12 34 5 678
A Socket A
B
AC POWER SUPPLY 14 AC POWER SUPPLY
-X101
Cubicle Lighting Cubicle Heating L
N
=E04/D1.7 1L1 -X230 1 3/N/PE 50Hz 380/220V PE -X230 2 1L1 =E06/D1.2
/Z4.4 4 1L2 =E06/D1.2
=E04/D1.7 1L2 3 6 1L3 =E06/D1.2
2.5 GN/YE
=E04/D1.7 1L3 5 10
B 17
2.5 BK
-F1 21
/Z4.4
10A
I>
C 150kV Bay No.4 (Bus Coupler) 150kV Bay No.6 (to PAMACUTAN) C
Control Protection Panel Control Protection Panel
(=E04+WR1) -X230 12 13 (=E06+WR1)
-S101 22 21 -B101 21
/Z4.6 V
/Z4.4
D 1 D
-E101 21 -R101
/Z4.5 /Z4.5
2
PE
E =E04/D1.7 1N -X230 7 -X230 8 9 11 1N =E06/D1.2 E
18 1PE =E06/D1.2
=E04/D1.7 1PE 15 16
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA AC Supply Sytem CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /D1 of 2
56 78
12 34 56 78
A POWER SUPPLY POWER SUPPLY POWER SUPPLY DC POWER SUPPLY A
DC POWER SUPPLY CONTROL PROT. CIRCUIT CONTROL PROT. CIRCUIT SIGNALLING CIRCUIT/BCU B
21L+ =E06/D2.1
(MAIN 1) (MAIN 2) 21L- =E06/D2.1
=E04/D2.7 21L+ -X110 1 110 VDC (CONTROL MAIN 1) -X110 2 22L+ =E06/D2.1
=E04/D2.7 21L- 3 4 22L- =E06/D2.1
150kV Bay No.4 (Bus Coupler) =E04/D2.7 22L+ -X210 1 110 VDC (CONTROL MAIN 2) -X210 2 150kV Bay No.6 (to PAMACUTAN)
Control Protection Panel =E04/D2.7 22L- 3 4 Control Protection Panel
(=E04+WR1) (=E06+WR1)
B
2.5 BK 2.5 BK 2.5 BK 2.5 BK
C C
-F2 21 -F3 21 -F4 21 -F5 21
/Z4.4 43 /Z4.4 43 /Z4.4 43 /Z4.4 43
6A 6A 6A 6A
I> I> I> I> I> I> I> I>
-KPSA2 A1 D
D /Z4.6 14 13 22 21
44 43 32 31
-KPS
/Z4.6
E
C1 21L+ C2 22L+ S 31L+ E
/M1.1 /M3.1 /R1.1
C1 21L- C2 22L- S 31L-
/M1.1 /M3.1 /R1.1
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA DC Supply Sytem CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /D2 of 2
56 78
1 2 3 4 5678
A
GIS Local Control Cubicle
=+ DWG. NO. HTD12-249-170-0105
S1 -X301 3 -XC41 1 -A300 TMU220 14 -XC41 9 -X A
6 /Z1.1 16 B
S2 9 2 A1 A2 10 -X C
S1 1 3 13 5A 11 D
15 1A -X
P2 P1 4 12
T5.51 P2 P1 5 9 B1 B2 10 13 -X
1000-2000/1A P2 P1 12
CL.0,2, 15VA TARIFF METER PANEL/DFR6 14 -X
=+7 15 -X
8 11 5A 16 -X
1A -X
-XV13 9
B S2 5 C1 C2 6 10
8 11
S1 7 5A 12
1A
S2 1 N1 N2 2
4
3 5A
1A C264
C
D LVT VA -A300 TMU220 22
/G4.5 /Z1.1
E LVT VB LINE VT
/G4.5 21 U1 U2
F LVT VC
/G4.5 23 V1 V2 24
A ISSUED FOR APPROVAL LVT VN
B FOR CONSTRUCTION /G4.5 25 W1 W2 26
C AS MANUFACTURED
REV. REMARKS 27 N1 N2 28 E
1 BUS VT
BVTM 2VA -XV14 1 19 X1 X2 20
/G6.2 2
BVTM 2VN
/G6.2 3
4
C264
F
15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CT and VT Connection CHECK RS DATE 31.01.2012
DATE NAME P.O.NO. 3 BCU (C264) APPR. RS SCALE NTS
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /G1 of 6
4 5678
12 3 4 5 67 8
A
GIS Local Control Cubicle 22
DWG. NO. HTD12-249-170-0105 24
A -S87LA -F87L
/Z4.1 /Z2.1
21 IA
C1 5A
T5.52 P2 P1 S1 -X302 3 -XC42 1 23 C3 1A
1000-2000/1A P2 P1 6
P2 P1S2 2 C2
CL.X, 15VA S1 3
C4 5A IB
C6 1A
C5
S2 4 B
B C7 5A IC
C9 1A
S1 9 5 25 26
C8
S2 6 C10 5A IM
1 C11 1A
7
8 C12
27 28 C13 5A IN SENSITIVE C
C14 1A P543
C
C15
MMLG01
S1 -X303 3 -XC43 1 -S50/51 22 -F50/51 IA -XC43 9 L1 =E00/G3.2
P2 P1 6 /Z4.2 /Z3.1 IB L2 =E00/G3.2
P2 P1 9 2 IC 10 L3 =E00/G3.2
P2 P1 1 3 21 C1 5A IN 11 N =E00/G3.2
C3 1A
D T5.53 4 C2 12 D
1000-2000/1A 5 13 E
C4 5A
CL.5P20+CL.0,5, 30VA S2 6 C6 1A 14 Disturbance Fault Recorder
7 C5 15 (=E00+EX381)
S1 8 23 24 16
C7 5A
S2 25 26 C9 1A
S1 C8
E S2 C10 5A
C11 1A
27 28 C12
MMLG01
0
P142
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CT Connection CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 MICOM P543 & P142 APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /G2 of 6
4 5678
12 345678
GIS Local Control Cubicle
DWG. NO. HTD12-249-170-0105
AA
P2 P1S1 -X304 45-L1A =E00/G4.3
P2 P1S2 45-L1B =E00/G4.3
C5.54 P2 P1
2000-4000/1A
CL.X, 15VA
S1 45-L2A =E00/G4.3 150kV Busbar Protection Panel B
45-L2B =E00/G4.3 (=E00+R1)
B S2
S1 45-L3A =E00/G4.3
S2 45-L3B =E00/G4.3
CC
S1 -X305
C5.55 P2 P1
D 2000-4000/1A P2 P1 D
P2 P1 E
CL.X, 15VA S2
S1
S2
S1
E S2
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CT Connection to Busbar Protection Relay CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /G3 of 6
56 78
12 345678
GIS Local Control Cubicle VL1 =E00/G3.2 Disturbance Fault Recorder A
DWG. NO. HTD12-249-170-0105 VL2 =E00/G3.2 (=E00+EX381)
VL3 =E00/G3.2
A VN =E00/G3.2
B -S87LA -F87L B
/Z4.1 /Z2.1 C
CL.3P, 150VA -X402 1 -XV11 1 1 2 VA
3 VT's,150V/V3/0.1kV/V3/0.1kV/V3 2 4 C19
3 6
2 3
4 5
3 C20 VB
4 5
6
5 C21 VC
7 C22 VN
C6 8
7 8
MMLG01
P543
BVTP 1VA -XV12 1 -S87LA 10 -F87L
/G5.2 /Z4.1 12 /Z2.1
D 2 9 D
C23 V BUSBAR
BVTP 1VN 3 11
/G5.2 4 C24
MMLG01
P543
CL.0,5, 100VA -X401 1 -XV13 1 VA LVT
3 CVT's,150V/V3/110V/V3 2 2 /G1.4
E3 3 VB LVT E
4 4 /G1.4
5 5 VC LVT
6 6 /G1.4
7 VN LVT
8 /G1.4
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Line VT Connection CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 Protection and Metering APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /G4 of 6
45678
1 2 34 56 78
A
BUS 1 BUS 2 BUS 1 BUS 2
VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER
150kV Bay No.4 (Bus Coupler) A
Control Protection Panel
(=E04+WR1)
1VBP-L1 =E04/G4.7
1VBP-L2 =E04/G4.7
1VBP-L3 =E04/G4.7
1VBP-N =E04/G4.7
2VBP-L1 =E04/G5.7
2VBP-L2 =E04/G5.7
2VBP-L3 =E04/G5.7
2VBP-N =E04/G5.7
150kV Bay No.6 (to PAMACUTAN)
Control Protection Panel
(=E06+WR1)
1VBP-L1 =E06/G5.2
1VBP-L2 =E06/G5.2
1VBP-L3 =E06/G5.2
1VBP-N =E06/G5.3
2VBP-L1 =E06/G5.3
2VBP-L2 =E06/G5.4
2VBP-L3 =E06/G5.4
2VBP-N =E06/G5.4
B B
C
-XVBP1 1 2 34 56 78 -XVBP2 1 2 34 56 78 D
E
C
-KQ1 1 -KQ2
/Z4.4 95 /Z4.4
D 6
10 2
BVT 1VA
/G4.4 1
BVT 1VN 95
/G4.4
6
10 2
E
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Bus VT Selection CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 Protection APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /G5 of 6
4 5678
1 2 34 56 78
A
BUS 1 BUS 2 BUS 1 BUS 2
VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER VOLTAGE TRANSFORMER
150kV Bay No.4 (Bus Coupler) A
Control Protection Panel
(=E04+WR1)
1VBM-L1 =E04/G4.8
1VBM-L2 =E04/G4.8
1VBM-L3 =E04/G4.8
1VBM-N =E04/G4.8
2VBM-L1 =E04/G5.8
2VBM-L2 =E04/G5.8
2VBM-L3 =E04/G5.8
2VBM-N =E04/G5.8
150kV Bay No.6 (to PAMACUTAN)
Control Protection Panel
(=E06+WR1)
1VBM-L1 =E06/G6.2
1VBM-L2 =E06/G6.2
1VBM-L3 =E06/G6.2
1VBM-N =E06/G6.3
2VBM-L1 =E06/G6.3
2VBM-L2 =E06/G6.4
2VBM-L3 =E06/G6.4
2VBM-N =E06/G6.4
B B
C
-XVBM1 1 2 34 56 7 8 -XVBM2 1 2 34 56 78 D
E
C
-KQ1 7 -KQ2
/Z4.4 11 3 /Z4.4
D 8
12 4
BVTM 2VA
/G1.4 7
BVTM 2VN 11 3
/G1.4
8
12 4
E
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Bus VT Selection CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 Metering APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /G6 of 6
4 5678
12 345678
A Relay Reset Manual Close AR Mode Line VT Bus VT -CB4 Circuit Breaker A
On Off MCB Tripped MCB Tripped B
-F87L Pole B Close C
Power Supply -X201 2 -X201 4 D
C1 21L+ -X201 1 Pole A Close Pole C Close 21L+ C1
/D2.3 -X201 3 -X201 5 /M2.1
=E04/P1.3 BVT-C -W1A 27 -W1B 27 -W1C 27
B 14 13 -KRST 1 -KMCL -A300 DO5 E10 E9 DO6 -KLVP 1 150kV Bay No.4 (Bus Coupler) Local Control Cubicle -X01.1 -Z2A 18 17 -X02.1 -Z2A 18 17 -X03.1 -Z2A 18 17
/Z4.4 95 /Z4.4 /Z1.1 E12 E11 /Z4.4 95 Control Protection Panel DWG. NO. HTD12-249-170-0105 -S03 -S03
-S87LA (=E04+WR1)
/Z4.1 1
95
C264
MMLG01 BVT =E04/P1.3
-Z2A -Z2A -Z2A
-W1A 28 -W1B 28 -W1C 28
C
J2 -X201 18 -X201 19 -X201 20 -X201 21
-F87L L+ RS1 RESET MC1 MCL
/Z2.1 L- /M2.3
P543J1
14mm²
GROUND STRAP
D
-S87LA 15 16 -F87L OPTO14 F12 OPTO13 F10 OPTO3 D6 OPTO4 D8 OPTO5 D10 OPTO12 F8 OPTO9 F2 OPTO10 F4 OPTO11 F6
/Z4.1 /Z2.1
E MMLG01 P543 E
F11 F9 D5 D7 D9 F7 F1 F3 F5
C1 21L- -X201 12 -X201 13 21L- C1
/D2.3 -X201 9 10 11 /M2.1
-X201 14 15 16 17
F
F
A ISSUED FOR APPROVAL
B FOR CONSTRUCTION 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
C AS MANUFACTURED 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Line Differential Protection Input CHECK RS DATE 31.01.2012
1 DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /M1 of 6
56 78
12 345678
A A
87L DTT from 87BB/50BF 1st stage 50BF 2nd stage DTT to CB Unhealthy DTT from Relay Reset Manual Close
79 Final Trip Remote End Trip Trip Remote End -X201 8 Remote End 21L+ C1
C1 21L+ -X201 6 -X201 7 -X243 23 -F87L
/M1.8 /Z2.1 R5
-F87L 17 18 H2 H1 -K94A 15 13 =E00/P4.6 CO2 P543 H10
150kV Busbar Protection Panel 9 10 H12 H11
/Z2.1 R1 /Z5.3 K1 E16 E15 B
B P543 MVAJ101 (=E00+R1) E20
D1 =E00/P4.2 87b/50BF 1st stage =E00/P4.1 CO1 Local Control Cubicle -A300
D2 =E00/P4.4 50BF 2nd stage DWG. NO. HTD12-249-170-0105 /Z1.1 DO8 E21 E19 DO9
50BF 2nd stage C264
-F87B -F87B -F87B
-S87LA D3 =E00/P4.6 -X243 24 -S87LB C
/Z4.1 /Z4.2
MMLG01 MMLG01
C
-X201 22 23 -X201 24 -X201 25
D RESET RS1 D
/M1.3
28 27 -F87L OPTO6 D12 OPTO15 F14 -K94A 28 27 -KMCL
24 /Z2.1 /Z5.3 Trip 24 /Z4.4
22 22
21 P543 21L- C1
23 13 14
4 13 14
-F86A Reset-F86A -KRST
/Z5.1 Trip 26 25/Z5.1 /Z4.4
MVAJ105t MVAJ101
E E
MVAJ105 D11 F13
C1 21L- Lock-Out Relay 1
/M1.8 Reset
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C INTERNAL REVISION 05.09.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Lock-Out Relay 1 Initiation CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /M2 of 6
56 78
12 345678
A A
RS900 -F50/51 Relay Reset Manual Close Spare Spare Spare Spare Spare
Power Supply Power Supply 3 4
C2 22L+ -X202 1 -X202 2 22L+ C2
/D2.4 /M4.1
B B
C
-S50/51 14 13 -KRST 6 -KMCL D
/Z4.2 /Z4.4 10 2 /Z4.4
6
10 2
MMLG01
C
ESW L+ -+ -F50/51 15 16 F1 F2 L+ -X202 17 18 19 20 21
L- /Z3.1 L-
RS2 RESET
/M4.3
P142
14mm²
D GROUND STRAP
-S50/51 -F50/51 OPTO1 D2 OPTO2 D4 OPTO3 D6 OPTO4 D8 OPTO5 D10 OPTO6 D12 OPTO7 D14
/Z4.2 /Z3.1
MMLG01 D1 D3 D5 D7 D9 D11 D13 E
E P142
C2 22L- -X202 11 -X202 12 22L- C
/D2.4 /M4.1
-X202 7 8 9 10 F
-X202 13 14 15 16
F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Overcurrent Protection Input CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /M3 of 6
56 78
12 34 5678
A A
-F50/51 DTT from 87BB/50BF 1st stage 50BF 2nd stage
Trip Remote End Trip Trip
C2 22L+ -X202 5 6 22L+ C2
/M3.8
-F50/51 E2 E1 -K94A 75
150kV Busbar Protection Panel
/Z3.1 R1 /Z5.3 K1 B
B P142 MVAJ101 (=E00+R1)
D4 =E00/P4.2 87b/50BF 1st stage =E00/P4.1 CO3
17 18 D5 =E00/P4.4 50BF 2nd stage-F87B-F87B
-S50/51 C
/Z4.2
MMLG01
C
-X202 22 23
D RESET RS2 D
/M3.4
-F86B 28 27 -F86B
/Z5.2 Trip 24 /Z5.2
22
21t
23
E
Reset
26 25
MVAJ105
E
MVAJ105
C2 22L- 22L- C2
/M3.8
Lock-Out Relay 2
Reset
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Lock-Out Relay 2 Initiation CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /M4 of 6
56 78
1 2 345678
A A
B B
C
-DS41 -DS42 -DS43 -ES41 -ES42 -ES43 D
Disconnector Switch Disconnector Switch Disconnector Switch Earthing Switch Earthing Switch Earthing Switch E
Open Close Open Close Open Close Open Close Open Close Open Close
Command Command Command Command Command Command Command Command Command Command Command Command
C Local Control Cubicle
DWG. NO. HTD12-249-170-0105
-A300 DO3 DO4 DO5 DO6 DO7 DO8 DO9 DO10 DO1 DO2 DO3 DO4
D5 D6/Z1.1
D7 D8
D9 D10C264
D11 D12
D -X100 1 D13 D14-X100 23-X100 45-X100 67-X100 89-X100 1011-X100 12 13
D15 D16
-X222 1 -X222 2 -X222 3 -X222 5 -X222 6 -X222 8 -X222 9 -X222 11 -X222 12 -X222 14 -X222 15 -X222 17 -X222 18
D20
E D21 D19
D23
D24 D22
E1 E2
E3 E4
E5 E6
E7 E8
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Disconnector Switch & Earthing Switch Control CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /M5 of 6
56 78
1 2 345678
A A
Synchrocheck -CB4
& Autoreclose Circuit Breaker
Close Command
B B
C
3 13 1 13 13 13 13 13 13 H16 H17 E14 E13 D4 D3 D
5 95 95 9 5 95 95 9 E
-F86A K1 -F74A -F74D -F87L -A300
/Z5.1 /Z5.5 /Z5.6 /Z2.1 /Z1.1
MVAJ105 M1 M1 R7 DO2
7PA30 7PA30 P543 C264
2 H18
C -F86B -F74B -F74E -S87LB -A300 DO7
/Z5.2 /Z5.5 /Z5.6 /Z4.2 /Z1.1
K1 M1 M1
MVAJ105 7PA30 7PA30 MMLG01 C264
1 Synchro/Bypass
-X100 17
-F74C -F74F
/Z5.6 M1 /Z5.7 M1
7PA30 7PA30
D -X100 14 -X100 16 15 -X100 18
Local Control Cubicle -X221 1 -X221 2 -X221 3
DWG. NO. HTD12-249-170-0105
E
-X100 19 20 21 22
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Circuit Breaker Closing cmd. CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /M6 of 6
56 78
12 3 4 5 67 8
A 87L Trip Lock-Out Relay 1 Pole A Trip Circuit Supervision 1 A
Pole A Pole B Pole C Operated Pole B
Circuit Breaker
Open Command Pole A Pole B Pole C
Pole C
-S87LA G3 19 20 B
G5
B /Z4.1 G7
G8
MMLG01
-A300 D2 D1 -F87L R9 R10 R11 -F86A K1 75K1 K1 -F74A 2-K1K2 -F74B K1 K2 -F74C K1 K2
/Z1.1 DO1 /Z2.1 /Z5.1 86 /Z5.5 12 1 /Z5.5 /Z5.6
11 9 84
C C264 P543 MVAJ105 7PA30 2-7PA307PA30 C
12 1
G4 84
G6 2-
G9 12 1
84
D D
E
-X200 1 -X200 2 34 -X200 5 6 7 -X200 8 9 -X200 10 11 -X200 12 13
-X223 11 12
-X223 1Local Control Cubicle 2 -X223 3 13 -X223 4 7 10 -X223 5 6 -X223 8 9
DWG. NO. HTD12-249-170-0105
E
-X200 14 15 16 17
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Tripping Circuit CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 CB Coil 1 APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /N1 of 2
4 5678
1 23 4 567 8
A A
Lock-Out Relay 2 Pole A Trip Circuit Supervision 2 Pole C
B Operated Pole B B
C C
Pole A Pole B Pole C
Local Control Cubicle -F86B K1 K1 K1 -F74D K1 K2 -F74E K1 K2 -F74F K1 K2
DWG. NO. HTD12-249-170-0105/Z5.2 /Z5.6 /Z5.6 /Z5.7
75MVAJ1057PA30 7PA30 7PA30
86
D 11 9 D
2- E
12 1-X300 1 2-X300 3 4 5-X300 67-X300 89-X300 10 11
84
2--X224 3 13-X224 5
12 1
84
2-
12 1
84
-X224 4 7 10 6 -X224 8 9 -X224 11 12
E
-X300 12 13 14 15
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Tripping Circuit CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 CB Coil 2 APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /N2 of 2
4 5678
1 2 345678
A A
B -F87L Start 50BF DTT from B
Trip Remote End C
-F50/51 D
Trip E
COMMUNICATION H5 E3 86
-F87L R3 -F50/51 R2 -K94A K1
/Z2.1 /Z3.1 /Z5.3
P543 P142 MVAJ101
C 4 H6 4 E4
-S87LB -S50/51
/Z4.2 /Z4.2
MMLG01 MMLG01
3 3
D -X400 1 2
-F87L 150kV Busbar Protection Panel
/Z2.1 (=E00+R1)
=E00/M10.6 COM1
TX1 RX1 TX2 RX2 P543 =E00/M10.6 SBF
FIBER OPTIC
COMMUNICATION
CURR. DIFF.
E
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA 50BF Initiation CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /P1 of 2
56 78
1 2 34567 8
A A
B -CB5 Circuit Breaker -DS51 -DS52 B
C Disconnector Switch Disconnector Switch C
D Pole A Pole B Pole C D
Open Close Open Close Open Close Open Close Open Close
-X244 6 -X244 1
-W1A 62 -W1A 26 -W1B 62 -W1B 26 -W1C 62 -W1C 26 -W2 19 -W2 39 -W3 19 -W3 39
-X01.1 Z4ALocal Control Cubicle Z2A -X02.1 Z4B Z2B -X03.1 Z4C Z2C X04.1 X2 X1 X05.1 X2 X1
DWG. NO. HTD12-249-170-0105
9 10
15 16
9 10
15 16
9 10
15 16
16 17
18 19
16 17
18 19
Z2A Z2B Z2C X1 X1
-W1A 61 -W1A 25 -W1B 61 -W1B 25 -W1C 61 -W1C 25 -W2 18 -W2 38 -W3 18 -W3 38
-X244 8 7 -X244 10 9 -X244 12 11 -X244 3 2 -X244 5 4
E 150kV Busbar Protection Panel E
(=E00+R1)
=E00/M10.2 COM2
=E00/M10.2 CB4A-OP
=E00/M10.2 CB4A-CL
=E00/M10.3 CB4B-OP
=E00/M10.3 CB4B-CL
=E00/M10.4 CB4C-OP
=E00/M10.4 CB4C-CL
=E00/M10.5 DS41-OP
=E00/M10.5 DS41-CL
=E00/M10.5 DS42-OP
=E00/M10.6 DS42-CL
-X400 3 4 5 6
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA CB/DS Status CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 For Busbar Protection APPR. RS SCALE NTS
1
2 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /P2 of 2
4 5678
12 345 678
C264 -CB5 -DS51 -DS52 -DS53
Power Supply Circuit Breaker Diconnector Switch Diconnector Switch Diconnector Switch
A Open Close Open Close Open Close Open Close A
S 31L+ -X500 1 -X500 2
/D2.5 -X500 3 31L+ S
/R2.1
B
-X243 1 SCOM2 /R2.1
-W1C 60 -W1C 24
-X03.1 Z4CLocal Control CubicleZ2C
DWG. NO. HTD12-249-170-0105
7 87 87 8Z2C -W2 37 -W2 17 -W3 37 -W36 17 -W4 34 -W4 16 B
13 14 13 14 13 14-W1C 59 -W1C 23 C
14 15-W1B 60 -W1B 24
16 17
-X02.1 Z4B 14 15Z2B-X04.1 X2X1-X05.1 X2X1 -X06.1 X2 13 14 X1
16 17 18 19
C
Z2B X1 X1 X1
-W4 33 -W4 15
-W1B 59 -W1B 23
-W1A 60 -W1A 24 -W2 36 -W2 16 -W3 36 -W3 16
-X01.1 Z4A Z2A
Z2A D
D -W1A 59 -W1A 23
-X243 3 -X243 2 -X243 9 -X243 8 -X243 11 -X243 10 -X243 13 -X243 12
-X500 16 17 -X500 18 19 -X500 20 21 -X500 22 23
A24 A23 -A300 DI1 P1 DI3 P4 DI5 P7 -A300 DI7 P10
A22 P2 P5 P8 /Z1.1 P11
E -A300 L+ /Z1.1 E
/Z1.1 C264
-KQ1 -KQ213 14
L- /Z4.4 /Z4.4 13 14
C264
C264
P3 P6 P9 P12
14mm²
GROUND STRAP
S 31L- -X500 14 -X500 15 31L- S
/D2.5 /R2.1
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Alarm Signalling to BCU (C264) CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /R1 of 6
56 78
12 345678
-ES51 -ES52 -ES53 Local/Remote CB Spring Charging Bus A&B, DS/ES/HSES, CB Zone SF6 Pressure Bus A&B, DS/ES/HSES, A
Earthing Switch Earthing Switch Selector switch Time Exceeded CH Zone SF6 Pressure CH Zone SF6 Pressure
A Earthing Switch
Off 1st Threshold 1st 2nd 2nd Threshold
Open Close Open Close Open Close Local Remote Threshold Threshold
31L+ 31L+ S
S -X500 4 /R3.1
/R1.7
-X242 1
/R1.7 SCOM2 SCOM1 /R3.1
B B
-W5 34 -W5 16 -W6 34 -W6 16 -W7 49 -W7 51
Local Control Cubicle
DWG. NO. HTD12-249-170-0105-X07.1 X2X1 -X08.1 X2 13 14 X1 -X09.1 PL2 23 24 PL2 LOCAL
18 19 25 26 OFF
13 14 43LR REMOTE 12 25 26 6 10
18 19 16 6 10
6 10
6 10
6 10
6 10
6 10
6 10
6 10
-KMC -K63GB1 -K63GD1 -K63GC1 -K63GA1 -K63GA2 -K63GB2 -K63GD2 -K63GC2
15
X1 X1 PL2
C -W5 33 -W5 15 -W6 33 -W6 15 -W7 48 -W7 50 C
-X243 15 14 -X243 17 16 -X243 19 18 -X243 20 21 22 -X242 2 3 -X242 4 5 6
-X500 24 25 -X500 26 27 -X500 28 29 -X500 30 31 32 -X500 33 34 -X500 35 36 37
D D
DI9 P13 DI11 P16 P17 DI13 P19 DI15 P22 P23 DI1 O1 O2 DI3 O4 O5 DI5 O7 O8
P14 P20
-A300 E
/Z1.1
P15 P18 P21 P24 O3 O6 O9
E
31L- S
C264 /R3.1
S 31L- F
/R1.7
15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
F 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Alarm Signalling to BCU (C264) CHECK RS DATE 31.01.2012
A ISSUED FOR APPROVAL
B FOR CONSTRUCTION DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
C AS MANUFACTURED
REV. REMARKS 2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /R2 of 6
1 56 78
12 3 45678
A CB/DS/ES/HSES CB Motor CB Control Signal & 110VDC 110VDC DS/ES/HSES Heater CB Pole ANN. Faulty VT MCB A
Motor Overload Circuit Circuit Indication Trip 1 Lighting Discrepancy Off/Trip
S 31L+ -X500 5 Circuit Circuit Trip 2 Motor AC Supply
/R2.8 Faulty 31L+ S
-X500 6 Circuit Circuit /R4.1
/R2.8 SCOM1 B
C
B
Local Control Cubicle H1
DWG. NO. HTD12-249-170-0105 -EVTX
6 10
6 10
6 10
6 10
6 10
6 10
6 10
26
26
26
26
26
26
26
26
46
46
I3 C3
6 10
-K49-52 -K49-189 -K49-289 -K49-389 -K49-157 -K49-257 -K49-357 -K36D5 -K36D1 -K36D2 -K36D3 -K36D4 -K36D6 -K36A1 -K36A2 -K47T1Y -K47T2Y
C -X242 8 -X242 9 -X242 10 -X242 11 -X242 12
-X242 7
-X500 38 -X500 39 40 -X500 41 42 43
D D
LVT /R4.1
DI7 O10 O11 DI9 O13 O14 DI11 O16 O17
-A300 E
/Z1.1
E
C264
O12 O15 O18
S 31L- 31L- S
/R2.8 /R4.1
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Alarm Signalling to BCU (C264) CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /R3 of 6
56 78
12 3456 78
A Lock-Out Relay Trip Circuit 1 Trip Circuit 2 Spare A
Operated Failure Failure B
S 31L+
/R3.8 31L+ S
/R5.1
B
-F86A K1 19 17 -F86B K1 -F74A -F74B -F74C -F74F -F74E -F74D
/Z5.1 19 17/Z5.2/Z5.5 M1 /Z5.5 M1 /Z5.6 M1 /Z5.7 M1 /Z5.6 M1 /Z5.6 M1
MVAJ105 147PA307PA30 7PA30 7PA30 7PA30 7PA30
6 10
14
6 10
14
6 10
14
6 10
14
6 10
14
6 10
MVAJ105
C C
-X500 44
D D
/R3.8 LVT DI13 O19 O20 DI15 O22 O23
-KLVP 13 14 -A300
/Z4.4 /Z1.1
E
E C264
O21 O24
S 31L- 31L- S
/R3.8 /R5.1
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Alarm Signalling to BCU (C264) CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /R4 of 6
56 78
12 345678
A -F87L Relay -F50/51 Relay Autoreclose CB Success Autoreclose F87L Relay F50/51 Relay DTT from AC Power Supply DC Power Supply A
Failure Failure In Progress Closed Lock-Out Operated Operated Remote End MCB Trip MCB Trip
S 31L+ 31L+ S
/R4.8 /R6.1
B -F87L J12 J11 -F50/51 F12 F11 -S87LB G10 -F87L 7 8 H4 H3-F50/51 -K94A B
G11 5 6 /Z2.1 E7/Z3.1 R4/Z5.3
/Z2.1 WC1 /Z3.1 WC1 /Z4.2 R2 K1 -F1 -F2 -F3 -F4 -F5
1 2 E9 E8P142 /Z4.4 /Z4.4 /Z4.4 /Z4.4 /Z4.4
12 10
P543 P142 MMLG01 P543 12 11MVAJ101
12 11
-F87L -F87L G13 -F87L G16 -S87LB 12 11-S50/51
G15 G14 G18 G17 12 11
C /Z2.1 R12 /Z2.1 R13 /Z2.1 R14 /Z4.2 12 11/Z4.2 C
P543 P543 P543 MMLG01 MMLG01
G12
D D
DI1 N1 N2 DI3 N4 N5 DI5 N7 N8 DI7 N10 N11 DI9 N13 N14
-A300 E
/Z1.1
E C264
N3 N6 N9 N12 N15
S 31L- 31L- S
/R4.8 /R6.1
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Alarm Signalling to BCU (C264) CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /R5 of 6
56 78
12 34 5678
A Spare Spare Spare Spare Spare Spare A
S 31L+ -X500 7 -X500 8 -X500 9 31L+ S
/R5.7
B B
C C
-X500 45 46 -X500 47 48 -X500 49 50
D D
DI11 N16 N17 DI13 N19 N20 DI15 N22 N23
-A300 E
/Z1.1
E
C264
N18 N21 N24
S 31L- 31L- S
/R5.7
-X500 10 11 12 13
F
F
A ISSUED FOR APPROVAL
B FOR CONSTRUCTION 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
C AS MANUFACTURED 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Alarm Signalling to BCU (C264) CHECK RS DATE 31.01.2012
1 DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /R6 of 6
56 78
1 2 345 678
A A
-F87L Autoreclose DTT DTT -F50/51 Relay Lock-Out Relay -CB4 Circuit Breaker
Operated In Progress to Remote End from Remote End Operated Operated Pole B Open
Pole A Open Pole C Open
B -X600 2 B
C
-X D
-W1A 49
X01.1 Z3A
-S87LB G1 17 18 -K94A K1 11 9 -S50/51 E5 7 8 -F86A K1 20 18-F86B K1 -W1B 49 -W1C 49
/Z4.2 /Z5.3 /Z4.2 /Z5.1 20 18/Z5.2 X02.1 Z3B X03.1 Z3B
Local Control Cubicle
MMLG01 MVAJ101 MMLG01 MVAJ105 DWG. NO. HTD12-249-170-0105MVAJ105
18 17
C H7 H13 18 17
H9 H8 H15 H14 18 17
-F87L R8 -F87L -F87L -F50/51 R3
/Z2.1 /Z2.1 R4 /Z2.1 R6 /Z3.1
P543 P543 P543 P142 -W1A 50 -W1B 50 -W1C 50
-X -X -X
G2 E6
-X600 9 -X600 10 -X600 11
-X600 1 -X600 3 -X600 4 -X600 5 -X600 6 -X600 7 -X600 8
D
Disturbance Fault Recorder =E00/M6.3 D14
(=E00+EX381) =E00/M6.4 D15
=E00/M6.1 COM1 =E00/M6.4 D16
=E00/M6.1 D10 =E00/M6.4 D17
=E00/M6.2 D11 =E00/M6.5 D18
=E00/M6.2 D12
=E00/M6.3 D13
E E
-X600 12 13 14 15
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Signalling to DFR CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /S1 of 1
56 78
1 2 3 4 5678
-A300 -A300 DI1 -A300 -A300 -A300 -A300 POWER AUXILIARY SUPPLY
DI2 /R5.2 /M5.6 AND LEGACY PORT - BIU241 - SLOT A
P1 + DI1 O1 + N1 + /M5.7 E1 A1 O2
/R2.5 /M5.7 E2 DO1 A2
A O2 + N2 + DI1 /M5.8 E3 A3 O1 A
DI2 O3 _ N3 _ DI2 /M1.4 E4 DO2 A5 B
/R1.3 P2 + O4 + N4 + DI3 /M1.4 E5 A4 WATCHDOG C
DI3 DI4 /M6.5 E6 DO3 A6 D
P3 _ /R2.6 O5 + N5 + DI5 /M2.7 E7 E
P4 + O6 _ N6 _ DI6 E8 DO4 A7 + F
DI4 O7 + N7 + DI7 /M2.7 E9
DI3 DI8 E10 DO5 DI1
DI5 O8 + N8 + DI9 /N1.2 E11
/R1.4 P5 + /R2.7 O9 _ /R5.3 N9 _ DI10 /M6.5 E12 DO6 A9 +
O10 + DI4 N10 + DI11 /M5.2 E13
DI6 DI12 /M5.2 E14 DO7 A8 _ DI2
O11 + N11 + DI13 /M5.3 E15
P6 _ DI7 O12 _ N12 _ DI14 /M5.3 E16 DO8
/R3.2 O13 + N13 + DI15 /M5.4 E17
B P7 + DI16 /M5.4 E18
DI8 O14 + N14 + E20
O15 _ DI5 N15 _ /M5.5 E19 A12 RXD/TB RS232/
DI9 O16 + N16 + /M5.5 E21 DO9
/R3.4 /R5.4 E23 A13 GND RS485 SERIAL LINK 1
O17 + DI6 N17 + E22
/R1.5 P8 + DI10 O18 _ N18 _ E24 DO10 A14 TXD/TA #
O19 + N19 +
P9 _ DI11 C264 (Part) A15 GND RS232/
P10 + /R3.7 O20 + N20 + Digital Output Unit A16 CTS RS422
O21 _ N21 _ DOU200 - Slot E
DI12 O22 + DI7 N22 + A17 RXD/TB RS485
D1
DI13 O23 + /R5.5 N23 + D2 DO1 A18 TXD/TA SERIAL LINK 2
/R4.2 O24 _ DI8 N24 _ D3 A19 RTS/RB
/R1.7 P11 + D4 DO2
P12 _ DI14 D5 A20 RA
C P13 + D6 DO3
DI15 D7 A21 DCB #
/R2.1 P14 + /R4.5 D8 DO4
P15 _ DI9 D9 A22 Vaux POWER
D P16 + DI16 /R5.6 D10 DO5 A23 +
/R2.2 D11 A24 - SUPPLY
P17 + DI10 D12 DO6
P18 _ D13 F1 1
P19 + DI11 D14 DO7 F2 DO1 /R1.2 5A 2 N1
D15 F3 /G1.5 N2
/R6.2 D16 DO8 F4 DO2 3
DI12 D17 F5 1A 4 C1
D18 F6 DO3 C2
/R2.3 P20 + DI13 D20 F7 5
D19 F8 DO4 5A 6 B1
P21 _ /R6.3 D21 DO9 F9 B2 TMU220
DI14 D23 F10 DO5 7
E P22 + D22 F11 1A 8 A1
DI15 D24 DO10 F12 DO6 A2
F13 9 X1
/R6.4 C264 (Part) F14 DO7 5A 10 X2
DI16 Digital Output Unit F15
DOU200 - Slot D F16 DO8 11
F17 1A 12
F18
13
F20 5A 14
F19
F21 DO9 15
F23 1A 16
F22
F24 DO10 19
20
C264 (Part)
/R2.4 P23 + Digital Output Unit 21 U1
P24 _ DOU200 - Slot F 22 U2
23 V1
C264 (PART) C264 (PART) C264 (PART) 24 V2
DIGITAL INPUT UNIT DIGITAL INPUT UNIT DIGITAL INPUT UNIT 25 W1
26 W2
F DIU200 - SLOT P DIU200 - SLOT O DIU200 - SLOT N 27 N1
28 N2
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA C264 CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /Z1 of 5
56 78
12 34567 8
A
A -F87L -F87L -F87L B
C
-F87L D
E
C1 5A D1 _ /R5.2 J11 WATCHDOG F1 _
C2 D2 + J12 F2 +
IA OPTO 1 /M2.2 J13 CONTACT OPTO 9 F3 _ /M1.6
C3 1A /R5.5 WATCHDOG F4 + /M1.7
/P1.5 J14 CONTACT F5 _ /M1.7
C4 5A D3 _ /S1.2 F6 + /M1.5
/M2.6 H1 F7 _
/S1.3 F8 +
C5 OPTO 2 D4 + /M6.4 H2 RELAY 1 OPTO 10
IB D5 _ /S1.2
C6 1A /N1.3 H3
/G2.6 C7 5A /N1.3 H4 RELAY 2
/N1.3
B C8 OPTO 3 /M1.4 /R5.3 H5 OPTO 11
IC /R5.3
D6 + /R5.4 H6 RELAY 3
C9 1A H7
D7 _ H8
C10 5A OPTO 4 D8 + /M1.4 H9 RELAY 4 OPTO 12
C11 IM
H10
C12 1A NOTE 1 D9 _ H11 F9 _
H12 RELAY 5 F10 +
C13 5A OPTO 5 D10 + /M1.5 H13 OPTO 13 F11 _ /M1.3
C14 IN
H14
C C15 1A SENSITIVE D11 _ H15 RELAY 6
NOTE 2 D12 +
D13 _ /M2.4 H16 OPTO 14 F12 + /M1.2
OPTO 6 F13 _ /M2.5
H17
H18 RELAY 7 F14 +
F15 _
VA C19 OPTO 7 D14 + G1 RELAY 8 OPTO 15
G2
VB C20 D15 _ G3
D16 + G4 RELAY 9
/G4.6 OPTO 8 G5 OPTO 16 F16 +
G6 RELAY 10
VC C21 D17 _ G7 COMMON CONNECTION F17 _
COMMON CONNECTION D18 + F18 +
G8
D VN C22 G9 RELAY 11
C23
G10
J1 _ /M1.2 G11
G12 RELAY 12
/G4.6 V Vx, AC/DC AUX. SUPPLY J2 + G13 TX1
BUSBAR C24
G14 RX1
J17 48V DC FIELD J7 + G15 RELAY 13 FIBER OPTIC /P1.2
EIA485 VOLTAGE OUT J8 + COMMUNICATION
KBUS J9 _ G16 TX2
CURR. DIFF.
J18 PORT J10 _ G17
G18 RELAY 14
RX2
CASE EARTH
E MICOM P543 (PART) MICOM P543 (PART)
NOTE 1
MUTUAL CURRENT INPUT ONLY REQUIRED IF ENABLED IN LINE PARAMETERS
NOTE 2
USED FOR SEF PROT. IN SENSITIVE SHOULD BE DRIVEN FROM A CORE BALANCE CT WHEN SENSITIVE SETTING ARE USED
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA MICOM P543 CHECK RS DATE 31.05.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /Z2 of 5
56 78
12 34 5678
A -F50/51 -F50/51 -F50/51 A
/R5.2 B
-F50/51 C
/M4.2 D
C1 5A D1 _ /P1.5 F11 WATCHDOG SK2 1 E
C2 D2 + /S1.4 F12 CONTACT (DATA READY)
D3 _ /R5.5
C3 1A IA OPTO 1 /M3.4 F13 (DATA
C4 5A NOTE 1 F14 ACKNOWLEDGE)
WATCHDOG 10
CONTACT
E1 (EXTERNAL 16
C5 OPTO 2 D4 + /M3.4 E2 RELAY 1 RESET)
C6 1A IB
E3 (DOWNLOAD COMMAND) 17
C7 5A D5 _ E4 RELAY 2 (D0-D7) 2-9
E5
B /G2.6 C8 OPTO 3 /M3.5
IC D6 + E6 RELAY 3 (T0-T7) 11,12,15,13,
E7 20,21,23,24
C9 1A
D7 _ E8 (OV) 19,18,22,25
E9 RELAY 4
C10 5A OPTO 4 D8 + /M3.5
C11 IN D9 _
E10 (NOT CONNECTED) 14
C12 1A
E11
OPTO 5 /M3.5 E12 RELAY 5
IN
C13 5A D10 + E13 SK1 1
C14 2
E14
C C15 1A SENSITIVE D11 _ E15 RELAY 6
OPTO 6 D12 +
D13 _ /M3.6 E16 3
E17 4
E18 RELAY 7 5
VA C19 OPTO 7 D14 + /M3.6 6
D15 _ 7
D16 +
VB C20 8
OPTO 8 9
VC C21 D17 _
COMMON CONNECTION D18 +
D VN C22 F1 _ /M3.2
Vx, AC/DC AUX. SUPPLY F2 + FIBER OPTIC TX1
COMMUNICATION RX1
F7 +
(OPTIONAL).
48V DC FIELD F8 +
IRIG-B INPUT
F17 VOLTAGE OUT F9 _ (OPTIONAL).
F10 _
EIA485 MICOM P142 (PART)
KBUS
F18 PORT
CASE EARTH
E MICOM P142 (PART)
NOTE 1
OPTO INPUT 1 & 2 MUST BE USED FOR SETTING GROUP CHANGES
IF THIS OPTION IS SELECTED IN THE RELAY MENU
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA MICOM P142 CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /Z3 of 5
56 78
12 3 45678
A 21 A
11 12
23 24
-S87LA -S87LB -S50/51 MMLG01 AC MCB I>
-F1 /D1.3
/G4.5 /M6.5 /R5.5 12 /R5.6
/G4.5 /P1.5 /P1.5 34
/G4.5 /R5.3 56 21
43
B I> B
11 12
23 24
/G4.5 /R5.5 /S1.4 78 I>
/G4.5 /M2.6 9 10 MCB /D2.3 /D2.3 /R5.7
/D2.4 /D2.4 /R5.7
/G4.5 11 12 -F2 /D2.5 /D2.5 /R5.7
-F3 /D2.6 /D2.6 /R5.8
-F4
-F5
/M1.2 /M3.2 13 14
C /M1.2 /M3.2 15 16 C
/M2.2 /S1.2 /M4.2 17 18 13 14
1
95
2
10 6
3
11 7
4
12 8
A2 A1
14 13
22 21
44 43
32 31
/N1.3 19 20 IDEC/EQ. 10A/12A MG/EQ.
-KPS
-KQ1 /R1.5 /G5.2 /G5.3 /G6.2 /G6.3 /D2.4 /D2.5 /D2.6 /D2.5 /D2.6
/G5.4 /G5.4 /G6.4 /G6.4
/G2.5 /G2.5 21 22 -KQ2 /R1.6 /M1.5
/M1.2 /M3.4
-KLVP /R4.1 /M1.3 /M3.4
23 24 -KRST /M2.7
/G2.5 /G2.5 -KMCL /M2.8
D /G2.5 /G2.5 25 26 D
/G2.5 /G2.5 27 28
NOTE 1 L 21
TERMINAL 13 & 14 ARE SHORTED TOGETHER N PE
BY THE COVER CONTACT WHEN THE COVER IS IN PLACE PE
-X101 /D1.5 HEATING /D1.4
220V AC
-R101
E E
. 21 21 22 21
V 14 13
CUBICLE LIGHTING
220V AC
-B101 /D1.4 -E101 /D1.3 -S101 /D1.3
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Test Block - MMLG, MCB, Aux. Components CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /Z4 of 5
56 78
12 34 5678
A A
B
-F86A -F86B -K94A -F74A -F74B -F74C -F74D -F74E -F74F II C
/M6.2 /M6.2 8
1 /M4.3 1 4
3 /P1.6 3 1 I
/S1.3 12
2 /R5.6 2 /N1.5 /N1.6 /N1.8 /N2.4 /N2.5 /N2.6
4 /M2.2 4 -2
/N1.4 /N2.3 5 5 14
7 7 10
B /N1.4 13
/N2.3 6 6 9
8 8
7PA30
9 9 /R4.3 /R4.4 /R4.5 /R4.6 /R4.6 /R4.5 6
11 11 5
/N1.4 /N2.3
10
10 12 /M6.3 /M6.3 /M6.3 /M6.4 /M6.4 /M6.4
12
13
13 15
15
14
14 16
C 16 17
19
/R4.2 /R4.3 17
19 18
20
/S1.5 /S1.5 18
20
23
21
/M2.2 /M4.2 22 t 22
D 24 24 D
/M2.6
27 28 27 28
Trip Trip
/M2.3 /M4.3 Reset 26
25
MVAJ105 - LOCKOUT RELAY MVAJ101
E NOTE 1 NOTE 1 E
LINK IN FOR HIGH BURDEN AS SUPPLIED LINK IN FOR HIGH BURDEN AS SUPPLIED
LINK OUT FOR LOW BURDEN LINK OUT FOR LOW BURDEN
NOTE 2
LINK TO ENABLE RESET INHIBITOR/ECONOMISING COIL
F F
A ISSUED FOR APPROVAL 15.06.2012 RIAN CUSTOMER PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN PROJECT 150kV GIS BANDARA NGURAH RAI
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Lock-Out Relay, TCS Relay, Tripping Relay CHECK RS DATE 31.01.2012
REV. REMARKS
DATE NAME P.O.NO. 3 APPR. RS SCALE NTS
1
2 4 CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ 0900 /Z5 of 5
56 78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14 -X222
-X222
15 -X100 -X222
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X222
-X222
-A300 :D6 1 /M5.1 -X222 :1
-X222
-A300 :D5 2 /M5.2 -X222 :2
-X222
-A300 :D7 3 /M5.2 -X222 :3
-X222
-A300 :D9 4 /M5.3 -X222 :5
-X222
-A300 :D11 5 /M5.3 -X221 :6
-X221
-A300 :D13 6 /M5.4 :8
-X221
C -A300 :D15 7 /M5.4 :9 C
-A300 :D21 8 /M5.5 :11
-A300 :D24 9 /M5.5 :12
-A300 :E1 10 /M5.6 :14
-A300 :E3 11 /M5.7 :15
-A300 :E5 12 /M5.7 :17
-A300 :E7 13 /M5.8 :18
-F86B :3 14 /M6.2 :1
-A300 :E14 15 /M6.5 :2
16 /M6.5
-S87LB :1 17 /M6.5
-F87L :H17 18 /M6.6 :3
19 /M6.2 D
D 20 /M6.2
21 /M6.2
22 /M6.2
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-X100 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD1 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK6N - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X110
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-F2 :1 1 /D2.2
-F2 :3 2 /D2.7
3 /D2.2
4 /D2.7
C
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-X110 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD2 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14 -X223
-X223
15 -X200 -X223
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X223
-X223
-A300 :D1 1 /N1.1 -X223 :1
-X223
-A300 :D2 2 /N1.2 -X223 :2
-X223
-S87LA :19 3 /N1.2 -X223 :3
-X223
-F74A :2 4 /N1.2 -X223 :13
-X223
-F87L :G4 5 /N1.3 :4
-F87L :G6 6 /N1.3 :7
C -F87L :G9 7 /N1.3 :10 C
-F74A :4 8 /N1.5 :5
-F74A :8 9 /N1.6 :6
-F74B :4 10 /N1.7 :8
-F74B :8 11 /N1.7 :9
-F74C :4 12 /N1.8 :11
-F74C :8 13 /N1.8 :12
14 /N1.2
15 /N1.2
16 /N1.2
17 /N1.2
D D
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-X200 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD3 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :2
Item designation No Item designation :27
13 :27
14 -F2 :27
-W1A
15 -X201 -W1B C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -W1C
:4
-S87LA :14 1 /M1.2 -F2 :28
-F86A
2 /M1.5
3 /M1.6
4 /M1.7
5 /M1.7
6 /M2.3
C 7 /M2.4
9 /M1.2
10 /M1.2
11 /M1.2
-S87LA :15 12 /M1.2
-F87L :F12 13 /M1.2
14 /M1.2
15 /M1.2
16 /M1.2
17 /M1.2
-F87L :F7 18 /M1.5
-F87L :F1 19 /M1.6 -W1A :28
-W1B :28
-F87L :F3 20 /M1.7 -W1C
:28 D
D -F87L :F5 21 /M1.7 -X243
:24
-K94A :15 22 /M2.3
23 /M2.4
-F87L :D11 24 /M2.4
-F87L :F13 25 /M2.5
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-X201 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD4 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :2
Item designation No Item designation :14
13
14 -F3 C
1
15 -X202 :4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -F3
-ESW :+ 1 /M3.2
2 /M3.2
-KRST :24 3 /M3.5
4 /M3.6
5 /M4.4
6 /M4.4
C 7 /M3.2
8 /M3.2
9 /M3.2
10 /M3.3
-ESW :- 11 /M3.2
-S50/51 :15 12 /M3.2
13 /M3.2
14 /M3.2
15 /M3.2
16 /M3.3
-F50/51 :D5 17 /M3.5
-F50/51 :D7 18 /M3.5
-F50/51 :D9 19 /M3.5
D -F50/51 :D11 20 /M3.6 D
-F50/51 :D13 21 /M3.6
-K94A :7 22 /M4.4
23 /M4.4
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-X202 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD5 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK6N - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X210
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-F4 :1 1 /D2.2
-F4 :3 2 /D2.7
3 /D2.2
4 /D2.7
C
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-X210 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD6 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK6N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X230
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-F1 :1 1 /D1.2
2 /D1.7
3 /D1.2
4 /D1.7
5 /D1.2
6 /D1.7
C -E101 :2 7 /D1.2 C
8 /D1.3
:21
-R101 :2 9 /D1.4
-X101 :N 10 /D1.5
11 /D1.7
-F1 :2 12 /D1.3 -S101
-B101 :1 13 /D1.4
-X101 :L 14 /D1.5
15 /D1.2
-R101 :PE 16 /D1.4
-X101 :PE 17 /D1.5
18 /D1.7
D D
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-X230 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD7 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14 -X224
-X224
15 -X300 -X224
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X224
-X224
-F86B :5 1 /N2.2 -X224 :3
-X224
-F74D :2 2 /N2.2 -X224 :13
-X224
-F86B :7 3 /N2.3 -X224 :4
-X224
-F86B :8 4 /N2.3 :7
-F86B :11 5 /N2.3 :10
-F74D :4 6 /N2.4 :5
C -F74D :8 7 /N2.4 :6 C
-F74E :4 8 /N2.5 :8
-F74E :8 9 /N2.6 :9
-F74F :4 10 /N2.7 :11
-F74F :8 11 /N2.7 :12
12 /N2.2
13 /N2.2
14 /N2.2
15 /N2.2
D D
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-X300 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD8 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X400
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-F87L :H5 1 /P1.4
-S87LB :3 2 /P1.5
3 /P2.2
4 /P2.2
5 /P2.2
6 /P2.3
C
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-X400 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD9 of 23 Sh.
2
78
1 2345 6 7 8
7
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :14
Item designation No Item designation :1
13 :1
14 -X500 -KPS
243 C
15 :A23 1 /R1.2 242
2 /R1.3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 3 /R1.5
4 /R2.5
-A300 5 /R3.2
6 /R3.4
C 7 /R6.2
8 /R6.3
-A300 9 /R6.4 -KQ2 :A2
-A300 10 /R6.2
-A300 11 /R6.2 243 :3
-A300 12 /R6.2
-A300 13 /R6.2 243 :2
-A300
-A300 :A24 14 /R1.2 243 :9
-A300 :P3 15 /R1.3
-A300 :P1 16 /R1.3 243 :8
-A300 :P2 17 /R1.3
D -A300 :P4 18 /R1.4 243 :11 D
-A300 :P5 19 /R1.4
E -A300 :P7 20 /R1.5 243 :10
-A300 :P8 21 /R1.5
F -A300 :P10 22 /R1.7 243 :13
-A300 :P11 23 /R1.7
A ISSUED FOR APPROVAL -A300 :P13 24 /R2.1 243 :12
B FOR CONSTRUCTION -A300 :P14 25 /R2.2
C AS MANUFACTURED -A300 :P16 26 /R2.2 243 :15
Rev. Remarks -A300 :P17 27 /R2.3
-A300 :P19 28 /R2.3 243 :14
1 -A300 :P20 29 /R2.3
-A300 :P22 30 /R2.4 243 :17
-A300 :P23 31 /R2.5
-A300 :O1 32 /R2.5 243 :16
-A300 :O2 33 /R2.5
-A300 :O4 34 /R2.6 243 :19
A :O5 35 /R2.7
B Screen bus :O7 36 /R2.7 243 :18
C :O8 37 /R2.7
D 243 :20
E :O10 38 /R3.2
:O11 39 /R3.4 243 :21
:O13 40 /R3.4
243 :22 E
150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) 242 :2
=E05+WR1-X500
242 :3
6
242 :4
242 :5
242 :6
242 :7
242 :8
242 :9
Screen bus F
N-bus
PE-PEN-bus
Used cores total
Continued on sheet
15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO DRAWN RIAN REV. C
01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI CHECK RS DATE 31.05.2012
03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA
APPR. RS SCALE NTS
Date Name PROJECT 3
DWG. NO. BNR/150/EL/ED/ 0900 /TD10 of 23 Sh.
2
45 8
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :10
Item designation No Item designation :11
13 :12
14 242
242 C
15 -X500 242
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-A300 :O14 41 /R3.6
-A300 :O16 42 /R3.7
-A300 :O17 43 /R3.7
-A300 :O23 44 /R4.7
-A300 :N16 45 /R6.2
-A300 :N17 46 /R6.2
C -A300 :N19 47 /R6.3
-A300 :N20 48 /R6.3
-A300 :N22 49 /R6.4
-A300 :N23 50 /R6.4
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-X500 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD11 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
UK5N - Phoenix
1
2
A3 A
B
4 C
D
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -X600
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-S87LB :17 1 /S1.1
-X 2 /S1.6
-F87L :G2 3 /S1.2
-F87L :H9 4 /S1.2
-F87L :H15 5 /S1.3
-K94A :11 6 /S1.3
C -F50/51 :E6 7 /S1.4
-F86A :20 8 /S1.5
-X 9 /S1.6
-X 10 /S1.7
-X 11 /S1.7
12 /S1.2
13 /S1.2
14 /S1.2
15 /S1.2
D
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-X600 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD12 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :3
Item designation No Item designation :6
13 :9
14 -X301
-X301 :1 C
15 -XC41 -X301
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X301 :3
-A300 :3
-A300 :3 1 /G1.4 -A300 :3
-A300 :3
2 /G1.4 -A300
D
-A300 :3 3 /G1.4
4 /G1.4
-A300 :3 5 /G1.4
6 /G1.4
C -A300 :3 7 /G1.4
8 /G1.4
-X 9 /G1.7
10 /G1.7
-X 11 /G1.7
12 /G1.7
-X 13 /G1.7
14 /G1.7
-X 15 /G1.7
16 /G1.7
D
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-XC41 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD13 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :3
Item designation No Item designation :6
13 :9
14 -X302
-X302 :1 C
15 -XC42 -X302
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X302
-S87LA :21 1 /G2.4
2 /G2.4
-S87LA :23 3 /G2.4
4 /G2.4
-S87LA :25 5 /G2.4
6 /G2.4
C -S87LA :27 7 /G2.4
8 /G2.4
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-XC42 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD14 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :3
Item designation No Item designation :6
13 :9
14 -X303
-X303 :1 C
15 -XC43 -X303
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X303 :C2
1 :C2
-S50/51 :21 1 /G2.4 1 :C2
1 :C2
2 /G2.4 1
-S50/51 :23 3 /G2.4
4 /G2.4
-S50/51 :25 5 /G2.4
6 /G2.4
C -S50/51 :27 7 /G2.4
8 /G2.4
9 /G2.7
10 /G2.7
11 /G2.7
12 /G2.7
13 /G2.7
14 /G2.7
15 /G2.7
16 /G2.7
D D
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-XC43 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD15 of 23 Sh.
2
78