVENUE ACTUAL TOLL ANCILLARY INCOME COMPENSATION AMOUNT
TOLL (RM) VOLUME (AT )*(T V) REVENUE
VEHICLE AT TA (RM) TA AI CA = ∑ (AT*TV) - (TA+AI)
CLASS (RM) (RM)
TOLL PLAZA (RM) (RM)
(A) ( B ) (C) (D) = (A)*(C) (E) (F) (G) = (D) - (E + F)
CLASS 1
CLASS 2
CLASS 3
CLASS 4
CLASS 5
T OT AL
i. JUMLAH PAMPASAN TAHUN …………… RM
ii. TOLAK (-) : PENDAHULUAN PAMPASAN YANG TELAH DIBAYAR OLEH KERAJAAN RM
ii. BAKI PAMPASAN TAHUN ……………….(i -ii) RM
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah *pampasan/baki pampasan *penangguhan kenaikan/ pengurangan kadar tol dipersetujui tanpa
prejudis. Pihak syarikat konsesi bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah
lapor mengenai perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah *pampasan/baki pampasan
*penangguhan kenaikan/ pengurangan kadar tol berdasarkan kepada maklumat dan pengiraan yang disediakan oleh syarikat
konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
Catatan: Bayaran pampasan adalah merujuk kepada Klausa…………Perjanjian Konsesi........................bertarikh...................
Nota: *Potong mana yang tidak berkenaan SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 324
LOGO SYARIKAT LAMPIRAN 18
JURUAUDIT BERTAULIAH
Lembaga Lebuhraya Malaysia
Wisma Lebuhraya
KM-6, Jalan Serdang - Kajang
43000 Kajang
Selangor Darul Ehsan
Tel: 03-8738 3000
Fax: 03-8737 3555
LEBUHRAYA ......................................................
OPERATION AUDITOR’S JOINT CERTIFICATION FOR THE
CONCESSION YEAR ENDED 31 DECEMBER ......RELATING TO CASH
COMPENSATION FOR THE REDUCTION IN TOLL RATE FOR ALL
CLASSES VEHICLES
Lebuhraya.......................................("the Company") and the Government of Malaysia
("the Government”) entered into a Concession Agreement on ................. ("CA").
Certain terms of the CA were subsequently amended vide a Supplemental Concession
Agreement dated ......... ("SCA").
Clause .......... of the SCA provides that should the Government impose Toll for any
class of vehicle which is lower than the Agreed Toll for that class of vehicle for that
Concession Year, then the Government shall compensate the Concession Company
for such reduction in respect of each such relevant Concession Year, until such time the
Company is allowed to collect the then prevailing Agreed Toll.
Clause ....................... the SCA requires a Joint Certificate of the Compensation
Amount by the Operation Auditors.
In exercising its rights under the Agreement, the Government had imposed Toll which is
lower than the Agreed Toll for Class 1 to Class 5 vehicles effective from 1 January
................ to 31 December........................
We have examined the documentation, records and calculation of the compensation
amount maintained and prepared by the Concession Company for the period from 1
January ... to 31 December ... and the Statement of Ancillary Income which we have
stamped for verification purposes. Our examination was made in accordance with
generally accepted auditing practices and accordingly included such test of the
accounting records and such other auditing procedures as we considered necessary in
the circumstances.
Page 1 of 4
325 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 18
For the purpose of the above-captioned Cash Compensation, the Government and the
Company had agreed to compute the Cash Compensation based on the formula set
out below.
Prescribed formula:
Where:
the amount of compensation payable in respect of the relevant
Operating Year,
summation for all classes of vehicles;
the Agreed Toll which should have applied for the relevant Operating
Year for the particular class of vehicle;
the actual traffic volume for the particular class of vehicle for the relevant
Operating Year;
the aggregate toll collected by the Company for the relevant Operating
Year; and
Ancillary Income for the relevant Operating Year. Where there are
losses, Al shall be construed as zero.
Page 2 of 4
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 326
LAMPIRAN 18
Based on the agreed procedures, we find the amount of the compensation for
Concession Year to be as follows:
Vehicle Agreed Actual Traffic Toll Revenue Actual Toll Ancillary Compensation
Class Toll at Volume (2019) based on Agreed Collected Income Amount
(RM) (RM)
Toll Rate (RM) (RM)
(RM) AI CA = Σ [AT x
TV] – [ΤΑ + AI]
AT TV [AT x TV ] TA
1. CLOSE SYSTEM
...................Toll Plaza
1
2
3
4
5
(A)
...................Toll Plaza
1
2
3
4
5
(B)
(C) =(A) + (B)
2. OPEN SYSTEM
...................Toll Plaza
1
2
3
4
5
(D)
Total :(C) + (D)
Page 3 of 4
327 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 18
i. Total compensation amount RM
RM
ii. Less: Advance payment paid by the Government
for the Concession Year RM
iii. Balance of the compensation amount to be paid by
the Government for the Concession Year
We, being the Operation Auditors, hereby jointly confirm that the balance of
Cash Compensation for the Concession Year ... calculated from 1 January ... to
31 December ... on the basis of the above formula is RM ...........................
(Ringgit Malaysia: .............................................................................................)
ANCILLARY INCOME & EXPENDITURE STATEMENT FOR THE PERIOD
FROM 1 JANUARY........ TO 31 DECEMBER ........
ANCILLARY INCOME RM
Advertising Rental .....................................
Telecommunication Tower Structure .....................................
Total Ancillary Income ___________________
___________________
............................................................ .................................................
COMPANY AUDITOR GOVERMENT AUDITOR
(No. )
Date: Date:
Page 4 of 4
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 328
SULIT LAMPIRAN 19
LEBUHRAYA…………………………………………………………………………………………….......................
SIJIL BAYARAN PAMPASAN *PENANGGUHAN KENAIKAN/ PENGURANGAN KADAR TOL TAHUN ….
SISTEM TOL TERTUTUP
TOLL PLAZAS VEHICLE AGREED ACTUAL TOLL ACTUAL TOTAL AGREED TOLL ACTUAL TOLL ANCILLARY INCOME COMPENSATION AMOUNT
CLASS TOLL (RM) TRAFFIC REVENUE REVENUE AI CA = ∑ (AT*TV) - (TA+AI)
AT (AT)*(TV) TA
(RM) VOLUME (IN KM) (RM) (RM) (RM) (RM)
TV
(A) ( B ) (C) (D) = (A)*(C) (E) (F) (G) = (D) - (E + F)
CLASS 1
CLASS 2
CLASS 3
CLASS 4
CLASS 5
TOTAL
SISTEM TOL TERBUKA
AGREED ACTUAL TOLL TOTAL TRAFFIC TOLL REVENUE ACTUAL TOLL ANCILLARY INCOME COMPENSATION AMOUNT
TOLL (RM) REVENUE AI CA = ∑ (AT*TV) - (TA+AI)
VEHICLE AT VOLUME (AT)*(TV) TA
CLASS (RM) (RM) (RM) (RM)
TOLL PLAZA TV (RM)
(A) ( B ) (C) (D) = (A)*(C) (E) (F) (G) = (D) - (E + F)
CLASS 1
CLASS 2
CLASS 3
CLASS 4
CLASS 5
TOTAL
i. JUMLAH PAMPASAN TAHUN …………… RM
ii. TOLAK (-) : PENDAHULUAN PAMPASAN YANG TELAH DIBAYAR OLEH KERAJAAN RM
iii. BAKI BAYARAN PAMPASAN TAHUN ……………….(i -ii) RM
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah pampasan *penangguhan kenaikan/ pengurangan kadar tol dipersetujui tanpa prejudis. Pihak
syarikat konsesi adalah bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah
lapor mengenai perkara ini.
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
Catatan : Bayaran pampasan adalah merujuk kepada Klausa …. Perjanjian Konsesi Lebuhraya ……... bertarikh ……...
Nota: *Potong mana yang tidak berkenaan
SULIT
329 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
SULIT LAMPIRAN 20
LEBUHRAYA…………………………………………………………………………………………….......................
SIJIL PENGESAHAN PERKONGSIAN HASIL TAHUN …….............................................................................
Toll Revenue RM
Compensation .... (part of Toll Revenue) RM
Ancillary Income RM
Revenue (A) RM
Projected Toll Revenue (PTR) (B) RM
~ Appendix …... (Clause …... of ………. Supplemental Concession Agreement)
Excess Of Revenue (A) - (B) (C) RM
RM
Toll Revenue Sharing due to the Government
[Clause …….... : ……...% of (C)]
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah perkongsian hasil dipersetujui tanpa prejudis. Pihak syarikat konsesi bertanggungjawab sepenuhnya
terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai perkara tersebut
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah perkongsian hasil berdasarkan
kepada maklumat dan pengiraan yang disediakan oleh syarikat konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
Catatan : Bayaran perkongsian hasil adalah merujuk kepada Klausa …. Perjanjian Konsesi Lebuhraya ……... bertarikh ……...
SULIT 330
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LOGO SYARIKAT LAMPIRAN 21
JURUAUDIT BERTAULIAH (CONTOH)
SIJIL BERSAMA JURUAUDIT OPERASI
BAGI PENGGUNAAN LEBIHAN DAN PERKONGSIAN HASIL SYARIKAT KONSESI
................................
UNTUK TAHUN BEROPERASI.............................
Sijil ini dikeluarkan berdasarkan hak - hak, tanggungan dan obligasi di bawah
Perjanjian Konsesi pada .................. dan Perjanjian Konsesi Tambahan ("SCA") pada
.............. di antara Kerajaan Malaysia ("Kerajaan") dan ....................................... (Pihak
Konsesi)
Perjanjian Konsesi Tambahan, Fasa ............................ menyatakan, jika
.........................................................................................................................................
.........................................................................................................................................
.........................................................................................................................................
.........................................................................................................................................
Berdasarkan formula yang telah dipersetujui dalam klausa ............. Perkongsian Hasil
adalah dikira seperti berikut:
Hasil Sebenar Tol ("ATR") (A) RM
(B) RM
Hasil Tol Unjuran ("PTR")
- Lampiran L1 (Fasal 18 Perjanjian Konsesi) (C) RM
ATR - PTR
Jumlah Perkongsian Hasil yang Dibayar
Kepada Kerajaan
[Fasal ......... 20% of(C)]
331 ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 21
Kami juga telah mengesahkan ke atas semua dokumen dan rekod berkaitan dengan
baki terhutang oleh pihak konsesi (termasuk pinjaman pokok, faedah dan faedah
terkumpul). Jumlah baki terhutang pihak konsesi termasuk jumlah pinjaman pokok, dan
faedah terkumpul pada 31 Disember ............... adalah seperti berikut:
[A] [B] [C] = [A] + [B]
PINJAMAN JUMLAH JUMLAH
FAEDAH
POKOK KESELURUHAN
(RM) (RM) (RM)
Irredeemable Convertible
Unsecured Loan Stocks ("ICULS")
Restructured Sukuk ("RS")
Third Party Financing
Facility ("TPFF")
Perjanjian Konsesi Tambahan, Fasal .......... memerlukan Sijil Bersama Hasil
Perkongsian daripada juruaudit operasi.
Berdasarkan prosedur yang telah dijalankan, kami sebagai Juruaudit Operasi,
berdasarkan Perjanjian Konsesi Tambahan ("SCA"), Fasal .............. memperakui
bahawa kerajaan ..................untuk mendapat Perkongsian Hasil bagi tahun konsesi
berakhir 31 Disember ........................
......................................................... .........................................................
Juruaudit: Juruaudit Kerajaan
Cop Firma : Tarikh :
Tarikh :
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA 332
LAMPIRAN 22
SULIT CONTOH FORMAT 1
LEBUHRAYA …….
SIJIL PENGESAHAN SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN LEBUH RAYA
TAHUN …….
JUMLAH JUMLAH PERATUS JUMLAH JUMLAH MINIMA JUMLAH
HASIL PAMPASAN SUMBANGAN SUMBANGAN /HAD SUMBANGAN SUMBANGAN
TOL TAHUN ….. PENYELIDIKAN, PENYELIDIKAN, PENYELIDIKAN,
BAGI LATIHAN DAN LATIHAN DAN PENYELIDIKAN, LATIHAN DAN
(RM) PEMBANGUNAN PEMBANGUNAN LATIHAN PEMBANGUNAN
TAHUN ……. LEBUH RAYA LEBUH RAYA LEBUH RAYA
DAN PEMBANGUNAN (JUMLAH MANA
(RM) (RM) (RM) LEBUH RAYA YANG LEBIH TINGGI)
(RM)
(A) (B) (C) (D) = (A+B) *(C) (RM)
(E)
(D) atau (E)
JUMLAH SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN RM
LEBUH RAYA TAHUN …..
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah sumbangan penyelidikan, latihan dan pembangunan lebuh raya dipersetujui tanpa prejudis. Pihak
syarikat konsesi bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai
perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah sumbangan penyelidikan, latihan
dan pembangunan lebuh raya berdasarkan kepada maklumat dan pengiraan yang disediakan oleh syarikat konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
Catatan: Bayaran Sumbangan Penyelidikan, Latihan dan Pembangunan Lebuh Raya adalah berdasarkan Klausa ……. Perjanjian
Konsesi …….. bertarikh ……..
333 SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 22
SULIT CONTOH FORMAT 2
LEBUHRAYA……
SIJIL PENGESAHAN SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN LEBUH RAYA
TAHUN…..
JUMLAH PERATUS JUMLAH JUMLAH JUMLAH
SUMBANGAN SUMBANGAN MAKSIMA SUMBANGAN
JUMLAH KOMISEN ETC JUMLAH PENYELIDIKAN, PENYELIDIKAN, PENYELIDIKAN,
JUMLAH ANCILLARY JUMLAH YANG DIBAYAR HASIL LATIHAN DAN LATIHAN DAN / HAD LATIHAN DAN
HASIL TOL PEMBANGUNAN PEMBANGUNAN SUMBANGAN PEMBANGUNAN
TOL INCOME/ DISKAUN KEPADA BERSIH LEBUH RAYA LEBUH RAYA PENYELIDIKAN, LEBUH RAYA
SEBENAR OTHER TOL SYARIKAT LATIHAN DAN
INCOME TOUCH 'N GO (RM) (RM) PEMBANGUNAN (JUMLAH
LEBUH RAYA MANA
(RM) (RM) SDN BHD
(RM) YANG LEBIH
(RM) (RM) RENDAH
(RM)
(RM)
(G) atau (H)
(A) (B) (C) (D) (E)=(A)+ (F) (G)=(E) x (F) (H)
(B)-(C)-(D)
JUMLAH SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN LEBUH RAYA TAHUN ….. RM
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah sumbangan penyelidikan, latihan dan pembangunan lebuh raya dipersetujui tanpa prejudis. Pihak
syarikat konsesi bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai
perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah sumbangan penyelidikan, latihan
dan pembangunan lebuh raya berdasarkan kepada maklumat dan pengiraan yang disediakan oleh syarikat konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
Catatan: Bayaran Sumbangan Penyelidikan, Latihan dan Pembangunan Lebuh Raya adalah berdasarkan Klausa …. Perjanjian
Konsesi ……. bertarikh ………
SULIT 334
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 22
SULIT CONTOH FORMAT 3
LEBUHRAYA ………
SIJIL PENGESAHAN SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN LEBUH RAYA
TAHUN ……
JUMLAH
JUMLAH PERKONGSIAN JUMLAH JUMLAH JUMLAH PERATUS JUMLAH
HASIL HASIL DISKAUN KOMISEN ETC HASIL SUMBANGAN SUMBANGAN
TOL TOL / REBAT YANG DIBAYAR TOL PENYELIDIKAN, PENYELIDIKAN,
KEPADA SYARIKAT BERSIH LATIHAN DAN LATIHAN DAN
SEBENAR TAHUN ….. TOL PEMBANGUNAN PEMBANGUNAN
BAGI KEPADA TNGSB (RM) LEBUH RAYA LEBUH RAYA
TAHUN …. KERAJAAN (RM) (RM) (RM)
(RM) MALAYSIA (RM) (F) (E) x (F)
(RM)
(A) (B) (C) (D) E=(A-B-C-D)
JUMLAH SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN LEBUH RAYA TAHUN …… RM
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah Sumbangan Penyelidikan, Latihan dan Pembangunan Lebuh Raya dipersetujui tanpa prejudis. Pihak
syarikat konsesi bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai
perkara ini.
Disediakan Oleh : Disemak Oleh : Disahkan Oleh :
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Syarikat Konsesi: Syarikat Konsesi: Syarikat Konsesi:
Tarikh : Tarikh : Tarikh :
Adalah dengan ini, Lembaga Lebuhraya Malaysia telah menyemak dan mengesahkan jumlah Sumbangan Penyelidikan, Latihan
dan Pembangunan Lebuh Raya berdasarkan kepada maklumat dan pengiraan yang disediakan oleh syarikat konsesi.
________________________ ________________________ ________________________
Nama: Nama: Nama:
Jawatan: Jawatan: Jawatan:
Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia Lembaga Lebuhraya Malaysia
Tarikh : Tarikh : Tarikh :
Catatan: Bayaran Sumbangan Penyelidikan, Latihan dan Pembangunan Lebuh Raya adalah berdasarkan Klausa …. Perjanjian
Konsesi ……. bertarikh ………
335 SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
SULIT LAMPIRAN 23
CONTOH FORMAT 1
LEBUHRAYA …….
SIJIL SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN LEBUH RAYA TAHUN …..
JUMLAH JUMLAH PERATUS JUMLAH JUMLAH JUMLAH SUMBANGAN
HASIL PAMPASAN SUMBANGAN SUMBANGAN MINIMA/HAD PENYELIDIKAN,
TOL TAHUN ….. PENYELIDIKAN, PENYELIDIKAN, SUMBANGAN LATIHAN DAN
BAGI PENYELIDIKAN, PEMBANGUNAN
(RM) LATIHAN LATIHAN LATIHAN DAN
TAHUN ….. DAN DAN PEMBANGUNAN LEBUH RAYA (JUMLAH
LEBUH RAYA MANA YANG LEBIH
(RM) PEMBANGUNAN PEMBANGUNAN TINGGI)
LEBUH RAYA LEBUH RAYA (RM)
(RM)
(RM) (RM)
(D) atau (E)
(A) (B) (C) (D) = (A+B) *(C) (E)
JUMLAH SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN LEBUH RAYA TAHUN …. RM
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah Sumbangan Penyelidikan, Latihan dan Pembangunan Lebuh Raya dipersetujui tanpa prejudis. Pihak
syarikat konsesi bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai
perkara ini.
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
Catatan: Bayaran Sumbangan Penyelidikan, Latihan dan Pembangunan Lebuh Raya adalah berdasarkan Klausa …. Perjanjian
Konsesi ……. bertarikh ………
SULIT 336
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 23
CONTOH FORMAT 2
SULIT
LEBUHRAYA……
SIJIL SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN LEBUH RAYA TAHUN…..
JUMLAH JUMLAH JUMLAH
SUMBANGAN
JUMLAH KOMISEN PERATUS JUMLAH MAKSIMA PENYELIDIKAN
LATIHAN DAN
JUMLAH ANCILLARY JUMLAH ETC YANG JUMLAH SUMBANGAN SUMBANGAN / HAD PEMBANGUNAN
DISKAUN LEBUH RAYA
HASIL INCOME/ DIBAYAR HASIL PENYELIDIKAN, PENYELIDIKAN, SUMBANGAN (JUMLAH MANA
TOL YANG LEBIH
TOL OTHER KEPADA TOL LATIHAN DAN LATIHANDAN PENYELIDIKAN,
SEBENAR INCOME (RM) RENDAH)
SYARIKAT BERSIH PEMBANGUNAN PEMBANGUNAN LATIHAN DAN
(RM)
TOUCH 'N GO LEBUH RAYA LEBUH RAYA PEMBANGUNAN
(RM) (RM) SDN BHD (RM) LEBUH RAYA
(RM) (RM)
(RM) (RM)
(E)=(A
(A) (B) (C) (D) +(B) (F) (G)=(E) x (F) (H) (G) atau (H)
-(C)-(D)
JUMLAH SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN LEBUH RAYA TAHUN ….. RM
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah Sumbangan Penyelidikan, Latihan dan Pembangunan Lebuh Raya dipersetujui tanpa prejudis. Pihak
Syarikat Konsesi bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai
perkara ini.
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
Catatan: Bayaran Sumbangan Penyelidikan, Latihan dan Pembangunan Lebuh Raya adalah berdasarkan Klausa …. Perjanjian
Konsesi ……. bertarikh ………
337 SULIT
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
LAMPIRAN 23
CONTOH FORMAT 3
SULIT
LEBUHRAYA……
SIJIL SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN LEBUH RAYA TAHUN…..
JUMLAH
JUMLAH PERKONGSIAN JUMLAH PERATUS JUMLAH
HASIL KOMISEN SUMBANGAN SUMBANGAN
TOL HASIL JUMLAH ETC YANG JUMLAH PENYELIDIKAN, PENYELIDIKAN,
DIBAYAR HASIL LATIHAN DAN LATIHAN DAN
SEBENAR TOL DISKAUN KEPADA PEMBANGUNAN PEMBANGUNAN
BAGI SYARIKAT TNGSB TOL BERSIH LEBUH RAYA LEBUH RAYA
TAHUN ….. REBAT
TAHUN …. (RM) (RM) (RM) (RM)
KEPADA TOL
(RM) (F) (E) x (F)
KERAJAAN
MALAYSIA (RM)
(RM)
(A) (B) (C) (D) E=(A-B-C-D)
RM
JUMLAH SUMBANGAN PENYELIDIKAN, LATIHAN DAN PEMBANGUNAN LEBUH RAYA TAHUN …..
ULASAN DAN PEMERHATIAN :
Adalah dengan ini, jumlah Sumbangan Penyelidikan, Latihan dan Pembangunan Lebuh Raya dipersetujui tanpa prejudis. Pihak
Syarikat Konsesi bertanggungjawab sepenuhnya terhadap sebarang kesilapan, kekurangan atau apa-apa salah lapor mengenai
perkara ini.
.................................................................... ....................................................................
Tandatangan, Nama, Jawatan dan Cop Tandatangan, Nama, Jawatan dan Cop
Ketua Pengarah/Timbalan Ketua Pengarah /Pengarah Pengawasan Tol
Syarikat Konsesi
Lembaga Lebuhraya Malaysia
Catatan: Bayaran Sumbangan Penyelidikan, Latihan dan Pembangunan Lebuh Raya adalah berdasarkan Klausa …. Perjanjian
Konsesi ……. bertarikh ………
SULIT 338
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA
339
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA LAMPIRAN 24
Kerja Penyenggaraan Rutin
Bil. Peralatan Penerangan Frekuensi Potensi Threshold Penarafan Masa Masa
(A) Kerja (Penyenggaraan Kegagalan / / Petunjuk (Rating) Tindakbalas Pembaikan
Ketidakpatuhan
Toll Collector Periksa Rutin)
1 Keyboard Kefungsian
PERALATAN TOL – LORONG
(TCK) Kebersihan /
Keadaan Bulanan Rosak Mana- mana B 2 Jam 7 Hari
Toll Collector Bulanan kegagalan N 2 Jam Bekerja
2 Display (TCD) Periksa Tidak bersih /
Kefungsian keadaan tidak Mana- mana 1 Bulan
kegagalan
Kebersihan / sempurna
Keadaan
3 Receipt Bulanan Rosak Mana- mana B 2 Jam 7 Hari
Printer (RPR) Periksa Bulanan kegagalan N 2 Jam Bekerja
Kefungsian Bulanan Tidak bersih / B 2 Jam
Intercom Bulanan keadaan tidak Mana- mana N 2 Jam 1 Bulan
4 (Slave) Kebersihan / Setiap 3 Bulan kegagalan C 2 Jam
Keadaan sempurna 7 Hari
Mana- mana Bekerja
Periksa Rosak kegagalan
Kefungsian 1 Bulan
Tidak bersih / Mana- mana
Kebersihan / keadaan tidak kegagalan 1 Bulan
Keadaan
sempurna Mana- mana
kegagalan
Rosak
Bulanan Tidak bersih / Mana- mana N 2 Jam 1 Bulan
keadaan tidak kegagalan
sempurna
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA Bil. Peralatan Penerangan Frekuensi Potensi Threshold Penarafan Masa Masa
Kerja (Penyenggaraan Kegagalan / / Petunjuk (Rating) Tindakbalas Pembaikan
Ketidakpatuhan
Rutin)
Periksa Bulanan Rosak Mana- mana C 2 Jam 1 Bulan
Bulanan kegagalan N 2 Jam 1 Bulan
5 Lane Traffic Kefungsian Tidak bersih /
Light (LTL) Kebersihan / keadaan tidak Mana- mana
kegagalan
Keadaan sempurna
6 Overhead Periksa Bulanan Rosak Mana- mana B 2 Jam 7 Hari
Traffic Light Kefungsian Bulanan kegagalan N 2 Jam Bekerja
Bulanan Tidak bersih / A 2 Jam
(OTL) Kebersihan / keadaan tidak Mana- mana 1 Bulan
kegagalan
Keadaan sempurna 24 Jam
Mana- mana
Periksa Rosak kegagalan
Kefungsian
(Lorong ETC)
Kebersihan / Bulanan Tidak bersih / Mana- mana N 2 Jam 1 Bulan
Bulanan keadaan tidak kegagalan B 2 Jam
Toll Fare Keadaan Bulanan N 2 Jam 7 Hari
7 Indicator (TFI) Periksa sempurna Bekerja
Kefungsian Rosak Mana- mana 1 Bulan
kegagalan
(Lorong
Manual)
Kebersihan / Tidak bersih / Mana- mana
Keadaan keadaan tidak kegagalan
sempurna
340
341
ARAHAN PENGURUSAN SISTEM TOL (APST) BAGI LEBUH RAYA DI BAWAH SELIAAN LEMBAGA LEBUHRAYA MALAYSIA Bil. Peralatan Penerangan Frekuensi Potensi Threshold Penarafan Masa Masa
Kerja (Penyenggaraan Kegagalan / / Petunjuk (Rating) Tindakbalas Pembaikan
Ketidakpatuhan
Rutin)
Automatic Periksa Bulanan Rosak Mana- mana C 2 Jam 1 Bulan
Vehicle Bulanan kegagalan N 2 Jam
8 Classification Kefungsian Bulanan Tidak bersih / B 2 Jam 1 Bulan
Bulanan keadaan tidak Mana- mana N 2 Jam 24 Jam
(AVC) Kebersihan / Bulanan kegagalan B 2 Jam (Barrier) /
sempurna 7 Hari
Keadaan Bekerja
1 Bulan
Automatic Periksa Rosak Mana- mana
kegagalan 7 Hari
9 Lane Barrier Kefungsian Bekerja
(ALB) Kebersihan / Tidak bersih / Mana- mana
keadaan tidak kegagalan
Keadaan
sempurna
Periksa Rosak Mana- mana
Kefungsian kegagalan
Untuk Lorong
SUV
Optical Mana- mana B 2 Jam 7 Hari
Barrier (OB) - kegagalan C 2 Jam Bekerja
10 Presence and Periksa Bulanan Rosak (Presence)
Kefungsian 1 Bulan
Passage Mana- mana
kegagalan
(Presence)
Kebersihan / Bulanan Tidak bersih / Mana- mana N 2 Jam 1 Bulan
Keadaan keadaan tidak kegagalan
sempurna