Proposal Penawaran
Konsultan Co-Firing Biomass, PLTU Jawa Tengah 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI)
KONSULTAN CO-FIRING BIOMASS i
PLTU JAWA TENGAH 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI)
PT PEMBANGKITAN JAWA BALI
Surabaya, Maret 2022
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
DAFTAR ISI
DAFTAR ISI............................................................................................................................................... 2
1. PENDAHULUAN ............................................................................................................................... 1
2. MAKSUD DAN TUJUAN.................................................................................................................... 2
3. PENGALAMAN DAN REKAM JEJAK .................................................................................................. 2
3.1 Pengalaman implementasi pada pembangkit yang dikelola oleh PJB antara lain :................ 2
3.2 Pengalaman konsultansi co-firing pada pembangkit yang dikelola di luar PJB yaitu : ........... 3
4. JANGKA WAKTU PELAKSANAAN PE KERJAAN ................................................................................. 4
5. LINGKUP PEKERJAAN....................................................................................................................... 5
6. BATASAN PEKERJAAN...................................................................................................................... 5
7. METODE IMPLEMENTASI ................................................................................................................ 5
8. UNIT IMPLEMENTASI....................................................................................................................... 6
9. SUSUNAN TIM & KUALIFIKASI PERSONEL ....................................................................................... 6
10. LAPORAN STUDI KELAYAKAN .......................................................................................................... 7
11. PENUTUP ......................................................................................................................................... 8
Proposal Penawaran
Konsultan Co-Firing Biomass, PLTU Jawa Tengah 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI)
1. PENDAHULUAN
Seiring meningkatnya fokus dunia pada sustainability, maka teknologi berbasis fossil fuel
menghadapi tantangan energy yang lebih ramah lingkungan. PLTU merupakan salah satu sektor energi
yang memiliki kontribusi tinggi dalam menghasilkan emisi karbon. Diperlukna komitmen perubahan
untuk meningkatkan kapasitas pembangkitan dengan fokus pada EBT, sehingga mendukung
tercapainya produksi listrik yang lebih ramah lingkungan. Pemerintah berupaya untuk mendorong
pencapaian net zero emission 2030 dengan komitmen menurunkan emisi gas rumah kaca sebesar 29%
pada tahun 2030 dan target pencapaian bauran EBT pada energi nasional mencapai 23% pada tahun
2025.
PT Bhimasena Power Indonesia (BPI) merupakan perusahaan “joint venture” yang didirikan oleh
konsorsium tiga perusahaan Electric Power Development Co., Ltd. (J-Power), PT Adaro Power, dan
ITOCHU Corporation. BPI mengembangkan, membangun dan mengoperasikan Pembangkit Listrik
Tenaga Uap 2 x 1.000 MW di Kabupaten Batang, Provinsi Jawa Tengah (“PLTU Jawa Tengah”) yang
memasok listrik ke PT PLN (Persero). PLTU Jawa Tengah merupakan proyek infrastruktur pertama di
Indonesia yang dilaksanakan dalam skema Kerjasama Pemerintah-Swasta ("KPS") dan juga
dikategorikan sebagai Proyek Strategis Nasional. Proyek ini memiliki peran penting untuk
memfasilitasi pembangunan infrastruktur dan akan memenuhi sebagian dari pertumbuhan kebutuhan
listrik di Indonesia.
Program co-firing dijadikan sebagai salah satu inisiatif dalam mendukung net zero emission
tahun 2030 dan percepatan peningkatan penggunaan energi terbarukan dengan investasi optimal dari
beberapa program EBT yang dapat diaplikasikan di lingkungan operasi PT BPI. Inisiatif program cofiring
adalah melakukan pencampuran sejumlah biomassa kedalam bahan bakar batubara yang selama ini
dipakai untuk pengoperasian PLTU Batubara sehingga mengurangi pemakaian batubara dan menekan
HPP serta mengurangi emisi Gas Rumah Kaca (GRK).
PT PJB merupakan anak perusahaan PT PLN (Persero) yang menjalankan bisnis pembangkit
listrik secara terintegrasi dan dalam hal ini telah berpengalaman dalam melakukukan kajian hingga
implementasi co-firing pada 12 PLTU Batubara yang dikelola oleh PT PJB antara lain : PLTU Indramayu,
PLTU Rembang, PLTU Paiton, PLTU Pacitan, PLTU Awar-awar dan 7 PLTU lainnya dengan kandungan
imlementasi co-firing 5 % pada bahan bakarnya.
Proposal ini dibuat sebagai opsi solusi bagi PT BPI dalam mendukung pengembangan green
energy di Indonesia.
Go Live Co-Firing PLTU Rembang
1PT PEMBANGKITAN JAWA-BALI │
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan Co-Firing Biomass, PLTU Jawa Tengah 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI)
2. MAKSUD DAN TUJUAN
Secara umum tujuan dari kegiatan ini adalah untuk:
a. Mengetahui potensi jenis-jenis biomass yang dapat dimanfaatkan berdasarkan pertimbangan
teknis sebagai bahan bakar co-firing di PLTU Jawa Tengah.
b. Mengetahui keuntungan dan kekurangan co-firing biomass di PLTU Jawa Tengah
c. Mengetahui metode co-firing biomass dengan batubara yang terbaik untuk diimplementasikan
termasuk perubahan pola pengoperasian dan perubahan batasan yang diperlukan di PLTU Jawa
Tengah
d. Mengetahui gambaran keekonomian co-firing biomass di PLTU Jawa Tengah.
e. Mengetahui aspek resiko implementasi co-firing biomass di PLTU Jawa Tengah.
Dengan mengimplematasikan co-firing di PLTU Jawa Tengah, maka diharapkan dapat
mendorong pencapaian net zero emission 2030 serta percepatan peningkatan penggunaan energi
terbarukan dengan investasi optimal.
3. PENGALAMAN DAN REKAM JEJAK
3.1 Pengalaman implementasi pada pembangkit yang dikelola oleh PJB antara lain :
Biomass Cofiring Implementation Progress Update
PJB Implementation Progress Update until Desember 2021
2PT PEMBANGKITAN JAWA-BALI │
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan Co-Firing Biomass, PLTU Jawa Tengah 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI)
From 52 sites of PLN Group, PJB contri-buted in 20 sites
3.2 Pengalaman konsultansi co-firing pada pembangkit yang dikelola di luar PJB yaitu
:
a. PT Cirebon Power pada PLTU Cirebon 1x660 MW (IPP) dengan lingkup pekerjaan antara
lain:
1. Studi Biomass
2. Biomass Ultimate Analysis
3. Identifikasi Supplier Biomass
4. Risk Assessment on the Price
5. Sustainability Biomass dan Supply Chain
6. Aturan Umum dan Lokal
7. Kuantitas Feed stock
b. Assessment dan Kajian PLTU Co-firing/Biomassa PLTU Talaud 2x3 MW dengan skup
pekerjaan antara lain :
1. Studi Literatur
2. Studi Ketersediaan Biomassa dan Kebutuhan Cofiring
3. Analisa Finansial Aplikasi Cofiring PLTU Talaud
4. Kajian PLTU Talaud sebagai PLTU Biomassa
3PT PEMBANGKITAN JAWA-BALI │
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan Co-Firing Biomass, PLTU Jawa Tengah 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI)
4. JANGKA WAKTU PELAKSANAAN PE KERJAAN
Pelaksanaan Konsultan Co-Firing Biomass di PLTU Jawa Tengah akan dilaksanakan selama 12
(dua belas) Minggu setelah kick-off meeting dilakukan target waktu penyerahan laporan sebagai
berikut :
No Uraian Bulan 1 Bulan 2 Bulan 3
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12
1 Kick-off Meeting
2 Hand-over dokumen
& data
Studi Literatur &
3 Referensi
pendukung
Identifikasi biomass
4 beserta
spesifikasinya
5 Laporan Interim
6 Survey/site visit
PLTU Jawa Tengah
7 Survey biomassa
Analisis teknologi,
8 operasional,
lingkungan, ekonomi
& risiko
9 Laporan Akhir &
Executive Summary
10 Presentasi Akhir
4PT PEMBANGKITAN JAWA-BALI │
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan Co-Firing Biomass, PLTU Jawa Tengah 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI)
5. LINGKUP PEKERJAAN
Lingkup pekerjaan dalam studi kelayakan ini adalah sebagai berikut:
a. Mempelajari dan mengetahui data-data teknis serta kondisi operasi eksisting dari PLTU Jawa
Tengah terkait dengan studi ini.
b. Melakukan identifikasi dan rekomendasi jenis-jenis biomass beserta spesifikasinya yang dapat
digunakan sebagai bahan bakar co-firing biomass di PLTU Jawa Tengah.
c. Melakukan analisis untuk mengetahui metode co-firing biomass yang paling optimal terhadap
kondisi operasional termasuk storage, fuel handling dan kesesuaian peralatan/teknologi eksisting.
d. Melakukan analisis terhadap kesesuaian teknologi peralatan eksisiting yang meliputi, kapasitas,
jenis peralatan dan memberikan rekomendasi jika harus dilakukan modifikasi peralatan eksisting
atau tambahan peralatan baru.
e. Mengidentifikasi tantangan dan permasalahan operasional maupun maintenance serta
memberikan rekomendasi mitigasi dalam co-firing biomass di PLTU Jawa Tengah.
f. Melakukan analisis dampak co-firing biomass terhadap penurunan emisi gas rumah kaca untuk
mengetahui jumlah penurunan carbon footprint dari implementasi co-firing tersebut.
g. Melakukan analisis kelayakan ekonomi yang memuat IRR, NPV, Payback Period (apabila ada
investasi peralatan baru), analisis sensitivitas dan cost saving dari implementasi co-firing biomass
dengan batubara di PLTU Jawa Tengah.
h. Melakukan identifikasi resiko terhadap implementasi co-firing biomass di PLTU Jawa Tengah
berdasarkan format Pedoman Manajemen Risiko.
i. Studi banding/visit pada PLTU yang dikelola PJB yang telah terimplementasi co-firing (apabila
diperlukan).
6. BATASAN PEKERJAAN
Beberapa batasan lingkup dari pekerjaan studi ini, meliputi:
a. Data-data primer yang diperlukan oleh pihak konsultan akan diberikan oleh pihak PT BPI kecuali
data-data tersebut bersifat confidential.
b. Konsultansi ini terbatas pada PLTU Jawa Tengah
7. METODE IMPLEMENTASI
Untuk menghasilkan Laporan Studi Co-Firing Biomass di PLTU Jawa Tengah sebagaimana
dimaksud dalam lingkup pekerjaan, kegiatan berikut harus dilakukan :
a. Kick-off Meeting dengan PT BPI.
b. Hand-over dokumen dari PT BPI untuk semua informasi yang relevan
c. Melakukan rapat koordinasi progress sesuai waktu yang ditentukan PT BPI.
d. Menggunakan referensi data-data yang tersedia oleh PT BPI.
e. PT BPI akan memberikan informasi mengenai kondisi operasi eksisting PLTU Jawa Tengah
5PT PEMBANGKITAN JAWA-BALI │
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan Co-Firing Biomass, PLTU Jawa Tengah 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI)
Selanjutnya metodologi pekerjaan yang akan dilakukan untuk studi co-firing ini adalah sebagaimana
berikut:
a. Studi dari Referensi yang Mendukung
Meliputi studi terkait biomassa dan penggunaan teknologi penggunaan biomassa pada boiler PLTU
batubara yang sudah ada sebagai referensi, terutama PLTU batubara milik PJB yang memiliki kesamaan
karakteristik dengan PLTU Jawa Tengah
b. Studi Literatur / Referensi dari unit terkait
Studi ini meliputi pengumpulan data spesifikasi/ data teknis unit, drawing as build, performa operasi unit,
coal yard, coal handling facility dan alat berat yang digunakan.
c. Survey/site Visit ke PLTU Jawa Tengah
Melakukan site visit ke PLTU Jawa Tengah untuk mengetahui kondisi operasi eksisting sehingga dapat
diketahui kondisi peralatan/teknologi eksisting dan potensi persentase biomassa yang dapat digunakan.
d. Survey Biomassa
Survey dilakukan dengan mengutamakan potensi biomassa terdekat dari PLTU, termasuk mengambil data
batubara yang digunakan di PLTU dan studi biomassa di sekitar PLTU.
e. Analisis
1) Analisis metode co-firing biomass yang paling optimal terhadap kondisi operasional
2) Analisis kesesuaian teknologi peralatan eksisiting
3) Tantangan dan permasalahan operasional maupun maintenance
4) Analisis dampak co-firing biomass terhadap penurunan emisi gas rumah kaca
5) Analisis kelayakan ekonomi
6) Identifikasi resiko implementasi co-firing biomass di PLTU Jawa Tengah
f. Studi Banding
Kesempatan atau optional untuk dapat melihat implementasi co-firing pada PLTU yang dikelola oleh PJB
8. UNIT IMPLEMENTASI
Implementasi Studi Cofiring PT BPI PLTU Jawa Tengah.
9. SUSUNAN TIM & KUALIFIKASI PERSONEL
Studi Studi Co-Firing Biomass di PLTU Jawa Tengah ini membutuhkan satu tim yang terdiri dari
tenaga ahli berikut ini (namun tidak terbatas pada):
6PT PEMBANGKITAN JAWA-BALI │
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan Co-Firing Biomass, PLTU Jawa Tengah 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI)
No Posisi Pendidikan
1 Team Leader S2 Teknik Mesin
2 Mechanical Engineer S2 Teknik Mesin
(Asisten Tenaga Ahli)
3 Material Handling Engineer S1 Teknik Mesin
(Asisten Tenaga Ahli)
4 Environmental Engineer S1 Teknik Lingkungan
(Asisten Tenaga Ahli)
5 Financial Analyst S1 Manajemen Keuangan
(Asisten Tenaga Ahli)
6 Administrasi S1
(Asisten Tenaga Ahli)
Keterangan : Tim Konseptor Rancangan SNI 8951:2020 Pelet biomassa untuk pembangkit listrik
FUNGSI
a. Team Leader
• Melaksanakan koordinasi antar stream di dalam Tim.
• Menyusun strategi, rencana, dan jadwal pelaksanaan studi co-firing.
• Melaksanakan koordinasi dengan PT BPI dan pihak lainnya terkait pelaksanaan studi co-
firing
b. Asisten Tenaga Ahli
• Bersama Team Leader menyusun strategi, rencana dan jadwal pelaksanaan studi co-firing
• Membantu Project Manajer melakukan persiapan dan pembekalan Tim
• Melakukan studi literatur dan survey studi co-firing ke PLTU Jawa Tengah.
• Bertanggung jawab untuk mengidentifikasi masalah dan isu-isu mengenai kualitas studi
• Melakukan pendampingan penyusunan dokumen laporan studi co-firing
c. Administrasi
• Membantu Team Leader dalam melaksanakan tugas studi co-firing
• Merencanakan jadwal kegiatan Tim studi co-firing
• Membuat dan menyampaikan risalah hasil rapat untuk setiap kegiatan yang dilakukan,
yang berisi hal-hal yang telah disepakati di dalam pembahasan Tim
• Merencanakan, melaksanakan, dan menyiapkan prasarana kegiatan yang berhubungan
dengan studi co-firing
10. LAPORAN STUDI KELAYAKAN
Laporan studi kelayakan akan disampaikan dengan daftar isi sebagai berikut :
7PT PEMBANGKITAN JAWA-BALI │
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan Co-Firing Biomass, PLTU Jawa Tengah 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI)
1. Lembar Pengesahan
2. Daftar Isi
3. Daftar Gambar
4. Daftar Tabel
5. Pendahuluan
5.1. Latar Belakang
5.2. Maksud dan Tujuan
6. Studi Literatur
6.1. Studi Aplikasi Biomassa
6.2. Studi Potensi Biomassa dan Keuntungan Co-firing
6.3. Studi Metode Co-firing Batubara dengan Biomassa
6.4. Intangible Benefit
6.5. Pengujian CoFiring di Pembangkit Eropa dan Amerika Serikat
6.6. Carbon Neutral Biomass
6.7. Cl-induced active oxidation
6.8. Molten Salt Corrosion
6.9. Slagging
7. Tahapan dan Metodologi Co-Firing
7.1. Studi literatur / referensi dari unit terkait
7.2. Survey/site visit ke PLTU Jawa Tengah
7.3. Survey Biomassa
8. Analisis
8.1. Analisis metode co-firing biomass yang paling optimal terhadap kondisi operasional
8.2. Analisis kesesuaian teknologi peralatan eksisiting
8.3. Analisis Tantangan dan permasalahan operasional maupun maintenance
8.4. Analisis dampak co-firing biomass terhadap penurunan emisi gas rumah kaca
8.5. Analisis kelayakan ekonomi
8.6. Analisis biaya produksi bahan bakar
8.7. Analisis Lingkungan
8.8. Analisis resiko implementasi co-firing biomass di PLTU Jawa Tengah
9. Kesimpulan dan Saran
10. Daftar Pustaka
11. Lampiran
11. PENUTUP
Demikian proposal ini kami sampaikan, untuk dapat ditindaklanjuti oleh PT BPI dan dijadikan
sebagai referensi dalam pelaksanaan Co-Firing Biomass di PLTU Jawa Tengah oleh PT Pembangkitan
Jawa-Bali.
Atas perhatian dan kerjasamanya kami ucapkan terimakasih.
8PT PEMBANGKITAN JAWA-BALI │
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan Co-Firing Biomass, PLTU Jawa Tengah 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI)
Surabaya, 27 Juli 2022
PT PEMBANGKITAN JAWA-BALI
KEPALA DIVISI NIAGA
RETNO HANDAYANI
9PT PEMBANGKITAN JAWA-BALI │
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan HSE, Implementasi CUBETECS (Custom Object Detection
Services)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
KONSULTAN HSE
IMPLEMENTASI CUBETECS (Custom Object Detection Services)
PLTU JAWA TENGAH 2 x 1.000 MW
PT Bhimasena PowerPT PEMBANGKITAN JAWA BALI Indonesia (BPI)
Surabaya, Maret 2022
i
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
DAFTAR ISI
DAFTAR ISI......................................................................................................................................... 2
1. PENDAHULUAN.......................................................................................................................... 1
2. MAKSUD DAN TUJUAN............................................................................................................... 2
3. JANGKA WAKTU PELAKSANAAN PEKERJAAN .............................................................................. 2
4. LINGKUP PEKERJAAN.................................................................................................................. 3
5. BATASAN PEKERJAAN................................................................................................................. 3
6. DELIVERABLE ............................................................................................................................. 3
7. PENUTUP ................................................................................................................................... 4
Proposal Penawaran
Konsultan HSE, Implementasi CUBETECS (Custom Object Detection Services)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
1. PENDAHULUAN
Bermula dari tingginya tingkat kecelakaan kerja serta perlu terus menerus diawasi yang menjadi
bagian dari tanggung jawab Negara dan Pengurus Perusahaan maka ditetapkanlah SOP (Standard
Operating Prosedure) terkait penerapan dan pelaksanaan K3, khususnya didalam perusahaan. Dengan
semboyan K3 ”Utamakan Keselamatan dan Kesehatan Kerja” maka tenaga kerja adalah target
pertama dalam memastikan kehidupan yang layak dan sejahtera dari sisi cara kerja yang aman serta
berbanding lurus juga dengan keberlangsungan proses produksi baik alat (barang) maupun jasa dari
suatu perusahaan yang berjalan dengan efisien (K3 adalah sebuah investasi yang mutlak bagi
perusahaan).
PT Bhimasena Power Indonesia (BPI) merupakan perusahaan “joint venture” yang didirikan oleh
konsorsium tiga perusahaan Electric Power Development Co., Ltd. (J-Power), PT Adaro Power, dan
ITOCHU Corporation. BPI mengembangkan, membangun dan mengoperasikan Pembangkit Listrik
Tenaga Uap 2 x 1.000 MW di Kabupaten Batang, Provinsi Jawa Tengah (“PLTU Jawa Tengah”) yang
memasok listrik ke PT PLN (Persero). PLTU Jawa Tengah merupakan proyek infrastruktur pertama di
Indonesia yang dilaksanakan dalam skema Kerjasama Pemerintah-Swasta ("KPS") dan juga
dikategorikan sebagai Proyek Strategis Nasional. Proyek ini memiliki peran penting untuk
memfasilitasi pembangunan infrastruktur dan akan memenuhi sebagian dari pertumbuhan kebutuhan
listrik di Indonesia.
Sebagai wujud komitmen terhadap pengelolaan K3 di lingkungan kerja, PJB telah memiliki aplikasi
CUBETECS (Custom Object Detection Services), yaitu sebuah produk layanan pembangunan system
Artficial Intelligence berbasis object deteksi dengan keunggulan kustomisasi pada model/weight,
sehingga system object deteksi tidak hanya terbatas pada deteksi object tertentu/model tertentu
namun juga mampu mendeteksi object yang diinginkan tergantung kepada permintaan pelanggan.
Selain keunggulan pada kustomisasi object deteksi, CUBETECS juga menawarkan system architecture
yang lebih fleksibel pada sisi implementasinya, sehingga pelanggan atau pengguna bisa
menenempatkan system ini di proses bisnis/manajemen manapun sesuai dengan kebutuhan.
CUBETECS adalah penyempurnaan dari applikasi I-Diagnostic PT.PJB yang telah teimplementasi di 5
unit pembangkit, I-Diagnostic adalah system artificial intelligence berbasis object deteksi untuk
mendeteksi unsafe act dan unsafe condition di unit pembangkit dengan system reporting yang
otomatis dan realtime 24/7, teknologi ini telah melalui research kelayakan teknologi dan
pengembangan selama 2 tahun terakhir dan berujung kepada system baru (CUBETECS) dengan
penyempurnaan dan peningkatan.
Proposal ini dibuat sebagai opsi solusi bagi PT BPI dalam mendukung penerapan K3 di wilayah
kerja PLTU Jawa Tengah dalam bentuk implementasi aplikasi CUBETECS.
PT PEMBANGKITAN JAWA-BALI │ 1
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan HSE, Implementasi CUBETECS (Custom Object Detection Services)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
I-Diagnostic mendapatkan penghargaan Bronze dalam Information Technology Awards, Stevie
Awards 2020 untuk kategori Best Technical Support Strategy and Implementation.
2. MAKSUD DAN TUJUAN
Secara umum tujuan dari kegiatan ini adalah untuk:
a. Mengimplementasikan penerapan aplikasi CUBETECS di PLTU Jawa Tengah
b. Mapping penerapan K3 di PLTU Jawa Tengah
c. Sharing budaya K3 yang telah dilakukan di unit PJB
Dengan mengimplematasikan CUBETECS, maka diharapkan dapat mendorong pencapaian dan
penerapan budaya K3 di area PLTU Jawa Tengah.
3. JANGKA WAKTU PELAKSANAAN PEKERJAAN
Estimasi pelaksanaan Implementasi CUBETECS di PLTU Jawa Tengah dilaksanakan selama 12
(dua belas) Minggu setelah kick-off meeting dilakukan, dengan target waktu sebagai berikut :
No Uraian Bulan 1 Bulan 2 Bulan 3
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12
1 Kick-off Meeting
2 Pengadaan
Perangkat
Workshop
3 Penyusunan
Requirement &
Desain
4 Development
PT PEMBANGKITAN JAWA-BALI │ 2
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan HSE, Implementasi CUBETECS (Custom Object Detection Services)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
No Uraian Bulan 1 Bulan 2 Bulan 3
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12
5 Functional Testing
6 User Training
7 User Acceptance
Test (UAT)
8 Deployment
4. LINGKUP PEKERJAAN
Lingkup pekerjaan dalam Implementasi CUBETECS ini adalah sebagai berikut:
a. Mengoptimalkan IP CCTV menjadi Early Warning System
b. Pendeteksian Asap, Api & Pelanggaran APD (Safety Helmet)
c. Notifikasi deteksi secara real time dan dikirimkan ke User dengan menggunakan Aplikasi
Telegram
d. Opsi pengoptimalan untuk kebutuhan user yang lain contoh perhitungan volume material secara
real time
5. BATASAN PEKERJAAN
Beberapa batasan lingkup dari pekerjaan studi ini, meliputi:
a. Data-data primer yang diperlukan oleh pihak PJB akan diberikan oleh pihak PT BPI kecuali data-
data tersebut bersifat confidential.
b. Konsultansi/Implementasi ini terbatas pada PLTU Jawa Tengah
6. DELIVERABLE
Implementasi aplikasi CUBETECS yang dapat diterapkan di PLTU Jawa Tengah
PT PEMBANGKITAN JAWA-BALI │ 3
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan HSE, Implementasi CUBETECS (Custom Object Detection Services)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
7. PENUTUP
Demikian proposal ini kami sampaikan, untuk dapat ditindaklanjuti oleh PT BPI dan dijadikan
sebagai referensi dalam pelaksanaan Implementasi CUBETECS sebagai bentuk penerapan budaya K3
di PLTU Jawa Tengah oleh PT Pembangkitan Jawa-Bali.
Atas perhatian dan kerjasamanya kami ucapkan terimakasih.
Surabaya, 27 Juli 2022
PT PEMBANGKITAN JAWA-BALI
KEPALA DIVISI NIAGA
RETNO HANDAYANI
PT PEMBANGKITAN JAWA-BALI │ 4
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan HSE, Implementasi IZAT (Zero Accident Assistant Application)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
KONSULTAN HSE
IMPLEMENTASI IZAT (Zero Accident Assistant Application)
PLTU JAWA TENGAH 2 x 1.000 MW
PT Bhimasena PowerPT PEMBANGKITAN JAWA BALI Indonesia (BPI) i
Surabaya, Maret 2022
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
DAFTAR ISI
DAFTAR ISI......................................................................................................................................... 2
1. PENDAHULUAN.......................................................................................................................... 1
2. MAKSUD DAN TUJUAN............................................................................................................... 2
3. JANGKA WAKTU PELAKSANAAN PEKERJAAN .............................................................................. 2
4. LINGKUP PEKERJAAN.................................................................................................................. 3
5. BATASAN PEKERJAAN................................................................................................................. 3
6. DELIVERABLE ............................................................................................................................. 3
7. PENUTUP ................................................................................................................................... 3
Proposal Penawaran
Konsultan HSE, Implementasi IZAT (Zero Accident Assistant Application)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
1. PENDAHULUAN
Bermula dari tingginya tingkat kecelakaan kerja serta perlu terus menerus diawasi yang menjadi
bagian dari tanggung jawab Negara dan Pengurus Perusahaan maka ditetapkanlah SOP (Standard
Operating Prosedure) terkait penerapan dan pelaksanaan K3, khususnya didalam perusahaan. Dengan
semboyan K3 ”Utamakan Keselamatan dan Kesehatan Kerja” maka tenaga kerja adalah target
pertama dalam memastikan kehidupan yang layak dan sejahtera dari sisi cara kerja yang aman serta
berbanding lurus juga dengan keberlangsungan proses produksi baik alat (barang) maupun jasa dari
suatu perusahaan yang berjalan dengan efisien (K3 adalah sebuah investasi yang mutlak bagi
perusahaan).
PT Bhimasena Power Indonesia (BPI) merupakan perusahaan “joint venture” yang didirikan oleh
konsorsium tiga perusahaan Electric Power Development Co., Ltd. (J-Power), PT Adaro Power, dan
ITOCHU Corporation. BPI mengembangkan, membangun dan mengoperasikan Pembangkit Listrik
Tenaga Uap 2 x 1.000 MW di Kabupaten Batang, Provinsi Jawa Tengah (“PLTU Jawa Tengah”) yang
memasok listrik ke PT PLN (Persero). PLTU Jawa Tengah merupakan proyek infrastruktur pertama di
Indonesia yang dilaksanakan dalam skema Kerjasama Pemerintah-Swasta ("KPS") dan juga
dikategorikan sebagai Proyek Strategis Nasional. Proyek ini memiliki peran penting untuk
memfasilitasi pembangunan infrastruktur dan akan memenuhi sebagian dari pertumbuhan kebutuhan
listrik di Indonesia.
Sebagai wujud komitmen terhadap pengelolaan K3 di lingkungan kerja, PJB telah memiliki aplikasi
IZAT (Zero Accident Assistant Application) yang digunakan untuk mengoptimalkan seluruh proses
bisnis bidang K3 dalam bentuk pengelolaan perencanaan, pelaksanaan, pengendalian dan evaluasi
proses bisnis K3. Pengelolaan terkait hal tersebut dijalankan di bawah pengawasan dan pembinaan
oleh Subdirektorat lingkungan dan K3 (LK3) di Unit dan Kantor Pusat PJB, sesuai OHSAS 18001.
Proposal ini dibuat sebagai opsi solusi bagi PT BPI dalam mendukung penerapan K3 di wilayah
kerja PLTU Jawa Tengah dalam bentuk implementasi aplikasi IZAT.
PT PEMBANGKITAN JAWA-BALI │ 1
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan HSE, Implementasi IZAT (Zero Accident Assistant Application)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
IZAT mendapatkan penghargaan Gold dalam Information Technology Awards, Stevie Awards 2020
untuk kategori Best Technical Support Strategy and Implementation.
2. MAKSUD DAN TUJUAN
Secara umum tujuan dari kegiatan ini adalah untuk:
a. Mengimplementasikan penerapan aplikasi IZAT di PLTU Jawa Tengah
b. Mapping penerapan K3 di PLTU Jawa Tengah
c. Sharing budaya K3 yang telah dilakukan di unit PJB
Dengan mengimplematasikan IZAT, maka diharapkan dapat mendorong pencapaian dan
penerapan budaya K3 di area PLTU Jawa Tengah.
3. JANGKA WAKTU PELAKSANAAN PEKERJAAN
Estimasi pelaksanaan Implementasi IZAT di PLTU Jawa Tengah dilaksanakan selama 12 (dua
belas) Minggu setelah kick-off meeting dilakukan, dengan target waktu sebagai berikut :
No Uraian Bulan 1 Bulan 2 Bulan 3
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12
1 Kick-off Meeting
2 Pengadaan
Perangkat
Workshop
3 Penyusunan
Requirement &
Desain
4 Development
5 Functional Testing
6 User Training
7 User Acceptance
Test (UAT)
8 Deployment
PT PEMBANGKITAN JAWA-BALI │ 2
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan HSE, Implementasi IZAT (Zero Accident Assistant Application)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
4. LINGKUP PEKERJAAN
Lingkup pekerjaan dalam Implementasi IZAT ini adalah sebagai berikut:
a. Pelaksanaan Patroli K3 untuk melaporkan temuan Unsafe Action, Unsafe Condition dan
Nearmiss
b. Pelaksanaan aktivitas rutin pengecekkan infrastruktur K3 (APAR, Hydrant, P3K, Eyewash,
Fire Pump, Ambulance, Fire Truck)
c. Lesson Learned Kecelakaan Kerja dengan fokus ke kejadian, tidak menunjukkan Unit dan
identitas korban
d. Monitoring Data Sertifikasi Peralatan dan Personil
e. Penyesuaian tampilan Dashboard IZAT untuk memudahkan Pengambilan Keputusan oleh
Manajemen
5. BATASAN PEKERJAAN
Beberapa batasan lingkup dari pekerjaan studi ini, meliputi:
a. Data-data primer yang diperlukan oleh pihak PJB akan diberikan oleh pihak PT BPI kecuali data-
data tersebut bersifat confidential.
b. Konsultansi/Implementasi ini terbatas pada PLTU Jawa Tengah
6. DELIVERABLE
Implementasi aplikasi IZAT yang dapat diterapkan di PLTU Jawa Tengah
7. PENUTUP
Demikian proposal ini kami sampaikan, untuk dapat ditindaklanjuti oleh PT BPI dan dijadikan
sebagai referensi dalam pelaksanaan Implementasi IZAT sebagai bentuk penerapan budaya K3 di PLTU
Jawa Tengah oleh PT Pembangkitan Jawa-Bali.
Atas perhatian dan kerjasamanya kami ucapkan terimakasih.
Surabaya, 27 Juli 2022
PT PEMBANGKITAN JAWA-BALI
KEPALA DIVISI NIAGA
RETNO HANDAYANI
PT PEMBANGKITAN JAWA-BALI │ 3
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan HSE, Implementasi IZAT (Zero Accident Assistant Application)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
PT PEMBANGKITAN JAWA-BALI │ 4
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan HSE, Implementasi CSMS (Contractor Safety Management
System)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
KONSULTAN HSE
IMPLEMENTASI CSMS (Contractor Safety Management System)
PLTU JAWA TENGAH 2 x 1.000 MW
PT Bhimasena Power Indonesia (BPI) i
PT PEMBANGKITAN JAWA BALI
Surabaya, Maret 2022
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
DAFTAR ISI
DAFTAR ISI......................................................................................................................................... 2
1. PENDAHULUAN.......................................................................................................................... 1
2. MAKSUD DAN TUJUAN............................................................................................................... 1
3. JANGKA WAKTU PELAKSANAAN PEKERJAAN .............................................................................. 1
4. LINGKUP PEKERJAAN.................................................................................................................. 2
5. BATASAN PEKERJAAN................................................................................................................. 2
6. DELIVERABLE ............................................................................................................................. 3
7. PENUTUP ................................................................................................................................... 3
Proposal Penawaran
Konsultan HSE, Implementasi CSMS (Contractor Safety Management System)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
1. PENDAHULUAN
Bermula dari tingginya tingkat kecelakaan kerja serta perlu terus menerus diawasi yang menjadi
bagian dari tanggung jawab Negara dan Pengurus Perusahaan maka ditetapkanlah SOP (Standard
Operating Prosedure) terkait penerapan dan pelaksanaan K3, khususnya didalam perusahaan. Dengan
semboyan K3 ”Utamakan Keselamatan dan Kesehatan Kerja” maka tenaga kerja adalah target
pertama dalam memastikan kehidupan yang layak dan sejahtera dari sisi cara kerja yang aman serta
berbanding lurus juga dengan keberlangsungan proses produksi baik alat (barang) maupun jasa dari
suatu perusahaan yang berjalan dengan efisien (K3 adalah sebuah investasi yang mutlak bagi
perusahaan).
PT Bhimasena Power Indonesia (BPI) merupakan perusahaan “joint venture” yang didirikan oleh
konsorsium tiga perusahaan Electric Power Development Co., Ltd. (J-Power), PT Adaro Power, dan
ITOCHU Corporation. BPI mengembangkan, membangun dan mengoperasikan Pembangkit Listrik
Tenaga Uap 2 x 1.000 MW di Kabupaten Batang, Provinsi Jawa Tengah (“PLTU Jawa Tengah”) yang
memasok listrik ke PT PLN (Persero). PLTU Jawa Tengah merupakan proyek infrastruktur pertama di
Indonesia yang dilaksanakan dalam skema Kerjasama Pemerintah-Swasta ("KPS") dan juga
dikategorikan sebagai Proyek Strategis Nasional. Proyek ini memiliki peran penting untuk
memfasilitasi pembangunan infrastruktur dan akan memenuhi sebagian dari pertumbuhan kebutuhan
listrik di Indonesia.
Sebagai wujud komitmen terhadap pengelolaan K3 di lingkungan kerja, PT PJB telah melakukan
implementasi CSMS (Contractor Safety Management System), yaitu sistem yang dikelola untuk
memastikan bahwa Pihak Ketiga yang bermitra dengan PT PJB telah memiliki system manajemen K3L
dan telah memenuhi persyaratan K3L yang berlaku di PT PJB, serta mampu menerapkan persyaratan
K3L dalam pekerjaan yang dilaksanakan.
Proposal ini dibuat sebagai opsi solusi bagi PT BPI dalam mendukung penerapan K3 di wilayah
kerja PLTU Jawa Tengah dalam bentuk implementasi CSMS mengacu pada skema yang diterapkan PT
PJB, dimana skema yang diterapkan oleh PT PJB telah menjadi acuan dalam PLN Group.
2. MAKSUD DAN TUJUAN
Secara umum tujuan dari kegiatan ini adalah untuk:
a. Mengimplementasikan penerapan CSMS di PLTU Jawa Tengah
b. Mapping penerapan K3 pada sistem pengadaan PLTU Jawa Tengah
c. Sharing implementasi CSMS yang telah dilakukan di unit PJB
Dengan mengimplematasikan CSMS, maka diharapkan dapat mendorong pencapaian dan
penerapan budaya K3 di area PLTU Jawa Tengah.
3. JANGKA WAKTU PELAKSANAAN PEKERJAAN
Estimasi pelaksanaan Implementasi CSMS di PLTU Jawa Tengah dilaksanakan selama 12 (dua
belas) Minggu setelah kick-off meeting dilakukan, dengan target waktu sebagai berikut :
PT PEMBANGKITAN JAWA-BALI │ 1
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan HSE, Implementasi CSMS (Contractor Safety Management System)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
No Uraian Bulan 1 Bulan 2 Bulan 3
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12
1 Kick-off Meeting
Workshop
2 Penyusunan
Requirement &
Desain
3 Development
4 Functional Testing
5 User Training
6 User Acceptance
Test (UAT)
7 Deployment
4. LINGKUP PEKERJAAN
Lingkup pekerjaan dalam Implementasi CSMS ini adalah sebagai berikut:
1. Menerapkan CSMS pada PLTU Jawa Tengah dengan tahapan yang perlu dilengkapi Pihak Ketiga
dari PLTU Jawa Tengah adalah sebagai berikut
a. Risk Assessment
b. Pre Qualification
c. Selection
d. Pre Job Activity
e. Work in Progress
f. Final Evaluation
2. Memastikan implementasi CSMS di PLTU Jawa Tengah sesuai dengan skema yang telah di terapkan
pada PT PJB
5. BATASAN PEKERJAAN
Beberapa batasan lingkup dari pekerjaan studi ini, meliputi:
a. Data-data primer yang diperlukan oleh pihak PJB akan diberikan oleh pihak PT BPI kecuali data-
data tersebut bersifat confidential.
b. Konsultansi/Implementasi ini terbatas pada PLTU Jawa Tengah
PT PEMBANGKITAN JAWA-BALI │ 2
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Konsultan HSE, Implementasi CSMS (Contractor Safety Management System)
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
6. DELIVERABLE
Implementasi CSMS yang dapat diterapkan di PLTU Jawa Tengah
7. PENUTUP
Demikian proposal ini kami sampaikan, untuk dapat ditindaklanjuti oleh PT BPI dan dijadikan
sebagai referensi dalam pelaksanaan Implementasi CSMS sebagai bentuk penerapan budaya K3 di
PLTU Jawa Tengah oleh PT Pembangkitan Jawa-Bali.
Atas perhatian dan kerjasamanya kami ucapkan terimakasih.
Surabaya, 27 Juli 2022
PT PEMBANGKITAN JAWA-BALI
KEPALA DIVISI NIAGA
RETNO HANDAYANI
PT PEMBANGKITAN JAWA-BALI │ 3
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Performance Test & Efficiency Improvement
PLTU Jawa Tengah - PT Bhimasena Power
Indonesia
Performance Test & i
Efficiency Improvement
PLTU Jawa Tengah 2x1000 MW
PT Bhimasena Power Indonesia
PT PEMBANGKITAN JAWA BALI
Surabaya, Juli 2022
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
DAFTAR ISI
DAFTAR ISI......................................................................................................................................... 2
1. PENDAHULUAN.......................................................................................................................... 1
2. MAKSUD DAN TUJUAN............................................................................................................... 1
3. LINGKUP PEKERJAAN.................................................................................................................. 1
4. DELIVERABLES............................................................................................................................ 2
5. JANGKA WAKTU PELAKSANAAN ................................................................................................. 2
6. PERSONIL PELAKSANAAN PEKERJAAN ........................................................................................ 3
7. TOOLS DAN CONSUMABLE MATERIAL ........................................................................................ 3
8. PENUTUP ................................................................................................................................... 4
Proposal Performance Test & Efficiency Improvement
PLTU Jawa Tengah - PT Bhimasena Power Indonesia
1. PENDAHULUAN
Listrik merupakan kebutuhan yang sangat esensial dalam kehidupan. Oleh karena itu, PT. PLN
tidak hanya menginginkan agar pasokan listrik yang tersedia dapat mencukupi kebutuhan masyarakat
sehingga kegiatan masyarakat dapat terlaksana dengan pelayanan terbaik tapi juga tetap
memperhatikan aspek lingkungan dan dampak dari pembangkitan listrik tersebut kepada ekosistem
disekitarnya.
PLTU Jawa Tengah atau Central Java Power Plant (CJPP) adalah proyek pembangkit listrik tenaga
uap ultra critical sebesar 2 x 1.000 MW di Kabupaten Batang, Jawa Tengah. PLTU Jawa Tengah akan
dibangun oleh Special Purpose Vehicle (SPV) PT Bhimasena Power Indonesia (PT BPI) yang
beranggotakan J-POWER (34%), Adaro (34%), dan Itochu (32%). PLTU Jawa Tengah atau Central Java
Power Plant (CJPP) ditujukan untuk memenuhi kebutuhan tenaga listrik di Pulau Jawa dan merupakan
bagian dari program penyediaan listrik 35.000 MW. Sebagai salah satu pilot project KPBU pertama dan
terbesar di Indonesia, PLTU Jawa Tengah memiliki peran strategis untuk mendorong keterlibatan
investasi swasta dalam pembangunan infrastruktur.
PT Pembangkitan Jawa-Bali (PJB) telah berhasil mengelola berbagai jenis pembangkit listrik
dengan total kapasitas sebesar 20.857 MW. PT PJB juga memiliki lini bisnis MRO Services yaitu PJB
Total Solution Services yang menyediakan solusi terintegrasi seperti Maintenance, Repair dan
Overhaul untuk pembangkit listrik dan utilitas industri lainnya. Salah satu upaya pengelolaan yang
dilakukan untuk mendapatkan parameter pola operasi yang optimal ialah melalui analisis pada
Performance Test. Performance test before Overhaul dilaksanakan untuk mencapai pelaksanaan
Overhaul yang tepat sasaran dan mengembalikan performa mendekati hasil commissioning.
Performance Test after Overhaul dilaksanakan untuk mengukur keberhasilan Overhaul dan sebagai
bahan masukan atas pelaksanaan Overhaul.
Proposal ini disusun sebagai gambaran rencana pelaksanaan jasa Performance Test untuk PT
BPI. Adapun isi dari proposal ini terdiri atas jadwal pekerjaan, lingkup pekerjaan, dan personil yang
dibutuhkan untuk pelaksanaan pekerjaan.
2. MAKSUD DAN TUJUAN
Maksud dan tujuan pekerjaan Proposal Performance Test & Efficiency Improvement
yang diusulkan PT PJB adalah sebagai berikut :
a. Untuk mendapatkan parameter pola operasi
b. Untuk mendapatkan optimalisasi kinerja unit pembangkit dengan memanfaatkan parameter
pola operasi
c. Untuk mendapatkan rekomendasi dalam meningkatkan efisiensi pembangkit PLTU Keban
Agung
3. LINGKUP PEKERJAAN
PT PJB mengusulkan lingkup pekerjaan Proposal Performance Test & Efficiency
Improvement adalah sebagai berikut :
a. Site Visit ke PLTU Jawa Tengah dan memverifikasi alat ukur terkait Performance Test
terkalibrasi
b. Melakukan performance test before OH (Metode Pelaksanaan Performance Test
berdasarkan ASME PTC);
c. Analisa data antara Comissioning dan Performance Test Before OH untuk mendapatkan
rekomendasi improvement saat OH dan Baseline improvement after OH;
PT PEMBANGKITAN JAWA-BALI │ 1
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Performance Test & Efficiency Improvement
PLTU Jawa Tengah - PT Bhimasena Power Indonesia
d. Melakukan Performance Test after OH (Metode Pelaksanaan Performance Test berdasarkan
ASME PTC);
e. Analisa Data Performance Test After OH;
f. Modelling Normalization Plant, untuk mencari gap dan memberikan rekomendasi efisiensi
improvement;
g. Heat Rate Analysis, untuk mencari gap dan memberikan rekomendasi efisiensi
improvement, dan rekomendasi tuning operasi after OH.
4. DELIVERABLES
PT PJB mengusulkan deliverables pekerjaan Proposal Performance Test & Efficiency
Improvement adalah sebagai berikut :
a. Site Visit Report dan Kondisi Alat Ukur
b. Recommendation Report Performance Test Before OH
c. Recommendation Report Performance Test After OH
d. Modelling Normalization Plant
e. Heat Rate Analysis
5. JANGKA WAKTU PELAKSANAAN
PT PJB mengusulkan jadwal pelaksaan Proposal Performance Test & Efficiency Improvement
adalah sebagai berikut :
Tabel 1. Jangka Waktu Pelaksanaan
No Lingkup pekerjaan PIC Durasi Jadwal pekerjaan
1 Site Visit PT PJB 3 hari Sebelum OH dan Performance
PT PJB 3 hari Test
2 Performance Test before OH PT BPI 3 minggu sebelum OH
Pengambilan data komposisi PT PJB
PT PJB
3 (ultimate dan proxymate) batu 1 minggu 3 minggu sebelum OH
bara, fly ash, bottom ash, dan PT BPI
fineness PT PJB
PT PJB
4 Analisa data Performance Test PT PJB 2 minggu 2 minggu sebelum OH
before OH 2 hari
1 Minggu setelah OH (Unit
5 Performance Test after OH kondisi Steady)
Pengambilan data komposisi
6 (ultimate dan proxymate) batu 1 minggu 1 Minggu setelah OH
bara, fly ash, bottom ash, dan
fineness batu bara
7 Analisa Data performance Test 2 minggu 3 Minggu setelah OH
after OH 4 minggu
4 minggu 1 Minggu setelah Analisa data
8 Modelling Normalization performance test
1 Minggu setelah Analisa data
9 Heat Rate Analysis performance test
PT PEMBANGKITAN JAWA-BALI │ 2
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Performance Test & Efficiency Improvement
PLTU Jawa Tengah - PT Bhimasena Power Indonesia
Catatan :
a. Data Commisioning diberikan maksimal 1 minggu sebelum Performance Test Before OH.
b. Terkait uji komposisi (ultimate dan proxymate) batu bara, fly ash, bottom ash, dan fineness
batu bara dilaksanakan di laboraturium PT BPI.
c. Kebutuhan data modelling : Heat balance diagram, commisioning, ultimate dan proxymate
batu bara, spesifikasi equipment Boiler, Steam Turbin, Condensor, Feed Water Heater, dan
lainnya.
6. PERSONIL PELAKSANAAN PEKERJAAN
Di dalam pelaksanaan Proposal Performance Test & Efficiency Improvement, PT Pembangkitan
Jawa Bali mengusulkan kebutuhan personil sebagaimana berikut:
Tabel 2. Personil pelaksanaan pekerjaan
NO Personil Jumlah (Orang)
Site Visit
1 Performance Engineer 4
2 Helper* 1
3 Personil Labor* 2
Performance Test before & after OH
1 Performance Engineer 4
2 Helper* 1
3 Personil Labor* 2
Modelling Normalization dan Heat Rate Analysis
1 Performance Engineer 4
2 Expert modelling 2
3 Expert Akademisi 1
Keterangan :
a. *) Helper dan personil Labor disediakan oleh PT BPI sepanjang pelaksanaan pekerjaan
b. Personil Labor melaksanakan Pengambilan data komposisi (ultimate dan proxymate) batu
bara, fly ash, bottom ash, dan fineness batu bara
7. TOOLS DAN CONSUMABLE MATERIAL
Dalam pemenuhan kebutuhan pada saat pelaksanaan pekerjaan, maka diperlukan tools dan
consumable material yang akan dipenuhi oleh PT PJB untuk digunakan sesuai lingkup pekerjaan
Performance Test & Efficiency Improvement adalah sebagaimana berikut :
a. Flue Gas Analyzer (MRU VARIO PLUSS LUX INDUSTRIAL)
b. Perlengkapan K3 yang diperlukan : safety glass, masker, handy talky dll
PT PEMBANGKITAN JAWA-BALI │ 3
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Performance Test & Efficiency Improvement
PLTU Jawa Tengah - PT Bhimasena Power Indonesia
8. PENUTUP
Demikian proposal ini kami sampaikan, untuk dapat di-review dan dijadikan sebagai referensi
pelaksanaan pekerjaan Performance Test & Efficiency Improvement PLTU Jawa Tengah - PT
Bhimasena Power Indonesia. Atas perhatian dan kerjasamanya kami ucapkan terimakasih.
Surabaya, 27 Juli 2022
PT PEMBANGKITAN JAWA-BALI
KEPALA DIVISI NIAGA
RETNO HANDAYANI
PT PEMBANGKITAN JAWA-BALI │ 4
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
PEKERJAAN JASA PENDAMPINGAN PROPER BIRU
PLTU JAWA TENGAH 2x1000 MW
PT.BHIMASENA POWER INDONESIA
Proposal Penawaran
Pekerjaan Jasa Pendampingan Proper Biru
PLTU Jawa Tengah 2x1000 MW
DAFTAR ISI
1 PENDAHULUAN.......................................................................................................................... 2
2 MAKSUD DAN TUJUAN............................................................................................................... 3
3 LINGKUP PEKERJAAN.................................................................................................................. 3
4 JANGKA WAKTU PELAKSANAAN ................................................................................................. 4
5 KEBUTUHAN PERSONIL .............................................................................................................. 4
6 SCHEDULE PEKERJAAN ............................................................................................................... 5
7 LK3 DAN PROTOCOL COVID-19................................................................................................... 5
8 DISCLAIMER DAN PENUTUP ....................................................................................................... 5
1
Proposal Penawaran
Pekerjaan Jasa Pendampingan Proper Biru
PLTU Jawa Tengah 2x1000 MW
7
1 PENDAHULUAN
Listrik merupakan kebutuhan yang sangat esensial dalam kehidupan. Oleh karena itu, PT. PLN
tidak hanya menginginkan agar pasokan listrik yang tersedia dapat mencukupi kebutuhan
masyarakat sehingga kegiatan masyarakat dapat terlaksana dengan pelayanan terbaik tapi juga
tetap memperhatikan aspek lingkungan dan dampak dari pembangkitan listrik tersebut kepada
ekosistem disekitarnya.
PLTU Jawa Tengah atau Central Java Power Plant (CJPP) adalah proyek pembangkit listrik
tenaga uap ultra critical sebesar 2 x 1.000 MW di Kabupaten Batang, Jawa Tengah. PLTU Jawa
Tengah akan dibangun oleh Special Purpose Vehicle (SPV) PT Bhimasena Power Indonesia (PT BPI)
yang beranggotakan J-POWER (34%), Adaro (34%), dan Itochu (32%). PLTU Jawa Tengah atau
Central Java Power Plant (CJPP) ditujukan untuk memenuhi kebutuhan tenaga listrik di Pulau Jawa
dan merupakan bagian dari program penyediaan listrik 35.000 MW. Sebagai salah satu pilot project
KPBU pertama dan terbesar di Indonesia, PLTU Jawa Tengah memiliki peran strategis untuk
mendorong keterlibatan investasi swasta dalam pembangunan infrastruktur.
PT Pembangkitan Jawa-Bali (PJB) telah meraih 19 penghargaan proper pada unit-unit yang
dikelolanya, diantaranya 3 Proper Emas pada UP Paiton, UP Gresik dan UBJOM Rembang, sehingga
diharap pengalaman PT PJB dalam raihan proper ini diharap dapat membantu PT BPI dalam meraih
proper.
Proposal ini disusun berdasarkan adanya permintaan dari PT BPI terkait kebutuhan jasa
pendampingan proper biru unit PLTU Jawa Tengah . Adapun isi dari proposal ini atas jadwal, lingkup
pekerjaan, dan manpower yang dibutuhkan untuk pelaksanaan pekerjaan.
2
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Pekerjaan Jasa Pendampingan Proper Biru
PLTU Jawa Tengah 2x1000 MW
7
Penghargaan Proper Emas PLTU Paiton, PLTU Rembang dan PLTGU Gresik
2 MAKSUD DAN TUJUAN
Maksud dan tujuan melakukan pekerjaan Jasa Pendampingan Proper Biru Unit PLTU Jawa
Tengah adalah:
1. Me-review aturan dan legalitas yang berhubungan dalam tujuan meraih Proper pada PLTU
Jawa Tengah
2. Mengarahkan kesiapan perizinan dan lapangan untuk pencapaian Proper PLTU Jawa Tengah
3 LINGKUP PEKERJAAN
Tahapan pekerjaan Jasa Pendampingan Proper Biru Unit PLTU Jawa Tengah sebagai berikut:
A. Pendampingan Pre-Assessment:
i. Workshop Awareness pengenalan PROPER
ii. Identifikasi proses dan dokumen kelengkapan pendukung PROPER, termasuk
pembuatan checklist
iii. Self Assessment kondisi lapangan, termasuk penentuan status kesiapan PROPER unit
3
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Pekerjaan Jasa Pendampingan Proper Biru
PLTU Jawa Tengah 2x1000 MW
7 iv. Studi banding implementasi PROPER pada unit PJB (opsional)
B. Tindak Lanjut Pre-Assessment:
i. Pre Assessment kesiapan PROPER oleh KLHK
ii. Pendampingan penyusunan program pemenuhan gap PROPER
iii. Pendampingan pemenuhan gap PROPER
iv. Pelaksanaan 2 kali check point
C. Pendampingan dan Verifikasi Data Kebutuhan Pengisian Aplikasi Simpel
i. Tim ahli akan melakukan check point setiap triwulan pada data yang diinput di aplikasi
simpel
ii. Tim ahli akan memberikan rekomendasi berdasarkan hasil check point data Simpel
D. Monitoring kesesuaian pengisian Simpel secara berkala setelah akses Simpel ditutup (2 kali
monitoring kesesuaian)
E. Pendampingan Pemenuhan Sanggahan Raport PROPER sementara
4 JANGKA WAKTU PELAKSANAAN
Estimasi durasi total waktu yang dibutuhkan untuk melakukan pelaksanaan pekerjaan adalah
sejak 1 Juni 2022 sampai dengan Awarding Proper (estimasi pada akhir September 2023).
5 KEBUTUHAN PERSONIL
Dalam melakukan pelaksanaan pekerjaan Jasa Pendampingan Proper Biru Unit PLTU Jawa
Tengah, PT Pembangkitan Jawa-Bali membutuhkan personil sebagai berikut:
No Personil Jumlah Keterangan
1 Analyst Lingkungan (Orang)
Pengalaman pendampingan Proper minimal 4
3 tahun
TOTAL 3
4
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Pekerjaan Jasa Pendampingan Proper Biru
PLTU Jawa Tengah 2x1000 MW
6 SCHEDULE PEKERJAAN
Rencana schedule pekerjaan yang akan dilakukan pada pekerjaan Jasa Pendampingan Proper
Biru Unit PLTU Jawa Tengah adalah sebagai berikut:
No Pekerjaan Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July Aug Sep
A Pendampingan Pre-Assessment
B Tindak Lanjut Pre-Assessment
C Pendampingan Pengisian Simpel
D Monitoring Kesesuaian Simpel
E Pendampingan Pemenuhan Sanggahan
Raport Proper Sementara
7 LK3 DAN PROTOCOL COVID-19
Dalam rangka kebutuhan kesehatan dan keselamatan kerja pada saat pelaksanaan pekerjaan
di era pandemi seperti ini, maka diperlukan peralatan terkait K3 dan pelaksanaan protokol covid-
19 yang akan dipenuhi oleh PT PJB untuk digunakan tiap-tiap personil dan kelengkapan area kerja,
dimana tidak termasuk pada Ambulance (jika diperlukan).
8 DISCLAIMER DAN PENUTUP
Perlu kami sampaikan bahwa pekerjaan Jasa Pendampingan Proper Unit PLTU Jawa Tengah
dalam proposal ini bersifat arahan dan konsultasi dengan ruang lingkup PROPER Biru tahun 2022-
2023, sehingga apabila ada hambatan proses dan hasil akhir raihan Proper sepenuhnya menjadi
tanggung jawab dan capaian dari PT BPI.
Demikian proposal ini kami sampaikan, untuk dapat direview dan dijadikan sebagai referensi
pelaksanaan pekerjaan Jasa Pendampingan Proper Unit PLTU Jawa Tengah.
Atas perhatian dan kerjasamanya kami ucapkan terimakasih.
Surabaya, 04 Juli 2022
PT PEMBANGKITAN JAWA-BALI
KEPALA DIVISI NIAGA
5
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Pekerjaan Jasa Pendampingan Proper Biru
PLTU Jawa Tengah 2x1000 MW
RETNO HANDAYANI
6
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Pekerjaan Jasa Pendampingan Proper Biru
PLTU Jawa Tengah 2x1000 MW
7
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Pekerjaan Jasa Cleaning Boiler
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
PEKERJAAN JASA CLEANING BOILER
PPEKLETRUJAJAAWN AJATSEANPGEANHDU2KxUN1.G00T0EKMNWIK DAN ADMINISTRASI
PPEMT.BBAHNIMGAKISTENA POWER INDONESIA i
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
PLTU JAWA TENGAH 2x1.000 MWmodify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
DAFTAR ISI
DAFTAR ISI......................................................................................................................................... 2
1. PENDAHULUAN.......................................................................................................................... 1
2. MAKSUD DAN TUJUAN............................................................................................................... 1
3. LINGKUP PEKERJAAN.................................................................................................................. 3
4. JANGKA WAKTU PELAKSANAAN PEKERJAAN .............................................................................. 4
5. LINGKUP PEKERJAAN.................................................................................................................. 4
6. PENGALAMAN PEKERJAAN......................................................................................................... 4
7. LK3 DAN PROTOCOL COVID-19................................................................................................... 5
8. PENUTUP ................................................................................................................................... 6
Proposal Penawaran
Pekerjaan Jasa Cleaning Boiler
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
1. PENDAHULUAN
Listrik merupakan kebutuhan yang sangat esensial dalam kehidupan. Oleh karena itu, PT. PLN
tidak hanya menginginkan agar pasokan listrik yang tersedia dapat mencukupi kebutuhan
masyarakat sehingga kegiatan masyarakat dapat terlaksana dengan pelayanan terbaik tapi juga
tetap memperhatikan aspek lingkungan dan dampak dari pembangkitan listrik tersebut kepada
ekosistem disekitarnya.
PLTU Jawa Tengah atau Central Java Power Plant (CJPP) adalah proyek pembangkit listrik
tenaga uap ultra critical sebesar 2 x 1.000 MW di Kabupaten Batang, Jawa Tengah. PLTU Jawa
Tengah akan dibangun oleh Special Purpose Vehicle (SPV) PT Bhimasena Power Indonesia (PT BPI)
yang beranggotakan J-POWER (34%), Adaro (34%), dan Itochu (32%). PLTU Jawa Tengah atau
Central Java Power Plant (CJPP) ditujukan untuk memenuhi kebutuhan tenaga listrik di Pulau Jawa
dan merupakan bagian dari program penyediaan listrik 35.000 MW. Sebagai salah satu pilot project
KPBU pertama dan terbesar di Indonesia, PLTU Jawa Tengah memiliki peran strategis untuk
mendorong keterlibatan investasi swasta dalam pembangunan infrastruktur.
PT Pembangkitan Jawa-Bali (PJB) telah berhasil mengelola berbagai jenis pembangkit listrik
dengan total kapasitas sebesar 20.857 MW . PT PJB juga memiliki lini bisnis Maintenance, Repair
& Overhaul (MRO services) yaitu PJB Total Solution Services yang menyediakan solusi terintegrasi
seperti Maintenance, Repair & Overhaul untuk pembangkit listrik dan utilitas industri lainnya.
Didukung oleh sumber daya kompeten yang berpengalaman dengan sertifikasi keahlian dan alat
untuk perakitan / pembongkaran, pengukuran, kalibrasi, perawatan online, penilaian dan perbaikan.
Proposal ini disusun berdasarkan adanya permintaan dari PT BPI terkait kebutuhan jasa
cleaning boiler unit PLTU Jawa Tengah . Adapun isi dari proposal ini atas jadwal, lingkup pekerjaan,
dan manpower yang dibutuhkan untuk pelaksanaan pekerjaan.
PT PEMBANGKITAN JAWA-BALI │ 1
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Pekerjaan Jasa Cleaning Boiler
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
Gambar 1. Proses cleaning boiler dengan menggunakan water jet
2. MAKSUD DAN TUJUAN
Maksud dan tujuan melakukan pekerjaan “Jasa Cleaning Boiler PLTU Jawa Tengah” adalah:
1. Melakukan pekerjaan cleaning boiler scoope A & scoope B
2. Pembersihan peralatan agar dapat beroperasi secara optimal
PT PEMBANGKITAN JAWA-BALI │ 2
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Pekerjaan Jasa Cleaning Boiler
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
3. LINGKUP PEKERJAAN
Scoope pekerjaan jasa cleaning boiler PLTU Jawa Tengah sebagai berikut:
A. Scoope A terdiri dari :
1. Penyediaan tools dan peralatan pendukung pekerjaan cleaning boiler
2. Material consumable dan non consumable
3. Pemasangan perlengkapan penutup pada bottom ash hopper
4. Pemasangan pelindung pada tube bottom ash hopper untuk menghindari material jatuh
pada tube
5. Pembersihan tube boiler meliputi area :
a. Tube Super heater
b. Tube Reheater
c. Tube Economizer
d. Tube Waterwall
e. Tube LTSH
f. Header LTSH
g. Header Economizer
6. Pembersihan awal dilakukan dengan menggunakan alat scraping/chiping untuk
pembersihan kerak yang menempel pada tube, dilakukan secara menyeluruh pada
semua tube sesuai dengan area tersebut diatas, tanpa ada yang terlewati.
Pembersihan seluruh tube boiler menggunakan water jet high pressure dengan setting
yang disesuaikan dengan permintaan dari pihak customer.
B. Scoope B terdiri dari :
Pekerjaan jasa pembersihan boiler scoope B ini meliputi area :
1. Bongkar pasang stop block (termasuk penyelam dan penyewaan kebutuhan untuk
penyelaman)
2. Pembersihan dan pengurasan area :
a. CWP Pit
b. Storage tank (CST)
c. Selokan
d. Sump pit inlet outlet condenser
e. Drum Screen
PT PEMBANGKITAN JAWA-BALI │ 3
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Pekerjaan Jasa Cleaning Boiler
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
f. Inlet Outlet Canal Condenser
g. Steam Coil
h. Coal Silo
3. Pembersihan untuk area :
a. Bottom ash silo
b. Gas duct
c. Hot air duct & cold air duct
d. Pulverizer & coal feeder
e. Bottom ash hopper
f. Hopper economizer & Storage Tank economizer
g. Settling & Surge tank
h. Sump pit
i. Lumpur di lantai
4. Drain economizer ke settling tank dan pengurasan settling tank
5. Finishing
4. JANGKA WAKTU PELAKSANAAN PEKERJAAN
Estimasi durasi total waktu yang dibutuhkan untuk melakukan pelaksanaan pekerjaan :
1. Scoope A = 10 – 15 hari kalender (belum termasuk waktu pemasangan scaffolding)
2. Scoope B = 10 – 15 hari kalender (dapat menyesuaikan kebutuhan customer)
Keterangan :
a. Belum termasuk waktu pemasangan scaffolding
b. Durasi penyelesaian pekerjaan bisa dipercepat sesuai dengan kebutuhan customer
c. Permintaan percepatan durasi penyelesaian pekerjaan akan menambah jumlah
manpower
5. KEBUTUHAN PERSONIL
Dalam melakukan pelaksanaan pekerjaan Jasa Cleaning Boiler PLTU Jawa Tengah, PT
Pembangkitan Jawa-Bali membutuhkan personil sebagai berikut:
1. Scoope A Jumlah Keterangan
No Personil (Orang)
PT PEMBANGKITAN JAWA-BALI │ 4
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Pekerjaan Jasa Cleaning Boiler
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
1 Koordinator 1 -
-
Lapangan
2 Tim Cleaning 16
TOTAL 17
2. Scoope B Jumlah Keterangan
No Personil (Orang)
-
1 Koordinator 1
Lapangan -
10 -
2 Tim Cleaning 2
3 Penyelam 13
TOTAL
Keterangan :
Jumlah personil menyesuaikan dengan durasi waktu pekerjaan yang diminta oleh
customer.
6. PENGALAMAN PEKERJAAN
Beberapa pengalaman pekerjaan jasa pemasangan scaffolding, meliputi:
a. Jasa Cleaning Boiler PT PJB UP Paiton 1-2 (2 x 400 MW)
b. Jasa Cleaning Boiler PLTU Paiton 9 (1 x 660 MW )
c. Jasa Cleaning Boiler PLTU Rembang (2 x 315 MW)
d. Jasa Cleaning Boiler PLTU Indramayu (3 x 330 MW)
e. Jasa Cleaning Boiler PLTU Pacitan (2 x 315 MW)
7. LK3 DAN PROTOCOL COVID-19
Dalam rangka kebutuhan kesehatan dan keselamatan kerja pada saat pelaksanaan pekerjaan
di era pandemi seperti ini, maka diperlukan peralatan terkait K3 dan pelaksanaan protokol covid-
PT PEMBANGKITAN JAWA-BALI │ 5
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Proposal Penawaran
Pekerjaan Jasa Cleaning Boiler
PLTU Jawa Tengah 2 x 1.000 MW, PT Bhimasena Power Indonesia (BPI)
19 yang akan dipenuhi oleh PT PJB untuk digunakan tiap-tiap personil dan kelengkapan area kerja,
dimana tidak termasuk pada Ambulance (jika diperlukan).
8. PENUTUP
Demikian proposal ini kami sampaikan, untuk dapat direvieu dan dijadikan sebagai referensi
pelaksanaan pekerjaan Jasa Cleaning Boiler PLTU Batang.
Atas perhatian dan kerjasamanya kami ucapkan terimakasih.
Surabaya, 27 Juli 2022
PT PEMBANGKITAN JAWA-BALI
KEPALA DIVISI NIAGA
RETNO HANDAYANI
PT PEMBANGKITAN JAWA-BALI │ 6
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy,
modify, or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT