Appendix 2b – Environmental Weekly Checklist (EMS-INTG-01-C02) – Rev. 1
154
155
Appendix 2c – Environmental Weekly Checklist (EMS-INTG-01-C01) – Rev. 1
156
Appendix 3 – Determination for Slope Stabilization (Merit & Demerit on each
Method)
157
158
159
Appendix 4 – Sample of PMU project with EIA/BMP : PMU Bukit Unggul
Aerial View of PMU BUGL
160
Sediment Pond
Drain
Earth drain
161
Noise Monitoring Control Activity
162
Appendix 5 – Sample of Transformer Oil Pit/Bund at various PMUs
PMU 132kV Pontian
Construction of Transformer Oil Pit
Completed Transformer Oil Pit
163
PMU 132kV Parit Raja
Construction of Transformer Oil Pit
PMU 132kV Ulu Tiram
Construction of Transformer Oil Pit
164
Completed Transformer Oil Pit
165
Appendix 6 – Sample of PMU project with BMP : OHL KPDN-AMPE
Site Clearing and Earthwork for access road
166
Gravel & its maintenance
167
Geotextile & it’s maintenance
168
Earth drain & it’s maintenance
169
Slit Trap & it’s maintenance
170
Slope Protection & it’s maintenance
171
Polymer immobilize sediment
172
Appendix 6 – Process Map for EIA/EMP Approval
Appendix 7 – Sample of EIA Approval from DOE
173
174
Appendix 8 – Sample of Tender Specification for Geological Terrain Mapping (GTM)
175
176
Appendix 9 – Sample of Tender Specification for Sediment Control Plan (ESCP)
177
Appendix 10 – Sample of Tender Specification for Wildlife Management Plan (WMP)
178
Appendix 11 – Sample of Tender Specification for Land Disturbing Pollution
Prevention and Mitigation Measures (LDP2M2)
-END-
179
180