The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.

Z . I . O . N . S . O . L . U . T . I . O N S . An EnergySoluitons Company . FUEL TRANSFER NOW IN PROGRESS! L L . C . Dry Cask Operations Have Commenced!!! • First ...

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by , 2016-01-14 03:42:02

Dry Cask Storage Project - INMM

Z . I . O . N . S . O . L . U . T . I . O N S . An EnergySoluitons Company . FUEL TRANSFER NOW IN PROGRESS! L L . C . Dry Cask Operations Have Commenced!!! • First ...

Fuel Modifications ZIONSOLUTIONSLLC
An EnergySoluitons Company

Campaign Duration: July 2011 – March 2013
Campaign Schedule: 24 hrs/day and 6 days/wk

ITTR & GTA Installations

• ZS-developed Design Change Pkgs & associated 50.59s
• Considered “Approved Contents” for NAC MAGNASTOR/MAGNATRAN
• Implemented via site work orders and site-approved Westinghouse

procedures
• Required all inserts removed (RCCAs, BPRAs, WABAs, HFRAs, NSAs, TPDs)
• ITTR-modified assemblies required re-insertion of inserts for dry cask storage
• GTA-modified assemblies cannot accommodate inserts

01/15/2014 INMM XXIX Spent Fuel Mgt Seminar 51

ITTR Modifications ZIONSOLUTIONSLLC
An EnergySoluitons Company

• ITTRs installed in 1451 assemblies

• The ITTR solution ensures:

• - The structural integrity of the fuel assembly
• - Allows the storage of core components in the fuel assembly
• - Allows continued fuel handling by “normal means

EDM Upper Nozzle Tie Rod Installation 52

01/15/2014 INMM XXIX Spent Fuel Mgt Seminar

GTA Modifications ZIONSOLUTIONSLLC
An EnergySoluitons Company

Guide Tube Anchor (GTA) Installation (6 per assembly)

• GTA sets installed in 2 assemblies with open top nozzle/removable pins
• GTA sets installed in 1 assembly with cut stuck source rods

01/15/2014 INMM XXIX Spent Fuel Mgt Seminar 53

Fuel Assembly Handling Issues -II ZIONSOLUTIONSLLC
An EnergySoluitons Company

• Other fuel condition specific issues needed to be addressed as well:
– Removable Top Nozzle lock tube inspections (generic)
– Top Nozzle spring clamp/screw inspections (generic)
– Bottom Nozzle foreign material inspections (site specific – nozzle dam
hardware/foreign material issue)

01/15/2014 INMM XXIX Spent Fuel Mgt Seminar 54

Developing the Fuel Pedigree ZIONSOLUTIONSLLC
An EnergySoluitons Company

• Each fuel assembly has to have the proper pedigree
before it can be loaded into dry cask storage

• Pedigree means that a comprehensive record has been
established that permits:

– Fuel characterization (initial design data, current state data)

– Fuel classification (evidence of F/A integrity)

– Demonstration that it meets the NAC MAGNASTOR
Certificate of Compliance Requirements

– 72.212 Requirements (i.e., in addition to C of C if any)

– Assembling DOE-required information

01/15/2014 INMM XXIX Spent Fuel Mgt Seminar 55

Developing the Fuel Pedigree – Visual Inspections ZIONSOLUTIONSLLC
An EnergySoluitons Company

• Visual Inspections of all fuel assemblies required as part of fuel
characterization/classification process (ISG-1, Rev. 2)

• Visual Inspection Campaign – performed by Westinghouse

– Began – early Dec 2011
– Completed – end of Jan 2012.

• ZS visually inspected all fuel assemblies for anomalies (2226 assemblies)

– Structural integrity
– Clad integrity
– Foreign Material

• Implemented via site work orders
and site-approved Westinghouse
procedures

01/15/2014 INMM XXIX Spent Fuel Mgt Seminar 56

Developing the Fuel Pedigree – Visual Inspections ZIONSOLUTIONSLLC
Visual Inspection Results An EnergySoluitons Company

• Damaged Fuel Assemblies identified from Visual Inspection

– 6 assemblies (with very obvious cladding defects)

• Damaged Fuel Assemblies previously identified by plant records

– 8 assemblies

• 48 fuel assemblies exhibiting minor amount of individual rod bowing (all within fuel
assembly envelope)

– Does not affect loadability

57