WAVE -PROFILE FOR A RESIDENTIAL DEVELOPMENT IN NAIROBI FOR TATU CITY DEVELOPMENT
WAVE design consultants pte. ltd.
Everywhere the ocean surges to restructure, shift,
change, and rearrange the contours of the shore.
Water works relentlessly, crafting and sculpting land.
The character of the shoreline is ever changing and
chiseled anew as wave after wave laps at it.
Many of nature’s sculpted spaces create unique visual
delights and memorable experiences for all.
WAVE, a boutique design studio based out of Singapore,
is inspired by this tenacity in creating distinct and
irreplaceable experiences. WAVE is a research based
design studio. It understands the impact of built
environment on society. It’s architecture is exploratory,
distinct and responsible. At WAVE the team is inspired
by all challenges which are design based, regardless of
scale and type. The studio strives to deliver meaningful
and enriching experiences; so in its own small way
helps to shape a better world.
PURPLE HAZE by WAVE won the award for Best Architecture - Multiple Residences, at the International Property Awards held in
Dubai. It went on to win the Best Architecture for Africa, in the same category, and was one of the five finalists at the global,
International property Awards, in London 2016. The project won the award for best residential development in Africa for 2018.
CURRENT PROJECTS
PEMBA TRAIL | CONCEPT MASTERPLAN PROPOSAL MAMBA VILLAGE | MIXED USE DEVELOPMENT
Surrounded by the Ngezi Forest, the Indian Ocean and some of the best diving and snorkelling sites in the world, the The site is an approximately 28 acre parcel on the outskirts of Nairobi. This Northern part of the Town of Langata is
Pemba Trail is designed to add a critical ‘ocean experience’ to the Tanzanian tourist circuit. Envisioned as a catalytic known as one of the most upscale residences in Nairobi.
development, it is designed to spur the tourism and tourism-related infrastructure across the Island of Pemba for long- The design proposal responds to the water front, so as to maximize lake views while maintaining public access. The
term economic, people, and environmental sustainability. It features clustered experiences of entertainment, adventure project also aims to restore wetlands while sensitively providing access to experience them.
and education, each with its own unique character rooted in the nature and culture of Pemba Island.
LOCATION PEMBA ISLAND, TANZANIA LOCATION MAMBA VILLAGE, NAIROBI
COMPLETION DATE COMPLETED COMPLETION DATE ON GOING
COST - COST -
CLIENT MUTORI ASSOCIATES CLIENT MUTORI ASSOCIATES
CURRENT PROJECTS
HONOLULU TOWERS | RESIDENTIAL DEVELOPMENT HONOLULU TOWER | SIGNAGE DESIGN AND FABRICATION
The project comprises a revamp of public areas for one of Singapore’s early condominiums. It is one of the finer examples To create a wayfinding system that resonates with Honolulu Tower, WAVE reinforced the building’s iconic architectural
of neo-tropicalism which evolved in the region during the 80s. Several modifications to the building, over the years, took geometries into its signages, icons and texts. These elements were designed to be attractive with the play of geometries and
away some of the finer characteristics of the building. at the same time to create a comprehensive, clear and consistent visual communication system with concise messaging.
The concept aims to return clarity to the original layout, incorporate updated program and to create a contemporary
architecture in sync with the past.
The project achieves this through subtle but far-reaching interventions to geometry and material, offering a quality of
space and organization which conveys both simplicity and grandeur.
LOCATION BUKIT TIMAH RD, SINGAPORE LOCATION BUKIT TIMAH ROAD, SINGAPORE
COMPLETION DATE ONGOING - COMPLETION 2021 COMPLETION DATE ON GOING - COMPETION 2021
COST SGD 3.6 MILLION COST SGD 25,000
CLIENT PRIVATE CLIENT PRIVATE
CURRENT PROJECTS
TECHNOPOLE | AGRICULTURE & FOOD PRODUCTION MASTERPLAN SUSTAINABILITY AND MARINE CENTER | MIX-USED DEVELOPMENT
WAVE proposed Agropolis as a solution model to address the food deficiency gap in United Arab Emirates. UAE envisioned WAVE proposed a sustainability and marine centre on the rooftop of Dubai’s largest desalination plant which is currently
to be the world’s best in the global food security index by 2051 as the ability of producing food locally is important. WAVE under planning process. The site is sitting right next to Jebel Ali Wildlife Sanctuary, which was added to the Ramsar List
proposed 3 approaches for the Agropolis - Future Farms, Vertical Farms and Nutri Farms. of Wetlands of International Importance making it a place of global significance. The idea is celebrating the uniqueness of
the site and integrating sustainability design and programs into the desalination plants. By taking advantages of the local
resources, different forms of aquaponics, hydroponics, aquaculture systems and food production systems are proposed.
LOCATION RAS AL-KHAIMAH, UAE LOCATION DUBAI, UAE
COMPLETION DATE DESIGN STAGE COMPLETION DATE DESIGN STAGE
COST - COST -
CLIENT CONFIDENTIAL CLIENT CONFIDENTIAL
CURRENT PROJECTS
SAEEDA | MIX-USED DEVELOPMENT ECO ISLAND, SAEEDA | MASTERPLAN PROPOSAL
Saeeda, Al Marjan which translates to ‘Happiness’ is designed around the idea of creating a destination which inspires The Pearl aims to create an exclusive destination for Millennials, through an immersive and interactive program, that
a feeling of elation, romance and nostalgia and fulfil one’s quest for discovery, thrill and adventure, besides offering a furthers the region’s goal to provide an authentic Arabian experience.
platform for various people to meet and interact in different settings. The project consists of three main areas, consisting of Hotel, Serviced Apartments, Millennial Hub, Entertainment Centres
The design concept is driven by the history and identity of the Emirate itself. The emirate is built, layer by layer, on nearly by the Pier and an Eco Island.
7000 years of heritage, culture and community. The civilisation in this region has evolved through millenniums by a unique
model that stems from the interaction between its varied landscape comprising of the coast, fertile lands, deserts and
the mountain ranges, with its inhabitants.
LOCATION AL MARJAN, UAE LOCATION AL MARJAN, UAE
COMPLETION DATE DESIGN STAGE COMPLETION DATE DESIGN STAGE
COST - COST -
CLIENT NOBLE DEVELOPMENTS CLIENT NOBLE DEVELOPMENTS
CURRENT PROJECTS
THE LIVING CITY | CONCEPT MASTERPLAN PROPOSAL MASONGA WAI RIVER | MIXED USE RESIDENTIAL
This 100 acre development is situated to the south of Pune and is envisaged as a self-contained township with The site is a 2 acre plot next to the university and the State House. This location is populated by a youth from various
residential, commercial and retail components. The living city is seen as a self-sustaining development that grows and is parts of Africa and is along the Masonga Wai river, with panoramic views of the Arboretum. The design creates an
tailored to take care of all its inhabitants of different age groups. The layout took inspiration from the fabric of the old city experential path leading to the river with community spaces dithering between the exterior and interior spaces. The
of Pune and is laid out along an amenity-rich green spine which develops a community rich in heritage and family life. The form is articulated into a series of terraces responding to the panoramic vista, while creating premium units for the
layout allows for flexibility and growth while keeping the community character intact. development. The project is characterised by compact but comfrotable and well finished apartments ranging from 30sq.
mts to 80sq.mts.
LOCATION PUNE, INDIA LOCATION ARBORETUM, NAIROBI
COMPLETION DATE COMPLETED COMPLETION DATE ON GOING
COST - COST USD 18M
CLIENT MANIKCHAND DHARIWAL CLIENT BOTRACK LTD
CURRENT PROJECTS
AEON | RESIDENTIAL DEVELOPMENT LAKE SIDE | MIXED-USE DEVELOPMENT
Situated at a prime location in Mumbai the design comprises of two conjoined towers that orient themselves towards The site is a 5 Acre mixed use development on the edge of Lake Bishoftu. The devevlopment comprising of retail, long-
the view through an interesting articulation of form. This view-centric design gives rise to six layered volumes of varying term rental units, branded residences, hotel and forest adventure-a theme park. The development is proposed as a series
heights, each shifting incrementally so that most of the interior spaces get advantage of the most preferred view, this of terraces opening out to the lake and a public amenity is created along the hill flanking the lake creating a platform for
site has to offer. The towers are organized on a tall parking podium that is rendered with a play of lights and shadows and community engagment and recreation.
interlaced with vertical greens. The amenities are situated on the podium with an expansive view.
LOCATION WADALA, MUMBAI LOCATION BISHOFTU, ETHIOPIA
COMPLETION DATE April 2021 COMPLETION DATE ON GOING
COST USD 42 M COST USD 39M
CLIENT AJMERA DEVELOPERS CLIENT PRIVATE
CURRENT PROJECTS
PURPLE HAZE | RESIDENTIAL DEVELOPMENT PURPLE HAZE | FURNITURE DESIGN
Purple Haze, situated in Central Nairobi, is an idylic community comprising of 226, 2 and 3 bedroom units in two blocks. WAVE developed a line of furniture in 3 variations for the developement. This bespoke line of furniture is in line with the
A striking composition of balconies, and fenestrations, create an interplay of shadows and a natural orientation to the overall architecture of the project and helps enhance the spatial quality of the apartments besides efficiently fitting into
sourrounding views. The two blocks are woven around a series of interesting experiences comprising of serveral couryards, the overall space. The furniture has clean geometric forms and is created with hand-picked natural wood planks framed in
and exterior spaces, leading to the river. white and black surfaces. All hardware is hidden to best display the exquisite wood textures.
LOCATION NAIROBI, KENYA LOCATION NAIROBI, KENYA
COMPLETION DATE COMPLETED IN 2019 COMPLETION DATE COMPLETED IN 2019
COST USD 26 MILLION COST USD 12,000 PER SET
CLIENT EDIFICE LTD CLIENT EDIFICE LTD
CURRENT PROJECTS
PURPLE HAZE | SCULPTURES PURPLE HAZE | INTERIORS
WAVE developed a series fo sculptures using corten steel, brass, copper and zinc to further embelish the space with art and Three schemes of interior architecture were developed inspired by the artwork of artists - Picasso, Rothko and Hoffman as
to create indulgent spaces which engaged the users on a sensory basis. the conceptual underpinnings. The interior design using forms, shapes and textures reinforces the architectural quality of
the project.
LOCATION NAIROBI, KENYA LOCATION NAIROBI, KENYA
COMPLETION DATE COMPLETED IN 2019 COMPLETION DATE COMPLETED IN 2019
COST USD 100,000 COST USD 26 MILLION
CLIENT EDIFICE LTD CLIENT EDIFICE LTD
CURRENT PROJECTS
PURPLE HAZE | SIGNAGE CAFE B | F&B
To create a synonymous wayfinding system through the Purple Haze residence, WAVE also reinforced the architectural CAFE B is a heritage development in Singapore housing a contemporary chic restaurant and bar. A neutral setting of
components into its signages and symbols. These elements were designed to be attractive yet comprehensible, as the white surfaces and wooden accents is complemented with black and white sculptural forms to create a visually enriched
graphics are made to play with geometry and viewer’s perspective. setting. The project scope included interior design and custom furniture.
LOCATION NAIROBI, KENYA LOCATION SINGAPORE
COMPLETION DATE DEC 2019 COMPLETION DATE MARCH 2018
COST USD 25,000 COST SGD 1 MILLION
CLIENT EDIFICE LTD, CLIENT 3D BOND
CURRENT PROJECTS
BROOKSIDE CLOSE | RESIDENTIAL DEVELOPMENT THE TROVE | RESIDENTIAL DEVELOPMENT
Brookside Close or as we referred to it - ‘Cascade’, is a premium high-rise residential development set within the prime The site is situated behind developments along General Mathenge Drive in Nairobi. A small access road leads into the site,
districts of Naroibi. The project addresses the challenges of a tight plot, in providing traditional green breathing spaces which allows the masterplan to create a dramatic sense of arrival. After passing through a green tunnel one arrives at the
on the ground plane. The development introduces green, private, and communal spaces, in a vertical array. By terracing up drop-off marked by a sculptural tree. Wide stairs lead up to the podium where pool and common amenities are located. The
a green corridor throughout the building, the spiraling green not only creates a distinctive aesthetic and identity but also two residential towers set on top of the podium are rotated to guarantee maximum privacy. A bridging element connects
offers a private green terrace to each unit. Comprised of 3 and 4 bedroom units the development has an atypical approach them, leaving only the bottom levels disconnected to maintain access and visibility to the common areas.The design is
where each individual unit has a unique layout with a private green and a recreational pool integrated in various configura- a contrast between organically shaped apartments with flaring balconies and a geometrical facade languages of boxed
tions. The communal spaces occur vertically at various levels. terraces.
LOCATION NAIROBI, KENYA LOCATION NAIROBI, KENYA
COMPLETION DATE ON GOING - COMPLETION 2022 COMPLETION DATE ON GOING- COMPLETION 2021
COST USD 23 MILLION COST $30 MILLION
CLIENT KINGS CLIENT ESQUIRE
CURRENT PROJECTS
AASTHA OFFICE | COMMERCIAL DEVELOPMENT CSP PARTNERS | COMMERCIAL DEVELOPMENT
The workplace is a premium 1500sft unit in downtown Singapore. The project involved developing a program that projected Interior architecture and furniture design for a premium office space in the CBD area of Singapore. A restrained pallete
the client’s brand and personality. The design involves a gallery space which also functions as a conference room and a of shades of gray and textures of wood with accents of plush leather was created to design a classy ofice interior for a
waiting area. The various project components are organized to offer city views to all the usable spaces. A glass box hovers financial firm.
above the double volume space giving an overview of the city as well as a visual connection to the spaces below. Bespoke scope: interior architecture and furniture design
furniture designed for the workspace and shades of grays and white with highlights of wood and black trimming define the
interior architecture.
LOCATION SINGAPORE LOCATION SINGAPORE
COMPLETION DATE APRIL 2018 COMPLETION DATE MAY 2018
COST $250,000 COST $200,000
CLIENT AASTHA CLIENT CSP
TEL TEL
CONTACT CONTACT
CURRENT PROJECTS
MUTTHA CHAMBERS | OFFICE RENOVATION MINE | MIXED-USE DEVELOPMENT
The client asked WAVE to propose a design for the renovation of one of their oldest office buildings. Not only was the MINE is a multi-use development compromised of a shopping mall and SOHO apartments. The project takes precedence
exterior look outdated, but floor-to-floor height and spatial arrangements were also not up to current standards. from traditional stepwells to create a programmatic and atmospheric approach, devising a new shopping experience for
WAVE proposed to create a typology that offers private office spaces with common amenities such as a coffee corner and the visitor. The retail experience is organized around a grand stairway ascending five levels. Through minor interventions
printer resulting in an office building with the look and feel of boutique hotels or ‘office suites’. the stairway offers an opportunity for adaptable usage, creating a vibrant setting for the central space across time. By
To achieve this, extreme care was taken in detailing all interior and exterior aspects. A beautiful example of this, is the adding Home-Office apartments, on top of the mall, the building stays animated at the upper levels. The two programs
way the facade is treated. Here the logo of the client has been used as a pattern. By embossing the logo into the fins, that come together in a consistent façade language of interwoven elements to create visual interest from the street.
cover the old facade, a play of light and shadows is created which changes during the course of the day.
LOCATION PUNE, INDIA LOCATION NAIROBI, KENYA
COMPLETION DATE MAY 2017 COMPLETION DATE ON GOING - COMPLETION 2022
COST USD 1.7 MILLION COST USD 40 MILLION
CLIENT MUTTHA GROUP CLIENT KINGS
CURRENT PROJECTS
YOO-GOA | VILLAS DEVELOPMENT CANVAS | HOTEL DEVELOPMENT
Situated in Goa, these are 12 high-end Villas offering a plethora of experiences and amenities which are customized Canvas is a 100 room boutique hotel in the heart of Nairobi. The design proposal defined and developed the brand identity
to foster ultimate luxury living. The villas are nestled within a thick foliage, allowing the Villas to become one with for a chain of hotels, with Canvas being the prototype. The architecture is a vibrant composition of projecting boxes with
their surroundings and offering an intimate setting in harmony with nature. The villas draw inspiration from historical coloured glass, set against a black and white backdrop, creating an interesting play of colour, shadow and light during
precedents and present an innovative typology which diltues the boundaries between Interiors and Exteriors. different times of day. The interior architecture reinforces the architectural principles and combines faceted geometric
forms in white, with black trimmings and hints of colour to create a luxe and sophisticated spatial experience.
LOCATION GOA, INDIA LOCATION NAIROBI, KENYA
COMPLETION DATE ON HOLD COMPLETION DATE ON HOLD
COST USD 12 MILLION COST USD 15 MILLION
CLIENT MUTTHA GROUP CLIENT SUN AFRICA HOTELS
CURRENT PROJECTS
LS MARG - A3 | RESIDENTIAL DEVELOPMENT LS MARG - A5 | RESIDENTIAL DEVELOPMENT
A3 is a mid-range residential development in close proximity of the LS MARG-A5 project.Hints were taken from the A5 is a mid-range residential development comprising of 360 residential units in three towers. A large part of the
immediate context of the building for the development of the facade. The base of the development merges with the hill it program is the MCGM, which is public parking. Besides an interactive urban edge created along this 200mts long facade,
is placed on,enabling the hill to continue to ‘flow’ over the top of the podium. The form language, texture and materiality of through retail and other amenities, the building creates a dynamic facade shaped as a flutter through its form and subtle
the base continues on to the protruding elements of the towers with the refuge terraces as highlights and the rest of the articulation of the facade elements. The linear layout allows for most of the units to get an unobstructed, expansive view
massing functioning as a backdrop. of the distant mangroves.
LOCATION MUMBAI, INDIA LOCATION MUMBAI, INDIA
COMPLETION DATE ON GOING COMPLETION DATE ON GOING
COST $40 MILLION COST $ 40 MILLION
CLIENT DKP GROUP CLIENT DKP GROUP
CURRENT PROJECTS
RUNDA | SERVICED APARTMENTS & PRIVATE VILLAS DEVELOPMENT THE HAVEN | VILLAS DEVELOPMENT
Located on a premium plot, close to the UN Headquarters, these are 52 serviced apartments and 15 villas. The design Located along the white beaches of Tiwi, this deep and narrow parcel is comprised of 103 serviced apartments and
attempts to create a low scale development in-keeping with the surrounding environs. The development integrates various 83 exquisite villas. The masterplan and architecture seek to provide a layered sense of space, from the public retail
natural features of the site creating private enclaves which offer exclusive, intimate, and natural living. spine, to the more intimate residential villa clusters, finally leading to the interiors of individual units. This is achieved
through a series of public and private courtyards creating a sense of grandeur, intimacy and exclusivity. A unique blend
of architecture is created by translating traditional and vernacular materials into a modern language and a concept that
identifies with the local spirit. Raw timber cladding, stacked stone and timber roof shingles intermixed with strong modern
lines creates a contemporary idiom of architecture.
PROJECT DONE AT SPACEMATRIX DESIGN CONSULTANTS PROJECT DONE AT SPACEMATRIX DESIGN CONSULTANTS
LOCATION NAIROBI, KENYA LOCATION TIWI, KENYA
COMPLETION DATE CONCEPT ONLY & COMPLETED COMPLETION DATE CONCEPT ONLY & COMPLETED
COST USD 18 MILLION COST USD 24 MILLION
CLIENT EDIFICE LTD, CLIENT MWIWARIA FAMILY
CURRENT PROJECTS
THIGIRI ROAD RESIDENTIAL | PRIVATE RESIDENCES MUSEUM HILL | MIXED-USE DEVELOPMENT
Thigiri road, situated in Central Nairobi, is a development with 2 villas for two families and 2 additional houses. A singular This development, in Nairobi, comprises of a shopping mall, hotel, office building and serviced apartments. The plot is
road, lined with trees and a formal green, traverses the property into two parts feeding into two units each on either sides. situated at the cusp of the old city and the new development, perched on top of a hill, and lying directly on the axis of
The villas have been positioned such that they have each their own private green at the outer periphery of the site. A Uhuru highway which connects the two parts of Nairobi. The design orients itself to this strategic location through a large
communal block with pool and gym separates the two villas yet these shared amenities bind the inhabitants. deck, with amenities, connecting various components of the mixed-use development in a multi-faceted form. The design
The development has been planned with the utmost care and consideration of the existing trees on the site. attempts to translate the abstract ideas of speed, flow and movement into an architectural expression taking a cue from
the pivotal location at which the plot is sited.
LOCATION NAIROBI, KENYA LOCATION NAIROBI, KENYA
COMPLETION DATE ON GOING - COMPLETION 2021 COMPLETION DATE ON GOING
COST $8 MILLION COST $170 MILLION
CLIENT PRIVATE CLIENT EDIFICE LTD, 6TH FLOOR, FORTIS TOWERS, PO BOX 12645-00400, NAIROBI, KENYA
CURRENT PROJECTS
SELECT PROJECTS
(DELETE THIS TEXT AFTER USE)
COMMAND+SHIFT+CLICK ITEM
to override master items on the page
(DELETE THIS TEXT AFTER USE)
COMMAND+SHIFT+CLICK ITEM
to override master items on the page
PURPLE HAZE | CONDOTEL, RESIDENDTIAL|SERVICED APART-
MENTS
Purple Haze, situated in Central Nairobi, is an idylic community
comprising of 226, 2 and 3 bedroom units in two blocks. A
striking composition of balconies, and fenestrations, create
an interplay of shadows and a natural orientation to the
sourrounding views. The two blocks are woven around a series
of interesting experiences comprising of serveral couryards, and
exterior spaces, leading to the river.
WAVE developed a line of furniture in 3 variations for the
developement. This bespoke line of furniture is in line with the
overall architecture of the project and helps enhance the spatial
quality of the apartments besides efficiently fitting into the
overall space.
WAVE developed a series fo sculptures using corten steel, brass,
copper and zinc to further embelish the space with art and to
create indulgent spaces which engaged the users on a sensory
basis.
WAVE developed signage and graphics for the project and
fabricated these in zinc and stainless steel.
The project won an award for the best residential in Africa and
was a global finalist in International Property Awards, London.
LOCATION NAIROBI
COMPLETION DATE 2019
COST US$27,500,000
CLIENT EDIFICE LTD
Building Architecture
Kitchen-Breakfast Counter Living Room
Dining Area Wash Room
Wash Room Kitchen
Wash Room
Installation in Copper, Brass and Corten Steel Installation in Zinc and Steel
Courtyard, Wood and Gravel Installation at Arrival in Corten Steel
PARKING SIGNAGE PUBLIC AREA SIGNAGE
FLOOR LEVEL SIGNAGE CAR PARK GRAPHICS
Cook-out Area at the terrace Bar Lounge
Swimming Pool Spa - Gym
Furniture Design
Furniture Design
THE SIOLIM HOUSE | HERITAGE BUILDING- BOUTIQUE HOTEL
THE SIOLIM HOUSE | HERITAGE BUILDING- BOUTIQUE HOTEL
HONOLULU TOWERS | UPGRADING OF AN OLD CONDOMINI-
UM- RESIDENTIAL
The project comprises a revamp of public areas for
one of Singapore’s early condominiums. It is one of
the finer examples of neo-tropicalism which evolved
in the region during the 80s. Several modifications
to the building, over the years, took away some of
the best architectural characteristics of the building.
The concept aims to return clarity to the original
layout, incorporate updated program and to create
a contemporary architecture in sync with the past.
The project achieves this through subtle but far-reaching
interventions to geometry and material, offering a
quality of space and organization which conveys both
simplicity and grandeur. Apartment prices saw a sharp
increase in value, following this intervention. The scope
involved architectural modifcations, Interior Design,
Landscape design and Signage design.
LOCATION SINGAPORE
COMPLETION DATE 2021
COST $3,500,000
CLIENT MCST 990
Entrance Lobby
New Function Room inserted at First Storey
Funtion Room Interiors
Signage Design
Wash Room | Shower Room design
Lower Deck, BBQ Area
Pool Shower and Water Feature Design
Pool
BBQ counter
New Swimming Pool