SITEPLAN(2021)
GROUNDFLOORPLAN(2021)
FIRSTFLOORPLAN(2021)
POLYCARBONATEROOF
ROOFPLAN(2021)
NORTHEASTELEVATION-MAINBUILDING(2021)
SOUTHWESTELEVATION-MAINBUILDING(2021)
NORTHWESTELEVATION-MAINBUILDING(2021)
SOUTHEASTELEVATION-MAINBUILDING(2021)
NORTHWESTELEVATION-ANNEXBUILDING(2021)
SOUTHWESTELEVATION-ANNEXBUILDING(2021)
SOUTHEASTELEVATION-ANNEXBUILDING(2021)
NORTHEASTELEVATION-ANNEXBUILDING(2021)
SECTIONA-A-MAINBUILDING(2021)
SECTIONB-B-MAINBUILDING(2021)
SECTIONC-C-ANNEXBUILDING(2021)
SECTIOND-D-ANNEXBUILDING(2021)
STAIRCASE2DETAIL(2021)
STAIRCASE2DETAIL(2021)
STAIRCASE3DETAIL(2021)
STAIRCASE3DETAIL(2021)
STAIRCASE5DETAIL(2021)
STAIRCASE5DETAIL(2021)
TOILETDETAILS(2021)
TOILETDETAILS(2021)
FOUNDATIONTOROOFDETAIL(2021)
FOUNDATIONTOROOFDETAIL(2021)
WATERSUPPLYSCHEMATICDIAGRAM (2021)
NOTTOSCALE
SANITARYSCHEMATICDIAGRAM (2021)
NOTTOSCALE
COLUMNLOCATIONGROUNDFLOORPLAN(2021)
COLUMNLOCATIONFIRSTFLOORPLAN(2021)
C1
DESCRIPTION 490MM X 490MM X 2510MM BRICK MASONRY COLUMN
OFFICE SPACE
LOCATION 10
QUANTITY
COLUMN SCHEDULE
C1
DESCRIPTION 490MM X 490MM X 2510MM BRICK MASONRY COLUMN
LOCATION OFFICE SPACE
QUANTITY 10
COLUMN SCHEDULE
C2
DESCRIPTION 490MM X 490MM X 2510MM BRICK MASONRY COLUMN
OFFICE SPACE
LOCATION 8
QUANTITY
COLUMN SCHEDULE
C3
DESCRIPTION 490MM X 700MM X 3800MM TIMBER COLUMN WITH
CONCRETE PAD STONE TEXTURE FINISHES
LOCATION TIMBER STAIRCASE
QUANTITY 8
COLUMN SCHEDULE
C4
DESCRIPTION 500MM X 500MM X 2840MM BRICK MASONRY COLUMN
LOCATION CORRIDOR
QUANTITY 3
COLUMN SCHEDULE
C5
DESCRIPTION 470MM X 470MM X 2840MM BRICK MASONRY COLUMN
LIBRARY, TRANSCRIPT ROOM, CLASSROOM
LOCATION 12
QUANTITY
COLUMN SCHEDULE
C6
DESCRIPTION 480MM X 480MM X 2840MM BRICK MASONRY COLUMN
LIBRARY,
LOCATION 1
QUANTITY
COLUMN SCHEDULE
C7
DESCRIPTION 480MM X 480MM X 2440MM BRICK MASONRY COLUMN
DINING ROOM, CHANGING ROOM, CLASSROOM, STORE ROOM
LOCATION
QUANTITY 27
COLUMN SCHEDULE
C8
DESCRIPTION 150MM X 150MM X 3290MM STEEL COLUMN WITH CONCRETE
PAD STONE TEXTURE FINISHES
LOCATION STEEL STAIRCASE
QUANTITY 6
COLUMN SCHEDULE
C9
DESCRIPTION 140MM X 140MM X 2640MM TIMBER COLUMN WITH CONCRETE
LOCATION PAD MOSAIC TILES FINISHES
QUANTITY CORRIDOR
COLUMN SCHEDULE 6
C10
DESCRIPTION 240MM X 240MM X 2970MM CONCRETE COLUMN
RESTROOM
LOCATION 10
QUANTITY
COLUMN SCHEDULE
C11
DESCRIPTION 180MM X 180MM X 2950MM CONCRETE COLUMN
LOCATION RESTROOM AND JANITOR ROOM
QUANTITY 6
COLUMN SCHEDULE
C12
DESCRIPTION 150MM X 150MM X 2950MM STEEL COLUMN WITH ROUND
PAD CONCRETE STONE TEXTURE FINISHES
LOCATION PEGOLA
QUANTITY
COLUMN SCHEDULE 18
C13
DESCRIPTION 140MM X 140MM X 2670MM TIMBER COLUMN
LOCATION OUTER COLUMN FOR FIRST FLOOR
QUANTITY 50
COLUMN SCHEDULE
C14
DESCRIPTION 170MM X 170MM X 2670MM TIMBER COLUMN
INTERIOR COLUMN FOR FIRST FLOOR
LOCATION 15
QUANTITY
COLUMN SCHEDULE
D1
DESCRIPTION 1355MM X 2370MM X 40MM THK DOUBLE LEAF TIMBER DOOR
WITH 70MM THK TIMBER FRAME WITH VENTILATION PANEL
LOCATION
STAFF ROOM(1),SERVICE ROOM (1),MEETING ROOM (2),OFFICE (6)
QUANTITY PENYANDANG KERUSI ZA'BA ROOM (1), DIRECTOR ROOM (1)
4
DOOR SCHEDULE
D2
DESCRIPTION 1380MM X 2590MM X 40MM THK DOUBLE LEAF TIMBER DOOR
WITH 70MM THK TIMBER FRAME WITH VENTILATION PANEL
LOCATION
STAFF ROOM, BILIK PENYANDANG KERUSI ZABA
QUANTITY
2
DOOR SCHEDULE
D3
DESCRIPTION 915MM X 2370MM X 40MM THK DOUBLE LEAF TIMBER DOOR
WITH 70MM THK TIMBER FRAME WITH VENTILATION PANEL
LOCATION
OFFICE SPACES
QUANTITY
9
DOOR SCHEDULE
D4
DESCRIPTION 900MM X 2610MM X 40MM THK SINGLE LEAF TIMBER DOOR
WITH 70MM THK TIMBER FRAME WITH VENTILATION PANEL
LOCATION
LIBRARY
QUANTITY
1
DOOR SCHEDULE
D5
DESCRIPTION 895MM X 2345MM X 40MM THK DOUBLE LEAF TIMBER DOOR
WITH 70MM THK TIMBER FRAME WITH VENTILATION PANEL
LOCATION
LIBRARY (1), TRANSKRIT ROOM (3), YEAR 3&4 CLASS (1),
QUANTITY YEAR 1&2 CLASS (1)
6
DOOR SCHEDULE
D6
DESCRIPTION 920MM X 2130MM X 40MM THK DOUBLE LEAF TIMBER DOOR
WITH 70MM THK TIMBER FRAME
LOCATION CHANGING ROOM
QUANTITY 1
DOOR SCHEDULE
D7
DESCRIPTION 740MM X 2120MM X 40MM THK SINGLE LEAF TIMBER DOOR
WITH 70MM THK TIMBER FRAME
LOCATION YEAR 3 CLASS
QUANTITY 1
DOOR SCHEDULE
D8
DESCRIPTION 920MM X 2350MM X 40MM THK DOUBLE LEAF TIMBER DOOR
WITH 70MM THK TIMBER FRAME WITH VENTILATION PANEL
LOCATION
DINING AREA (1), CHANGING ROOM (1), YEAR 1&2 CLASS (1),
QUANTITY STORE ROOM (2), YEAR 3&4 CLASS (2)
7
DOOR SCHEDULE