The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by azmanjam14, 2021-10-26 09:29:52

Taskforce OER 26OKTOBER2021

Taskforce OER 26OKTOBER2021

FGV PALM INDUSTRIES SDN. BHD.

WILAYAH 6

KILANG SAWIT
TENGGAROH TIMUR

TARIKH : 26/10/2021

FGV PALM INDUSTRIES SDN BHD
KILANG SAWIT TENGGAROH TIMUR

LAPORAN PEMANTAUAN GREDING BERSAMA PENGURUS OKTOBER 2021

TARIKH BTS TERIMA FELDA fgvpm LUAR JUMLAH KPG MT REJECT MUDA OER CATATAN
(MT)
MT % MT % MT % MT % 19.53 MT % 20.51
19.77 20.52
10/1/2021 0.00 0.00 0.00 0.00 0.00 0% 19.86 0.00 20.50
19.69 20.60
10/2/2021 333.66 92.58 0.28 169.99 8.70 71.09 7,038.54 333.66 100% 19.89 3.37 0.01 20.82
19.94 21.00
10/3/2021 549.63 175.07 0.32 303.45 15.35 71.11 5,868.50 549.63 100% 19.85 6.66 0.01
19.96 0.00
10/4/2021 538.97 208.08 0.39 288.88 14.55 42.01 5,660.53 538.97 100% 19.93 4.00 0.01 20.65
19.98 21.02
10/5/2021 514.94 165.61 0.32 311.74 15.83 37.59 4,379.32 514.94 100% 20.12 4.42 0.01 21.02
19.94 21.07
10/6/2021 546.10 251.02 0.46 246.67 12.40 48.41 6,294.45 546.10 100% 19.95 4.20 0.01 21.05
19.93 21.10
10/7/2021 496.41 203.44 0.41 239.47 12.01 53.5 5,311.59 496.41 100% 19.83 5.00 0.01
19.72 0.00
10/8/2021 175.93 58.07 0.33 82.54 4.16 35.32 6,213.85 175.93 100% 19.91 1.00 0.01 21.04
21.01
10/9/2021 539.18 221.6 0.41 266.53 13.35 51.05 6,089.63 539.18 100% 19.52 4.52 0.01 21.08
19.48
10/10/2021 474.44 205.88 0.43 224.82 11.28 43.74 4,673.88 474.44 100% 19.53 4.44 0.01 0.00
19.54 21.03
10/11/2021 483.70 217.59 0.45 250.46 12.54 15.65 1,732.24 483.70 100% 19.78 4.37 0.01 21.10
19.61
10/12/2021 464.51 217.51 0.47 216.99 10.78 30.01 3,249.40 464.51 100% 19.73 4.29 0.01 0.00
21.06
10/13/2021 536.08 215.56 0.40 287.37 14.41 33.15 4,251.45 536.08 100% 4.18 0.01 21.09
21.04
10/14/2021 512.15 218.14 0.43 269.09 13.49 24.92 47.02 512.15 100% 5.00 0.53

10/15/2021 293.02 115.52 0.39 165.32 8.30 12.18 81.20 293.02 100% 2.48 0.15

10/16/2021 572.57 248.52 0.43 270.56 13.64 53.49 140.76 572.57 100% 4.92 0.38

10/17/2021 598.12 241.65 0.40 276.15 14.00 80.32 229.49 598.12 100% 5.58 0.35

10/18/2021 535.15 248.62 0.46 248.85 12.50 37.68 101.84 535.15 100% 3.78 0.37

10/19/2021 0.00 0.00 0.00 0.00 0.00 0% 0.37

10/20/2021 662.52 302.48 0.46 293.29 15.03 66.75 125.94 662.52 100% 7.65 0.53

10/21/2021 624.40 277.93 0.45 295.65 15.18 50.82 90.75 624.40 100% 6.09 0.56

10/22/2021 317.84 134.13 0.42 151.93 7.78 31.78 51.26 317.84 100% 3.01 0.62

10/23/2021 587.15 246.21 0.42 302.4 15.48 38.54 77.08 587.15 100% 4.39 0.50

10/24/2021 728.82 205.89 0.28 496.57 25.10 26.36 53.80 728.82 100% 5.80 0.49

10/25/2021 840.06 213.6 0.25 549.66 28.03 76.8 202.11 840.06 100% 3.23 0.38

10/26/2021 888.52 257.5 0.29 583.89 29.59 47.13 96.18 888.52 100% 4.36 0.49

10/27/2021 0.00 0.00 0.00 0.00 0.00 100% 0.00

10/28/2021 0.00 0.00 0.00 0.00 0.00 100% 0.00

10/29/2021 0.00 0.00 0.00 0.00 0.00 100% 0.00

10/30/2021 0.00 0.00 0.00 0.00 0.00 100% 0.00

PLAN TINDAKAN OER
(KUALITI BTS)

Gambar Greding Gambar Greding

 Mengumpul/menyapu biji relai supaya tidak dilenyek oleh
jentera

 Melaksanakan FIFO
 Sasaran BTS masak melebihi 95%
 Memastikan prasarana dan petugas mencukupi untuk kerja-

kerja grading BTS

PLAN TINDAKAN OER

Tarikh : 26/10/2021 BTS Terima BTS Kualiti
Pembekal
MT) % Masak (%)
FELDA
FGVPM 257.50 28.98 92.49
FTP
FAAS 583.89 65.71 95.08
BTS LUAR
JUMLAH BESAR ---

---

47.13 5.30 85.19

888.52 100 92.08

PLAN TINDAKAN OER

PEMBEKAL MASAK MUDA MENGKAL KOSONG GRADING 100% > 48HRS T/PANJANG S/TIKUS
93.66 0.28 5.97 0.09 PERAM BUSUK 0.73 2
FELDA TENGGAROH 3 *94.62 0.26 4.86 0.26 1.65 4
FELDA TENGGAROH 6 90.18 0.68 8.22 0.91 0.00 0.00 2.51 1
FELDA SELATAN 1 95.88 0.08 4.03 0.27 0.00 0.00 2.06 9
FGVPM TENGGAROH TIMUR 2 95.52 0.14 4.34 0.00 0.00 0.00 1.71 5
FGVPM TENGGAROH 12 88.29 2.66 8.81 0.21 0.00 0.00 2.56 2
BINGAN JAYA SDN BHD 0.00 0.00
ENG HUAT LASEX 83.91 0.00 0.00 3.16 17
KIM MA PALM OIL 91.72 2.05 41
1.01 15.08 0.00 0.00 0.00
PURATA 0.73 7.33 0.21 0.00 0.00

CATATAN: 1. GRADING DIBUAT/DISAKSIKAN OLEH PENGURUSAN KILANG.
2. PENUMPUAN SAMPEL GRADING KPD MAJORITI BTS DITERIMA.
3. MEMBERI MAKLUMBALAS KEDUDUKAN KUALITI BTS KEPADA PEMBEKAL BERKAITAN.

BIL CAGES / RESIPI MASAK BTS

TARIKH : 26/10/2021 CATATAN
BILANGAN CAGES BAIK 66
BILANGAN CAGES ROSAK 13
JUMLAH CAGES 53

 RESEPI MASAK BTS MENGIKUT KEADAAN BUAH
 CAGES MENCUKUPI, SENTIASA DIISI PENUH SUPAYA T/PUT

KONSISTEN DAN PROSES STABIL

GRAF STERILISER

Sterilizer No.1 Sterilizer No.2

Sterilizer No.3 Sterilizer No.4

STERILISER CONTROL CHECK SHEET

MILL: SHIFT: A/B TARIKH: 26/10/2021
RECIPE:
STR NO. 2

STR NO. 1 Steam In To Steam In (SI2SI) Str T/put Holding Time Holding Pressure (PSI)

Steam In To Steam In (SI2SI) Str T/put Holding Time Holding Pressure (PSI) SI2SI
(min)
SI2SI Cycle SI Next SI (mt/hr) Start B-Off Hld. Time Start Middle End Average
(min)
Cycle SI Next SI (mt/hr) Start B-Off Hld. Time Start Middle End Average 33 34
36 36
1 0930 1120 110 44 1000 1050 50 36 35 35 1 1030 1215 105 46 1100 1150 50 36
1156 1245 50 36 37 37 2 1215 1410 115
2 1120 1320 120 40 1340 1430 50 35 34 36 3 42 1250 1340 50 35
4
3 1320 1505 105 46
4

55

66

STR NO. 3 Holding Time Holding Pressure (PSI) STR NO. 4 Str T/put Holding Time Holding Pressure (PSI)
Steam In To Steam In (SI2SI) Str T/put
Steam In To Steam In
(SI2SI)

Cycle SI Next SI2SI (mt/hr) Start B-Off Hld. Start Middle End Average Cycle SI Next SI2SI (mt/hr) Start B-Off Hld. Start Middle End Average
SI (min) Time SI (min) Time
36
1 0845 1100 135 46 0905 1030 50 36 35 33 1 1000 1155 1150 42 1030 1120 50 36 35 35
2 1100 1245 105 42 1120 1210 50 36 37 35 2 1155 1335 1000 48 1220 1310 50 35 36 38
3 1245 1440 115 1315 1405 50 36 33 36 3
4 4
5 5
6 6

MASA HB & USB USB
1000 5.50
1200 HB 5.00
1400 1.50 5.00
1600 1.00
1800 1.00

BUNCH PICKER: ADA / TIADA BIL: X ORG

REALITY CHECK SUHU DIGESTER

Digester No.1 Digester No.2 Digester No.3 Digester No.4

REALITY CHECK SUHU

VCT NO. 1 = 98°C VCT NO. 2 = 98°C COT = 96°C HOT WATER = 80°C

• PEMANTAUAN SUHU DI DIGESTER, HWT, COT, OIL TANK, DAN SLUDGE TANK
• SUHU SEMASA OPERASI IAITU DI VCT,COT, HWT & DIGESTER.

REALITY CHECK - OIL CONTENT

Dilution Water A (%) Dilution Water B (%)

Masa Oil Water Nos Oil Water Nos
1400
1600 42 28 30
1800
45 30 25
Masa
1400 • MEMASTIKAN DILUTION DI PRESS BETUL
1600 • MEMASTIKAN UNDERFLOW OIL CONTENT < 6%
1800
Oil Underflow A (%) Oil Underflow B(%)

Oil Water Nos Oil Water Nos

3 66 31

3 67 30

SLUDGE
UNDERFLOW
VCT NO. 1 & 2

REALITY CHECK – OIL LEVEL

Masa VCT 1 Paras (“) VCT 3
8 VCT 2
1000 10
1200 8
1400

Masa 1 Paras Oil Tank (‘) 4
7 23
1400 7 4
1600 5 8
1800 5

EVAPORATION LOSS

MINGGU BTS SEBELUM KUKUS ( Kg ) BTS SELEPAS KUKUS ( Kg ) JUMLAH ( Kg ) % EVAPORATION LOSS
M1 16.40 14.20 2.20 13.41
M2 15.80 13.80 2.00 12.65
M3 15.40 13.30 2.10 13.63
M4

TABURAN HUJAN

TARIKH HARI INI ( MM ) SEHINGGA KINI ( MM )

21.10.2021 0.00 72.30
22.10.2021 10.20 82.50
23.10.2021 2.00 84.50
24.10.2021 2.00 86.50

SLUDGE PIT

SLUDGE PIT NO. 1 SLUDGE PIT NO. 2

• MINYAK YANG TERDAPAT DI SLUDGE PIT PERLU DI RECYCLE BY SHIFT
TANPA GAGAL

SEKIAN, TERIMA KASIH.

KER-SOLUTION FOR KER
5.45% AT FGVPISB

HIDDEN LOSSES & UNRECORDED DATA

16

CHECK LIST UTK PENINGKATAN KER

Bil STESEN ISU TINDAKAN PEMBETULAN YA TIDAK
Penggunaan blower 1 unit setiap line . √
Biji relai di geser, dilenyek tayar shovel dan lori semasa menurunkan Bts. Pengantian plate bucket secara berkala
Pengunaan Bin @ lori c/w jack secara menyeluruh. √


Loading Biji relai terperangkap dalam platform yang berlubang/rosak Resurface platform , tampal yg pecah. √
Ramp Atas Biji relai terbuang bersama air semasa pencucian
1 Kutip sebelum dan semasa pencucian. √
Meratakan BTS dan mengeluarkan sepenuhnya √
buah muda.
BTS muda tidak dikeluarkan sepenuhnya daripada consignment semasa greding.
Kadar sorter/MQI dipenuhi setiap masa mengikut
Biji relai dalam longkang tidak dikutip jadual ditetapkan. √

Dikutip secara berkala mengikut shift.

2 Loading Biji relai bertaburan dan dilenyek semasa/selepas pengisian BTS Kutip segera setiap selepas cycle pengisian selesai √
Ramp Bawah

Biji relai terbuang bersama air semasa pencucian Kutip sebelum pencucian √

Biji relai depan pintu Sterilizer tidak dikutip Penggunaan bakul berjaring depan Sterilizer. √ √
√ √
Biji relai jatuh dalam Sterilizer BTS dalam cage perlu diratakan. √
Distributor plate dlm dipasang sepenuhnya elakkan
3 Sterilizer BTS "splash”
Biji relai tidak dikutip dalam condensate sump Sesuaikan saiz dan rekabentuk strainer supaya biji
relai tidak bolos.
Pencucian dalam Sterilizer setiap 2 hari berbanding
mingguan

Buah terbiar dalam cages yang rosak atau CS yang breakdown Pindahkan segera BTS dalam cages/CS rosak √

Biji relai carry over ke HEBC Pengisian BTS dalam autofeeder secara konsisten √
Ubahsuai lifting angle supaya retention time optima √

Cara penentuan HB/USB Memasang roller strainer di HEBC & IEBC √
Tandan yang diragui perlu diteliti @ belek.
Biji relai melekat di dinding body Thresher Pencucian setiap minggu √ √
Worm screw ditukar apabila broken melebihi 5% √
4 Threshing & Kawal Nut/Fiber >110% √
Pressing Kawal tekanan tekanan supaya broken tidak
melebihi 5% √
Pulverised semasa aktiviti memerah - Nut to Fiber <110% Digester dan press cage perlu dikosongkan semasa
breakdown dan
Digested mass dibiarkan semasa breakdown dan pemberhentian proses
pemberhentian proses

CHECK LIST UTK PENINGKATAN KER

Bil STESEN ISU TINDAKAN PEMBETULAN YA TIDAK

Nut yg keluar depan polishing drum/destoner bersama bendasing Pengasingan secara manual. √
Nut melekat dan mereput dalam separating column Dicuci secara berkala. √

Nut polishing drum sumbat Set Kelajuan angin dgn CFM meter mengikut perjalanan press.

Akan dibuat semi Auti air bleeder di depericarper.

Nut & kernel yg bertaburan di lantai terbuang semasa pencucian. Kutip sebelum pencucian dibuat. √
Nut/Kernel Kawal Cracking efficiency dalam 96% - 97% & broken kernel
5 Plant Kernel yg pulverize semasa cracking bawah 15%. √

Rotary feeder akan dipasang setelah kajian tentang design

Inconsistency Feeding to ROLEK dan capasity siap dibuat. √

Sample analisa dibuang. Dimasukan semula dalam crack mixture conveyor. √

Kawal limpahan air dan perangkap yg carryover √

Kernel overflow semasa operasi Hidrosiklon Operasi hidrosiklon dilanjutkan 15 minit selepas
pemberhentian nut cracking.


Kernel terbuang semasa pencucian hidrosiklon. Lanjutkan masa operasi hidrosiklon 15 minit selepas tamat √
operasi kilang.

Kernel terlepas ke transport fan @ hancur dan berlonggok di chamber Kernel Bunker Pastikan pengisian bunker tidak melebihi had muatan / Airlock
tidak bocor.

Kernel Hydrocyclone - kemudahan prasarana untuk operator membuat adjustment di vortex Pemasangan kemudahan prasarana dibuat dgn segera dan

6 Recovery finder tidak sempurna tarikh siap diberi pada 31/3/2021.

Plant Isian ke lori tidak melebihi muatan dan penggunaan bunker

Kernel tumpah semasa despatch @ kena lenyek sepenuhnya.

Segerakan penghantaran √

Susut berat @ setok lama tak despatch. Memastikan kualiti kernel baik √

Pengambilan stok kernel secara fifo √

KERNEL REALITY CHECK – PRESS STATION

PRESS AMP CONE PRESS DIGESTER % ODM % NUT/FIBRE % BROKEN NUT
1 LEVEL
2 32 45 8.57 97.60 1.20
3 3/4
4
5 33 44 3/4 8.96 97.49 0.90
6
31 45 3/4 8.77 94.54 1.60

KERNEL REALITY CHECK – NUT PLANT STATION KERNEL REALITY CHECK – NUT PLANT STATION KERNEL REALITY CHECK – HYDROCYLONE

NUT % % WHOLE ROTARY FIBRE LPTS (% HYDROCYC WET SHELL PRESS. ACCESSABILITY
CRACKER CRACKING KERNEL EX- FEEDER CYCLONE (% KERNEL TEST TANGGA PLATFORM
LOSSES) LONE LOSS POINT
EFF CRACKER ADA/TIDAK LINE KERNEL
LOSSES)
1 TIDAK

2 97.50 33.94 TIDAK 1

3 97.20 36.87 TIDAK 1 1.00 1.00 2 2.44 ADA TIADA
ADA TIADA
4 3
4
5 2 1.20

6

REALITI CHECK UTK PENINGKATAN KER - RUMUSAN

Wilayah 6
Kilang Tenggaroh Timur
Tarikh: 26/10/2021

Masa USB HB % Broken % Nut To % Losses Losses Losses
Nut Fibre Cracking LPTS Fibre Wet Shell
8.00 5.50 Cyclone
10.00 5.00 eff
12.00 5.00
14.00 1.50 1.80 96.47 97.10 1.60 0.80 2.11

1.00 0.90 99.57 97.50 1.70 0.90 2.50

1.00 2.01 95.47 97.40 1.20 0.90 2.45

SEKIAN, TERIMA KASIH.


Click to View FlipBook Version