Golden Nails PreQualification - Profile

Golden Nails PreQualification - Profile

Keywords: Golden Nails

Landscape & Irrigation
& Landscape Maintenance Projects

Landscaping & Irrigation in Mesaieed Housing Project Package 3

Client: Qatar Petroleum / Alagaria Project Duration: 28/12/2011 – 28/ 3/ 2012
Project Location: Alagaria
Consultant: Aecom / Maunsel Scope of Work:
Design and built of Landscape Irrigation system
Main Contractor: Alcat Trading & Contracting

Sub contract

project Value: QAR 7.153 Million

goldennails.qa 51

Landscape & Irrigation
& Landscape Maintenance Projects

3-Woqood Petrol Stations Mic-Mouither North - Mouither South

Client: Woqod Project Duration: 10/4/ 2013 – 6/ 8/ 2013
Project Location: Mic-Mouither
Consultant: Woqod Scope of Work:
Works include Hard and soft landscaping
Main Contractor: Condor Trading & Contracting including irrigation system design and landscape
maintenance works.
Sub contract

project Value: QAR 819,075.00

Development of Ruwais Port Package 2

Client: ASHGHAL & Private Engineering Office Project Duration: 9/ 8/ 2013 – 15/ 12/ 2014
Project Location: Al Ruwais
Consultant: National Engineering Services Scope of Work:
Design, supply, installation of hard and soft
Main Contractor: PAT Engineering landscape and irrigation system with 400 days of
maintenance, plus the external services (portable
Sub contract water, drainage and lights).

project Value: QAR 2.8 Million

goldennails.qa 52

Landscape & Irrigation
& Landscape Maintenance Projects

Landscape & Irrigation Works at New Doha Port

Client: New Doha Port Project Duration: 12/ 4/ 2012 – 11/ 4/ 2013
Project Location: New Doha Port
Consultant: AECOM Scope of Work:
Supply and installation of landscape, irrigation,
Main Contractor: China Harbor Engineering Company potable water, drainage, of the CHEC labor camp

Sub contract

project Value: QAR 1,934,210.00

Marrona Complex

Client: Private Project Duration: 1/ 8/ 2010 – 22/ 3/ 2011
Project Location: Alwab
Consultant: CEG Scope of Work:
Supply and installation of landscape including
Main Contractor: Alalia Trading and Contracting irrigation system design & Landscape maintenance
works.
Sub contract

project Value: QAR 523,000.00

goldennails.qa 53

Landscape & Irrigation
& Landscape Maintenance Projects

Pearl Qatar

Client: Pearl Qatar Project Duration: 1/ 8/ 2013 – 30/ 7/ 2015
Project Location: Pearl Qatar
Consultant: CBM Qatar Scope of Work:
Works include soft landscaping and irrigation
Main Contractor: EMCOR maintenance works at the Pearl Qatar

Sub contract

project Value: QAR 6.325 Million

goldennails.qa 54

Landscape & Irrigation
& Landscape Maintenance Projects

Design & Build for Additional Works at Muaither Palace – Package 2

PHOTOS ARE NOT ALLOWED FOR THIS PROJECT

Client: PEO Project Duration: March 2016 – April 2016
Project Location: Muaither
Consultant: Dorsch Scope of Work:
Construction of Landscaping & Irrigation works
Main Contractor: PAT Engineering

Sub contract QAR 211,000.00

project Value:

Design & Build for the Extension of Laweena Majlis & Guest House
– 8 Rooms PHOTOS ARE NOT ALLOWED FOR THIS PROJECT

Client: PEO Project Duration: March 2016 – April 2016
Consultant: Dorsch Project Location: Muaither
Main Contractor: PAT Engineering Scope of Work:
Sub contract QAR 211,000.00 Construction of Landscaping & Irrigation works
project Value:

Service Block & Police Station in Dafna PHOTOS ARE NOT ALLOWED FOR THIS PROJECT

Client: MOI Project Duration: March 2015 – May 2015
Project Location: DAFNA
Consultant: MOI Eng Scope of Work:
Construction of Landscaping & Irrigation works
Main Contractor: Al Alia Trading & Contracting

Sub contract

project Value: QAR 243,000.00

Landscape and Irrigation works at Amiri Security Guard PHOTOS ARE NOT ALLOWED FOR THIS PROJECT

Client: Private Engineering Office Project Duration: December 2013 – May 2014
Project Location: Amiri Diwan, Qatar
Consultant: Engineering Consultants Group (ECG) Scope of Work:
Design & built of landscape and irrigation works
Main Contractor: PAT Engineering

Sub contract

project Value: QAR 0.614 Million

goldennails.qa 55

WE’RE PROFESSIONAL IN MAINTAINING
PRIVATE VILLAS PLANTS & LANDSCAPES.

goldennails.qa 56

WE’RE SPECIALIZED IN FOOTBALL FIELD MAINTENANCE & AND
HAS AGREEMENTS WITH GOVERMENTAL AND PRIVATE SECTORS

goldennails.qa 57

WE ALSO OFFER MAINTENANCE SERVICES FOR INDOOR
PLANTS INSIDE BUILDINGS, HOTELS, COMBOUNDS ...ETC

goldennails.qa

goldennails.qa 58

٢٠٢١/٢٠٧٣/١‫��ش�م�إ‬

. 5,845,560 MCS/APD/OP/005/ 2021

Performance Bond 10%

15

Client Approvals,

goldennails.qa 59

Client Approvals

goldennails.qa 60

Client Approvals

goldennails.qa 61

Ministry of Municipality and Environment
Tender & Auctions Committee

email: [email protected] 44889951 : 44889950 :
/

,,

( TC/B/56/1597/2020)

,
:

. .4,246,817/16

( )
.

Client Approvals(+974) 44348598 :

goldennails.qa 62
Tel. : (+974) 44348505/8957 – Fax : (+974) 44348598 www.baladiya.gov.qa – (+974) 44348505/8957 :
P.O.Box : 2727 Doha - Qatar – 2727 : .

Client Approvals

goldennails.qa 63

Client Approvals

goldennails.qa 64

Client Approvals

goldennails.qa 65

Client Approvals

goldennails.qa 66

Client Approvals

goldennails.qa 67

Client Approvals

goldennails.qa 68

Client Approvals

goldennails.qa 69

Client Approvals

goldennails.qa 70

Client Approvals

goldennails.qa 71

Client Approvals

goldennails.qa 72

Client Approvals

goldennails.qa 73

Client Approvals

goldennails.qa 74

Client Approvals

goldennails.qa 75

Completion Certificates

goldennails.qa 76

Completion Certificates

goldennails.qa 77

Completion Certificates

goldennails.qa 78

Completion Certificates

goldennails.qa 79

Completion Certificates

goldennails.qa 80

Completion Certificates

goldennails.qa 81

Completion Certificates

goldennails.qa 82

Completion Certificates

goldennails.qa 83

Completion Certificates

goldennails.qa 84

Resources - Nurseries & Supplies

We own and maintain the one of the most elaborate and extensive nursery facilities
in Qatar, located in UM OWINA- AQUA PARK EXIT in DOHA stock yard :15000 Sq. with
supporting overseas facilities.

Producers and importers of quality plants and trees. | Production ability of 300,000 plants per
year.

GROUND COVERS STORE

SUCCULENTS TREES
SHRUBS

TREES

STORE TREES

WATER
TREATMENT

WORKERS BONSAI TREE VISITORS
ROOM AREA
OFFICE
BONSAI TREE

PRODUCTION
AREA

SHRUBS

ENTRANCE

goldennails.qa 85

Resources - Nurseries & Supplies

THAILAND SUPPORT NURSERY: Resources - Doha, Nursery
35,000 Sq.M. THAILAND SUPPORT NURSERY: our Thailand nursery partner (green trop-
ical co. LTD). Supporting us with different trees, palms, shrubs, etc.

121

goldennails.qa 86

Resources - Doha Nursery
Resources - Nurseries Import Actvities

goldennails.qa 87

Green Walls Supply and Installation and Maintenance services Resources - Green Walls Supply and Installation and Maintenance Services

126 goldennails.qa 88

125

SUPPLIES –RCesOoCuOrcePsEA- TSupplies – Coco Peat

127

goldennails.qa 89

Resources - Supplies - Pebbles

SUPPLIES - PEBBLES

128

goldennails.qa 90

Resources - Supplies - Pebbles

129

129

goldennails.qa 91

Resources - Supplies - Aggregare ProductsSUPPLIES -SUAgPgPrLeIgEaSre- PArgogdruegctasre Products
130 131
goldennails.qa 92

SUPPRLeIEsSou-rTcreospi-cSaluGpparlideesn-PTeraotpmicoassl Garden Peatmos

132

goldennails.qa 93

Resources

133

goldennails.qa 94

Heavy Equipments and Vehicles

Heavy Equipment & Vehicles

Brand Model Category Name Total QTY Photo illustration

ͳ
ƒ…Š‘‡
ƒ…Š‘‡ ͳ
‘ƒ†‡” Ž‘ƒ†‡”

ʹ ‹‹ š…ƒ˜ƒ–‘” ͵


͵ š…ƒ˜ƒ–‘” ͳ

Ͷ ‘„…ƒ– ͵

ͷ ͳ͵ͳ͸ ͸ʹ ‡ƒ– —•

ʹ

͸

͹ ʹͶ ‡ƒ–• —•‡• ͸

ͺ ͺ

ͻ ‹… ’ ƒ–‡” ͵ �
–‘
��
��� �������–��������������������� ���������

stration

��� ������� ������� 134 �
��� ������������ �������
��� ������� ������� ������������� ���

��� ��������� �������� ��������� �
�����
��

��� ���� ������������� ����������� �

��

Landscaping Equipment & Machinerygoldennails.qa 95

Landscaping EquipLamnedsncta&pinMg aEcqhuiipnmereynts & Machinery

Sr Item Description Quantity

1. Tractor (Messay ) 2

2. Tractor (Kubota B2140S) 3

3. Tractor ( Kubota BS350 ) 2

4. Lawn Mower (Iseki) 2

5. Lawn Mower (Turf tidy Peruzzo Flail Mower Models L 2000) 2

6. Lawn Mower (Turf tidy Peruzzo Flail Mower Models /L 1600) 2

7. Lawn Mower( Turf tidy Peruzzo Mower Collector L 1200 ) 2

8. Lawn Mower (Toro Grand Master d4500) 1

9. Lawn Mower (Cub Cadet Zero-Turn Mower- XZ5 L137 # 137CM KAWI) 8
6
10. Lawn Mower (Cub Cadet LT3 PS107 # 107CM B&S/ XT2 PS 117/ XT3 QS137 Lawn 8
Tractor)

11. Lawn Mower (Ride on Mower Honda)

12. Lawn Mower( Push on Mower Honda) 19
17
13. Lawn Mower( Push on Mower Cub Cadet LM1 CR53 / LM2 DR53S / LM3 ER53S # 53CM
CUB SELF PROPELLED MOWER)

14. Brush Cutter (Honda) 43

15. Hedge Trimmer (Stihl ,Husqvarna ,Makita ) 58

16. Chainsaw (stihl MS- 290) 17
13
13517. Lawn edger, Side Cutter Machine (Victa)

18. Aerator Machine ( Back Tractor Tagged -Ryan-2m) 2

19. Aerator Machine (Classen SA-18-65 CM) 5

20. Verti cut Machine ( Back Tractor Tagged - -1.8-2 m) 2

21. Verti cut Machine (Agrimetal 65cm ) 6

22. Top dressor Machine (DALTON -120 cm,5.5 hp Honda) 4

23. Sod cutter (Classen 18” pro sod cutter 8-HP Honda) 2

24. Cultivator (Push on Cultivator) 5

25. Fertilizer Spreader big 250 kg 2

26. Fertilizer Spreader big 175 kg 3

27. Fertilizer Spreader mid-Size 75 kg 2

28. Fertilizer Spreader (Push MTD WE 330 SPREADER-10-25 KG) 12

29. Pesticide sprayer( Pesticide Sprayer soil Master Boom 10 M &with 2 gun 50m -2000lt) 2

30. Pesticide sprayer( Pesticide Sprayer soil Master with 2 gun 50 m -1000lt) 2

31. Pesticide sprayer( Pesticide Sprayer with 1 gun -200lt) 3

32. Pesticide sprayer( Tagged Pesticide Sprayer with 1 gun -15-20 lt) 12

33. Leaf Vacuum Cleaner 6

34. Air Sweeper (Peruzzo) 2

35. Air Blower (Honda, Makita) 22

36. CUB CADET HAULER #450KG 2

37. TILLER - CUB CADET XC3 F46 # 46CM CUB 1

38. TOW STEEL DUMP CART MAX.750LB /340KG, 10 CUFT, BLACK 2

39. TOW "PRO" SPRAYER 25GAL/95L 4

40. TILLER - CUB CADET XC3 F46 # 46CM CUB 1

41. Back Tractor Mixer 2

42. Mid-Size Tag Trailer 1

43. Mid-Size Box Trailer goldennails.qa 1
44. shifting plate 916

36. CUB CADET HAULER #450KG 2

37. TILLER - CUB CADET XC3 F46 # 46CM CUB 1

38. TOW STEEL DUMP CART MAX.750LB /340KGL, 1a0nCdUsFTc,aBLpAiCnKg Equipments & Machi2nery
39. TOW "PRO" SPRAYER 25GAL/95L 4

40. TILLER - CUB CADET XC3 F46 # 46CM CUB 1

41. Back Tractor Mixer 2

42. Mid-Size Tag Trailer 1

43. Mid-Size Box Trailer 1

44. shifting plate 1

45. compactor 2

46. AIR COMPRESSOR 3

47. Generator 5

48. Water Pump ‫ماء‬ 2

49. trailer Tanker for Water spray 1

50. Welding Machine / ‫الة لحام‬ 1

51. Wood Shredder / ‫فرامة خشب‬ 1

52. PVC Water Tank 1000 L & 5000 L 2

136 Hand Tools

HAND TOOLS 200
100
1. KA-2K HAND GRUBBER- 122
2. LD-2K MINI SWEEP 110
3. KF-2K SCRAPER 75
4. LU FLOWER TROWEL 165
5. LU-2P PLANTING TROWEL 350
6. LJ-Z MINI RAKE 250
7. LN-2K DOUBLE HOE 25
8. RR-EN PROMO BYPASS SHEAR SECATEUR 75
9. RR 5000 PROFI BYPASS ALU/ CARD SECATEUR 25
10. RR 1500 INDOOR BYPASS SHEAR SECATEUR 55
11. POWER CUT RR 630 PROMOTIONAL BYPASS LOPPER 35
12. PDC RR 200 - Power Dual Cut FIXED TOOL - TREE LOPPER 45
13. POWER CUT* RR 650 BASIC PLUS BYPASS LOPPER 42
14. HS-W HEDGE SHEAR W/ WAVE EDGED BLADES 35
15. HS-B BOX TREE SHEAR HEDGE SHEAR 250
16. HS 1000 T HEDGE SHEAR 80
17. ZMI 12/04 ALUMINUM HANDLE 30
18. MINI-SET FIXED TOOLS 75
19. POWER CUT SAW 370 NEW MULTI-STAR TREE SAW 105
20. FB-ME WEEDING BRUSH REPL.-SET NEW MULTI- SOIL PROCESSING goldennails.qa 97 92
21. BE-M CULTIVATOR BE-M
22. BI-M AERATOR

11. POWER CUT RR 630 PROMOTIONAL BYPASS LOPPER 25
12. PDC RR 200 - Power Dual Cut FIXED TOOL - TREE LOPPER 55
13. POWER CUT* RR 650 BASIC PLUS BYPASS LOPPER
14. HS-W HEDGE SHEAR W/ WAVE EDGED BLADES Hand T3o5ols
15. HS-B BOX TREE SHEAR HEDGE SHEAR
16. HS 1000 T HEDGE SHEAR 45
17. ZMI 12/04 ALUMINUM HANDLE 42
18. MINI-SET FIXED TOOLS 35
19. POWER CUT SAW 370 NEW MULTI-STAR TREE SAW 250
20. FB-ME WEEDING BRUSH REPL.-SET NEW MULTI- SOIL PROCESSING 80
21. BE-M CULTIVATOR BE-M 30
22. BI-M AERATOR 75
23. IL-M 3 DOUBLE HOE 105
24. DR-M 30/ DR-M 35 SOIL RAKE 92
25. DO-M 40 BOW RAKE 110
26. UF-M GARDEN TINE RAKE 310
27. UC-M ADJUSTABLE RAKE 95
28. UI-M SWEEP LEAF RAKE 40
29. DR-M 3-IN-1 RAKE 45
30. UR-M 3 SCARIFYING ROLLER NEW MULTI-STAR LAWN CARE 60
31. RB-M LAWN EDGER 102
32. RM-M LAWN EDGE-IRON 18
33. GH-BO 8 BED GLOVES "SOIL" 12
15
137 225

goldennails.qa 98

MANPOWER PERSONNEL

General Manager Indirect Manpower
Engr. Wael Aldemashki

Operations Manager Engr. Hussein Ismail

Design Manager Engr. Ghada Khushaify

Maintenance Manager Engr. Hamdy Ali

HR Manager Suleiman Rafea

Finance Manager Rafat Adel Naem

QA/QC Manager Engr. Catalino S. Santiago Jr.

Nursery Manager Engr. Aysar Aldemashki

Graphic Designer & Social Media Specialist Domingo Luna

Landscape Engineer Direct Manpower
Engr. Izhar Ali

Irrigation Engineer Engr. Hamza Musa Monofali Attaalmanan

Site Engineer Engr. Loay Ramez Aldimashky

Landscape Supervisor Mohamed Elshazly / Iyad Kadhaj

Hardscape Supervisor Golam Sultan

Site Foreman(Irrigation, Mechanical, Electrical) 7 persons

Soft Landscape Supervisor 12 persons

Pipe Fitters & Plumbers 20 persons

Gardeners 50 persons

Electrician 2 persons

Mechanic 4 persons

Machine Operator 20 persons

Mason 14 persons

General Workers 90 persons

Drivers 15 persons

goldennails.qa 99

CV’s & Qualification Certificates

KEY PERSONNEL CV’s

Hussein.docx Wael Ramez Aldemashki

General Manager

Personal Information: Education:

Marital status : Married  Bachelor’s in Agricultural Engineering
Nationality : Syrian (Landscaping major)
Date of birth : 18 July 1983 Damascus University – Syria / 2002 – 2007
Mail: :[email protected]
 High School Certificate – Science Branch
Shahba School - Damascus / 2001 – 2002

Summary of Experience:

MANAGING DIRECTOR (01 October 2011 to present)

GOLDEN NAILS, DOHA, QATAR
DUTIES & RESPONSIBILITIES:

 Responsible for design, execution, maintenance of infrastructure, landscaping and

irrigation works.
 Manage day to day construction operation & ensuring quality of the work

throughout the sit and intact precautions
 Preparation of cost estimate and bill of quantity for both construction material and

plants.
 Customer Feedback Evaluation
 Reviewing of agreements and Tenders
 Administer staff of 52 workers of different nationality in maintenance department
 Dealing with the clients during the maintenance contract.
 Present reports to the higher management on regular basis.
 Maintain daily records of work attended, reports, faxes and general

correspondences.
 Preparation the annual budget.

PROJECTS MANAGER (01 October 2010 – 01 October 2011)

KENDA FLOWERS LANDSCAPE & IRRIGATION CO., DOHA, QATAR
PROJECTS INVOLVED:

Albedaa Tour (Private) - New Access Road at RLIC (ORYX) - Construction of Ain Sinan -Public Garden

(Ashghal)- Renovation of Alwakrah Academy (Qatar Foundation)- Residential compounds in different

locations

DUTIES & RESPONSIBILITIES:
 Dealing with Clients during presentation of designs.
 Preparation of cost estimate and bill of quantity for both construction material and

plants.
 Supervision on irrigation systems installation.
 Implement and organize the installation of softscape, hardscape, gazebos, artificial

rocks, and walk ways as per the drawing.
 Administer staff of 34 workers of different nationality in maintenance department

142

goldennails.qa 100