Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :1
Item designation No Item designation :3
13 :5
14 -X402
-X402 :6 C
15 -XV11 -X402
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -X402
-S87LA :1 1 /G4.4
2 /G4.4
-S87LA :3 3 /G4.4
4 /G4.4
-S87LA :5 5 /G4.4
6 /G4.4
C -S87LA :7 7 /G4.4
8 /G4.4
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-XV11 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD16 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :11
Item designation No Item designation :21
13
14 -KQ1 C
-KQ1
15 -XV12
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-S87LA :9 1 /G4.4
-S87LA :11 2 /G4.4
3 /G4.4
4 /G4.4
C
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-XV12 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD17 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :1
Item designation No Item designation :3
13 :5
14 -X401
:6 C
15 -XV13 -X401
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-X401
-A300 :21 1 /G4.4
-X401
2 /G4.4
-X
-A300 :21 3 /G4.4 -X
-X
4 /G4.4 -X
-A300 :21 5 /G4.4
6 /G4.4
C -A300 :21 7 /G4.4
8 /G4.4
-A300 :21 9 /G1.7
-A300 :21 10 /G1.7
-A300 :21 11 /G1.7
-A300 :21 12 /G1.7
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-XV13 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD18 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
4
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B B
Destination Destination
B 12 Link Term.- :31
Item designation No Item designation :41
13
14 -KQ1 C
-KQ1
15 -XV14
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-A300 :21 1 /G1.4
-A300 :21 2 /G1.4
3 /G1.4
4 /G1.4
C
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-XV14 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD19 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -XVBM1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 /G6.2
2 /G6.2
-KQ1 :34 3 /G6.2
4 /G6.2
5 /G6.2
6 /G6.2
C -KQ1 :44 7 /G6.3
8 /G6.3
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-XVBM1 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD20 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -XVBM2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 /G6.3
2 /G6.3
-KQ2 :34 3 /G6.4
4 /G6.4
5 /G6.4
6 /G6.4
C -KQ2 :44 7 /G6.4
8 /G6.4
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-XVBM2 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD21 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -XVBP1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 /G5.2
2 /G5.2
-KQ1 :14 3 /G5.2
4 /G5.2
5 /G5.2
6 /G5.2
C -KQ1 :24 7 /G5.3
8 /G5.3
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-XVBP1 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD22 of 23 Sh.
2
78
1 234567 8
Cable designation Type, core number, cross section Destination, item designation Level Terminal Line-up type Type of wiring
URTK/S - Phoenix
1
2
A3 A
B
4 C
5
6
7
8
A
9 Cable connection to termination
10 B
11 Termination A Terminal strip Termination B
Destination Destination
B 12 Link Term.-
Item designation No Item designation
13
14
15 -XVBP2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 /G5.3
2 /G5.3
-KQ2 :14 3 /G5.4
4 /G5.4
5 /G5.4
6 /G5.4
C -KQ2 :24 7 /G5.4
8 /G5.4
DD
EE
F Screen bus A F
N-bus B Screen bus
A ISSUED FOR APPROVAL 15.06.2012 RIAN CONTRACT NO. PT. PLN PERSERO PE-PEN-bus C 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) DRAWN RIAN REV. C
B FOR CONSTRUCTION 01.08.2012 RIAN CUSTOMER 150kV GIS BANDARA NGURAH RAI Used cores total D =E05+WR1-XVBP2 CHECK RS DATE 31.05.2012
C AS MANUFACTURED 03.10.2012 RIAN CONTRACTOR PT. INDOKOMAS BUANA PERKASA Continued on sheet E
Rev. Remarks 6 APPR. RS SCALE NTS
Date Name PROJECT 3 4 5
1 DWG. NO. BNR/150/EL/ED/ 0900 /TD23 of 23 Sh.
2
78
ALSTOM A B Identification Data DE F G
Qty Description and application C264MB1I6910012503000031111N10 Item Item Designation Manufacture Remark
1 BAY CONTROLLER UNIT 1 -A300 ALSTOM
Case 80 T for use with CT/VT (Medium size), IP20, pin-terminal connection, 14 slots 1)
Front Panel with Leds + Graphic Display LCD +L/R switch -GHU200(40TE) or GHU201(80TE) - IP52 prot. P543316H7M0570K 2 -F87L ALSTOM
BIU241-A03 :VA,nom: 110 to 125 VDC / Nominal voltage for 2 DI: 110/125 VDC
Port N°2: RS485 ; Port N°1: RS485, DIU200 : 16 DIx5, DOU200 ; 10 DOx3, AIU211 1 P142316A7M0440J 3 -F50/51 ALSTOM
with TMU220 ( measurement 4*I + 5*U) , Inom: 1 A / 5A, Vnom: 50 to 250 VAC - 9)
VA,nom: 110/125 V DC (- to common) - DIU200-A03 board or CCU200-A03/CCU211 board or DSP210-A03 MMLG01R1AA9002D 4 -S87LA, -S87LB, -S50/51 ALSTOM
MVAJ105RA0802A 5 -F86A, -F86B ALSTOM
1 LINE DIFFERENTIAL PROTECTION RELAY ALSTOM
With Distance Backup, 1/3 pole Autoreclose and Check Synchronising MVAJ101RA0802A 6 -K94A SIEMENS
Vx Auxiliary Rating : 110-250V DC (100-240V AC)
In/Vn Rating : 1A/5A, Vn : 110/120V 7PA3032-1AAOO-1 7 -F74A, -F74B, -F74C
Ch1 : 850nm multi-mode, Ch2 : 1300nm single-mode, 16 optos + 14 relays -F74D, -F74E, -F74F
Ethernet with 100Mits/s fibre-optic port, IEC 61850+IEC60870-103 via rear RS485 port C60N-C10
C60H-DC
1 FEEDER MANAGEMENT RELAY 110DLT
Vx Auxiliary Rating : 110-250V DC (100-240V AC) CA032-FD
In/Vn Rating : 1A/5A, Vn : 110/120V CNTD (CLS-101)
8 optos + 7 relays NTR-10A
IEC 61850 over Ethernet with CS103 rear port RS485 DMK-047050
MSCSEP
3 TEST MODULE
RS8000H-HI-MMST-MS
2 HAND AND ELECTRICAL RESET TRIPPING RELAY
Nominal Supply Voltage : 110/125VDC, Contact : 8NO+2NC with Flag
1 SELF RESET TRIPPING RELAY
Nominal Supply Voltage : 110/125VDC, Contact : 8NO+2NC with Flag
6 TRIP CIRCUIT SUPERVISION RELAY
Aux. Voltage : 110/125V DC Including socket 7XP9011-0 Flush Mounting
1 MINIATUR CIRCUIT BREAKER 8 -F1 MERLIN-GERIN
4 MINIATUR CIRCUIT BREAKER (6A) 9 -F2, -F3, -F4, -F5 MERLIN-GERIN
5 AUXILIARY RELAY, 4COS 110V DC 10 -KQ1, -KQ2, -KRST, -KMCL, -KLVP CARLO GAVACCI
1 POWER RELAY 11 -KPS
1 LIMITS SWITCH 12 -S101 SCHNEIDER
1 THERMOSTAT 13 -B101 ALSTOM
1 HEATHER 14 -R101 ELEXPERT
1 OUTLET SOCKET 15 -X101 ELEXPERT
GE
1 ETHERNET SWITCH 16 -ESW
RUGGEDCOM
C AS MANUFACTURED 03.10.12 RIAN PT. PLN PERSERO 150kV Bay No.5 (to UGC NUSA DUA) LC1
Rev Remarks Date Name Norm 150kV GIS BANDARA NGURAH RAI (=E05+WR1) Sheet C1+
PT. INDOKOMAS BUANA PERKASA
List of Components 1
12 34 5 678
A Socket A
B
AC POWER SUPPLY 14 AC POWER SUPPLY
-X101
Cubicle Lighting Cubicle Heating L
N
-X -X230 1 3/N/PE 50Hz 380/220V PE -X230 2 1L1 =E01/D1.2
/Z4.5 4 1L2 =E01/D1.2
-X 3 6 1L3 =E01/D1.2
2.5 GN/YE
-X 5 10
B 17
2.5 BK
-F1 21
/Z4.5
10A
I>
C AC DISTRIBUTION BOARD 150kV Bay No.1 (Transformer 1) C
Control Protection Panel
-X230 12 13 (=E01+WR1)
-S101 22 21 -B101 21
/Z4.7 V
/Z4.5
D 1 D
-E101 21 -R101
/Z4.6 /Z4.6
2
PE
E -X -X230 7 -X230 8 9 11 1N =E01/D1.2 E
18 1PE =E01/D1.2
-X 15 16
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI AC Supply System
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR CIRCUIT DIAGRAM
1 3 APPR. RS SCALE NTS
DATE NAME P.O.NO. 56
DWG. NO. BNR/150/EL/ED/ /D1 of 2
2
4 78
12 3 456 78
A Power Supply DC POWER SUPPLY A
DC POWER SUPPLY Busbar Protection Relays B
21L+ =E01/D2.1
-X -X110 1 110 VDC (Control Supply Main 1)DC DISTRIBUTION BOARD -X110 2 21L- =E01/D2.1 150kV Bay No.1 (Transformer 1)
-X 3 4 Control Protection Panel
22L+ =E01/D2.1 (=E01+WR1)
-X -X210 1 110 VDC (Control Supply Main 2) -X210 2 22L- =E01/D2.1
-X 3 4
B
2.5 BK 2.5 BK
C C
-F4 21 -F5 21
/Z4.5 43 /Z4.5 43
6A 6A
I> I> I> I>
D -KPSA2 A1 D
/Z4.5
14 13 22 21
-KPS 34 33 42 41
/Z4.5
E C 31L+ E
/M1.1
C 31L-
/M1.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI DC Supply System
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR CIRCUIT DIAGRAM
1 3 APPR. RS SCALE NTS
DATE NAME P.O.NO. 56
DWG. NO. BNR/150/EL/ED/ /D2 of 2
2
4 78
1 2 34567 8
A A
B =E01/G3.4 15-L1A -XC15 1 -S87B1 22 -F87B1 1A1 B
C =E01/G3.4 15-L1B 2 /Z4.1 24 /Z1.1 P746 C
D 3 21 D23 D
=E01/G3.4 15-L2A 1A1
=E01/G3.4 15-L2B 4 23 D24 P746
5
150kV Bay No.1 (Transformer 1) =E01/G3.4 15-L3A 6 25 26 -F87B2 1A1
Control Protection Panel =E01/G3.4 15-L3B 27 28 /Z2.1 P746
(=E01+WR1) 7 D23
8
9 1 2 D24
3 4
-F87B3
MMLG01 /Z3.1
D23
D24
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CT Connection to MICOM P746 CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.1 (Transformer 1) (=E01+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /G1 of 5
2
4 5678
1 2 34567 8
A A
B =E02/G3.4 25-L1A -XC25 1 -S87B2 22 -F87B1 1B1 B
C =E02/G3.4 25-L1B 2 /Z4.2 24 /Z1.1 P746 C
D 3 21 D25 D
=E02/G3.4 25-L2A 1B1
=E02/G3.4 25-L2B 4 23 D26 P746
5
150kV Bay No.2 (Transformer 2) =E02/G3.4 25-L3A 6 25 26 -F87B2 1B1
Control Protection Panel =E02/G3.4 25-L3B 27 28 /Z2.1 P746
(=E02+WR1) 7 D25
8
9 1 2 D26
3 4
-F87B3
MMLG01 /Z3.1
D25
D26
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CT Connection to MICOM P746 CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.2 (Transformer 2) (=E02+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /G2 of 5
2
4 5678
1 2 34 5 6 7 8
A A
=E04/G1.4 32-L1A -XC32 1 -S87B3 22 -F87B1 1C1
B =E04/G1.4 32-L1B 2 /Z4.2 24 /Z1.1 P746 B
C 3 21 D27 C
=E04/G1.4 32-L2A 1C1
=E04/G1.4 32-L2B 4 23 D28 P746
5
=E04/G1.4 32-L3A 6 25 26 -F87B2 1C1
=E04/G1.4 32-L3B 27 28 /Z2.1 P746
7 D27
8 1 2
9 3 4 D28
MMLG01 -F87B3
/Z3.1
D27
D28
150kV Bay No.4 (Bus Coupler) -S87B4 -F87B1
Control Protection Panel /Z4.3 /Z1.1
(=E04+WR1) 21
23 22 D17 1A2
=E04/G2.4 33-L1A -XC33 1
D =E04/G2.4 33-L1B 2 25 24 D18 D
3 27
E =E04/G2.4 33-L2A P746
=E04/G2.4 33-L2B 4 1
F 5 3 -F87B2
=E04/G2.4 33-L3A 6 /Z2.1
A ISSUED FOR APPROVAL =E04/G2.4 33-L3B MMLG01
B FOR CONSTRUCTION 7 26 D17 1A2
REV. REMARKS 8 5
9 28 D18 E
1
P746
-F87B3
/Z3.1
2 D17 1A2
4 D18
P746
F
CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
150kV GIS BANDARA NGURAH RAI CT Connection to MICOM P746
15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA from 150kV Bay No.4 (Bus Coupler) (=E04+WR1) CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
3 CIRCUIT DIAGRAM APPR. RS SCALE NTS
DATE NAME P.O.NO.
6 DWG. NO. BNR/150/EL/ED/ /G3 of 5
2
4 78
1 2 34567 8
A A
B =E05/G3.4 45-L1A -XC45 1 -S87B5 22 -F87B1 1B2 B
C =E05/G3.4 45-L1B 2 /Z4.3 24 /Z1.1 P746 C
D 3 21 D19 D
=E05/G3.4 45-L2A 1B2
=E05/G3.4 45-L2B 4 23 D20 P746
5
150kV Bay No.5 (to UGC NUSA DUA) =E05/G3.4 45-L3A 6 25 26 -F87B2 1B2
Control Protection Panel =E05/G3.4 45-L3B 27 28 /Z2.1 P746
(=E05+WR1) 7 D19
8
9 1 2 D20
3 4
-F87B3
MMLG01 /Z3.1
D19
D20
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CT Connection to MICOM P746 CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /G4 of 5
2
4 5678
1 2 34567 8
A A
B =E06/G3.4 55-L1A -XC55 1 -S87B6 22 -F87B1 1C2 B
C =E06/G3.4 55-L1B 2 /Z4.3 24 /Z1.1 P746 C
D 3 21 D21 D
=E06/G3.4 55-L2A 1C2
=E06/G3.4 55-L2B 4 23 D22 P746
5
150kV Bay No.6 (to PAMACUTAN) =E06/G3.4 55-L3A 6 25 26 -F87B2 1C2
Control Protection Panel =E06/G3.4 55-L3B 27 28 /Z2.1 P746
(=E06+WR1) 7 D21
8
9 1 2 D22
3 4
-F87B3
MMLG01 /Z3.1
D21
D22
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CT Connection to MICOM P746 CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /G5 of 5
2
4 5678
12 3 4567 8
RS900 -F87B1 -F87B1 -F87B1 -CB1 -DS11 -DS12 Start 50BF A
Power Supply Power Supply Power Supply Circuit Breaker Disconnector Switch Disconnector Switch
A Power Supply
2 3 4 Open Close Open Close Open Close
C 31L+ -X301 1
/D2.5 -X301 5 -X301 6 31L+ C
/M2.1
=E01/P2.2 COM2 =E01/P1.3 COM1
BB
150kV Bay No.1 (Transformer 1)
14 13 14 13 14 13 Control Protection Panel CB1 DS11 DS12 -F87T -F50/51 -F51N -K94A -K94T
(=E01+WR1)
-S87B1 -S87B2 -S87B3 Trip Trip Trip
/Z4.1 /Z4.2 /Z4.2
MMLG01 MMLG01 MMLG01
CB1-OP =E01/P2.3 CB1-CL =E01/P2.3 DS11-OP =E01/P2.4 DS12-OP =E01/P2.4 SBF =E01/P1.4
DS11-CL =E01/P2.4 DS12-CL =E01/P2.5
CC
-+ M2 M2 M2
ESW L+ -F87B1 L+ -F87B2 L+ -F87B3 L+ -X301 27 28 29 30 31 32 33
/Z1.1 /Z2.1 /Z3.1
CB1-OP /M2.2
L- L- L- L- CB1-CL /M2.2
P746 P746 P746M1M1 M1 DS11-OP /M2.2 D
DS11-CL /M2.2 E
D DS12-OP /M2.2
14mm²
GROUND STRAP
DS12-CL /M2.2
SBF1 /M2.2
-S87B1 15 16 -S87B2 15 16 -S87B3 15 16 -F87B1 OPTO1 E2 OPTO2 E4 OPTO3 E6 OPTO4 E8 OPTO5 E10 OPTO6 E12 OPTO7 E14
/Z4.1 /Z4.2 /Z4.2 /Z1.1
E MMLG01 MMLG01 MMLG01
P746
E1 E3 E5 E7 E9 E11 E13
C 31L- -X301 19 20 21 22 31L- C
/D2.5 -X301 15 16 17 18 /M2.1
-X301 23 24 25 26
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.1 (Transformer 1) (=E01+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M1 of 15
2
4 5678
12 345678
A -CB1 -DS11 -DS12 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M1.8 Open Close Open Close Open Close
31L+ C
/M3.1
BB
C C
D
/M1.7 CB1-OP CB1-OP /M3.2
/M1.7 CB1-CL CB1-CL /M3.2
/M1.7 DS11-OP DS11-OP /M3.2
DS11-CL /M3.2
D /M1.7 DS11-CL DS12-OP /M3.2
/M1.7 DS12-OP DS12-CL /M3.2
/M1.7 DS12-CL
/M1.7 SBF1 SBF1 /M3.2
-F87B2 OPTO1 E2 OPTO2 E4 OPTO3 E6 OPTO4 E8 OPTO5 E10 OPTO6 E12 OPTO7 E14 E
/Z2.1
E
P746
E1 E3 E5 E7 E9 E11 E13
C 31L- 31L- C
/M1.8 /M3.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.1 (Transformer 1) (=E01+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M2 of 15
2
4 5678
12 345678
A -CB1 -DS11 -DS12 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M2.7 Open Close Open Close Open Close
31L+ C
/M4.1
BB
C C
/M2.5 CB1-OP D
/M2.5 CB1-CL
/M2.5 DS11-OP OPTO1 E2 OPTO2 E4 OPTO3 E6 OPTO4 E8 OPTO5 E10 OPTO6 E12 OPTO7 E14 E
D /M2.5 DS11-CL
/M2.5 DS12-OP
/M2.5 DS12-CL
/M2.5 SBF1
-F87B3
/Z3.1
E
P746
E1 E3 E5 E7 E9 E11 E13
C 31L- 31L- C
/M2.7 /M4.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.1 (Transformer 1) (=E01+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M3 of 15
2
4 5678
1 2 345 6 78
A -CB2 -DS21 -DS22 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M3.7 Open Close Open Close Open Close
-X301 7 -X301 8 31L+ C
/M5.1
B 150kV Bay No.2 (Transformer 2) =E02/P2.2 COM2 =E02/P1.3 COM1 B
Control Protection Panel
(=E02+WR1) CB2 DS21 DS22 -F87T -F50/51 -F51N -K94A -K94T
Trip Trip Trip
CB2-OP =E02/P2.3 CB2-CL =E02/P2.3 DS21-OP =E02/P2.4 DS22-OP =E02/P2.4 SBF =E02/P1.4
DS21-CL =E02/P2.4 DS22-CL =E02/P2.5
CC
-X301 34 35 36 37 38 39 40
CB2-OP /M5.2 D
CB2-CL /M5.2 E
DS21-OP /M5.2
D DS21-CL /M5.2
DS22-OP /M5.2
DS22-CL /M5.2
SBF2 /M5.2
-F87B1 OPTO8 E16 OPTO9 G2 OPTO10 G4 OPTO11 G6 OPTO12 G8 OPTO13 G10 OPTO14 G12
/Z1.1
E
P746
E15 G1 G3 G5 G7 G9 G11
C 31L- 31L- C
/M3.7 /M5.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.2 (Transformer 2) (=E02+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M4 of 15
2
4 5678
12 345678
A -CB2 -DS21 -DS22 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M4.8 Open Close Open Close Open Close
31L+ C
/M6.1
BB
C C
D
/M4.5 CB2-OP CB2-OP /M6.2
/M4.5 CB2-CL CB2-CL /M6.2
/M4.5 DS21-OP DS21-OP /M6.2
DS21-CL /M6.2
D /M4.5 DS21-CL DS22-OP /M6.2
/M4.5 DS22-OP DS22-CL /M6.2
/M4.5 DS22-CL
/M4.5 SBF2 SBF2 /M6.2
-F87B2 OPTO8 E16 OPTO9 G2 OPTO10 G4 OPTO11 G6 OPTO12 G8 OPTO13 G10 OPTO14 G12 E
/Z2.1
E
P746
E15 G1 G3 G5 G7 G9 G11
C 31L- 31L- C
/M4.8 /M6.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.2 (Transformer 2) (=E02+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M5 of 15
2
4 5678
12 345678
A -CB2 -DS21 -DS22 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M5.7 Open Close Open Close Open Close
31L+ C
/M7.1
BB
C C
/M5.5 CB2-OP D
/M5.5 CB2-CL
/M5.5 DS21-OP OPTO8 E16 OPTO9 G2 OPTO10 G4 OPTO11 G6 OPTO12 G8 OPTO13 G10 OPTO14 G12 E
D /M5.5 DS21-CL
/M5.5 DS22-OP
/M5.5 DS22-CL
/M5.5 SBF2
-F87B3
/Z3.1
E
P746
E15 G1 G3 G5 G7 G9 G11
C 31L- 31L- C
/M5.7 /M7.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.2 (Transformer 2) (=E02+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M6 of 15
2
4 5678
12 345678
A -CB3 -DS31 -DS32 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch -X301 10
C 31L+
/M6.7 Open Close Open Close Open Close
-X301 9 31L+ C
/M8.1
B 150kV Bay No.4 (Bus Coupler) =E04/P2.4 COM2 =E04/P2.2 COM1 B
Control Protection Panel
(=E04+WR1) CB3 DS31 DS32 -F50/51
Trip
CB3-OP =E04/P2.4 CB3-CL =E04/P2.5 DS31-OP =E04/P2.5 DS32-OP =E04/P2.6 SBF =E04/P2.3
DS31-CL =E04/P2.6 DS32-CL =E04/P2.7
CC
-X301 41 42 43 44 45 46 47
CB3-OP /M8.2 D
CB3-CL /M8.2 E
DS31-OP /M8.2
D DS31-CL /M8.2
DS32-OP /M8.2
DS32-CL /M8.2
SBF2 /M8.2
-F87B1 OPTO15 G14 OPTO16 G16 OPTO17 H2 OPTO18 H4 OPTO19 H6 OPTO20 H8 OPTO21 H10
/Z1.1
E
P746
G13 G15 H1 H3 H5 H7 H9
C 31L- 31L- C
/M6.7 /M8.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Bay No.1 (Transformer 1) (=E01+WR1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.4 (Bus Coupler) (=E04+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M7 of 15
2
4 5678
12 345678
A -CB3 -DS31 -DS32 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M7.8 Open Close Open Close Open Close
31L+ C
/M9.1
BB
C C
D
/M7.5 CB3-OP CB3-OP /M9.2
/M7.5 CB3-CL CB3-CL /M9.2
/M7.5 DS31-OP DS31-OP /M9.2
DS31-CL /M9.2
D /M7.5 DS31-CL DS32-OP /M9.2
/M7.5 DS32-OP DS32-CL /M9.2
/M7.5 DS32-CL
/M7.5 SBF3 SBF3 /M9.2
-F87B2 OPTO15 G14 OPTO16 G16 OPTO17 H2 OPTO18 H4 OPTO19 H6 OPTO20 H8 OPTO21 H10 E
/Z2.1
E
P746
G13 G15 H1 H3 H5 H7 H9
C 31L- 31L- C
/M7.8 /M9.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.4 (Bus Coupler) (=E04+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M8 of 15
2
4 5678
12 345678
A -CB3 -DS31 -DS32 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch
C 31L+
/M8.7 Open Close Open Close Open Close
31L+ C
/M10.1
BB
C C
/M8.5 CB3-OP D
/M8.5 CB3-CL
/M8.5 DS31-OP OPTO15 G14 OPTO16 G16 OPTO17 H2 OPTO18 H4 OPTO19 H6 OPTO20 H8 OPTO21 H10 E
D /M8.5 DS31-CL
/M8.5 DS32-OP
/M8.5 DS32-CL
/M8.5 SBF3
-F87B3
/Z3.1
E
P746
G13 G15 H1 H3 H5 H7 H9
C 31L- 31L- C
/M8.7 /M10.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.4 (Bus Coupler) (=E04+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M9 of 15
2
4 5678
1 2 34 56 78
A -CB4 -DS41 -DS42 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch -X301 12
C 31L+
/M9.7 Open Close Open Close Open Close Open Close Open Close
-X301 11
31L+ C
/M11.1
B 150kV Bay No.5 (to UGC NUSA DUA) =E05/P2.2 COM2 =E05/P1.4 COM1 B
Control Protection Panel
(=E05+WR1) CB4 CB4 CB4 DS41 DS42 -F87L -F50/51 -K94A
Pole A Pole B Pole C Trip Trip Trip
CB4A-OP =E05/P2.3 CB4A-CL =E05/P2.3 CB4B-OP =E05/P2.3 CB4C-OP =E05/P2.4 DS41-OP =E05/P2.5
CB4B-CL =E05/P2.4 CB4C-CL =E05/P2.5 DS41-CL =E05/P2.6
DS42-OP =E05/P2.6
DS42-CL =E05/P2.7
SBF =E05/P1.5
CC
-X301 48 49 50 51 52 53 54 55 56 57 58
D CB4B-OP /M11.2 DS41-OP /M11.2 D
CB4B-CL /M11.2 DS41-CL /M11.2 E
-F87B1 CB4C-OP /M12.2 DS42-OP /M11.2
/Z1.1 CB4C-CL /M12.2 DS42-CL /M11.2
E SBF4 /M11.2
P746 OPTO22 H12 OPTO23 H14 OPTO24 H16 OPTO25 C2 OPTO26 C4 OPTO27 C6 OPTO28 C8
H11 H13 H15 C1 C3 C5 C7
C 31L- 31L- C
/M9.7 /M11.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M10 of 15
2
4 5678
12 345678
A -CB4 -DS41 -DS42 Start 50BF A
Disconnector Switch Disconnector Switch
C 31L+ Circuit Breaker
/M10.8
Pole B
Open Close Open Close Open Close
31L+ C
/M12.1
BB
C C
/M10.4 CB4B-OP DS41-OP /M12.2 D
/M10.4 CB4B-CL DS41-CL /M12.2
/M10.7 DS41-OP DS42-OP /M12.2
DS42-CL /M12.2
D /M10.7 DS41-CL
/M10.7 DS42-OP SBF4 /M12.2
/M10.7 DS42-CL
/M10.7 SBF4 OPTO22 H12 OPTO23 H14 OPTO24 H16 OPTO25 C2 OPTO26 C4 OPTO27 C6 OPTO28 C8 E
-F87B2
/Z2.1
E
P746
H11 H13 H15 C1 C3 C5 C7
C 31L- 31L- C
/M10.8 /M12.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M11 of 15
2
4 5678
12 345678
A -CB4 -DS41 -DS42 Start 50BF A
Disconnector Switch Disconnector Switch
C 31L+ Circuit Breaker
/M11.7
Pole C
Open Close Open Close Open Close
31L+ C
/M13.1
BB
C C
/M10.4 CB4C-OP D
/M10.4 CB4C-CL
/M11.5 DS41-OP OPTO22 H12 OPTO23 H14 OPTO24 H16 OPTO25 C2 OPTO26 C4 OPTO27 C6 OPTO28 C8 E
D /M11.5 DS41-CL
/M11.5 DS42-OP
/M11.5 DS42-CL
/M11.5 SBF4
-F87B3
/Z3.1
E
P746
H11 H13 H15 C1 C3 C5 C7
C 31L- 31L- C
/M11.7 /M13.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M12 of 15
2
4 5678
1 2 34 56 78
A -CB5 -DS51 -DS52 Start 50BF A
Circuit Breaker Disconnector Switch Disconnector Switch -X301 14
C 31L+
/M12.7 Open Close Open Close Open Close Open Close Open Close
-X301 13
31L+ C
/M14.1
B 150kV Bay No.6 (to PAMACUTAN) =E06/P2.2 COM2 =E06/P1.4 COM1 B
Control Protection Panel
(=E06+WR1) CB5 CB5 CB5 DS51 DS52 -F87L -F50/51 -K94A
Pole A Pole B Pole C Trip Trip Trip
CB5A-OP =E06/P2.3 CB5A-CL =E06/P2.3 CB5B-OP =E06/P2.3 CB5C-OP =E06/P2.4 DS51-OP =E06/P2.5
CB5B-CL =E06/P2.4 CB5C-CL =E06/P2.5 DS51-CL =E06/P2.6
DS52-OP =E06/P2.6
DS52-CL =E06/P2.7
SBF =E06/P1.5
CC
-X301 59 60 -X301 61 62 -X301 63 64 65 66 67 68 69
D CB5B-OP /M14.2 DS51-OP /M14.2 D
CB5B-CL /M14.2 DS51-CL /M14.2 E
-F87B1 CB5C-OP /M15.2 DS52-OP /M14.2
/Z1.1 CB5C-CL /M15.2 DS52-CL /M14.2
E SBF5 /M14.2
P746 OPTO29 C10 OPTO30 C12 OPTO31 C14 OPTO32 C16 OPTO33 B2 OPTO34 B4 OPTO35 B6
C9 C11 C13 C15 B1 B3 B5
C 31L- 31L- C
/M12.7 /M14.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M13 of 15
2
4 5678
12 345678
A -CB5 -DS51 -DS52 Start 50BF A
Disconnector Switch Disconnector Switch
C 31L+ Circuit Breaker
/M13.8
Pole B
Open Close Open Close Open Close
31L+ C
/M15.1
BB
C C
/M13.4 CB5B-OP DS51-OP /M15.2 D
/M13.4 CB5B-CL DS51-CL /M15.2
/M13.7 DS51-OP DS52-OP /M15.2
DS52-CL /M15.2
D /M13.7 DS51-CL
/M13.7 DS52-OP SBF5 /M15.2
/M13.7 DS52-CL
/M13.7 SBF5 OPTO29 C10 OPTO30 C12 OPTO31 C14 OPTO32 C16 OPTO33 B2 OPTO34 B4 OPTO35 B6 E
-F87B2
/Z2.1
E
P746
C9 C11 C13 C15 B1 B3 B5
C 31L- 31L- C
/M13.8 /M15.1
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M14 of 15
2
4 5678
1 2 345 67 8
A -CB5 -DS51 -DS52 Start 50BF 50BF 2nd stage 31L+ C A
Disconnector Switch Disconnector Switch Multiplication
C 31L+ Circuit Breaker
/M14.7
Pole C
Open Close Open Close Open Close
L16
L18 L17
L16
L18 L17
L16
L18 L17
B B-F87B1
-F87B2 -F87B3
/Z1.1 R8 /Z2.1 R8 /Z3.1 R8
P746 P746 P746
C C
/M13.4 CB5C-OP D
/M13.4 CB5C-CL
/M14.5 DS51-OP OPTO29 C10 OPTO30 C12 OPTO31 C14 OPTO32 C16 OPTO33 B2 OPTO34 B4 OPTO35 B6 -K50BF 28 27
/Z5.3 Trip 24
D /M14.5 DS51-CL 22
/M14.5 DS52-OP E
/M14.5 DS52-CL
/M14.5 SBF5 MVAJ101
-F87B3
/Z3.1
E
P746
C9 C11 C13 C15 B1 B3 B5
C 31L- 31L- C
/M14.7
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Busbar Protection and 50BF Initiation CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 from 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /M15 of 15
2
4 5678
1 2 345678
A A
To To To 20kV Protection Panel
Lock-Out 1 Relay Lock-Out 2 Relay
87BB/50BF 1st stage 50BF 2nd stage 87BB/50BF 1st stage 50BF 2nd stage 50BF 2nd stage
BB
-F87B1 R1 L2 L1 -F87B2 R1 -F87B3 R1 -K50BF K1 75 -F87B1 R2 -F87B2 R2 -F87B3 R2 K50BF K1 86 -K50BF K1
/Z1.1 L2 L1/Z2.1 /Z3.1 /Z5.3 L4 L3/Z1.1 /Z2.1 /Z3.1 /Z5.3 11 9/Z5.3
L2 L1 L4 L3
P746 P746 P746 MVAJ101 L4 L3P746P746P746MVAJ101 MVAJ101
C C
-X400 1 2 3 -X400 4 5 6 -X400 7 8
150kV Bay No.1 (Transformer 1) =E01/M2.5 A2 =E01/M7.5 A4
Control Protection Panel =E01/M7.5 CO2 =E01/P3.7 CO3
(=E01+WR1) =E01/M7.5 A3 =E01/P3.7 A5
=E01/M2.4 CO1
=E01/M2.4 A1
DD
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.1 (Transformer 1) (=E01+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P1 of 6
2
4 5678
1 2 345678
A A
To To To 20kV Protection Panel
Lock-Out 1 Relay Lock-Out 2 Relay
87BB/50BF 1st stage 50BF 2nd stage 87BB/50BF 1st stage 50BF 2nd stage 50BF 2nd stage
BB
-F87B1 R3 L6 L5 -F87B2 R3 -F87B3 R3 -K50BF K1 12 10 -F87B1 R4 -F87B2 R4 -F87B3 R4 K50BF K1 15 13 -K50BF K1
/Z1.1 L6 L5/Z2.1 /Z3.1 /Z5.3 L8 L7/Z1.1 /Z2.1 /Z3.1 /Z5.3 16 14/Z5.3
L6 L5 L8 L7
P746 P746 P746 MVAJ101 L8 L7P746P746P746MVAJ101 MVAJ101
C C
-X400 9 10 11 -X400 12 13 14 -X400 15 16
150kV Bay No.2 (Transformer 2) =E02/M2.5 B2 =E02/M7.5 B4
Control Protection Panel =E02/M7.5 CO2 =E02/P3.7 CO3
(=E02+WR1) =E02/M7.5 B3 =E02/P3.7 B5
=E02/M2.4 CO1
=E02/M2.4 B1
DD
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.2 (Transformer 2) (=E02+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P2 of 6
2
4 5678
1 2 34567 8
A A
B
To To C
Lock-Out 1 Relay Lock-Out 2 Relay D
B 87BB/50BF 1st stage 50BF 2nd stage 87BB/50BF 1st stage 50BF 2nd stage
-F87B1 R5 L10 L9 -F87B2 R5 -F87B3 R5 -K50BF K1 19 17 -F87B1 R6 -F87B2 R6 -F87B3 R6 K50BF K1 20 18
/Z1.1 L10 L9/Z2.1/Z3.1 /Z5.3 L12 L11/Z1.1 /Z2.1 /Z3.1 /Z5.3
L10 L9 L12 L11
P746 P746 P746 MVAJ101 L12 L11P746P746P746MVAJ101
C
-X400 17 18 19 -X400 20 21 22
D 150kV Bay No.4 (Bus Coupler) =E04/M2.4 C2 =E04/M3.4 C4
Control Protection Panel =E04/M3.3 CO2
(=E04+WR1) =E04/M3.3 C3
=E04/M2.3 CO1
=E04/M2.3 C1
EE
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.4 (Bus Coupler) (=E04+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P3 of 6
2
4 5678
1 23 4 5 67 8
A A
To 50BF 2nd stage DTT to Remote End
Lock-Out 1 Relay 50BF 2nd stage B
87BB/50BF 1st stage
-F87B1 R9 K2 K1 -F87B2 R9 K2 K1 -F87B3 R9 K2 K1 -F87B1 K4 K3 -F87B2 -F87B3 -F87B1 K6 K5 -F87B2 -F87B3 K6 K5
/Z1.1 /Z2.1 /Z3.1 /Z1.1 R10 K4 K3/Z2.1 R10 /Z3.1 R10 /Z1.1 R11 K6 K5/Z2.1 R11/Z3.1 R11
K4 K3
P746 P746 P746 P746 P746 P746 P746 P746 P746
B -X400 23 24 25 -X400 26 27
150kV Bay No.5 (to UGC NUSA DUA) =E05/M2.4 D2 =E05/M2.5 CO2
Control Protection Panel =E05/M2.5 D3
(=E05+WR1)
C =E05/M2.3 CO1 C
=E05/M2.3 D1 D
E
To
Lock-Out 2 Relay
87BB/50BF 1st stage 50BF 2nd stage
D -F87B1 K8 K7 -F87B2 K8 K7 -F87B3 K8 K7 -F87B1 K10 K9 -F87B2 -F87B3
K10 K9
/Z1.1 R12 /Z2.1 R12 /Z3.1 R12 /Z1.1 R13 K10 K9/Z2.1 R13/Z3.1 R13
P746 P746 P746 P746 P746 P746
-X400 28 29 30
E 150kV Bay No.5 (to UGC NUSA DUA) =E05/M4.4 D5
Control Protection Panel
(=E05+WR1)
=E05/M4.4 CO3
=E05/M4.4 D4
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.5 (to UGC NUSA DUA) (=E05+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P4 of 6
2
4 5678
1 23 4 5 67 8
A A
To 50BF 2nd stage DTT to Remote End
Lock-Out 1 Relay 50BF 2nd stage B
87BB/50BF 1st stage
-F87B1 K12 K11 -F87B2 K12 K11 -F87B3 K12 K11-F87B1 -F87B2 -F87B3 -F87B1 K13 -F87B2 -F87B3
/Z1.1 R14 /Z2.1 R14 /Z3.1 R14 K13/Z1.1 R15 /Z2.1 R15 /Z3.1 R15 /Z1.1 R16 K15 K14 /Z2.1 R16 /Z3.1 R16
P746 P746 P746 K15 K14P746 P746 P746 P746 K13P746P746
K13 K15 K14
K15 K14 K13
K13 K15 K14
K15 K14
B -X400 31 32 33 -X400 34 35
150kV Bay No.6 (to PAMACUTAN) =E06/M2.4 E2 =E06/M2.5 CO2
Control Protection Panel =E06/M2.5 E3
(=E06+WR1)
C =E06/M2.3 CO1 C
=E06/M2.3 E1 D
E
To
Lock-Out 2 Relay
87BB/50BF 1st stage 50BF 2nd stage
D -F87B1 J2 J1 -F87B2 -F87B3 J2 J1 -F87B1 J4 J3 -F87B2 -F87B3
J2 J1 J4 J3
/Z2.1 R17 /Z3.1 R17 J4 J3
/Z1.1 R17 /Z1.1 R18 /Z2.1 R18 /Z3.1 R18
P746 P746 P746 P746 P746 P746
-X400 36 37 38
E 150kV Bay No.6 (to PAMACUTAN) =E06/M4.4 E5
Control Protection Panel
(=E06+WR1)
=E06/M4.4 CO3
=E06/M4.4 E4
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P5 of 6
2
4 5678
12 345678
To
Lock-Out 1 Relay
87BB/50BF 1st stage 50BF 2nd stage
AA
-F87B1 J6 J5-F87B2 -F87B3 -F87B1 -F87B2 -F87B3
/Z1.1 R19 J6 J5/Z2.1 R19/Z3.1 R19/Z1.1 R20 /Z2.1 R20 /Z3.1 R20
J6 J5
P746 J8 J7P746P746P746P746P746
J8 J7
J8 J7
B -X400 39 40 41 B
C C
D
To To 20kV Protection Panel E
Lock-Out 2 Relay 50BF 2nd stage
87BB/50BF 1st stage 50BF 2nd stage
D -F87B1 J10 J9-F87B2 -F87B3 -F87B1 -F87B2 -F87B3 -F87B1 -F87B2 -F87B3
J10 J9
/Z1.1 R21 J10 J9/Z2.1 R21/Z3.1 R21/Z1.1 R22/Z2.1 R22/Z3.1 R22 /Z1.1 R23 /Z2.1 R23 /Z3.1 R23
J12 J11
J12 J11
J12 J11
J13
J15 J14
J13
J15 J14
J13
J15 J14
P746 P746 P746 P746 P746 P746 P746 P746 P746
-X400 42 43 44 -X400 45 46
E
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Busbar Protection Panel (=E00+R1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA Intertripping CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
1 3 to 150kV Bay No.6 (to PAMACUTAN) (=E06+WR1) APPR. RS SCALE NTS
DATE NAME P.O.NO.
CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /P6 of 6
2
4 5678
1 2 345678
A A
B B
C
-F87B1 -F87B2 -F87B3 -F87B1 -F87B2 -F87B3 AC Power Supply DC Power Supply D
Operated Operated Operated Failure Failure Failure MCB Trip MCB Trip
-F87B1 J13 -F87B2 -F87B3 -F87B1 -F87B2 -F87B3
J15 J14
C /Z1.1 R24 /Z2.1 R24 /Z3.1 R24 /Z1.1 WD1 /Z2.1 WD1 /Z3.1 WD1 -F1 -F4 -F5
J13 /Z4.5 /Z4.5 /Z4.5
J15 J14
J13
J15 J14
M12 M11
M12 M11
M12 M11
12 11
12 11
12 11
P746 P746 P746 P746 P746 P746
-X400 47 48 49 50 51
D
150kV Bay No.4 (Bus Coupler) E
Control Protection Panel
(=E04+WR1)
=E04/R6.4 CO5
=E04/R6.4 BBOP
=E04/R6.5 BBFL
=E04/R6.5 AC-MF
=E04/R6.5 DC-MF
E
-X400 52 53 54 55
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Bay No.4 (Bus Coupler) (=E04+WR1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI Alarm Signalling to BCU (C264)
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR CIRCUIT DIAGRAM
1 3 APPR. RS SCALE NTS
DATE NAME P.O.NO. 56
DWG. NO. BNR/150/EL/ED/ /S1 of 2
2
4 78
1 2 34 5678
A A
B B
-F87B1 -F87B2 -F87B3
Operated Operated Operated
-F87B1 L13 -F87B2 -F87B3
L15 L14
C /Z1.1 R7 /Z2.1 R7 /Z3.1 R7 C
L13
L15 L14
L13
L15 L14
P746 P746 P746
-X600 1 -X600 2
D D
Disturbance Fault Recorder E
(=E00+EX1)
/M5.4 COM1
/M5.4 F10
E
-X600 3 4 5 6
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Bay No.4 (Bus Coupler) (=E04+WR1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI Signalling to DFR
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR CIRCUIT DIAGRAM
1 3 APPR. RS SCALE NTS
DATE NAME P.O.NO. 56
DWG. NO. BNR/150/EL/ED/ /S2 of 2
2
4 78
12 3 45 678
-F87B1 -F87B1 -F87B1 -F87B1 -F87B1
/M13.5 /G1.6
_ E1 OPTO 1 /M7.3 _ H1 OPTO 17 /M13.6 _ B1 OPTO 33 /P4.4 K7 RELAY 12 /G2.6 D23 IA
OPTO 2 /M7.4 + H2 OPTO 18 /M13.6 + B2 /P4.4 K8 RELAY 13 /G3.6 D24 IB
A /M1.4 + E2 _ H3 /P5.2 K9 RELAY 14 IC A
_ E3 + H4 _ B3 OPTO 34 /P5.4 K10 /G3.6 D25 IA B
/M1.5 + E4 + B4 K11 RELAY 15 /G4.6 D26 IB C
/P5.6 K12 /G5.6 IC D
/M1.5 _ E5 OPTO 3 /M7.4 _ H5 OPTO 19 _ B5 OPTO 35 /P5.2 K13 RELAY 16 D27 IA E
+ E6 + H6 + B6 /P5.4 K14 RELAY 17 D28 IB
/P6.2 K15 RELAY 18 IC
/M1.5 _ E7 OPTO 4 /M7.5 _ H7 OPTO 20 _ B7 OPTO 36 /P6.4 K16 RELAY 19 D17 IA
+ E8 + H8 + B8 /P6.2 K17 RELAY 20 D18 IB
/P6.4 K18 RELAY 21 IC
B _ E9 OPTO 5 /M7.5 _ H9 OPTO 21 _ B9 OPTO 37 RELAY 22 D19 IA
/M1.6 + E10 + H10 + B10 /P6.6 J1 D20 IB
J2 RELAY 23 IC
/M1.6 _ E11 OPTO 6 /M10.2 _ H11 OPTO 22 _ B11 OPTO 38 /S1.2 J3 D21 IA
+ E12 + H12 + B12 J4 RELAY 24 D22 IB
J5 IC
/M1.7 _ E13 OPTO 7 /M10.2 _ H13 OPTO 23 _ B13 OPTO 39 J6 D11
+ E14 + H14 + B14 J7 D12
J8
_ E15 OPTO 8 /M10.5 _ H15 OPTO 24 _ B15 OPTO 40 J9 D13
+ H16 + B16 J10 D14
C /M4.3 + E16 J11
J12 D15
_ E17 _ H17 _ B17 J13 D16
+ E18 COMMON CONNECTION + H18 COMMON CONNECTION + B18 COMMON CONNECTION J14
J15 F23
J16 F24
J17
J18 F25
F26
/M4.3 _ G1 OPTO 9 /M10.5 _ C1 OPTO 25 M11 WATCHDOG
+ G2 + C2 M12 CONTACT F27
M13 WATCHDOG F28
_ G3 OPTO 10 /M10.5 _ C3 OPTO 26 /P1.2 M14 CONTACT M17
OPTO 11 /M10.6 + C4 OPTO 27 /P1.5 RELAY 1 EIA485 F17
/M4.3 + G4 _ C5 /P2.2 L1 RELAY 2 KBUS F18
+ C6 /P2.5 L2 RELAY 3
D _ G5 /P3.2 L3 RELAY 4 M18 PORT F19
/P3.5 L4 RELAY 5 F20
/M4.4 + G6 L5 RELAY 6
/S2.2 L6 F21
/M4.4 _ G7 OPTO 12 /M10.6 _ C7 OPTO 28 L7 RELAY 7 _ M1 Vx, AC/DC F22
+ G8 + C8 /M15.6 L8 /M1.2 + M2 AUX. SUPPLY
L9 RELAY 8 F11
/M4.5 _ G9 /M13.2 _ C9 /P4.2 L10 RELAY 9 + M7 48V DC FIELD F12
+ G10 + C10 /P4.4 L11 RELAY 10 + M8 VOLTAGE OUT
/P4.6 L12 RELAY 11 _ M9 F13
L13 _ M10 F14
L14
L15 F15
L16 F16
L17
OPTO 13 OPTO 29 L18
_ G11 OPTO 14 /M13.2 _ C11 OPTO 30 K1 VA D2
+ C12 K2 D1
E /M4.5 + G12 K3
K4 VB D4
/M7.3 _ G13 OPTO 15 /M13.5 _ C13 OPTO 31 K5 D3
+ G14 + C14 K6
VC F2
/M7.3 _ G15 OPTO 16 /M13.5 _ C15 OPTO 32 VN F1
+ G16 + C16
_ G17 _ C17
F+ G18 COMMON CONNECTION + C18 COMMON CONNECTION MICOM P746 (PART) MICOM P746 (PART) MICOM P746 (PART) F
MICOM P746 (PART) MICOM P746 (PART)
CUSTOMER PT. PLN PERSERO 150kV Bay No.4 (Bus Coupler) (=E04+WR1) DRAWN RIAN REV. B
150kV GIS BANDARA NGURAH RAI MICOM P746 Phase R (L1)
A ISSUED FOR APPROVAL 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
B FOR CONSTRUCTION 3 APPR. RS SCALE NTS
DATE NAME P.O.NO.
REV. REMARKS CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /Z1 of 5
2
1 45 6 78
12 3 45 678
-F87B2 -F87B2 -F87B2 -F87B2 -F87B2
/M14.4 /G1.6
_ E1 OPTO 1 /M8.3 _ H1 OPTO 17 /M14.4 _ B1 OPTO 33 /P4.4 K7 RELAY 12 /G2.6 D23 IA
OPTO 2 /M8.4 + H2 OPTO 18 /M14.5 + B2 /P4.4 K8 RELAY 13 /G3.6 D24 IB
A /M2.2 + E2 _ H3 /P5.3 K9 RELAY 14 IC A
_ E3 + H4 _ B3 OPTO 34 /P5.4 K10 /G3.6 D25 IA B
/M2.3 + E4 + B4 K11 RELAY 15 /G4.6 D26 IB C
/P5.7 K12 /G5.6 IC D
/M2.3 _ E5 OPTO 3 /M8.4 _ H5 OPTO 19 _ B5 OPTO 35 /P5.3 K13 RELAY 16 D27 IA E
+ E6 + H6 + B6 /P5.4 K14 RELAY 17 D28 IB
/P6.3 K15 RELAY 18 IC
/M2.4 _ E7 OPTO 4 /M8.4 _ H7 OPTO 20 _ B7 OPTO 36 /P6.4 K16 RELAY 19 D17 IA
+ E8 + H8 + B8 /P6.3 K17 RELAY 20 D18 IB
/P6.4 K18 RELAY 21 IC
B _ E9 OPTO 5 /M8.5 _ H9 OPTO 21 _ B9 OPTO 37 RELAY 22 D19 IA
/M2.4 + E10 + H10 + B10 /P6.7 J1 D20 IB
J2 RELAY 23 IC
/M2.4 _ E11 OPTO 6 /M11.2 _ H11 OPTO 22 _ B11 OPTO 38 /S1.3 J3 D21 IA
+ E12 + H12 + B12 J4 RELAY 24 D22 IB
J5 IC
/M2.5 _ E13 OPTO 7 /M11.3 _ H13 OPTO 23 _ B13 OPTO 39 J6 D11
+ E14 + H14 + B14 J7 D12
J8
_ E15 OPTO 8 /M11.3 _ H15 OPTO 24 _ B15 OPTO 40 J9 D13
+ H16 + B16 J10 D14
C /M5.2 + E16 J11
J12 D15
_ E17 _ H17 _ B17 J13 D16
+ E18 COMMON CONNECTION + H18 COMMON CONNECTION + B18 COMMON CONNECTION J14
J15 F23
J16 F24
J17
J18 F25
F26
/M5.3 _ G1 OPTO 9 /M11.4 _ C1 OPTO 25 M11 WATCHDOG
+ G2 + C2 M12 CONTACT F27
M13 WATCHDOG F28
_ G3 OPTO 10 /M11.4 _ C3 OPTO 26 /P1.2 M14 CONTACT M17
OPTO 11 /M11.4 + C4 OPTO 27 /P1.5 RELAY 1 EIA485 F17
/M5.3 + G4 _ C5 /P2.2 L1 RELAY 2 KBUS F18
+ C6 /P2.5 L2 RELAY 3
D _ G5 /P3.3 L3 RELAY 4 M18 PORT F19
/P3.6 L4 RELAY 5 F20
/M5.4 + G6 L5 RELAY 6
/S2.3 L6 F21
/M5.4 _ G7 OPTO 12 /M11.5 _ C7 OPTO 28 L7 RELAY 7 _ M1 Vx, AC/DC F22
+ G8 + C8 /M15.6 L8 /M1.3 + M2 AUX. SUPPLY
L9 RELAY 8 F11
/M5.4 _ G9 /M14.2 _ C9 /P4.3 L10 RELAY 9 + M7 48V DC FIELD F12
+ G10 + C10 /P4.4 L11 RELAY 10 + M8 VOLTAGE OUT
/P4.7 L12 RELAY 11 _ M9 F13
L13 _ M10 F14
L14
L15 F15
L16 F16
L17
OPTO 13 OPTO 29 L18
_ G11 OPTO 14 /M14.3 _ C11 OPTO 30 K1 VA D2
+ C12 K2 D1
E /M5.5 + G12 K3
K4 VB D4
/M8.2 _ G13 OPTO 15 /M14.3 _ C13 OPTO 31 K5 D3
+ G14 + C14 K6
VC F2
/M8.3 _ G15 OPTO 16 /M14.4 _ C15 OPTO 32 VN F1
+ G16 + C16
_ G17 _ C17
F+ G18 COMMON CONNECTION + C18 COMMON CONNECTION MICOM P746 (PART) MICOM P746 (PART) MICOM P746 (PART) F
MICOM P746 (PART) MICOM P746 (PART)
CUSTOMER PT. PLN PERSERO 150kV Bay No.4 (Bus Coupler) (=E04+WR1) DRAWN RIAN REV. B
150kV GIS BANDARA NGURAH RAI MICOM P746 Phase S (L2)
A ISSUED FOR APPROVAL 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
B FOR CONSTRUCTION 3 APPR. RS SCALE NTS
DATE NAME P.O.NO.
REV. REMARKS CIRCUIT DIAGRAM DWG. NO. /Z2 of 5
2
1 45 6 7 8
12 3 45 678
-F87B3 -F87B3 -F87B3 -F87B3 -F87B3
/M15.4 /G1.6
_ E1 OPTO 1 /M9.3 _ H1 OPTO 17 /M15.4 _ B1 OPTO 33 /P4.5 K7 RELAY 12 /G2.6 D23 IA
OPTO 2 /M9.4 + H2 OPTO 18 /M15.5 + B2 /P4.5 K8 RELAY 13 /G3.6 D24 IB
A /M3.2 + E2 _ H3 /P5.3 K9 RELAY 14 IC A
_ E3 + H4 _ B3 OPTO 34 /P5.5 K10 /G3.6 D25 IA B
/M3.3 + E4 + B4 K11 RELAY 15 /G4.6 D26 IB C
/P5.7 K12 /G5.6 IC D
/M3.3 _ E5 OPTO 3 /M9.4 _ H5 OPTO 19 _ B5 OPTO 35 /P5.3 K13 RELAY 16 D27 IA E
+ E6 + H6 + B6 /P5.5 K14 RELAY 17 D28 IB
/P6.3 K15 RELAY 18 IC
/M3.4 _ E7 OPTO 4 /M9.4 _ H7 OPTO 20 _ B7 OPTO 36 /P6.5 K16 RELAY 19 D17 IA
+ E8 + H8 + B8 /P6.3 K17 RELAY 20 D18 IB
/P6.5 K18 RELAY 21 IC
B _ E9 OPTO 5 /M9.5 _ H9 OPTO 21 _ B9 OPTO 37 RELAY 22 D19 IA
/M3.4 + E10 + H10 + B10 /P6.7 J1 D20 IB
J2 RELAY 23 IC
/M3.4 _ E11 OPTO 6 /M12.2 _ H11 OPTO 22 _ B11 OPTO 38 /S1.3 J3 D21 IA
+ E12 + H12 + B12 J4 RELAY 24 D22 IB
J5 IC
/M3.5 _ E13 OPTO 7 /M12.3 _ H13 OPTO 23 _ B13 OPTO 39 J6 D11
+ E14 + H14 + B14 J7 D12
J8
_ E15 OPTO 8 /M12.3 _ H15 OPTO 24 _ B15 OPTO 40 J9 D13
+ H16 + B16 J10 D14
C /M6.2 + E16 J11
J12 D15
_ E17 _ H17 _ B17 J13 D16
+ E18 COMMON CONNECTION + H18 COMMON CONNECTION + B18 COMMON CONNECTION J14
J15 F23
J16 F24
J17
J18 F25
F26
/M6.3 _ G1 OPTO 9 /M12.4 _ C1 OPTO 25 M11 WATCHDOG
+ G2 + C2 M12 CONTACT F27
M13 WATCHDOG F28
_ G3 OPTO 10 /M12.4 _ C3 OPTO 26 /P1.3 M14 CONTACT M17
OPTO 11 /M12.4 + C4 OPTO 27 /P1.6 RELAY 1 EIA485 F17
/M6.3 + G4 _ C5 /P2.3 L1 RELAY 2 KBUS F18
+ C6 /P2.6 L2 RELAY 3
D _ G5 /P3.3 L3 RELAY 4 M18 PORT F19
/P3.6 L4 RELAY 5 F20
/M6.4 + G6 L5 RELAY 6
/S2.3 L6 F21
/M6.4 _ G7 OPTO 12 /M12.5 _ C7 OPTO 28 L7 RELAY 7 _ M1 Vx, AC/DC F22
+ G8 + C8 /M15.7 L8 /M1.3 + M2 AUX. SUPPLY
L9 RELAY 8 F11
/M6.4 _ G9 /M15.2 _ C9 /P4.3 L10 RELAY 9 + M7 48V DC FIELD F12
+ G10 + C10 /P4.5 L11 RELAY 10 + M8 VOLTAGE OUT
/P4.7 L12 RELAY 11 _ M9 F13
L13 _ M10 F14
L14
L15 F15
L16 F16
L17
OPTO 13 OPTO 29 L18
_ G11 OPTO 14 /M15.3 _ C11 OPTO 30 K1 VA D2
+ C12 K2 D1
E /M6.5 + G12 K3
K4 VB D4
/M9.2 _ G13 OPTO 15 /M15.3 _ C13 OPTO 31 K5 D3
+ G14 + C14 K6
VC F2
/M9.3 _ G15 OPTO 16 /M15.4 _ C15 OPTO 32 VN F1
+ G16 + C16
_ G17 _ C17
F+ G18 COMMON CONNECTION + C18 COMMON CONNECTION MICOM P746 (PART) MICOM P746 (PART) MICOM P746 (PART) F
MICOM P746 (PART) MICOM P746 (PART)
CUSTOMER PT. PLN PERSERO 150kV Bay No.4 (Bus Coupler) (=E04+WR1) DRAWN RIAN REV. B
150kV GIS BANDARA NGURAH RAI MICOM P746 Phase T (L3)
A ISSUED FOR APPROVAL 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR
B FOR CONSTRUCTION 3 APPR. RS SCALE NTS
DATE NAME P.O.NO.
REV. REMARKS CIRCUIT DIAGRAM DWG. NO. BNR/150/EL/ED/ /Z3 of 5
2
1 45 6 78
12 345678
A A
B
21 C
11 12 D
23 24 E
AC MCB I>
-S87B1 -S87B2 -S87B3 -S87B4 -S87B5 -S87B6 MMLG01 -F1 /D1.3
/S1.6
/G1.5 /G2.5 /G3.5 /G3.5 /G4.5 /G5.5 12
B 34 21
/G1.5 /G2.5 /G3.5 /G3.5 /G4.5 /G5.5 43
56 11 12
23 24
I> I>
78 MCB /D2.5
/D2.6
9 10 -F4 /D2.5 /S1.6
-F5 /D2.6 /S1.7
C 11 12
13 14
/M1.2 /M1.3 /M1.3 15 16 A2 A1
17 18 14 13
/M1.2 /M1.3 /M1.3 22 21
34 33
42 41
3RH/EQ. /D2.4 /D2.5 /D2.6 /D2.5 /D2.6
-KPS
19 20
D /G1.5 /G2.5 /G3.5 /G3.5 /G4.5 /G5.5 21 22
/G1.5 /G2.5 /G3.5 /G3.5 /G4.5 /G5.5 23 24 21
PE
/G1.5 /G2.5 /G3.5 /G3.5 /G4.5 /G5.5 25 26 L
N
PE
/G1.5 /G2.5 /G3.5 /G3.5 /G4.5 /G5.5 27 28 HEATING
220V AC
-X101 /D1.5 /D1.4
-R101
NOTE 1 . 21 22 21
V 14 13
E TERMINAL 13 & 14 ARE SHORTED TOGETHER
BY THE COVER CONTACT WHEN THE COVER IS IN PLACE
CUBICLE LIGHTING 21
220V AC
-B101 /D1.4 -E101 /D1.3 -S101 /D1.3
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Bay No.4 (Bus Coupler) (=E04+WR1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI Test Block - MMLG, MCB, Aux. Components
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR CIRCUIT DIAGRAM
1 3 APPR. RS SCALE NTS
DATE NAME P.O.NO. 56
DWG. NO. BNR/150/EL/ED/ /Z4 of 5
2
4 78
1 2 345678
A
B -K50BF 1 A
C 3 B
D /P1.4 C
E /P1.7 2
/P1.8 4
/P2.4
/P2.7 5
/P2.8 7
/P3.4
/P3.7 6
8
9
11
10
12
13
15
14
16
17
19
18
20
/M15.6 22 D
24 E
28
27
Trip
MVAJ101
NOTE 1
LINK IN FOR HIGH BURDEN AS SUPPLIED
LINK OUT FOR LOW BURDEN
F F
A ISSUED FOR APPROVAL CUSTOMER PT. PLN PERSERO 150kV Bay No.4 (Bus Coupler) (=E04+WR1) DRAWN RIAN REV. B
B FOR CONSTRUCTION 150kV GIS BANDARA NGURAH RAI Tripping Relay
REV. REMARKS 15.06.2012 RIAN PROJECT PT. INDOKOMAS BUANA PERKASA CHECK RS DATE 31.05.2012
01.08.2012 RIAN CONTRACTOR CIRCUIT DIAGRAM
1 3 APPR. RS SCALE NTS
DATE NAME P.O.NO. 56
DWG. NO. BNR/150/EL/ED/ /Z5 of 5
2
4 78
1 23 4 56 7 8 9 10 11 12
A A
FRONT VIEW
B DOOR OPEN NO MARK DESCRIPTION BRANCH QTY
C 110 VDC 1 BOX PANEL FREE STANDING, (HxWxD)2200x800x600mm, FRONT DOOR/COVER WITH GLASS WINDOWS CUSTOMEZED 1 B
2U IP:41,POWDER COATING PAINTING RAL7032, THICNESS PLATE : Min 2,5 mm C
2 HL.. IDEC IZUMI 3 D
~ 3 HLAC PILOT LAMP,YWIP-2EQM3RP (RED,WHITE,YELLOW) 110VAD IDEC IZUMI 1 E
HSIANG CHENG 1 F
DC110V 4 P121 PILOT LAMP,YWIP-2EQM3RP (RED) 220VAC G
HSIANG CHENG 1
~ 5 P201 DC AMPERE METER , DIGITAL3/4, 48x96,Cls.0,2%,AUX.SUPPLY : AC/DC 30-250V
INPUT THROUGH R SHUNT : 100A/60mVOLT TYPE : MA-U-S-Y-Y SCHENEIDER 1
6 64 STEGO 1
7 B1 AC V9OLT METER , DIGITAL3/4, 48x96,Cls.0,2%,AUX.SUPPLY : AC/DC 30-250V 1
8 F27 INPUT : DC 0 - 150V, SCALE : 0 - 150A,TYPE : MDV-U-S-Y-Y SCHENEIDER 5
9 F...... AXEL 3
10 Q9501, Q9502, Q9527 DC FAULT INDICATOR, VIGILOMH TR5A, DC120V 10
11 Q9503, Q9504, Q9510 s/d Q9516, Q9526 TERMOSTHAT SCHENEIDER 4
12 Q9505, Q9506, Q9507, Q9508, Q9525 SCHENEIDER 12
64 13 Q9509, Q9617 s/d Q9524, Q9528, Q9529, Q9530 UNDER VOLTAGE RM17UAS15 SCHENEIDER 1
B11 14 Q951 FUSE CATRIDGE, 6A KBR SCHENEIDER 30
15 Q95......... MCB, C60N, 2P,2D, 6 kA, 16 A SCHENEIDER 1
F27 16 Q951 SCHENEIDER 1
FLAC 17 RS2 SCHENEIDER 1
FLDC 18 RQ1 SCHENEIDER ...
FS21 19 X.... SCHENEIDER 3
FS64 20 -TA 1
FS27 21 R1 PHOENIX 1
22 B1 CIC 1
D 23 X90 - X91 MCB, C60N, 2P,2D, 6 kA, 25 A EBL 1
24 S21 MCB, C60N, 2P,2D, 6 kA, 32 A 1
25 E21 MCB, C60N, 2P,2D, 6 kA, 10 A Non udjustable Trip Unit STEGO 1
26 MCCB,EZC250F, 2P0LE, CAP. 18 kA, RATIO 100 A LEGRAND
27 AUX. CONTACT FOR MCB, TYPE : OF, 2697
28 OMRON
E 29 AUX. CONTACT FOR MCCB, TYPE : EZEAX PHILIPS
30 R SHUNT, 100A/60mV LOCAL
SHUNT TRIP MCCB , EZ4SH200ACDC
TERMINAL BLOCK, 4/6-6/8mm
CURRENT TRANSFORMER, RATIO : 300/5A, Cls 1%, 50VA
HEATER.AC220V/100W
F TERMOSTHAT
G JACK PLUG, 1PHASE AND 3PHASE
DOOR LIMIT SWITCH PUSH BUTTON
LAMP, AC220V/10W,NEON
WIRING ACCESSORIES
CONTRACTOR : PROJECT NAME : DRAWING TITLE : SHEET L EMBAR
PT. PLN (PERSERO) KSO PEMBANGUNAN 110V DC SWITCHBOARD 003.PJ/133/UIPJJB/2012
GIS 150kV MCB ONE LINE DIAGRAM
H UNIT INDUK PEMBANGUNAN JARINGAN PT. INDOKOMAS BUANA PERKASA - PT. KENCANA ALAM PUTRA CONTRACT DRAWING NO. :
JAWA - BALI PT. TINA KANA - PT. LEKTRIKA KARYATAMA BANDARA NGURAHRAI
BNR-150-EL-LA-0202
12 3 4 56 7 89
10 11
12
1 23 45 6 7 8 9 10 11 12
A A
BACK VIEW FRONT VIEW FRONT VIEW RIGHT VIEW
B DOOR OPEN DOOR CLOSE B
110 VDC 110 VDC C
2U
~
~
DC110V
DC110V
~
~
C
64
B11
F27
FLAC
FLDC
FS21
FS64
FS27
64
B11
F27
FLAC
FLDC
FS21
FS64
FS27
FRONT
REAR
DD
PANEL DOOR
E OPENING DIRECTION E
(VIEW FROM TOP)
DOOR
FF
GG
CONTRACTOR : PROJECT NAME : DRAWING TITLE : CONTRACT NO. : SHEET L EMBAR
PT. PLN (PERSERO) KSO PEMBANGUNAN 003.PJ/133/UIPJJB/2012
GIS 150kV
H UNIT INDUK PEMBANGUNAN JARINGAN PT. INDOKOMAS BUANA PERKASA - PT. KENCANA ALAM PUTRA 110V DC SWITCHBOARD CONTRACT DRAWING NO. :
JAWA - BALI PT. TINA KANA - PT. LEKTRIKA KARYATAMA BANDARA NGURAHRAI LAYOUT BOARD
BNR-150-EL-LA-0202
12 3 4 56 7 89
10 11
12
12 3 4 56 7 8 9 10 11 12
A
400/230 VAC SWITCH BOARD FEEDER Q9621
300Ah 08 SHORE B
A 110VDC BATTERY
FEEDER Q9601
CHARGER
110VDC CHARGER
400VAC/110VDC
100A
B
FUSE BOX
F401
250A
C ALARM 110V DCDB SUPPLY C
FAILURE/UNDER VOLTAGE
ALARM
BATTERY FUSE FAILURE
WHITE HLDC 48V DC DISTRIBUTION BOARD
COMMON FAULT D
HLFC
FS64 64 FLAC
6A
D MCCB CLOSED 6A GFR HLAC
VIGILOHM
YELLOW HLMC
Q951 P201 F27 SHUNT. TRIP
I >> 0-150VDC
>U< RQ1
V
HEATHING & LIGHTING
PANEL
MCCB UNDER VOLTAGE
2P,100A RM17UBE15
A1/A2.110.240~
E Cu: 30x5 P121 FS21 FS27 E
0-200ADC
RS2 A 6A
100mV 6A
BUSBAR 2W,300A, 16kA/Sec TO (B01/2)
Q9501 Q9502 Q9503 Q9504 Q9505 Q9506 Q9507 Q9508 Q9509 Q9510
2P,16A 2P,16A 2P,25A 2P,25A 2P,32A 2P,32A 2P,32A 2P,32A 2P,10A 2P,25A
FF
I >> I >> I >> I >> I >> I >> I >> I >> I >> I >>
TO (B01/2)
XQ11:1-2 XQ11:3-4 XQ11:5-6 XQ11:7-8 XQ11:9-10 XQ11:11-12 XQ11:13-14 XQ11:15-16 XQ11:17-18 XQ11:19-20
GG
CONTROL SUPPLY MAIN 1 CONTROL & CLOSING SUPPLY T1 +/- TRIPPING T2 +/- TRIPPING FIRE PROTECTION ALARM
(BUSBAR PROTECTION PANEL) LOC 01 TO 03 BAY 01 TO 03 BAY 01 TO 03 PANEL CONTROL SUPPLY
CONTROL SUPPLY MAIN 2 CONTROL & CLOSING SUPPLY T1 +/- TRIPPING T2 +/- TRIPPING 220V AC
(BUSBAR PROTECTION PANEL) LOC 04 TO 06 BAY 04 TO 06 BAY 04 TO 06 INVERTER
CONTRACTOR : PROJECT NAME : DRAWING TITLE : CONTRACT NO. : SHEET L EMBAR
PT. PLN (PERSERO) KSO PEMBANGUNAN 003.PJ/133/UIPJJB/2012
GIS 150kV
H UNIT INDUK PEMBANGUNAN JARINGAN PT. INDOKOMAS BUANA PERKASA - PT. KENCANA ALAM PUTRA 110V DC SWITCHBOARD CONTRACT DRAWING NO. :
JAWA - BALI PT. TINA KANA - PT. LEKTRIKA KARYATAMA BANDARA NGURAHRAI SINGLE LINE DIAGRAM
BNR-150-EL-LA-0201
12 3 4 56 7 89
10 11
12
12 3 4 56 7 8 9 10 11 12
A
A
B B
C C
D
110V DC DISTRIBUTION BOARD
D
E Cu: 25x3 (+,-) Q9513 Q9514 Q9515 Q9516 Q9517 Q9518 Q9519 Q9520 T0 (B01/3) E
2P,25A 2P,25A 2P,25A 2P,25A 2P,10A 2P,10A 2P,10A 2P,10A TO (B01/3) F
FROM (B01/1) Q9512
2P,25A I >> I >> I >> I >> I >> I >> I >> I >>
Q9511
2P,25A I >>
I >>
F
FROM (B01/1)
XQ11:21-22 XQ11:23-24 XQ11:25-26 XQ11:27-28 XQ11:29-30 XQ11:31-32 XQ11:33-34 XQ11:35-36 XQ11:37-38 XQ11:39-40
G LOCAL CONTROL CUBICLE LOCAL CONTROL CUBICLE LOCAL CONTROL CUBICLE FAULT RECORDER 150/20KV G
MOTOR SUPPLY BAY 01 (UGC 1) MOTOR SUPPLY BAY 03 (TRAFO 1) MOTOR SUPPLY BAY 05 (TRAFO 2) AND MATERING PANEL TRANSFORMER 2 CUBICLE
LOCAL CONTROL CUBICLE LOCAL CONTROL CUBICLE LOCAL CONTROL CUBICLE 150/20KV 150/20KV
MOTOR SUPPLY BAY 02 (COUPLER) MOTOR SUPPLY BAY 04 (UGC 2) MOTOR SUPPLY BAY 06 (TRAFO 2) FUTURE TRANSFORMER 1 CUBICLE TRANSFORMER 3 CUBICLE (FUTURE)
CONTRACTOR : PROJECT NAME : DRAWING TITLE : CONTRACT NO. : SHEET L EMBAR
PT. PLN (PERSERO) KSO PEMBANGUNAN 003.PJ/133/UIPJJB/2012
GIS 150kV
H UNIT INDUK PEMBANGUNAN JARINGAN PT. INDOKOMAS BUANA PERKASA - PT. KENCANA ALAM PUTRA 400/230V AC SWITCHBOARD CONTRACT DRAWING NO. :
JAWA - BALI PT. TINA KANA - PT. LEKTRIKA KARYATAMA BANDARA NGURAHRAI SINGLE LINE DIAGRAM
BNR-150-EL-LA-0201
12 3 4 56 7 89
10 11
12