The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by designgoldennails, 2022-09-20 04:16:10

Golden Nails PreQualification - Profile

Golden Nails PreQualification - Profile

Keywords: Golden Nails

goldennails.qa 1

Table of Contents

Introduction 3
Mission 3
Vision 3
4
Organization Chart 5
Our Services 6
9
Key Management Personel Profile 13
Company Classification, Legal Documents & ISO

Clients

PROJECT EXPERIENCES

Civil & Infrastructure Division 14

Landscape, Irrigation & Landscape Maintenance 31

Client Approvals 59
Completion Certificates 77
85
Resources 95
Heavy Equipments and Vehicles 96
Landscaping Equipments & Machinery 97
100
Handtools 101
Manpower Personnel 126
CV’s & Qualification Certificates 131
Quality & HSE Integrated Management
Contacts & Location Map

goldennails.qa 2

INTRODUCTION

GOLDEN NAILS is a dynamic contractor based in
Doha, set up to meet the growing demand for
quality as well as the innovative design and construction
through teamwork of professionals which can be
tailored to suit any project in infrastructure, landscaping
and irrigation projects. not mentioning also the maintenance
srevices for landscape & irrigation network according to clients
needs.The management team has single objective, that is, to create a
work of art that is not only beautiful and pleasing to the eye, but is sustainable and practical in its
usage for many years to come.

To achieve our objective, we have assembled a highly qualified Team committed to deliver
excellence through fair and respectful dealings which cater to understand and anticipate our
Client needs in addressing any challenges in infrastructure, landscaping and irrigation projects.

MISSION VISION

Golden Nails is a full service infrastructure, Empowered by its proactive management,
landscaping and irrigation company, Golden Nails aspires to become one of
which believe in environmental the leading Contractor in infrastructure,
improvement through a consistent and landscaping and irrigation projects in
sustainable ecofriendly approach. Our our region and serve our Clients with our
mission is to work in cooperation with our utmost professionalism and commitment.
Client to design, innovate,create, install,
and maintain our projects to the highest
quality standard .

goldennails.qa 3

ORGANIZATION CHART

GENERAL MANAGER

OPERATIONS MANAGER
Document
Controller

Accounting & Design Technical Maintenance Construction Nursery Logistic HSE Procurement Marketing
HR Manager Manager & Estimation Manager Manager Manager Manager Manager & Administraion Manager
Logistic
Manager Supervisor Manager

Accountant Draftsman Production Safety Sales
QA/QC Officer Data Entry Engineer Officer Officer

Campboss Inspector Production Team Drivers / Procurement
PRO PRO Operators Officer
Procurement
Officer

Project Manager Project Manager

Football Field
Maintenance Team

Football Field Tech Irrigation Landscape Landscape Landscape
Engineer Engineer Engineer Engineer Engineer

F.F Supervisor Irrigation Landscape Irrigation Landscape
Supervisor Supervisor Supervisor Supervisor

goldennails.qa 4

OUR SERVICES

We offer a fully comprehensive infrastructure and landscape service including irrigation
system, operation and ongoing maintenance. We also have extensive nursery facilities
for the production and establishment of a wide variety of special plant to supply our
landscape schemes and to continue the development and variety within our on-going
maintenance projects.

CONSTRUCTION SERVICES DESIGN SERVICES

We take responsibility for the • Landscape Design
complete construction of the • Irrigation Design (Central
following:
System, Controllers, Main & Lateral
LANDSCAPING: Lines, Cabling, Shop drawings,
• Softscape as-built drawings, Hydrolic
• Indoorplants, Green walls. calculations & water requirement
• Irrigation studies)
• Hardscape: (Interlock, Kerbstone,
Our Design Department offers
Concrete works, fountains, a fully professional service
walkways, parks accessories & to a wide range of Clients
lightening playgrounds. including:
• Public Parks
LANDSCAPE MAINTENANCE • Palaces
• Hotel
• Public parks ,Sport Feilds, Indoor • Complexes & Commercial Ventures
Plants, villas,Palaces & green walls. • Private & Island Residences
• Roads & Highways
• Services includes lawn mowing,
hedges, groundcovers & trees With a greater awareness and
trimming, pesticide control, concern over water consumption,
fertilizing, planting, Irrigation our irrigation systems are designed
network. to maximize water usage efficiency,
automatically controlled to apply
the exact quality of water required to
maintain the landscape in pristine
condition without wastage by over
watering.

goldennails.qa 5

KEY MANAGEMENT PERSONNEL PROFILE

Eng. Wael Ramez Aldemashki General Manager

Senior Manager, holding a degree in Agricultural Engineering with Masters Degree
in Project Management - Woodbridge University having thirteen (13) years of
exceptional track record in a variety of:

• Management of infrastructure, landscaping and irrigation projects;
• Managing, organizing, planning, problem solving for construction projects industry.
• Strategic marketing direction
• Design & execution strategy
• Nursery management
• Multinational working environment, with specific proficiency in project / construction

management;

“Mr. Wael Aldemashki’s leadership and skill has enable Golden Nails to be one
of the leading construction firm in infrastructure, landscaping, and irrigation
projects in Qatar”

Eng. Hussein Ismail Operations Manager

Senior Manager, holding a bachelor’s degree in Agricultural Engineering with various
academic qualification and professional memberships having more than twenty (20)
years of exceptional track record in a variety of:

• Implementation and management of construction and operations projects for
Landscape and Irrigation works & land landscape Maintenance.

• Development and execution of business plans and marketing programs;
• Supervising Projects Estimations a budgets.
• Managing, organizing, planning, problem solving for Landscape projects.
• Irrigation systems design, Landscape project’ Management, Landscape Maintenance

management.

“Eng. Hussein’s management skills are major driving force in Golden Nails goals
to achieve a high quality and safe performance of all the company projects.”

Eng. Ghada Khushaifi Design Department Manager

Senior Manager, holding a bachelor’s degree in Civil Engineering with having more
than (11) years of exceptional track record in a variety of:

• Overseeing the design process using technical expertise
• Design, create Landscape & Irrigation project drawings & rivet presentation renderings.
• Maintaining thorough documentation of the design process
• Keeping up-to-date with changing building legislation and codes of practice relating to

design.

“Eng. Ghada Design skills are key points to achieve the concept schemes of our client
to be a reality.”

goldennails.qa 6

KEY MANAGEMENT PERSONNEL PROFILE

Mr. Sulieman Rafa

Human Resources Manager
Manager, having Degree in English Litrature and got more than (7) years of
experience in:
• Consistently recruiting excellent staff.
• Training, counseling and coaching our staff.
• Carrying out necessary administrative duties.
• Conducting performance and wage reviews.
• Developing clear policies and ensuring policy awareness.
• Creating clear and concise reports.
• Maintaining and reporting on workplace health and safety compliance.
• Handling workplace investigations, disciplinary and termination procedures.
• Maintaining employee and workplace privacy.
“Mr. Sulieman experiences an asset to Golden Nails to maintain the relation with its employees at the top positive
range with supporting the company’s goals in manpower & projects budgeting.”

Hamza Musa Monofali Attaalmanan

Irrigation & QA/QC Engineer

• Responsible for QA/QC documents of the complete project, including certificates,
calibration, test results, inspection requests, non-compliance reports and site instruction/
observations, permanent materials delivered, and other important QA/QC documents.

• Develop and determine all standards to perform inspections and tests on all procedures,
oversee all testing methods, and maintain high-quality standards for all processes.

• Review the quality of all materials at the site, ensure compliance with all project
specifications and quality, and collaborate with the department for all material
procurement and quality materials.

• Supervise the effective implementation of all test and inspection schedules, ensure adherence to all procedures, and
coordinate with various teams to perform quality audits on processes.

Rafat Adel Naem

Finance Manager
Bringing 16+ years of experience in preparing reports for management and other
stakeholders
• Plan, organize, and execute financial tasks and projects of the organization.
• Make estimates of funds required for the short and long-term financial objectives of

the organization.
• Complete financial reports, lead the month-end closing process and conduct

monthly financial forecast.
• Develop and implement plans for budgeting, forecasting, and reporting.
• Provide financial insight and analysis to drive the business performance of the organization.
• Evaluate the financial performance of the organization and measure returns on investments.
• Understand and calculate the risks involved in the financial activities of the organization.

goldennails.qa 7

KEY MANAGEMENT PERSONNEL PROFILE

Hamdy Abdulfattah A. Ali

Maintenance Manager
• Design of Landscape and Maintenance Program;
• On-site supervision of all Landscaping scope including Irrigation system;
• Coordinates with clients on requirements for Landscaping and Irrigation works.
• Check and approve on the material used in maintaining the sites plants-trees etc.
• Monitor team performance on sites and report to top management.
• Coordinates with consultants and contractors on-site;
• Attends coordination meetings and site inspections of projects;
• Monitors and assigns work plans and schedules for projects on Landscaping and Irrigation maintenance: In the

following projects: 8TH Group Maintenance / Muntazah project maintenance works / landscape & Irrigation Works
Duhail ISF project.
• Maintenance of Golden Nail’s Nursery, and Private Villas.

Catalino S. Santiago Jr.

QA/QC Manager

• Creates, supervises, and maintains Quality Management policies and procedures
by project standard requirements

• Leads workplace safety through prevention, instruction, and random inspection
• Monitors prime and subcontract actions for contract compliance, monitors risk and

contributes suggestions for risk mitigation
• Facilitates a culture of continuous process improvement among management

team, providing resources and collaborating to implement processes that are
streamlined and compliant
• Prepares and provides high-quality reports to management and customer on a
weekly, monthly, and quarterly basis
• Document control including document management systems

Domingo B. Luna

Graphic Designer & Social Media Specialist

• Conceptualizes and creates designs, concepts and layouts based on knowledge of
design principles.

• Develops and creates graphics for wide variety of print and online publications,
illustrations, collateral materials, website, video and social media channels.

• Manages and constantly updates/monitors company’s social media channels.
• Creates, shoots, edits and produces short videos with short timelines.
• Familiarity with design programs, such as Adobe PhotoShop, Illustrator and

InDesign.
• Shoots digital photos of projects to illustrate stories and videos, for use on social media platforms, collateral materials,

marketing and advertising Golden Nails.
• Assists in the development and implementation of a comprehensive social media strategy.

goldennails.qa 8

‫‪18000266-CON-002‬‬ ‫ﺷﻬﺎﺩﺓ ﺗﺼﻨﻴﻒ ﺍﻟﻤﻘﺎﻭﻝ‬

‫ﺗﺸﻬﺪ ﺇﺩﺍﺭﺓ ﺗﻨﻈﻴﻢ ﺍﻟﻤﺸﺘﺮﻳﺎﺕ ﺍﻟﺤﻜﻮﻣﻴﺔ ﺑﺄﻥ ﺍﻟﺴﺎﺩﺓ ‪ /‬ﺟﻮﻟﺪﻥ ﻧﻴﻠﺰ ﻟﻠﺮﻱ ﻭﺍﻟﺰﺭﺍﻋﺔ‬
‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‪ 70338 :‬ﻗﺪ ﺗﻢ ﺗﺼﻨﻴﻔﻬﻢ ﻓﻲ ﻗﻄﺎﻉ ﺍﻟﻤﻘﺎﻭﻟﻴﻦ ﺑﺎﻟﺘﺨﺼﺼﺎﺕ ﻭﺍﻟﻔﺌﺎﺕ ﺍﻟﺘﺎﻟﻴﺔ‪:‬‬

‫ﺍﻟﺤﺪ ﺍﻷﻗﺼﻰ‬ ‫‪Company Classification, Legal Documents & ISO‬‬‫ﺍﻟﻨﻘﺎﻁ‬‫ﺑﻴﺎﻥ ﺍﻟﻌﻨﺎﺻﺮ‬‫ﺍﻟﺤﺪﻭﺩ ﺍﻟﻤﺎﻟﻴﺔ‬‫ﺍﻟﻔﺌﺔ‬‫ﺍﻟﺘﺨﺼﺺ‬
‫ﻟﻠﻨﻘﺎﻁ‬ ‫ﺍﻟﻤﻜﺘﺴﺒﺔ‬ ‫ﺭﺃﺱ ﺍﻟﻤﺎﻝ‬ ‫ﺃﻛﺜﺮ ﻣﻦ ‪ 5‬ﻣﻠﻴﻮﻥ ﺍﻟﻲ ‪ 20‬ﻣﻠﻴﻮﻥ‬ ‫ﺍﻷﻭﻟﻰ‬ ‫ﺃﻋﻤﺎﻝ ﺯﺭﺍﻋﻴﺔ ﻭﺗﺠﻤﻴﻠﻴﺔ‬
‫‪6‬‬‫‪goldennails.qa 9‬‬
‫‪12‬‬ ‫‪3.50‬‬ ‫ﺻﺎﻓﻲ ﺍﻟﻤﻮﺟﻮﺩﺍﺕ‬ ‫ﻳﺠﺐ ﻋﻠﻰ ﺍﻟﻤﺼﻨﻒ ﻋﻨﺪ ﺍﻟﻘﻴﺎﻡ ﺑﺄﻱ ﺗﺼﺮﻑ ﻗﺎﻧﻮﻧﻲ ﻳﺘﺮﺗﺐ ﻋﻠﻴﻪ‬ ‫* ﺍﻟﺸﺮﻭﻁ‬
‫‪9‬‬ ‫‪4.38‬‬ ‫ﺍﻟﺠﻬﺎﺯ ﺍﻹﺩﺍﺭﻱ‬ ‫ﺗﻌﺪﻳﻞ ﻓﻲ ﻣﺮﻛﺰﻩ ﺍﻟﻘﺎﻧﻮﻧﻲ ﺑﻤﺎ ﻳﺨﻞ ﺑﺎﻟﻔﺌﺔ ﺃﻭ ﺍﻟﻤﺠﺎﻻﺕ ﺍﻟﺘﻲ ﺗﻢ‬ ‫ﻭ ﺍﻷﺣﻜﺎﻡ‬
‫‪17‬‬ ‫‪4.25‬‬ ‫ﺍﻟﺠﻬﺎﺯ ﺍﻟﻔﻨﻲ‬ ‫ﺗﺼﻨﻴﻔﻪ ﻓﻴﻬﺎ‪ ،‬ﺃﻥ ﻳﺨﻄﺮ ﺍﻹﺩﺍﺭﺓ ﺑﻬﺬﺍ ﺍﻟﺘﻌﺪﻳﻞ ﺧﻼﻝ ﺧﻤﺴﺔ ﻋﺸﺮ ﻳﻮﻣﺎ‬
‫‪29‬‬ ‫‪13.60‬‬
‫‪20.83‬‬ ‫ﺍﻟﻤﻌﺪﺍﺕ ﻭﺍﻵﻟﻴﺎﺕ‬ ‫ﻣﻦ ﺗﺎﺭﻳﺦ ﺇﺟﺮﺍﺀ ﻫﺬﺍ ﺍﻟﺘﺼﺮﻑ‪.‬‬
‫‪27‬‬ ‫ﺟﻮﺩﻩ ﺍﻷﺩﺍﺀ ﻭﺍﻟﺨﺒﺮﺓ‬ ‫ﻭﻳﺘﺮﺗﺐ ﻋﻠﻰ ﺇﺧﻼﻝ ﺍﻟﻤﺼﻨﻒ ﺑﺎﻟﺘﺰﺍﻣﺎﺗﻪ ﺍﻟﻤﺸﺎﺭ ﺇﻟﻴﻬﺎ ﺍﻧﺘﻬﺎﺀ ﺻﻼﺣﻴﺔ‬
‫‪23.77‬‬
‫‪100‬‬ ‫ﺍﻟﺴﺎﺑﻘﺔ‬ ‫ﺷﻬﺎﺩﺓ ﺍﻟﺘﺼﻨﻴﻒ ﺍﻟﻤﻤﻨﻮﺣﺔ ﻟﻪ‪.‬‬
‫‪74.33‬‬ ‫ﻣﺠﻤﻮﻉ ﺍﻟﻨﻘﺎﻁ‬

‫ﻣﺪﻳﺮ ﺇﺩﺍﺭﺓ ﺗﻨﻈﻴﻢ ﺍﻟﻤﺸﺘﺮﻳﺎﺕ ﺍﻟﺤﻜﻮﻣﻴﺔ‬ ‫‪13/10/2023‬‬ ‫ﺻﺎﻟﺤﻪ ﺣﺘﻰ‪:‬‬ ‫‪14/10/2021‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ‪:‬‬

‫>‪<Bar Code‬‬ ‫>‪<Bar Code‬‬

‫ﻣﺴﺘﺨﺮﺝ ﺑﺒﻌﺾ ﺑﻴﺎﻧﺎﺕ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‬ ‫ﻣﺴﺘﺨﺮﺝ ﺑﺒﻌﺾ ﺑﻴﺎﻧﺎﺕ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‬

‫ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ‪2022/03/21 :‬‬ ‫‪Company Classification, Legal Documents & ISO‬‬‫ﻣﺴﺘﺨﺮﺝ ﺑﺒﻌﺾ ﺑﻴﺎﻧﺎﺕ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺮﻯ‬‫ﺻﻼﺣﻴﺎﺕ ﻛﺎﻣﻠﺔ ﻭﻣﻄﻠﻘﺔ ‪ -‬ﻣﺪﻳﺮ‬‫ﻗﻄﺮ‬‫‪27063400034‬‬‫ﻓﻴﺼﻞ ﻋﺒﺪﺍﻟﻬﺎﺩﻯ ﺭﺍﺷﺪ ﻋﺒﺪﺍﻟﻠﻪ ﺍﻟﺪﻭﺳﺮﻯ‬

‫‪goldennails.qa 10‬‬ ‫*‪*70338‬‬ ‫ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‬

‫‪5000207621‬‬ ‫ﺭﻗﻢ ﺍﻟﺘﺴﺠﻴﻞ ﺍﻟﻀﺮﻳﺒﻲ‪:‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‪70338 :‬‬ ‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺍﻟﺮﻗﻢ‬ ‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺍﻟﺮﻗﻢ‬
‫‪16/01/2023‬‬ ‫ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‪:‬‬ ‫ﺟﻮﻟﺪﻥ ﻧﻴﻠﺰ ﻟﻠﺮﻱ ﻭﺍﻟﺰﺭﺍﻋﻪ‬ ‫ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ‪:‬‬
‫ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺴﺠﻞ‪:‬‬ ‫‪18/01/2015‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻧﺸﺎﺀ ﺍﻟﺴﺠﻞ‪:‬‬ ‫ﺯﺭﺍﻋﺔ ﺍﻟﻨﺒﺎﺗﺎﺕ ﺍﻟﺤﻴﺔ ﻷﻏﺮﺍﺽ ﺍﻟﻐﺮﺱ ﻭﺍﻟﺘﺰﻳﻴﻦ‬ ‫‪0130020‬‬ ‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻻﺳﻤﺪﺓ ﺍﻟﺰﺭﺍﻋﻴﺔ‬ ‫‪4773511‬‬
‫‪7000000‬‬ ‫ﺭﺍﺱ ﺍﻟﻤﺎﻝ‪:‬‬ ‫ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺌﻮﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ‬ ‫ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻰ‪:‬‬ ‫ﺗﺸﻐﻴﻞ ﻧﻈﻢ ﺍﻟﺮﻱ ﻟﻠﻤﺸﺮﻭﻋﺎﺕ ﺍﻟﺰﺭﺍﻋﻴﺔ‬ ‫‪1610300‬‬ ‫ﺭﻋﺎﻳﺔ ﻭ ﺻﻴﺎﻧﺔ ﺍﻟﻤﺘﻨﺰﻫﺎﺕ ﻭﺍﻟﺤﺪﺍﺋﻖ ﻻﻏﺮﺍﺽ ﺍﻻﺳـﻜﺎﻥ‬ ‫‪8130110‬‬
‫ﻗﻄﺮ‬ ‫ﺟﻨﺴﻴﺔ ﺍﻟﻤﻨﺸﺄﺓ‪:‬‬ ‫ﺣﺎﻟﺔ ﺍﻟﺴﺠﻞ‪ :‬ﻧﺸﻂ‬ ‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻟﻤﻮﺍﺩ ﻭ ﺍﻻﺩﻭﺍﺕ ﺍﻟﺰﺭﺍﻋﻴﺔ‬ ‫‪4773242‬‬
‫ﻋﺪﺩ ﺍﻟﻔﺮﻭﻉ‪0 :‬‬ ‫ﺭﻋﺎﻳﺔ ﻭﺻﻴﺎﻧﺔ ﻣﻨﺎﻇﺮ ﺍﻟﻤﺒﺎﻧﻲ ﻭﺍﻟﺤﺪﺍﺋﻖ ﺍﻟﻤﻨﺰﻟﻴﺔ ﻭﺣﺪﺍﺋﻖ‬ ‫‪8130120‬‬ ‫ﺍﻟﻌﺎﻡ‬ ‫‪4100001‬‬
‫‪+97433667622‬‬ ‫ﺍﻻﺳﻘﻒ ﻭ ﻭﺍﺟﻬﺎﺕ ﺍﻟﻤﺒﺎﻧﻲ ﺍﻟﺨﺎﺻﺔ ﻭﻏﻴﺮﻫﺎ‬ ‫ﺍﻻﻧﺸﺎﺀﺍﺕ ﻭ ﺍﻟﻤﻘﺎﻭﻻﺕ ﺍﻟﻌﺎﻣﻪ‬ ‫‪4773521‬‬
‫ﺍﻟﺘﺠﺎﺭﻩ ﻓﻰ ﺍﻟﺒﺬﻭﺭ ﻭﺍﻟﺸﺘﻼﺕ ﻭﺍﻟﻨﺒﺎﺗﺎﺕ‬ ‫‪4620102‬‬ ‫‪4620331‬‬
‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻟﺰﻫﻮﺭ ﻭ ﺍﻟﻮﺭﻭﺩ‬ ‫‪4620321‬‬
‫ﻣﻌﻠﻮﻣﺎﺕ ﺍﻻﺗﺼﺎﻝ‬ ‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻟﻨﺒﺎﺗﺎﺕ ﺍﻟﺪﺍﺧﻠﻴﺔ‬
‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻟﻨﺒﺎﺗﺎﺕ ﺍﻟﺨﺎﺭﺟﻴﺔ‬

‫ﺃﺭﻗﺎﻡ ﺍﻻﺗﺼﺎﻝ‪:‬‬ ‫‪45046‬‬ ‫ﺻﻨﺪﻭﻕ ﺍﻟﺒﺮﻳﺪ‪:‬‬

‫ﺍﻟﺤﺎﻟﺔ‬ ‫ﺍﻟﻨﺴﺒﺔ‬ ‫ﺍﻟﺠﻨﺴﻴﺔ‬ ‫ﺍﻟﺸﺮﻛﺎﺀ‬ ‫ﺭﻗﻢ ﺍﻹﺛﺒﺎﺕ‬ ‫ﺍﻷﺳﻢ‬
‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ‬
‫ﻧﺸﻂ‬ ‫‪49‬‬ ‫ﺳﻮﺭﻳﺎ‬ ‫‪28376003198‬‬ ‫ﻭﺍﺋﻞ ﺭﺍﻣﺰ ﺍﻟﺪﻣﺸﻘﻰ‬
‫‪51‬‬
‫ﻧﺸﻂ‬ ‫ﻗﻄﺮ‬ ‫‪27063400034‬‬ ‫ﻓﻴﺼﻞ ﻋﺒﺪﺍﻟﻬﺎﺩﻯ ﺭﺍﺷﺪ ﻋﺒﺪﺍﻟﻠﻪ ﺍﻟﺪﻭﺳﺮﻯ‬

‫ﺍﻟﻤﺪﺭﺍﺀ )ﺍﻟﻤﺨﻮﻟﻮﻥ ﺑﺎﻟﺘﻮﻗﻴﻊ(‬

‫ﺍﻟﺼﻔﺔ )ﺍﻟﺼﻼﺣﻴﺔ(‬ ‫ﺍﻟﺠﻨﺴﻴﺔ‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ‬ ‫ﺭﻗﻢ ﺍﻹﺛﺒﺎﺕ‬ ‫ﺍﻷﺳﻢ‬
‫‪ -‬ﻣﺪﻳﺮ‬
‫ﺳﻮﺭﻳﺎ‬ ‫‪28376003198‬‬ ‫ﻭﺍﺋﻞ ﺭﺍﻣﺰ ﺍﻟﺪﻣﺸﻘﻰ‬

‫‪Page 1 of 2‬‬ ‫‪Page 2 of 2‬‬
‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ‪70338 :‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ‪70338 :‬‬

‫ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ‬ ‫ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ‬
‫‪Qatar Chamber certifies that the above mentioned establishment has been registered‬‬ ‫‪Qatar Chamber certifies that the above mentioned establishment has been registered‬‬

<Bar Code>

2022/02/14 :‫ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ‬

No 1 of 1 :‫ﺻﻔﺤﺔ ﺭﻗﻢ‬

‫ﺭﺧﺼﺔ ﺗﺠﺎﺭﻳﺔ‬ This is to certify that
The Management Systems of
*101663*

Company Classification, Legal Documents & ISO2015/01/21:‫ﺗﺎﺭﻳﺦ ﺍﺻﺪﺍﺭ ﺍﻟﺮﺧﺼﺔ‬101663:‫ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ‬
2023/02/28 :‫ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺮﺧﺼﺔ‬ :‫ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ‬
goldennails.qa 11 :‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‬ ‫ﺟﻮﻟﺪﻥ ﻧﻴﻠﺰ ﻟﻠﺮﻱ ﻭﺍﻟﺰﺭﺍﻋﻪ‬ :‫ﻧﻮﻉ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺘﺠﺎﺭﻳﺔ‬
70338 :‫ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‬
‫ﺷﺮﻛﺔ‬

: ‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺆﻭﻝ‬ Golden Nails Landscape & Irrigation

‫ ﺳﻮﺭﻳﺎ‬:‫ﺟﻨﺴﻴﺔ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺌﻮﻝ‬ :‫ﻋﻘﺎﺭ ﺭﻗﻢ‬ ‫ﻭﺍﺋﻞ ﺭﺍﻣﺰ ﺍﻟﺪﻣﺸﻘﻰ‬ :‫ﺍﺳﻢ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺌﻮﻝ‬ Carried out at following site:
: ‫ﻧﻤﻮﺫﺝ ﺧﺘﻢ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺘﺠﺎﺭﻳﺔ‬ :‫ ﺍﻟﻮﺣﺪﺓ‬/‫ﺭﻗﻢ ﺍﻟﺪﻭﺭ‬ 28376003198 :‫ﺭﻗﻢ ﺍﻹﺛﺒﺎﺕ‬
: ‫ﺍﺳﻢ ﻣﺎﻟﻚ ﺍﻟﻌﻘﺎﺭ‬ Office No. 4, Floor No. 1, Entrance No. 1, Building No. 112,
112 ‫ﺗﺠﺎﺭﻱ‬ : ‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﻮﻗﻊ‬ Back of QNB, Salwa Road, Doha, Qatar
: ‫ﻧﻮﻉ ﺍﻟﺮﺧﺼﺔ‬ ‫ﻣﻜﺘﺐ ﺗﺠﺎﺭﻱ‬ :‫ﺗﺼﻨﻴﻒ ﺍﻟﻤﻮﻗﻊ‬
1 : ‫ﻭﺻﻒ ﺍﻟﻌﻨﻮﺍﻥ‬ ‫ ﻋﻴﻦ ﺧﺎﻟﺪ‬56 Has been found to conform to the environmental management system Standard:
‫ﻭﺭﺛﺔ ﺣﻤﺪ ﺑﻦ ﺧﺎﻟﺪ ﺍﻝ‬ ‫ﺷﺎﺭﻉ ﺭﻭﺿﺔ ﺍﻡ ﺍﻟﻘﻠﺒﺎﻥ‬ :‫ﻧﻮﻉ ﺍﻟﻤﻮﻗﻊ‬
ISO 14001:2015
‫ﺛﺎﻧﻲ‬ 451 :‫ﺍﻟﻤﻨﻄﻘﺔ‬
This certificate is valid for the following Product or Service ranges:
:‫ﺍﻟﺸﺎﺭﻉ‬
: ‫ﺭﻗﻢ ﺍﻟﺸﺎﺭﻉ‬ - Landscape & Irrigation Works – Construction & Maintenance
: ‫ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‬ - Trading of Plants And Agriculture Related Materials
- General Contracting & Infrastructure Works
‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺭﻗﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺭﻗﻢ ﺍﻟﻨﺸﺎﻁ‬
‫ﺍﻻﻧﺸﺎﺀﺍﺕ ﻭ ﺍﻟﻤﻘﺎﻭﻻﺕ ﺍﻟﻌﺎﻣﻪ‬ ‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻻﺳﻤﺪﺓ ﺍﻟﺰﺭﺍﻋﻴﺔ‬ 4773511 Certificate no. : IAS/EMS/G1033
4100001 ‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻟﻤﻮﺍﺩ ﻭ ﺍﻻﺩﻭﺍﺕ ﺍﻟﺰﺭﺍﻋﻴﺔ‬ 4773242
‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻟﺰﻫﻮﺭ ﻭ ﺍﻟﻮﺭﻭﺩ‬ ‫ﺭﻋﺎﻳﺔ ﻭﺻﻴﺎﻧﺔ ﻣﻨﺎﻇﺮ ﺍﻟﻤﺒﺎﻧﻲ ﻭﺍﻟﺤﺪﺍﺋﻖ‬ 8130120 Issued on : 10/03/2022 1st Surveillance Due On: 10/02/2023
‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻟﻨﺒﺎﺗﺎﺕ ﺍﻟﺪﺍﺧﻠﻴﺔ‬ 4773521 ‫ﺍﻟﻤﻨﺰﻟﻴﺔ ﻭﺣﺪﺍﺋﻖ ﺍﻻﺳﻘﻒ ﻭ ﻭﺍﺟﻬﺎﺕ‬ 2ND Surveillance Due On: 10/02/2024
‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻟﻨﺒﺎﺗﺎﺕ ﺍﻟﺨﺎﺭﺟﻴﺔ‬ 4620102 Validity Date : 09/03/2025
4620331 ‫ﺍﻟﻤﺒﺎﻧﻲ ﺍﻟﺨﺎﺻﺔ ﻭﻏﻴﺮﻫﺎ‬
‫ﺍﻟﺘﺠﺎﺭﻩ ﻓﻰ ﺍﻟﺒﺬﻭﺭ ﻭﺍﻟﺸﺘﻼﺕ ﻭﺍﻟﻨﺒﺎﺗﺎﺕ‬
4620321

The validity of certificate is subject to regular surveillance audit on or
before above mentioned dates and it’s only valid after successful
surveillance with continuation letter issued by CCPL
To verify the status of the certificate, please visit IAFSEARCH CERT website https://www.iafcertsearch.org/

CHAIRMAN / DIRECTOR

‫ﻣﺪﻳﺮ ﺇﺩﺍﺭﺓ ﺍﻟﺘﺴﺠﻴﻞ ﻭﺍﻟﺘﺮﺍﺧﻴﺺ ﺍﻟﺘﺠﺎﺭﻳﺔ‬

Company Classification, Legal Documents & ISO

This is to certify that
The Quality Management Systems

Of

Golden Nails Landscape & Irrigation

Carried out at following site:

Office No. 4, Floor No. 1, Entrance No. 1, Building No. 112,
Back of QNB, Salwa Road, Doha, Qatar

Has been found to conform to the Quality Management System Standard:

ISO 9001:2015

This certificate is valid for the following Product or Service ranges:

- Landscape & Irrigation Works – Construction & Maintenance
- Trading of Plants And Agriculture Related Materials
- General Contracting & Infrastructure Works

Certificate no. : IAS/QMS/F1095

Issued on : 01/02/2021 1st Surveillance Due On: DONE
2ND Surveillance Due On: 01/01/2023
Validity Date : 31/01/2024

The validity of certificate is subject to regular surveillance audit on or
before above mentioned dates and it’s only valid after successful
surveillance with continuation letter issued by CCPL
To verify the status of the certificate, please visit IAFSEARCH CERT website https://www.iafcertsearch.org/

CHAIRMAN / DIRECTOR

goldennails.qa 12

CLIENTS

goldennails.qa 13

PROJECT EXPERIENCES
CIVIL & INFRASTRUCTURE DIVISION

goldennails.qa 14

CIVIL & INFRASTRUCTURE
DIVISION PROJECT LIST

NO. PROJECT NAME CONSULTANT LOCATION CLIENT START COMPLETION

1 IPCUIZNHPOGFG1NRHRSAPAATSRWKDTURIGNAUCGC2TOTOAUNFLRAKENRODIFTAYLAT & CEG AL&IANKRIDHEZUAGASRRHTORAAAITWADILY,AAT ASGHAL 01-01-22 ON-GOING
MUNTAZAH STREET GINANTENRETNTAFTLIEOMNINAGL QATAR PPASDHGHAL
1 AUGUST 2016 JANUARY 2021
CONSULTANT
CEOXNTESNTRSUIOCNTIO–NPA&CIKRARGIGEAT1IO3N - LOOCNATIZIOAN PRIVATE 01-06-21 01-04-22
N2O. ANRNEOTDAWDMOARPJNKRLDIOOSJFAEPTCROTIVNNAIAZTMEAEVILLA EONSFINFGECITCICLNEIUEERERNIEOITRTRYING
2 INFRASTRUCTURE AROUND GANNETT FLEMING DOHA, QATAR FORCE (ISF) START COMPLETION
CISOFNCSATMRUPCTON AND HYDER 2016 2017
UPGRADING OF INDUSTRIAL
31 IRNOFARDAS&TRINUFCRTAUSRTERUOCFTAULRE AREA ROAD, ASHGHAL AUGUST 2016 JANUARY 2021
MINUANLT-AKZHAEHESSATRNEOERTTH & ASHGHAL DECEMBER 2016
3 EAXTSETN(SRIAOWND–ATPAACL-KHAAGMEA1M3A ALQAKTIASRSA 2015
AREA SEP2T0E1M7BER
DISTRICT) 2015

42 ROAD AND EH-AF DAOLHMAE,SQSAITLAAR, FFOOSSIINNEERRTTCCCCEEUUEERRRRII((OOIIIITTSSRRYYFF))  MAR2C0H162015 2016
DIIPSNREFFOSRCIJAGAESNMCTTRP&UBCUTIULTREOAFR6OVUILNLDA ENGINEERING QATAR DECEMBER
4
2014
ROAD & INFRASTRUCTURE SEPTEMBER
IN AL-KHEESA NORTH & AL KISSA DECEMBER NO2V0EM15BER
53 DPEDAOIESSVRTTETRL(I(OCRPPAAT)MWCKEDANAGTTEAOL2F-)HRAUMWAAMISA NAHTYIDOENRAL AREA AASSHHGGHHAALL& 2015
ENGINEERING PRIVATE 2013
5 AL RUWAIS AUGUST 2013 DECEMBER
SERVICES AL MESSILA, ENGINEERIN  MARCH 2015 APR2I0L 124014
64 DPILNAREFNOSRDIJAGESSNCCTTAR&PUBICNUTGIULATRNEO,DF 6 VILLA EHAF GINTOEFRFIIOCRE
IRRIGATION WORKS AT ROAD QMAITCA-R SECURITY JUNE 2012 NMOA2VYE02M103B1E4R
6 ENGINEERING MOUITHER
MIC CONSULTING AL RUWAIS FORQCAETA(RISF) AUGUST 2013 AMPARYIL22001144
550-MIC GHARYIA PETROLEUM AUGUST 2013
NATIONAL ASHGHAL & JMUANYE22001146
75 DEVELOPMENT OF RUWAIS AREEANNBSGGECIIRNNOVEENIEECSRRUEIISLNNTGGANT EENNGGPPGGRROOIIIINNFFVVFFEEAAIIEETTCCRREEEEIINN
GPOHRATRY(PEACBKEAAGCEH2H)OUSE DMEACYE2M0B1E4R
7 PROJECT PACKAGE 2 2015

886 LNAI5IINNRAT5ORFFN0QRRRIDG-TAAAMASHTSSATICTTCGIRAORRAPUUNUTICCNENWTTIGVUUOEARRRRNEEKS,,DSIWTAYOTRRKOSAD MIC COCNESGULTING QMAITCA-R QATAR JFUEBN2R0EU12A40R1Y2 JOUNN-EGO2I0N1G6
997 GIPASNTWRHFOLARAUJRGAESYSECAETTIATRLRUPBEDACAEECTTAVMUKCEARHELGEONH,ETPWOM2WUOEOSRNERKTKS–S UMNOIVUEITRHSEITRY PUENTIRVOERLESUITMY
DECEMBER
AREANBPGACHIRNOYSDENOEESNRRUSILN/TGANT GLHUASRAYILIA ENPGLRUIINSVEAAETILREIN AUMGAUYS2T0210313 2015
QPCEEGDR RUANSQIVALETARAFSRFIATNY G OFFICE
ON-GOING
1180 CHBNCAINTUISOOTFIEQNRYRLTADSAAHTTSNIANRTDGRGURASUCUATECTNETCITIORVUUANERRSRIEOTS,LYFIWATNFYOAERNWKS QATAR JFUENB2ER0U12A40R1Y4
11911 WAISEANTPNWOFIDLCRARUGAKOFSSESOFATHFTRIRLIROCUFEDPEICAESESTTL,VMUADWETRELASEONQRU,TPPWEPMSWHPOFOEOOARNURRKITSTNKSE–SS PUENTIRVOERLESUITMY

DCOUKNHSATRNUCTION OF NEW PARSONS/ DLUUKSHAAILN LQUASTAAIRL SMEPAYTE2M0B1E3R
HMYDZEPR RAWS ALKARFFAAN PETROLEUM 2012
111220 HCWCBUOISATIEMYKLDARPNAILNEDCGXESALETECBRURARASITTLIYOANFAHNALL QPECEGDR EPNEPTGQRRIAINOVTELAAEETRRUEIMN
MZP DUKHAN JDUENCEEM20B1ER4
EPIC FOR FIELD SUPPORT G OFFICE 2015
WORKSHOPS, WAREHOUSES QATAR
1131 AND OFFICES AT QPSFA IN SEPTEMBER
PETROLEUM 2012
DUKHAN

1142 WAKRA CELEBRATION HALL ECG WAKRA PRIVATE DECEMBER
COMPLEX ENGINEERIN 2015

G OFFICE

������������ goldennails.qa 15
��������� �������������������������������� ��
��������� �������� ������������ ����������

CIVIL & INFRASTRUCTURE
DIVISION PROJECT LIST

NO. PROJECT NAME CONSULTANT LOCATION CLIENT START COMPLETION

1153 INFRASTRUCTURE WORKS OF PROJACS/ KATARA KATARA OCTOBER SEPTEMBER
KATARA BEACH HOUSE KEO 2015 2016
PROJECT

1164 DESIGN & BUILT OF VILLA’S EHAF AL MESSILA PRIVATE MARCH SEPTEMBER
COMPOUND PROJECT ENGINEERING ENGINEERING 2015 2015

OFFICE

1175 QATAR ALUMINUM FACTORY MIC MESAIEED QATAR AUGUST FEBRUARY
EXTENSIONS CONSULTING CITY ALUMINUM 2014 2015

1186 MEP WORKS IN HAMAD - HAMAD ASHGHAL APRIL NOVEMBER
MEDICAL CITY MEDICAL 2015 2015

CITY

1197 BANI HAJER NORTH PHASES 1 - BANI HAJER ASHGHAL DECEMBER JULY 2016
& 2, PACKAGE 2015

!

������������ ��������� �������� ������������ ����������
��������� �������������������������������� ��
goldennails.qa 16

Landscape & Infrastructure Division Projects

Construction of PH1 PKg 2 Alkrityat & Izghawa

Client: Asghal - PPD Project Duration: 01-01-22 - Ongoing
Project Location: Al Kharatiyat & Izghawa
Consultant: CEG International Scope of Work: Sub-contract - Construction of Landscape &
Irrigation Network & 400 Days Maintenance of :
Main Contractor: Infraroad Landscape & Irrigation Network

Sub contract QAR 5.327 MILLION
project Value:

goldennails.qa 17

Landscape & Infrastructure Division Projects

Construction & Irrigation Network of Private Villa and Majlis at Oniza

Client: Private Engineering Office Project Duration: 01-01-21 - 1-04-2022
Project Location: Oniza
Consultant: Scope of Work: Construction of Landscape & irrigation
networK & 400 days maintenance Landscape
Main Contractor: & Irriagation network,Indoor plants supply

Sub contract QAR 0.235 MILLION
project Value:

goldennails.qa 18

Landscape & Infrastructure Division Projects

Construction and Upgrading of Infrastructure of Al Muntazah Street Extension - Package 13

Client: Ashghal Project Duration: August 2016 - September 2021
Project Location: Industrial Area Road, Qatar
Consultant: Gannett Fleming Scope of Work: Construction of Landscaping & Irrigation &
and landscape & Irrigation Maintenance works
Main Contractor: Al Jaber Transport & General Contracting

Sub contract QAR 83.20 MILLION
project Value:

goldennails.qa 19

Landscape & Infrastructure Division Projects

Construction and Upgrading of Infrastructure of Al Muntazah Street Extension - Package 13
goldennails.qa 20

Landscape & Infrastructure Division Projects

Road and Infrastructure around ISF Camp

Client: Interior Security Force (ISF) Project Duration: 2016-2017
Project Location: Doha, Qatar
Consultant: Gannett Fleming Scope of Work: Construction of civil works for Intelligent Transport
System
Main Contractor: Al Jaber & MAKHLOUF

Sub contract QAR - MILLION
project Value:

goldennails.qa 21

Landscape & Infrastructure Division Projects

Design & Built of 6 Villa Project

Client: PEO Project Duration: March 2015 - September 2015
Project Location:
Consultant: EHAF Engineering Scope of Work: Al Messila, Qatar
Works include external works for the villa, consists
Main Contractor: PAT ENGINEERING of pavements and walkways within the boundary
wall. Works also include underground works consist
Sub contract QAR 1.65 MILLION of all services (telephone, storm water, sewer,
project Value:
irrigation, potable water) works.

goldennails.qa 22

Landscape & Infrastructure Division Projects

Development of Ruwais Port ( Package 2 )

Client: Ashghal & Private Engineering Office Project Duration: 2013 – 2014
Project Location: Al Ruwais
Consultant: National Engineering Services Scope of Work:
External Services maintenance for potable water,
Main Contractor: PAT ENGINEERING drainage and lighting

Sub contract QAR 2.8 Million
project Value:

goldennails.qa 23

Landscape & Infrastructure Division Projects

Infrastructure, Landscaping and Irrigation Works at Road 550 - Mic

Client: Qatar Petroleum Project Duration: 2012 – 2013
Project Location: Mic- Mouither
Consultant: Mic Consulting Scope of Work:
Laying of LV Cable, LV Cable Ducts: EN2 (2-Way
Main Contractor: ETA Qatar Type), EN4 (4-Way Type),

Sub contract QAR 13.764 Million
project Value:

goldennails.qa 24

Landscape & Infrastructure Division Projects

Gharyea Beach House Project Package

Client: Private Engineering Office Project Duration: 2013 – 2014
Project Location: Gharyia
Consultant: Arab Consultant Engineering Scope of Work:
Underground pipe laying works for Irrigation,
Main Contractor: PAT ENGINEERING Lighting, Drainage, & Potable Water

Sub contract QAR 1,324,430.00
project Value:

goldennails.qa 25

Landscape & Infrastructure Division Projects

Infrastructure,Works at Qatar University North Gate

Client: Qatar University Project Duration: February 2014 – May 2014
Project Location: Qatar University
Consultant: CEG Scope of Work: Excavation & Backfilling works plus connection to
Main Irrigation network & installation of Secondary
Main Contractor: SIN Engineering Irrigation Network

Sub contract QAR 2.21 Million

project Value:

goldennails.qa 26

Landscape & Infrastructure Division Projects

Infrastructure,Works at Lusail Development – Sewage Treatment Works

Client: Lusail Project Duration: May 23, 2013 – May 31, 2014
Project Location: Lusail
Consultant: Parsons / Hyder Scope of Work:
Underground services i.e. LV cable works and road
Main Contractor: Mushrif Trading and Contracting crossing duct works

Sub contract QAR 8.327 Million
project Value:

goldennails.qa 27

Landscape & Infrastructure Division Projects

Construction of New HSE and Security Building at Ras Lafan City

Client: Qatar Petroleum Project Duration: June 22, 2014 – June 6, 2016
Project Location: Ras Laffan
Consultant: QP EDR Scope of Work:
External Works for the new HSE building consists of
Main Contractor: Al Alia Trading & Contracting services like lighting & potable water

Sub contract QAR 765,000.00
project Value:

Epic for Field Support Workshops,Warehouses and Offices at QPSFA in Dukhan

Client: Qatar Petroleum Project Duration: September 11, 2012 – December 14, 2015
Consultant: Parsons / Hyder Project Location: Dukhan
Main Contractor: Al Alia Trading & Contracting Scope of Work: Infraworks (i.e. potable water, LV network, sewer
Sub contract QAR 5.3 million system, irrigation systems) LV Cable Ducts: EN2
project Value: (2-Way Type)

Design & Built of Villa’s Compound Project

Client: Private Engineering Office Project Duration: March 15, 2015 – September 30, 2015
Project Location: Al Messila
Consultant: EHAF Engineering Scope of Work: Underground works consist of all services i.e.
telephone cables and ducts, storm water, sewer,
Main Contractor: PAT Engineering potable water & irrigation system.

Sub contract

project Value: QAR 1.65 million

goldennails.qa 28

Landscape & Infrastructure Division Projects

Wakra Celebration Hall Complex

Client: Private Engineering Office Project Duration: December 1, 2015 – May 5, 2018
Project Location: Wakra
Consultant: ECG Scope of Work:
E Underground services works consist of lighting
Main Contractor: Combined Group drainage, & potable water network

Sub contract QAR 3.335 million
project Value:

goldennails.qa 29

Landscape & Infrastructure Division Projects

N0 PHOTO IS AVAILABLE FOR THIS PROJECT

Road & Infrastructure in Al-Kheesa North & East (Rawdat Al-Hamama District)

Client: Ashghal Project Duration: August 2015 - September 2016
Project Location: Al Kissa Area , Qatar
Consultant: Hayder Scope of Work: Irrigation Water Road Crossing Ducts, Potable Water Road
Crossing Ducts, LV Cable Ducts: EN2 (2-Way Type) , Street
Main Contractor: Sacyr / Combined Group Contracting Co. Lighting Road Crossing Ducts:Type SL1.

Sub contract QAR 4.9 MILLION
project Value:

N0 PHOTOS ALLOWED FOR THIS PROJECT

Qatar Aluminum Factory Extensions

Client: Qatar Aluminum Project Duration: August 1, 2014 – February 3, 2015
Project Location: Mesaieed City
Consultant: Mic Consulting Scope of Work: Underground works consist of telephone, potable
water & irrigation system
Main Contractor: DutCo

Sub contract

project Value: QAR 5.345 million

N0 PHOTOS ALLOWED FOR THIS PROJECT

MEP works in Hamad Medical City

Client: ASHGHAL Project Duration: April 2015 – November 2015
Consultant: Project Location: Hamad Medical City
Main Contractor: Ali Bin Ali Medical / IB Trading & Contracting Company Scope of Work: Mechanical, Electrical and related Civil works for
Sub contract QAR - million other services and utilities (road crossing ducts
project Value: and chambers)

N0 PHOTOS ALLOWED FOR THIS PROJECT

Bani Hajer North Phases 1&2, Package

Client: ASHGHAL Project Duration: December 2015 – July 2016
Project Location: Bani Hajer
Consultant: Scope of Work: Civil work activities of irrigation and landscaping
(kerbstone, interlock, granite, irrigation network,
Main Contractor: Al Basra City Construction Co. W.L.L. /CGC-SACYR JV ducts and manholes, etc.)

Sub contract QAR 320,000
project Value:

goldennails.qa 30

PROJECT EXPERIENCES
LANDSCAPE & IRRIGATION

goldennails.qa 31

LANDSCAPE & IRRIGATION
& LANDSCAPE MAINTENANCE PROJECT LIST

NO. PROJECT NAME CONSULTANT LOCATION CLIENT START COMPLETIO
N
1 MINISTRY OF CULTURE & SPORTS (MAINTENANCE) VARIOUS LOCATIONS MINISTRY OF 10-AUG-
MAINTENANCE CONTRACT (MAINTENANCE) QATAR UNIVERSITY CULTURE 2021 ON-GOING
(MAINTENANCE) VARIOUS LOCATIONS & SPORTS ON-GOING
2 QATAR UNIVERSITY HOUSING QATAR 20-03-2022 ON-GOING
COMPLEX JUNE 2021 - ON-GOING
UNIVERSITY / ON-GOING
3 EIGHTH GROUP - AL RAYAN TDGI NOW 14-AUG-
MUNICIPALITY ( MAINTENANCE ) JUNE 2021 -
MME NOW 2021
ON-GOING
HARDSCAPE WORKS AT LUSAIL LUSAIL 2019
4 COMMERCIAL & SEEF LUSAIL PRIVATE
12-JAN-
PROJECTS MME 2021
ASHGHAL
5 3 PRIVATE VILLAS (MAINTENANCE) BANI HAJER – AL AUGUST
(MAINTENANCE) WAKRA – AIN 2016
AL MUNTAZAH ST -6 MONTHS KHALED
6 DIRECT CONTRACT MAINTENANCE INDUSTRIAL AREA
ROAD, QATAR
FROM JAN 2021 TO AUG. 2021
CONSTRUCTON AND UPGRADING OF GANNETT INDUSTRIAL AREA
7 INFRASTRUCTURE OF AL MUNTAZAH FLEMING ROAD, QATAR
STREET EXTENSION – PACKAGE 13

8 NEW ORBITAL HIGHWAY & TRUCK SALFO MESSAIEED ASHGHAL FEBRUARY APRIL 2017
ROUTE (P023) CONTRACT 1 2017

DESIGN & BUILD FOR ADDITIONAL DORSCH MUAITHER PEO MARCH 2016 APRIL 2016
9 WORKS AT MUAITHER PALACE-

PACKAGE 2

10 DESIGN & BUILT OF KATARA BEACH KEO KATARA, DOHA, KATARA OCTOBER SEPTEMBER
HOUSE PROJECT EHAF QATAR PRIVATE 2015 2016
CONSULTINNG ENGINEERING
11 DESIGN & BUILT OF 6 VILLAS AT ENGINEERS AL MESSILA, QATAR OFFICE (PEO)  MAY 2015 DECEMBER
MESSILA – PACKAGE 3 2015

LANDSCAPE & IRRIGATION WORKS
FOR FILED SUPPORT WORKSHOPS, QATAR SEPTEMBER DECEMBER
12 WAREHOUSE AND OFFICES AT QP MZ & PARTNERS DUKHAN, QATAR PETROLEUM 2012 2015
QP EDR RAS LAFFAN
SFA IN DUKHAN DORSH
- INDUSTRIAL CITY,
CONSTRUCTION OF NEW HSE AND QATAR QATAR JUNE 2014 JUNE 2016
13 SECURITY BUILDING AT RAS LAFFAN DAFNA PETROLEUM
DAFNA
CITY

DESIGN & BUILD FOR THE PEO JANUARY MARCH
14 EXTENSION OF LAWEENA MAJLIS & MARRIOTT 2016 2016
MAY 2016
GUEST HOUSE-8 ROOMS HOTEL MAY 2014
MOI
15 RENAISSANCE HOTEL

16 SERVICE BLOCK & POLICE STATION MOI, ENG DAFNA MARCH 2015 MAY 2015
AT DAFNA PARSONS / LUSAIL CITY, QATAR

LANDSCAPE AND IRRIGATION WORKS HYDER QATARI DIAR MAY 2013 MAY 2014
17 AT LUSAIL SEWAGE TREATMENT

WORKS

18 LANDSCAPE AND IRRIGATION WORKS CEG QATAR UNIVERSITY, QATAR FEBRUARY MAY 2014
AT QATAR UNIVERSITY NORTH GATE QATAR UNIVERSITY 2014

19 LANDSCAPE & IRRIGATION WORKS AT MZ & PARTNERS AL WAJBA, QATAR PRIVATE OCTOBER  NOVEMBER
PRIVATE PALACES PALACE 2012 2013

goldennails.qa 32

LANDSCAPE & IRRIGATION
& LANDSCAPE MAINTENANCE PROJECT LIST

NO. PROJECT NAME CONSULTANT LOCATION CLIENT START COMPLETION

20 GHARYEA BEACH HOUSE ARAB GHARYIA, QATAR PRIVATE 10-AUG- APRIL 2014
PROJECT PACKAGE 2 CONSULTANT LUSAIL CITY, ENGINEERING 2021
ENGINEERING QATAR DECEMBER
RENOVATION OF LANDSCAPE QATARI DIAR OFFICE SEPTEMBER 2015
21 & IRRIGATION WORKS AT QATARI DIAR 2013
JANUARY
QATARI DIAR HEAD OFFICE OCTOBER 2014
2013
22 EPC OF LOGISTICS TERMINAL QAPCO MESSAIEED, QATAR QAPCO MAY 2014
EXPANSION IN MESAIEED DECEMBER DECEMBER
ENGINEERING AMIRI DIWAN, PRIVATE 2013
LANDSCAPE AND IRRIGATION CONSULTANTS QATAR ENGINEERING AUGUST 2015
23 WORKS AT AMIRI SECURITY GROUP (ECG) 2012 SEPTEMBER
(MAINTENANCE) AL DAFNA, QATAR OFFICE
GUARD AL DAFNA, QATAR ZIG-ZAG MAY 2013 2013
MIC TOWERS 28/3/2012
24 LANDSCAPE AND IRRIGATION ALAGARIA 28/12/2011
WORKS AT ZIG-ZAG TOWERS AECOM / QATAR
MAUNSEL PETROLEUM
25 PALMS TREES RELOCATION AT
MESAIEED AL WAKRA ROAD QATAR
PETROLEUM /
LANDSCAPING & IRRIGATION
26 IN MESAIEED HOUSING ALAGARIA

PROJECT PACKAGE 3

3-WOQOD PETROL STATION WOQOD MIC-MOUITHER WOQOD 10/4/2013 6/8/2013
27 MIC-MOUITHER NORTH –

MOUITHER SOUTH

28 DEVELOPMENT OF RUWAIS NATIONAL AL RUWAIS ASHGHAL & 9/8/2013 15/12/2014
PORT PACKAGE #2 ENGINEERING AL WAJBA PRIVATE 20/10/2012 21/11/2013

LANDSCAPE & IRRIGATION SERVICES ENGINEERING
29 WORKS AT PRIVATE PALACE / MZP OFFICE
PRIVATE
ALWAJBA AREA

30 LANDSCAPE & IRRIGATION AECOM NEW DOHA PORT NEW DOHA  12/4/2012 11/4/2013
WORKS AT NEW DOHA PORT PORT

31 MARRONA COMPLEX (MAINTENANCE) ALWAAB PRIVATE 1/8/2010 22/3/2011

32 SCHOOLS / FOOTBALL FIELD OLYMPIC DIFFERENT SCHOOLS 1/9/2012 21/5/2016
AROUND DOHA COMMITTEE LOCATIONS 30/7/2015
CBM QATAR PEARL QATAR
33 PEARL QATAR PEARL QATAR 1/8/2013

goldennails.qa 33

Landscape & Irrigation
& Landscape Maintenance Projects

Landscape & Irrigation Maintenance Contract for 4 Years at Various Locations

Client: Ministry of Culture & Sports Project Duration: Aug 2021 - on Going Maintenance
Consultant: QAR 5.84 MILLION Project Location:
Main Contractor: Scope of Work: Various Location in the Ministry
Sub contract - Landscaping & Irrigation
project Value: - Landscape & Irrigation Maintenance works

goldennails.qa 34

Landscape & Irrigation
& Landscape Maintenance Projects

Operations and Maintenance Activities of Landscape & Irrigation
system at Qatar University Housing Complex Project

Client: Qatar University Project Duration: March 2022 - on Going Maintenance
Project Location:
Consultant: Scope of Work: Qatar University
Landscaping & Irrigation & and Landscape &
Main Contractor: TDGI services Irrigation Maintenance works

Sub contract

project Value: QAR 1.02 MILLION

goldennails.qa 35

Landscape & Irrigation
& Landscape Maintenance Projects

8th Group at AL Rayan Municipality

Client: Ministry of Municipality Project Duration: 2021-2023 (on going maintenance)
Project Location: Various Location
Consultant: Scope of Work:
Landscape & Irrigation Maintenance works
Main Contractor: Golden Nails

Sub contract

project Value: QAR 4.246 million

goldennails.qa 36

Landscape & Irrigation
& Landscape Maintenance Projects

Construction and Upgrading of Infrastructure of Al Muntazah Street Extension

Client: Ashghal. & Maintenance Contract with Project Duration: Aug 2016 - 1 Sep 2021
Project Location:
Consultant: Gannett Fleming Scope of Work: Industrial Area Road, Qatar
Construction of Landscaping & Irrigation & and
Main Contractor: Al Jaber Transport & General Contracting landscape & Irrigation

Sub contract

project Value: QAR 83.20 MILLION

goldennails.qa 37

Landscape & Irrigation
& Landscape Maintenance Projects

Construction and Upgrading of Infrastructure of Al Muntazah Street Extension
goldennails.qa 38

Landscape & Irrigation
& Landscape Maintenance Projects

Hardscape Works at Commercial & Seef Lusail Projects

Client: LUSAIL Project Duration: 2021 Sub-contract works
Project Location: Various Location in the Ministry
Consultant: Scope of Work:
Installation of Granite, Curbstone and Interlock.
Main Contractor: ITS Qatar

Sub contract

project Value: QAR 6.920 million

New Orbital Highway & Truck Route (P023) Contract 1

Client: ASHGHAL Project Duration: February 2017 – April 2017
Consultant: Salfo Project Location: Messaieed
Main Contractor: J&P Scope of Work:
Sub contract Construction of Landscaping & Irrigation works
project Value: QAR 1.89 MILLION

goldennails.qa 39

Landscape & Irrigation
& Landscape Maintenance Projects

Design & Built of Katara Beach House Project

Client: KATARA Project Duration: October 2015 – September 2016
Project Location:
Consultant: Projacs/ KEO Scope of Work: Katara, Doha, Qatar

Main Contractor: PAT Engineering Works include hard & soft landscaping including
irrigation systems and 1400 sq.m. of Green Wall as
Sub contract well as other general works including landscape

project Value: QAR 4.312 Million

goldennails.qa 40

Landscape & Irrigation
& Landscape Maintenance Projects

Design & Built of 6 Villas at Messila – Package 3

Client: Private Engineering Office (PEO) Project Duration: May 2015 – December 2015
Project Location: Al Messila
Consultant: EHAF Consulting Engineers Scope of Work:
Works include external works for the visitor
Main Contractor: PAT Engineering villa,consists of soft landscape, irrigation works,
internal pavements and walkways within the
Sub contract boundary wall.

project Value: QAR 1.530 Million

goldennails.qa 41

Landscape & Irrigation
& Landscape Maintenance Projects

Construction of New HSE and Security Building at Ras Laffan City

Client: Qatar Petroleum Project Duration: June 2014 – June 2016
Project Location: Ras Laffan Industrial City, Qatar
Consultant: QP EDR Scope of Work:
Works include hard & soft landscaping works
Main Contractor: Al Alia Trading & Contracting including irrigation works installation & Landscape
Maintenance Works.
Sub contract

project Value: QAR 0.765 Million

goldennails.qa 42

Landscape & Irrigation
& Landscape Maintenance Projects

Rennaisance Hotel

Client: Mariott Hotel Project Duration: May 2014 – May 2016
Project Location: Al Dafna, Near City Center
Consultant: EHAF Consulting Engineers Scope of Work:
Landscape maintenance works
Main Contractor: GOLDEN NAILS

Sub contract

project Value: QAR 512,800.00

Landscape & Irrigation works for Filed Support Workshops,
Warehouse and Offices at QP SFA in Dukhan

Client: Qatar Petroleum Project Duration: September 2012 – December 2015
Project Location: Dukhan, Qatar
Consultant: MZ & Partners Scope of Work:
Works include hard & soft landscaping works
Main Contractor: Al Alia Trading & Contracting including irrigation system design & installation &
landscape maintenance works.
Sub contract

project Value: QAR 5.300 Million

goldennails.qa 43

Landscape & Irrigation
& Landscape Maintenance Projects

Landscape and Irrigation Works at Lusail Sewage Treatment Works

Client: Parsons / Hyder Project Duration: May 2013 – May 2014
Project Location: Lusail City, Qatar
Consultant: Qatari Diar Scope of Work:
Landscaping & irrigation works & and landscape
Main Contractor: Mushrif Trading and Contracting maintenance works.

Sub contract

project Value: QAR 8.327 Million

goldennails.qa 44

Landscape & Irrigation
& Landscape Maintenance Projects

Landscape and Irrigation Works at Qatar University North Gate

Client: Qatar University Project Duration: February 2014 – May 2014
Project Location: Qatar University, Qatar
Consultant: CEG Scope of Work:
Works include landscape and irrigation works as
Main Contractor: SIN Engineering well as landscape maitenance works

Sub contract

project Value: QAR 2.210 Million

goldennails.qa 45

Landscape & Irrigation
& Landscape Maintenance Projects

Landscape & Irrigation Works at Private Palaces

Client: Private Palace Project Duration: QAR 5.8 Million
Project Location: Al Wajba, Qatar
Consultant: MZ & Partners Scope of Work:
Design, supply, installation of hard and soft
Main Contractor: Alalia Trading & Contracting landscape and irrigation system, as well as
landscape maintenance works
Sub contract

project Value: QAR 5.8 Million

goldennails.qa 46

Landscape & Irrigation
& Landscape Maintenance Projects

Gharyea Beach House Project Package 2

Client: Private Engineering Office Project Duration: August 2013 – April 2014
Project Location: Gharyia, Qatar
Consultant: Arab Consultant Engineering Scope of Work:
Landscape and irrigation works as well as
Main Contractor: PAT Engineering Landscape maitnenance works.

Sub contract

project Value: QAR 1.325 Million

goldennails.qa 47

Landscape & Irrigation
& Landscape Maintenance Projects

Renovation of Landscape & Irrigation works at Qatari Diar Head Office

Client: Qatari Diar Project Duration: September 2013 – December 2015
Project Location: Lusail City, Qatar
Consultant: Qatari Diar Scope of Work:
Landscape and irrigation Maintenance works.
Main Contractor: EMS Electromechanical Services

Sub contract

project Value: QAR 0.912 Million

goldennails.qa 48

Landscape & Irrigation
& Landscape Maintenance Projects

Landscape and Irrigation Maintenance works at Zig-Zag Towers

Client: Zig Zag Towers Project Duration: August 2012 – December 2015
Project Location: Al Dafna, Qatar
Consultant: Lagoona Scope of Work:
MAINTENANCE of Landscape and irrigation system.
Main Contractor: CBM Qatar

Sub contract

project Value: QAR 0.390 Million

goldennails.qa 49

Landscape & Irrigation
& Landscape Maintenance Projects

G Palms Trees Relocation at Mesaieed Al Wakra Road

Client: Qatar Petroleum Project Duration: May 2013 – September 2013
Project Location: Mesaieed Al Wakra
Consultant: MIC Scope of Work:
Relocation of palm trees and irrigation works.
Main Contractor: Condor Trading & Contracting

Sub contract

project Value: QAR 0.691 Million