The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.

LAPORAN TAHUNAN 2016
MAJLIS PERBANDARAN TELUK INTAN

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by ainzubaidah, 2022-01-16 22:21:34

LAPORAN TAHUNAN 2016

LAPORAN TAHUNAN 2016
MAJLIS PERBANDARAN TELUK INTAN

2 MISI DAN VISI, OBJEKTIF ORGANISASI, WAWASAN MPTI

3 CARTA ORGANISASI MPTI

4-5 AHLI - AHLI MAJLIS MPTI

6 - 10 JABATAN KHIDMAT PENGURUSAN
11 - 30 JABATAN KEJURUTERAAN
31 - 35 JABATAN PERBENDAHARAAN
JABATAN PENILAIAN DAN PENGURUSAN HARTA
36 - 45 JABATAN PERANCANG BANDAR DAN LANDSKAP
46 - 49 JABATAN PERKHIDMATAN PERBANDARAN

50 - 54

55 - 58 BAHAGIAN PENGUATKUASA

59 - 61 UNIT TEKNOLOGI MAKLUMAT
UNIT UNDANG - UNDANG
62 - 67 UNIT ONE STOP CENTER ( OSC )
68 - 71 UNIT KOMUNITI DAN PERHUBUNGAN AWAM ( PRO)
72 - 77 UNIT AUDIT DALAM

78 - 84

............... ,

LAPORAN
TAHUNAN
2016

UMAT KORPORAT

VISI

"Ke arah menjadikan Teluk Intan kawasan perbandaran yang maju, aman dan sejahtera
menjelang tahun 2021''.

MISI

"Berusaha ke arah meningkatkan pengurusan kawasan pentadbiran majlis secara cekap dan
berkesan untuk menyelesaikan pelbagai masalah dan menangani perubahan bagi mencapai
matlamat dasar pembangunan negeri dan negara".

OBJEKTIF

• Menyediakan kemudahan infrastruktur yang dapat membaiki kualiti kehidupan masyarakat.
• Melaksanakan Dasar Pembangunan Negara dan Negeri.
• Memberi perkhidmatan perbandaran yang komprehensif kepada masyarakat.
• Merancang projek - projek sosial, ekonomi yang memberi manafaat kepada masyarakat.
• Menyediakan satu sistem pengurusan yang berkualiti, dinamik dan inovatif.

WAWASAN MPTI

II Ke arah menjadikan HilirPerak daerah yang maju, aman, makmur, dan terunggul di Malaysia".

1- DASAR KUALITI MPTI

Komitmen kepada semua keperluan pelanggan melalui penyediaan perkhidmatan yang
berkualiti dan perancangan yang terkawal ke arah merealisasikan Wawasan Hilir Perak sebagai
daerah yang maju, aman, makmur dan terunggul di Malaysia.

FUNGSI

Menentukan kualiti hidup penduduk tempatan terkawal dan terjamin melalui pelaksanaan dan
penguatkuasaan tiga Akta Induk Pihak Berkuasa Tempatan ( PBT ) iaitu:
1. Akta Kerajaan Tempatan 1976 ( Akta 171 )
2. Akta Perancang Bandar Dan Desa 1976 ( Akta 172 )
3. Akta Parit, Jalan Dan Bangunan 1974 ( Akta 133 )

LAPORAN
TAHUNAN

2016

RTA

MAJLIS PERBANDARAN TELUK INTAN

PENILAIAN

LETAK

PENGUATKUASAAN
MAKLUMAT

LAPORAN
TAHUNAN

2016

AULI -AULI LIS

MAJLIS PERBANDARAN TELUK INTAN

-

YUAN HAJI UMAR BIN MUSA YUAN HJ. KHAIRUDDIN BIN HJ. PUAN MASIYAH BY. AHMAD ENCIK AHMAD HILMI BIN YUNUS
PJK.
AMP.,PPY.,PPN. AMN ..PPT.

ENCIK KAMARUDDIN BIN MAJID ENCIK YUZAILE BIN YUSOP YUAN HJ. AHMAD BIN ABDULLAH KPY.(B) HJ MOHO YOHAKBIN ABD

PJK. PPT. AMN.,PJK. PJM.,AMP., PPT.,BAT.

• .. _._

-- • _

MOHAMED SHOIB BIN SHAARI ENCIKSUPRAMANIAM AIL RAMALINGAM ENCIK SELVARAJO AIL PERMAL

AMP.,PPT. AMN.,AMP.,P JK. KMN.,AMP.,P JK.





• .' •

LAPORAN
TAHUNAN

72016

CARTA ORGANISASI

PEN. PE

PEMBANTU TAOBIR

(N19/N22)

I<AMARlAH 81NTI BAHARl

LAPORAN MAJLIS PERBANDARAN TELUK INTAN
LAPORAN TAHUNAN 2016
TAHUNAN

2016 ••

JABATAN KHIDMAT PENGURUSAN

._OBJEKTIF

Mem n pe idrncton urusetia yang efisyen kepada semua bahagian dan mengendalikan

pengurusan sumber manusia dengan cekap dan efisyen.

FUNGSI menyelaras akitivit - aktiviti di antara bahagian / jabatan dari

Sebagai urusetia yang bertanggungjawab
segi pentadbiran dan perkhidmatan.

Bahagian ini juga menguruskan :
- Pentadbiran Am
- Mesyuarat
- Perjawatan Dan Latihan
- Keselamatan Pejabat
- Pengurusan Bekalan
- Pengurusan Kualiti

LAPORAN PENGISIAN JAWATAN 01 MAJLIS PERBANOARAN TELUK INTAN

a. Pengisian Jawatan

Kumpulan Sokongan 291 291 273 283 1 1 1 27

b. Pengisian Jawatan Baru

Kumpulan Sokongan o o 3 19 o o o 25

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN

2016

JABATAN KHIDMAT PENGURUSAN

BILANGAN KESELURUHAN KEHADIRAN KURSUSPEGAWAI DAN KAKITANGAN

KEKERAPAN MESYUARAT YANG DIADAKAN DI MAJLIS PERBANDARAN TELUKINTAN

LAPORAN MAJLIS PERBANDARAN TELUK INTAN
TAHUNAN LAPORAN TAHUNAN 2016
2016
JABATAN KHIDMAT PENGURUSAN

BENGKEL PELAN STRATEGIK MPTI 2012 - 2016

TARIKH: 05 - 07 DISEMBER 2016
TEMPAT : HOTEL PREMIERA, KUALA LUMPUR

....-.

BENGKEL PERANCANGAN SKT 2017

TARIKH: 05 - 07 DISEMBER 2016
TEMPAT : HOTEL PREMIERA, KUALA LUMPUR

,I I

I II :

I-



LAPORAN
TAHUNAN

122016

CARTA ORGANISASI

EN. A«AVINDH DEVAR All MARINAIOU

------------- ----

-- -- ----------~- "-------------------------------" - ---

- - -- ------- - -- - - --

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN

2016

LAPORAN JABATAN KEJURUTERAAN

P.ENGELUARAN NOTIS PERMIT 213 PERMll 18,703,02
P.ENGELUARAN PERMIT BAHAN 55 PERMIT RM 75,641.56
BINAAN

LALU

P.ElAN BANGUNAN

•I BANGUNAN SESEBUAH

•• SKIM 10 FAIU
28 FAI~
II 593 FAIL

•II•I• LAIN BANGUNAN

•IV
V

BAYARAN 6 FAIL RM 312,500.00
RM7,130.11
VI• 130 FAIL RM 96,967.00
259 ADUAN
PELAN 1167 SEBUTHARGA

VI•I• BAYARAN

VI•II•• BAYARAN

•IX

SETAHUN

LAPORAN PERUNTUKAN PROJEK MARRIS TAHUN 2016

AKTIVITI STATUS PENCAPAIAN YANG TELAH DIBAYAR STATUS

SENARA! 1 13 PROJEK RM 4,416,09~,40 RM 4,416,096.40 SlAP & SAYAR
SENARAI2 6 PROJEK RM 4 265 615.32
SENARAI3 17 PROJEK RM 4.265,615.32 RM 4 265,615.32 SlAP & SAYAR
1 PROJE~ RM 4,265 615,32 RM 48,529.14 1 PROJEK AKAN DIBAYAR
PENYELENGGARAAN M 12,300,000,00 RM 48 529.14 RM 2,277 075,00
( KEJURUTERAAN ) 15 PROJEK RM 2,731,921.00 PADA TAHUN 2017
RM 395 546.50
KONTRAK PEMBERSIHAN SENARAi 6 10 PROJEK RM 494 709.50 RM 15.668477 68 SlAP & SA't' AR
RM 996,373.12
LANTIKAN TERUS 53 PROJEK RM 996 37312 , NOV TElAH SAYAR
RM 16,664,850.80 IS AICAN DIBAYAR PADA
RM 2 500 00,00 DIS 2015 HINGGA DIS 2016 RM 17,218,859.80
RM 2,651 918,66 lAHUN 2017
429,674,39

LANDSKAP RM 200,000.00 RM 319,282,20 RM 319,282.20
~UMLAH KESElURUHAN RM 18 967 816.39 RM 19,636,051.66

LAPORAN MAJLIS PERBANDARAN TELUK INT
TAHUNAN LAPORAN TAHUNAN 20 6
2016

LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF GELANGGAN TENIS OAN KEMUOAHAN SUKAN
01 BANOAR BARU, TELUK INTAN

LOKASI PROJEK RINGKASAN PROJEK KEWANGAN PROJEK PRESTASI PROJEK
Daerah : Hilir Perak Peruntukan : BP.1 Peruntukan : RM 300,000.00 Tarikh mula : 08.02.2016
Parlimen : Teluk Intan
No. Kontrak :PB.7/16 Harga : RM288,972.96 Tarikh akhir : 18.04.2016
Dun : Pasir Kontrak
Berdamar
Kontraktor : Pro - Belanja : RM 288,972.96 Kemajuan : 100%
Landscape Jadual
Kaedah Structure
Tawaran Sdn Bhd No. Waran Kemajuan : 100%
: Sebutharga Sebenar




SKOP PROJEK
- Membaiki dan membina baru tapak permukaan gelanggang
- Membekallapisan cat TENNISPAVE Arcylic
- Membekal dan memasang pagar baru jenis 'Chain Link Wire Netting'
- Memasang longkang bersaiz 450mm x 450mm
- Membekal dan memasang papan tanda beserta logo MPTI dan KPKT

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM

SEMASA SELEPAS

- -. ,

-

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN
2016

LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF lONGKANG 01 KAMPUNG TERSUSUN
PAOANG TEMBAK OAlAM, TElUK INTAN

LOKASI PROJEK RINGKASAN PROJEK, KEWANGAN PROJEK PRESTASI PROJEK
Peruntukan : RM 200,000.00
--'_ . - - -- - --

Daerah : Hilir Perak Peruntukan : BP.1 Tarikh mula : 08.02.2016

Parlimen : Teluk Intan No. Kontrak : PB. 7/16 Harga : RM 170,380.16 Tarikh akhir : 18.04.2016
Kontrak

Kontraktor : Lucrangka Kemajuan : 100%
Jadual
Dun : Changkat Development Belanja : RM 170,380.16
Jong

Sdn. Bhd.

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK

- Kerja - kerja membina longkang U shape bersaiz 1200mm x 1200mm
- Membina sump bersaiz lS00mm x lS00mm
- Menambak dan meratakan tanah merah di kawasan pembinaan longkang

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM

SEMASA SELEPAS

LAPORAN MAJLIS PERBANDARAN TELUK INT
TAHUNAN LAPORAN TAHUNAN 20 6
2016

LAPORAN JABATAN KEJURUTERAAN

MEMBINA LALUAN KELUAR / MASUK KE RPA
CHENDERONG BALAI, TELUKINTAN

LOKASI P.ROJEK RINGKASAN P.ROJEK KEWANGAN P.ROJEK P.RESTASI P.ROJEK
Peruntukan : RM 200,000.00 Tarikh mula : 08.02.2016
Daerah : Hilir Perak Peruntukan : BP.1
Tarikh akhir : 11.04.2016
Parlimen : Teluk Intan No. Kontrak :PB.9/16 Harga : RM 181,185.00
Kontrak

Dun : Sg. Manik Kontraktor : lie lie Belanja : RM 181,185.00 Kemajuan : 100%
Jadual
Indah Ent

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK
- Kerja - kerja pembersihan kawasan
- Membina dan meyiapkan sebuah jambatan baru bersaiz 8m x 15m
- Menambak dan me mad at crusher run dengan ketebalan 300mm
- Menurap jalan baru dengan premix ACWC 14
- Membina railing keselamatan

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM SEMASA

SEMASA SELEPAS

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN
2016

LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF GERAI 01 PEKAN CHENOERONG BALAI,
TELUK INTAN

LOKASI PROJEK RINGKASAN PROJEK. KEWANGAN PROJEK PRESTASI PROJEK
Peruntukan : RM 300,000.00 Tarikh mula : 08.02.2016
Daerah : Hilir Perak Peruntukan : BP.1
Tarikh akhir : 02.05.2016
Parlimen : Pasir Salak No. Kontrak : PB. 10/16 Harga : RM 288,945.40
Kontrak

Dun : Sg. Manik Kontraktor : Serentak Belanja : RM 288,945.40 Kemajuan : 100%

Bina Ent Jadual

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK
- Kerja - kerja melantak cerucuk bakau
- Membekal dan memasang 2.0m x 1.Om x 1.Om raga gabion disalut PVC
- Membina rasuk tanah, tiang dan rasuk bumbung
- Membina semula dinding, pendawaian elektrik dan kemasan mozek
- Kerja-kerja mengecat semula bahagian dalan dan luar bangunan

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM .... SEMASA
~

._

-

SELEPAS

••

_

•r



LAPORAN MAJLIS PERBANDARAN TELUK INT
TAHUNAN LAPORAN TAHUNAN 20 6
2016

LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF LONGKANG 01 KAMPUNG BAHAGIA,
TELUK INTAN

LOKASI PROJEK RINGKASAN PROJEK KEWANGAN PROJEK PRESTASI PROJEK
Peruntukan : RM 200,000.00 Tarikh mula : 08.02.2016
Daerah : Hilir Perak Peruntukan : BP.1
Tarikh akhir : 04.04.2016
Parlimen : Teluk Intan No. Kontrak : PB. 12/16 Harga : RM 181,207.00
Kontrak

Dun : Changkat Kontraktor : Mohd Shafie Belanja : RM 181,207.00 Kemajuan : 100%

Jong Bidawi Jadual

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK

- Kerja - kerja membina longkang U shape bersaiz 1200mm x 1200mm
- Membina sump bersaiz lS00mm x lS00mm
- Menambak dan meratakan tanah merah di kawasan pembinaan long kong

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM

SEMASA SELEPAS

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN
2016

LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF GERAI 01 PEKAN SELEKOH,
BAGAN OATOH

LOKASI PROJEK RINGKASAN PROJEK, KEWANGAN PROJEK PRESTASI PROJEK
Peruntukan : RM 200,000.00
Daerah : Hilir Perak Peruntukan : BP.1 --'_ . - - -

Parlimen : Bagan Datoh No. Kontrak :PB.11/16 Harga : RM 171,000.00 Tarikh mula : 08.02.2016
Kontrak
Tarikh akhir : 04.04.2016

Dun : Rungkup Kontraktor : Syarikat Belanja : RM 171,000.00 Kemajuan : 100%
Jadual
k na

Sg.Doorg

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK
- Kerja - kerja melantak cerucuk bakau
- Membekal dan memasang 2.0m x 1.Om x 1.Om raga gabion disalut PVC
- Membina rasuk tanah, tiang dan rasuk bumbung
- Membina semula dinding, pendawaian elektrik dan kemasan mozek
- Kerja - kerja mengecat semula bahagian dalam dan luar bangunan

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM SEMASA

SEMASA SELEPAS
--,• • -

LAPORAN MAJLIS PERBANDARAN TELUK INT
TAHUNAN LAPORAN TAHUNAN 20 6
2016

LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF JALAN 01 JALAN KEMPAS,
TELUK INTAN

LOKASI PROJEK RINGKASAN PROJEK KEWANGAN PROJEK PRESTASI PROJEK
Daerah : Hilir Perak Peruntukan : BP.1 Peruntukan : RM 400,000.00 Tarikh mula : 08.02.2016

Parlimen : Teluk Intan No. Kontrak : PB. 13/16 Harga : RM 373,692.40 Tarikh akhir : 04.04.2016
Kontrak

Dun : Changkat Kontraktor : Whd Ent Belanja : RM 373,692.40 Kemajuan : 100%

Jong Jadual

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK

- Kerja - kerja korekan sedalam 600mm
- Kerja - kerja menambak po sir sedalam 300mm
- Kerja - kerja menambak crusher run sedalam 300mm
- Kerja - kerja premix ACWC 14 setebal SOmm
- Kerja - kerja membina bonggol jolon

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM

SEMASA SELEPAS

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN

2016

LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF PERSIMPANGAN LORONG BINTANG DAN
LORONG BULAN, PADANG TEMBAK

lOKASI PROJEK RINGKASAN PROJEK KEWANGAN PROJEK PRESTASI PROJEK
Peruntukan : RM 200,000.00 Tarikh mula : 08.02.2016
Daerah : Hilir Perak Peruntukan : BP.1
Tarikh akhir : 04.04.2016
Parlimen : Teluk Intan No. Kontrak : PB. 1/16 Harga : RM 181,313.00
Kontrak

Dun : Changkat Kontraktor : Perniagaan Belanja : RM 181,313.00 Kemajuan : 100%

Jong Azamasri Jadual

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK
- Kerja - kerja membina longkang U shape bersaiz 1200mm x 1200mm
- Membina sump bersaiz lS00mm x lS00mm
- Kerja - kerja korekan sedalam 300mm
- Kerja - kerja menambak po sir dan crusher run sedalam 12Smm
- Kerja - kerja premix ACWC 14

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM SEMASA

,.

~' •

••

. •.~•.,



SELEPAS

LAPORAN MAJLIS PERBANDARAN TELUK INT
TAHUNAN LAPORAN TAHUNAN 20 6
2016

LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF PERSIMPANGAN LORONG - LORONG TELEKOM
TELUK INTAN

LOKASI PROJEK RINGKASAN PROJEK, KEWANGAN PROJEK PRESTASI PROJEK
Daerah : Hilir Perak Peruntukan : BP.1 Peruntukan : RM 50,000.00
--'_ . - --- --

Tarikh mula : 08.02.2016

Parlimen : Teluk Intan No. Kontrak : PB. 2/16 Harga : RM 46,777.80 Tarikh akhir : 21.03.2016
Kontrak

Dun : Pasir Kontraktor : Cheaz Ent Belanja : RM 46,777.80 Kemajuan : 100%

Berdamar Jadual

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK

- Kerja - kerja membina longkang U shape bersaiz 600mm x 600mm
- Kerja - kerja korekan sedalam 300mm
- Kerja - kerja menambak pasir dan crusher run sedalam 125mm
- Kerja - kerja premix ACWC 14

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM

SEMASA SELEPAS

0< M£DAN SELERA
STADIUM MINI

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN

2016

LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF PERSIMPANGAN MASUK RPA 1,
SIMPANG 4, HUTAN MELINTANG

LOKASI PROJEK RINGKASAN PROJEK KEWANGAN PROJEK PRESTASIPROJEK
Daerah : Hilir Perak Peruntukan : BP.1 Peruntukan : RM 150,000.00 Tarikh mula : 08.02.2016

Parlimen • nDatoh No. Kontrak : PB. 3/16 Harga : RM 146,150.00 Tarikh akhir : 04.04.2016
• Kontrak

Dun : Hutan Kontraktor : Usaha Jaya Belanja : RM 146,150.00 Kemajuan : 100%

Melintang Ent Jadual

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK

- Kerja - kerja korekan sedalam 600mm 300mm
- Kerja - kerja menambak po sir dan crusher run sedalam
- Kerja - kerja memasang road kerb
- Kerja - kerja premix ACWC 14

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM SEMASA

SEMASA SELEPAS

LAPORAN MAJLIS PERBANDARAN TELUK INT
TAHUNAN LAPORAN TAHUNAN 20 6
2016

LAPORAN JABATAN KEJURUTERAAN

MENYENGGARA PERABOT JALAN 01 KAWASAN PERUMAHAN
TELUK INTAN

LOKASI PROJEK RINGKASAN PROJEK KEWANGAN PROJEK PRESTASI PROJEK
Daerah : Hilir Perak Peruntukan : BP.1 Peruntukan : RM 50,000.00 Tarikh mula : 08.02.2016

Parlimen : Teluk Intan No. Kontrak : PB. 4/16 Harga : RM 49,502.00 Tarikh akhir : 07.03.2016
Kontrak

Dun : Changkat Kontraktor : Asas Bina Belanja : RM 49,502.00 Kemajuan : 100%

Jong Ent Jadual

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK

- Menyediakan cat garisan jolon reflective thermoplastik ketebalan 3mm
- Menyediakan cat jolon untuk tanda jolon dan arah ketebalan Smm
- Membekal dan memasang papan tanda mengikut standard piawai JKR

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM SEMASA

SELEPAS

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN

2016

LAPORAN JABATAN KEJURUTERAAN

MENYENGGARA PERABOTJALAN 01 KAWASAN PERUMAHAN

SIMPANG 4 & HUTAN MELINTANG

LOKASI PROJEK RINGKASAN PROJEK KEWANGAN PROJEK PRESTASI PROJEK
Peruntukan : RM 50,000.00 Tarikh mula : 08.02.2016
Daerah : Hilir Perak Peruntukan : BP.1

Parlimen • n~ No. Kontrak : PB. 5/16 Harga : RM 47,567.50 Tarikh akhir : 07.03.2016
• Kontrak

Dun : Hutan Kontraktor : Thema Belanja : RM 47,567.50 Kemajuan : 100%

Melintang Global Ent Jadual

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK

- Menyediakan cat garisan jolon reflective thermoplastik ketebalan 3mm
- Menyediakan cat jolon untuk tanda jolon dan arah ketebalan Smm
- Membekal dan memasang papan tanda mengikut standard piawai JKR

GAMBAR - GAMBAR KEMAJUAN KERJA

SEMASA SELEPAS

., .

LAPORAN MAJLIS PERBANDARAN TELUK INTAN
TAHUNAN LAPORAN TAHUNAN 2016
2016
LAPORAN JABATAN KEJURUTERAAN

MENYENGGARA PERABOTJALAN 01 PEKAN LANGKAP

LOKASI PROJEK RINGKASAN PROJEK KEWANGAN PROJEK PRESTASI PROJEK
Daerah : Hilir Perak Peruntukan : BP.1 Peruntukan : RM 50,000.00 Tarikh mula : 08.02.2016

Parlimen : Pasir Salak No. Kontrak : PB. 6/16 Harga : RM 49,880.00 Tarikh akhir : 04.04.2016
Kontrak

Dun : Sg. Manik Kontraktor : Elmi Brothers Belanja : RM 49,880.00 Kemajuan : 100%

Ent Jadual

Kaedah : Sebutharga No. Waran Kemajuan : 100%
Tawaran Sebenar



SKOP PROJEK

- Menyediakan cat garisan jolon reflective thermoplastik ketebalan 3mm
- Menyediakan cat jolon untuk tanda jolon dan arah ketebalan Smm
- Membekal dan memasang papan tanda mengikut standard piawai JKR

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM SEMASA SELEPAS

- .. .:,

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN

2016

LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF TANOAS AWAM 01 PASAR AWAM
TELUK INTAN

LOKASI PROJEK RINGKASAN PROJEK KEWANGAN PROJEK PRESTASI PROJEK
Daerah : Hilir Perak Peruntukan : BP.1 Peruntukan : RM 55,000.00 Tarikh mula : 08.02.2016

Parlimen : Teluk Intan No. Kontrak : PB. 14/16 Harga : RM 54,930.00 Tarikh akhir : 04.04.2016
Kontrak

Dun : Pasir Kontraktor : K Zech Tech Belanja : RM 54,930.00 Kemajuan : 100%

Berdamar Ent Jadual

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK

- Menyediakan kemasan lantai jenis jubin seramik bersaiz 300mm x 600mm
- Membekal dan memasang siling asbestos bersaiz 4' x 8'
- Membina dan menyiapkan bangunan tambahan bersaiz 10' x 15'
- Kerja - kerja mengecat semula dinding bangunan tandas

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM
-



SEMASA SELEPAS

• •

LAPORAN MAJLIS PERBANDARAN TELUK INTAN
TAHUNAN LAPORAN TAHUNAN 2016
2016

LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF TANDAS AWAM DI DEWAN RUMAH REHAT
TELUK INTAN

LOKASI PROJEK RINGKASAN PROJEK. KEWANGAN PROJEK PRESTASI PROJEK
Daerah : Hilir Perak Peruntukan : BP.1 Peruntukan : RM 135,000.00 Tarikh mula : 08.02.2016

Parlimen : Teluk Intan No. Kontrak : PB. 15/16 Harga : RM 127,997.00 Tarikh akhir : 04.04.2016
Kontrak

Dun : Pasir Kontraktor : D - Haiz Belanja : RM 127,997.00 Kemajuan : 100%

Berdamar Ent Jadual

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK

- Menyediakan kemasan lantai jenis jubin seramik bersaiz 300mm x 600mm
- Membekal dan memasang siling asbestos bersaiz 4' x 8'
- Kerja - kerja menyenggara dan membaiki semula sistem paip kumbahan UPVC
- Kerja - kerja mengecat semula dinding bangunan tandas

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM SEMASA

,



-

SEMASA SELEPAS

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN

2016

LAPORAN JABATAN KEJURUTERAAN

PENYELENGGARAAN RUMAH PANGSA SRI NIBONG,
JALAN SG. NIBONG, TELUKINTAN

lOKASI PROJEK RINGKASAN PROJEK KEWANGAN PROJEK PRESTASIPROJEK

Daerah : Hilir Perak Peruntukan : BP.1 Peruntukan : RM 100,000.00 Tarikh mula : 29.03.2016

Parlimen : Teluk Intan No. Kontrak : PB. 27/16 Harga : RM 91,098.52 Tarikh akhir : 24.05.2016
Kontrak

Dun : Pasir Kontraktor : M & lEnt Belanja : RM 91,098.52 Kemajuan : 100%

Berdamar Jadual

Kaedah : Sebutharga No. Waran Kemajuan : 100%
Tawaran Sebenar



SKOP PROJEK yang

- Menyelenggara sistem perpaipan, kemasan dinding dan kemudahan
sedia ada di rumah pangsa damai

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM SELEPAS

•' ' •

m'" • _

SEBELUM SELEPAS

LAPORAN MAJLIS PERBANDARAN TELUK INTAN
TAHUNAN LAPORAN TAHUNAN 2016
2016
LAPORAN JABATAN KEJURUTERAAN

MENAIKTARAF INFRASTRUKTUR 01 RUMAH PANGSA
SG. NIBONG, TELUK INTAN

LOKASI PROJEK RINGKASAN PROJEK KEWANGAN PROJEK PRESTASI PROJEK
Daerah : Hilir Perak Peruntukan : BP.1 Peruntukan : RM 200,000.00 Tarikh mula : 13.05.2016

Parlimen : Teluk Intan No. Kontrak : PB. 56/16 Harga : RM 182,132.00 Tarikh akhir : 08.07.2016
Kontrak

Dun : Pasir Kontraktor : Khaiyus Ent Belanja : RM 182,132.00 Kemajuan : 100%

Berdamar Jadual

Kaedah : Sebutharga No. Waran • Kemajuan : 100%
Tawaran • Sebenar

SKOP PROJEK
- Membekal dan memasang pagar jenis anti climb
- Membina longkang perimeter bersaiz 375mm
- Membina rumah sampah bersaiz 6m x 4m
- Menurap semula jolon dengan premix ACWC 14

GAMBAR - GAMBAR KEMAJUAN KERJA

SEBELUM SELEPAS

SELEPAS SELEPAS

,... . - •

I



LAPORAN KETUA
TAHUNAN

2016

ARTA

KETUA

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN
2016

JABATAN PERBENDAHARAAN

PENGENALAN

Jabatan Perbendaharaan adalah jabatan yang bertanggungjawab bagi segal a urusan
kewangan majlis yang meliputi aspek perakaunan dan pengurusan aset, kutipan hasil dan
pengurusan letak kereta, penyediaan bajet dan pengurusan pembayaran.

Terdapat 3 bahagian utama di Jabatan Perbendaharaan iaitu :
- Bahagian Akaun dan Pengurusan Aset
- Bahagian Kutipan Hasildan Pengurusan Letak Kereta
- Bahagian Bajet dan Pengurusan Pembayaran

OBJEKTIF

- Menguruskan kutipan hasil serta mengawal perbelanjaan majlis.
- Membentuk peraturan, garis panduan, kaedah dan sistem pengurusan kewangan bagi

meningkatkan produktiviti dan prestasi
- Mengurus semua aspek kewangan & perakaunan berkaitan perolehan dan projek - projek

pembangunan
- Memastikan setiap anggota mematuhi peraturan yang telah ditetapkan dalam menjalankan
tug as sekaligus dapat memenuhi piagam pelanggan yang telah ditetapkan oleh jabatan.
- Menyediakan perancangan jadual kursus tahunan jabatan yang dapat menambahbaik

prestasi dan pengetahuan kakitangan dalam menjalankan tugas berkaitan.

PIAGAM PELANGGAN

Di dalam memenuhi polisi kualiti ini, Jabatan Perbendaharaan mengamalkan Pengurusan Kualiti
Menyeluruh dengan objektif - objektif berikut :

- Sentiasa proaktif dalam tug as.
- Menambahbaikan kualiti keseluruhan perkhidmatan yang diberikan oleh Jabatan

Perbendaharaan secara berterusan.
- Mengamalkan Sistem Pengurusan Kualiti berasaskan MS ISO9001 : 2000

LAPORAN MAJLIS PERBANDARAN TELUK INT
TAHUNAN
2016 LAPORAN TAHUNAN 20 6

2015 JABATAN PERBENDAHARAAN

PENYATA KEWANGAN 2014 - 2016

TARIKH

Bil.2/2015 28 Mac 2016 Bersih
Bil.2/2016
Bil.1Z201 Z

PENCAPAIAN KUTIPAN CUKAI TAKSIRAN (SEMASA)

CUKAI

2015 10,966,072 9,889,071 90

PENCAPAIAN KUTIPAN (TUNGGAKAN )

CUKAI

2015 2,446,150 919,022 38
922,869

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN
2016

JABATAN PERBENDAHARAAN

BAHAGIAN HASIL DAN LETAK KERETA

Fungsi :-

- Memastikan semua hasil Majlis Perbandaran Teluk Intan ( MPTI ) termasuk tunggakan dapat
dikutip.

- Memastikan pengurusan letak kereta di kawasan pentadbiran majlis antara yang terbaik

2 Lesen ~0,730,Z89 2,360,134 11,35Z,398
4 Perolehan Jualan Barang2 945,759 2,515,053
6 Faedah 1,786,985 77,213
8 Hasil Projek Usahasama 167,652
86,545 2,373,966 2,180,ZZZ
253,962
297,017 624,829 243,101
594,690
8,921,311 o o

29,059,176 3,576,906

BAHAGIAN ASET

PENGENALAN

Bahagian Aset telah ditubuhkan pada November 2009 di mana anggotanya terdiri daripada
Pembantu Tadbir N17 ( 2 orang ) di bawah pengawasan Akauntan sebagai Pegawai Aset.
Mesyuarat JKPAKyang pertama telah diadakan pad a bulan November 2009.

Fungsi :

- Menguruskan proses pendaftaran aset / inventori MPTI.
- Menguruskan proses pelupusan aset / inventori / bekalan MPTI.
- Menguruskan semua laporan - laporan yang diperlukan berkaitan dengan pengurusan

aset / inventori
- Menguruskan semua aspek kewangan & akaun berkaitan projek - projek pembangunan.



LAPORAN
TAHUNAN
2016

ARTA

PEGAWAI PENI~AIAN

MOHAMAO IZWAN BIN IBRAHIM

FAIRUL AZHAR BIN ABDUL AZIZ

KANAN AZLINA BT OEMYAOI

SITI HANOM BTSUHIR

P.EMBANTU PENILAIAN I

RUBINAH BT MOHO lAMANI

MOHO FAIZHAL B MOHO SANI SALMAH BT. TAIS

r.EM~TADBIRIHARTA III

ZANARIY AH BT ISMAIL

AZHAR BIN RAZALI

LAPORAN MAJLIS PERBANDARAN TELUK INTAN
TAHUNAN LAPORAN TAHUNAN 2016
2016
JABATAN PEN/LA/AN & PENGURUSAN HARTA

OBJEKTIF JABATAN PENILAIAN
DAN PENGURUSAN HARTA

"Untuk melaksanakan pengurusan penilaian kadaran dengan efisyen dan a wajar dan munasabah
selaras dengan peruntukan Akta Kerajaan Tempatan 1976, ( Akta 171 ). Juga bertanggungjawab untuk
menguruskan hartanah majlis dengan optimum dan berkesan supaya memberikan pulangan hasil yang
terbaik kepada m

OBJEKTIF BAHAGIAN PENILAIAN

"Menentukan nilai tahunan bagi semua harta kadaran yang berada di dalam kawasan majlis dan semua

bangunan m Kerajaan Persekutuan, Kerajaan Negeri Dan Badan - Badan Berkanun untuk tujuan

pengenaan kadar dan Sumbangan Membantu Kadar. Sebagai yang mengawal selia pengurusan

bangunan berha strata di bawah peruntukan Akta Pengurusan Strata 2013 ( Akta 757 )."

OBJEKTIF BAHAGIAN
PENGURUSAN HARTA

"Untuk mengoptimumkan hasil dan memaksimumkan nilai modal bagi semua hartanah k majlis serta
sebarang kepentingan di atasnya, melalui pelaksaan strategi - strategi pembangunan, penyewaan,
pengurusan dan kawalan yang berkesan. Juga berperanan untuk menguruskan bank tanah MPTI."

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN
2016

JABATAN PEN/LA/AN & PENGURUSAN HARTA

FUNGSI

o Membuat penilaian cukai taksiran ke atas hartanah persendirian di kawasan MPTI;

Membuat penilaian Sumbangan Membantu Kadar ke atas harta milik Kerajaan
Persekutuan, Kerajaan Negeri dan Badon Berkanun;

o Membuat penilaian nilai insuran bagi harta - harta milik MPTI;

o Memproses permohonan pulangan balik cukai taksiran;

.0 Memproses pertukaran nama pemilik pegangan cukai taksiran;

Mengurus permohonan tanah, sewaan tanah dan bayaran cukai tahunan bagi
tanah - tanah milik MPTI;

o Menguruskan pembangunan, penyewaan dan menyenggara bangunan

perniagaan, pasar, gerai dan ruang niaga milik MPTI;

o Urusetia kepada Mesyuarat Jawatankuasa Penilaian dan Bantahan MPTI;

o Urusetia kepada Mesyuarat Jawatankuasa Pembangunan Hartanah

dan Penswastaan Majlis; dan

.0 Mengawalselia pengurusan bangunan berhakmilik strata di bawah peruntukan
Akta Pengurusan Strata 2013 ( Akta 757).

LAPORAN MAJLIS PERBANDARAN TELUK INTAN
TAHUNAN LAPORAN TAHUNAN 2016
2016

JABATAN PEN/LA/AN & PENGURUSAN HARTA

i. BAHAGIAN PENILAIAN

A. JUMLAH PEGANGAN BAGI TAHUN 2014 - 2016 B. JUMLAH PEGANGAN MENGIKUT JENIS HARTA SEHINGGA
31 DISEMBER 2016
PEGANGAN
JENIS HARTA ~UML'.AH PERATUSAN

TAHUN CUKAI SUMBANGAN JUMLAH 6. 274 2.55
TAKSIRAN 989 99 0.66
2014 42,232 0.24
2015 40,210 42.772 41,780
2016 41,243
41.780

C. JUMLAH PEGANGAN SUMBANGAN MEMBANTU F. JUMLAH HASIL TAKSIRAN MENGIKUT KAWASAN SEHINGGA

KADAR SEHINGGA31 DISEMBER 2016 31 DISEMBER 2016

JENIS SUMBANGAN KAWASAN TAKSIRAN ~UMlAH HASll PERATUSAN
TAKSIRAN
TAKSIRAN
(RM) (% )

2. SMK Kerajaan Negeri 87 8.80 Teluk Intan 8,410,416.3

2. langkapjChui ChakjPelawanjBalu 12 981,863.34 8.54

TigajSimpang EmpaljHutan 429984,95 10.23

D. JUMLAH KESELURUHAN PEGANGAN SEHINGGA 4. Chenderong Balai 23,237.30 0.23
31 DISEMBER 2016 10,845,501.89

PERKARA JUMLAH PEGANGAN

JUMlAH B 41.780

JUMLAH C 992 G. JUMLAH HASIL SUMBANGAN MEMBANTU KADAR SEHINGGA

42772 31 DISEMBER 2016

E. JUMLAH HASIL TAKSIRAN BAGI TAHUN JENIS CARUMAN 354.238.63 79,70
49.469,70 13,94
2014-2016 2, SMKKerajaan Negeri 27.577.00
431.285,33
TAHUN CUKAI SUMBANGAN
TAKSIRAN MEMBANTU

2014 10,485, 132.02 430,84703 10,893919.85 H. JUMLAH KESELURUHAN HASIL TAKSIRAN SEHINGGA
2015 10,765,489.82 430.847.03 11,196,336.85 31 DISEMBER 2016
2016 10,845,501.89 431,285.33 11,276,787.22,
PERKARA HASIL TAKSIRAN ( RM)

JUMLAH f 10,845,501.89

JUMLAH G 431,285,33

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN

2016

JABATAN PEN/LA/AN & PENGURUSAN HARTA

KADAR TAHUN 2016 2016(%) KAWASAN TERLIBAT KADAR TAHUN

KAWASAN TERLIBAT 10.S 3. BAGAN DATOH 2016~)

1. TELUK INTAN 12.5 9.5
10.5
yang 12.5 10.S
1.2 hingga 1.S:
5o.5 9.5

9.5 10.S

12.5 5o.5

1.3. 9.5 4. SIMPANG TIGA, SELEKOH, BATU 20,

Jalan Woo Saik , 12.5 JENDARATA DAN SIMPANG EMPAT
dan 011Jalan Woo Saik Hong
5o.5 1 Pekan Simpang TIga, Pekan Selekoh, Pekan Batu 20,

10.5 Pekan Jendarala dan Pekan Simpang Empat
115
10.5 4.2 Kawasan Operasi Baru Simpang Tiga, Selekoh,
11.5 Batu 20, Jendarata dan Simpang Empat

1.S. 5o.5

9.5

10.S

9.5

10.5

So.5

9.5

10.5

9.5

10.5
5.5

o

KAWASAN TERLIBAT 5. KAWASAN TERLIBAT

2. LANGKAP 1 Peka SUNGAI SUMUN

2.1 Jalan Besar, Jalan Kampar, Jalan Chui Chak, Pekan 11.5
dan Jong, Langkap
12.5

11.5

12.5

5o.5

8.S PELAWAN

11.5

8.5

11.5

5o.S 6.

7.S 9.5
10.5
7.S 11.5
10.5
9.5
5o.5
11.5

5o.5

2.4 Kawasan Operasi Baru Langkap 6.2 Kawasan Operasi Baru Pelawan

7. CHUI CHAK

ng Baru Chui Chak

8.5

11.5

8.5

11 .S

5o.5

LAPORAN MAJLIS PERBANDARAN TELUK INTAN
TAHUNAN LAPORAN TAHUNAN 2016
2016
JABATAN PEN/LA/AN & PENGURUSAN HARTA

KADARTAHUN JUMLAH HASIL BAGI TAHUN
2014-2016
2016(%)

7.1 Kawasan Operasi Baru Chui Chak 12000000

Dimajukan 10000000

8. BATU 12, JALAN BlOOR 8000000

8.1 Kampung Baru Batu 12 6000000

Tanah
Tanah

8.2 Kawasan Operasi Baru Batu 12

4000000

Kosong 2000000
Perlanian
o
Dimajukan
2014 2015 2016

Cukai Taksiran
bengen Membantu Kadar

Jumlah Hasil

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN

2016

JABATAN PEN/LA/AN & PENGURUSAN HARTA

DAFTAR HARTANAH MPTI TAHUN 2016

I. SENARAI HARTA SEWAAN ( PASAR AWAM ) II. SENARAI HARTA SEWAAN ( GERAI ) 2016

HARTA PENYEWAAN HARTA
SEWA SEMASA SEWA
TELUKINTAN
PASAR BESARTELUK GM JALAN BAN DAR
INT GM JALAN SELAT
Gerai ( A)
Gerai ( B ) RM150.00
GM PEKAN AHAD ( B. RAKYAT ) RM120.00
GM TAMAN INDAH JAYA RM16000
BUAH • BUAHAN RM130.00
RM200.00
PLAZA R&R BATU 5 RM380.00

PASAR BARU BAGAN 9 9 RM200 .0. 0
2 DATOH 2 2 RM100.00
3 3 RM400.00
1. Gerai Ikan 1 1 RM240.00
2. Gerai Ayam RM240.00
3. Gerai Sayur Campur RM5120 4
4. Gerai Sayur Kampung RM3840 1 GM RPA 4 KARENTINA
RM38.40 1
PASAR SELEKOH RM38.40 6
RM38.40 2
3 GM 1 MUKIM 1 PRODUK RM200.00
4 PASAR SIMPANG 4 4 RM200.00
1. Gerai Ayam 1 30 10 GM MEDAN SELERAMINI STADIUM RM25000
2. Gerai Kambing 2 8 Gerai'Makan RM150 .0. 0
3. Gerai Lembu 6 4 Kiosk RM190.00
4. Gerai Ikan 3 RM200.00
5. Gerai sayur 4 6 RM 100.00
6. Gerai Runcit
RM24.00 20 RM200.00
PASAR CHUI CHAK RM24 00 1 RM200.00
Gerai Ayam RM24.00
Gerai Khinzir RM24.00 6
Gerai Daging RM24.00
Gerai Ikan RM24.00 30
Gerai sayur
Gerai Buah • buahan 30

6 PASAR IIARU LANGKAP 8
1. Gerai Sayur 4
2. Gerai Ayam
·1 meja 7
·2 meja
3. Gerai Ikan 20
·1 meja 1
·2 meja 8
4. Gerai Lembu 30

5. Gerai Khinzir

6. Gerai Berkunci

LAPORAN MAJLIS PERBANDARAN TELUK INTAN
TAHUNAN LAPORAN TAHUNAN 2016

2016

JABATAN PEN/LA/AN & PENGURUSAN HARTA

II. SENARAI HARTA SEWAAN ( GERAI ) 2016

RM250.00
RM250.00
RM250.00

RM85 00
RM11000

RM60,OO

BARU RM380,00 RM200.00
GM TAMAN CICELY RM10,OO
GM TEPISUNGAI III. SENARAI HARTA SEWAAN
DATARAN NANAS SELABAK ( BANGUNAN - BANGUNAN LAIN) 2016
TAPAK PENJAJA JAlAN SEKOLAH
HARTA
BAGAN DATOH SEWA
GM JAlAN SHAHBAN DAR
GM JAlAN PANGllMA ( BARU ) BANGUNAN INDUSTRI ~AlAN KASIAM
( 11/2 T )
BANGUNAN PERNIAGAAN JAlAN PASAR

GM PEKAN BAGAN DATOH RM 150.00
HUIAN MEllNIANG
GM RPA SIMPANG 4

GM PEKAN SIMPANG 4 ( BARU J

SELEKOH BEKAS} RM150.00

26 GM PEKAN SELEKOH( BARU ) RM150.00 8 8 7 TERMINAL BAS BAN DAR BARU
-Kaunter Tiket
27 GM PEKAN SELEKOH( TERBAKAR) RM80.00 12 12 -Petak Bas RM300.00 8 8
-Petak Bas (Sementara) RM100.00
RUNGKUP -Ting kat Atas RM100.00 12 12
KIOKS BGN. PERNIAGAAN MPTI JLN. RM1,500.00
GM SlMPANG 3 RUNGKUP RMI50,OO 2 2
8 PASAR RM10.00
SUNGAI SUMUN BGN. KOMPLEKS PELANCONGAN 1 1
RM500.00 1
29 GM PARIT 7 SUNGAI SUMUN ( BARU ) RM150.00 2 2 9 B.DATOH 1 1
10 BGN. PERNIAGAAN JALAN SPEEDY RM2,500.00
30 GM BATU 16 SUNGAI SUMUN BARU +----,R",M",1",5",0.",_,0_0,,- .:.5_--+ _ __;5"---_-1 RM1,500.00 1 1
-Tingkat Bawah 0
lANGKAP -Tingkat 1 RM850.00 1 0
-Tingkat 2 RM450.00 1 1
GM TERBUKALANGKAP RM60.00 -Tingkat Tiga 1
1 3
CHUI CHAK 12 KEDAI DESA LANGKAP 0
0
GM PUSAI PENJAJA CHUI CHAK Tingkat Bawah
Tingkat Atas (tepi)
CHENDERONG BALAI Tingkat Atas (tengah )

GM CHENDERONG BALAI RM6000

GERAI PLB

RM90.00
RM35,OO
RM50.00
RM70.00
RM90.00
RMbO.OO
RM45,00
RM60.00

GERAI KIOSK E - KASIH

42 Jelen Kempas RM30.00 2 2 RM850.00 3
43 Kebun Limau RM30.00 2 2 RM550.00 1
44 Menara Condong RM30.00 3 3 RM450.00
45 Sungai Nibong RM30.00 2 2 2
46 Riverfront RM30.00 2 2
47 Detarcn Nenas RM30.00 2 2
48 Glutton S uare RM30.00 2 2

MAJLIS PERBANDARAN TELUK INTAN LAPORAN
LAPORAN TAHUNAN 2016 TAHUNAN
2016

JABATAN PEN/LA/AN & PENGURUSAN HARTA

IV. SENARAI HARTA SEWAAN (TAPAK & TANAH) 2016 PEMILIHAN TEMUDUGA TAHUN 2016

HARTA SEM S TARIKH PREMIS TERLIBAT BILANGAN
SEWA PEMOHON

TAPAK MUD ARIA, ~AlAN AH CHEONG RM30 00

TAPAK PETI/MESIN AIS PBTI RM20 00 GB11 GERAI BERKUNCI PASAR 4 PEMOHON
BARU LANGKA~
PADANG GOLF RM1,500,00 2 04 OGOS 2016 NO. 10, GERAI MAJLIS 9 PEMOHON
PUSAT GIAT MARA BAGAN DATOH RM3 00 00 RPA BAGAN DATOH 3 PEMOHON
LOT 1809 JAlAN LAKSAMANA RM370,00 28 SEPTEMBER 12 PEMOHON
2016 20 GERAI MAJLIS 15 PEMOHON
TANAH RIZAB KTMB RM1 000 00 ALAN MAHKOTA TELUK INTAN 4PEMOHON
4 23 DISEMBER 2016 NO. 02 MEDAN MAK INTAN
RM6,500,00 JALAN MAHKOTA, TELUK INTAN 7 PEMOHON
RM2 000,00 NO, 03 MEDAN MAK INTAN 2 PEMOHON
RM1,000,00 JALAN MAHKOTA, TELUK INTAN
RM1,000,00 NO, 19, MEDAN SELERA
MI NI STADI UM
PENCAPAIAN KUTIPAN SEWAAN (SEMASA) JALAN SPE EDY
TELUK INTAN
ANGGARAN KUTIPAN PERATUS
SEWAAN 02 GERAI MAJLIS BARU
TAHUN CHENDERONG BALAI

2014 2,060,998,70 1,897,639,65 98,93% GERAI SAYUR
2015 2,000,794 90 1,811,557,33 92.07% PASAR BARU LANGKAP
90,54%
11, GERAI PLB
PENCAPAIAN KUTIPAN SEWAAN (TUNGGAKAN) ALAN MAHKAMAH
ELUK INTAN (TEMUDUGA KHAS )
NO, 07 GERAI MAJllS
RPA KARENTINA
JAlAN MAHARAJAlELA,
TElUK INTAN
NO. M28, GERAI DAGING ( IKAN ) PASAR
BARU lANGKAP

TAHUN TUNGGAKAN KUTIPAN PERATUS
SEWAAN SEBENAR (% )

2014 306,352.20 180,659.95 77.10%
2015 283,485.10 63,73%

352,921 224,896.57 63.72%



LAPORAN
TAHUNAN
2016

ARTA

P.ERANCANG F?ERANCANG

LAPORAN MAJLIS PERBANDARAN TELUK INTAN
TAHUNAN LAPORAN TAHUNAN 2016

2016

JABATAN PERANCANG BANDAR DAN LANDSKAP

1. Kebenaran Merancang ( KM )
a) Januari - Disember 2016

5,000.00 1,000.00
1,000.00
3,000.00 600.00

1,600.00

••

b) Ulasan PTHP/ PTG / JPBD ( Januari - Disember 2016 )