FAILURE MODE & EFFECTS ANALYSIS (FMEA)
Project Name
PROCESS <Name> SUB PROCESS 01.01.15
RESPONSIBLE DATE
POTENTIAL POTENTIAL POTENTIAL A B E RPN COUNTER- EFFECT A B E RP
ERRORS CONSEQUENCES CAUSES MEASURES N
<Text> <Text> <Text> 8 4 10 320 <Text> <Text> 0 0 0 000
<Text> <Text> <Text> 0 0 0 000 <Text> <Text> 00 0 00 000
O = Occurrence (1-10)
S = Severity (1-10)
D = Detection (1-10)
RPN = Risk Priority Number (multiplication of the three previous valuation numbers: number between 1-1000)
STATUS QUOSWOT ANALYSIS WEAKNESSES
POTENTIALProject Name The text demonstrates how your own text will look
when you replace the placeholder with your own text.
STRENGTHS
THREATS
The text demonstrates how your own text will look
when you replace the placeholder with your own text. This is a placeholder text. This text can be replaced with your
If you don’t want to use the style and size of the fonts as own text.
used in this placeholder it’s possible to replace it by selecting This text can be replaced with your own text.
different options. This text can be replaced with your own text.
This is a placeholder text.
OPPORTUNITIES
HIGH
The text demonstrates how your own text will look when you
replace the placeholder with your own text.
If you don’t want to use the style and size of the fonts as
used in this placeholder it’s possible to replace it by selecting
different options.
LOW
SWOT ANALYSIS 45
Project Name 2
3
Placeholder 1: 1
This is a placeholder text.
Placeholder 2:
This text can be replaced with your own text.
Placeholder 3:
This text can be replaced with your own text.
Placeholder 4:
This is a placeholder text.
Placeholder 5:
This is a placeholder text.
PROJECT CONTROL
PROJECT CONTROL
Project Control as cycle
Conception of Measures and 5 1 Fine Planning
their Implementation
Cause Analysis / Determine 42 Actual-Dates / Inventory
Deviations
3
Target / Actual Comparison
PROJECT MANAGEMENT
Project management as cycle
CONTROL TARGET-
ACTUAL
COMPARISON CONTROL
REVIEW
ACTUAL
VALUES
DEVELOPMENT DECISION
IMPLEMENTATION
TARGET DEFAULT
VALUES
CHANGE REQUEST
Project Name
SUBPROJECT <Text> REQUEST-NO. 05 RESPONSIBLE <Name 1
DATE 01.01.2015 PRIORITY low INITIATOR <Name 2>
DEADLINE high
DESCRIPTION medium
CONSEQUENCES The text demonstrates how your own text will look when you replace the placeholder with your own text.
If you don’t want to use the style and size of the fonts as used in this placeholder it’s possible to replace it
MEASURES by selecting different options.
The text demonstrates how your own text will look when you replace the placeholder with your own text.
If you don’t want to use the style and size of the fonts as used in this placeholder it’s possible to replace it
by selecting different options.
The text demonstrates how your own text will look when you replace the placeholder with your own text.
If you don’t want to use the style and size of the fonts as used in this placeholder it’s possible to replace it
y selecting different options.
01.01.15 Signature Client Signature Project Manager
Date
CHANGE REQUEST
Project Name
SUBPROJECT <Text> REQUEST-NO. 05 RESPONSIBLE <Name 1
DATE 01.01.2015 PRIORITY low INITIATOR <Name 2>
DEADLINE high
CONSEQUENCES medium
DESCRIPTION
MEASURES
01.01.15 Signature Client Signature Project Manager
Date
MEETING SCHEDULE
Project Name
DATE DESCRIPTION / CONTENT NOTES
Note: The text demonstrates how your own text will look when you replace the placeholder with your own text.
MEETING SCHEDULE
Project Name
DATE DESCRIPTION / CONTENT NOTES
Note: The text demonstrates how your own text will look when you replace the placeholder with your own text.
MEETING AGENDA
Project Name
TOPIC Name of Meeting TIME 00:00 – 00:00 LOCATION Room 104
DATE 01.01.2015
TIME FRAME /
PARTICIPANTS <Name 1>, <Name 2>, <Name 3>, <Name4 > DURATION
<Name 5>, <Name 6>
COPY TO 30 Min.
TOPIC / CONTENT OBJECTIVE RESPONSIBLE / 45 Min.
PRIORITY PRESENTER 15 Min.
<Text> <Text> …
ABC <Text> <Text> <Name 1>
<Text> <Text> <Name 2>
x … … <Name 3>
x …
x
x
x
APPOINTMENT ARRANGEMENTS
Project Name
PROJECT NAME / NO. Name of Meeting
TOPIC
COPY TO <Text> DATE 01.01.15 AUTHOR <Name >
<Name 1>, <Name 2>, <Name 3>, <Name 4>
NAME PHONE DEADLINES
(EMAIL)
Max Doe 01.03 05.04 04.05 06.06 18.06 01.07 15.08 29.09 02.09
<Name> 055-55 55 123
<Name> <Phone> + + + +++ + + +
<Name> <Phone> + + 0 0 + +
<Name> <Phone> + + + -0- + + +
<Name> <Phone> + 0 + 0 0 +
<Name> <Phone> + + + 000 + + +
<Phone> + + + - + +
+ + + - -+ 0 0 +
+++
0-0
+++
+ = Attendance possible 0 = Attendance mandatory - = No Attendance
MINUTES OF MEETING − VERSION 1
Project Name
PROJECT NAME / NO. Name of Meeting
DATE
01.01.2015 LOCATION / TIME Room 4, 10:00 o‘clock AUTHOR <Name >
PARTICIPANTS
COPY TO <Name 1>, <Name 2>, <Name 3>, <Name 4*> * No Attendance
<Name 5>, <Name 6>
COMPLETED BY /
NO. TOPIC / CONTENT RESPONSIBLE RESULT / DECISION TILL
1 <Text> <Name 1> <Text>
2 <Text> <Name 2> <Text>
3 <Text> <Name 3> <Text>
…… … …
MINUTES OF MEETING − VERSION 2
Project Name
PROJECT NAME / NO. Name of Meeting
DATE
01.01.2015 LOCATION / TIME Room 4, 10:00 o‘clock AUTHOR <Name >
PARTICIPANTS
COPY TO <Name 1>, <Name 2>, <Name 3>, <Name 4*> * No Attendance
<Name 5>, <Name 6>
NO. ART RESULT COMPLETED BY / TILL
1 Assignment <Text>
2 Decision <Text>
3 …. <Text>
…… …
10 Date <Text>
11 Recommendation <Text>
12 Detection <Text>
MINUTES OF MEETING − VERSION 3
Project Name
PROJECT NAME / NO. Name of Meeting
DATE
01.01.2015 LOCATION / TIME Room 4, 10:00 o‘clock AUTHOR <Name >
PARTICIPANTS
COPY TO <Name 1>, <Name 2>, <Name 3>, <Name 4*> * No Attendance
<Name 5>, <Name 6>
NO. WHO? TILL WHEN?
WHAT? WITH WHOM?
1 <Name 1> <Date>
2 <Name 3> <Text> <Name 2> …
3 <Name 4> <Text> … …
…… … … …
… …
NOTE <Name 1> PHONE 110
Max Doe (Position) DATE
Project Name <Name 2> NOTE TAKEN Lisa Doe (Position)
FROM <Name 3>
DIVISION <Name 4>
TO
ACTION / DESCRIPTION The text demonstrates how your own text will look when you replace
the placeholder with your own text. If you don’t want to use the style
The text demonstrates how your own text will look when you replace and size of the fonts as used in this placeholder it’s possible to replace
the placeholder with your own text. If you don’t want to use the style it by selecting different options.
and size of the fonts as used in this placeholder it’s possible to replace The text demonstrates how your own text will look
it by selecting different options. when you replace the placeholder with your own text.
The text demonstrates how your own text will look
when you replace the placeholder with your own text.
If you don’t want to use the style and size of the fonts
as used in this placeholder it’s possible to replace it by selecting
different options.
PROJECT STATUS − REVIEW
Project Name
PROJECT NAME / NO. <Text> PROJECT STATUS:
DATE
COPY TO 01.01.2015 AUTHOR <Name > Green
HIGHLIGHTS / RESULTS <Name 1>, <Name 2>, <Name 3> COSTS STATUS DEVIATION / REASON
<Text> SCHEDULE STATUS <Text> <Text>
<Text>
PROPOSED MEASURES / NEXT STEPS
<Text>
01.01.15 Signature Client Signature Project Manager
Date
PROJECT STATUS REPORT − OVERALL STATUS (TRAFFIC LIGHTS)
Project Name
PROJECT NAME / NO. 01.01.2015 AUTHOR <Name>
DATE REQUIREMENTS
COSTS / BUDGET OVERALL STATUS
TIME / DEADLINES This is a placeholder text.
This is a placeholder text. This is a placeholder text.
This is a placeholder text.
The text demonstrates how The text demonstrates how The text demonstrates how The text demonstrates how
your own text will look your own text will look your own text will look your own text will look
when you replace the when you replace the when you replace the when you replace the
placeholder with your own placeholder with your own placeholder with your own placeholder with your own
text. text. text. text.
If you don’t want to use the If you don’t want to use the If you don’t want to use the
style and size of the fonts style and size of the fonts style and size of the fonts
it’s possible to replace it by it’s possible to replace it by it’s possible to replace it by
selecting different options. selecting different options. selecting different options.
PROJECT STATUS REPORT − OVERALL STATUS (TRAFFIC LIGHTS)
Project Name
PROJECT NAME / NO. 01.01.2015 AUTHOR <Name>
DATE
TIME / DEADLINES COSTS / BUDGET REQUIREMENTS OVERALL STATUS NEXT STEPS DECISIONS
The text The text The text The text The text The text
demonstrates demonstrates demonstrates demonstrates demonstrates demonstrates
how your own how your own how your own how your own how your own how your own
text will look text will look text will look text will look text will look text will look
when you replace when you replace when you replace when you replace when you replace when you replace
the placeholder the placeholder the placeholder the placeholder the placeholder the placeholder
with your own with your own with your own with your own with your own with your own
text. text. text. text. text. text.
PROJECT STATUS REPORT − PROJECT REPORT (CHECKLIST)
Project Name
PROJECT NAME / NO. 01.01.2015 AUTHOR <Name>
DATE
YES NO OVERALL STATUS
Will the Project be completed on time?
Will the Project be completed within budget?
Were all project issues successfully addressed and implemented?
Were the desired project results achieved with an acceptable quality level?
Were change requests implemented successfully?
Were the Project risks mitigated successfully?
Were all concerns of the clients considered and implemented?
…
PROJECT STATUS REPORT − PROJECT REPORT (TABLE)
Project Name
PROJECT NAME / NO. 01.01.2015 TIME FRAME 01.01 - 01.02.2015 AUTHOR <Name 2>
DATE
SUMMARY / MANAGEMENT SUMMARY
<Text>
PROJECT STATUS DEVIATION FROM PROJECT PLAN REASON
TASK / MILESTONES
<Text> <Text>
<Text>
PROJECT STATUS REPORT − PROJECT REPORT (TABLE)
Project Name
PROBLEMS EXPECTED PROBLEMS SOLUTION APPROACH
EXISTING PROBLEMS
<Text> <Text>
<Text>
IMPLEMENTED CHANGE REQUESTS IMPLEMENTED CORRECTIONS
CHANGES TO PROJECT PROCESS
SUGGESTED CHANGE REQUESTS <Text> <Text>
<Text>
PLANNED ACTIONS
<Text>
ORGANIZATIONAL POINTS
<Text>
JOB LIST / TASK LIST
Project Name
DATE WHAT? WHO? TILL WHEN? COMPLETED
This is a placeholder text. This text can be Yes
replaced with your own text.
This text can be replaced with your own text. No
This is a placeholder text. In process
Note: The text demonstrates how your own text will look when you replace the placeholder with your own text.
JOB LIST / TASK LIST
Project Name
DATE WHAT? WHO? TILL WHEN? COMPLETED
This text can be replaced with your own text. Yes
This is a placeholder text. No
This text can be replaced with your own text. In process
This is a placeholder text.
This text can be replaced with your own text.
This is a placeholder text.
Note: The text demonstrates how your own text will look when you replace the placeholder with your own text.
DECISION CHART − DECISION DIARY
Project Name
DATE DECISION REASON RESPONSIBLE / DECIDER
This text can be replaced with your own text.
This is a placeholder text.
This text can be replaced with your own text.
This is a placeholder text.
DECISION CHART − DECISION DIARY
Project Name
DATE DECISION REASON RESPONSIBLE / DECIDER
This text can be replaced with your own text.
This is a placeholder text.
This text can be replaced with your own text.
This is a placeholder text.
LIST OPEN ISSUES − VERSION A
Project Name
PROJECT NAME / NO. <Project name> AUTHOR <Name >
DATE (STAND) 01.01.2015
RESPONSIBLE
NO. ACTIVITY / TASK DATE DATE NOTE
(PLANNED) (ACTUAL) <Name>
1 <Text> <Name> …
2 <Text> 01.01.15 15.01.15 … …
3 <Text> <Date> <Date> … …
…… …
… …
… …
LIST OPEN ISSUES − VERSION B
Project Name
PROJECT NAME / NO. <Project name> AUTHOR <Name >
DATE (STAND) 01.01.2015
RESPONSIBLE
NO. ACTIVITY / TASK RESULT DATE STATUS
<Name>
1 <Text> <Text> <Name> 01.01.15 open
2 <Text> <Text> <Name> 01.01.15 completed
3 <Text> <Text> … 01.01.15 open
…… … … …
LESSONS LEARNED REPORT ─ REVIEW
Project Name
PROJECT NAME / NO. <Project name> AUTHOR <Name >
DATE (STAND) 01.01.2015
SUCCESS FACTORS
SUBJECTS / CATEGORIES (What was good?) PROBLEMS / FAILURES
… (What needs improvement?)
Project start …
Definition of objectives and Project assignment … ….
Skill of Project team … …
Project organization ….
Project planning …
Communication
Conferences & Meetings
Documentation
Decisions
Project controlling
Project marketing
…
LESSONS LEARNED REPORT ─ REVIEW
Project Name
DIFFICULTIES / PROBLEMS DURING REASONS / ROOT CAUSES COGNITIONS (LESSONS LEARNED)
PROJECT PROCESS
… …
<Text> … …
<Text> … …
<Text> … …
<Text>
…
WHAT WENT WELL …
DURING THE PROJECT? …
WHAT WENT NOT WELL
DURING THE PROJECT?
LESSONS LEARNED REPORT ─ REVIEW
Project Name
Project assignment CHANGING OF THE CONDITIONS DURING PROJECT
Project planning / Schedule
Budget No longer relevant, necessary adjustments
Team rules Everything according to schedule
Risk analysis and estimation
Project success Budget is no longer sufficient and must be adapted
… Rule XY was not respected
New risks have been added
ASSESSMENT OF COOPERATION …
…
Project Manager Project team
Project team together PRAISE / RECOGNITION CRITICISMS
Project team Other Areas
Project team Steering Committee … …
Project team Client … …
… …
… …
… …
COST PERFORMANCE INDEX
Project Name
COST PERFORMANCE INDEX UND SCHEDULE PERFORMANCE INDEX COST PERFORMANCE INDEX
PROJECT TITLE CPI SPI BUDGET % COST PLAN Underrun 10
COMPLETE VARIANCE VARIANCE 0 to 5% Overrun 15
A Placeholder 0.98 1.34 1.000 000
B Placeholder 1.00 0.62 1.000 000 TO DATE xxxx xxxx
C Placeholder 0.91 0.85 1.000 000 xx.xx%
D Placeholder 0.90 0.75 1.000 000
E Placeholder 0.95 0.90 1.000 000 xx.xx% xxxx xxxx 5 to 10% Overrun 65
F Placeholder 0.97 0.86 1.000 000
G Placeholder 0.93 1.01 1.000 000 xx.xx% xxxx xxxx
H Placeholder 0.89 0.83 1.000 000
I Placeholder 0.99 0.97 1.000 000 xx.xx% xxxx xxxx
xx.xx% xxxx xxxx SCHEDULE PERFORMANCE INDEX
xx.xx% xxxx xxxx Underrun
0 to 5% Overrun
xx.xx% xxxx xxxx 28
xx.xx% xxxx xxxx
xx.xx% xxxx xxxx 71
COST PERFORMANCE INDEX COST PERFORMANCE INDEX
Project Name 0,9
COST PERFORMANCE INDEX UND SCHEDULE PERFORMANCE INDEX SCHEDULE PERFORMANCE INDEX
1.2 0,78
1
0.8
0.6
0.4
0.2
0
CPI SPI
COST PERFORMANCE INDEX
Project Name
COST PERFORMANCE INDEX UND SCHEDULE PERFORMANCE INDEX COST PERFORMANCE INDEX
Reporting Cut-Off-Date Estimated Cost 0,9
at completion
SCHEDULE PERFORMANCE INDEX
Total budgeted Cost Projected
Overrun 0,78
DOLLARS Actuals Budget at
Plan completion
Earned Value
Estimated
difference
TIME
COST PERFORMANCE INDEX
Project Name
COSTS COSTS
INFLUENCE
PREPARATION
PROJECT PROJECT PLANNING OF IMPLEMENTATION PROJECT SUPPORT
DEFINITION PREPARATION IMPLEMENTATION COMPLETION
PROJECT CONCLUSION
PROJECT CONCLUSION REPORT − PERFORMANCE ANALYSIS
Project Name
PROJECT NAME / NO. <Date> PROJECT START <Date> PROJECT END <Date>
DATE <Name 1> CLIENT <Name 2> PROJECT MANAGER <Name 3>
AUTHOR
<Name 4>, <Name 5>, <Name 6>, …
PROJECT MEMBERS
PLANNED PROJECT OBJECTIVE (TARGET) ACTUAL PROJECT RESULT (ACTUAL) DEVIATION / CAUSE
Actual project assignment, objectives and goals Ascertained results of the Project Reasons and causes of deviations
and responsible person
……
…
… ……
PROJECT CONCLUSION REPORT − PERFORMANCE ANALYSIS
Project Name
PROJECT NAME / NO. <Date> PROJECT START <Date> PROJECT END <Date>
DATE <Name 1> CLIENT <Name 2> PROJECT MANAGER <Name 3>
AUTHOR
<Name 4>, <Name 5>, <Name 6>, …
PROJECT MEMBERS
PLANNED PROJECT OBJECTIVE (TARGET) ACTUAL PROJECT RESULT (ACTUAL) DEVIATION / CAUSE
Actual project assignment, objectives and goals Ascertained results of the Project Reasons and causes of deviations
and responsible person
… …
…
… ……
PROJECT CONCLUSION REPORT − DEADLINES / MILESTONES
Project Name
NO. DATE / MILESTONE DATE (PLAN) DATE (PLAN) DEVIATIONS / CAUSE
1.1 <Text> <Date> <Date> Reasons and causes of deviations and
responsible person
1.2 <Text> <Date> <Date>
1.3 <Text> <Date> <Date> …
1.4 <Text> <Date> <Date>
…… … … …
…
…
PROJECT CONCLUSION REPORT − PROJECT ORGANIZATION
Project Name
DEVELOPMENT PROCEDURE ALTERATION
Structural organization during project. Structural organization during project. History of alterations including filed and
approved applications.
MANAGEMENT <Date1>
<Date2> <Date>, <Application 1>, Status
PROJECT STAFF <Date3> <Date>, <Application 2>, Status
MANAGER <Date4> <Date>, <Application 3>, Status
<Date5> <Date>, <Application 4>, Status
Department A Department B Department C <Date6> <Date>, <Application 5>, Status
<Date7> <Date>, <Application 6>, Status
1 2 3 <Date>, <Application 7>, Status
Evaluation of development and structural Evaluation of development and structural Evaluation of development and structural
organization: Additional notes and organization: Additional notes and organization: Additional notes and
comments comments comments
Evaluation of development and structural Evaluation of development and structural Evaluation of development and structural
organization: Additional notes and organization: Additional notes and organization: Additional notes and
comments comments comments
PROJECT CONCLUSION REPORT − BUDGET / COSTS
Project Name
TYPE OF COST PLANNED ACTUAL DEVIATIONS / CAUSES
COSTS COSTS
Staff Costs (internal) Reasons and causes of deviations and responsible person
00.000 00.000
Services (external) …
00.000 00.000 …
Material …
Travel Expenses 00.000 00.000 …
Advertising Expenses 0.000 0.000
Rent 0.000 0.000
Hardware 0.000 0.000
Software / Licenses 0.000 0.000
Equipment 0.000 0.000
Other Costs 0.000 0.000
Total Costs 0.000 0.000
00.000 00.000
PROJECT CONCLUSION REPORT − TRANSFER LIST
Project Name
TOPIC RECIPIENT STATUS
<Text> <Name> Transfer completed
<Department> <Date>
<Text> Still open
<Name>
<Text> <Department> Transfer completed
<Text> <Name> Transfer completed
<Text> <Department> …
…
… <Name>
<Department>
…
PROJECT CONCLUSION REPORT − OPEN ISSUES
Project Name
STILL PENDING ACTIVITIES / FOLLOW-UP'S DATE RESPONSIBLE
NO. TASK / DESCRIPTION
<Date> <Name>
1.1 <Text> <Date> <Name>
1.2 <Text> <Date> <Name>
1.3 <Text>
01.01.15 Signature Client Signature Project Manager
Date
PROJECT FEEDBACK − SURVEY FORM
Project Name
PROJECT NAME / NO. <Text> Project team 2 Project team 3 Project team 4
Expert
YOUR FUNCTION DURING PROJECT Project team 1 Very good
Steering Average Very satisfied
How do you rate the quality of the job description Very satisfied
and to goal achievement by the team? Committee Average
How satisfied are you with the advice of Poor Very high
project management and planning team? Average Very satisfied
How significant do you estimate your own contribution Unsatisfied Very satisfied
to problem solving and success of the project? Average
How significant do you estimate your own contribution Unsatisfied
to problem solving and success of the project? Average
How satisfied are you with the Very low
implementation of the project's objectives? Average
How satisfied are you with the cost Unsatisfied
and time frame of the project?
Unsatisfied
What specific suggestions and recommendations Proposal 1
do you have for future projects? Proposal 2
Proposal 3