ECL is a leading civil engineering and infrastructure company. We operate within the
South East, Home Counties and South Midlands, forging partnerships with leading
residential and commercial developers, local authorities, landowner groups and
consultant Project Managers.
With our main office in Kempston, Bedford we are able to deliver fully resourced, high
quality infrastructure projects from Wiltshire to the Suffolk coast. across a range of sectors
including infastructure, groundworks and highways.
We have a workforce of over 900 people in our operations in and around the UK.
5 OUR VALUES
ECL’s honesty and reliability strengthen our brand and reputation.
We believe that each member of our team, whether site operative or
board member, should push themselves and challenge their skills and
knowledge to ensure personal progression – always with the help and
support of their peers and mentors.
Our 9 core values are at the backbone of our company, they make us
what we are today.
SAFETY FIRST
PRESERVING THE WELLBEING OF OUR PEOPLE
FOCUS ON SUCCESS IN A WAY THAT MAKES US PROUD
PURSUE GROWTH & LEARNING FOR ALL
ALWAYS GO BEYOND EXPECTATIONS
QUALITY – WHAT WE DO, WE DO THE BEST
MAINTAIN INTEGRITY IN ALL WE DO
BUILD A POSITIVE TEAM & FAMILY SPIRIT
BE FEARLESS, EMBRACE & DRIVE CHANGE
6 www.company.com
BUILD A POSITIVE TEAM AND
FAMILY SPIRIT
7 OUR STORY
Over two decades, ECL has grown from our humble roots as a groundworks services company to an ambitious and
continually growing civil engineering provider. Today, we’re proud of our history and look forward to making our mark in
the civil engineering industry and beyond.
Our continual investment in new technologies and highly clients need to plan, build and develop their portfolio, safer
trained staff allows us to lay the infrastructure that our and quicker than ever before.
SUPPLY CHAIN RELATIONSHIPS RECORD TURNOVER JUNE 2019
ECL has recently posted a record turnover, reporting With our local staff and self delivery model, together
£135 million revenue up to June 2019. This is in line with with our expert knowledge and experience, we have the
an organic growth strategy which has seen a strong required attributes to work collaboratively and successfully
Operating Margin maintained in a competitive trading to deliver high-quality infrastructure projects for the homes
market. and businesses of tomorrow.
Although we pride ourselves on a self- FOCUS ON SUCCESS IN A
delivery model, we have strong supply chain WAY THAT MAKES US PROUD
relationships with specialist subcontractors
and material suppliers.
CASE STUDY
9 BIDWELL PROJECT
INFASTRUCTURE | £14,000,000
In mid-2018 ECL was contracted by Bidwell Land Ownership Group, a consortium of local landowners, to deliver the strategic
infrastructure necessary to develop the 166 hectare site which will eventually accommodate nearly 2000 new homes.
Works commenced in the summer of 2018 with over The sustainably designed SUDS systems made best use of
100,000m3 of bulk earthworks which proceed the the existing watercourses that traversed the site. To tie-in
installation of Phase 1, 2, 3 & 4 of the onsite works. These the new drainage and road network, over 1,200 tonnes
phases - included over 6km of strategic storm and foul of pre-cast box culvert was installed along with 21 in-situ
along with 19,000m2 of new carriageway. To facilitate the headwalls. The Section 278 work was split into six phases,
disposal of the foul sewage, a 7m deep in-situ pumping all of which involved removal and upgrade of the existing
station was constructed, with an oversized wet-well and Thorn Road, whilst maintaining access for residents and
300m of foul rising main connecting into the existing developers. The installation of 2km of off-site drainage was
Houghton Regis trunk main. carefully undertaken alongside a live HV cable – this work
was meticulously planned to avoid incident.
“ECL BRING A FLEXIBLE,
FORWARD-THINKING
APPROACH TO THE PROJECT,
INTERFACING SEAMLESSLY
WITH ALL PARTIES, KEEPING
THE WORKS ON SCHEDULE,
TO THE HIGHEST SAFETY
STANDARDS, DESPITE
UNEXPECTED CHALLENGES.”
ALUN ISAAC, PROJECT MANAGER FOR
BIDWELL LAND OWNERSHIP GROUP
PROJECT CHALLENGES PROJECT OUTCOMES
As this development lies within a flood plain, the new road Meticulous planning, flexibility and innovative thinking were
network needed elevating to protect it from flooding. In crucial to tackle this complex, evolving project. All services to
order to generate the material required to raise the roads be installed are on schedule and include; gas, electric, fibre,
a borrow pit strategy was implemented. This required the water and LV connections for the entire development, along
recovery of 60,000m3 of suitable fill material from the flood with three substations – including all superstructure works.
plain areas which was hauled and placed into the road Temporary supplies of gas and LV were delivered where
footprint. The residual excavations were then developed in needed and the immediate availability of our specialist
to permanent feature ponds and lakes for use by the RSPB equipment prevented delays to the occupation dates of
reserve. The geology of the existing ground presented the first developer. The successful delivery on time and on
further engineering challenges as the top layer of subsoil schedule, and the ability to accommodate the challenging
was unsuitable for road construction. To overcome this size and fluidity of the project resulted in ECL being awarded
ECL worked closely with BDW’s appointed engineers to large contract extensions to assist with development of
implement a systematic testing regime that minimised the additional phases.
amount of unsuitable material that had to be removed.
QUALITY - WHAT WE DO,
WE DO THE BEST
GROUND BREAKING ON EVERY LEVEL
12 OUR APPROACH
ECL is dedicated to successfully delivering a diverse range of infastructure and groundworks projects and
our in-house team has the capability to take on complex and technically challenging projects from start to
finish.
OUR MISSION
TO DEVELOP THE NEXT GENERATION OF CONSTRUCTION PROFESSIONALS
AND SKILLED WORKFORCE, AND SET NEW STANDARDS OF EXCELLENCE IN
OUR INDUSTRY THROUGH TRAINING AND TECHNOLOGY. WE ARE FORGING
STRONG CLIENT COLLABORATIONS TO BUILD THE FOUNDATIONS FOR
FUTURE COMMUNITIES TO GROW.
ALWAYS GO
BEYOND
EXPECTATIONS
14 DELIVERY
Over the years we have committed to building a reputation for excellence,
working on some of the UK’s biggest housing developments. We have over
25 years of experience within the construction industry, and have in that time,
developed a proven track record of successful project delivery, collaborative
working and innovative methods. Our experience enables us to offer our client’s
best value through early contractor involvement, project planning and financial
forecasting.
We encourage our teams to look out for innovative new methods of project
delivery.
By challenging our workforce to offer better, more cost-effective and efficient
methods of working, we are able to pass any benefits on to our clients, be it
through early delivery of a scheme or their bottom line.
15 SELF-DELIVERY
We pride ourselves on our robust self-delivery model, which means only specialist works are carried out by
our supply chain partners. Our in-house capabilities not only minimises the need for subcontractors but
enables a prompt, flexible approach to project delivery. Our use of local labour creates a positive, lasting
economic impact on the areas we work in.
MAINTAIN INTEGRITY IN ALL WE DO
ECL PLANT HIRE
To support the delivery teams, our sister company - ECL Plant Hire currently owns and operates:
OVER 300 EXCAVATORS, DUMPERS & DUMP TRUCKS OVER 13T
FULL GPS CAPABILITIES
OVER 300 EXCAVATORS UNDER 13T
OVER 300 DUMPERS & ROLLERS
900+ SITE OPERATIVES
80+ SITE-BASED
MANAGEMENT &
ENGINEERING STAFF
70+ HEAD OFFICE STAFF
CASE STUDY
17 KINGSBROOK PROJECT
RESIDENTIAL & INFASTRUCTURE | £20,000,000
Barratt Homes contracted ECL at the beginning of 2018 to build infrastructure and provide groundworks for a major
development of 2,450 homes over three villages in Kingsbrook, Aylesbury Vale. In partnership with RSPB, Barratt David
Wilson aim was to pioneer the concept of nature-friendly The second phase of the transport infrastructure works
housing developments. ECL started work on the site in begun on the 1st of July of 2019. This stage delivered the
May 2018, finishing a part-installed single carriageway, complete Eastern Link Road, connecting the development
Stock Lake Link Road. Under the strategic planning, the to the A418, a major thoroughfare from Milton Keynes. A
road has relieved the once challenging traffic conditions signalised junction was installed off of the new carriageway
through Aylesbury town, and has provided an important to enable the new connection to the A418. An estate road
transport link for the residents of the new development. network was built to support bus links and other traffic
throughout the development. On 6th of January 2019,
ECL also commenced the groundworks to Village 3, The
Canal Quarter. As well as the standard foundations, private
drainage, floor slabs and external works, ECL have also
completed the strategic private road and sewer network.
PROJECT CHALLENGES
As this development lies within a flood plain, the new road
network needed elevating to protect it from flooding. In
order to generate the material required to raise the roads
a borrow pit strategy was implemented. This required the
recovery of 60,000m3 of suitable fill material from the flood
plain areas which was hauled and placed into the road
18 www.company.com
footprint. The residual excavations were then developed in
to permanent feature ponds and lakes for use by the RSPB
reserve. The geology of the existing ground presented
further engineering challenges as the top layer of subsoil
was unsuitable for road construction. To overcome this
ECL worked closely with BDW’s appointed engineers to
implement a systematic testing regime that minimised the
amount of unsuitable material that had to be removed.
PROJECT OUTCOMES
The collaborative approach to date has ensured that the
project was delivered successfully on programme.
“ECL’S FLEXIBLE APPROACH AND POSITIVE ATTITUDE MADE
CLOSE COLLABORATION EASY AND ENABLED US TO COME
UP WITH INNOVATIVE SOLUTIONS TO KEEP THE PROJECT ON
TRACK WHEN UNFORESEEN ISSUES AROSE”
JUSTIN FAHEY
COMMERCIAL MANAGER AT BARRATT NORTH THAMES
Web design & development for Company Name 19
SAFETY FIRST
S.A.F.E. SAFE ATTITUDE FROM EVERYONE
20 HEALTH & SAFETY
ECL is committed to achieving the highest possible standards of Health and Safety
performance on all of our projects.
S.A.F.E. “SAFE ATTITUDE FROM EVERYONE”
This ethos reflects the importance of health and safety in ECL. Driven from the very top of
the business, we are creating a positive safety culture for everyone that works for us.
Our robust Integrated Management System ensures that our operations are carried out
safely and efficiently in a sustainable way to deliver exceptional quality to our clients.
Our system has been audited and certified to the following standards:
BS OHSAS 18001:2007 HEALTH AND SAFETY
ISO 14001:2015 ENVIRONMENTAL MANAGEMENT
ISO 9001:2015 QUALITY ASSURANCE
TECHNOLOGY AND
21 INNOVATION
Every project and client is different in its requirements, so we develop
project specific information that aligns to the employer’s information
requirements.
We work together with our clients to propose and develop new working
methods and project delivery innovations. Our teams are challenged to
bring added value to a project through strategic and innovative thinking at
every stage of the project’s delivery.
It’s this culture of innovative thinking and development that ensures we
continue to successfully deliver projects, stay ahead of the competition and
exceed our client’s expectations.
BE FEARLESS, EMBRACE &
DRIVE CHANGE
“ECL IS A
MOTIVATING,
POSITIVE &
SUCCESSFUL
WORKPLACE,
ENCOURAGING YOU
TO BE THE BEST YOU
CAN BE”
“ECL HAS GIVEN ME
THE OPPORTUNITY
TO CHANGE MY
CAREER PATH AFTER
COMPLETING A
BA HONOURS IN
EDUCATION”
24 TRAINING
Here at ECL we believe that every member of our growing team should strive to learn and develop
themselves in a working environment that is safe, supportive and dynamic.
We’re a strong believer in the training, support and GRADUATE & APPRENTICE SCHEMES
nurturing of our people. This allows us to bring out
the best in all our employees, creating a workforce As a leading specialist in civil engineering and
with longevity and commitment to their roles. groundworks, we know it’s essential to support
the future of our workforce to ensure we continue
PURSUE to lead and innovate. We offer a wide range of
GROWTH AND training and learning opportunities, including
LEARNING FOR apprenticeship schemes and graduate schemes for
ALL engineers and surveyors.
CASE STUDY
25 WIXAM VILLAGE PROJECT
RESIDENTIAL | £11,000,000
Wixams Village, built on the site of a World War II munitions depot, is to date the largest single strategic nfrastructure
development in Bedfordshire. The settlement provides 4,500 homes over a total of four villages, built on 384 hectares.
Each supported by schools, community buildings and Borough Council. In order to link existing Villages 2 & 4
generous landscaping for recreational use. Village together, we installed 8.5km of new storm drainage. The
3 includes the town centre and a rail link, offering a foul drainage network was more complex, with a detailed
direct connection to Bedford and London. The strategic existing sewer diversion placed prior to the installation of
infrastructure works have supported the layout, density 8km of new foul drainage. Due to the existing network of
and facilities of Village 3 whilst maintaining the design of a brooks and waterways, the scope included for the supply
traditional local market town. and installation of five pre-cast concrete culverts with
associated reinforced concrete headwalls. These works also
The Stage 1 infrastructure works have enabled the client included the diversion of the existing watercourses, in-situ
to sell the land parcels, includes in excess of 40,000m2 of Clipsham stone facework and vehicular and pedestrian
new carriageways which have been constructed under S38 restraint systems.
agreement with both Central Bedfordshire and Bedford
26 www.company.com
PROJECT CHALLENGES PROJECT OUTCOMES
As with all infrastructure schemes, we were working around Working with L&Q Estates presented an exciting new
numerous existing apparatus’, namely medium pressure chapter in the continuous growth for us at ECL. This large
gas mains and fibre networks, to install the storm and foul infrastructure project has showcased our ability to liaise with
networks while reducing the risk of harm to our operatives multiple stakeholders to ensure the smooth and on-time
by utilising in-house vacuum excavators. The Houghton delivery of a demanding project programme.
Conquest Sewer is the main foul sewer for the local village
of Houghton Conquest and runs through the development “I COULDN’T BE HAPPIER
and as part of our scope, is was diverted under the new WITH ECL’S PERFORMANCE
road network, with temporary diversions taking place prior ON THE WIXAMS VILLAGE 3
to the main diversion and eventual abandonment of the old RESIDENTIAL DEVELOPMENT.
sewer. Due to the sewer depth, we had to undertake in-situ IT’S CLEAR SAFETY AND THE
testing to ensure any historically contaminated material is QUALITY OF WORKMANSHIP
correctly handled, and the excavations backfilled with clean ARE ALWAYS ECL’S TOP
material taken from excavations elsewhere on site. PRIORITIES.”
Web design & development for Company Name 27
STEPHEN SAGE, PROJECT DIRECTOR AT LQ ESTATES
PRESERVING THE
WELLBEING OF OUR
PEOPLE
28 SOCIAL VALUES
We believe that every company has a responsibility to its customers, its people and the planet. We have
established policies and procedures in place to ensure that our business makes a positive impact.
NOMINATED CHARITIES SUSTAINABILITY
We regularly work with our charity partners, We have taken steps to ensure we carry out
carrying out fundraising activities and donating our business in an environmentally friendly and
time and resources to help deserving organisations. sustainable manner, as evidenced by our ISO
14001 accreditation.
SAFETY FOR ALL PROVIDING CAREERS LOCALLY
The safety and wellbeing of our employees, as well ECL understands that supporting communities
as anyone else on-site, is our top priority and we means more than just charity and community
invest extensively in education, tools and systems work. This is why we actively employ workers,
to help ensure that our activities are carried out in apprentices and graduates from local areas giving
a safe, responsible and faultless manner. our local workforce the chances they deserve.
30 www.company.com
30 LET’S TALK
ECL Civil Engineering are ready to answer any questions
you may have, and will work with you to provide
effective solutions for your next project.
Commercial Director: Michael Clorley
[email protected]
Principal Estimator: Daniel Crosk
[email protected]
Bid Manager: Alice Gosbee
[email protected]
ECL CIVIL ENGINEERING LTD
Vanquish House, Wolseley Road,
Kempston, Bedford, MK42 7EF
E: [email protected]
T: 01582 579812
Web design & development for Company Name 31
ECL CIVIL ENGINEERING LTD
OUR VISION
TO BE THE UK’S LEADING NAME IN CIVIL ENGINEERING, SETTING
LANDMARK HEALTH AND SAFETY RECORDS AND PARTNERING WITH
PIONEERS IN TECHNOLOGY TO OFFER WHAT NO OTHERS CAN.
ECL CIVIL ENGINEERING LTD
Vanquish House, Wolseley Road,
Kempston, Bedford, MK42 7EF
E: [email protected]
T: 01582 579812
eclcivils.co.uk