Project New mold
Mold name 0.960 OKPINK
Cavity number 12 Cavity 2Mold
Product name 0.960 OKPINK
Customer name White House
SB2-7 / 6H2S
Machine HDPE HXM 50100
Material RA50100 70% / RGPK1103 30%
Formula Pink
62g.
Color 3.0%
Weight Zero%
Master batch 30Sec
Additive 4±g.
Cycle time 0.7mm.
Tolerances weight 85Pcs
Thickness
Packing

Product feature MANUFACTURE JETTA
Maker 1,900,000 THB
Price S50C
3Month
Material 30/04/2022
Period 30/07/2022
Start 30/07/2022 (3Month)
Finish

Delivery

APPEARANCE Pass
Shape Pass
Surface Pass
Pass
Dimension Pass
Bend Pass
Sink Pass
Flash Pass

Undercut
Color

FUNCTION TEST 30Min
Water leak test Not in the testing process
Air pressure test 1.0Meter
Drop test 10Kgf
Top load Not in the testing process
Stacking test Not in the testing process
Tensile test -ft-ib
Closure torque -Kgf
Closing force 1.08Liter
Brimful capacity 1.00Liter
Normal capacity

Factors cause delays Delivery delayed (Month)

Problems caused by mold trials

ฐานคอไมเ่ ป็น R โยนตกกระแทกแตก
แกไ้ ข เพ่มิ Rรอบฐานคอ

อพั เดท วนั ท่ี 29/02/2020

ลองพิมพ์ T0 วนั ท่ี 26/08/2022 ผล พนั้ ชิง้ ไมไ่ ด้

Project New mold
Mold name 1 Liter dtb mold no.3, 4
Cavity number 2Cavity 2Mold
Product name 1 Liter dtb
Customer name White house
SB2-5 / 2H2S
Machine HDPD5840
Material RA8540 30% / RG5840 70%
Formula Pink, Light purple, Dark purple, Milk
65g.
Color 3%
Weight Zero%
Master batch 25Sec
Additive ±2g.
Cycle time 0.6mm.
Tolerances weight 92Pcs
Thickness
Packing

Product feature MANUFACTURE Srg
Maker 670,000 THB
Price S50C
2Month
Material 05/08/2019
Period 05/10/2019
Start 29/01/2020 (6Month)
Finish

Delivery

APPEARANCE Pass
Shape Pass
Surface Pass
Pass
Dimension Pass
Bend Pass
Sink Pass
Flash Pass

Undercut
Color

FUNCTION TEST 30Min
Water leak test 1.5Meter
Air pressure test 1.5Meter
Drop test 30Kgf
Top load Not in the testing process
Stacking test Not in the testing process
Tensile test 14ft-ib
Closure torque -Kgf
Closing force 1Liter
Brimful capacity 1Liter
Normal capacity

Factors cause delays Delivery delayed (6Month)
1. Design
2. Drawing
3. Long time to order raw materials.
4. Insertion work
5. The mold trial plan has been

postponed.

Problems caused by mold trials Drop test (ทา่ ปากลง)
1.5M ไมผ่ า่ น แตกบรเิ วณบา่
ผิวชนิ้ งานเห่ียว คอขวด
แกไ้ ข แกไ้ ข
เปิดรูระบายอากาศ เพ่มิ R1 รอยตอ่ คอกบั บา่ ขวด
พน่ ทราย ตะเข็บเหล่ียม
เพ่มิ แรงดนั ลมเป่า จดั เซ็นเตอรพ์ ิมพ์

Drop test (ทา่ กน้ ลง)
1.5M ไมผ่ า่ น แตกบรเิ วณ
ตะเข็บกน้
แกไ้ ข
เพ่มิ เสน้ บบี ตะไกรใหห้ นาขนึ้

อพั เดท 05/10/2022

ไดร้ บั แจง้ จากทางฝ่ายขาย (คณุ ไก)่ แจง้ วา่ ตวั อยา่ งสินคา้ ท่ีสง่ ไปใหท้ างลกู ทดสอบไมผ่ า่ น โดยสินคา้ แตกในท่าปากตก
กระแทก 1.5 เมตร (1ใบทดสอบตกกระแทกในทา่ เดียวกนั 3 ครงั้ )

Project New mold
Mold name 1 Liter nkk mold no.2, 3
Cavity number 2Cavity 2Mold
Product name 1 Liter nkk
Customer name White house
SB2-3 / 2H2S
Machine HDPD5840
Material RA8540 30% / RG5840 70%
Formula Pink, Light purple, Dark purple, Milk
65g.
Color 3%
Weight Zero%
Master batch 23Sec
Additive ±2g.
Cycle time 0.6mm.
Tolerances weight 92Pcs
Thickness
Packing

Product feature MANUFACTURE Srg
Maker 670,000 THB
Price S50C
2Month
Material 05/08/2019
Period 05/10/2019
Start 29/01/2020 (6Month)
Finish

Delivery

APPEARANCE Pass
Shape Pass
Surface Pass
Pass
Dimension Pass
Bend Pass
Sink Pass
Flash Pass

Undercut
Color

FUNCTION TEST 30Min
Water leak test Not in the testing process
Air pressure test 1.5Meter
Drop test 30Kgf
Top load Not in the testing process
Stacking test Not in the testing process
Tensile test 14ft-ib
Closure torque -Kgf
Closing force 1Liter
Brimful capacity 1Liter
Normal capacity

Factors cause delays Delivery delayed (6Month)
1. Design
2. Drawing
3. Long time to order raw materials.
4. Insertion work
5. The mold trial plan has been

postponed.

Problems caused by mold trials

1) ลกู คา้ โยนตกกระแทกไมผ่ า่ น ตามมาตรฐานท่ีกาหนด
1.1) ทดสอบทา่ แนวนอน 3 ครงั้ ตอ่ 1 ใบ ความสงู 1.8 m.
1.2) ทดสอบทา่ แนวตงั้ 3 ครงั้ ตอ่ 1 ใบ ความสงู 1.8 m.
1.3) ทดสอบทางแนวด่งิ ปากลง 3 ครงั้ ตอ่ 1 ใบ ความสงุ 1.5 m.

Drop test (ทา่ แนวตงั้ )
1.8 M ไมผ่ า่ น แตกบรเิ วณบา่ มมุ กน้
แกไ้ ข
เพ่มิ เสน้ บบี ตะไกรใหห้ นาขนึ้

Drop test (ทา่ ปากลง)
1.5 M ไมผ่ า่ น แตกบรเิ วณฐานคอ
แกไ้ ข
ปรบั แตง่ เพ่มิ ความหนา

อพั เดท วนั ที่ 8/7/2022

ลกู คา้ รอ้ งเรยี นแมพ่ ิมพ์ 1 ลติ ร NKK ประกอบฝาป๊ อก(ฝาฟรหี มนุ 14 ฟตุ ปอนด)์ ตรวจสอบพิมพใ์ หมพ่ บคา่ OD ติดคา่
MIN ทาการแกไ้ ข OD ใหส้ เปคเท่าพิมพเ์ กา่ กาหนดเสรจ็ 20/9/2022

Project New mold
Mold name 3.5 Sika
Cavity number 1Cavity 1Mold
Product name 3.5 Sika
Customer name Sika
INJ408-1
Machine PP400L
Material RA400L 30% / RGPP400L 70%
Formula Yellow
210g.
Color 3%
Weight Zero%
Master batch 42Sec
Additive ±3g.
Cycle time 1.5mm.
Tolerances weight 12Pcs
Thickness
Packing

Product feature MANUFACTURE TMM Mold
Maker 400,000 THB
Price S50C
2Month
Material 16/12/2020
Period 16/02/2021
Start 16/02/2021 (3Month)
Finish

Delivery

APPEARANCE Pass
Shape Pass
Surface Pass
Pass
Dimension Pass
Bend Pass
Sink Pass
Flash Pass

Undercut
Color

FUNCTION TEST Not in the testing process
Water leak test Not in the testing process
Air pressure test 1.5Meter
Drop test 30Kgf
Top load Not in the testing process
Stacking test Not in the testing process
Tensile test -ft-ib
Closure torque -Kgf
Closing force 3.5Liter
Brimful capacity 3.5Liter
Normal capacity

Factors cause delays Delivery delayed (6Month)
1. Design Mold

Problems caused by mold trials

ระบบพมิ พ์ ติดพมิ พ์
แกไ้ ข ปรบั จงั หวะเป่าลมให้
สอดคลอ้ งกบั เปิดพมิ พ์

อพั เดท 29/09/2022

ลองพิมพ์ 20/9/2022 ระบบพิมพผ์ า่ น สง่ ตวั อย่างใหล้ กู คา้ 29/9/2022 รอลกู คา้ แจง้ ผล

Project New mold
Mold name 4 Liter Arrow mold no.2
Cavity number 2Cavity 1Mold
Product name 4 Liter Arrow
Customer name White house
SB5-18 / 2H2S
Machine HDPD5840
Material RA8540 30% / RG5840 70%
Formula Milk, White
170g.,220g.
Color 1%
Weight Zero%
Master batch 37Sec
Additive 5±g.
Cycle time 0.8mm.
Tolerances weight 25Pcs
Thickness
Packing

Product feature MANUFACTURE Srg
Maker 492,200 THB
Price S50C
3Month
Material 30/11/2017
Period 28/03/2018
Start 28/03/20218 (6Month)
Finish

Delivery

APPEARANCE Pass
Shape Pass
Surface Pass
Pass
Dimension Pass
Bend Pass
Sink Pass
Flash Pass

Undercut
Color

FUNCTION TEST 30Min
Water leak test Not in the testing process
Air pressure test 1.5Meter
Drop test 80Kgf
Top load Not in the testing process
Stacking test Not in the testing process
Tensile test 5ft-ib
Closure torque -Kgf
Closing force 4Liter
Brimful capacity 4Liter
Normal capacity

Factors cause delays Delivery delayed (6Month)
1. Design
2. Drawing
3. Long time to order raw materials.
4. Insertion work
5. The mold trial plan has been

postponed.

Problems caused by mold trials

1) ลกู คา้ โยนตกกระแทกไมผ่ า่ น ตามมาตรฐานท่ีกาหนด
1.1) ทดสอบทา่ แนวนอน 3 ครงั้ ตอ่ 1 ใบ ความสงู 1.8 m.
1.2) ทดสอบทา่ แนวตงั้ 3 ครงั้ ตอ่ 1 ใบ ความสงู 1.8 m.
1.3) ทดสอบทางแนวด่งิ ปากลง 3 ครงั้ ตอ่ 1 ใบ ความสงุ 1.5 m.

Drop test (ทา่ แนวด่งิ ปากลง)
0.8 M ไมผ่ า่ น แตกบรเิ วณใตห้ จู บั
แกไ้ ข เพ่มิ เสน้ บบี ตะไกร
-

Drop test (ทา่ นอน)
1.2 M ไมผ่ า่ น แตกบรเิ วณรอ่ งดไี ซต์
แกไ้ ข
ปรบั แตง่ เพ่มิ ความหนา

อพั เดท วนั ที่ 29/02/2020

โยนตกกระแทกแตก ความสงู 1.8 เมตร แตกตะเข็บใตห้ จู บั ไมผ่ า่ นเน่ืองจากระบบพนั้ ชิง้ ทาการขอลองพิมพใ์ หมเ่ พ่ือหา
ปัญหาการแกไ้ ข 6-10/10/2022

Project New mold
Mold name 4.5-56
Cavity number 4Cavity 2Mold
Product name 4.5-56
Customer name Chuahahseng
SB5-14 / 2H2S
Machine HDPD6600
Material RA6600 60% / RG6600 40%
Formula White
230g.
Color 0.0035%
Weight Zero%
Master batch 35Sec
Additive 5±g.
Cycle time 1.0mm.
Tolerances weight 25Pcs
Thickness
Packing

Product feature MANUFACTURE JETTA
Maker 1,640,000 THB
Price S50C
3Month
Material 23/04/2021
Period 2/12/2021
Start 2/12/2021 (9Month)
Finish

Delivery

APPEARANCE Pass
Shape Pass
Surface Pass
Pass
Dimension Pass
Bend Pass
Sink Pass
Flash Pass

Undercut
Color

FUNCTION TEST 30Min
Water leak test Not in the testing process
Air pressure test 1.0Meter
Drop test 90Kgf
Top load 4 Stack
Stacking test Not in the testing process
Tensile test -ft-ib
Closure torque -Kgf
Closing force 4.55Liter
Brimful capacity 4.50Liter
Normal capacity

Factors cause delays Delivery delayed (6Month)
1. Design
2. Approve Drawing
3. Punching.

Problems caused by mold trials

หจู บั และใตห้ จู บั พนั้ ไมเ่ รียบเป็นขลยุ
แกไ้ ข
1 ลดเสน้ บีบตะไกร
2 ทำตะไกรท่อนบนใหย้ กสงู ขนึ้ ขำ้ งละ0.2

ปำกเป็นขลยุ
แกไ้ ข
1 เชค็ ปำกชน วำ่ กลมหรือไม่

อพั เดท วนั ท่ี 5/10/2022

พนั้ ชิง้ ค์ ไมเ่ รียบ เอำพิมพล์ งซอ่ ม 5/10/2022

Project New mold
Mold name 5L.Diversy
Cavity number 2Cavity 1Mold
Product name 5L.Diversy
Customer name Diversy
SB5-16 / 2H1S
Machine HDPD6600
Material RA6600 30% / RG6600 70%
Formula White
18g.
Color Zero%
Weight Zero%
Master batch 30Sec
Additive ±6g.
Cycle time 0.4mm.
Tolerances weight 20Pcs
Thickness
Packing

Product feature MANUFACTURE TMM Mold
Maker 670,000 THB
Price S50C
2Month
Material 08/03/2021
Period 30/05/2021
Start 30/05/2021 (2Month)
Finish

Delivery

APPEARANCE Pass
Shape Pass
Surface Pass
Pass
Dimension Pass
Bend Pass
Sink Pass
Flash Pass

Undercut
Color

FUNCTION TEST 30Min
Water leak test Not in the testing process
Air pressure test 1.2Meter
Drop test 35Kgf
Top load Not in the testing process
Stacking test Not in the testing process
Tensile test 4ft-ib
Closure torque -Kgf
Closing force 5Liter
Brimful capacity 5Liter
Normal capacity

Factors cause delays Delivery delayed (2Month)
1. Punching

Problems caused by mold trials

หจู บั พนั้ ชิง้ ไมเ่ รียบเป็นขลยุ
แกไ้ ข
1 เช่ือมหนา้ ตะไกรยกสงู ขนึ้ เฉพาะจดุ

ขอบปากไมเ่ รยี บ เป็นขลยุ
แกไ้ ข
ทาแหวนชน ใหม่

อพั เดท 05/10/2022

เน่ืองจากปัจจบุ นั ทางโรงงานยงั ใชแ้ มพ่ ิมพใ์ นการผลติ สนิ คา้ อยู่ ออเดอร์ 100,000 ใบเร่ิมผลติ วนั ท่ี 27/09/22 -17/10/2022
แกไ้ ขเสรจ็ 27/10/2022

Project New mold
Mold name 3009-5-6
Cavity number 1Cavity 2Mold
Product name 3009-5-6
Customer name Thai Peroxide Company Limited
BB30-19 / 1H2S
Machine HDPD7200
Material RA7200 30% / RG7200 70%
Formula Blue
1600gg.,2200g.
Color 1%
Weight Zero%
Master batch 75Sec
Additive 20±g.
Cycle time 1.8mm.
Tolerances weight 4Pcs
Thickness
Packing

Product feature MANUFACTURE Srg
Maker 536,000THB
Price S50C
3Month
Material 13/06/2022
Period 15/08/2022
Start 15/8/2022 (2Month)
Finish

Delivery

APPEARANCE Pass
Shape Pass
Surface Pass
Pass
Dimension Pass
Bend Pass
Sink Pass
Flash Pass

Undercut
Color

FUNCTION TEST 30Min
Water leak test Not in the testing process
Air pressure test 1.5Meter
Drop test 750Kgf
Top load 4 Stac
Stacking test Not in the testing process
Tensile test 15ft-ib
Closure torque -Kgf
Closing force 32Liter
Brimful capacity 30Liter
Normal capacity

Factors cause delays Delivery delayed (2Month)
1. Design
2. Mold

Problems caused by mold trials 1) ตะไกรกน้ พนั้ ไมข่ าด
แกไ้ ข
ฟิตตะไกรใหม่ เกิดจากเช่ือมแลว้ เหลก็ บดิ
ตวั

2)ชิน้ งานบบุ
แกไ้ ข
ปรบั แตง่ หวั ดาย
3) ปรมิ าตรไมไ่ ด้ 32 ลิตร ตวงจรงิ 31.3ลิตร
แกไ้ ข
ขยายความกวา้ งใหเ้ ทา่ กบั พิมพ3์ 009-3

อพั เดท วนั ที่ 21/9/2022

แกไ้ ขแมพ่ ิมพ์ ขยายดา้ นกวา้ งใหไ้ ดเ้ ท่ากบั 3009-3 เพ่ือใหไ้ ดป้ รมิ าตร 32 ลิตร
กาหนดเสรจ็ แมพ่ ิมพ์ 10/10/2022 ลองพิมพ์ 17/10/2022

Product feature Project New mold
Mold name Cap Udorn mold no.2
Cavity number 8Cavity 1Mold
Product name Cap Udorn mold no.2
Customer name Bangkok New Siam Food
I180-4 / Hotrunner
Machine PP HP400K
Material RAPP400K 70% / RGMK0152 30%
Formula Milk
4.3g.
Color 0.5%
Weight Zero%
Master batch 25Sec
Additive 0.5±g.
Cycle time -mm.
Tolerances weight 100Pcs / 2,000Pcs
Thickness
Packing Srg
800,000 THB
MANUFACTURE S50C
Maker 3Month
Price 1/06/2018
3/10/2018
Material 3/10/2018 (5Month)
Period
Start Pass
Finish Pass
Pass
Delivery Pass
Pass
APPEARANCE Pass
Shape Pass
Surface Pass

Dimension 30Min
Bend Not in the testing process
Sink Not in the testing process
Flash Not in the testing process
Not in the testing process
Undercut Not in the testing process
Color 2-3ft-ib
-Kgf
FUNCTION TEST -Liter
Water leak test -Liter
Air pressure test
Drop test
Top load
Stacking test
Tensile test
Closure torque
Closing force
Brimful capacity
Normal capacity

Factors cause delays Delivery delayed (6Month)
1. Design
2. Drawing
3. Long time to order raw materials.
4. Insertion work
5. The mold trial plan has been

postponed.

Problems caused by mold trials

ปัญหา ระบบพิมพน์ า้ ร่วั ฝ่ังตวั เมีย No 7

แกไ้ ข เจียรหนา้ รอ่ งโอรงิ และประกอบใหม่

อพั เดท วนั ที่ 05/10/2022

PM แมพ่ ิมพใ์ หม่ ทดลองเดินผลิต 24 ชม. เร่ิม 6/10/2022-7/10/2022

Project New mold
Mold name 1 Liter dtb mold no.3, 4
Cavity number 8Cavity 1Mold / Hotrunner
Product name ZB025
Customer name General
INJI100-2
Machine LDPE C150Y
Material LDPE C150Y =100%
Formula White
7.3g.
Color Zero%
Weight Zero%
Master batch 35Sec
Additive ±1g.
Cycle time Not.
Tolerances weight 1,000Pcs
Thickness
Packing

Product feature MANUFACTURE ST CNC Mold
Maker 500,000 THB
Price S50C
2Month
Material 12/12/2017
Period 10/07/2018
Start 10/07/2018 (8Month)
Finish

Delivery

APPEARANCE Pass
Shape Pass
Surface Pass
Pass
Dimension Pass
Bend Pass
Sink Pass
Flash Pass

Undercut
Color

FUNCTION TEST 30Min
Water leak test Not in the testing process
Air pressure test Not in the testing process
Drop test Not in the testing process
Top load Not in the testing process
Stacking test Not in the testing process
Tensile test Not in the testing process
Closure torque -Kgf
Closing force -Liter
Brimful capacity -Liter
Normal capacity

Factors cause delays Delivery delayed (8Month)
1. Design
2. Drawing
3. Design Mold

Problems caused by mold trials

เป็นรอยอนั้ อากาศขอบฝา รูฉีดเป็นตอ
ดา้ นใน ลองนา้ ร่วั แกไ้ ข
แกไ้ ข ปรบั คา่ การฉีด เพ่ิมHold
เปิดอากาศ
แมพ่ มิ พไ์ หม้ คราบดา
แกไ้ ข
เปิดอากาศ

อพั เดท 28/01/2021

ปัญหาใหญ่คอื ชิน้ งานอนั้ อากาศทะลดุ า้ นใน รูปทรงไมเ่ หมอื นเดมิ เสนอขอยกเลิกแมพ่ ิมพ์

Product feature Project New mold
Mold name Cap 68-69 mold no.3
Cavity number 4Cavity 1Mold
Product name 68-69-3
Customer name General
I360-1 / Cold Runner
Machine PPCO EP400L
Material RAPP 70% / RGRD0155 30%
Formula Red
33g.
Color 0.3%
Weight Zero%
Master batch 87Sec
Additive 2±g.
Cycle time -mm.
Tolerances weight 200Pcs
Thickness
Packing K Speed
800,000 THB
MANUFACTURE S50C
Maker 3Month
Price 21/07/2021
15/02/2022
Material 15/02/2022 (7Month)
Period
Start Pass
Finish Pass
Pass
Delivery Pass
Pass
APPEARANCE Pass
Shape Pass
Surface Pass

Dimension 30Min
Bend Not in the testing process
Sink Not in the testing process
Flash Not in the testing process
Not in the testing process
Undercut Not in the testing process
Color 20ft-ib
-Kgf
FUNCTION TEST -Liter
Water leak test -Liter
Air pressure test
Drop test
Top load
Stacking test
Tensile test
Closure torque
Closing force
Brimful capacity
Normal capacity

Factors cause delays Delivery delayed (7Month)
1. Design Mold

Problems caused by mold trials

กา้ นรนั เนอรต์ ดิ พมิ พ์
แกไ้ ข
1 เพ่ิมองศาปลดกา้ น
2 เพ่ิมขนาดเข็มดงึ กา้ น

เฟื องลอ็ คเป็นรอยขาว
แกไ้ ข
ปรบั ระบบกระทงุ้ เปล่ียนสปรงิ

หลงั ฝาบบุ
แกไ้ ข
1 ลดอณุ หภมู นิ า้

อพั เดท วนั ท่ี 01/09/2022

ระบบพิมพก์ า้ นรนั เนอรต์ ดิ พิมพ์ ชิน้ งานเป็นรอยขาว บบุ ลองพิมพ์ 29/8/2022 ปลายเกลยี วเยิน ฝาอนั้ อากาศ นาพิมพไ์ ปซอ่ ม
ลองพิมพท์ ่ี บ.เคสพีดโมลด์ วนั ท่ี 10/10/2022