01 Proposed Finishes
Index
02 Proposed Design 03 Costing
01 Proposed Finishes
Index
02 Proposed Design 03 Costing
To create a harmonious approach
experience that matches the charm and
architectural grandeur of Regency Park.
OUR DESIGN
VISION
01 06 11
02 07 12
03 05 08 13
04 09 10 14
15
16
PROPOSED FINISHES
FF&E
17 20 23
18
21
24
25
19 22
PROPOSED FINISHES
FF&E
01
05
03 04 01 Travertine Porcelain tiles
08 02 Micro cement with mica chips (curbs)
02 03 Granite look alike tile (driveway)
06 04 Curved glass
05 Brushed hairline stainless steel as inserts
06 Paint in two textures: grainy & smooth
07 Curved track sliding door
08 Painted Panels
PROPOSED FINISHES
FF&E
03
04
01
05 02
01 LED Linear Kalypso Lights
02 Spike lights for trees and plants in black
03 LED rope lights for coves
04 Linear LED light in black for ceiling
05 Circular in-floor uplighter
06 In-floor one way lights for paths in black
06 07 07 In-floor two-way lights for grass lawn in black
PROPOSED FINISHES
LIGHTING
05 09 03
04
07 01 Bunched Bamboo
02 06 02 Weeping Willow
03 Cyrtostachys renda Blume, Lipstick palm
08 04 Termínala Mantalay/buchida
01 05 Syzgium myrtifolium/ Eugenia
06 Ficus - S shape large
07 Garcinia subelliptica
08 White Frangipani
09 Dracena Fragnas
PROPOSED FINISHES
LANDSCAPE ACCENT TREES
08 07 02
06 01 05 09
04 03 01 Carpet grass
02 cordyline red
03 Spider lily
04 Grey granite chips/ white pebbles
05 Radermachera
06 Monstera
07 Dracaena Marginata
08 Dracaena draco
09 String of pearls
PROPOSED FINISHES
LANDSCAPE BASE AND PLANTS
01 Proposed Finishes
Index
02 Proposed Design 03 Costing
01 Entrance has been brought nearer to the driveway
02 Geometries have been simplified
03 Reduced security desk size
04 Symmetrical landscaping
05 Additional lights added to the lobbies
06 Additional parking/unloading added
07 Seating with visibility of drop off point included
PROPOSED PLAN
BLOCK 9 GROUND FLOOR ENTRANCE
PROPOSED PLAN
BLOCK 9 COMMON LOBBY
PROPOSED PLAN
BLOCK 9 LOBBY A
PROPOSED PLAN
BLOCK 9 LOBBY B
PROPOSED PLAN
BLOCK 9 LOBBY B
PROPOSED PLAN
BLOCK 9 BASEMENT
PROPOSED PLAN
BLOCK 11 CONNECTING LOBBY
PROPOSED PLAN
BLOCK 11 LOBBY A
PROPOSED PLAN
BLOCK 11 BASEMENT
PROPOSED PLAN
BLOCK 11 BASEMENT LOBBY A
PROPOSED PLAN
LOW RISE BLOCK BASEMENT FLOOR
PROPOSED PLAN
LOW RISE BLOCK BASEMENT FLOOR
PROPOSED PLAN
LOW RISE BLOCK BASEMENT FLOOR
PROPOSED PLAN
LOW RISE BLOCK BASEMENT FLOOR
01 Proposed Finishes
Index
02 Proposed Design 03 Costing
BASIC FINISHES
ITEM COUNT RATE TOTAL DESCRIPTION
BLOCK 9 2 $94,500 $189,000 Area around the lift upto the glazing
Block 9 Lift lobby,
Drop-off Level Area around the lift upto the glazing and
Block 9 Lift 1 $63,800 $63,800 the landscaped courtyard
Lobby, Carpark
Levl 1 $180,000 Area connecting the two lift lobbies
Block 9, 1 $97,400 $180,000 inclusive of security desk
Connecting lobby,
Drop-off level Area from Drop-off to the connecting
lobby, on two sides with ramps/stairs and
Block 9, Entrance $97,400 landscape
near drop off
$530,200
Total for Block 9
BLOCK 11 1 $165,500 $165,500 Area around the lift upto the glazing
Block 11 Lift
lobby, Drop-off Area around the lift upto the glazing and
Level 1 $165,500 $165,500 the landscaped courtyard
Block 11 Lift
Lobby, Carpark Area connecting the two lift lobbies
Levl 1 $140,000 $140,000 inclusive of security desk
Block 11,
Connecting lobby, 1 $180,700 Area connecting the two lift lobbies
Drop-off level 1 $90,000 $180,700 inclusive of landscape areas
Block 11,
Connecting lobby, Area from Drop-off to the connecting
Parking level lobby, on one side with ramps/stairs (Not
Block 11, $90,000 seen in the quote)
Entrance near
drop off $741,700
Total for Block 11
LOW RISE Includes lobbies around the lift and the
BLOCKS 13 $29,800 $387,400 landscape behind the lift
Low Rise block
lobbies $387,400
Total for Low Rise
blocks
Total Budget for construction $1,659,300 10%
Add 10% preliminaries $165,930
Total Budget for construction
$1,825,230
Not included:
False Ceiling in areas other than what is above the designed areas.
Loose furniture items
GST
Soft landscape other than the one at the entrance (block 9) and courtyards (block 9 and low-rise)
OVERVIEW
BASIC FINISHES SPECIFICATIONS
S/n Description of Works Count Budget Cost Remarks
1.0 Site Preliminaries
2.0 Block 9 - 1F Lift lobby -$ 97,200.00- subject to final project cost (10%)
2 -$ 189,000.00-
Renovate existing Block 9 1st floor lift lobby
Demolish existing floor tiles -$ 1,100.00-
Demolish existing glass partition including support -$ 600.00- assumed 3m high
-$ - - omitted as per comment
Demolish existing wall tiles -$ 500.00-
Demolish existing mail box -$ 1,000.00-
Demolish existing bulkhead -$ 3,200.00-
-$ 15,400.00- 2.4m high
Demolition works
Supply and install new glass partition -$ 4,680.00- Cost includes panel above curved glass
Screen Wall in 150x300 fins made of dry wall
construction using metal faming and calcium silicate -$ 10,000.00- 24m2
-$ 19,200.00- $400/no.
boards
Construct new curved wall as entrance to stairs -$ 10,600.00- assuming PC supply rate of $90/m2
Construct new mail box, front panel in metal paint
lacquered finish with one notice board (750 x 1000) -$ 10,800.00- installation rate considreed at $120/m2
Supply and install new travertine stone look alike tile to
-$ 3,200.00-
floor including screed and waterproofing -$ 600.00-
Apply special paint finish on top of the existing wall tiles -$ 5,000.00-
to achieve travertine look quote from HMH electro painters for 1250 per set.
Supply and install new ceiling in calcium sylicate in -$ 2,900.00- (+6590121096, Rafoob).
paint finish Considered lift doors
Supply and install metal trimming for ceiling -$ 8,900.00-
Electrical Works ie light fitting and sensor for entrance
LIFT LOBBIES
Polish and make good existing stainless steel doors and
panels BASIC FINISHES SPECIFICATIONS
Contingency (10%)
S/n Description of Works Count Budget Cost Remarks
3.0 Block 9 - Basement Lift lobby
1 -$ 63,800.00-
Renovate existing Block 9 Basement floor lift lobby
Demolish existing landscape -$ 700.00-
Demolish existing floor tiles -$ 1,300.00-
Demolish existing glass partition including support -$ 400.00-
Demolish existing wall tiles -$ - - omitted as per comment
-$ 2,400.00-
Demolition works -$ 5,200.00-
Supply and install new glass partition -$ - - included on the item below
Supply and install new wall feature (black)
Apply special paint finish on the walls to achieve -$ 21,100.00- installation rate considreed at $120/m2
travertine look -$ - - omitted as per comment
Construct new bench
Supply and install new travertine stone look alike tiles to -$ 12,100.00- assuming PC supply rate of $90/m2
floor including screed and waterproofing
Renovate ceiling in calcium sylicate boards -$ 3,500.00-
Electrical Works ie light fitting and sensor for entrance -$ 3,500.00-
New landscape (chips and trees) -$ 7,000.00-
Polish and make good existing stainless steel doors and quote from HMH electro painters for 1250 per set.
panels -$ 2,900.00- (+6590121096, Rafoob).
Contingency (10%) Considered lift doors
-$ 6,100.00-
LIFT LOBBIES
BASIC FINISHES SPECIFICATIONS